A cigarette factory air conditioning energy-saving system and control method

By setting up the first and second air conditioning units in the cigarette factory air conditioning system and dynamically adjusting with the air supply and return air systems, the problem of energy waste in the air conditioning system in abnormal production state is solved, and significant energy savings and Air environment control effect.

CN115950008BActive Publication Date: 2024-11-08CHINA TOBACCO GUANGXI IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211592255.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-12
Publication Date
2024-11-08
Estimated Expiration
2042-12-12

AI Technical Summary

Technical Problem

The existing cigarette factory air conditioning system cannot stop the chiller unit and steam boiler when the production of the main wire production of the wire is suspended, resulting in energy waste.

Method used

Design a cigarette factory air conditioning energy system, including a first air conditioning unit and a second air conditioning unit, the first air conditioning unit operates in a normal production state, the second air conditioning unit operates in an abnormal production state, and through air supply and return The air system is dynamically adjusted to supply air to the required workshop rooms to reduce energy consumption.

Benefits of technology

It greatly reduces the energy consumption under abnormal production conditions such as weekend shifts, reduces the operating time of steam boilers and chillers, improves energy utilization efficiency, reduces the total air volume of air conditioning design, and solves the problem of air temperature and humidity stratification.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115950008B_ABST
    Figure CN115950008B_ABST
Patent Text Reader

Abstract

The present invention discloses an air conditioning energy-saving system and control method for a cigarette factory building, the system comprising: a first air conditioning unit, connected to the main power source of the factory, suitable for opening under normal production process conditions; at least one second air conditioning unit, arranged in parallel with the first air conditioning unit, and connected to an independent power source; the first air conditioning unit and the second air conditioning unit independently and alternately operate; an air supply system, the air inlet end is respectively connected to the air outlet end of the first air conditioning unit or the second air conditioning unit, the air outlet end extends into the interlayer above different workshop rooms and extends to the air supply port of the workshop room working area; the air supply system is suitable for regulating and controlling the air supply of the first air conditioning unit or the second air conditioning unit; a return air system, connected to the return air ports of different workshop rooms, and connected to the air inlet end of the first air conditioning unit or the second air conditioning unit. The present invention reorganizes the operation energy supply mode for the weekend shift working condition, greatly reducing the energy consumption of the weekend working condition operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of temperature control systems in cigarette factories, and in particular to an air conditioning energy-saving system and a control method for cigarette factory workshops. Background Art

[0002] Inside the cigarette factory workshop, corresponding to the characteristics of the production line, a large number of functional rooms that require environmental temperature and humidity control are set up, such as: a stem storage room corresponding to the stem production line, a storage room for expanded tobacco production line, and a leaf storage room corresponding to the leaf production line, etc., and corresponding air-conditioning units, air-conditioning pipelines and control systems are set up respectively. The physical characteristics of the loose structure of tobacco materials determine that it is highly sensitive to environmental temperature and humidity, and has always been in the core process control position. Without exception, technical personnel in this field have proposed the highest level of air-conditioning capacity design requirements in this industry, that is, according to the volume of the workshop section, a higher number of circulating winds and a higher regional air-conditioning air supply volume are configured. While the operating condition control margin is enlarged, the operating energy consumption is also higher. However, simply enlarging the design volume of the HVAC of the plant is not conducive to solving the air stratification problem caused by the limitation of the dense layout of process equipment.

[0003] The main technical defect of the existing plant air conditioning design and operation control system is that the intelligent design and control capabilities are insufficient. The temperature and humidity detection points are far away from the materials, and the air conditioning system operation response is only related to the average temperature and humidity changes in the entire space, and is not highly correlated with the production dynamics and actual needs of process materials. Especially during the weekend shift, in order to ensure the air environment control requirements of 2-3 temporary storage cabinets with a total volume of less than 600 cubic meters, the entire area of ​​about 8,000 cubic meters is often operated and controlled to match the air conditioning with a design capacity of 100,000 cubic meters / hour. At the same time, when the main silk production line is suspended, the chillers and steam boilers related to the operation of this air conditioning system cannot be stopped, resulting in energy waste. Summary of the invention

[0004] Therefore, the technical problem to be solved by the present invention is to overcome the defect in the prior art that when the main silk-making line production is suspended, the chillers and steam boilers related to the air-conditioning system cannot be stopped, resulting in energy waste, thereby providing a cigarette factory air-conditioning energy-saving system and control method.

[0005] To achieve the above object, the technical solution adopted by the present invention is:

[0006] An air conditioning energy-saving system for a cigarette factory building, comprising:

[0007] The first air conditioning unit is connected to the main power source of the factory and is suitable for starting under normal production process conditions;

[0008] At least one second air conditioning unit is arranged in parallel with the first air conditioning unit and connected to an independent power source, suitable for being turned on in an abnormal production process state; the first air conditioning unit and the second air conditioning unit operate independently and alternately;

[0009] An air supply system, the air inlet end of which is respectively connected to the air outlet end of the first air-conditioning unit or the second air-conditioning unit, and the air outlet end extends into the mezzanine above different workshop rooms and extends to the air supply outlet of the workshop room working area; the air supply system is suitable for adjusting and controlling the air supply of the first air-conditioning unit or the second air-conditioning unit, and stopping the air supply to the workshop room that is not in operation;

[0010] The return air system is connected to the return air outlets of different workshop rooms and to the air inlet of the first air-conditioning unit or the second air-conditioning unit; the return air system is suitable for returning the internal air of different workshop rooms to the first air-conditioning unit or the second air-conditioning unit for circulation treatment.

[0011] To further optimize the technical solution, the air supply system includes:

[0012] At least two air outlet pipes of the air conditioner units are connected to the air outlet ends of the first air conditioner unit and the second air conditioner unit in sequence;

[0013] A first stop valve, each of the air outlet pipes of the air conditioning unit is respectively provided with a first stop valve;

[0014] The air supply main pipe, the air inlet end is connected with the intersection of the air outlet pipes of each air conditioning unit;

[0015] A plurality of air supply branch pipes, the air inlet ends of which are respectively connected to the air outlet ends of the air supply main pipes, the air outlet ends of which extend to the air supply outlets of the working area of ​​the workshop rooms, and are arranged in the mezzanines above different workshop rooms;

[0016] A plurality of booster fans are located in the mezzanine above the workshop room, and a booster fan is correspondingly arranged on each of the air supply branch pipes; the booster fan is used to pressurize the air delivered from the air supply main pipe, and then deliver the pressurized air to the air supply outlet of the working area of ​​the workshop room through the air supply branch pipe.

[0017] To further optimize the technical solution, the air supply branch pipe is provided with an electric regulating valve suitable for adjusting the air flow rate according to working conditions.

[0018] To further optimize the technical solution, the booster fan is set to match the air supply pressure and air supply volume according to the number, structure and air supply distance of the air supply outlets in each working area of ​​the workshop room.

[0019] To further optimize the technical solution, the return air system includes:

[0020] Several return air branches are connected to the return air outlets of different workshop rooms;

[0021] The return air main pipe is connected to each return air branch pipe;

[0022] At least two air-conditioning unit return air ducts, one end of which is connected to the air outlet end of the return air main pipe, and the other end of which is connected to the air inlet end of the first air-conditioning unit and the second air-conditioning unit in sequence;

[0023] A second stop valve is provided on the return air duct of each air conditioning unit; the air inside the workshop room is returned to the first air conditioning unit or the second air conditioning unit for circulation treatment by controlling the second stop valve.

[0024] To further optimize the technical solution, the return air system further includes:

[0025] A plurality of proportional integral return air valves are respectively arranged on each of the return air branches, and are suitable for adjusting the cumulative amount of return air to maintain a positive pressure state between the interior and exterior environment of the workshop room.

[0026] To further optimize the technical solution, the first air-conditioning unit, the second air-conditioning unit, the air supply system and the return air system are respectively communicatively connected to the silk making central control system and the power energy management system.

[0027] A method for controlling an air conditioning energy-saving system of a cigarette factory building, wherein the method controls the air conditioning energy-saving system of a cigarette factory building according to different production process states, and comprises the following steps:

[0028] S1. When the startup conditions of the normal production process are met, start the factory's main power source, the first air conditioning unit, the air supply system, and the return air system;

[0029] The main power source of the factory supplies energy to the first air-conditioning unit, and the output wind of the first air-conditioning unit is transmitted to the air outlet of the working area of ​​the workshop room to adjust the temperature in each workshop room;

[0030] The output air from each workshop room flows back to the first air conditioning unit through the return air system to form a cycle;

[0031] S2. When the startup conditions of the abnormal production process state are met, shut down the factory main power energy and the first air-conditioning unit in step S1, and start the independent power energy, the second air-conditioning unit, the air supply system, and the return air system;

[0032] The independent power source supplies energy to the second air-conditioning unit, and the output wind of the second air-conditioning unit is transmitted to the air supply outlet of the working area of ​​the workshop room to adjust the temperature in each workshop room;

[0033] The output air from each workshop room flows back to the second air-conditioning unit through the return air system to form a circulation.

[0034] Further optimizing the technical solution, the maximum design air supply volume of the first air-conditioning unit is related to the total volume of the different workshop rooms controlled, and the number of air circulation times of the first air-conditioning unit is less than or equal to 3;

[0035] The maximum designed air supply volume of the second air-conditioning unit is related to the total volume of the different controlled workshop rooms, and the number of air circulation times of the second air-conditioning unit is less than or equal to 1.

[0036] Further optimizing the technical solution, the start-up conditions of the normal production process state include:

[0037] Receive instructions from the silk-making central control system;

[0038] And / or start-up of process equipment in the workshop room;

[0039] And / or semi-finished product feeding or unloading of storage cabinets in workshop rooms;

[0040] And / or pre-production heat machine required for environmental control in workshop rooms after long-term shutdown;

[0041] The starting conditions of the abnormal production process state include:

[0042] During weekends or holidays, there are semi-finished materials in the storage cabinets in the workshop room;

[0043] And / or ambient air quality requirements for weekend inspection and maintenance of certain areas within the workshop room.

[0044] To further optimize the technical solution, the air supply control steps of step S1 are:

[0045] The first air-conditioning unit is in the startup state, and when a process flow device in one of the controlled workshop rooms is in the startup state, the booster fan corresponding to the workshop room is started;

[0046] The opening of each electric regulating valve is adjusted so that the air exhausted by the first air conditioning unit directly participates in process control and / or adjusts the overall temperature and humidity in the balancing workshop room;

[0047] The return air control steps of step S1 are:

[0048] The proportional integral return air valve automatically adjusts the total return air volume of the workshop room corresponding to the proportional integral return air valve according to the total supply air volume of the electric control valve.

[0049] To further optimize the technical solution, the air supply control steps of step S2 are:

[0050] The first air conditioning unit is in a stopped state, the second air conditioning unit is in a started state, and a storage cabinet in one of the controlled workshop rooms is in a loaded state, and the booster fan corresponding to the workshop room is started;

[0051] The opening of each electric regulating valve is adjusted so that the air exhausted by the second air-conditioning unit is sent to the air supply outlet of the controlled storage cabinet area, ensuring the environmental temperature and humidity control requirements required for material storage handover, and stopping the air supply to the workshop room where the storage cabinet is not started.

[0052] The return air control steps of step S2 are:

[0053] Through process tests and / or manual adjustment of proportional integral return air valve parameters, the supply and return air pressure differences in the workshop room and / or the working condition control area within the workshop room are adjusted to meet the process control requirements of different working conditions.

[0054] The technical solution of the present invention has the following advantages:

[0055] 1. The present invention provides an air conditioning energy-saving system for a cigarette factory building. Aiming at the weekend shift working condition, the operating energy supply mode is reorganized to greatly reduce the energy consumption of the weekend working condition. In particular, steam boilers with a total energy consumption of more than 60%, and chillers with a large power consumption and a total energy consumption of more than 15%, can be shut down on weekends under new technical conditions, which is of great significance to the scientific energy saving of the cigarette factory. The present invention sets the first air conditioning unit and the second air conditioning unit in parallel, and makes the first air conditioning unit and the second air conditioning unit operate independently and alternately, and then the first air conditioning unit is used to supply air under normal production process conditions, and the second air conditioning unit is used to supply air under abnormal production process conditions; and under abnormal production process conditions, the main power energy of the factory with large energy consumption can be suspended, and energy is supplied by an independent power energy source independent of the main power energy of the factory and with small energy consumption, and the air supply system is used to supply air only to the workshop rooms in working state, thereby greatly saving energy consumption.

[0056] The present invention designs and coordinates different physically partitioned rooms that originally used the same process parameters and were individually equipped with air conditioners at the factory level, breaks down the physical boundaries including different floors, and adopts the terminal boosting method to directly distribute and transport them to the operating point, greatly reducing the total air volume of the air conditioning design.

[0057] 2. The present invention provides an air conditioning energy-saving system for cigarette factory buildings, which improves the green technology and intelligent manufacturing level of industry enterprises. The technical method of the present invention of "selecting energy according to working conditions" and "supplying air according to working conditions" for dynamic adjustment provides new technical solutions and practical cases for industry enterprises to scientifically save energy, improve green technology and intelligent manufacturing level.

[0058] 3. The present invention provides an air conditioning energy-saving system for cigarette factory buildings. The air conditioning system is linked with the production process equipment to accurately control the ambient temperature and humidity of process materials, solve the problem of temperature and humidity stratification in large spaces, and achieve substantial energy saving.

[0059] 4. The present invention provides an air conditioning energy-saving system for a cigarette factory building, which adopts a method of setting a corresponding booster fan on each air supply branch pipe, and then directly distributes and transports the air generated by the first air-conditioning unit or the second air-conditioning unit to the working point through the terminal boosting method, so that the air distribution speed is faster.

[0060] 5. The present invention provides an air conditioning energy-saving system for a cigarette factory building, wherein an electric regulating valve is provided on the air supply branch pipe, and the electric regulating valve is suitable for adjusting the air flow rate according to the working conditions. Only for the leaf storage cabinets storing materials, the electric regulating valve is opened, and the air supply branch pipe sends air to the controlled leaf storage cabinets for air supply. Under special working conditions, for the leaf storage cabinets without materials, the electric regulating valve is opened to an opening of 20-30%, and the air supply branch pipe sends air to the air supply port of the controlled leaf storage cabinet without materials to adjust and balance the overall temperature and humidity of the entire leaf storage room and the enthalpy difference with the outside air. Comprehensively reduce major quality risks such as yellow spots and mildew caused by condensation and dripping.

[0061] 6. The present invention provides an energy-saving air conditioning system for a cigarette factory building. A booster fan is correspondingly arranged on each air supply branch pipe, and then the air generated by the first air-conditioning unit or the second air-conditioning unit is directly distributed and transported to the operating point through terminal boosting, so that the air distribution speed is faster and the total air volume of the air conditioning design is greatly reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0063] Figure 1 The present invention is a flow chart of an air conditioning energy-saving system for a cigarette factory building.

[0064] Reference numerals:

[0065] 1. First air conditioning unit, 2. Second air conditioning unit, 3. Supply air main, 4. First stop valve, 5. Booster fan, 6. Electric regulating valve, 7. Supply air branch pipe, 8. Supply air outlet, 9. Return air outlet, 10. Return air branch pipe, 11. Proportional integral return air valve, 12. Return air main, 13. Steam boiler, 14. Chiller, 15. Second stop valve, 16. Air conditioning unit outlet pipe, 17. Air conditioning unit return air pipe. DETAILED DESCRIPTION

[0066] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0067] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0068] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0069] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0070] Example 1

[0071] like Figure 1 A specific implementation of an air conditioning energy-saving system for a cigarette factory building is shown, comprising: a first air conditioning unit 1, a second air conditioning unit 2, an air supply system and a return air system.

[0072] The first air conditioning unit 1 is connected to the main power source of the factory and is suitable for being turned on under normal production process conditions.

[0073] At least one second air conditioning unit 2 is provided, which is arranged in parallel with the first air conditioning unit 1 and connected to an independent power source, and is suitable for being turned on under abnormal production process conditions. The first air conditioning unit 1 and the second air conditioning unit 2 operate independently and alternately. The second air conditioning unit uses electric heating, cooling and humidification to control the local environmental temperature and humidity required for the working conditions of the shift handover of materials stored in some storage cabinets on weekends.

[0074] The air inlet end of the air supply system is connected to the air outlet end of the first air-conditioning unit 1 or the second air-conditioning unit 2 respectively, and the air outlet end of the air supply system extends into the mezzanine above different workshop rooms and extends to the air supply outlet of the working area of ​​the workshop room; the air supply system is suitable for adjusting and controlling the air supply of the first air-conditioning unit 1 or the second air-conditioning unit 2, and stopping air supply to the workshop rooms that are not in operation.

[0075] The return air system is connected to the return air outlets of different workshop rooms and to the air inlet of the first air-conditioning unit 1 or the second air-conditioning unit 2; the return air system is suitable for returning the internal air of different workshop rooms to the first air-conditioning unit 1 or the second air-conditioning unit 2 for circulation treatment.

[0076] The above-mentioned air conditioning energy-saving system for a cigarette factory building sets the first air conditioning unit and the second air conditioning unit in parallel, and makes the first air conditioning unit and the second air conditioning unit operate independently and alternately, and then supply air through the first air conditioning unit under normal production process conditions, and supply air through the second air conditioning unit under abnormal production process conditions, and in abnormal production process conditions, the main power energy of the factory with high energy consumption can be suspended, and energy is supplied by an independent power energy source that is independent of the main power energy of the factory and has low energy consumption, and the air supply system only supplies air to the workshop rooms in working state, thereby greatly saving energy consumption. This embodiment designs and coordinates different physical partition rooms that originally use the same process parameters and are individually equipped with air conditioners at the factory level, breaks the physical boundaries including different floors, and adopts the terminal boosting method to directly distribute and transport to the working point, and the total air volume of the air conditioning design is greatly reduced.

[0077] More specifically, the abnormal production process status includes, but is not limited to, weekend shift change conditions, holiday conditions, and other main production process stop conditions.

[0078] The main power energy of the factory is supplied by the chiller 14 and the steam boiler 13, and the temperature and humidity of the normal working environment are controlled; the independent power energy is not connected to the chiller and steam boiler of the main power energy of the factory, and is heated, cooled and humidified by electricity.

[0079] The air supply system includes: an air outlet pipe 16 of the air conditioning unit, a first stop valve 4, an air supply main pipe 3, an air supply branch pipe 7 and a booster fan 5. At least two air outlet pipes 16 of the air conditioning unit are provided, which are connected to the air outlet ends of the first air conditioning unit 1 and the second air conditioning unit 2 in sequence. Each air outlet pipe 16 of the air conditioning unit is respectively provided with a first stop valve 4, and the on and off of the air outlet pipe 16 of the air conditioning unit is controlled by the first stop valve 4. The air inlet end of the air supply main pipe 3 is connected to the intersection of the air outlet pipes 16 of each air conditioning unit. There are several air supply branch pipes 7, and the air inlet ends of the air supply branch pipes 7 are respectively connected to the air outlet ends of the air supply main pipes, and the air outlet ends of the air supply branch pipes 7 extend to the air supply outlets of the workshop working area, and are arranged in the mezzanine above different workshops. There are several booster fans 5, which are respectively located in the mezzanine above the workshop, and a booster fan 5 is correspondingly arranged on each air supply branch pipe 7. The booster fan 5 is used to pressurize the air delivered from the air supply main pipe, and then deliver the pressurized air to the air supply outlet in the working area of ​​the workshop room through the air supply branch pipe 7.

[0080] This embodiment adopts the method of setting a booster fan 5 on each air supply branch pipe 7, and then directly distributes and delivers the air generated by the first air conditioning unit 1 or the second air conditioning unit 2 to the working point through terminal boosting, so that the air distribution speed is faster. The first air conditioning unit or the second air conditioning unit and the corresponding air supply pipeline can cross the workshop room isolation including floor isolation to supply air to multiple different workshops, and after being pressurized by the booster fan, it is directly delivered to the working point along the air supply pipeline.

[0081] As a further improved implementation, an electric regulating valve 6 is provided on the air supply branch pipe 7, and the electric regulating valve 6 is suitable for adjusting the air flow rate according to working conditions.

[0082] Only for the leaf storage cabinet storing materials, the electric regulating valve 6 is opened, and the air supply branch pipe 7 supplies air to the controlled leaf storage cabinet for air supply.

[0083] Under special working conditions, for the leaf storage cabinet without material, open the electric regulating valve 6 to 20-30% of the opening, and the air supply branch pipe 7 sends air to the controlled air supply port of the leaf storage cabinet without material, so as to adjust and balance the overall temperature and humidity of the entire leaf storage room and the enthalpy difference with the outside air. Comprehensively reduce major quality risks such as yellow spots and mildew caused by condensation and dripping.

[0084] As a further improved implementation method, the booster fan 5 is set with matching air supply pressure and air supply volume according to the number, structure, and air supply distance of the air supply outlets in each working area of ​​the workshop room.

[0085] The air supply pressure and air supply volume parameters of the booster fan include but are not limited to:

[0086] For storage cabinets, the single-tube 30-meter fiber cloth air duct with different apertures has an air outlet speed of 2.8 meters per second, an air supply distance of 1.75 meters, a booster fan pressure of 500Pa, and an air supply volume of 1,000 cubic meters per hour;

[0087] For the conveyor belt, multiple single-tube 15-meter fiber cloth air ducts with different apertures are connected in series, with an air outlet speed of 1.8 m / s, an air supply distance of 1.0 m, a booster fan pressure of 400 Pa, and an air supply volume of 5000 m3 / h / 100 m process line;

[0088] For the control of the internal area of ​​the workshop, such as the feeding and mixing area, multiple single tubes are connected in series to form a mouth-shaped fiber cloth air duct, with an air outlet speed of 4.8 m / s for different apertures, a vertical downward air supply distance of 6.0 m, a booster fan pressure of 1200 Pa, and an air supply volume of 11,000 cubic meters / hour / 100 meters of the mouth-shaped process line.

[0089] As a specific implementation, the return air system includes: a return air branch pipe 10, a return air main pipe 12, an air conditioning unit return air pipe 17, and a second stop valve 15. There are several return air branch pipes 10, which are respectively connected to the return air outlets of different workshops. The return air main pipe 12 is connected to each return air branch pipe 10. There are at least two return air pipes 17 of the air conditioning unit, one end of which is connected to the air outlet end of the return air main pipe 12, and the other end is connected to the air inlet end of the first air conditioning unit 1 and the second air conditioning unit 2 in sequence. A second stop valve 15 is respectively arranged on the return air pipe 17 of each air conditioning unit. By controlling the second stop valve 15, the air inside the workshop is returned to the first air conditioning unit 1 or the second air conditioning unit 2 for circulation treatment. The return air system in this embodiment can circulate the air at the return air outlet of each different workshop to the first air conditioning unit 1 or the second air conditioning unit 2, and then the recovered air is heated or cooled again by the first air conditioning unit 1 or the second air conditioning unit 2.

[0090] As a further improved implementation, the return air system further includes a plurality of proportional integral return air valves 11, which are respectively arranged on each return air branch pipe 10, and are suitable for adjusting the cumulative amount of return air to maintain a positive pressure state between the interior of the workshop room and the external environment. The proportional integral return air valve 11 in this embodiment can adjust the return air volume in each workshop room according to the cumulative amount of inlet air of the associated electric regulating valve 6, and control the temperature in the workshop room by controlling the return air volume, and control the pressure balance inside different workshop rooms.

[0091] As a further improved implementation method, the first air conditioning unit 1, the second air conditioning unit 2, the air supply system and the return air system are respectively connected to the silk making central control system and the power energy management system. The air conditioning operation is electrically connected to the silk making process and directly participates in the process control.

[0092] Example 2

[0093] On the basis of Example 1, this example provides an air conditioning energy-saving system for a cigarette factory building, taking the initial scientific research and development process of the thread making and leaf storage process section of A cigarette factory as an implementation case.

[0094] The main building of the A cigarette factory is a light steel structure. The leaf storage room for the silk thread storage process is a single-layer structure. The north wall is connected to the outside world and is equipped with 5 sets of double-layer cabinets. The air conditioning units are concentrated in other areas on the second floor away from the leaf storage room. The total air supply volume of the matching independent air conditioning units is 50,000 cubic meters per hour. The "side and bottom circular air supply and top return air" air return method commonly used by cigarette factories in the industry is adopted. After more than ten years of operation, a large number of technical bottlenecks have been encountered. The summary is as follows:

[0095] In terms of air supply, due to the long air supply pipe and multiple right-angle turns, the designed air volume is 50,000 cubic meters per hour, but the total air volume reaching the leaf storage room is less than 25,000 cubic meters per hour. The air outlets of the air supply branches on the four walls have very uneven wind speed and volume. The air outlets of the air supply branches on the same wall all have a decreasing wind volume and speed phenomenon. Improvement measures such as using baffles to distribute airflow were once used for the air supply branches, but the effect was minimal.

[0096] Because it is severely restricted by various hardware conditions such as air supply and return air ducts, the original air conditioning system must further increase the air supply temperature difference and humidity difference to improve the temperature and humidity control efficiency when regulating the temperature and humidity in working conditions. However, the results are not ideal, especially in winter working conditions, the ceiling of the light steel structure on the single-story floor that is in contact with the outside world is rusty due to condensation and dripping; the double-layer glass inner wall of the north wall, dew drips on the ground to form large water stains; other walls are detached and a large number of mold spots appear; in terms of the implementation of process standards, the process standards require a temperature and humidity index of 68±5% and 30±2℃, but in winter working conditions, it can only be implemented at 62±5% and 26±2℃, and the air supply enthalpy value of the air conditioner is reduced as much as possible to prevent major quality risks such as yellow spots and mildew caused by condensation and dripping.

[0097] In view of the above problems, the present invention improves the air supply system and adopts the technical solution of the present invention, which is implemented as follows:

[0098] This embodiment utilizes the existing air supply main, connects the existing air conditioning unit, and delivers the air processed by the air conditioning unit to the mezzanine above the leaf storage room.

[0099] A new booster fan is located in the mezzanine above the leaf storage room. It pressurizes the air delivered from the air supply main pipe before it enters the air supply branch pipe.

[0100] The original air supply branch pipe and the air outlet pipe are shielded, and the air supply branch pipe described in the present invention is newly added to directly transport the conditioned air to each leaf storage cabinet in the leaf storage room.

[0101] As a further improved implementation method, according to the structural characteristics of the leaf storage cabinet, a terminal air outlet duct is arranged along the outside of the leaf storage cabinet in a longitudinal direction of 30 meters. The terminal air outlet duct is connected to the air supply branch pipe 7, and an air supply port is arranged to discharge air toward the cabinet to form an air curtain layer.

[0102] The air outlet speed of a single 30-meter fiber cloth duct with different apertures is 2.8 meters per second, the air supply distance is 1.75 meters, the booster fan pressure is 500Pa, and the double-tube air supply volume is 2000 cubic meters per hour.

[0103] As a further improved implementation method, a large number of process tests are carried out for optimization in view of special working conditions, especially winter working conditions and returning south wind working conditions:

[0104] The air conditioning operation is electrically connected to the silk-making production process and directly participates in the process control; only for the leaf storage cabinet where materials are stored, the electric regulating valve is opened, and the air supply branch pipe sends air to the controlled leaf storage cabinet for air supply.

[0105] Under special working conditions, for the leaf storage cabinet without material, open the electric regulating valve to 20-30% of the opening, and the air supply branch pipe will send air to the controlled air supply port of the leaf storage cabinet without material, so as to adjust and balance the overall temperature and humidity of the entire leaf storage room and the enthalpy difference with the outside air. This can comprehensively reduce major quality risks such as yellow spots and mildew caused by condensation and dripping.

[0106] After the above steps, compared with the prior art, the present invention has obvious technical progress features:

[0107] 1. The air supply volume and efficiency of the original air-conditioning unit were seriously insufficient, with 50,000 cubic meters / hour at the air-conditioning end and 25,000 cubic meters / hour at the air outlet end. The air supply was improved to 35,000 cubic meters / hour, the minimum safe operation threshold, at the air-conditioning end, but only 15,000-20,000 cubic meters / hour was needed at the air outlet end, resulting in a large amount of surplus energy and waste.

[0108] 2. The condensation phenomenon caused by the internal and external enthalpy difference is significantly improved, and the process guarantee capability under special working conditions is significantly improved.

[0109] 3. Industry-wide, we have solved the process problem of air temperature and humidity stratification in large spaces with dense equipment, which seriously affects the temperature and moisture of process materials, and obtained new technical solutions and practical cases.

[0110] Example 3

[0111] On the basis of Example 1, this example provides an air conditioning energy-saving system for a cigarette factory building, taking the discrete process points of the expanded tobacco production line of the B cigarette factory as an implementation case.

[0112] The main building of the expanded tobacco production line of B Cigarette Factory is a multi-story frame brick-concrete structure. According to the process flow of the production line, the leaf storage room is on the third floor, and a 40,000 cubic meters / hour air conditioning unit is configured on the same floor; two sets of storage cabinets for storing high-moisture leaf shreds after cutting are arranged on the second floor, covering about 15% of the floor area, and are in the same workshop with other process equipment that occupies 85% of the floor area, and use post-air supply air conditioning.

[0113] These two groups of small-sized discrete storage cabinets for storing high-moisture shredded leaves have a great impact on the moisture content of the subsequent finished products, which is a problem for the power air conditioning system. The air supply air conditioning on the second floor is obviously in the opposite control direction to the high-humidity material storage process requirements; changing the air supply air conditioning on the second floor to a high-temperature and high-humidity state is obviously a loss of the greater for the less, and is not operational; if the 40,000 cubic meters / hour air conditioning unit on the third floor is used to supply air, how can the air conditioning be guaranteed when the production of the front end of the process on the third floor is shut down.

[0114] The technical solution of the present invention is adopted and the improvement is implemented as follows:

[0115] Utilizing the original first air-conditioning unit 1 on the third floor, a new air supply main pipe 3 is added to transport the conditioned air to the vertical upper part of the process point on the second floor, connected to the newly added booster fan 5, and the air supply branch pipe 7 transports the conditioned air to the vicinity of the process point.

[0116] At an appropriate location in the air-conditioning room on the third floor, a small second air-conditioning unit 2 with a capacity of 5,000 cubic meters per hour is added. It is connected in parallel with the original first air-conditioning unit 1, and an electric regulating valve is installed to connect the newly added air supply main to supply air to discrete process points on the second floor.

[0117] For the blade storage cabinet at the discrete process point, a terminal air outlet structure similar to that of Example 2 is adopted;

[0118] For conveyor belts, multiple single-tube 15-meter fiber cloth air ducts are connected in series, with air outlet speeds of 1.8 m / s with different apertures, air supply distance of 1.0 m, booster fan pressure of 400 Pa, and air supply volume of 5000 cubic meters / hour / 100 meters of process lines.

[0119] As a further improved implementation method, the return air duct design and operation control are abandoned for discrete process points.

[0120] As a further improved implementation method, when the production of the previous process of the discrete process point stops, but there are process materials at the discrete process point, the air supply is switched to the second air-conditioning unit 2, and the operation is executed by remote video monitoring.

[0121] As a further improved implementation method, a technical solution similar to that of Example 2 is adopted to improve the entire air supply and return air ducts of the air conditioning in the leaf storage room on the third floor.

[0122] Through the above steps, compared with the prior art, in addition to achieving the same energy-saving effect as in Example 2, the new technical progress of the present invention is:

[0123] 1. Aiming at the temperature and humidity control problem of discrete process control points that the original technology is unable to solve or there are difficulties in technology selection, a new technical solution and practical case are provided;

[0124] 2. Dual air conditioners / multiple air conditioners are deployed across regions / floors and their combined use. According to working conditions, the front-end energy organization form, air supply and return organization mode, and terminal air organization mode of the air conditioning system are reorganized to form a new technical combination cognition, so as to achieve scientific energy use, scientific energy saving, and precise control effects.

[0125] Example 4

[0126] Based on the combination of Examples 2-3, this example provides an energy-saving air conditioning system for cigarette factory buildings, which implements large-scale technical improvement and application in the silk mixing process section of the silk making workshop of B cigarette factory, targeting a large space of more than 35,000 cubic meters.

[0127] Under the original technical conditions, the tobacco stem storage room, tobacco leaf storage room, and tobacco mixing and blending room of B Cigarette Factory were separated by solid walls and equipped with independent air-conditioning systems, with designed air volumes of 50,000 cubic meters per hour, 50,000 cubic meters per hour, and 100,000 cubic meters per hour, respectively. Several groups of expanded tobacco storage cabinets and a large number of process equipment were located in the tobacco mixing and blending room. The above areas were restricted by the height of process equipment, with a floor height of about 8.8 meters and a total area of ​​more than 4,000 square meters. The total designed air volume was 200,000 cubic meters per hour, and the designed number of circulating winds was 5.8. Each independent air-conditioning system was connected to the factory's steam boiler and chiller, and regional temperature and humidity control was achieved after air circulation treatment.

[0128] The length of a single storage cabinet is more than 30 meters. In addition to the design requirements of the safety passage, the minimum length of each workshop is more than 40 meters. Therefore, under the original technical conditions, each workshop room supplies air from the four walls to the middle with "high air volume and low air speed", and the return air setting on the ceiling with "side supply and top return" has almost no effect. Further increasing the number of circulating air at full load, increasing the temperature and humidity difference of the supply air, and extending the air duct to the bottom of the cabinet to increase the uniformity of air supply are all high energy and low efficiency.

[0129] In the areas mentioned above, the air conditioning systems are fully turned on under all operating conditions, including weekend shifts; even when operating at the lowest safety threshold, the minimum air supply volume is 140,000 cubic meters per hour.

[0130] The technical solution of the present invention is adopted and the improvement is implemented as follows:

[0131] Combined with the technical methods of Examples 2-3, the above regional air conditioning systems and control areas are re-arranged and pipelines are reorganized in a "point-to-surface combined air supply" manner.

[0132] The first air conditioning unit 1 and the second air conditioning unit 2 are arranged in parallel, and are respectively connected to the air supply main 3 through the first stop valve to deliver the treated air to the upper mezzanine of each independent workshop;

[0133] The first air conditioning unit 1 is connected to a steam boiler 13 and a chiller 14, and has a designed air volume of 100,000 cubic meters per hour for reuse, and a designed number of circulating air times less than or equal to 3.

[0134] The second air-conditioning unit 2 adopts electric heating, cooling and electric humidification, with a designed air volume of 30,000 cubic meters per hour and a circulation air number less than or equal to 1, and is only used for shift conditions.

[0135] Multiple groups of booster fans 5 are provided, which are respectively located in the mezzanines above the different workshops, connected to the air supply main pipe 3, pressurize the delivered air, enter the air supply branch pipe 7, and then deliver it to the air supply outlets 8 of each working area of ​​the workshop room for discharge;

[0136] The air supply pressure and air supply volume parameters of the booster fan include:

[0137] For storage cabinets, the single-tube 30-meter fiber cloth air duct with different apertures has an air outlet speed of 2.8 meters per second, an air supply distance of 1.75 meters, a booster fan pressure of 500Pa, and an air supply volume of 1,000 cubic meters per hour.

[0138] For the conveyor belt, multiple single-tube 15-meter fiber cloth air ducts with different apertures are connected in series, with an air outlet speed of 1.8 m / s, an air supply distance of 1.0 m, a booster fan pressure of 400 Pa, and an air supply volume of 5000 cubic meters / hour / 100 m process line.

[0139] For the control of the internal area of ​​the workshop, such as the feeding and mixing area, multiple single tubes are connected in series to form a mouth-shaped fiber cloth air duct, with an air outlet speed of 4.8 m / s for different apertures, a vertical downward air supply distance of 6.0 m, a booster fan pressure of 1200 Pa, and an air supply volume of 11,000 cubic meters / hour / 100 meters of the mouth-shaped process line.

[0140] The return air vent 9 can be arranged at any appropriate position inside the workshop room. In this embodiment, the original return air pipeline is reused; the return air vent 9 is connected to the return air branch pipe 10, the proportional integral return air valve 11, and the return air main pipe 12.

[0141] The proportional integral return air valve 11 and the return air main 12 are located in the mezzanine above the workshop room, and return the air inside the workshop room to the first air conditioning unit 1 and / or the second air conditioning unit 2 for circulation treatment.

[0142] As an optional implementation, electric stop valves are provided between the first air-conditioning unit 1 and / or the second air-conditioning unit 2 and the supply air pipe 3 and the return air pipe 12, which can provide different supply air volumes and return air volumes according to different working conditions of the controlled workshop rooms.

[0143] As an optional implementation, an electric regulating valve 6 is provided between the booster fan 5 and the air supply branch pipe 7 to adjust the air flow rate according to working conditions.

[0144] As an optional implementation, a proportional integral return air valve 11 is provided between the return air branch pipe 10 and the return air main pipe 12, which can adjust the cumulative amount of return air according to the cumulative amount of intake air of the associated electric regulating valve 6 to maintain a positive pressure state between the interior and exterior environment of the workshop room.

[0145] As an optional implementation, the first air-conditioning unit 1, the second air-conditioning unit 2, the first stop valve 4, the booster fan 5, the electric regulating valve 6, and the proportional integral return air valve 11 are respectively communicatively connected to the silk making central control system and the power energy management system.

[0146] As a further improved implementation method, a corresponding software control system is developed and improved, and a connection and linkage control relationship is established with production process equipment to achieve automated operation.

[0147] After the above steps and more than three months of scientific research and working condition testing, the technical effect of the present invention is further demonstrated compared with the original technology:

[0148] Compared with the original technology, the air conditioning energy saving of this process section is more than 45% under normal working conditions from Monday to Friday; the air conditioning energy saving is more than 80% under weekend shift working conditions; at the same time, due to the cessation of steam and chilled water demand, about 90 power shifts of steam and cold water supply involved in the air-conditioning units of this process section are saved each year.

[0149] The technical architecture of directly delivering pressurized air to the working point without any temperature or humidity difference solves the industry-wide technical problem of air temperature and humidity stratification in large spaces.

[0150] Due to the significant reduction in total air supply volume and air circulation times, the regional dust concentration was reduced by more than 30%.

[0151] Example 5

[0152] This embodiment discloses a cigarette factory air conditioning energy-saving control method based on embodiments 1-4. The method controls a cigarette factory air conditioning energy-saving system according to different production process states, and includes the following steps:

[0153] S1. When the startup conditions of the normal production process state are met, start the factory main power energy, the first air-conditioning unit 1, the air supply system, the return air system, and start other system components except the second air-conditioning unit 2.

[0154] The main power source of the factory supplies energy to the first air-conditioning unit 1, and the output wind of the first air-conditioning unit 1 is transmitted to the air outlet of the working area of ​​the workshop room to adjust the temperature in each workshop room;

[0155] The output air from each workshop room flows back to the first air conditioning unit 1 through the return air system to form a cycle;

[0156] S2. When the start-up or shutdown conditions of the abnormal production process state are met, shut down the factory main power source and the first air-conditioning unit 1 in step S1, and start the independent power source, the second air-conditioning unit 2, the air supply system, and the return air system.

[0157] The independent power source supplies energy to the second air conditioning unit 2, and the output wind of the second air conditioning unit 2 is transmitted to the air supply outlet of the working area of ​​the workshop room to adjust the temperature in each workshop room;

[0158] The output air from each workshop room flows back to the second air conditioning unit 2 through the return air system to form a cycle.

[0159] Among them, the start-up conditions of the normal production process state include:

[0160] Receive instructions from the silk-making central control system;

[0161] And / or start-up of process equipment in the workshop room;

[0162] And / or semi-finished product feeding or unloading of storage cabinets in workshop rooms;

[0163] And / or pre-production heat machine required for environmental control in workshop rooms after long production stoppages.

[0164] The starting conditions of abnormal production process status include:

[0165] During weekends or holidays, there are semi-finished materials in the storage cabinets in the workshop room;

[0166] And / or ambient air quality requirements for weekend inspection and maintenance of certain areas within the workshop room.

[0167] The maximum designed air supply volume of the first air-conditioning unit 1 is related to the total volume of the different controlled workshop rooms, and the number of air circulation times of the first air-conditioning unit 1 is less than or equal to 3.

[0168] The maximum design air supply volume of the second air-conditioning unit is related to the total volume of the different workshop rooms controlled, and the circulation number of the second air-conditioning unit is less than or equal to 1.

[0169] The air supply control steps of step S1 are:

[0170] The first air-conditioning unit 1 is in the startup state. When a process flow equipment in one of the controlled workshop rooms is in the startup state, the booster fan 5 corresponding to the workshop room is started.

[0171] The opening of each electric regulating valve 6 is adjusted so that the air discharged by the first air conditioning unit 1 directly participates in the process control and / or adjusts and balances the overall temperature and humidity in the workshop. The specific process is: the opening of the electric regulating valve 6 is adjusted to 100%, and the air supply branch pipe 7 sends the air to the air supply port 8 in the start-up area of ​​the controlled process equipment, directly participating in the process control. And / or adjust the opening of the electric regulating valve, and the air supply branch pipe 7 sends the air to the air supply port 8 in the non-starting area of ​​other process equipment to adjust and balance the overall temperature and humidity of the workshop.

[0172] The return air control steps of step S1 are:

[0173] The proportional integral return air valve 11 automatically adjusts the total return air volume of the workshop room corresponding to the proportional integral return air valve 11 according to the total air supply volume of the electric control valve 6.

[0174] The air supply control steps of step S2 are:

[0175] The first air-conditioning unit 1 is in a stopped state, the second air-conditioning unit 2 is in a started state, and a storage cabinet in one of the controlled workshop rooms is in a loaded state, and the booster fan 5 corresponding to the workshop room is started.

[0176] The opening of each electric regulating valve 6 is adjusted so that the air exhausted by the second air conditioning unit 2 is sent to the air outlet of the controlled storage cabinet area to ensure the environmental temperature and humidity control requirements for material storage shifts, and stop supplying air to the workshop room where the storage cabinet is not started. Specifically, the electric regulating valve is opened 100%, and the air supply branch pipe sends air to the air outlet of the controlled storage cabinet area to ensure the environmental temperature and humidity control requirements for material storage shifts. And / or the electric regulating valve is closed to stop supplying air to other areas where the process equipment is not started.

[0177] The return air control steps of step S2 are:

[0178] Through process tests and / or manual adjustment of proportional integral return air valve parameters, the supply and return air pressure differences in the workshop room and / or the working condition control area within the workshop room are adjusted to meet the process control requirements of different working conditions.

[0179] Weather conditions with large temperature and / or humidity differences between the inside and outside of the workshop, including but not limited to seasonal changes, extremely high or low temperatures, the rainy season, and the return of southerly weather; process control areas where one or more walls in the workshop are in contact with the outside world.

[0180] Obviously, the above embodiments are merely examples for clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from them are still within the protection scope of the invention.

Claims

1. A cigarette factory air conditioning energy-saving system, characterized in that: include: The first air conditioning unit (1) is connected to the main power source of the factory and is suitable for being turned on under normal production process conditions; the maximum design air supply volume of the first air conditioning unit (1) is related to the total volume of different workshops controlled, and the number of air circulation times of the first air conditioning unit (1) is less than or equal to 3; At least one second air conditioning unit (2) is arranged in parallel with the first air conditioning unit (1) and connected to an independent power source, and is suitable for being turned on in an abnormal production process state; the first air conditioning unit (1) and the second air conditioning unit (2) operate independently and alternately; the maximum design air supply volume of the second air conditioning unit is related to the total volume of different controlled workshop rooms, and the number of air circulation of the second air conditioning unit is less than or equal to 1; An air supply system, the air inlet end of which is respectively connected to the air outlet end of the first air-conditioning unit (1) or the second air-conditioning unit (2), and the air outlet end extends into the mezzanine above different workshop rooms and extends to the air supply outlet of the workshop room working area; the air supply system is suitable for adjusting and controlling the air supply of the first air-conditioning unit (1) or the second air-conditioning unit (2), and stopping the air supply to the workshop room that is not in operation; The return air system is connected to the return air outlets of different workshop rooms and is connected to the air inlet of the first air-conditioning unit (1) or the second air-conditioning unit (2); the return air system is suitable for returning the internal air of each different workshop room to the first air-conditioning unit (1) or the second air-conditioning unit (2) for circulation treatment.

2. The cigarette factory air conditioning energy-saving system according to claim 1, characterized in that: The air supply system comprises: At least two air-conditioning unit air outlet pipes (16) are connected to the air outlet ends of the first air-conditioning unit (1) and the second air-conditioning unit (2) in sequence; A first stop valve (4), each of the air outlet pipes (16) of the air conditioning unit is respectively and sequentially provided with a first stop valve (4); The air supply main pipe (3) has an air inlet end connected to the intersection of the air outlet pipes (16) of each air conditioning unit; A plurality of air supply branch pipes (7), the air inlet ends of which are respectively connected to the air outlet ends of the air supply main pipes, the air outlet ends of which extend to the air supply outlets of the working area of ​​the workshop rooms, and are arranged in the mezzanines above different workshop rooms; A plurality of booster fans (5) are located in the mezzanine above the workshop room, and a booster fan (5) is correspondingly arranged on each of the air supply branch pipes (7); the booster fans (5) are used to pressurize the air delivered from the air supply main pipe, and then deliver the pressurized air to the air supply outlet of the working area of ​​the workshop room through the air supply branch pipe (7).

3. The air conditioning energy-saving system for cigarette factory buildings according to claim 2, characterized in that: The air supply branch pipe (7) is provided with an electric regulating valve (6) suitable for adjusting the air flow rate according to working conditions.

4. The cigarette factory air conditioning energy-saving system according to claim 2, characterized in that: The booster fan (5) is configured to set matching air supply pressure and air supply volume according to the number, structure and air supply distance of air supply outlets in each working area of ​​the workshop room.

5. The air conditioning energy-saving system for cigarette factory buildings according to claim 1, characterized in that: The return air system comprises: A plurality of return air branch pipes (10) are respectively connected to the return air outlets of different workshop rooms; A return air main pipe (12) connected to each return air branch pipe (10); At least two air-conditioning unit return air ducts (17), one end of which is connected to the air outlet end of the return air main pipe (12), and the other end of which is connected to the air inlet end of the first air-conditioning unit (1) and the second air-conditioning unit (2) in sequence; A second stop valve (15), a second stop valve (15) is respectively arranged on the return air duct (17) of each of the air conditioning units; the air inside the workshop room is returned to the first air conditioning unit (1) or the second air conditioning unit (2) for circulation treatment by controlling the second stop valve (15).

6. The air conditioning energy-saving system for cigarette factory buildings according to claim 5, characterized in that: The return air system also includes: A plurality of proportional integral return air valves (11) are respectively arranged on each of the return air branch pipes (10) and are suitable for adjusting the cumulative amount of return air to maintain a positive pressure state between the interior of the workshop room and the external environment.

7. The air conditioning energy-saving system for cigarette factory buildings according to any one of claims 1 to 6, characterized in that: The first air conditioning unit (1), the second air conditioning unit (2), the air supply system and the air return system are respectively connected to the silk making central control system and the power energy management system for communication.

8. A control method for an air conditioning energy-saving system in a cigarette factory, characterized in that: The method controls the air conditioning energy-saving system of a cigarette factory building according to any one of claims 1 to 7 according to different production process states, and comprises the following steps: S1. When the startup conditions of the normal production process are met, the factory main power source, the first air conditioning unit (1), the air supply system, and the return air system are started; The main power source of the factory supplies energy to the first air conditioning unit (1), and the output wind of the first air conditioning unit (1) is transmitted to the air supply outlet of the working area of ​​the workshop room to adjust the temperature in each workshop room; The output air from each workshop room flows back to the first air conditioning unit (1) through the return air system to form a cycle; S2. When the startup conditions of the abnormal production process state are met, shut down the factory main power energy and the first air conditioning unit (1) in step S1, and start the independent power energy, the second air conditioning unit (2), the air supply system, and the return air system; The independent power source supplies energy to the second air conditioning unit (2), and the output wind of the second air conditioning unit (2) is transmitted to the air supply outlet of the working area of ​​the workshop room to adjust the temperature in each workshop room; The output air from each workshop room flows back to the second air conditioning unit (2) through the return air system, forming a circulation.

9. The control method of a cigarette factory air conditioning energy-saving system according to claim 8, characterized in that: The start-up conditions of the normal production process state include: Receive instructions from the silk-making central control system; And / or start-up of process equipment in the workshop room; And / or semi-finished product feeding or unloading of storage cabinets in workshop rooms; And / or pre-production heat machine required for environmental control in workshop rooms after long-term shutdown; The starting conditions of the abnormal production process state include: During weekends or holidays, there are semi-finished materials in the storage cabinets in the workshop room; And / or ambient air quality requirements for weekend inspection and maintenance of certain areas within the workshop room.

10. The control method of a cigarette factory air conditioning energy-saving system according to claim 8, characterized in that: The air supply control steps of step S1 are: The first air conditioning unit (1) is in a startup state, and when a process flow device in one of the controlled workshop rooms is in a startup state, the booster fan (5) corresponding to the workshop room is started; The opening of each electric regulating valve (6) is adjusted so that the air exhausted by the first air conditioning unit (1) directly participates in process control and / or adjusts and balances the overall temperature and humidity in the workshop; The return air control steps of step S1 are: The proportional integral return air valve (11) automatically adjusts the total return air volume of the workshop room corresponding to the proportional integral return air valve (11) according to the total air supply volume of the electric regulating valve (6).

11. The control method of a cigarette factory air conditioning energy-saving system according to claim 8, characterized in that: The air supply control steps of step S2 are: The first air conditioning unit (1) is in a stopped state, the second air conditioning unit (2) is in a started state, and a storage cabinet in one of the controlled workshop rooms is in a loaded state, and the booster fan (5) corresponding to the workshop room is started; The opening of each electric regulating valve (6) is adjusted so that the air exhausted by the second air conditioning unit (2) is delivered to the air outlet of the controlled storage cabinet area, so as to ensure the environmental temperature and humidity control requirements required for material storage shift handover, and stop delivering air to the workshop room where the storage cabinet is not started; The return air control steps of step S2 are: Through process tests and / or manual adjustment of proportional integral return air valve parameters, the supply and return air pressure differences in the workshop room and / or the working condition control area within the workshop room are adjusted to meet the process control requirements of different working conditions.