A method for spraying concrete in initial support of TBM tunnel
Through the combination of the tunnel contour imaging module and the data processing module, the thickness and flatness of the shotcrete can be detected and adjusted in real time, which solves the problem of difficult control of worker operations during TBM construction and improves construction quality and efficiency.
Patent Information
- Application Number
- CN202211673126.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-26
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2042-12-26
AI Technical Summary
In TBM construction, the operating level of workers affects the thickness and flatness of shotcrete, which is difficult to control, resulting in increased construction costs and safety hazards, and the construction quality is not up to standard.
The tunnel contour imaging module is used in conjunction with the data processing module to detect the thickness and flatness of the shotcrete in real time. The sprayed concrete system automatically adjusts the nozzle movement and concrete flow rate to ensure that the thickness and flatness meet the design specifications.
It achieves fast and accurate detection and control of shotcrete, improves construction quality and efficiency, and reduces material waste and construction organization costs.
Smart Images

Figure CN115908389B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of TBM construction, and in particular to a method for spraying concrete for initial support of a TBM tunnel. Background Art
[0002] TBM (abbreviation of Tunnel Boring Machine) is an advanced tunnel construction equipment, widely used in railway, highway and water conservancy tunnel / tunnel construction. The initial support structure of the tunnel is generally divided into four categories: shotcrete, anchor rods, steel mesh and steel arch frame. During construction, the type and parameters of the support structure to be used are determined according to the level of the surrounding rock in accordance with the principle of graded support. Shotcrete is the last step in the initial support process. The thickness of shotcrete varies under different surrounding rock levels. For tunnels constructed by TBM method, workers currently remotely operate the shotcrete system in the shotcrete bridge area to complete the shotcrete operation.
[0003] Affected by the workers' operating level, the thickness and flatness of shotcrete under different surrounding rock levels are difficult to control. First, the local thickness of the shotcrete will exceed or fall short of the design value. If the shotcrete is too thick, it will occupy the space for the later secondary lining construction. It is necessary to clean up the extra-thick area before constructing the secondary lining, which is time-consuming and labor-intensive and increases construction costs. If the thickness of the shotcrete does not reach the design value, it will reduce the support capacity of the initial support structure and bring safety hazards to the tunnel construction. Second, the flatness of the shotcrete will exceed the construction quality acceptance standard and reduce the construction quality. Summary of the invention
[0004] In view of this, the purpose of the present invention is to provide a method for initial support shotcrete of a TBM tunnel in order to address the deficiencies in the prior art, which can quickly and accurately detect the thickness and flatness of shotcrete in a large area, and control the walking mode of the concrete shotcrete system and the consumption of concrete according to the detection results.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A method for spraying concrete for initial support of a TBM tunnel, wherein a tunnel inner contour imaging module is installed on one side of a spraying concrete nozzle, and the tunnel inner contour imaging module is electrically connected to a tunnel contour data processing module, specifically comprising the following steps:
[0007] (1) Collecting the original image of the tunnel inner contour: using the tunnel inner contour imaging module to scan the tunnel inner contour of the area to be sprayed with concrete, obtaining its contour surface data, and storing it in the tunnel contour data processing system;
[0008] (2) Shotcrete spraying: Use TBM shotcrete system to carry out shotcrete spraying;
[0009] (3) Thickness detection of shotcrete operation area: the operation area in step (2) is scanned by using the tunnel inner contour imaging module to obtain the inner contour surface data after the operation, and the data is stored in the tunnel contour data processing system again; the system is used to compare and analyze the distance between the inner contour surfaces of the tunnel before and after the two scans, and the maximum distance value, the minimum distance value and the coordinates of the position are marked on the original image data of the inner contour of the tunnel, and the average distance value is displayed. These three data are the maximum thickness value, the minimum thickness value and the average thickness value of this shotcrete operation;
[0010] (4) Shotcrete operation quality evaluation: The shotcrete operation quality evaluation system is used to compare the average thickness value of the shotcrete operation obtained in step (3) with the design value of the concrete thickness of the tunnel area to be shotcreted, so as to evaluate whether the shotcrete thickness of the current operation meets the requirements, and select the area with a large concrete thickness change rate as the flatness evaluation area;
[0011] (5) Repeat the above steps (2) to (4) until the thickness and flatness of the shotcrete reach the design specifications.
[0012] Preferably, the tunnel profile data processing module calculates and displays in real time the total amount of shotcrete m0 required for the operation area and the actual consumption of shotcrete m0 after each operation is completed based on the theoretical design value of concrete thickness. i , the estimated remaining concrete demand is m2; the number of operations is n, then the above parameters satisfy the following relationship:
[0013]
[0014] Real-time calculation shows the rebound amount δ of each tank of shotcrete. The specific calculation method is as follows:
[0015]
[0016] Where m is the total amount of concrete per tank measured in the production management system of the mixing station, m i is the actual consumption of shotcrete after each operation is completed, and s is the number of operations that each tank of concrete can be used for.
[0017] The beneficial effects of the present invention are:
[0018] The present invention can quickly and accurately detect the thickness and flatness of shotcrete in a large area, improving the detection efficiency, accuracy and range; the movement of the TBM shotcrete system nozzle and the concrete flow rate are controlled according to the detection results, replacing the traditional workers' visual judgment and remote control of the movement of the TBM shotcrete system nozzle. The control of thickness and flatness in the process of shotcrete is no longer dependent on the workers' work experience, which is conducive to improving the construction quality; the total amount of shotcrete required in the work area, the actual consumption and the demand can be calculated in real time, improving the accuracy of shotcrete production, realizing the informatization and intelligence of TBM tunnel shotcrete operation, which is conducive to saving materials and construction organization efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the structure of the present invention.
[0020] In the figure: 1 nozzle, 2 tunnel contour imaging module. DETAILED DESCRIPTION
[0021] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0022] like Figure 1 As shown, a method for spraying concrete for initial support of a TBM tunnel is provided. A tunnel inner contour imaging module 2 is installed on one side of a spraying concrete nozzle 1. The tunnel inner contour imaging module 2 is electrically connected to a tunnel contour data processing module. The specific steps of the construction method are as follows:
[0023] (1) Collecting the original image of the tunnel inner contour: using the tunnel inner contour imaging module 2 to scan the tunnel inner contour of the area to be sprayed with concrete, obtaining its contour surface data, and storing it in the tunnel contour data processing system;
[0024] (2) Shotcrete spraying: Use TBM shotcrete system to carry out shotcrete spraying;
[0025] (3) Thickness detection of shotcrete operation area: the operation area in step (2) is scanned by tunnel inner contour imaging module 2 to obtain the inner contour surface data after the operation, and the data is stored in the tunnel contour data processing system again; the system is used to compare and analyze the distance between the inner contour surfaces of the tunnel before and after the two scans, and the maximum distance value, the minimum distance value and the coordinates of the position are marked on the original image data of the inner contour of the tunnel, and the average distance value is displayed. These three data are the maximum thickness value, the minimum thickness value and the average thickness value of this shotcrete operation;
[0026] (4) Shotcrete operation quality evaluation: The shotcrete operation quality evaluation system is used to compare the average thickness value of the shotcrete operation obtained in step (3) with the design value of the concrete thickness of the tunnel area to be shotcreted, so as to evaluate whether the shotcrete thickness of the current operation meets the requirements, and select the area with a large concrete thickness change rate as the flatness evaluation area;
[0027] (5) Repeat the above steps (2) to (4) until the thickness and flatness of the shotcrete reach the design specifications.
[0028] The tunnel inner contour imaging module is installed next to the nozzle of the shotcrete system. It can follow the movement mechanism of the nozzle to rotate around the center line of the tunnel to obtain the inner contour of any tunnel section. The scanning range is the area above the invert block, and the angle is not less than 315°. The module can also follow the movement mechanism of the nozzle to make a translational movement in a direction parallel to the center line of the tunnel to obtain the inner contour of any mileage section of the tunnel. The tunnel inner contour data of the above two latitudes are superimposed to form a tunnel contour surface image within a certain range. The tunnel inner contour imaging module uses laser radar imaging. The light source is a semiconductor laser with a wavelength of 905nm, which is equivalent to 160 beams, and the imaging accuracy reaches the millimeter level.
[0029] The tunnel inner contour imaging module control can drive the TBM shotcrete nozzle to move to the corresponding position according to the maximum distance value and the minimum distance value position coordinates marked on the original image data of the tunnel inner contour. This module can collect the flow rate during the shotcrete operation in real time, and adjust the concrete flow rate in different areas during the shotcrete operation in real time according to the difference between the thickness detection result of the shotcrete operation area and the theoretical design value.
[0030] The tunnel profile data processing module calculates and displays the total amount of shotcrete m0 required for the operation area and the actual consumption of shotcrete m after each operation is completed in real time based on the theoretical design value of concrete thickness. i , the estimated remaining concrete demand is m2; the number of operations is n, then the above parameters satisfy the following relationship:
[0031]
[0032] Real-time calculation shows the rebound amount δ of each tank of shotcrete. The specific calculation method is as follows:
[0033]
[0034] Where m is the total amount of concrete per tank measured in the production management system of the mixing station, m i is the actual consumption of shotcrete after each operation is completed, and s is the number of operations that each tank of concrete can be used for.
[0035] Shotcrete flatness evaluation: Select the location with the largest change rate in the area with a large concrete thickness change rate (gradient), and select two locations with the thickest thickness in a circular area with the location as the center and a radius of 0.5m. Use the tunnel profile data processing system to calculate the straight-line distance L between the two thickest locations and the deepest depth D between the two locations. When D / L is not greater than 1 / 20, it means that the flatness meets the requirements.
[0036] Unless otherwise specified, the device elements involved in the above embodiments are all conventional device elements, and the structural settings, working modes or control modes involved are all conventional settings, working modes or control modes in the art unless otherwise specified.
[0037] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Other modifications or equivalent substitutions made to the technical solution of the present invention by ordinary technicians in the field should be included in the scope of the claims of the present invention as long as they do not depart from the spirit and scope of the technical solution of the present invention.
Claims
1. A method for initial support shotcrete of a TBM tunnel, characterized in that: A tunnel inner contour imaging module is installed on one side of the shotcrete nozzle, and the tunnel inner contour imaging module is electrically connected to the tunnel contour data processing module, which specifically includes the following steps: (1) Collecting the original image of the tunnel inner contour: using the tunnel inner contour imaging module to scan the tunnel inner contour of the area to be sprayed with concrete, obtaining its contour surface data, and storing it in the tunnel contour data processing system; (2) Shotcrete spraying: Use TBM shotcrete system to carry out shotcrete spraying; (3) Thickness detection of shotcrete operation area: the operation area in step (2) is scanned by using the tunnel inner contour imaging module to obtain the inner contour surface data after the operation, and the data is stored in the tunnel contour data processing system again; the system is used to compare and analyze the distance between the inner contour surfaces of the tunnel before and after the two scans, and the maximum distance value, the minimum distance value and the coordinates of the position are marked on the original image data of the inner contour of the tunnel, and the average distance value is displayed. These three data are the maximum thickness value, the minimum thickness value and the average thickness value of this shotcrete operation; (4) Shotcrete operation quality evaluation: The shotcrete operation quality evaluation system is used to compare the average thickness value of the shotcrete operation obtained in step (3) with the design value of the concrete thickness of the tunnel area to be shotcreted, so as to evaluate whether the shotcrete thickness of the current operation meets the requirements, and select the area with a large concrete thickness change rate as the flatness evaluation area; The method for evaluating the flatness of shotcrete is as follows: select the location with the largest change rate in the area where the concrete thickness changes greatly, select two locations with the thickest thickness in a circular area with the location as the center and a radius of 0.5m, calculate the straight-line distance L between the two locations with the thickest thickness and the deepest depth D between the two locations, and when D / L is not greater than 1 / 20, it means that the flatness meets the requirements; (5) Repeat the above steps (2) to (4) until the thickness and flatness of the shotcrete reach the design specifications.
2. The method for spraying concrete for initial support of a TBM tunnel according to claim 1, characterized in that: The tunnel profile data processing module calculates and displays the total amount of shotcrete m0 required for the operation area and the actual consumption of shotcrete m after each operation is completed in real time based on the theoretical design value of concrete thickness. i , the estimated remaining concrete demand is m2; the number of operations is n, then the above parameters satisfy the following relationship: Real-time calculation shows the rebound amount δ of each tank of shotcrete. The specific calculation method is as follows: Among them, m is the total amount of each tank of concrete measured in the production management system of the mixing station, mi is the actual consumption of shotcrete after each operation is completed, and s is the number of times each tank of concrete can be used for operation.