Device for efficiently preparing refractory metal coating on the inner and outer surfaces of engine thrust chamber
By designing a device that includes a precursor sublimation device and a reaction chamber, the problem of low preparation efficiency of refractory metal coatings on the internal and external surfaces of the engine thrust chamber body is solved, achieving efficient and uniform coating preparation, reducing manufacturing costs, and providing a new The engine provides engineering application support.
Patent Information
- Application Number
- CN202211296989.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-10-21
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2042-10-21
AI Technical Summary
It is difficult to efficiently prepare a uniform thickness of refractory metal coating on the internal and external surfaces of the engine thrust chamber body simultaneously with the existing technology, resulting in complex processes, long production cycles, low efficiency and high manufacturing costs.
A device including a precursor sublimation device, a reaction chamber, a rotating motor, an air intake carrier and a vacuum system was designed. Through multi-station design and magnetic fluid sealing connection, the coating was integrated on the internal and external surfaces of the thrust chamber body, using The carrier gas cylinder and condensation filter device control the deposition thickness and gas flow, reducing processing difficulty and gas leakage.
Efficient preparation of coatings with uniform thickness on the inner and outer surfaces of the thrust chamber body is achieved, with a deposition thickness deviation of no more than 15%, which improves preparation efficiency, reduces manufacturing costs, and provides engineering application guarantee for new rail/attitude control engines.
Smart Images

Figure CN115821209B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of manufacturing aerospace engine thrust chamber body, and in particular to a device for efficiently preparing refractory metal coatings on the inner and outer surfaces of an engine thrust chamber body. Background Art
[0002] Low-thrust bipropellant liquid rocket engines are mainly used for attitude adjustment and orbit control of spacecraft. The fuel combustion temperature in the body of the engine thrust chamber is as high as 2700°C. After the inner wall liquid film cooling technology is adopted, the inner wall temperature is still higher than 1000°C. In order to meet the high-temperature strength requirements of the engine thrust chamber, refractory metals (W, Mo, Ta, Nb, Re, etc.) or platinum metal must be used as the body material, but these materials have poor high-temperature oxidation resistance. For example, niobium alloys will undergo catastrophic oxidation above 600°C and cannot directly cope with the high-temperature oxygen-rich environment during combustion. Therefore, high-temperature anti-oxidation coatings must be applied to the inner and outer surfaces of the body material for protection.
[0003] The technology of high-temperature anti-oxidation coating on the surface of refractory metals began in the 1950s, and has formed a variety of material systems. The main types of coatings that have been applied in models include: niobium-hafnium alloy coated with silicide coating, niobium-tungsten alloy coated with silicide coating, niobium-tungsten alloy coated with molybdenum disilicide coating and rhenium coated with iridium coating. The preparation process of silicide coating is slurry sintering, the preparation process of molybdenum disilicide coating is physical vapor deposition of molybdenum layer + vacuum infiltration silicide, and the preparation process of iridium coating is physical vapor deposition.
[0004] The process characteristics of physical vapor deposition determine that the coating cannot be deposited on the inner and outer surfaces of the body at the same time. Moreover, even if the coating is only deposited on the inner surface of the body, a coating with uniform thickness can only be obtained by multiple depositions in sections, which greatly increases the complexity of the coating preparation process, resulting in a long product production cycle, low efficiency, and high manufacturing costs. Summary of the invention
[0005] The present application provides a device for efficiently preparing coatings on the inner and outer surfaces of an engine thrust chamber body, the purpose of which is to achieve integrated preparation of coatings with uniform thickness on the inner and outer surfaces of the thrust chamber body, effectively improve the preparation efficiency of the coating, and reduce the manufacturing cost. The device involved in the present invention is of great significance for the engineering application of a new type of engine thrust chamber body.
[0006] In a first aspect, a device for preparing a coating on a thrust chamber body is provided, comprising:
[0007] A precursor sublimation device, wherein the precursor sublimation device is used to provide a precursor gas;
[0008] A reaction chamber, wherein the reaction chamber and the precursor sublimation device are connected via an air inlet pipeline;
[0009] An air intake bearing, the air intake bearing is used to carry a workpiece in the reaction chamber, the air intake bearing has a ventilation inner cavity, and the ventilation inner cavity is arranged opposite to the inner cavity of the workpiece;
[0010] A rotary motor, the rotary motor is used to rotate the workpiece;
[0011] The reaction chamber is provided with a workbench, the workbench has a workbench opening sealedly connected to the rotating motor, the rotating motor is assembled with the fixed end of the air intake bearing around the workbench opening, and the fixed end is located on a side of the air intake bearing away from the workpiece;
[0012] The air inlet bearing member has an air vent opening communicating with the air vent inner cavity, and the precursor gas from the air inlet pipeline enters the inner cavity of the workpiece through the air vent opening and the air vent inner cavity.
[0013] Compared with the prior art, the solution provided by this application includes at least the following beneficial technical effects:
[0014] The present application proposes a device for efficiently preparing coatings on the inner and outer surfaces of an engine thrust chamber body, which realizes the integrated preparation of coatings with uniform thickness on the inner and outer surfaces of the thrust chamber body. The deviation of the deposited coating thickness is no more than 15% of the total thickness, which effectively improves the coating preparation efficiency, reduces the manufacturing cost, and provides capability guarantee for the engineering application of new track / attitude control engines.
[0015] In combination with the first aspect, in certain implementations of the first aspect, the ventilation opening is provided at the fixed end.
[0016] In addition to the hole for installing the motor, the fixed end is also provided with a ventilation opening, so that the side wall of the air intake bearing member does not need to be processed with a through hole, which is beneficial to reducing the difficulty of processing the air intake bearing member.
[0017] In combination with the first aspect, in certain implementations of the first aspect, the ventilation opening is arranged opposite to the air intake pipeline.
[0018] The ventilation opening is arranged in a position that matches the flow direction of the precursor gas, so as to facilitate the precursor gas to flow into the inner cavity of the workpiece.
[0019] In combination with the first aspect, in certain implementations of the first aspect, the workbench is provided with an avoidance trough, the bottom of the avoidance trough is provided with the workbench opening, the mover end of the rotating motor extends into the avoidance trough and is assembled with the air intake bearing member, the side wall of the avoidance trough is provided with a trough vent, and the trough vent is communicated with the air intake pipeline.
[0020] The avoidance trough is provided to prevent the rotation of the gas inlet bearing from interfering with the components in the reaction chamber. The cavity formed by the avoidance trough can also be used to evenly mix the carrier gas and the precursor gas so that the mixed gas entering the workpiece cavity meets the coating preparation requirements.
[0021] In combination with the first aspect, in certain implementations of the first aspect, the device further includes a trough cover, the outer periphery of the trough cover cooperates with the opening of the avoidance trough, the trough cover has a cover through hole in the center, and the air intake bearing member passes through the cover through hole.
[0022] Reduce the overflow of precursor gas, so that more precursor gas can enter the reaction chamber through the inner cavity of the workpiece first. For workpieces of different sizes and shapes, different specifications of air inlet bearings and sink covers can be selected, so that the device provided in the embodiment of the present application can be adapted to various types of workpieces.
[0023] In combination with the first aspect, in certain implementations of the first aspect, the rotating motor is connected to the workbench opening via a magnetic fluid seal.
[0024] This helps to avoid gas leakage.
[0025] In combination with the first aspect, in some implementations of the first aspect, the device includes a plurality of the workbenches, and the number of the workbenches is 3 to 6.
[0026] The present invention has achieved a breakthrough in the integrated preparation technology of the inner and outer surface coatings of the engine thrust chamber body, and through a multi-station design, it has achieved the integrated deposition of functional coatings on multiple workpieces at the same time, greatly improving the deposition efficiency, reducing production costs, and providing capability guarantee for the engineering application of new track / attitude control engines.
[0027] In combination with the first aspect, in certain implementations of the first aspect, a plurality of exhaust channels are further arranged around the workbench, and the number of the plurality of exhaust channels is 10 to 20.
[0028] The exhaust channels are evenly arranged around the workbench, which is beneficial to improving the exhaust efficiency.
[0029] In combination with the first aspect, in some implementations of the first aspect, the device further includes an induction heating device, and the induction heating device is used to heat the workpiece.
[0030] In combination with the first aspect, in certain implementations of the first aspect, the device further includes a carrier gas cylinder, a condenser, a filter, a molecular pump, a dry pump, an exhaust gas treatment device, a vacuum system, and an electronic control system;
[0031] The carrier gas cylinder is used to provide carrier gas, the carrier gas cylinder is connected to the gas inlet of the precursor sublimation device through a first pipeline, and the carrier gas cylinder is connected to the gas inlet of the reaction chamber through a second pipeline;
[0032] The gas outlet of the precursor sublimation device and the gas inlet of the reaction chamber are connected through a third pipeline, the third pipeline merges with the second pipeline, and a heating belt is wound around the portion of the second pipeline connected to the gas inlet of the reaction chamber and the outside of the third pipeline;
[0033] The reaction chamber gas outlet and the condenser are connected via a fourth pipeline, and a heating belt is wound around the outside of the fourth pipeline;
[0034] The condenser and the filter are connected via a fifth pipeline;
[0035] The condenser and the molecular pump are connected via a sixth pipeline, and the sixth pipeline merges with the fifth pipeline;
[0036] The molecular pump is connected to the dry pump via a seventh pipeline;
[0037] The filter is connected to the dry pump via an eighth pipeline;
[0038] The dry pump and the exhaust gas treatment device are connected via a ninth pipeline. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 A schematic structural diagram of an apparatus for preparing a coating on a thrust chamber body provided in an embodiment of the present application.
[0040] Figure 2 A schematic structural diagram of a reaction chamber provided in an embodiment of the present application.
[0041] Figure 3 A schematic structural diagram of a reaction chamber provided in an embodiment of the present application. DETAILED DESCRIPTION
[0042] The present application is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0043] Figure 1 It is a schematic structural diagram of a device for preparing a coating on a thrust chamber body provided in an embodiment of the present application.
[0044] A device for efficiently preparing coatings on the inner and outer surfaces of an engine thrust chamber body, the device comprising a carrier gas cylinder, a precursor sublimation device, a reaction chamber, a rotating motor, an air intake / exhaust pipeline, a condensation filter device, an exhaust gas treatment device, a vacuum system and an electronic control system.
[0045] The carrier gas cylinder stores carrier gas, which is an inert gas, generally Ar gas. The carrier gas cylinder outputs two carrier gases, the first carrier gas enters the precursor sublimation device, and the second carrier gas enters the reaction chamber. The carrier gas cylinder is connected to the gas inlet of the precursor sublimation device through a first pipeline. Valve V1, vacuum gauge P1 and mass flow meter MFC-1 are installed on the first pipeline. The carrier gas cylinder is connected to the gas inlet of the reaction chamber through a second pipeline, and valve V2, vacuum gauge P2 and mass flow meter MFC-2 are installed on the second pipeline. Mass flow meter MFC-1 and mass flow meter MFC-2 are both used to control the flow rate of the inert gas output from the carrier gas cylinder.
[0046] The gas outlet of the precursor sublimation device and the gas inlet of the reaction chamber are connected through a third pipeline. The third pipeline can merge with the second pipeline. A valve V3 is installed on the third pipeline. The part of the second pipeline connected to the gas inlet of the reaction chamber and the outside of the third pipeline are wrapped with a heating belt and a heat preservation belt, which are used to heat and keep the third pipeline warm to prevent the sublimated precursor from condensing into a solid state and blocking the pipeline. The temperature setting depends on the precursor.
[0047] The precursor sublimation device stores the corresponding precursors required for the coating to be deposited. To avoid mutual contamination, one set of equipment can only deposit one coating. The corresponding sublimation temperature is set according to different precursors. During operation, the precursor bottle is heated by resistance heating to sublimate it into gas.
[0048] The reaction chamber is a hot wall chamber. During operation, the reaction chamber is kept warm to a certain temperature by resistance heating, and the temperature setting depends on the precursor. The workpieces in the reaction chamber are heated individually by induction heating, and the induction coil is connected to the electrode arranged on the wall of the reaction chamber. The reaction chamber can have a chassis, and a plurality of workpiece tables can be arranged on the chassis, and the plurality of worktables can be evenly distributed on a circumference. The number of the plurality of worktables is generally set to 3, 4 or 6.
[0049] Figure 2 and Figure 3 A schematic structural diagram of a reaction chamber provided in an embodiment of the present application is shown.
[0050] An air intake carrier is arranged in the reaction chamber. The air intake carrier can carry a workpiece. The air intake carrier can have a ventilation inner cavity, which is arranged opposite to the inner cavity of the workpiece, so as to facilitate the precursor gas to preferentially enter the reaction chamber through the inner cavity of the workpiece. A workbench opening can be arranged on the axis of the workpiece table, and the stator of the rotating motor can be sealed and connected to the workbench opening. The mover of the rotating motor can extend into the workbench opening and be assembled with the fixed end of the air intake carrier on the side away from the workpiece. Thereby, the air intake carrier can rotate driven by the motor and drive the workpiece to rotate. The sealing connection between the rotating motor and the workbench opening can be sealed by means of a magnetic fluid.
[0051] The air intake carrier has a ventilation opening, and the ventilation opening is used to input the precursor gas. The air intake pipeline in the reaction chamber is connected to the third pipeline, and the air intake pipeline can be arranged at the center of the bottom of the reaction chamber. The air intake pipeline can be divided into corresponding branches according to the number of workpiece platforms and transported to the ventilation opening of the air intake carrier. Thus, the precursor gas from the air intake pipeline enters the inner cavity of the workpiece through the ventilation inner cavity.
[0052] In some embodiments, the opening of the air intake line can be arranged on the workbench, and the ventilation opening of the air intake carrier can be arranged on a side of the air intake carrier away from the workpiece. The opening of the air intake line can be arranged opposite to the ventilation opening of the air intake carrier, so that when the gas flows out from the opening of the air intake line, it can directly enter the ventilation opening of the air intake carrier and enter the inner cavity of the workpiece through the ventilation inner cavity of the air intake carrier.
[0053] In other embodiments, Figure 2 As shown, the workbench can be provided with an avoidance trough. The air intake carrier can be arranged in the avoidance trough. When the air intake carrier rotates driven by the motor, the air intake carrier can be spaced apart from the side wall of the avoidance trough to avoid interference between the rotation of the air intake carrier and the components in the reaction chamber. The bottom wall or side wall of the avoidance trough can be provided with an opening for the air intake pipeline. The precursor gas can first enter the avoidance trough and then enter the reaction chamber through the inner cavity of the workpiece. The cavity formed by the avoidance trough can also be used to evenly mix the carrier gas and the precursor gas so that the mixed gas entering the inner cavity of the workpiece meets the coating preparation requirements. In this case, the ventilation opening of the air intake carrier can be set at the end or the side wall, as long as the ventilation opening of the air intake carrier is located in the avoidance trough.
[0054] In one possible case, the opening of the avoidance trough may be provided with a trough cover (not shown in the figure). The periphery of the trough cover may cooperate with the opening of the avoidance trough to reduce the overflow of the precursor gas, so that more precursor gas can first enter the reaction chamber through the inner cavity of the workpiece. The center of the trough cover may have a cover through hole. The contour of the cover through hole may be arranged around the air intake carrier to avoid the interference between the rotation of the air intake carrier and the trough cover. The outer contour of the air intake carrier located at the same horizontal plane as the cover through hole may be adapted to the contour of the cover through hole, which is conducive to further reducing the overflow of the precursor gas.
[0055] For workpieces of different sizes and shapes, air intake bearings and sink covers of different specifications can be selected so that the device provided in the embodiment of the present application can be adapted to various types of workpieces.
[0056] The workpiece stage may also be evenly distributed with exhaust pipes of the reaction chamber. In some embodiments, the number of exhaust pipes around each workpiece stage is 12, 18 or 20, which are connected to the fourth pipe after being collected.
[0057] During operation, the reaction gas with precursor flows in from the bottom of the inner wall of the workpiece, flows through the inner wall of the workpiece and flows out from the top of the inner wall, then flows through the outer surface of the workpiece, and finally flows out of the reaction chamber from the exhaust pipe at the bottom of the reaction chamber. During operation, by adjusting the opening of the butterfly valve, the values of MFC-1 and MFC-2, and the sublimation temperature of the precursor, the reaction gas pressure and the precursor concentration are controlled to achieve control of the consistency of the thickness of the deposited coating.
[0058] The reaction chamber outlet and the condenser are connected through the fourth pipeline. A valve V4 is installed on the fourth pipeline. A heating belt and a heat preservation belt are wrapped around the outside of the fourth pipeline to heat and insulate the fourth pipeline to prevent the sublimated precursor from condensing into a solid state and blocking the pipeline. The temperature setting depends on the precursor.
[0059] The condenser and the filter are connected through the fifth pipeline, on which valves V5 and V8 are installed. The condensation and filtration device is used to cool the unreacted precursor in the exhaust gas, and the precursor is filtered and stored in the filter for subsequent treatment or reuse, thereby protecting the dry pump.
[0060] The condenser and the molecular pump are connected via a sixth pipeline, which can be joined to the fifth pipeline between valves V5 and V8. A valve V7 is installed on the sixth pipeline.
[0061] The molecular pump is connected to the dry pump through a seventh pipeline, and a valve V6 is installed on the seventh pipeline.
[0062] The filter is connected to the dry pump through the eighth pipeline, and a vacuum gauge P3, a butterfly valve and a valve V9 are installed on the eighth pipeline.
[0063] The dry pump and the exhaust gas treatment device are connected through a ninth pipeline, on which a one-way valve and a valve V10 are installed.
[0064] The tail gas treatment device is used to treat harmful gases in the tail gas by water washing to ensure that the tail gas emissions meet the requirements of relevant national and local emission standards. The tail gas treated by the tail gas treatment device is discharged through the tenth pipeline, and the tenth pipeline is equipped with an exhaust gas concentration detector.
[0065] The method for preparing a coating using the device comprises the following steps:
[0066] (1) The refractory metal coating is a rhenium coating, an iridium coating and a molybdenum coating, the precursor for depositing the rhenium coating is rhenium pentachloride; the precursor for depositing the iridium coating is iridium acetylacetonate or iridium trichloride; the precursor for depositing the molybdenum coating is molybdenum tetrachloride; the precursor corresponding to the deposited refractory metal coating is loaded into a precursor sublimation device;
[0067] (2) placing the workpiece to be deposited on a workpiece table in the reaction chamber, the workpiece table being connected to a motor, and when the motor rotates, the workpiece table can be driven to rotate, thereby causing the workpiece on which the coating is to be deposited to rotate;
[0068] (3) Before coating deposition begins, ensure that all valves and butterfly valves are in the closed state;
[0069] (4) heating the reaction chamber to a certain temperature and then maintaining it at that temperature. The heating temperature of the reaction chamber varies with the precursor. When the precursor is rhenium pentachloride, the heating temperature of the reaction chamber is 250-300°C; when the precursor is iridium acetylacetonate, the heating temperature of the reaction chamber is 150-200°C; when the precursor is iridium trichloride, the heating temperature of the reaction chamber is 300-380°C; when the precursor is molybdenum tetrachloride, the heating temperature of the reaction chamber is 280-350°C;
[0070] (5) Open valve V10 in sequence, and then dry pump, V6, molecular pump, V7, V5, and V4 to evacuate. When the vacuum gauge P2 shows less than 1 mbar, open valve V3 to continue evacuating. When the vacuum gauges P1 and P2 show less than 1 mbar again, close valves V7, molecular pump, and V6 in sequence, open valves V9, butterfly valve, and V8, and adjust the butterfly valve opening to 100% to continue evacuating. When the vacuum gauge P3 shows less than 10 Pa, open valve V2, and open MFC-2 to input a certain amount of load. Gas, by adjusting the MFC-2 reading and the butterfly valve opening, the vacuum degree of the reaction chamber is within a certain range. The vacuum degree of the reaction chamber varies with the precursor. When the precursor is rhenium pentachloride, the vacuum degree of the reaction chamber is 50-150mbar; when the precursor is iridium acetylacetonate, the vacuum degree of the reaction chamber is 30-50mbar; when the precursor is iridium trichloride, the vacuum degree of the reaction chamber is 100-200mbar; when the precursor is molybdenum tetrachloride, the vacuum degree of the reaction chamber is 150-300mbar;
[0071] (6) Turn on the motor to drive the workpiece to be deposited to rotate at a rate of 10-20 r / min;
[0072] (7) The workpiece to be deposited in the reaction chamber is heated by induction heating. When the temperature of the workpiece to be deposited reaches the set temperature, the third pipeline and the fourth pipeline are heated to a certain temperature by the heating belt, the precursor in the precursor sublimation device is heated, and the exhaust gas concentration detector is turned on; during deposition, the heating temperature of the third pipeline and the fourth pipeline and the workpiece temperature vary with the precursor. When the precursor is rhenium pentachloride, the heating temperature of the third pipeline and the fourth pipeline is 250-300°C, and the workpiece temperature is The temperature of the third and fourth pipelines is 1250-1400°C; when the precursor is iridium acetylacetonate, the heating temperature of the third and fourth pipelines is 150-200°C, and the temperature of the workpiece is 750-1000°C; when the precursor is iridium trichloride, the heating temperature of the third and fourth pipelines is 300-380°C, and the temperature of the workpiece is 1100-1250°C; when the precursor is molybdenum tetrachloride, the heating temperature of the third and fourth pipelines is 280-350°C, and the temperature of the workpiece is 1200-1300°C;
[0073] (8) Open valve V1, adjust the readings of MFC-1 and MFC-2, and start to deposit the refractory metal coating after the precursor temperature is heated to the set temperature. The heating temperature of the precursor varies with the precursor. When the precursor is rhenium pentachloride, the heating temperature of the precursor is 180-260°C; when the precursor is iridium acetylacetonate, the heating temperature of the precursor is 110-150°C; when the precursor is iridium trichloride, the heating temperature of the precursor is 220-300°C; when the precursor is molybdenum tetrachloride, the heating temperature of the precursor is 240-280°C;
[0074] (9) when the deposition time reaches a predetermined value, the induction heating is turned off and the resistance heating in the precursor sublimation device is turned off;
[0075] (10) After the workpiece temperature drops below 600°C and the precursor temperature drops below 80°C, close MFC-1, valves V1 and V3 in sequence, and adjust the MFC-2 reading;
[0076] (11) Turn off the heating of the third pipeline and the fourth pipeline;
[0077] (12) When the temperature of the third pipeline and the fourth pipeline drops below 80°C, MFC-2, valves V2, V4, V5, V8, butterfly valve, V9 and V10 are closed in sequence, and the opening of the butterfly valve is adjusted to 0, thus ending the coating deposition;
[0078] (13) Turn off the exhaust gas treatment device.
[0079] Example 1
[0080] The present invention proposes a device for efficiently preparing coatings on the inner and outer surfaces of an engine thrust chamber body, the device comprising a carrier gas cylinder, a precursor sublimation device, a reaction chamber, a rotating motor, an air intake / exhaust pipeline, a condensation filter device, an exhaust gas treatment device, a vacuum system and an electronic control system;
[0081] The carrier gas cylinder stores carrier gas, which is an inert gas, generally Ar gas;
[0082] The mass flow meter is used to control the flow rate of the inert gas output from the carrier gas cylinder;
[0083] The precursor sublimation device stores the corresponding precursors required for the coating to be deposited. To avoid mutual contamination, one set of equipment can only deposit one coating. The corresponding sublimation temperature is set according to different precursors. During operation, the precursor bottle is heated by resistance heating to sublimate it into a gaseous state.
[0084] The reaction chamber is a hot wall chamber. When working, the reaction chamber is kept warm to a certain temperature by resistance heating. The temperature setting depends on the precursor. The workpiece tables in the reaction chamber are evenly distributed on a circumference, and generally 3, 4 or 6 workpiece tables are set. The workpiece table realizes the rotation of the workpiece through a rotating motor, and the connection between the rotating motor and the reaction chamber is sealed by a magnetic fluid. The workpiece in the reaction chamber is heated separately by induction heating, and the induction coil is connected to the electrode set on the wall of the reaction chamber. The air intake pipeline in the reaction chamber connected to the third pipeline is set at the center of the bottom of the reaction chamber, and the corresponding branches are separated according to the number of workpiece tables and transported to the bottom of the workpiece; the exhaust pipes in the reaction chamber are evenly distributed around the workpiece table, and the number of exhaust pipes around each workpiece table is 12, 18 or 20, which are connected to the fourth pipe after being collected. When working, the reaction gas with the precursor flows in from the bottom of the inner wall of the workpiece, flows out from the top of the inner wall after passing through the inner wall of the workpiece, then flows through the outer surface of the workpiece, and finally flows out of the reaction chamber from the exhaust pipe at the bottom of the reaction chamber. During operation, the thickness consistency of the deposited coating is controlled by adjusting the butterfly valve opening, the values of MFC-1 and MFC-2, and the precursor sublimation temperature to control the reaction gas pressure and precursor concentration.
[0085] The air inlet / exhaust pipeline connects the various components of the equipment. Some pipelines need to be maintained at a certain temperature through resistance heating during operation to prevent the sublimated precursor from condensing into a solid state and blocking the pipeline. The temperature setting depends on the precursor.
[0086] The condensation filtration device is used to cool the unreacted precursor in the exhaust gas, and the unreacted precursor is filtered and stored in the filter for subsequent processing or reuse, thereby protecting the dry pump.
[0087] The tail gas treatment device is used to treat harmful gases in the tail gas by water washing to ensure that the tail gas emissions meet the requirements of relevant national and local emission standards;
[0088] The carrier gas cylinder outputs two carrier gas paths. The first carrier gas path is connected to the gas inlet of the precursor sublimation device through a first pipeline, and a valve V1, a vacuum gauge P1 and a mass flow meter MFC-1 are installed on the first pipeline; the second carrier gas path is connected to the reaction chamber through a second pipeline, and a valve V2, a vacuum gauge P2 and a mass flow meter MFC-2 are installed on the second pipeline;
[0089] The gas outlet of the precursor sublimation device and the gas inlet of the reaction chamber are connected through a third pipeline, a valve V3 is installed on the third pipeline, and a heating belt and a heat preservation belt are wrapped around the outside of the third pipeline for heating and heat preservation of the third pipeline;
[0090] The reaction chamber gas outlet and the condenser are connected through a fourth pipeline, a valve V4 is installed on the fourth pipeline, and a heating belt and a heat preservation belt are wrapped around the outside of the fourth pipeline for heating and heat preservation of the fourth pipeline;
[0091] The condenser and the filter are connected via a fifth pipeline, on which valves V5 and V8 are installed;
[0092] The molecular pump is connected to the fifth pipeline between valves V5 and V8 through a sixth pipeline, and a valve V7 is installed on the sixth pipeline;
[0093] The molecular pump is connected to the dry pump through a seventh pipeline, and a valve V6 is installed on the seventh pipeline;
[0094] The filter is connected to the dry pump through the eighth pipeline, and a vacuum gauge P3, a butterfly valve and a valve V9 are installed on the seventh pipeline;
[0095] The dry pump and the exhaust gas treatment device are connected through a ninth pipeline, on which a check valve and a valve V10 are installed;
[0096] The exhaust gas treated by the exhaust gas treatment device is discharged through the tenth pipeline, and an exhaust gas concentration detector is installed on the tenth pipeline.
[0097] Although the present invention is disclosed as above in the form of a preferred embodiment, it is not intended to limit the present invention. Any person skilled in the art may make possible changes and modifications without departing from the spirit and scope of the present invention. Therefore, the scope of protection of the present invention shall be based on the scope defined by the claims of the present invention.
Claims
1. A device for preparing a coating on a thrust chamber body, characterized in that: include: A precursor sublimation device, wherein the precursor sublimation device is used to provide a precursor gas; A reaction chamber, wherein the reaction chamber and the precursor sublimation device are connected via an air inlet pipeline; an air intake bearing, the air intake bearing being used for bearing a workpiece in the reaction chamber; A rotating motor, the rotating motor is used to rotate the workpiece; wherein, The reaction chamber is provided with a workbench, the workbench is provided with an avoidance trough, the workbench is provided with a workbench opening at the bottom of the avoidance trough, the mover end of the rotating motor extends into the avoidance trough at the workbench opening to be assembled with the fixed end of the air intake bearing, the fixed end is located on the side of the air intake bearing away from the workpiece, and the workbench opening is sealed and connected with the rotating motor; the device also includes a trough cover, the outer periphery of the trough cover cooperates with the opening of the avoidance trough, the trough cover has a cover through hole at the center, and the air intake bearing passes through the cover through hole; The air inlet pipeline of the reaction chamber is arranged at the center of the bottom of the reaction chamber, and the air inlet pipeline is divided into corresponding branches according to the number of workpiece tables and transported to the avoidance trough; the bottom wall or side wall of the avoidance trough is provided with a trough vent, and the trough vent is connected with the air inlet pipeline, and the precursor gas first enters the avoidance trough, and the cavity formed by the avoidance trough is used to evenly mix the carrier gas and the precursor gas; The air intake carrier has a ventilation inner cavity, and the ventilation inner cavity is arranged opposite to the inner cavity of the workpiece. The air intake carrier has a ventilation opening that penetrates the ventilation inner cavity, and the ventilation opening of the air intake carrier is located in the avoidance trough. After the precursor gas from the air intake pipeline passes through the avoidance trough, it enters the inner cavity of the workpiece through the ventilation opening and the ventilation inner cavity, and then enters the reaction chamber through the inner cavity of the workpiece.
2. The device according to claim 1, characterized in that The ventilation opening is arranged at the fixing end.
3. The device according to claim 2, characterized in that The ventilation opening is arranged opposite to the air intake pipeline.
4. The device according to any one of claims 1 to 3, characterized in that The rotating motor is connected to the workbench opening via a magnetic fluid seal.
5. The device according to any one of claims 1 to 3, characterized in that The device comprises a plurality of the working tables, and the number of the working tables is 3 to 6.
6. The device according to any one of claims 1 to 3, characterized in that A plurality of air extraction channels are also arranged around the workbench, and the number of the plurality of air extraction channels is 10 to 20.
7. The device according to any one of claims 1 to 3, characterized in that The device further comprises an induction heating device, and the induction heating device is used to heat the workpiece.
8. The device according to any one of claims 1 to 3, characterized in that The device also includes a carrier gas cylinder, a condenser, a filter, a molecular pump, a dry pump, an exhaust gas treatment device, a vacuum system and an electronic control system; The carrier gas cylinder is used to provide carrier gas, the carrier gas cylinder is connected to the gas inlet of the precursor sublimation device through a first pipeline, and the carrier gas cylinder is connected to the gas inlet of the reaction chamber through a second pipeline; The gas outlet of the precursor sublimation device and the gas inlet of the reaction chamber are connected through a third pipeline, the third pipeline merges with the second pipeline, and a heating belt is wound around the portion of the second pipeline connected to the gas inlet of the reaction chamber and the outside of the third pipeline; The reaction chamber gas outlet and the condenser are connected via a fourth pipeline, and a heating belt is wound around the outside of the fourth pipeline; The condenser and the filter are connected via a fifth pipeline; The condenser and the molecular pump are connected via a sixth pipeline, and the sixth pipeline merges with the fifth pipeline; The molecular pump is connected to the dry pump via a seventh pipeline; The filter is connected to the dry pump via an eighth pipeline; The dry pump and the exhaust gas treatment device are connected via a ninth pipeline.