A super high-rise core tube structure steel concrete slab wall connection device
By using a device with electric push rods and servo motors in the installation of super high-rise core tube structural steel concrete panel walls, the problem of loose fit is solved, achieving a more stable installation and preventing falling off and unevenness.
Patent Information
- Application Number
- CN202211608224.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-14
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2042-12-14
AI Technical Summary
The existing technology is difficult to ensure tight fit when installing super-high-rise core-tube structural steel concrete slab walls, and the concrete adhesive material may overflow, resulting in unstable installation.
Using a device including a movable base, linear guide rail, sliding seat, guide seat, connecting splint, clamping connection mechanism and automatic alignment mechanism, the electric push rod drives the toggle part and the rotating groove rod to realize the clamping and fixation of the connecting splint. Prevent gaps from appearing, and perform automatic alignment and correction through servo motors and return springs.
It effectively avoids concrete overflow, improves the installation stability and tightness of super-high-rise core tube structural steel concrete slab walls, and prevents falling off and unevenness.
Smart Images

Figure CN115807551B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a super high-rise core tube structure steel concrete slab wall connection device. Background Art
[0002] Steel-concrete slab walls are building panels made of reinforced concrete materials. They are widely used in house construction and various engineering structures for manufacturing buildings. There are many types of reinforced concrete, among which super-high-rise core tube structure steel-concrete slab walls have stronger support and bearing capacity. In the prior art, when installing and connecting super-high-rise core tube structure steel-concrete slab walls, it is necessary to first apply concrete adhesive material on the wall surface, and then extrude the super-high-rise core tube structure steel-concrete slab walls so that the super-high-rise core tube structure steel-concrete slab walls are bonded to the wall surface. In this process, it is necessary to always maintain the bonding state of the super-high-rise core tube structure steel-concrete slab walls and the wall surface. However, when installing super-high-rise core tube structure steel-concrete slab walls in the prior art, it is difficult to ensure that there are no gaps between the super-high-rise core tube structure steel-concrete slab walls during reinforcement and bonding. Concrete adhesive material may overflow from the gap, resulting in unstable bonding installation of the super-high-rise core tube structure steel-concrete slab walls.
[0003] Therefore, in order to solve the above problems, a super high-rise core tube structure steel concrete slab wall connection device is developed to improve the tightness of the steel concrete slab wall and make the installation more stable. Summary of the invention
[0004] In order to overcome the disadvantage that existing devices are difficult to ensure that there are no gaps between the steel-concrete slab walls of the super-high-rise core tube structure, concrete adhesive materials may overflow from the gaps, resulting in unstable bonding installation of the steel-concrete slab walls of the super-high-rise core tube structure, a super-high-rise core tube structure steel-concrete slab wall connection device is provided, which can improve the tightness of the steel-concrete slab wall fitting and make the installation more stable.
[0005] The technical solution of the present invention is: a super high-rise core tube structure steel concrete slab wall connection device, including a movable base, a first linear guide rail, a sliding seat, a guide seat, a connecting splint, a clamping connection mechanism and an automatic alignment mechanism, two first linear guide rails are connected to the top of the movable base, a sliding seat is slidably connected between the two first linear guide rails, six guide seats are connected to the top of the sliding seat, and two connecting splints are slidably connected to each guide seat. The sliding seat is provided with a clamping connection mechanism for assisting the connecting splint to automatically clamp and position the super high-rise core tube structure steel concrete slab wall, and the movable base is provided with an automatic alignment mechanism for driving the sliding seat to automatically align the movement.
[0006] Furthermore, the clamping connection mechanism includes an electric push rod, a second linear guide, a toggle member, a mounting bracket, a rotating disk, a connecting member and a rotating slot rod. The electric push rod is connected to the upper front side of the sliding seat by bolts, the second linear guide is connected to the middle position of the top of the sliding seat, the second linear guide is slidably connected to a toggle member, the telescopic end of the electric push rod is connected to the toggle member, six mounting brackets are connected to the top of the sliding seat, the mounting brackets are rotatably connected to the rotating disk, the front side of the rotating disk is connected to a rotating slot rod, the rotating slot rod is slidably connected to the toggle member, the front side of the connecting splint is rotatably connected to a connecting member, and the connecting members are rotatably connected to the corresponding rotating disk.
[0007] Furthermore, the automatic alignment mechanism includes a servo motor, a connecting bracket, a screw and a connecting seat. The servo motor is connected to the upper front side of the movable base by bolts, the connecting bracket is connected to the top of the movable base, the screw is connected to the output shaft of the servo motor, and the connecting seat is connected to the lower part of the sliding seat.
[0008] Furthermore, it also includes an anti-loosening mechanism for preventing the super-high-rise core tube structure steel concrete slab wall from falling off. The anti-loosening mechanism includes a mounting frame, a rotating shaft, a connecting frame and an anti-loosening plate. The mounting frame is connected between the upper sides of the left and right parts of the sliding seat, and the rotating shaft is rotatably connected between the sides of the mounting frames that are close to each other. The anti-loosening plates are connected to the rotating shafts, and three connecting frames are evenly connected to the toggle member.
[0009] Furthermore, it also includes a reinforcement mechanism for improving the stability of the support of the super-high-rise core tube structure steel concrete slab wall, the reinforcement mechanism includes a sliding block, a reinforcement rod, a mounting column and a limit frame, two sliding blocks are slidingly connected to the upper front side of the movable base, the sliding blocks are rotatably connected to the reinforcement rods, the upper side of the sliding seat close to each other is connected to the mounting column, and the telescopic end of the electric push rod is connected to the limit frame.
[0010] Furthermore, it also includes an auxiliary alignment mechanism for supporting and aligning the lower part of the steel-concrete slab wall of the super-high-rise core tube structure. The auxiliary alignment mechanism includes an alignment member, a first return spring and a guide bracket. Two guide brackets are connected to the upper rear side of the movable base. The guide frames are slidably connected with alignment members, and two first return springs are connected between the alignment member and the guide bracket.
[0011] Furthermore, it also includes a correction mechanism for testing the flatness of the super-high-rise core tube structure steel concrete slab wall. The correction mechanism includes a guide block, a second reset spring and a photoelectric sensor. The left and right sides of the sliding seat are connected to the guide blocks, and the guide blocks are slidably connected to the photoelectric sensors. The second reset spring is connected between the photoelectric sensor and the guide block.
[0012] Furthermore, the mobile base is provided with a stabilizing screw rod which contacts the ground to improve stability, thereby preventing the mobile base from sliding.
[0013] Compared with the prior art, the present invention has the following advantages: 1. The present invention drives the toggle member to move through an electric push rod, so that the rotating slot rod drives the rotating disk to rotate, and then the connecting clamps clamp and fix the steel-concrete slab wall of the super-high-rise core tube structure, avoiding the formation of gaps between the steel-concrete slab walls of the super-high-rise core tube structure, resulting in concrete overflow during the installation process, resulting in reduced connection stability of the steel-concrete slab wall of the super-high-rise core tube structure.
[0014] 2. The present invention drives the connecting frame to move to the left through the toggle member, which causes the rotating shaft to rotate, thereby causing the anti-drop plate to rotate backward and support the super-high-rise core tube structure steel concrete slab wall, thereby preventing the super-high-rise core tube structure steel concrete slab wall from being loosely connected to the wall surface, causing the super-high-rise core tube structure steel concrete slab wall to fall off.
[0015] 3. The present invention supports and reinforces the sliding seat by means of a reinforcing rod, thereby improving the supporting effect on the super-high-rise core tube structure steel concrete slab wall, so that the super-high-rise core tube structure steel concrete slab wall and the wall surface are more firmly attached.
[0016] 4. The present invention irradiates the photoelectric sensor on the left side. If the photoelectric sensor on the right side receives infrared rays, it indicates that the steel-concrete slab wall of the super-high-rise core tube structure is in a flat state. If the photoelectric sensor on the right side does not receive infrared rays, it indicates that the steel-concrete slab wall of the super-high-rise core tube structure is in an uneven state. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is the first three-dimensional structural schematic diagram of the present invention.
[0018] Figure 2 It is a schematic diagram of the second three-dimensional structure of the present invention.
[0019] Figure 3 It is a three-dimensional structural schematic diagram of the tightening connection mechanism of the present invention.
[0020] Figure 4 It is a three-dimensional structural schematic diagram of the tightening connection mechanism of the present invention.
[0021] Figure 5 It is a schematic diagram of the enlarged structure of part A of the present invention.
[0022] Figure 6 It is a schematic diagram of the three-dimensional structure of the automatic alignment mechanism of the present invention.
[0023] Figure 7 It is a three-dimensional structural schematic diagram of the anti-loosening mechanism of the present invention.
[0024] Figure 8It is a schematic diagram of the three-dimensional structure of the reinforcement mechanism of the present invention.
[0025] Fig. 9 It is a schematic diagram of the three-dimensional structure of the auxiliary alignment mechanism of the present invention.
[0026] Fig.10 It is a schematic diagram of the three-dimensional structure of the deviation correction mechanism of the present invention.
[0027] Explanation of the accompanying drawings: 1. Mobile base, 2. First linear guide, 3. Sliding seat, 4. Guide seat, 5. Connecting splint, 6. Clamping connection mechanism, 61. Electric push rod, 62. Second linear guide, 63. Toggle member, 64. Mounting bracket, 65. Rotating disk, 66. Connecting member, 67. Rotating slot rod, 7. Automatic alignment mechanism, 71. Servo motor, 72. Connecting bracket, 73. Screw, 74. Connecting seat, 8. Anti-loosening mechanism, 81. Mounting frame, 82. Rotating shaft, 83. Connecting frame, 84. Anti-slip plate, 9. Reinforcement mechanism, 91. Sliding block, 92. Reinforcement rod, 93. Mounting column, 94. Limiting frame, 10. Auxiliary alignment mechanism, 101. Alignment member, 102. First return spring, 103. Guide bracket, 11. Correction mechanism, 111. Guide block, 112. Second return spring, 113. Photoelectric sensor. DETAILED DESCRIPTION
[0028] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0029] A super high-rise core tube structure steel concrete slab wall connection device, such as Figure 1 and Figure 2 As shown, it includes a movable base 1, a first linear guide rail 2, a sliding seat 3, a guide seat 4, a connecting splint 5, a clamping connection mechanism 6 and an automatic alignment mechanism 7. The movable base 1 is provided with a stabilizing screw that contacts the ground to improve stability and can prevent the movable base 1 from sliding. Two first linear guide rails 2 are connected to the top of the movable base 1. The first linear guide rails 2 are symmetrically distributed on the left and right. A sliding seat 3 is slidably connected between the two first linear guide rails 2. Six guide seats 4 are connected to the top of the sliding seat 3. Two connecting splints 5 are slidably connected to each guide seat 4. The connecting splints 5 on each guide seat 4 cooperate with each other to clamp and position the steel concrete slab wall of the super high-rise core tube structure. A clamping connection mechanism 6 is provided on the sliding seat 3 to assist the connecting splint 5 to automatically clamp and position the steel concrete slab wall of the super high-rise core tube structure. The movable base 1 is provided with an automatic alignment mechanism 7 to drive the sliding seat 3 to automatically align the movement.
[0030] When connecting the super-high-rise core tube structure steel-concrete slab wall, the device can be used to assist the installation and connection of the super-high-rise core tube structure steel-concrete slab wall. First, the movable base 1 is pushed close to the super-high-rise core tube structure steel-concrete slab wall, and then the automatic alignment mechanism 7 is started to make the sliding seat 3 automatically slide backward, so that the connecting clamps 5 are in contact with the super-high-rise core tube structure steel-concrete slab wall, and then the automatic alignment mechanism 7 is closed, and then the clamping connection mechanism 6 is started, so that the connecting clamps 5 clamp and fix the super-high-rise core tube structure steel-concrete slab wall, and the super-high-rise core tube structure steel-concrete slab wall is supported, so that the super-high-rise core tube structure steel-concrete slab wall can be stably installed and connected. After the installation and connection of the super-high-rise core tube structure steel-concrete slab wall is completed, the clamping connection structure is controlled so that the connecting clamps 5 no longer clamp the super-high-rise core tube structure steel-concrete slab wall.
[0031] like Figure 1-Figure 5 As shown, the clamping connection mechanism 6 includes an electric push rod 61, a second linear guide rail 62, a toggle member 63, a mounting bracket 64, a rotating disk 65, a connecting member 66 and a rotating groove rod 67. The upper front side of the sliding seat 3 is connected to the electric push rod 61 by bolts, the middle position of the top of the sliding seat 3 is connected to the second linear guide rail 62, the toggle member 63 is slidably connected to the second linear guide rail 62, the second linear guide rail 62 can slide and guide the toggle member 63, the telescopic end of the electric push rod 61 is connected to the toggle member 63, and the sliding seat 3 Six mounting brackets 64 are connected to the top, and a rotating disk 65 is rotatably connected to the mounting brackets 64. A rotating slot rod 67 is connected to the front side of the rotating disk 65. The rotating slot rod 67 is slidably connected to the toggle member 63. The sliding of the toggle member 63 can drive the rotating slot rod 67 to rotate. A connecting member 66 is rotatably connected to the front side of the connecting splint 5. The connecting members 66 are rotatably connected to the corresponding rotating disk 65. The rotation of the rotating disk 65 can drive the connecting member 66 to rotate, thereby causing the connecting splint 5 to slide.
[0032] When auxiliary installation is performed on the super-high-rise core tube structure steel-concrete slab wall, in order to avoid gaps between the super-high-rise core tube structure steel-concrete slab wall, the super-high-rise core tube structure steel-concrete slab wall can be fixed and clamped during the auxiliary installation process. First, the sliding seat 3 is pushed so that the sliding seat 3 is close to the super-high-rise core tube structure steel-concrete slab wall. After the connecting clamps 5 are in contact with the super-high-rise core tube structure steel-concrete slab wall, the electric push rod 61 is started. The movement of the telescopic end of the electric push rod 61 will cause the toggle member 63 to slide to the left, thereby pushing the rotating groove rod 67 to rotate clockwise, and then the rotating disk 65 rotates clockwise. As the rotating disk 65 starts to rotate clockwise, it will drive the connecting members 66 to rotate, thereby causing the connecting clamps 5 on each guide seat 4 to slide to the side close to each other, and clamp the super-high-rise core tube structure steel-concrete slab wall to avoid the super-high-rise core tube structure steel-concrete slab wall. Gaps appear between the board walls, resulting in concrete overflow during the installation process, which reduces the connection stability of the super-high-rise core tube structure steel-concrete board wall. When the installation is completed, the telescopic end of the electric push rod 61 is controlled to extend to the right and reset, so that the toggle member 63 slides to the right and resets. The toggle member 63 will drive the rotating slot rod 67 to rotate counterclockwise and reset, so that the rotating disk 65 drives the connecting member 66 to rotate and reset, so that the connecting clamps 5 no longer clamp and fix the super-high-rise core tube structure steel-concrete board wall. In summary, the electric push rod 61 drives the toggle member 63 to move, so that the rotating slot rod 67 drives the rotating disk 65 to rotate, so that the connecting clamps 5 clamp and fix the super-high-rise core tube structure steel-concrete board wall, avoiding gaps between the steel-concrete board walls of the super-high-rise core tube structure, resulting in concrete overflow during the installation process, which reduces the connection stability of the super-high-rise core tube structure steel-concrete board wall.
[0033] like Figure 1 , Figure 2 and Figure 6 As shown, the automatic alignment mechanism 7 includes a servo motor 71, a connecting bracket 72, a screw 73 and a connecting seat 74. The servo motor 71 is connected to the upper front side of the movable base 1 by bolts, and the connecting bracket 72 is connected to the top of the movable base 1. The output shaft of the servo motor 71 is set to face backward, and the screw 73 is connected to the output shaft of the servo motor 71. The screw 73 is rotatably connected to the connecting bracket 72. The lower part of the sliding base 3 is connected to the connecting seat 74, and the connecting seat 74 is threadedly connected to the screw 73.
[0034] Before auxiliary installation of the super-high-rise core tube structure steel-concrete slab wall, start the servo motor 71, and the output shaft of the servo motor 71 drives the screw rod 73 to rotate, so that the connecting seat 74 drives the sliding seat 3 to slide backward, so that the sliding seat 3 is close to the super-high-rise core tube structure steel-concrete slab wall, so that the connecting clamps 5 are in contact with the super-high-rise core tube structure steel-concrete slab wall, and then turn off the servo motor 71. When the super-high-rise core tube structure steel-concrete slab wall is installed, control the output shaft of the servo motor 71 to rotate in the opposite direction, so that the screw rod 73 drives the connecting seat 74 to move forward and reset, and then the sliding seat 3 slides forward and resets. In summary, the output shaft of the servo motor 71 drives the screw rod 73 to rotate, so that the sliding seat 3 slides automatically and approaches the super-high-rise core tube structure steel-concrete slab wall, so that the connecting clamps 5 are in contact with the super-high-rise core tube structure steel-concrete slab wall.
[0035] like Figure 1 , Figure 2 and Figure 7 As shown, it also includes an anti-loosening mechanism 8, which includes a mounting frame 81, a rotating shaft 82, a connecting frame 83 and an anti-slip plate 84. The mounting frame 81 is connected between the upper sides of the left and right parts of the sliding seat 3, and the rotating shaft 82 is rotatably connected between the sides of the mounting frames 81 that are close to each other. The rotating shafts 82 are all connected with anti-slip plates 84, and the anti-slip plates 84 can support the steel-concrete slab wall of the super-high-rise core tube structure, thereby preventing the steel-concrete slab wall of the super-high-rise core tube structure from falling off and loosening from the wall surface. Three connecting frames 83 are evenly connected to the toggle member 63, and the connecting frames 83 are all slidably connected to the rotating shaft 82. As the toggle member 63 drives the connecting frame 83 to move to the left, the rotating shaft 82 will rotate.
[0036] As the toggle member 63 slides to the left, the connecting frame 83 is driven to move to the left, and as the connecting frame 83 moves to the left, the rotating shaft 82 is driven to rotate backward, thereby causing the anti-slip plate 84 to rotate backward. When the connecting splint 5 contacts the super-high-rise core tube structure steel-concrete slab wall, the anti-slip plate 84 will also contact the super-high-rise core tube structure steel-concrete slab wall, thereby supporting the super-high-rise core tube structure steel-concrete slab wall, thereby making the super-high-rise core tube structure steel-concrete slab wall more firmly connected to the wall surface, avoiding the super-high-rise core tube structure steel-concrete slab wall from falling off. After the installation is completed, as the toggle member 63 slides to the right and resets, it will drive the connecting frame 83 to move to the right and reset, so that the rotating shaft 82 rotates forward and resets, and then the anti-drop plate 84 rotates forward and resets. At this time, the super-high-rise core tube structure steel concrete slab wall is no longer squeezed. In summary, by driving the connecting frame 83 to the left through the toggle member 63, the rotating shaft 82 rotates, and then the anti-drop plate 84 rotates backward, and supports the super-high-rise core tube structure steel concrete slab wall, thereby preventing the super-high-rise core tube structure steel concrete slab wall from being loosely connected to the wall, causing the super-high-rise core tube structure steel concrete slab wall to fall off.
[0037] like Figure 1 , Figure 2 and Figure 8 As shown, it also includes a reinforcement mechanism 9, which includes a sliding block 91, a reinforcement rod 92, a mounting column 93 and a limit frame 94. Two sliding blocks 91 are slidably connected to the upper front side of the mobile base 1. The sliding blocks 91 are symmetrically distributed on the left and right. The sliding blocks 91 are rotatably connected to the reinforcement rods 92. The sides of the upper part of the sliding seat 3 that are close to each other are connected to the mounting columns 93. The reinforcement rod 92 on the left is rotatably connected to the mounting column 93 on the left, and the reinforcement rod 92 on the right is rotatably connected to the mounting column 93 on the right. The limit frame 94 is connected to the telescopic end of the electric push rod 61, and the limit frame 94 can limit the sliding block 91.
[0038] When the support rail 91 is in the forward direction, the stopper 94 is moved to the left, and the stopper 94 is moved to the right, so that the support rail 91 is in the forward direction, and the stopper 94 is moved to the left, so that the support rail 91 is in the forward direction, and the stopper 94 is moved to the right, so that the support rail 91 is in the forward direction, and the stopper 94 is moved to the right, so that the support rail 91 is in the forward direction, and the stopper 94 is moved to the right, so that the support rail 91 is in the forward direction, and the stopper 94 is moved to the right, so that the support rail 91 is in the forward direction, and the stopper 94 is moved to the right, so that the support rail 91 is in the forward direction, and the stopper 94 is moved to the right, so that the support rail 91 is in the forward direction, and the stopper 94 is moved to the right, so that the support rail 91 is in the forward direction, and the stopper 94 is moved to the right, so that the support rail 91 is in the forward direction, and the stopper 94 is moved to the right, so that the support rail 91 is in the forward direction, and the stopper 94 is moved to the right, so that the support rail 91 is moved to the
[0039] like Figure 1 , Figure 2 and Fig. 9 As shown, an auxiliary alignment mechanism 10 is also included, and the auxiliary alignment mechanism 10 includes an alignment member 101, a first return spring 102 and a guide bracket 103. Two guide brackets 103 are connected to the upper rear side of the mobile base 1, and the guide brackets 103 are symmetrically distributed. The guide brackets are slidably connected with the alignment members 101, and the alignment members 101 can support and align the lower part of the steel concrete slab wall of the super high-rise core tube structure. Two first return springs 102 are connected between the alignment member 101 and the guide bracket 103, and the first return springs 102 are wound on the alignment member 101. The front end of the first return spring 102 is connected to the guide bracket 103, and the rear end of the first return spring 102 is connected to the alignment member 101.
[0040] As the moving base 1 approaches the super-high-rise core tube structure steel-concrete slab wall, the positioning parts 101 will contact the lower part of the super-high-rise core tube structure steel-concrete slab wall, so that the positioning parts 101 will slide forward and the first return springs 102 will be compressed. At this time, the positioning parts 101 cooperate with the first return springs 102 to support and align the lower part of the super-high-rise core tube structure steel-concrete slab wall. When the super-high-rise core tube structure steel-concrete slab wall is installed, as the moving base 1 moves away from the super-high-rise core tube structure steel-concrete slab wall, the positioning parts 101 are no longer squeezed. Under the action of the first return springs 102, the positioning parts 101 will slide backward and reset. In summary, through the cooperation between the positioning parts 101 and the first return springs 102, the lower part of the super-high-rise core tube structure steel-concrete slab wall is supported and aligned, so that the super-high-rise core tube structure steel-concrete slab wall and the wall surface fit more firmly.
[0041] like Figure 1 , Figure 2 and Fig.10 As shown, a correction mechanism 11 is also included, and the correction mechanism 11 includes a guide block 111, a second return spring 112 and a photoelectric sensor 113. The left and right sides of the sliding seat 3 are connected with guide blocks 111, and the guide blocks 111 are slidably connected with photoelectric sensors 113. The photoelectric sensors 113 are used to detect the flatness of the steel concrete slab wall of the super high-rise core tube structure. A second return spring 112 is connected between the photoelectric sensor 113 and the guide block 111, and the front end of the second return spring 112 is connected to the photoelectric sensor 113, and the rear end of the second return spring 112 is connected to the photoelectric sensor 113, and the second return spring 112 is wound around the photoelectric sensor 113.
[0042] After the super high-rise core tube structure steel concrete slab wall is installed, it is necessary to detect the flatness of the super high-rise core tube structure steel concrete slab wall. At this time, as the photoelectric sensors 113 are in contact with the super high-rise core tube structure steel concrete slab wall, the photoelectric sensors 113 will be squeezed and slide forward, and the second reset springs 112 will be stretched. At this time, the photoelectric sensors 113 on the left are irradiated with infrared rays. If the super high-rise core tube structure steel concrete slab wall is not flat at this time, the photoelectric sensor 113 on the right cannot receive the signal. If the super high-rise core tube structure steel concrete slab wall is flat, the photoelectric sensor on the right 113 will receive a signal. When the installation of the super-high-rise core tube structure steel-concrete slab wall is completed, as the photoelectric sensor 113 loses contact with the super-high-rise core tube structure steel-concrete slab wall, under the action of the second reset spring 112, the photoelectric sensor 113 will slide backward and reset. In summary, by irradiating the photoelectric sensor 113 on the left, if the photoelectric sensor 113 on the right receives infrared rays, it indicates that the super-high-rise core tube structure steel-concrete slab wall is in a flat state at this time. If the photoelectric sensor 113 on the right does not receive infrared rays, it indicates that the super-high-rise core tube structure steel-concrete slab wall is in an uneven state at this time.
[0043] The above is a detailed introduction to the present application. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method of the present application and its core idea. At the same time, for general technical personnel in this field, according to the idea of the present application, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as a limitation on the present application.
Claims
1. A super high-rise core tube structure steel concrete slab wall connection device, comprising a movable base (1), a first linear guide rail (2), a sliding seat (3), a guide seat (4) and a connecting clamp (5), wherein two first linear guide rails (2) are connected to the top of the movable base (1), a sliding seat (3) is slidably connected between the two first linear guide rails (2), six guide seats (4) are connected to the top of the sliding seat (3), and two connecting clamps (5) are slidably connected to each guide seat (4), wherein: It also includes a clamping connection mechanism (6) and an automatic alignment mechanism (7); the sliding seat (3) is provided with a clamping connection mechanism (6) for assisting the connection clamping plate (5) to automatically clamp and position the super-high-rise core tube structure steel concrete slab wall; the moving base (1) is provided with an automatic alignment mechanism (7) for driving the sliding seat (3) to automatically align and move; The clamping connection mechanism (6) comprises an electric push rod (61), a second linear guide rail (62), a toggle member (63), a mounting bracket (64), a rotating disk (65), a connecting member (66) and a rotating slot rod (67). The electric push rod (61) is connected to the upper front side of the sliding seat (3) by bolts, the middle position of the top of the sliding seat (3) is connected to the second linear guide rail (62), the toggle member (63) is slidably connected to the second linear guide rail (62), and the electric push rod ( 61) The telescopic end is connected to the toggle member (63), the top of the sliding seat (3) is connected to six mounting brackets (64), the mounting brackets (64) are all rotatably connected to a rotating disk (65), the front side of the rotating disk (65) is connected to a rotating groove rod (67), the rotating groove rod (67) is slidably connected to the toggle member (63), the front side of the connecting splint (5) is rotatably connected to a connecting member (66), and the connecting member (66) is rotatably connected to the corresponding rotating disk (65); The automatic alignment mechanism (7) comprises a servo motor (71), a connecting bracket (72), a screw rod (73) and a connecting seat (74); the upper front side of the movable base (1) is connected to the servo motor (71) by bolts; the top of the movable base (1) is connected to the connecting bracket (72); the output shaft of the servo motor (71) is connected to the screw rod (73); and the lower part of the sliding base (3) is connected to the connecting seat (74); The invention also comprises an anti-loosening mechanism (8) for preventing the super high-rise core tube structure steel concrete slab wall from falling off. The anti-loosening mechanism (8) comprises a mounting frame (81), a rotating shaft (82), a connecting frame (83) and an anti-loosening plate (84). The mounting frame (81) is connected between the upper sides of the left and right parts of the sliding seat (3). The rotating shaft (82) is rotatably connected between the sides of the mounting frame (81) that are close to each other. The anti-loosening plates (84) are connected to the rotating shafts (82). The toggle member (63) is evenly connected to three connecting frames (83).
2. The super high-rise core tube structure steel concrete slab wall connection device according to claim 1 is characterized by: The invention also comprises a reinforcement mechanism (9) for improving the support stability of the steel concrete slab wall of the super high-rise core tube structure. The reinforcement mechanism (9) comprises a sliding block (91), a reinforcement rod (92), a mounting column (93) and a limit frame (94). Two sliding blocks (91) are slidably connected to the upper front side of the movable base (1). The sliding blocks (91) are rotatably connected to the reinforcement rod (92). The upper side of the sliding seat (3) close to each other is connected to the mounting column (93). The telescopic end of the electric push rod (61) is connected to the limit frame (94).
3. The super high-rise core tube structure steel concrete slab wall connection device according to claim 1 is characterized by: The invention also comprises an auxiliary alignment mechanism (10) for supporting and aligning the lower part of the super high-rise core tube structure steel concrete slab wall. The auxiliary alignment mechanism (10) comprises an alignment member (101), a first return spring (102) and a guide bracket (103). Two guide brackets (103) are connected to the upper rear side of the movable base (1). The guide brackets are slidably connected to the alignment member (101). Two first return springs (102) are connected between the alignment member (101) and the guide bracket (103).
4. The super high-rise core tube structure steel concrete slab wall connection device according to claim 1 is characterized by: The invention also comprises a deviation correction mechanism (11) for testing the flatness of a super high-rise core tube structure steel concrete slab wall. The deviation correction mechanism (11) comprises a guide block (111), a second return spring (112) and a photoelectric sensor (113). The left and right sides of the sliding seat (3) are both connected with the guide blocks (111). The guide blocks (111) are both slidably connected with the photoelectric sensors (113). The second return spring (112) is connected between the photoelectric sensor (113) and the guide block (111).
5. The super high-rise core tube structure steel concrete slab wall connection device according to claim 1 is characterized by: The mobile base (1) is provided with a stabilizing screw rod which contacts the ground to improve stability, thereby preventing the mobile base (1) from sliding.