Ceiling decoration system of aluminum square tube structure and construction method thereof

Through the ceiling decoration system with aluminum square-connection molding structure, the combination of hoisting frame, installation keel and pendant is used to solve the visual and visual problems caused by the excessively long-term construction of honeycomb aluminum plates, and the seamless installation of aluminum veneer is achieved. Improved visual sense.

CN115874753BActive Publication Date: 2024-12-27SHANGHAI CHINA CONSTR EIGHTH ENG DIVISION DECORA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310071227.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-01-16
Publication Date
2024-12-27
Estimated Expiration
2043-01-16

AI Technical Summary

Technical Problem

In the prior art, honeycomb aluminum plates need to be constructed in sections when the size is too long, resulting in joint joints after installation, affecting the overall appearance effect.

Method used

The ceiling decoration system adopts the aluminum square pass shape structure, through the combination of lifting and converting frames, installing keels, pendants, first aluminum square passes and aluminum veneers, ensure that the aluminum veneers can be installed without cutting off, and pass through the first aluminum veneers. The overall strength of the aluminum veneer is strengthened to avoid deformation, and at the same time, the clamp sleeve and the clamp slot structure are used to fix the connection to eliminate the impact of the seam separation.

Benefits of technology

The seamless installation of ultra-long aluminum veneer is achieved, which enhances the overall strength and installation quality, improves the visual effect, simplifies the installation process, and avoids the visual problems caused by segmented construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115874753B_ABST
    Figure CN115874753B_ABST
Patent Text Reader

Abstract

The present invention relates to a ceiling decoration system and construction method of an aluminum square tube structure, the system comprising: a conversion frame hoisted on a building floor; a plurality of installation keels hung on the conversion frame, the installation keels being arranged at intervals; a plurality of hangers clamped on the installation keels; a first aluminum square tube and an aluminum single plate hung on the hangers, the first aluminum square tube and the aluminum single plate are both fixedly connected to the hangers, the setting directions of the first aluminum square tube and the aluminum single plate are perpendicular to the setting direction of the installation keel, the first aluminum square tube is arranged on both sides of the aluminum single plate, and there are a plurality of the first aluminum square tube and the aluminum single plate and they are fully spread under the building floor. The present invention is suitable for the installation of aluminum square tube shapes with extra-long dimensions, and a plurality of aluminum square tubes and aluminum single plates are connected and fixed to improve the overall strength and stability, so that the aluminum single plate and the square tube do not need to be installed in sections, and the aluminum single plate is guaranteed not to be deformed, solving the problem that the segmented construction has a butt joint that affects the overall observation effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building construction engineering, in particular to a ceiling decoration system with an aluminum square tube shape structure and a construction method thereof. Background Art

[0002] The lobby passage of venue projects is usually designed as a tall and large-span space with a simple and bright layout. The ceiling of the space is mostly made of honeycomb aluminum panels or shaped aluminum panels. Specifically, the honeycomb aluminum panels can be hung under the floor slab, and then the honeycomb aluminum panels are used as the base plate, and aluminum square tubes are installed on the base plate. The maximum length of conventional aluminum panels is 6m. If the size of the aluminum panel is too long, direct installation will cause deformation of the aluminum panel. Usually, segmented construction is carried out, and the aluminum panel is cut into multiple segments for installation. In this way, joints will be generated between the aluminum panels after installation, which will have a certain impact on the overall visual effect. Summary of the invention

[0003] The purpose of the present invention is to overcome the defects of the prior art, provide a ceiling decoration system with an aluminum square tube structure and a construction method thereof, and solve the problem that the existing honeycomb aluminum panels are constructed in sections when the size is too long, which affects the overall appearance.

[0004] The technical solution to achieve the above purpose is:

[0005] The present invention provides a ceiling decoration system with an aluminum square tube structure, comprising:

[0006] The conversion frame is hoisted on the building floor;

[0007] A plurality of mounting keels are hung on the conversion frame, and the mounting keels are arranged at intervals;

[0008] A plurality of hangers clamped on the installation keel; and a first aluminum square tube and an aluminum single plate hung on the hangers, the first aluminum square tube and the aluminum single plate are fixedly connected to the hangers, the setting direction of the first aluminum square tube and the aluminum single plate is perpendicular to the setting direction of the installation keel, the first aluminum square tube is arranged on both sides of the aluminum single plate, and there are a plurality of the first aluminum square tube and the aluminum single plate and they are fully spread under the building floor.

[0009] The ceiling decoration system of the present invention is suitable for the installation of aluminum panels with extra-long dimensions. The aluminum panels can be directly installed without being cut off. A first aluminum square tube is arranged on the side of the aluminum panel. The overall strength of the aluminum panel is strengthened by the first aluminum square tube so that the aluminum panel will not be deformed during hoisting, thereby ensuring the installation quality and solving the problem of segmented construction having butt joints that affect the overall viewing effect.

[0010] A further improvement of the ceiling decoration system of the aluminum square tube structure of the present invention is that the hanging piece includes an inverted U-shaped portion clamped on the mounting keel and a clamping portion connected to the bottom of the inverted U-shaped portion;

[0011] The size of the clamping portion matches the size of the first aluminum square tube, and a clamping groove is provided at the connection between the clamping portion and the inverted U-shaped portion;

[0012] A clamping plate is provided at the top of the first aluminum square tube corresponding to the clamping slot, and the first aluminum square tube is clamped in the clamping slot through the clamping plate.

[0013] A further improvement of the ceiling decoration system of the aluminum square tube structure of the present invention is that the side of the aluminum single plate is provided with a folded edge, and the folded edge is also clamped in the clamping groove.

[0014] A further improvement of the ceiling decoration system of the aluminum square tube structure of the present invention is that it also includes a second aluminum square tube fixed to the top of the bottom surface of the aluminum single plate, and the second aluminum square tube is attached to and fixedly connected to the first aluminum square tube on one side of the aluminum single plate.

[0015] A further improvement of the ceiling decoration system of the aluminum square tube structure of the present invention is that the length of the second aluminum square tube is smaller than the length of the first aluminum square tube, and the second aluminum square tube is arranged in an inclined shape.

[0016] The present invention also provides a construction method for a ceiling decoration system of an aluminum square tube structure, comprising the following steps:

[0017] Installing the conversion frame on the building floor;

[0018] Hanging the installation keel on the conversion frame, and arranging a plurality of installation keels at intervals;

[0019] Hang the pendant on the installation keel;

[0020] Assemble the first aluminum square tube and the aluminum veneer, connect the first aluminum square tube and the aluminum veneer to form an assembly; and hoist the assembly as a whole to the bottom of the building floor, and connect the assembly with the corresponding hanger, the setting direction of the installed first aluminum square tube and the aluminum veneer is perpendicular to the setting direction of the installation keel, and repeatedly install the assembly until the first aluminum square tube and the aluminum veneer are fully laid under the building floor.

[0021] A further improvement of the construction method of the present invention is that a slot is provided on the hanging piece, and a clamping plate is provided on the top of the first aluminum square tube corresponding to the slot;

[0022] When installing the assembly, the first aluminum square tube is arranged under the hanging component, and the clamping plate is clamped in the corresponding clamping slot, and then the first aluminum square tube and the hanging component are fixedly connected.

[0023] A further improvement of the construction method of the present invention is that it also includes:

[0024] A second aluminum square tube is provided, and the top of the second aluminum square tube is attached to the bottom surface of the aluminum single plate, and the side is attached to the side surface of the first aluminum square tube, and the second aluminum square tube is fixedly connected to the aluminum single plate and the first aluminum square tube.

[0025] A further improvement of the construction method of the present invention is that when installing the second aluminum square tube, the second aluminum square tube is set at an angle. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a structural schematic diagram of the ceiling decoration system of the aluminum square tube structure of the present invention.

[0027] Figure 2 This is a structural schematic diagram of the installation of the conversion frame in the ceiling decoration system of the aluminum square tube shape structure of the present invention.

[0028] Figure 3 This is a schematic diagram of the structure for installing a keel in a ceiling decoration system of an aluminum square tube structure according to the present invention.

[0029] Figure 4 It is a structural schematic diagram of the installation state of the pendants in the ceiling decoration system of the aluminum square tube shape structure of the present invention.

[0030] Figure 5 The present invention is a schematic diagram of the installation status of the first aluminum square tube, the aluminum veneer and the second aluminum square tube in the ceiling decoration system of the aluminum square tube structure.

[0031] Figure 6 It is a side view of the first aluminum square tube and the second aluminum square tube in the ceiling decoration system of the aluminum square tube shape structure of the present invention.

[0032] Figure 7 It is a schematic diagram of the installation state of the equipment belt in the ceiling decoration system of the aluminum square tube shape structure of the present invention.

[0033] Figure 8 The present invention is a flow chart of a construction method of a ceiling decoration system of an aluminum square tube molding structure. DETAILED DESCRIPTION

[0034] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0035] See also Figure 1The present invention provides a ceiling decoration system with an aluminum square tube structure and a construction method thereof, which are used to realize the overall processing and installation of super-long square tubes and aluminum veneers, eliminate the influence of the split seams, and fix the aluminum veneer and the square tube as a whole after being assembled on the ground, thereby improving the installation efficiency. The ceiling decoration system with an aluminum square tube structure and a construction method thereof of the present invention are described below in conjunction with the accompanying drawings.

[0036] See also Figure 1 , showing the structural schematic diagram of the ceiling decoration system of the aluminum square tube structure of the present invention. Figure 1 , the ceiling decoration system of the aluminum square tube shape structure of the present invention is explained.

[0037] like Figure 1 As shown, the ceiling decoration system of the aluminum square tube structure of the present invention includes a conversion frame 21, a plurality of installation keels 22, a plurality of hangers 23, a plurality of first aluminum square tubes 24 and a plurality of aluminum veneers 25, combined with Figure 2 As shown, the conversion frame 21 is hoisted on the building floor 10, combined with Figure 3 The installation keel 22 is hung on the conversion frame 21, and multiple installation keels 22 are arranged at intervals; Figure 4 As shown, the hangers 23 are inserted into the mounting keels 22, and each mounting keel 22 is provided with a plurality of hangers 23, and the hangers 23 on each mounting keel 22 are arranged correspondingly. If the mounting keels 22 are arranged in the transverse direction, the corresponding hangers 23 in the longitudinal direction are arranged in a aligned manner. Figure 5 As shown, the first aluminum square tube 24 and the aluminum single plate 25 are hung on the hanger 23, and the first aluminum square tube 24 and the aluminum single plate 25 are connected to the installation keel 22 through the hanger 23, and the first aluminum square tube 24 and the aluminum single plate 25 are fixedly connected to the hanger 23. The setting direction of the first aluminum square tube 24 and the aluminum single plate 24 is perpendicular to the setting direction of the installation keel 22. The first aluminum square tube 24 is arranged on both sides of the aluminum single plate 25, and there are multiple first aluminum square tubes 24 and aluminum single plates 25 and they are fully spread under the building floor 10, and the first aluminum square tube 24 and the aluminum single plate 25 form a ceiling decoration ceiling.

[0038] The aluminum square tube 24 and the aluminum single plate 25 of the present invention are arranged along the length direction of the building floor. Preferably, the length of the aluminum square tube 24 and the aluminum single plate 25 is 10.5 meters.

[0039] The ceiling decoration system of the present invention is suitable for the installation of aluminum panels with extra-long dimensions. The aluminum panels can be directly installed without being cut off. A first aluminum square tube is arranged on the side of the aluminum panel. The overall strength of the aluminum panel is strengthened by the first aluminum square tube so that the aluminum panel will not be deformed during hoisting, thereby ensuring the installation quality and solving the problem of segmented construction having butt joints that affect the overall viewing effect.

[0040] In a specific embodiment of the present invention, Figure 4 As shown, the hanging member 23 includes an inverted U-shaped portion 231 which is clamped on the mounting keel 22 and a clamping portion 232 connected to the bottom of the inverted U-shaped portion 231;

[0041] Combination Figure 5 As shown, the size of the clamping portion 232 matches the size of the first aluminum square tube 24, and a clamping groove 233 is provided at the connection between the clamping portion 232 and the inverted U-shaped portion 231;

[0042] A clamping plate is provided at the top of the first aluminum square tube 24 corresponding to the clamping slot 233 , and the first aluminum square tube 24 is clamped in the clamping slot 233 through the clamping plate.

[0043] Preferably, the card slot 233 is vertically arranged, and the top of the first aluminum square tube 24 is provided with a vertical plate and a horizontal plate vertically connected to the vertical plate, the card plate is vertically connected to the end side of the horizontal plate, the vertical plate is attached to the side of the card connection portion 232 of the hanger 23, the horizontal plate is attached to the top surface of the card connection portion 232 of the hanger 23, and the card plate is inserted into the card slot 233, and then self-tapping screws are installed between the horizontal plate and the card connection portion 232 of the hanger 23, and the first aluminum square tube 24 and the hanger 23 are fixedly connected by the self-tapping screws.

[0044] Furthermore, the inverted U-shaped portion 231 of the hanging member 23 is inserted into the mounting keel 22 , and then the hanging member 23 is fixedly connected to the mounting keel 22 by self-tapping screws.

[0045] Furthermore, if Figure 5 As shown, the side of the aluminum single plate 25 is provided with a folded edge, and the folded edge is also clamped in the clamping groove 233.

[0046] During installation, the aluminum veneer 25 and the first aluminum square tube 24 are first fixedly connected on the ground, the folded plate on the side of the aluminum veneer 25 is attached to the clamping plate of the first aluminum square tube 24, and then self-tapping screws are set on the side edge of the aluminum veneer 25 for fixed connection. The aluminum veneer and the first aluminum square tube are fixedly connected to form an assembly, and then hoisted together to the building floor, and fixed to the installation keel 22 through the hanger 23. The assembly includes at least one aluminum veneer and one first aluminum square tube, and the assembly may also include one aluminum veneer and two first aluminum square tubes.

[0047] In a specific embodiment of the present invention, Figure 5 and Figure 6 As shown, it also includes a second aluminum square tube 26 fixed on the top to the bottom surface of the aluminum single plate 25, and the second aluminum square tube 26 is attached to and fixedly connected to the first aluminum square tube 24 on one side of the aluminum single plate 25.

[0048] Preferably, the second aluminum square tube 26 is fixedly connected to the first aluminum square tube 24 at the end by self-tapping screws.

[0049] In a specific embodiment of the present invention, the length of the second aluminum square tube 26 is less than the length of the first aluminum square tube 24, and the second aluminum square tube 26 is arranged in an inclined shape.

[0050] Preferably, the second aluminum square tube 26 is arranged at one end of the aluminum single plate 25, one end of the aluminum single plate 25 is close to the glass curtain wall outside the room, and the other end is close to the stone curtain wall inside the room. The second aluminum square tube is arranged on the side of the aluminum single plate 25 close to the stone curtain wall.

[0051] In a specific embodiment of the present invention, Figure 1 and Figure 2 As shown, the conversion frame 21 includes a vertical steel member 211 and a transverse steel member 212, wherein the vertical steel member 211 is fixedly connected to the bottom surface of the building floor 10, the vertical steel member 211 is multiple and arranged at intervals, the transverse steel member 212 is connected to the bottom of the vertical steel member 211, and the transverse steel bars are also multiple and arranged at intervals. The transverse steel member 212 and the vertical steel member 211 are preferably hot-dip galvanized angle steels with a size of 40mm*40mm*4mm and a spacing of 1000mm.

[0052] like Figure 3 As shown, a connecting angle steel is further provided at the connection between the horizontal steel member 212 and the vertical steel member 211 , and the connecting angle steel is fixedly connected to both the horizontal steel member 212 and the vertical steel member 211 .

[0053] In a specific embodiment of the present invention, Figure 3 As shown, the installation keel 22 is hoisted on the conversion frame 21 through the screw rod 28. Specifically, according to the construction position of the screw rod, the transverse steel piece is pre-percussion drilled on the ground, and anti-rust treatment is done after the hole is opened, and then the transverse steel piece is installed. The screw rod 28 passes through the hole reserved on the transverse steel piece 212 and is fixedly connected to the transverse steel piece 212 through a nut. The screw rod 28 preferably adopts a screw rod with a diameter of M8 and is arranged at a spacing of 1200mm.

[0054] A collar is connected to the bottom of the lead screw 28, and the mounting keel 22 is connected through the collar. Specifically, the mounting keel 22 can be inserted into the collar.

[0055] Preferably, the installation keel 22 adopts a C-shaped keel. The type is " " shape.

[0056] In a specific embodiment of the present invention, Figures 4 to 7 As shown, two types of hangers 23 are provided, one size is consistent with the size of the first aluminum square tube 24, and the other size is consistent with the size of the equipment belt 27. The hanger 23 is inserted into the installation keel 22 and then fixed with self-tapping screws.

[0057] In a specific embodiment of the present invention, the first aluminum square tube adopts a 2mm thick wood grain transfer aluminum plate, and the aluminum veneer adopts a 2mm thick wood grain transfer veneer, with an overall length of 10.5 meters. The side of the aluminum veneer is bent downward to form a folded edge. During installation, the aluminum veneer and the first aluminum square tube are first fixed on the ground, so that the folded plate of the aluminum veneer is attached to the cardboard of the first aluminum square tube, and then the side of the aluminum veneer is fixed with self-tapping screws to form an assembly, and then the assembly is hoisted to a corresponding height as a whole, and installed with the assistance of a climbing vehicle, and the folded edge of the aluminum veneer is hooked with a hanger. After being firmly hooked, it hangs naturally, relying on the gravity of the aluminum veneer itself and the subsequently installed components to ensure a firm installation.

[0058] In a specific embodiment of the present invention, the second aluminum square tube adopts a 2mm thick wood grain transfer aluminum plate. After the first aluminum square tube and the aluminum single plate are installed, the second aluminum square tube is installed, and the side of the second aluminum square tube is firmly fixed to the side of the first aluminum square tube by self-tapping screws.

[0059] In a specific embodiment of the present invention, Figure 7 As shown, the installation of the equipment belt 27 on the first aluminum square tube is similar, and the equipment belt 27 is fixed with the aluminum single plate.

[0060] The present invention also provides a construction method for a ceiling decoration system of an aluminum square tube structure, which is described below.

[0061] like Figure 8 As shown, a construction method of a ceiling decoration system of an aluminum square tube structure of the present invention comprises the following steps:

[0062] Execute step S11 to install a conversion frame on the building floor; then execute step S12;

[0063] Execute step S12, hang the installation keel on the conversion frame, and set a plurality of installation keels at intervals; then execute step S13;

[0064] Execute step S13, hang the hanger on the installation keel; then execute step S14;

[0065] Execute step S14, assemble the first aluminum square tube and the aluminum single plate, and connect the first aluminum square tube and the aluminum single plate to form an assembly; then execute step S15;

[0066] Execute step S15, hoist the assembly as a whole to the bottom of the building floor, and connect the assembly to the corresponding hanger. The setting direction of the installed first aluminum square tube and aluminum single plate is perpendicular to the setting direction of the installation keel, and repeat the installation of the assembly until the first aluminum square tube and aluminum single plate are fully laid under the building floor.

[0067] In a specific embodiment of the present invention, a card slot is provided on the hanging piece, and a card plate is provided on the top of the first aluminum square tube corresponding to the card slot;

[0068] When installing the assembly, the first aluminum square tube is arranged under the hanging piece, and the clamping plate is clamped in the corresponding clamping slot, and then the first aluminum square tube and the hanging piece are fixedly connected.

[0069] In a specific embodiment of the present invention, it also includes:

[0070] Provide a second aluminum square tube, attach the top of the second aluminum square tube to the bottom surface of the aluminum veneer, attach the side to the side of the first aluminum square tube, and fix the second aluminum square tube to the aluminum veneer and the first aluminum square tube.

[0071] In a specific implementation of the present invention, when installing the second aluminum square tube, the second aluminum square tube is tilted.

[0072] The ceiling decoration system of the aluminum square tube structure of the present invention uses a hanger adapted to the first aluminum square tube to install the aluminum square tube and the aluminum single plate, which simplifies the installation method and makes the installation more convenient and flexible.

[0073] The ceiling decoration system of the aluminum square tube modeling structure of the present invention adopts aluminum veneer as the modeling structure, which can save materials compared with honeycomb panels, and the installation efficiency of the present invention is high. Before installation, the aluminum square tube and the aluminum veneer are first connected and fixed on the ground, and then hoisted and fixed as a whole, so that the aluminum veneer will not be deformed during hoisting, thereby ensuring the installation quality.

[0074] The invention optimizes the installation method of the aluminum square tube ceiling, realizes the overall processing and installation of the super-long square tube, and eliminates the influence of the split seam.

[0075] The present invention is described in detail above in conjunction with the embodiments of the accompanying drawings. A person skilled in the art can make various variations of the present invention according to the above description. Therefore, certain details in the embodiments should not constitute a limitation of the present invention, and the scope of protection of the present invention shall be defined by the scope of the attached claims.

Claims

1. A ceiling decoration system with an aluminum square tube structure, characterized in that: include: The conversion frame is hoisted on the building floor; A plurality of mounting keels are hung on the conversion frame, and the mounting keels are arranged at intervals; A plurality of hangers clamped on the installation keel; and a first aluminum square tube and an aluminum single plate hung on the hanger, the first aluminum square tube and the aluminum single plate are fixedly connected to the hanger, the first aluminum square tube and the aluminum single plate are arranged in a direction perpendicular to the arrangement direction of the installation keel, the first aluminum square tube is arranged on both sides of the aluminum single plate, and there are a plurality of the first aluminum square tube and the aluminum single plate and they are fully laid under the building floor; The hanging piece includes an inverted U-shaped portion which is clamped on the mounting keel and a clamping portion connected to the bottom of the inverted U-shaped portion; The size of the clamping portion matches the size of the first aluminum square tube, and a clamping groove is provided at the connection between the clamping portion and the inverted U-shaped portion; A clamping plate is provided on the top of the first aluminum square tube corresponding to the clamping slot, and the first aluminum square tube is clamped in the clamping slot through the clamping plate; The side of the aluminum single plate is provided with a folded edge, and the folded edge is also clamped in the clamping groove.

2. The ceiling decoration system of the aluminum square tube structure according to claim 1 is characterized in that: It also includes a second aluminum square tube fixed on the top of the bottom surface of the aluminum single plate, and the second aluminum square tube is attached to and fixedly connected with the first aluminum square tube on one side of the aluminum single plate.

3. The ceiling decoration system of the aluminum square tube structure according to claim 2 is characterized in that: The length of the second aluminum square tube is smaller than that of the first aluminum square tube, and the second aluminum square tube is arranged in an inclined shape.

4. A construction method for a ceiling decoration system of an aluminum square tube structure as claimed in claim 1, characterized in that: The steps include: Installing the conversion frame on the building floor; Hanging the installation keel on the conversion frame, and arranging a plurality of installation keels at intervals; Hang the pendant on the installation keel; Assemble the first aluminum square tube and the aluminum veneer, connect the first aluminum square tube and the aluminum veneer to form an assembly; and hoist the assembly as a whole to the bottom of the building floor, and connect the assembly with the corresponding hanger, the setting direction of the installed first aluminum square tube and the aluminum veneer is perpendicular to the setting direction of the installation keel, and repeatedly install the assembly until the first aluminum square tube and the aluminum veneer are fully laid under the building floor.

5. The construction method according to claim 4, characterized in that: The pendant is provided with a slot, and a card plate is provided at the top of the first aluminum square tube corresponding to the slot; When installing the assembly, the first aluminum square tube is arranged under the hanging component, and the clamping plate is clamped in the corresponding clamping slot, and then the first aluminum square tube and the hanging component are fixedly connected.

6. The construction method according to claim 4, characterized in that: Also includes: A second aluminum square tube is provided, and the top of the second aluminum square tube is attached to the bottom surface of the aluminum single plate, and the side is attached to the side surface of the first aluminum square tube, and the second aluminum square tube is fixedly connected to the aluminum single plate and the first aluminum square tube.

7. The construction method according to claim 6, characterized in that: When installing the second aluminum square tube, the second aluminum square tube is set at an angle.