Multi-connection system control method and device, electronic device and storage medium

By obtaining and analyzing the operating environment information of the air-conditioning system, the operating capacity of each unit is adjusted to achieve the lowest power consumption operation of the multi-line air-conditioning system, solving the energy-saving problem caused by the single capacity allocation between modules in the traditional system.

CN115899995BActive Publication Date: 2024-10-11GREE ELECTRIC APPLIANCE INC OF ZHUHAI
View PDF 21 Cites 0 Cited by

Patent Information

Application Number
CN202211591914.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-09
Publication Date
2024-10-11
Estimated Expiration
2042-12-09

AI Technical Summary

Technical Problem

In the traditional modular multi-split air conditioning system, the capacity allocation method between modules is single, which cannot ensure that the air conditioning system is in the most energy-saving operation mode.

Method used

By obtaining the operating environment information, the operating energy efficiency information of each single machine is determined, and the initial operating capability of each single machine is adjusted based on this information to achieve the lowest power consumption operation plan of the multi-connection system in a specific environment.

Benefits of technology

While maintaining the target indoor temperature, the power consumption of the multi-split system is reduced, and the energy-saving problem caused by the single capacity allocation method in the traditional modular multi-split air conditioning system is overcome.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115899995B_ABST
    Figure CN115899995B_ABST
Patent Text Reader

Abstract

The present application provides a multi-split system control method and device, electronic device and storage medium, wherein the method includes: the target temperature to be maintained in the target room where the multi-split system needs to adjust the temperature, and the outdoor temperature of the environment where the outdoor unit of the multi-split system is located; determining the operating energy efficiency information of each unit in the multi-split system according to the operating environment information; determining the capacity allocation adjustment direction of the multi-split system according to the operating environment information and the operating energy efficiency information of each unit; adjusting the initial operating capacity of each unit according to the capacity allocation adjustment direction and through a preset adjustment strategy to obtain the multi-split system under the operating environment information. Through this application, the technical problem that the capacity allocation method between modules in the traditional modular multi-split air-conditioning system existing in the related art is single and cannot ensure that the air-conditioning system is in the most energy-saving operating mode is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of control technology, and in particular to a multi-connected system control method and device, electronic equipment and storage medium. Background Art

[0002] With the rapid development of the air-conditioning industry, users have an increasingly strong demand for energy-saving and intelligent air-conditioning.

[0003] In the current traditional modular multi-split air conditioning system, when multiple modules (single air conditioner) are running at the same time, the total load of the system needs to be distributed to each operating module. The traditional distribution method is generally to distribute according to the rated capacity of each module. Although this traditional distribution method makes the output load rate of each unit consistent, it is not the most energy-saving distribution method.

[0004] Therefore, in the related art, there is a problem that in the traditional modular multi-split air-conditioning system, the capacity allocation method between modules is single and it is impossible to ensure that the air-conditioning system is in a relatively energy-saving operation mode. Summary of the invention

[0005] The present application provides a multi-split system control method and device, electronic device and storage medium, so as to at least solve the problem existing in the related art that the capacity allocation method between modules is single and cannot ensure that the air-conditioning system is in the most energy-saving operation mode.

[0006] According to one aspect of an embodiment of the present application, a multi-link system control method is provided, comprising:

[0007] Acquiring operating environment information, wherein the operating environment information includes: a target indoor temperature to be maintained in a target room where the multi-split system needs to perform temperature regulation, and an outdoor temperature of an environment in which an outdoor unit of the multi-split system is located;

[0008] Determining the operating energy efficiency information of each single machine in the multi-connected system according to the operating environment information, wherein the multi-connected system includes multiple single machines, and for the operating energy efficiency information of each single machine, the operating energy efficiency information is used to indicate the relationship between the operating capacity and energy efficiency of the single machine;

[0009] Determining the capacity allocation adjustment direction of the multi-connection system according to the operating environment information and the operating energy efficiency information of each single machine;

[0010] According to the capacity allocation adjustment direction, the initial operation capacity of each single machine is adjusted through a preset adjustment strategy to obtain the minimum power consumption operation plan of the multi-connected system under the operation environment information.

[0011] Optionally, as in the aforementioned method, before adjusting the initial operating power of each single machine according to the capacity allocation adjustment direction and by a preset adjustment strategy to obtain the minimum power consumption operating scheme of the multi-connected system under the operating environment information, the method further includes:

[0012] Determine the rated capacity of each unit, wherein the rated capacity of each unit is used to indicate the operating capacity of the corresponding unit under rated operating conditions;

[0013] Determining the operating capacity requirements according to the operating environment information;

[0014] Based on the ratio of the operating capacity requirement divided by the rated total capacity, the initial operating capacity of each single machine and the initial operating power are determined, wherein the rated total capacity is the sum of all the rated capacities, and the initial operating capacity of each single machine is the product of the rated capacity of each single machine and the ratio.

[0015] Optionally, as in the aforementioned method, before determining the operating energy efficiency information of each single machine in the multi-connected system according to the operating environment information, the method further includes:

[0016] In the environment corresponding to the operating environment information, the energy efficiency of each single machine at each operating capacity is measured, and a one-to-one correspondence between the operating capacity and the energy efficiency is obtained;

[0017] According to the one-to-one correspondence, the operating energy efficiency information of each single machine is obtained.

[0018] Optionally, as in the aforementioned method, determining the capacity allocation adjustment direction of each single machine according to the operating environment information and the operating energy efficiency information of each single machine includes:

[0019] Determine N candidate capability allocation adjustment directions, wherein in each of the candidate capability allocation adjustment directions, for each first single machine in the N-1 first single machines, the first operating capability of the first single machine is the corresponding optimal operating capability, and the second operating capability of the second single machines other than the N-1 first single machines in the multiple single machines is the difference between the operating capability requirement and the sum of all the first operating capabilities, and the second single machines in different candidate capability allocation adjustment directions are different, N is the number of the multiple single machines, and the operating capability requirement is determined according to the operating environment information;

[0020] For each candidate capacity allocation adjustment direction, based on the compressor energy efficiency information of each single machine and the operating capacity of each single machine in the candidate capacity allocation adjustment direction, the total power consumption of the candidate capacity allocation adjustment direction is determined, wherein the compressor energy efficiency information includes a one-to-one correspondence between compressor frequency and power consumption, and the compressor frequency is positively correlated with the operating capacity;

[0021] Among all the candidate capability allocation adjustment directions, the one with the lowest total power consumption is determined as the capability allocation adjustment direction.

[0022] Optionally, as in the aforementioned method, adjusting the initial operating capacity of each single machine according to the capacity allocation adjustment direction and by a preset adjustment strategy to obtain the minimum power consumption operating solution of the multi-connected system under the operating environment information includes:

[0023] For each target single machine, determining a deviation of the target first operating capacity of the target single machine in the capacity allocation adjustment direction relative to the initial operating capacity of the target single machine, wherein the target single machine is a single machine among the multiple single machines whose operating capacity allocated in the capacity allocation adjustment direction is the corresponding optimal operating capacity;

[0024] Under the condition that the total operating capacity of the multi-connected system remains unchanged, the initial operating capacity of at least one target single machine is adjusted by performing at least one adjustment operation, and the corresponding operating scheme is an optimal capacity allocation scheme for operation according to the lowest power consumption, wherein the total operating capacity is equal to the operating capacity requirement, and each adjustment operation is used to reduce the deviation between the current operating capacity of the target single machine being adjusted and the corresponding optimal operating capacity according to the lower limit of the operating capacity adjustment indicated in the preset adjustment strategy, and for any target single machine, the deviation corresponding to the target single machine after adjustment is less than or equal to the deviation before adjustment;

[0025] The lowest power consumption operation plan is obtained according to the optimal capacity allocation plan.

[0026] Optionally, as in the aforementioned method, the initial operating capacity of at least one target stand-alone machine is adjusted by performing at least one adjustment operation, and the corresponding operating scheme is an optimal capacity allocation scheme for operating according to the lowest power consumption, including:

[0027] Determine a capacity allocation scheme after adjustment obtained by performing the adjustment operation to adjust the capacity allocation scheme before adjustment, wherein, when the adjustment operation is performed for the first time, for each of the single machines, the operating capacity of each of the single machines in the capacity allocation scheme before adjustment is the initial operating capacity of each of the single machines;

[0028] In the case where the total power consumption after adjustment is less than or equal to the total power consumption before adjustment, the adjustment operation is continued on the capacity allocation scheme before adjustment through the capacity allocation scheme after adjustment, and the capacity allocation scheme after adjustment is updated through the capacity allocation scheme obtained after the adjustment operation, wherein the total power consumption after adjustment is the total power consumption corresponding to the capacity allocation scheme after adjustment, and the total power consumption before adjustment is the total power consumption corresponding to the capacity allocation scheme before adjustment;

[0029] Determine whether the total power consumption corresponding to the latest adjusted capacity allocation plan is less than or equal to the total power consumption corresponding to the adjusted capacity allocation plan before adjustment;

[0030] The above steps are executed cyclically until the total power consumption corresponding to the latest adjusted capacity allocation scheme is greater than the total power consumption corresponding to the latest adjusted capacity allocation scheme before adjustment, and the latest adjusted capacity allocation scheme is determined as the optimal capacity allocation scheme.

[0031] Optionally, in the aforementioned method, the adjusting operation includes:

[0032] According to the lower limit of the operating capacity adjustment, the current operating capacity of each target stand-alone machine is adjusted to obtain the latest operating capacity of each target stand-alone machine;

[0033] The latest operating capacity of the designated machine is determined according to the latest operating capacity of each target machine and the total operating capacity, wherein the sum of the latest operating capacity of each target machine and the latest operating capacity of the designated machine is the total operating capacity.

[0034] According to another aspect of the embodiment of the present application, a multi-connection system control device is also provided, including:

[0035] An acquisition module, used for acquiring operating environment information, wherein the operating environment information includes: a target indoor temperature to be maintained for a target room to be temperature-regulated by a multi-split system, and an outdoor temperature of an environment in which an outdoor unit of the multi-split system is located;

[0036] A first determination module is used to determine the operation energy efficiency information of each single machine in the multi-connected system according to the operation environment information, wherein the multi-connected system includes multiple single machines, and for the operation energy efficiency information of each single machine, the operation energy efficiency information is used to indicate the relationship between the operation capacity and energy efficiency of the single machine;

[0037] A second determination module is used to determine the capacity allocation adjustment direction of the multi-connection system according to the operating environment information and the operating energy efficiency information of each single machine;

[0038] The adjustment module is used to adjust the initial operation capacity of each single machine according to the capacity allocation adjustment direction and through a preset adjustment strategy to obtain the minimum power consumption operation plan of the multi-connected system under the operation environment information.

[0039] According to another aspect of the embodiments of the present application, there is also provided an electronic device, including a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other via the communication bus; wherein the memory is used to store a computer program; and the processor is used to execute the method steps in any of the above embodiments by running the computer program stored in the memory.

[0040] According to another aspect of the embodiments of the present application, a computer-readable storage medium is provided, in which a computer program is stored, wherein the computer program is configured to execute the method steps in any of the above embodiments when executed.

[0041] In an embodiment of the present application, the capacity allocation adjustment direction of the multi-split system can be determined according to the operating environment information and the operating energy efficiency information of each single machine, and the operating capacity of each single machine in the multi-split system can be adjusted according to the capacity allocation adjustment direction, thereby maintaining the target temperature to be maintained in the target room while minimizing the power consumption of the multi-split system; thereby overcoming the technical problem in the related art that in the traditional modular multi-split air-conditioning system, the capacity allocation method between modules is single and it is impossible to ensure that the air-conditioning system is in the most energy-saving operating mode. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0043] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0044] Figure 1 is a schematic diagram of a hardware environment of an optional multi-connection system control method according to an embodiment of the present application;

[0045] Figure 2 It is a flowchart of an optional multi-link system control method according to an application example of the present application;

[0046] Figure 3 is in accordance with Figure 2A schematic flow chart of a method for controlling a multi-connected system in method 1 of the application example shown;

[0047] Figure 4 is an optional capacity-energy efficiency curve schematic diagram according to an embodiment of the present application;

[0048] Figure 5 is a schematic diagram of an optional compressor frequency-power consumption curve according to an embodiment of the present application;

[0049] Figure 6 is a structural block diagram of an optional multi-connection system control device according to an embodiment of the present application;

[0050] Figure 7 It is a structural block diagram of an optional electronic device according to an embodiment of the present application. DETAILED DESCRIPTION

[0051] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0052] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0053] According to one aspect of an embodiment of the present application, a multi-connection system control method is provided. Optionally, in this embodiment, the multi-connection system control method can be applied to a hardware environment consisting of a terminal and a server. The server is connected to the terminal via a network, and can be used to provide services (such as advertising push services, application services, etc.) to the terminal or a client installed on the terminal. A database can be set on the server or independently of the server to provide data storage services for the server.

[0054] The above network may include but is not limited to at least one of the following: wired network, wireless network. The above wired network may include but is not limited to at least one of the following: wide area network, metropolitan area network, local area network, and the above wireless network may include but is not limited to at least one of the following: WIFI (Wireless Fidelity), Bluetooth. The terminal may not be limited to a PC, a mobile phone, a tablet computer, etc.

[0055] The multi-connection system control method of the embodiment of the present application can be executed by a server, a terminal, or a server and a terminal together. The multi-connection system control method of the embodiment of the present application can be executed by a terminal or a client installed thereon.

[0056] Taking the multi-connection system control method of this embodiment executed by the server as an example, Figure 1 A multi-connection system control method provided in an embodiment of the present application includes the following steps:

[0057] Step S101, obtaining operating environment information, wherein the operating environment information includes: a target indoor temperature to be maintained in a target room where the multi-split system needs to perform temperature adjustment, and an outdoor temperature of an environment where an outdoor unit of the multi-split system is located;

[0058] The multi-split system control method in this embodiment can be applied to scenarios where multiple (for example, 2, 3, 4, etc.) single machines (for example, air conditioners) need to be controlled for energy-saving operation. In the embodiment of the present application, the multi-split system control method is described by taking multiple air conditioners as an example. For other types of electrical equipment, the multi-split system control method is also applicable if there is no contradiction.

[0059] Optionally, the temperature of the target room in a stable state can be obtained by a temperature sensor and used as the target temperature. Similarly, the temperature of the environment where the outdoor unit is located can be monitored to obtain the outdoor temperature of the environment where the outdoor unit of the multi-split system is located.

[0060] Step S102, determining the operating energy efficiency information of each single machine in the multi-connected system according to the operating environment information, wherein the multi-connected system includes multiple single machines, and for each single machine, the operating energy efficiency information is used to indicate the relationship between the operating capacity and energy efficiency of the single machine;

[0061] Generally speaking, under different operating environments, the operating energy efficiency information of each single machine is different, and the greater the temperature difference between indoor and outdoor (ie, the temperature difference between the target temperature and the outdoor temperature), the greater the power consumption of each single machine.

[0062] The operating energy efficiency information is used to indicate the relationship between the operating capacity and power consumption of the corresponding single machine. Figure () shows an example of the operating energy efficiency information. The operating capacity specifically refers to the total heat exchange capacity of the air conditioner outdoor unit to undertake the cooling or heating required for a certain space, which is measured by the heat exchange of the indoor space and the unit is W or KW.

[0063] Furthermore, the operating energy efficiency information of each single machine under different optional operating environment information can be determined in advance. As described below, taking the determination of the operating energy efficiency information under the operating environment information as an example, before determining the operating energy efficiency information of each single machine in the multi-connected system according to the operating environment information in step S102, the method further includes the following steps:

[0064] Step S201 , in an environment corresponding to the operating environment information, the energy efficiency of each single machine at each operating capacity is measured, and a one-to-one correspondence between the operating capacity and the energy efficiency is obtained.

[0065] A test environment corresponding to the set operating environment information can be set, and each single machine can be operated under the test environment, and then the energy efficiency of each single machine under different operating capabilities can be obtained, and the operating capabilities and energy efficiencies can be recorded one by one.

[0066] Step S202: Obtain the operating energy efficiency information of each single machine according to a one-to-one correspondence.

[0067] After obtaining the one-to-one correspondence, the one-to-one correspondence may be processed to obtain the operating energy efficiency information of each single machine. For example, optionally, the following may be obtained based on the one-to-one correspondence: Figure 4 Capacity-efficiency curve shown.

[0068] Step S103: determining the capacity allocation adjustment direction of the multi-connection system according to the operating environment information and the operating energy efficiency information of each single machine.

[0069] After obtaining the operating environment information, the operating capacity requirements required to maintain the target temperature in the target room can be obtained.

[0070] After determining the operating energy efficiency information of each single machine, the operating energy efficiency of different single machines at different operating capacities can be obtained.

[0071] Therefore, after determining the operating environment information and the operating energy efficiency information of each single machine, a capacity allocation adjustment direction for guiding the subsequent adjustment of the operating capacity of each single machine can be determined.

[0072] The capacity allocation adjustment direction may be a capacity allocation solution that is preliminarily estimated to achieve the lowest power consumption.

[0073] Step S104, adjusting the initial operating capacity of each single machine according to the capacity allocation adjustment direction and using a preset adjustment strategy, to obtain a minimum power consumption operating solution for the multi-connected system under the operating environment information.

[0074] After the capacity allocation adjustment direction is obtained, the initial operation capacity of each single machine can be adjusted according to the capacity allocation adjustment direction to obtain the minimum power consumption operation plan of the multi-connected system under the operation environment information.

[0075] The initial operating capacity of each single machine can be adjusted by a preset adjustment strategy, that is, after the initial operating capacity of each single machine is adjusted to the operating capacity indicated by the capacity allocation adjustment direction, it is adjusted according to the preset deviation, and the total power consumption corresponding to each adjustment is recorded, and the operating capacity allocation scheme when the total power consumption is the lowest is determined as the lowest power consumption operating scheme. In addition, it is also possible to use the initial operating capacity as the initial value, and gradually adjust in the capacity allocation adjustment direction according to the preset minimum adjustment value, and determine the operating capacity allocation scheme when the total power consumption is the lowest during the adjustment process as the lowest power consumption operating scheme.

[0076] Then, the operation of each single machine is controlled according to the lowest power consumption operation plan.

[0077] Through the method in this embodiment, the capacity allocation adjustment direction of the multi-split system can be determined according to the operating environment information and the operating energy efficiency information of each single machine, and the operating capacity of each single machine in the multi-split system can be adjusted according to the capacity allocation adjustment direction, so that the power consumption of the multi-split system can be minimized while maintaining the target temperature to be maintained in the target room; thereby overcoming the technical problem that in the traditional modular multi-split air-conditioning system in the related art, the capacity allocation method between modules is single and it is impossible to ensure that the air-conditioning system is in the most energy-saving operating mode.

[0078] As an optional implementation, as in the aforementioned method, before the initial operating power of each single machine is adjusted according to the capacity allocation adjustment direction and the preset adjustment strategy in step S104 to obtain the minimum power consumption operation scheme of the multi-connected system under the operating environment information, the method further includes the following steps:

[0079] Step S301, determining the rated capacity of each single machine, wherein the rated capacity of each single machine is used to indicate the operating capacity of the corresponding single machine under rated operating conditions;

[0080] Step S302, determining the operating capacity requirement according to the operating environment information;

[0081] Step S303, based on the ratio of the operating capacity requirement divided by the rated total capacity, determine the initial operating capacity and initial operating power of each unit, wherein the rated total capacity is the sum of all rated capacities, and the initial operating capacity of each unit is the product of the rated capacity of each unit and the ratio.

[0082] In a modular multi-connected system, when multiple single machines are running at the same time, the capacity of the multiple single machines is allocated according to the rated capacity of each single machine and the corresponding ratio during the first x minutes (for example, 30 minutes, 40 minutes, etc.) after the multi-connected system is started.

[0083] For example, when there are three units (unit 1, unit 2, unit 3), and the rated capacities are 4KW, 3KW, and 3KW respectively, and the operating capacity requirement is 6KW, the rated total capacity is 4KW+3KW+3KW=10KW, and the ratio is the operating capacity requirement divided by the rated total capacity, that is, 6 / 10=0.6, so the initial operating capacity of unit 1 is 4*0.6=2.4KW, the initial operating capacity of unit 2 is 3*0.6=1.8KW, and the initial operating capacity of unit 3 is 3*0.6=1.8KW. The initial operating power of each unit can be determined according to the corresponding initial operating capacity to be achieved by each unit.

[0084] As an optional implementation, as in the above method, the step S103 determines the capacity allocation adjustment direction of the multi-connected system according to the operating environment information and the operating energy efficiency information of each single machine, including the following steps:

[0085] Step S401, determining N candidate capacity allocation adjustment directions, wherein in each candidate capacity allocation adjustment direction, for each first single machine in N-1 first single machines, the first operating capacity of the first single machine is the corresponding optimal operating capacity, and the second operating capacity of the second single machine except the N-1 first single machines in the multiple single machines is the difference between the operating capacity requirement and the sum of all the first operating capabilities. The second single machines in different candidate capacity allocation adjustment directions are different, N is the number of the multiple single machines, and the operating capacity requirement is determined according to the operating environment information;

[0086] Each single machine has a corresponding optimal operating capacity. For each single machine, the optimal operating capacity is the operating capacity when the corresponding single machine has the highest energy efficiency.

[0087] For example, when the operating capacity requirement is Y and the multi-connection system includes three stand-alone machines (stand-alone machine 1 (corresponding optimal operating capacity is X1), stand-alone machine 2 (corresponding optimal operating capacity is X2), and stand-alone machine 3 (corresponding optimal operating capacity is X3)), three candidate capacity allocation adjustment directions can be determined:

[0088] The candidate capacity allocation adjustment direction 1 is: the operating capacity provided by the stand-alone 1 is X1, the operating capacity provided by the stand-alone 2 is X2, and the operating capacity provided by the stand-alone 3 is Y-X1-X2;

[0089] The candidate capacity allocation adjustment direction 2 is: the operating capacity provided by the stand-alone 1 is X1, the operating capacity provided by the stand-alone 2 is Y-X1-X3, and the operating capacity provided by the stand-alone 3 is X3;

[0090] Candidate capacity allocation adjustment direction 3 is: the operating capacity provided by single machine 1 is Y-X3-X2, the operating capacity provided by single machine 2 is X2, and the operating capacity provided by single machine 3 is X3.

[0091] Step S402: For each candidate capacity allocation adjustment direction, the total power consumption of the candidate capacity allocation adjustment direction is determined based on the compressor energy efficiency information of each single machine and the operating capacity of each single machine in the candidate capacity allocation adjustment direction, wherein the compressor energy efficiency information includes a one-to-one corresponding compressor frequency and power consumption, and the compressor frequency is positively correlated with the operating capacity.

[0092] Optionally, for a single machine, the higher the compressor frequency, the stronger the operating capacity, therefore, the compressor frequency is positively correlated with the operating capacity, and, in general, for a compressor, the compressor frequency and the power consumption are also correlated. Therefore, after all candidate capacity allocation adjustment directions are determined, for each candidate capacity allocation adjustment direction, the single machine power consumption of each single machine can be determined based on the operating capacity of each single machine in the candidate capacity allocation adjustment direction, and then the total power consumption is obtained based on the sum of the power consumption of all single machines.

[0093] Step S403: Among all the candidate capability allocation adjustment directions, determine the capability allocation adjustment direction with the lowest total power consumption as the capability allocation adjustment direction.

[0094] After obtaining the total power consumption corresponding to each candidate capability allocation adjustment direction, the candidate capability allocation adjustment direction with the lowest total power consumption may be determined as the capability allocation adjustment direction.

[0095] As an optional implementation, as in the aforementioned method, step S104 adjusts the initial operating power of each single machine according to the capacity allocation adjustment direction and through a preset adjustment strategy to obtain the minimum power consumption operation scheme of the multi-connected system under the operating environment information, including the following steps:

[0096] Step S501, for each target single machine, determine the deviation of the target first operating capacity of the target single machine in the capacity allocation adjustment direction relative to the initial operating capacity of the target single machine, wherein the target single machine is a single machine among multiple single machines, the operating capacity allocated in the capacity allocation adjustment direction being the corresponding optimal operating capacity.

[0097] After determining the capacity allocation adjustment direction and the initial operating capacity of the target machine, the deviation of the target first operating capacity of the target machine in the capacity allocation adjustment direction relative to the initial operating capacity of the target machine can be determined by subtraction.

[0098] For example, the capacity allocation adjustment direction is: the operating capacity provided by single machine 1 is X1, the operating capacity provided by single machine 2 is X2, and the operating capacity provided by single machine 3 is Y-X1-X2; and the initial operating capacity of single machine 1 is x1; then the deviation of single machine 1 is X1-x1.

[0099] Step S502, while keeping the total operating capacity of the multi-connected system unchanged, adjust the initial operating capacity of at least one target single machine by performing at least one adjustment operation, and obtain the corresponding operating plan, which is the optimal capacity allocation plan for operating at the lowest power consumption, wherein the total operating capacity is equal to the operating capacity demand, and each adjustment operation is used to reduce the deviation between the current operating capacity of the target single machine being adjusted and the corresponding optimal operating capacity according to the lower limit of the operating capacity adjustment indicated in the preset adjustment strategy, and for any target single machine, the adjusted deviation corresponding to the target single machine is less than or equal to the deviation before adjustment.

[0100] After determining the deviation corresponding to each single machine, in order to move closer to the capacity allocation adjustment direction, the deviation needs to be reduced. In addition, in order to ensure that the target room temperature can be maintained, the total operating capacity of the multi-connected system needs to be kept unchanged.

[0101] And through at least one adjustment operation, the initial operating capacity of at least one of the target machines (it can be one of the target machines or all the target machines) is adjusted according to the operating capacity adjustment lower limit, so that the corresponding operating plan is the optimal capacity allocation plan that operates according to the lowest power consumption.

[0102] The lower limit of operating capacity adjustment can be y min / kw, where y can be 1, 2, 3, etc.

[0103] Step S503: obtaining a minimum power consumption operation plan according to the optimal capacity allocation plan.

[0104] After obtaining the optimal capacity allocation plan, the operating capacity of each single machine can be determined, and then the operating power of each single machine can be obtained, and finally the lowest power consumption operation plan can be obtained.

[0105] As an optional implementation, as in the aforementioned method, the step S502 adjusts the initial operating capacity of at least one target stand-alone machine by performing at least one adjustment operation, and obtains the corresponding operating scheme as an optimal capacity allocation scheme for operating at the lowest power consumption, including the following steps:

[0106] Step S601, determining the capacity allocation plan after adjustment obtained by performing an adjustment operation to adjust the capacity allocation plan before adjustment, wherein when the adjustment operation is performed for the first time, for each single machine, the operating capacity of each single machine in the capacity allocation plan before adjustment is the initial operating capacity of each single machine.

[0107] After performing the adjustment operation on the capacity allocation scheme before adjustment, the capacity allocation scheme after adjustment can be obtained. Performing the adjustment operation on the capacity allocation scheme before adjustment can be to adjust the operating capacity of each single machine in the capacity allocation scheme before adjustment. Since the total operating capacity of the multi-connected system needs to remain unchanged, after increasing or decreasing the operating capacity of a single machine, the operating capacity of another or more single machines must be adjusted. Therefore, when making adjustments, the operating capacity of two or more single machines must be adjusted.

[0108] Step S602: When the total power consumption after adjustment is less than or equal to the total power consumption before adjustment, the capacity allocation scheme before adjustment is adjusted by the capacity allocation scheme after adjustment, and the capacity allocation scheme after adjustment is updated by the capacity allocation scheme obtained after the adjustment operation, wherein the total power consumption after adjustment is the total power consumption corresponding to the capacity allocation scheme after adjustment, and the total power consumption before adjustment is the total power consumption corresponding to the capacity allocation scheme before adjustment;

[0109] As known from the above embodiments, each capacity allocation scheme can obtain the corresponding total power consumption, so the adjusted total power consumption corresponding to the adjusted capacity allocation scheme and the pre-adjustment total power consumption corresponding to the pre-adjustment capacity allocation scheme can be obtained.

[0110] Furthermore, the relationship between the total power consumption after adjustment and the total power consumption before adjustment can be determined; when the total power consumption after adjustment is less than or equal to the total power consumption before adjustment, the capacity allocation plan before adjustment is adjusted through the capacity allocation plan after adjustment, the adjustment operation is continued to be performed on the capacity allocation plan after adjustment, and the capacity allocation plan after adjustment is updated through the capacity allocation plan obtained after the adjustment operation.

[0111] For example, when there are two stand-alone machines (stand-alone machine 1 and stand-alone machine 2), a condition parameter P0 is set (the initial value of P0 is infinite). After each adjustment, the average total power consumption P before the adjustment is 总(i.e., the sum of the average power consumption P1 of single machine 1 and the average power consumption P2 of single machine 2 when running according to the capacity allocation plan before adjustment) is assigned to P0, that is, let P0 = P 总 =P1+P2.

[0112] The sum of the average power consumption P'1 of single machine 1 and the average power consumption P'2 of single machine 2 when running according to the capacity allocation plan before adjustment is assigned to P 总 .

[0113] The average power consumption may be obtained by calculating the average value of the total power consumption of a single machine in a period of time.

[0114] Step S603, determining whether the total power consumption corresponding to the latest adjusted capacity allocation scheme is less than or equal to the total power consumption corresponding to the adjusted capacity allocation scheme before adjustment;

[0115] The latest capacity allocation scheme after adjustment can be obtained through the aforementioned embodiment method; further, the total power consumption corresponding to the latest capacity allocation scheme after adjustment and the total power consumption corresponding to the capacity allocation scheme before adjustment can be obtained.

[0116] It can then be determined whether the total power consumption corresponding to the latest adjusted capacity allocation scheme is less than or equal to the total power consumption corresponding to the adjusted capacity allocation scheme before adjustment.

[0117] Step S604, the above steps are executed repeatedly until the total power consumption corresponding to the latest adjusted capacity allocation scheme is greater than the total power consumption corresponding to the latest adjusted capacity allocation scheme before adjustment, and the latest adjusted capacity allocation scheme is determined as the optimal capacity allocation scheme.

[0118] If the total power consumption corresponding to the latest adjusted capacity allocation plan is less than or equal to the total power consumption corresponding to the capacity allocation plan before adjustment, return to step S601; if the total power consumption corresponding to the latest adjusted capacity allocation plan is greater than the total power consumption corresponding to the capacity allocation plan before adjustment, the latest adjusted capacity allocation plan is determined as the optimal capacity allocation plan.

[0119] Based on the above example, if the average total power consumption P of the adjusted capacity allocation scheme is 总 ≤P0+b, continue to perform optimal adjustment; otherwise, maintain the current capacity allocation, that is, maintain the adjusted capacity allocation plan.

[0120] Among them, b is a fixed negative value. There are two reasons for setting it: ① The average power consumption of the multi-split system is calculated based on the voltage and current parameters detected by the multi-split system itself, which has a certain error, so a certain tolerance correction is given here; ② After executing the energy efficiency optimization control, the overall power consumption of the multi-split system must be lower than before the adjustment, and the amount of power consumption reduction must be greater than a certain value to be considered more energy-efficient, otherwise the reduction value is too small and the optimization control is of little significance.

[0121] As an optional implementation, in the aforementioned method, the step adjustment operation includes the following steps:

[0122] Step S701, adjusting the current operating capacity of each target stand-alone machine according to the lower limit of the operating capacity adjustment, and obtaining the latest operating capacity of each target stand-alone machine.

[0123] After the lower limit of the operating capacity adjustment is obtained, the current operating capacity of each designated single machine can be adjusted according to the lower limit of the operating capacity adjustment to obtain the latest operating capacity of each target single machine.

[0124] For example:

[0125] Time / min Total capacity of multi-link system Single machine 1 allocation capacity Single machine 2 allocation capacity 0 <![CDATA[Q 总 ]]> <![CDATA[Q1]]> <![CDATA[Q2]]> y <![CDATA[Q 总 ]]> <![CDATA[Q1-1]]> <![CDATA[Q2+1]]> 2y <![CDATA[Q 总 ]]> <![CDATA[Q1-2]]> <![CDATA[Q2+2]]> ... ... ... ... ny <![CDATA[Q 总 ]]> <![CDATA[Q 1优 ]]> <![CDATA[Q 总 -Q 1优 ]]>

[0126] Step S702: Determine the latest operating capacity of the designated machine according to the latest operating capacity of each target machine and the total operating capacity, wherein the sum of the latest operating capacity of each target machine and the latest operating capacity of the designated machine is the total operating capacity.

[0127] In order to keep the total operating capacity unchanged, when the operating capacity of the target single machine changes, the operating capacity of the specified single machine may also need to change. The latest operating capacity of the specified single machine is the difference between the total operating capacity and the latest operating capacity of each target single machine. For example, a multi-connected system includes two single machines. When the operating capacity of single machine 1 changes, the operating capacity of single machine 2 must also be adjusted.

[0128] like Figure 2 and Figure 3 As shown, an application example of applying any of the above embodiments is provided:

[0129] In a modular multi-connection system, when multiple modules (i.e., single machines) are running simultaneously, the capacity allocation between modules is based on the rated capacity of each module and the corresponding ratio for the first x min after the multi-connection system is started up.

[0130] After x min, the unit has been operating stably according to the initial allocation capacity, and is then controlled according to the dynamic adjustment allocation method.

[0131] Take two stand-alone machines running simultaneously as an example:

[0132] 1. Establish a database of unit operation energy efficiency curves.

[0133] According to the characteristics of different single machines, the operation energy efficiency curve of the single machine (ie, the operation energy efficiency information) is formulated and input into the program control database.

[0134] At different outdoor ambient temperatures T w and different indoor average ambient temperature T n Under these conditions, each stand-alone machine has different capacity-efficiency curves. For example, Figure 4 An optional capacity-energy efficiency curve diagram is shown as follows: Figure 5 As shown, an optional compressor frequency-power consumption curve is provided.

[0135] Optionally, the relationship between different indoor and outdoor ambient temperatures and the optimal operating capacity and optimal power consumption is shown in the following table:

[0136]

[0137] Detect the outdoor ambient temperature T of each powered-on unit w and the average ambient temperature T of all powered-on indoor units n , through T w and T n Obtain the optimal operating capacity Q corresponding to each single machine 优 and the compressor frequency Z at optimal operating capacity 优 , power consumption P 优 .

[0138] Second, determine the direction of capacity allocation adjustment.

[0139] There are two ways to adjust according to the optimal operation:

[0140] Method 1: Run stand-alone machine 1 to its optimal operating capacity. The allocation capacity of stand-alone machine 1 should be Q 1优 , and the allocation capacity of stand-alone 2 is Q 总 -Q 1优 , the theoretical total power consumption of the two stand-alone machines is P 1优 +P2';

[0141] Method 2: Run stand-alone 2 to its optimal operating capacity, then the allocation capacity of stand-alone 1 should be Q 总 -Q 2优 , and the allocation capacity of stand-alone 2 is Q 2优 At this time, the theoretical total power consumption of the two single machines is P1'+P 2优 .

[0142] The final capacity allocation adjustment direction is determined according to the result of the minimum theoretical total power consumption. 1优+P2'<P1'+P 2优 , then adjust according to the allocation method of method 1; if P 1优 +P2'>P1'+P 2优 , then adjust according to the second allocation method; if P 1优 +P2'=P1'+P 2优 When the rated capacity of unit 1 is less than or equal to the rated capacity of unit 2, the allocation method of method 1 shall be used for adjustment; otherwise, the allocation method of method 2 shall be used for adjustment.

[0143] 3. Monitoring of total system power consumption.

[0144] While determining the adjustment direction, detect the average voltage U and average operating current I of each single machine in the current control cycle (y min), and then calculate the average power consumption P of the current control cycle (i.e., the control cycle for executing the current capacity allocation plan) according to the formula P = a*U*I (a is the power factor correction coefficient). The average total power consumption P of the current control cycle is 总 =P1+P2.

[0145] 4. Energy efficiency optimization and adjustment cycle.

[0146] After determining the adjustment direction, ensure the total system capacity Q 总 The allocation capacity of each machine is Q w Adjust according to the amplitude of every ymin / kw.

[0147] like Figure 3 A method according to Figure 2 The schematic diagram of the method flow of the multi-link system control method in the application example shown in FIG. 1 is taken as an example (Q1>Q 1优 ):

[0148] Time / min Total capacity of multi-link system Single machine 1 allocation capacity Single machine 2 allocation capacity 0 <![CDATA[Q 总 ]]> <![CDATA[Q1]]> <![CDATA[Q2]]> y <![CDATA[Q 总 ]]> <![CDATA[Q1-1]]> <![CDATA[Q2+1]]> 2y <![CDATA[Q 总 ]]> <![CDATA[Q1-2]]> <![CDATA[Q2+2]]> ... ... ... ... ny <![CDATA[Q 总 ]]> <![CDATA[Q 1优 ]]> <![CDATA[Q 总 -Q 1优 ]]>

[0149] 5. Optimal control conditions for energy efficiency.

[0150] Set a condition parameter P0 (the initial value of P0 is infinite). After each adjustment, the average total power consumption P before adjustment is 总 Assign a value to P0, that is, let P0 = P 总 =P1+P2.

[0151] If the average total power consumption P of the current control cycle 总 ≤P0+b, the optimization adjustment is continued; otherwise, the current control cycle is not adjusted, the current capacity allocation is maintained, and the current operation plan is used as the operation plan with the lowest power consumption.

[0152] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.

[0153] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method according to the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course it can also be implemented by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM (Read-Only Memory) / RAM (Random Access Memory), a disk, or an optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present application.

[0154] According to another aspect of the embodiment of the present application, a multi-split system control device for implementing the multi-split system control method is also provided. Figure 6 is a structural block diagram of an optional multi-connection system control device according to an embodiment of the present application, such as Figure 6 As shown, the device may include:

[0155] The acquisition module 1 is used to acquire the operating environment information, wherein the operating environment information includes: the target temperature to be maintained in the target room where the multi-split system needs to perform temperature adjustment, and the outdoor temperature of the environment where the outdoor unit of the multi-split system is located;

[0156] A first determination module 2 is used to determine the operation energy efficiency information of each single machine in the multi-connected system according to the operation environment information, wherein the multi-connected system includes multiple single machines, and for the operation energy efficiency information of each single machine, the operation energy efficiency information is used to indicate the relationship between the operation capacity and energy efficiency of the single machine;

[0157] The second determination module 3 is used to determine the capacity allocation adjustment direction of the multi-connection system according to the operating environment information and the operating energy efficiency information of each single machine;

[0158] The adjustment module 4 is used to adjust the direction according to the capacity allocation and adjust the initial operating power of each single machine through a preset adjustment strategy to obtain the minimum power consumption operation plan of the multi-connected system under the operating environment information.

[0159] It should be noted that the acquisition module 1 in this embodiment can be used to execute the above step S101, the first determination module 2 in this embodiment can be used to execute the above step S102, the second determination module 3 in this embodiment can be used to execute the above step S103, and the adjustment module 4 in this embodiment can be used to execute the above step S104.

[0160] The device in this embodiment, in addition to the above modules, may also include a module for executing any method in any of the above-mentioned embodiments of the multi-connected system control method.

[0161] It should be noted that the above modules and corresponding steps implement the same examples and application scenarios, but are not limited to the contents disclosed in the above embodiments. It should be noted that the above modules, as part of the device, can be run in the implementation of Figure 1 The hardware environment of the method shown may be implemented by software or hardware, wherein the hardware environment includes a network environment.

[0162] According to another aspect of the embodiment of the present application, an electronic device for implementing the above-mentioned multi-connection system control method is also provided. The electronic device may be a server, a terminal, or a combination thereof.

[0163] According to another embodiment of the present application, there is also provided an electronic device, including: Figure 7 As shown, the electronic device may include: a processor 1501 , a communication interface 1502 , a memory 1503 and a communication bus 1504 , wherein the processor 1501 , the communication interface 1502 , and the memory 1503 communicate with each other via the communication bus 1504 .

[0164] Memory 1503, used for storing computer programs;

[0165] The processor 1501 is used to implement the following steps when executing the program stored in the memory 1503:

[0166] Step S101, obtaining operating environment information, wherein the operating environment information includes: a target indoor temperature to be maintained in a target room that needs to be temperature-regulated by a multi-split system, and an outdoor temperature of an environment in which an outdoor unit of the multi-split system is located.

[0167] Step S102, determining the operating energy efficiency information of each single machine in the multi-connected system according to the operating environment information, wherein the multi-connected system includes multiple single machines, and the operating energy efficiency information of each single machine is used to indicate the relationship between the operating capacity and energy efficiency of the single machine.

[0168] Step S103: determining the capacity allocation adjustment direction of the multi-connection system according to the operating environment information and the operating energy efficiency information of each single machine.

[0169] Step S104, adjusting the initial operating capacity of each single machine according to the capacity allocation adjustment direction and using a preset adjustment strategy, to obtain a minimum power consumption operating solution for the multi-connected system under the operating environment information.

[0170] Optionally, in this embodiment, the above-mentioned communication bus can be a PCI (Peripheral Component Interconnect) bus, or an EISA (Extended Industry Standard Architecture) bus, etc. The communication bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, only one thick line is used in the figure, but it does not mean that there is only one bus or one type of bus. The communication interface is used for communication between the above-mentioned electronic device and other devices.

[0171] The memory may include a random access memory (RAM) or a non-volatile memory (NVM), such as at least one disk memory. Optionally, the memory may also be at least one storage device located away from the aforementioned processor.

[0172] The above-mentioned processor can be a general-purpose processor, which can include but not be limited to: CPU (Central Processing Unit), NP (Network Processor), etc.; it can also be DSP (Digital Signal Processor), ASIC (Application Specific Integrated Circuit), FPGA (Field-Programmable Gate Array) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components.

[0173] An embodiment of the present application further provides a computer-readable storage medium, the storage medium including a stored program, wherein the method steps of the above method embodiment are executed when the program is run.

[0174] Optionally, in this embodiment, the storage medium may include, but is not limited to, various media that can store program codes, such as a USB flash drive, a ROM, a RAM, a mobile hard disk, a magnetic disk, or an optical disk.

[0175] The serial numbers of the above-mentioned embodiments of the present application are for description only and do not represent the advantages or disadvantages of the embodiments.

[0176] If the integrated units in the above embodiments are implemented in the form of software functional units and sold or used as independent products, they can be stored in the above computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for enabling one or more computer devices (which may be personal computers, servers, or network devices, etc.) to execute all or part of the steps of the methods described in the various embodiments of the present application.

[0177] In the above embodiments of the present application, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, please refer to the relevant description of other embodiments.

[0178] In the several embodiments provided in the present application, it should be understood that the disclosed client can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.

[0179] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution provided in this embodiment.

[0180] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0181] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A multi-connection system control method, characterized in that: include: Acquiring operating environment information, wherein the operating environment information includes: a target indoor temperature to be maintained in a target room where the multi-split system needs to perform temperature regulation, and an outdoor temperature of an environment in which an outdoor unit of the multi-split system is located; Determining the operating energy efficiency information of each single machine in the multi-connected system according to the operating environment information, wherein the multi-connected system includes multiple single machines, and for the operating energy efficiency information of each single machine, the operating energy efficiency information is used to indicate the relationship between the operating capacity and energy efficiency of the single machine; Determining the capacity allocation adjustment direction of the multi-connection system according to the operating environment information and the operating energy efficiency information of each single machine; According to the capacity allocation adjustment direction, the initial operation capacity of each single machine is adjusted by a preset adjustment strategy to obtain the minimum power consumption operation plan of the multi-connected system under the operation environment information; The method of determining the capacity allocation adjustment direction of the multi-connected system according to the operating environment information and the operating energy efficiency information of each single machine includes: determining N candidate capacity allocation adjustment directions, wherein, in each candidate capacity allocation adjustment direction, for each first single machine among N-1 first single machines, the first operating capacity of the first single machine is the corresponding optimal operating capacity, and the second operating capacity of the second single machine except the N-1 first single machines among the multiple single machines is the difference between the operating capacity requirement and the sum of all the first operating capacities, and the second single machines in different candidate capacity allocation adjustment directions are different, N is the number of the multiple single machines, and the operating capacity requirement is determined according to the operating environment information; for each candidate capacity allocation adjustment direction, based on the compressor energy efficiency information of each single machine and the operating capacity of each single machine in the candidate capacity allocation adjustment direction, determining the total power consumption of the candidate capacity allocation adjustment direction, wherein the compressor energy efficiency information includes a one-to-one corresponding compressor frequency and power consumption, and the compressor frequency is positively correlated with the operating capacity; among all the candidate capacity allocation adjustment directions, determining the one with the lowest total power consumption as the capacity allocation adjustment direction; The method of adjusting the initial operating capacity of each single machine according to the capacity allocation adjustment direction and by a preset adjustment strategy to obtain the minimum power consumption operation plan of the multi-connected system under the operation environment information includes: for each target single machine, determining the deviation of the target first operating capacity of the target single machine in the capacity allocation adjustment direction relative to the initial operating capacity of the target single machine, wherein the target single machine is a single machine among the multiple single machines, the operating capacity allocated in the capacity allocation adjustment direction being the corresponding optimal operating capacity; while keeping the total operating capacity of the multi-connected system unchanged, adjusting the initial operating capacity of at least one target single machine by performing at least one adjustment operation, and obtaining the corresponding operation plan is the optimal capacity allocation plan for operation according to the minimum power consumption, wherein the total operating capacity is equal to the operating capacity requirement, and each adjustment operation is used to reduce the deviation between the current operating capacity of the target single machine being adjusted and the corresponding optimal operating capacity according to the operating capacity adjustment lower limit indicated in the preset adjustment strategy, and for any target single machine, the deviation corresponding to the target single machine after adjustment is less than or equal to the deviation before adjustment; and obtaining the minimum power consumption operation plan according to the optimal capacity allocation plan.

2. The method according to claim 1, characterized in that Before adjusting the initial operating power of each single machine according to the capacity allocation adjustment direction and using a preset adjustment strategy to obtain the minimum power consumption operating solution of the multi-connected system under the operating environment information, the method further includes: Determine the rated capacity of each unit, wherein the rated capacity of each unit is used to indicate the operating capacity of the corresponding unit under rated operating conditions; Determining the operating capacity requirements according to the operating environment information; Based on the ratio of the operating capacity requirement divided by the rated total capacity, the initial operating capacity of each single machine is determined, wherein the rated total capacity is the sum of all the rated capacities, and the initial operating capacity of each single machine is the product of the rated capacity of each single machine and the ratio.

3. The method according to claim 2, characterized in that Before determining the operating energy efficiency information of each single machine in the multi-connected system according to the operating environment information, the method further includes: In the environment corresponding to the operating environment information, the energy efficiency of each single machine at each operating capacity is measured, and a one-to-one correspondence between the operating capacity and the energy efficiency is obtained; According to the one-to-one correspondence, the operating energy efficiency information of each single machine is obtained.

4. The method according to claim 1, characterized in that: The step of adjusting the initial operating capacity of at least one target stand-alone machine by performing at least one adjustment operation, and obtaining a corresponding operating scheme that is an optimal capacity allocation scheme for operating at the lowest power consumption, includes: Determine a capacity allocation scheme after adjustment obtained by performing the adjustment operation to adjust the capacity allocation scheme before adjustment, wherein, when the adjustment operation is performed for the first time, for each of the single machines, the operating capacity of each of the single machines in the capacity allocation scheme before adjustment is the initial operating capacity of each of the single machines; In the case where the total power consumption after adjustment is less than or equal to the total power consumption before adjustment, the adjustment operation is continued on the capacity allocation scheme before adjustment through the capacity allocation scheme after adjustment, and the capacity allocation scheme after adjustment is updated through the capacity allocation scheme obtained after the adjustment operation, wherein the total power consumption after adjustment is the total power consumption corresponding to the capacity allocation scheme after adjustment, and the total power consumption before adjustment is the total power consumption corresponding to the capacity allocation scheme before adjustment; Determine whether the total power consumption corresponding to the latest adjusted capacity allocation plan is less than or equal to the total power consumption corresponding to the adjusted capacity allocation plan before adjustment; The above steps are executed cyclically until the total power consumption corresponding to the latest adjusted capacity allocation scheme is greater than the total power consumption corresponding to the latest adjusted capacity allocation scheme before adjustment, and the latest adjusted capacity allocation scheme is determined as the optimal capacity allocation scheme.

5. The method according to claim 1, characterized in that The adjustment operation includes: According to the lower limit of the operating capacity adjustment, the current operating capacity of each target stand-alone machine is adjusted to obtain the latest operating capacity of each target stand-alone machine; According to the latest operating capacity of each target single machine and the total operating capacity, the latest operating capacity of the designated single machine is determined, wherein the designated single machine is a single machine among the multiple single machines except the target single machine, and the sum of the latest operating capacity of each target single machine and the latest operating capacity of the designated single machine is the total operating capacity.

6. A multi-connection system control device, characterized in that: include: An acquisition module, used for acquiring operating environment information, wherein the operating environment information includes: a target indoor temperature to be maintained for a target room to be temperature-regulated by a multi-split system, and an outdoor temperature of an environment in which an outdoor unit of the multi-split system is located; A first determination module is used to determine the operation energy efficiency information of each single machine in the multi-connected system according to the operation environment information, wherein the multi-connected system includes multiple single machines, and for the operation energy efficiency information of each single machine, the operation energy efficiency information is used to indicate the relationship between the operation capacity and energy efficiency of the single machine; A second determination module is used to determine the capacity allocation adjustment direction of the multi-connection system according to the operating environment information and the operating energy efficiency information of each single machine; An adjustment module, configured to adjust the initial operation capacity of each single machine according to the capacity allocation adjustment direction and through a preset adjustment strategy, so as to obtain a minimum power consumption operation plan of the multi-connected system under the operation environment information; The second determination module is specifically used to: determine N candidate capacity allocation adjustment directions, wherein, in each of the candidate capacity allocation adjustment directions, for each first single machine among the N-1 first single machines, the first operating capacity of the first single machine is the corresponding optimal operating capacity, and the second operating capacity of the second single machine except the N-1 first single machines among the multiple single machines is the difference between the operating capacity requirement and the sum of all the first operating capacities, and the second single machines in different candidate capacity allocation adjustment directions are different, N is the number of the multiple single machines, and the operating capacity requirement is determined according to the operating environment information; for each candidate capacity allocation adjustment direction, based on the compressor energy efficiency information of each single machine and the operating capacity of each single machine in the candidate capacity allocation adjustment direction, determine the total power consumption of the candidate capacity allocation adjustment direction, wherein the compressor energy efficiency information includes a one-to-one corresponding compressor frequency and power consumption, and the compressor frequency is positively correlated with the operating capacity; among all the candidate capacity allocation adjustment directions, determine the one with the lowest total power consumption as the capacity allocation adjustment direction; The adjustment module is specifically used to: for each target single machine, determine the deviation of the target first operating capacity of the target single machine in the capacity allocation adjustment direction relative to the initial operating capacity of the target single machine, wherein the target single machine is a single machine among the multiple single machines, and the operating capacity allocated in the capacity allocation adjustment direction is the corresponding optimal operating capacity; while keeping the total operating capacity of the multi-connected system unchanged, by performing at least one adjustment operation, the initial operating capacity of at least one target single machine is adjusted, and the corresponding operating scheme is the optimal capacity allocation scheme for operating according to the lowest power consumption, wherein the total operating capacity is equal to the operating capacity requirement, and each adjustment operation is used to adjust the operating capacity indicated in the preset adjustment strategy. limit, reduce the deviation between the current operating capacity of the target single machine being adjusted and the corresponding optimal operating capacity, for any target single machine, the adjusted deviation corresponding to the target single machine is less than or equal to the deviation before adjustment; and obtain the minimum power consumption operating plan according to the optimal capacity allocation plan.

7. An electronic device comprising a processor, a communication interface, a memory and a communication bus, wherein: The processor, the communication interface and the memory communicate with each other via the communication bus, wherein: The memory is used to store computer programs; The processor is configured to execute the method steps of any one of claims 1 to 5 by running the computer program stored in the memory.

8. A computer-readable storage medium, characterized in that: The storage medium stores a computer program, wherein the computer program is configured to execute the method steps described in any one of claims 1 to 5 when executed.

9. An air conditioning system, characterized in that: Comprising the electronic device as claimed in claim 7.

Citation Information

Patent Citations

  • Running control method and device for heat recovery multiple online system and multiple online system

    CN105972769A

  • Control method and device of multi-connected unit system and system with control device

    CN107860103A

  • Air conditioner outdoor fan control method, device and equipment and air conditioner

    CN109210675A

  • Control method of variable frequency air conditioner and air conditioner

    CN109269006A

  • Control method, control device and control system of multi-split air conditioner and readable medium

    CN111503842A