A safety monitoring and early warning method for half-ship displacement

Through simplified mechanical models and real-time data collection, safety monitoring during the semi-ship shifting process is achieved, which solves the problem of poor accuracy of traditional manual monitoring, improves construction safety and accuracy, and reduces the occurrence of safety accidents.

CN115830913BActive Publication Date: 2024-10-15NANTONG COSCO KHI SHIP ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211354293.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-31
Publication Date
2024-10-15
Estimated Expiration
2042-10-31

AI Technical Summary

Technical Problem

During the traditional half-ship shifting process, manual monitoring has poor accuracy and lacks effective quantitative and real-time monitoring methods, resulting in frequent safety accidents. Especially in the complex shape of large ships, monitoring becomes more difficult.

Method used

A simplified mechanical model is used to obtain real-time data through the draft gauge probe, trim measurement probe and stress monitoring probe. The monitoring software determines the trim angle of the half-ship, the water injection height in the dock and the stress of the piers in real time, and the early warning system automatically issues a warning. , ensuring the safety of half-ship shifting.

Benefits of technology

Through real-time monitoring and early warning, safety accidents during the shifting process of the semi-ship were reduced, construction safety and accuracy were improved, and the smooth floating of the semi-ship and effective protection of the piers during the shifting process were ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115830913B_ABST
    Figure CN115830913B_ABST
Patent Text Reader

Abstract

The present invention discloses a safety monitoring and early warning method for half-ship displacement, comprising the following steps: step 1, before half-ship displacement, by simplifying the calculation of the half-ship displacement mechanical model, obtain the dock water injection depth-maximum allowable trim curve when half-ship displacement; step 2, input the allowable trim curve value into the displacement calculation monitoring software; step 3, build the monitoring system required for half-ship displacement; step 4, when implementing half-ship displacement, the monitoring software performs real-time monitoring and early warning on the safety of ship displacement, when the half-ship instantaneous floating point is below the dock water injection depth-maximum allowable trim curve, it indicates that the half-ship displacement operation is in a safe state; when the half-ship instantaneous floating point exceeds the dock water injection depth-maximum allowable trim curve allowable range, reaches above the curve, the early warning system will issue a safety warning, reminding the half-ship displacement operator to adjust the half-ship floating state. The present invention is mainly used to monitor the safety of the half-dock displacement project when the ship is built in series.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of safety of half-ship displacement engineering, and in particular to a safety monitoring method for half-ship displacement. Background Art

[0002] In recent years, with the development of shipbuilding technology, more and more shipyards have begun to adopt the tandem construction method to improve the utilization efficiency of docks. Among them, the tandem construction method of one and a half ships is the most common: to achieve the tandem construction of ships, when one of the full ships is completed and ready to be launched, the half ship must be moved to the pier of the full ship to continue construction, so that one full ship and one half ship can always be built in the dock. Figure 1 shown.

[0003] The whole process of half-ship displacement is mainly divided into three stages: half-ship floating, displacement, and landing. Among them, the half-ship floating stage is the most critical. When the dock door is opened and water enters the dock, the "half-ship" begins to float. During the floating process, you should always pay attention to the floating state of the "half-ship", observe the longitudinal tilt and the height of water entering the dock. If the floating state is not ideal, the floating state of the half-ship should be balanced and adjusted in time to keep it as horizontal and stable as possible. Generally, the method of adding ballast water to the ballast tank compartment, or placing weights or ballast water tanks on the ship can be used to balance the "half-ship".

[0004] If the operator makes a mistake in the operation during the half-ship floating operation, the half-ship shifting operation is prone to safety accidents such as excessive longitudinal tilt of the half-ship, partial contact with the pier, damage to the pier, and capsizing of the half-ship (such as Figure 2 The floating state of the half ship is shown in FIG2 , and the floating state of the half ship is shown in FIG2 ). This directly affects the safety of the half ship displacement operation and affects the progress of the project.

[0005] The application number is: 202010517079.0, and the patent name is: A ship dock displacement automatic control system and method. This patent collects the stress and position of the ship to be displaced in real time during the displacement process to control the opening and closing of the remote control valve to reduce the amount of water pumped into the ship's ballast tank and the dock, thereby saving materials and time. This patent also improves the accuracy and safety of ship displacement by controlling the displacement control system to accurately position the ship.

[0006] With the trend of larger ships, the shape of half-ships becomes more and more complex, and the safety issues in the process of half-ship displacement become more and more prominent; the traditional monitoring and early warning methods mainly use manual observation with the naked eye, and the monitoring accuracy is poor; they rely on human intuitive judgment and lack effective quantitative, real-time monitoring and early warning methods. Summary of the invention

[0007] Purpose of the invention: The purpose of the present invention is to overcome the drawbacks of traditional manual early warning methods and provide a quantitative monitoring method for half-ship displacement.

[0008] Technical solution: A safety monitoring and early warning method for half-ship displacement, comprising the following steps:

[0009] Step 1: Before half-ship displacement, a simplified calculation of the half-ship displacement mechanical model is performed to obtain a dock water filling depth-maximum allowable trim curve when half-ship displacement occurs;

[0010] Step 2: Input the allowable trim curve value into the displacement calculation monitoring software;

[0011] Step 3: Build the monitoring system required for half-ship shifting. The system consists of a draft gauge probe responsible for real-time monitoring of the water filling depth in the dock, a stress monitoring probe for detecting the stress of the pier wood, a trim measurement probe for measuring the trim size, and monitoring software;

[0012] Step 4. When half-ship displacement is implemented, the monitoring software performs displacement safety and judgment in real time according to the real-time information obtained in step 3. When the instantaneous floating point of the half-ship is below the curve of water injection depth in the dock-maximum allowable trim, it indicates that the half-ship displacement operation is in a safe state; when the instantaneous floating point of the half-ship exceeds the allowable range of the curve of water injection depth in the dock-maximum allowable trim and reaches above the curve, the early warning system will issue a safety warning to remind the half-ship displacement operator to adjust the floating state of the half-ship.

[0013] As an optimization: the mechanical model of the half-ship displacement process is simplified to variables that are convenient for direct monitoring, namely: the water filling height in the dock, the longitudinal inclination angle of the half-ship and the number of stressed piers.

[0014] As an optimization: After the simplification of the mechanical model, the maximum allowable trim angle is only related to the geometric shape of the half-ship itself under specific draft conditions; before the half-ship is displaced, a series of water injection height-maximum allowable trim angle curves can be obtained by calculation, and an early warning system can be implanted in advance.

[0015] As an optimization: real-time data information on the water filling height in the dock, the trim angle of the half-ship and the number of stressed piers is obtained through the draft meter probe, trim measurement probe and stress monitoring probe. When the trim exceeds the maximum allowable range, the early warning system automatically issues an alarm to remind the half-ship shifting operator to adjust the half-ship's floating state.

[0016] As an optimization: the following data required for half-ship displacement monitoring are obtained in real time through the probe: ① real-time trim data, ② dock water filling height information, ③ pier wood stress monitoring signal; the purpose of each monitoring signal is as follows: ① real-time trim data: obtain trim real-time data through the probe, and compare it with the allowable water filling height-trim curve to determine the safety of half-ship displacement; ② dock water filling height information: obtain dock water filling height information through the draft probe. Compare it with the allowable water filling height-trim curve to determine the safety of half-ship displacement; ③ Pier wood stress monitoring signal: by analyzing the stress state of each pier wood, the number of stressed pier woods when the half-ship is displaced is known, so as to select the water filling height-trim curve of the corresponding number of pier woods.

[0017] Beneficial effect: The present invention is mainly used to monitor the safety of the displacement project in the half-dock during the tandem construction of ships. By simplifying the mechanical model, during the displacement of the half-ship, only three information, namely the longitudinal tilt angle of the half-ship, the water filling height in the dock and the number of stressed piers, need to be obtained in real time. Then, the allowable curve under the condition of the corresponding number of stressed piers is selected to provide a real-time early warning of the safety of the half-ship displacement. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a structural diagram of the tandem construction method of ships;

[0019] Figure 2 It is a schematic diagram of the structure of the half-ship floating state II;

[0020] Figure 3 It is a schematic diagram of the longitudinal inclination calibration curve when the half-ship is floating and the single pier is stressed between the longitudinal inclination angle and the water filling depth in the dock;

[0021] Figure 4 Schematic diagram of the pitch angle measuring probe of the present invention;

[0022] Figure 5 It is a schematic diagram of a water filling height signal in a dock according to the present invention;

[0023] Figure 6 It is a schematic diagram of the construction process of the early warning system of the present invention;

[0024] Figure 7 It is a structural schematic diagram of the inclinometer measuring probe of the present invention;

[0025] Figure 8 It is a schematic diagram of the transmission of the real-time signal of the tilt angle when the half ship is shifted according to the present invention;

[0026] Fig. 9 It is a schematic diagram of receiving and processing signals when half of the ship is shifted according to the present invention;

[0027] Fig.10 It is a schematic diagram of the real-time interface of the early warning system of the present invention. DETAILED DESCRIPTION

[0028] The technical solutions in the embodiments of the present invention will be described clearly and completely below so that those skilled in the art can better understand the advantages and features of the present invention, thereby making a clearer definition of the protection scope of the present invention. The embodiments described in the present invention are only a part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present invention.

[0029] Example

[0030] 1. The mechanical theoretical model to solve the problem is as follows:

[0031] Mechanical problems involved in the half-ship displacement process: When the half-ship floats with flat draft (no trim), when the dock is filled with water to a certain height and the gravity and buoyancy are balanced, the longitudinal center of gravity and longitudinal center of buoyancy of the half-ship tend to be on the same plumb line, and the half-ship will float with flat draft.

[0032] When the half-ship floats with trim (usually trimmed by the stern), the longitudinal center of gravity and longitudinal center of buoyancy of the half-ship will change with the trim size and the height of water in the dock compared with the horizontal floating. In order to ensure the safety of the half-ship displacement, the stress of the hull and the dock pier when the half-ship floats is mainly studied.

[0033] According to the theory of ship statics, the above model of floating with trim can be considered as: the process of the ship's floating state changing from horizontal floating to floating with trim angle in a very short time. In this process, the stern of the half ship exerts force on the pier, and the pier exerts reaction force on the stern of the half ship. When the half ship floats at a certain inclination angle, the relationship between the force on multiple piers and trim is:

[0034]

[0035] Where: L is the length of half ship; θ is the trim angle when half ship is floating, F n is the sum of the maximum forces on n piers; Δ is the displacement; x F It is the floating center under the draft state at that time; F is the force on half of the ship n High longitudinal stability;

[0036] If the maximum load that the dock pier can bear is F max When the limit pitch θ is max , and the safety condition formula for half-ship displacement is as follows:

[0037]

[0038] 2. The theoretical model is simplified as follows:

[0039] Considering that the above formula (2) is relatively complex: there are many variables, and each variable affects each other, x F It is difficult to directly monitor variables such as tgθ in actual engineering. In actual displacement engineering, the mechanical model should be simplified based on actual engineering. Through analysis, it is found that: Formula (2): tgθ max The force F on the stern of the half ship max Half-length L and Proportional to displacement Δ, initial stability Generally, as the draft increases, the center of drift moves closer to the midship, while the longitudinal stability decreases.

[0040] In actual engineering, under the condition of a certain water filling height in the dock, Δ and It is related to the shape of the water plane of the two:

[0041]

[0042] In the formula: I L is the longitudinal moment of inertia of the waterplane area under a certain draft condition. Its size is related to the geometric shape of the waterplane. For large and fat ships, under a certain water filling height in the dock, the effect of trim on I L The impact is small. In general, the I L Will be greater than I with trim L , we can use I in the floating state L (Average draught) replaces I with trim L , the simplified calculation result is more secure in engineering. The simplified formula (2) becomes:

[0043]

[0044] Simplified working hours x F and I L All are related to the geometry of the hull at a specific draft.

[0045] 3. Calculate the allowable trim curve:

[0046] Take a 180,000-ton bulk carrier as an example: the half-ship length L is 169.2 meters, and the maximum limit load of a single pier is 2300N;

[0047] The calculation results using simplified formula (4) are shown in Table 1 below:

[0048] Table 1 Calculation results of simplified formula (4)

[0049]

[0050] The schematic diagram of the longitudinal inclination check curve of the force relationship between the longitudinal inclination angle when the half ship is floating and the water filling depth in the dock can be obtained, as shown in Figure 3 shown.

[0051] Similarly, the trim calibration curve for n piers can be calculated. If the water filling height and trim value monitored in the dock during the actual displacement process are below the curve, it means that the displaced half of the ship is in a safe state, which is convenient for real-time monitoring during the displacement process.

[0052] 4. The monitoring signals used for half-ship displacement are as follows:

[0053] After obtaining the relationship curve between the water filling depth in the dock and the maximum allowable trim of the half ship, we can transplant the curve to the monitoring software in advance. At the same time, the probe can obtain the following data required for half ship displacement monitoring in real time: ① real-time trim data, ② dock water filling height information, ③ pier wood stress monitoring signal. By comparing with the water filling-allowable trim curve, it can be judged whether it is safe to shift the half ship at this moment.

[0054] The purpose of each monitoring signal is as follows:

[0055] ① Real-time trim data: The real-time trim data is obtained through the probe and compared with the allowable water filling height-trim curve to determine the safety of half-ship displacement.

[0056] ② Dock water filling height information: The dock water filling height information is obtained through the draft probe. Compared with the allowable water filling height-trimming curve, the safety of half-ship displacement is judged.

[0057] ③ Pier stress monitoring signal: By analyzing the stress state of each pier, the number of stressed piers when half of the ship is shifted can be obtained, so as to select the water injection height-trimming curve of the corresponding number of piers.

[0058] After receiving the above real-time information, the monitoring system software can compare the half-ship trim and dock water filling height information with the critical value of the allowable curve (dock water filling height-maximum allowable trim angle curve) pre-implanted into the monitoring software.

[0059] If the real-time trim angle information is less than the critical allowable value of the curve under the condition of a certain dock filling height, it means that the half-ship displacement is in a safe state; if the real-time trim angle information is greater than the critical allowable value of the curve under the condition of a certain dock filling height, it means that the half-ship displacement is in an unsafe state, and the bottom pier or the bottom of the half-ship may be damaged, and the system monitoring software can issue a safety warning for the half-ship displacement. Remind the half-ship displacement operator to adjust the ballast water volume of the ballast tank or the distribution position or quantity of the weights on the half-ship in time.

[0060] 5. The specific implementation of the present invention is as follows:

[0061] By simplifying the mechanical model, during the half-ship displacement process, only three pieces of information need to be obtained in real time: the longitudinal inclination angle of the half-ship, the water filling height in the dock and the number of stressed piers. Then, the allowable curve under the corresponding number of stressed piers is selected to provide real-time warning of the safety of the half-ship displacement.

[0062] First, the method for obtaining quantitative real-time information of the pitch angle during displacement and floating:

[0063] like Figure 4 As shown in the figure, a trim angle measuring probe is arranged in front and behind the half ship, and the probe signal is transmitted to the shore through wireless transmission signal, and the real-time data is transmitted to the portable computer. The signal is analyzed through the analysis software. When the average trim angle monitored by the front and rear probes is greater than the set critical value, the early warning system will send an alarm signal. The shifting operator is prompted to take floating control measures (adjust the amount of ballast water injection or the number and distribution of weights) to reduce the trim angle and ensure the safety of the half ship during the floating stage.

[0064] Secondly, the real-time signal of the water filling height in the dock can be obtained by installing an electric pressure water gauge on the inner wall of the dock to obtain a wireless signal of the water filling height in the dock, such as Figure 5 shown.

[0065] 6. The early warning system is built as follows, and the relevant process diagram is as follows Figure 6 As shown, where:

[0066] 1) Probe installation: Figure 7 As shown, the inclination measuring probe has three supporting feet (the supporting feet are magnetic and can be adsorbed on the deck of the ship), and the height of the supporting feet can be adjusted by screws to ensure that the inclination measuring instrument remains horizontal. The horizontal conditions in four dimensions of front, back, left and right can be observed through the bubble above the probe.

[0067] 2) When half of the ship is shifted, the real-time signal of the tilt angle is transmitted as follows Figure 8 As shown:

[0068] The antenna is equipped with a magnetic device, which can be easily attached to any position on the hull;

[0069] One part is the probe + battery, and the other part is the antenna. The antenna and the probe are connected by a data cable.

[0070] 3) When half of the ship is shifted, the signal reception and processing are as follows: Fig. 9 As shown:

[0071] 4) Real-time interface of early warning system Fig.10 As shown:

[0072] a) It can display the data of four probes and the simulated picture of the ship's floating state at the same time;

[0073] b) After starting recording, the average value of each probe every minute can be displayed, and the instantaneous value of each probe can also be displayed;

[0074] c) Automatically calculate the average value for each minute and measure continuously for 5 minutes.

[0075] The present invention is mainly used to monitor the safety of the displacement project in the half-dock when the ships are built in series. By simplifying the mechanical model, during the half-ship displacement process, only three information, namely the longitudinal inclination angle of the half-ship, the water filling height in the dock and the number of stressed piers, need to be obtained in real time. Then, the allowable curve under the condition of the corresponding number of stressed piers is selected, so that the half-ship displacement safety can be warned in real time.

Claims

1. A safety monitoring and early warning method for half-ship displacement, characterized in that: The steps include: Step 1: Before half-ship displacement, the water filling depth in the dock-maximum allowable trim curve when half-ship displacement is obtained by simplifying the calculation of the half-ship displacement mechanical model; the simplified mechanical model is: Where: L is the length of half ship; θ is the trim angle when half ship is floating; F max is the maximum load-bearing capacity of the dock pier; θ max is the limit trim; x F is the floating center under the current draft state; I L is the longitudinal moment of inertia of the waterline area under a certain draft condition; x F and I L All are related to the geometry of the hull at a specific draft; Step 2: Input the allowable trim curve value into the displacement calculation monitoring software; Step 3: Build the monitoring system required for half-ship shifting. The system consists of a draft gauge probe responsible for real-time monitoring of the water filling depth in the dock, a stress monitoring probe for detecting the stress of the pier wood, a trim measurement probe for measuring the trim size, and monitoring software; Step 4. When half-ship displacement is implemented, the monitoring software performs displacement safety and judgment in real time according to the real-time information obtained in step 3. When the instantaneous floating point of the half-ship is below the curve of water injection depth in the dock-maximum allowable trim, it indicates that the half-ship displacement operation is in a safe state; when the instantaneous floating point of the half-ship exceeds the allowable range of the curve of water injection depth in the dock-maximum allowable trim and reaches above the curve, the early warning system will issue a safety warning to remind the half-ship displacement operator to adjust the floating state of the half-ship.

2. The safety monitoring and early warning method for half-ship displacement according to claim 1 is characterized in that: The mechanical model of the half-ship displacement process is simplified into variables that are convenient for direct monitoring, namely: the water filling height in the dock, the longitudinal tilt angle of the half-ship and the number of stressed piers.

3. The safety monitoring and early warning method for half-ship displacement according to claim 1 is characterized in that: The simplified mechanical model allows the maximum trim angle to be related only to the geometric shape of the half-ship itself under specific draft conditions. Before the half-ship is displaced, a series of water injection height-maximum allowable trim angle curves are obtained by calculation, and an early warning system is implanted in advance.

4. The safety monitoring and early warning method for half-ship displacement according to claim 1 is characterized in that: Real-time data information on the water filling height in the dock, the trim angle of the half-ship and the number of stressed piers is obtained through the draft meter probe, trim measurement probe and stress monitoring probe. When the trim exceeds the maximum allowable range, the early warning system automatically issues an alarm to remind the half-ship shifting operator to adjust the floating state of the half-ship.

5. The safety monitoring and early warning method for half-ship displacement according to claim 1 is characterized in that: The following data required for half-ship displacement monitoring are obtained in real time through the probe: ① real-time trim data, ② dock water filling height information, ③ pier wood stress monitoring signal; the uses of each monitoring signal are as follows: ① real-time trim data: obtain the real-time trim data through the probe, and compare it with the allowable water filling height-trim curve to determine the safety of half-ship displacement; ② dock water filling height information: obtain the dock water filling height information through the draft probe; compare it with the allowable water filling height-trim curve to determine the safety of half-ship displacement; ③ pier wood stress monitoring signal: by analyzing the stress state of each pier wood, the number of stressed pier woods when the half-ship is displaced is known, so as to select the water filling height-trim curve of the corresponding number of pier woods.