A foundation pit and slope early warning method and system based on real-time monitoring

Through the application of real-time monitoring and safety assessment models, the problem of insufficient accuracy in safety monitoring of foundation pits and slopes has been solved, intelligent, timely and efficient safety warnings have been achieved, and the quality of warnings has been improved.

CN115966060BActive Publication Date: 2024-10-29ZHONGTIE ELECTRIZATION BUREAU GRP BEIJING CONSTR ENG
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211657633.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-22
Publication Date
2024-10-29
Estimated Expiration
2042-12-22

AI Technical Summary

Technical Problem

The safety monitoring accuracy of foundation pits and slopes in the existing technology is insufficient, resulting in low quality safety warnings and affecting the safety of project construction and the normal use of roads and underground pipelines.

Method used

Adopt the foundation pit and slope early warning method and system based on real-time monitoring, and judge whether the safety constraints are met through the collection of basic information at the high support mode monitoring site, the analysis of monitoring layout planning, the collection of real-time monitoring data and the application of the safety assessment model, and send Early warning signs.

Benefits of technology

It improves the accuracy of safety monitoring of foundation pits and slopes, realizes intelligent, timely and efficient safety warnings, and improves the quality of safety warnings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115966060B_ABST
    Figure CN115966060B_ABST
Patent Text Reader

Abstract

The present invention discloses a foundation pit and slope early warning method and system based on real-time monitoring, which relates to the field of data processing, wherein the method comprises: obtaining a monitoring site information set; obtaining a monitoring point planning scheme based on the monitoring site information set and a preset high-support formwork monitoring index set; deploying multiple monitoring devices at the high-support formwork monitoring site based on the monitoring point planning scheme; obtaining a real-time monitoring data set; inputting the real-time monitoring data set into a foundation pit-slope safety assessment model to obtain a foundation pit-slope safety assessment result; if the foundation pit-slope safety assessment result does not meet the foundation pit-slope safety constraint condition, obtaining a foundation pit-slope safety early warning signal, and sending the foundation pit-slope safety early warning signal to the staff at the high-support formwork monitoring site. The method solves the technical problem that the safety monitoring accuracy of foundation pits and slopes in the prior art is insufficient, which in turn causes the low quality of safety early warnings for foundation pits and slopes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data processing, and in particular to a foundation pit and slope early warning method and system based on real-time monitoring. Background Art

[0002] Foundation pit monitoring and slope monitoring are key links in engineering safety. In recent years, foundation pit accidents and slope accidents have occurred frequently, directly affecting the safety of engineering construction, the normal use of roads and underground pipelines, and even endangering people's lives and property. Researching and designing a method for real-time safety warning of foundation pits and slopes is of great practical significance.

[0003] In the existing technology, there is a technical problem that the accuracy of safety monitoring of foundation pits and slopes is insufficient, which leads to low quality of safety warning for foundation pits and slopes. Summary of the invention

[0004] The present application provides a foundation pit and slope early warning method and system based on real-time monitoring. It solves the technical problem that the safety monitoring accuracy of foundation pits and slopes in the prior art is insufficient, which results in low quality of safety early warning for foundation pits and slopes. It achieves the technical effect of improving the accuracy of safety monitoring of foundation pits and slopes, realizing intelligent, timely and efficient safety early warning for foundation pits and slopes, and improving the quality of safety early warning for foundation pits and slopes.

[0005] In view of the above problems, the present application provides a foundation pit and slope early warning method and system based on real-time monitoring.

[0006] In the first aspect, the present application provides a foundation pit and slope early warning method based on real-time monitoring, wherein the method is applied to a foundation pit and slope early warning system based on real-time monitoring, the method comprising: obtaining a high-support formwork monitoring site; collecting basic information based on the high-support formwork monitoring site to obtain a monitoring site information set; obtaining a preset high-support formwork monitoring indicator set, wherein the preset high-support formwork monitoring indicator set includes a plurality of preset foundation pit monitoring indicators and a plurality of preset slope monitoring indicators; based on the monitoring site information set and the preset high-support formwork monitoring indicator set, performing a monitoring point planning analysis on the high-support formwork monitoring site to obtain a monitoring point planning scheme; based on the monitoring point planning scheme A plurality of monitoring devices are deployed at the high formwork monitoring site; after the deployment is completed, based on the preset high formwork monitoring indicator set, the high formwork monitoring site is monitored in real time through the high formwork monitoring module to obtain a real-time monitoring data set; the real-time monitoring data set is input into the foundation pit-slope safety assessment model to obtain a foundation pit-slope safety assessment result; it is determined whether the foundation pit-slope safety assessment result satisfies the foundation pit-slope safety constraint condition; if the foundation pit-slope safety assessment result does not satisfy the foundation pit-slope safety constraint condition, a foundation pit-slope safety warning signal is obtained, and the foundation pit-slope safety warning signal is sent to the staff at the high formwork monitoring site.

[0007] In the second aspect, the present application also provides a foundation pit and slope early warning system based on real-time monitoring, wherein the system includes: a monitoring site determination module, the monitoring site determination module is used to obtain a high-support formwork monitoring site; an information collection module, the information collection module is used to collect basic information based on the high-support formwork monitoring site to obtain a monitoring site information set; a preset monitoring indicator acquisition module, the preset monitoring indicator acquisition module is used to obtain a preset high-support formwork monitoring indicator set, wherein the preset high-support formwork monitoring indicator set includes a plurality of preset foundation pit monitoring indicators and a plurality of preset slope monitoring indicators; a monitoring point planning and analysis module, the monitoring point planning and analysis module is used to perform monitoring point planning and analysis on the high-support formwork monitoring site based on the monitoring site information set and the preset high-support formwork monitoring indicator set to obtain a monitoring point planning scheme; a layout module, the layout module is used to Based on the monitoring point planning scheme, multiple monitoring devices are deployed at the high-formwork monitoring site; a real-time monitoring module, which is used to, after the deployment is completed, based on the preset high-formwork monitoring indicator set, perform real-time monitoring of the high-formwork monitoring site through the high-formwork monitoring module to obtain a real-time monitoring data set; a safety assessment module, which is used to input the real-time monitoring data set into a foundation pit-slope safety assessment model to obtain a foundation pit-slope safety assessment result; a safety warning module, which is used to determine whether the foundation pit-slope safety assessment result meets the foundation pit-slope safety constraint conditions. If the foundation pit-slope safety assessment result does not meet the foundation pit-slope safety constraint conditions, a foundation pit-slope safety warning signal is obtained, and the foundation pit-slope safety warning signal is sent to the staff at the high-formwork monitoring site.

[0008] In a third aspect, the present application also provides an electronic device, comprising: a memory for storing executable instructions; and a processor for executing the executable instructions stored in the memory to implement a foundation pit and slope early warning method based on real-time monitoring provided by the present application.

[0009] In a fourth aspect, the present application also provides a computer-readable storage medium storing a computer program, which, when executed by a processor, implements a foundation pit and slope early warning method based on real-time monitoring provided by the present application.

[0010] One or more technical solutions provided in this application have at least the following technical effects or advantages:

[0011] By collecting basic information on the high-support formwork monitoring site, the monitoring site information set is obtained; through the monitoring site information set and the preset high-support formwork monitoring indicator set, the monitoring point planning and analysis of the high-support formwork monitoring site is carried out to obtain the monitoring point planning scheme; multiple monitoring devices are deployed at the high-support formwork monitoring site through the monitoring point planning scheme; after the deployment is completed, the high-support formwork monitoring site is monitored in real time through the high-support formwork monitoring module to obtain a real-time monitoring data set; the real-time monitoring data set is input into the foundation pit-slope safety assessment model to obtain the foundation pit-slope safety assessment result; it is determined whether the foundation pit-slope safety assessment result meets the foundation pit-slope safety constraint condition. If the foundation pit-slope safety assessment result does not meet the foundation pit-slope safety constraint condition, the foundation pit-slope safety warning signal is obtained, and the foundation pit-slope safety warning signal is sent to the staff at the high-support formwork monitoring site. The technical effect of improving the accuracy of safety monitoring of foundation pits and slopes, realizing intelligent, timely and efficient foundation pit and slope safety warning, and improving the quality of safety warning of foundation pits and slopes is achieved.

[0012] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] In order to more clearly illustrate the technical solutions of the embodiments of the present disclosure, the drawings of the embodiments of the present disclosure are briefly introduced below. Obviously, the drawings described below only relate to some embodiments of the present disclosure, and are not intended to limit the present disclosure.

[0014] Figure 1 A schematic diagram of a process flow of a foundation pit and slope early warning method based on real-time monitoring for this application;

[0015] Figure 2 A schematic diagram of the process of obtaining a monitoring point planning scheme in a foundation pit and slope early warning method based on real-time monitoring in this application;

[0016] Figure 3 A schematic diagram of the structure of a foundation pit and slope early warning system based on real-time monitoring for this application;

[0017] Figure 4 This is a schematic diagram of the structure of an exemplary electronic device of the present application.

[0018] Explanation of the accompanying drawings: monitoring site determination module 11, information collection module 12, preset monitoring index acquisition module 13, monitoring point planning and analysis module 14, deployment module 15, real-time monitoring module 16, safety assessment module 17, safety warning module 18, processor 31, memory 32, input device 33, output device 34. DETAILED DESCRIPTION

[0019] This application provides a foundation pit and slope early warning method and system based on real-time monitoring. It solves the technical problem that the safety monitoring accuracy of foundation pits and slopes in the prior art is insufficient, which leads to the low quality of safety early warning for foundation pits and slopes. It achieves the technical effect of improving the accuracy of safety monitoring of foundation pits and slopes, realizing intelligent, timely and efficient safety early warning for foundation pits and slopes, and improving the quality of safety early warning for foundation pits and slopes.

[0020] Embodiment 1

[0021] Please refer to the attached Figure 1 The present application provides a foundation pit and slope early warning method based on real-time monitoring, wherein the method is applied to a foundation pit and slope early warning system based on real-time monitoring, the system includes a high-support formwork monitoring module, and the method specifically includes the following steps:

[0022] Step S100: obtaining a high-support formwork monitoring site;

[0023] Step S200: Collect basic information based on the high-support formwork monitoring site to obtain a monitoring site information set;

[0024] Step S300: obtaining a preset high formwork monitoring indicator set, wherein the preset high formwork monitoring indicator set includes a plurality of preset foundation pit monitoring indicators and a plurality of preset slope monitoring indicators;

[0025] Specifically, basic information is collected on the high-formwork monitoring site to obtain a monitoring site information set, and a preset high-formwork monitoring indicator set is determined. Among them, the high-formwork monitoring site can be any construction site that uses the foundation pit and slope early warning system based on real-time monitoring to perform intelligent foundation pit and slope safety early warning. The monitoring site information set includes data information such as the location of the high-formwork monitoring site and site layout information. The preset high-formwork monitoring indicator set includes multiple preset foundation pit monitoring indicators such as horizontal displacement monitoring, vertical displacement monitoring, deep horizontal displacement monitoring, and support structure internal force monitoring, as well as multiple preset slope monitoring indicators such as formwork settlement monitoring, vertical pole axial force monitoring, pole inclination monitoring, and support overall horizontal displacement monitoring. The technical effect of obtaining a monitoring site information set and a preset high-formwork monitoring indicator set is achieved, laying the foundation for subsequent foundation pit and slope safety early warnings at the high-formwork monitoring site.

[0026] Step S400: Based on the monitoring site information set and the preset high-support formwork monitoring indicator set, a monitoring point planning analysis is performed on the high-support formwork monitoring site to obtain a monitoring point planning scheme;

[0027] Further, as attached Figure 2As shown, step S400 of the present application also includes:

[0028] Step S410: obtaining site layout information based on the monitoring site information set;

[0029] Step S420: dividing the high-support formwork monitoring site into regions based on the site layout information to obtain a monitoring region division result;

[0030] Specifically, the site layout information is extracted from the monitoring site information set, and the high-support formwork monitoring site is divided into regions according to the site layout information to obtain the monitoring region division result. The site layout information includes the spatial structure and spatial composition information of the high-support formwork monitoring site. The monitoring region division result includes multiple spatial region information within the high-support formwork monitoring site.

[0031] Step S430: performing monitoring factor analysis based on the preset high-support formwork monitoring indicator set to obtain monitoring factor analysis results;

[0032] Furthermore, step S430 of the present application also includes:

[0033] Step S431: obtaining a plurality of sample high formwork monitoring indicators;

[0034] Step S432: obtaining a plurality of sample high-formwork monitoring elements;

[0035] Step S433: constructing an indicator-element mapping relationship based on the multiple sample high formwork monitoring indicators and the multiple sample high formwork monitoring elements;

[0036] Step S434: constructing a monitoring element analysis library based on the multiple sample high formwork monitoring indicators, the multiple sample high formwork monitoring elements, and the indicator-element mapping relationship;

[0037] Step S435: input the preset high-support formwork monitoring indicator set into the monitoring element analysis library to obtain the monitoring element analysis results.

[0038] Step S440: input the monitoring area division result and the monitoring element analysis result into the monitoring planning model to obtain the monitoring point layout planning scheme.

[0039] Specifically, based on big data query, multiple sample high-formwork monitoring indicators and multiple sample high-formwork monitoring elements are obtained. The matching relationship between multiple sample high-formwork monitoring indicators and multiple sample high-formwork monitoring elements is analyzed to obtain the indicator-element mapping relationship. Based on the indicator-element mapping relationship, multiple sample high-formwork monitoring indicators and multiple sample high-formwork monitoring elements are arranged to obtain the monitoring element parsing library. Then, the preset high-formwork monitoring indicator set is used as input information, input into the monitoring element parsing library, and the monitoring element parsing result is obtained. The monitoring area division result and the monitoring element parsing result are used as input information, input into the monitoring planning model, and the monitoring point planning scheme is obtained. Among them, the multiple sample high-formwork monitoring indicators include multiple historical foundation pit monitoring indicators and multiple historical slope monitoring indicators. The multiple sample high-formwork monitoring elements include multiple historical monitoring element parsing results corresponding to the multiple sample high-formwork monitoring indicators. The indicator-element mapping relationship includes the matching relationship between multiple sample high-formwork monitoring indicators and multiple sample high-formwork monitoring elements. The monitoring element parsing library includes multiple sample high-formwork monitoring indicators and multiple sample high-formwork monitoring elements arranged according to the indicator-element mapping relationship. The monitoring point planning scheme includes location information of multiple monitoring points, and achieves the technical effect of analyzing the monitoring point planning of the high-support formwork monitoring site through the monitoring planning model, obtaining the monitoring point planning scheme, and thus improving the reliability of monitoring the high-support formwork monitoring site.

[0040] Step S500: deploying a plurality of monitoring devices at the high-support formwork monitoring site based on the monitoring point deployment planning scheme;

[0041] Furthermore, step S500 of the present application also includes:

[0042] Step S510: performing working condition detection on the plurality of monitoring devices to obtain a plurality of working condition detection results;

[0043] Step S520: obtaining a plurality of operating condition constraints based on the plurality of monitoring devices;

[0044] Step S530: determining whether the plurality of operating condition detection results satisfy the plurality of operating condition constraint conditions;

[0045] Step S540: If the operating condition detection result does not meet the operating condition constraint condition, obtain an operating condition warning instruction, and adjust the multiple monitoring devices based on the operating condition warning instruction.

[0046] Step S600: After the deployment is completed, based on the preset high-support formwork monitoring indicator set, the high-support formwork monitoring site is monitored in real time by the high-support formwork monitoring module to obtain a real-time monitoring data set;

[0047] Specifically, the working condition detection is performed on multiple monitoring devices such as high-precision displacement sensors, vertical pole axial pressure sensors, inclination sensors, etc., to obtain multiple working condition detection results. It is judged whether the multiple working condition detection results meet the corresponding multiple working condition constraint conditions. If the working condition detection results do not meet the corresponding working condition constraint conditions, a working condition warning instruction is obtained, and the multiple monitoring devices are adjusted according to the working condition warning instruction. The monitoring devices corresponding to the working condition detection results that do not meet the working condition constraint conditions can be replaced and repaired according to the working condition warning instruction, so as to ensure that the multiple monitoring devices can work normally. The multiple working condition detection results include multiple working parameters corresponding to the multiple monitoring devices. The multiple working condition constraints include multiple rated working parameters corresponding to the multiple monitoring devices.

[0048] Furthermore, multiple monitoring devices are deployed at the high-support formwork monitoring site according to the monitoring point planning scheme. After the deployment is completed, the multiple monitoring devices are connected to the high-support formwork monitoring module for communication. Then, based on the preset high-support formwork monitoring indicator set, the high-support formwork monitoring site is monitored in real time through the high-support formwork monitoring module to obtain a real-time monitoring data set. The technical effect of deploying multiple monitoring devices at the high-support formwork monitoring site through the monitoring point planning scheme, monitoring the high-support formwork monitoring site according to the deployed monitoring devices, and obtaining a reliable real-time monitoring data set is achieved, thereby improving the accuracy of safety monitoring of foundation pits and slopes at the high-support formwork monitoring site.

[0049] Step S700: inputting the real-time monitoring data set into the foundation pit-slope safety assessment model to obtain the foundation pit-slope safety assessment result;

[0050] Furthermore, step S700 of the present application also includes:

[0051] Step S710: performing principal component analysis based on the real-time monitoring data set to obtain a reduced-dimensionality monitoring data set;

[0052] Furthermore, step S710 of the present application also includes:

[0053] Step S711: obtaining a first characteristic monitoring data set according to the real-time monitoring data set;

[0054] Step S712: performing decentralized processing on the first feature monitoring data set to obtain a second feature monitoring data set;

[0055] Step S713: obtaining a covariance matrix of the first monitoring data set according to the second feature monitoring data set;

[0056] Step S714: obtaining an eigenvalue of the first monitoring data set and an eigenvector of the first monitoring data set according to the covariance matrix of the first monitoring data set;

[0057] Step S715: Obtain the reduced-dimensionality monitoring dataset according to the eigenvalues ​​of the first monitoring dataset and the eigenvectors of the first monitoring dataset.

[0058] Specifically, on the basis of obtaining the real-time monitoring data set, it is numerically processed to obtain the first feature monitoring data set. Then, each feature data in the first feature monitoring data set is decentralized. That is, first solve the average value of each feature data in the first feature monitoring data set, and then for all samples, each feature data is subtracted from its own mean value, and then a new eigenvalue is obtained, and the new feature data set constitutes the second feature monitoring data set, and the second feature monitoring data set is a data matrix. Then, the second feature monitoring data set is operated by the covariance formula to obtain the covariance matrix of the first monitoring data set. Further, through matrix operation, the eigenvalues ​​and eigenvectors of the covariance matrix of the first monitoring data set are obtained, and each eigenvalue corresponds to an eigenvector, and the eigenvalues ​​of the first monitoring data set and the eigenvectors of the first monitoring data set are obtained. The eigenvalue of the first monitoring data set is any eigenvalue obtained after the covariance matrix of the first monitoring data set is subjected to matrix operation. The eigenvector of the first monitoring data set is the eigenvector corresponding to the eigenvalue of the first monitoring data set. Furthermore, among the obtained eigenvalues ​​of the first monitoring data set and the eigenvectors of the first monitoring data set, the largest first K eigenvalues ​​and their corresponding eigenvectors are selected, and the original data in the first characteristic monitoring data set is projected onto the selected eigenvectors to obtain a reduced-dimensional monitoring data set. This achieves the technical effect of using the principal component analysis method to reduce the dimensionality of the real-time monitoring data set, eliminating redundant data while ensuring the amount of information, and after the dimensionality reduction, the information loss of the reduced-dimensional monitoring data set is minimized, thereby improving the efficiency of security assessment of the reduced-dimensional monitoring data set.

[0059] Step S720: Based on the preset high-formwork monitoring indicator set, cluster analysis is performed on the dimension-reduced monitoring data set to obtain a foundation pit monitoring data set and a slope monitoring data set;

[0060] Specifically, a cluster analysis is performed on the dimensionality reduction monitoring data set according to the preset high-support formwork monitoring indicator set, and the data information corresponding to multiple preset foundation pit monitoring indicators in the dimensionality reduction monitoring data set are classified into one category to obtain the foundation pit monitoring data set; the data information corresponding to multiple preset slope monitoring indicators in the dimensionality reduction monitoring data set are classified into one category to obtain the slope monitoring data set.

[0061] Step S730: inputting the foundation pit monitoring data set and the slope monitoring data set into the foundation pit-slope safety assessment model to obtain the foundation pit-slope safety assessment result.

[0062] Furthermore, step S730 of the present application also includes:

[0063] Step S731: the foundation pit-slope safety assessment model includes a foundation pit safety assessment model and a slope safety assessment model;

[0064] Step S732: the foundation pit safety assessment model includes a plurality of preset foundation pit safety assessment indicators, the foundation pit monitoring data set is input into the foundation pit safety assessment model, and a plurality of foundation pit safety assessment coefficients are obtained;

[0065] Step S733: the slope safety assessment model includes a plurality of preset slope safety assessment indicators, the slope monitoring data set is input into the slope safety assessment model, and a plurality of slope safety assessment coefficients are obtained;

[0066] Step S734: Based on the multiple foundation pit safety assessment coefficients and the multiple slope safety assessment coefficients, the foundation pit-slope safety assessment result is obtained.

[0067] Specifically, the foundation pit-slope safety assessment model includes a foundation pit safety assessment model and a slope safety assessment model. The foundation pit safety assessment model includes multiple preset foundation pit safety assessment indicators, which are indicators for safety assessment of multiple preset foundation pit monitoring indicators. The foundation pit monitoring data set is input into the foundation pit safety assessment model to obtain multiple foundation pit safety assessment coefficients. The slope safety assessment model includes multiple preset slope safety assessment indicators, which are indicators for safety assessment of multiple preset slope monitoring indicators. The slope monitoring data set is input into the slope safety assessment model to obtain multiple slope safety assessment coefficients. Multiple foundation pit safety assessment coefficients and multiple slope safety assessment coefficients are output as foundation pit-slope safety assessment results. The technical effect of accurately and efficiently evaluating the foundation pit monitoring data set and the slope monitoring data set through the foundation pit-slope safety assessment model to obtain the foundation pit-slope safety assessment results is achieved, thereby improving the reliability of safety warnings for foundation pits and slopes.

[0068] Step S800: Determine whether the foundation pit-slope safety assessment result meets the foundation pit-slope safety constraint conditions. If the foundation pit-slope safety assessment result does not meet the foundation pit-slope safety constraint conditions, obtain a foundation pit-slope safety warning signal, and send the foundation pit-slope safety warning signal to the staff at the high-support formwork monitoring site.

[0069] Specifically, the pit-slope safety constraint conditions are set based on multiple preset pit safety assessment indicators and multiple preset slope safety assessment indicators. The pit-slope safety constraint conditions include multiple preset pit safety assessment indicators and multiple preset safety assessment coefficient thresholds corresponding to the multiple preset slope safety assessment indicators. It is judged whether the multiple pit safety assessment coefficients and multiple slope safety assessment coefficients in the pit-slope safety assessment results meet the corresponding preset safety assessment coefficient thresholds. If not, a pit-slope safety warning signal is generated and sent to the staff at the high-support formwork monitoring site. The technical effect of providing high-quality safety warnings for pits and slopes at the high-support formwork monitoring site is achieved by judging whether the pit-slope safety assessment results meet the pit-slope safety constraint conditions.

[0070] In summary, the foundation pit and slope early warning method based on real-time monitoring provided by this application has the following technical effects:

[0071] 1. Collect basic information on the high-support formwork monitoring site to obtain the monitoring site information set; analyze the monitoring site layout planning of the high-support formwork monitoring site through the monitoring site information set and the preset high-support formwork monitoring index set to obtain the monitoring layout planning scheme; deploy multiple monitoring devices on the high-support formwork monitoring site through the monitoring layout planning scheme; after the deployment is completed, the high-support formwork monitoring site is monitored in real time through the high-support formwork monitoring module to obtain a real-time monitoring data set; input the real-time monitoring data set into the foundation pit-slope safety assessment model to obtain the foundation pit-slope safety assessment result; determine whether the foundation pit-slope safety assessment result meets the foundation pit-slope safety constraint condition; if the foundation pit-slope safety assessment result does not meet the foundation pit-slope safety constraint condition, obtain the foundation pit-slope safety warning signal, and send the foundation pit-slope safety warning signal to the staff at the high-support formwork monitoring site. The technical effect of improving the accuracy of safety monitoring of foundation pits and slopes, realizing intelligent, timely and efficient foundation pit and slope safety warning, and improving the quality of safety warning of foundation pits and slopes is achieved.

[0072] 2. Deploy multiple monitoring devices at the high formwork monitoring site through the monitoring point planning plan, and monitor the high formwork monitoring site according to the deployed monitoring devices to obtain reliable real-time monitoring data sets, thereby improving the accuracy of safety monitoring of foundation pits and slopes at the high formwork monitoring site.

[0073] Embodiment 2

[0074] Based on the same inventive concept as the foundation pit and slope early warning method based on real-time monitoring in the aforementioned embodiment, the present invention also provides a foundation pit and slope early warning system based on real-time monitoring, the system includes a high formwork monitoring module, see the attached Figure 3 , the system comprising:

[0075] A monitoring site determination module 11, wherein the monitoring site determination module 11 is used to obtain a high-support formwork monitoring site;

[0076] An information collection module 12, the information collection module 12 is used to collect basic information based on the high-support formwork monitoring site to obtain a monitoring site information set;

[0077] A preset monitoring indicator acquisition module 13, wherein the preset monitoring indicator acquisition module 13 is used to obtain a preset high-support formwork monitoring indicator set, wherein the preset high-support formwork monitoring indicator set includes a plurality of preset foundation pit monitoring indicators and a plurality of preset slope monitoring indicators;

[0078] A monitoring point planning and analysis module 14, the monitoring point planning and analysis module 14 is used to perform monitoring point planning and analysis on the high-support formwork monitoring site based on the monitoring site information set and the preset high-support formwork monitoring indicator set to obtain a monitoring point planning scheme;

[0079] A deployment module 15, the deployment module 15 is used to deploy multiple monitoring devices at the high-support formwork monitoring site based on the monitoring point planning scheme;

[0080] A real-time monitoring module 16, which is used to perform real-time monitoring of the high-support formwork monitoring site through the high-support formwork monitoring module based on the preset high-support formwork monitoring indicator set after the deployment is completed, so as to obtain a real-time monitoring data set;

[0081] A safety assessment module 17, wherein the safety assessment module 17 is used to input the real-time monitoring data set into a foundation pit-slope safety assessment model to obtain a foundation pit-slope safety assessment result;

[0082] The safety warning module 18 is used to determine whether the foundation pit-slope safety assessment result meets the foundation pit-slope safety constraint conditions. If the foundation pit-slope safety assessment result does not meet the foundation pit-slope safety constraint conditions, a foundation pit-slope safety warning signal is obtained, and the foundation pit-slope safety warning signal is sent to the staff at the high-support formwork monitoring site.

[0083] Furthermore, the system also includes:

[0084] A site layout information acquisition module, the site layout information acquisition module is used to obtain site layout information based on the monitoring site information set;

[0085] A region division module, the region division module is used to divide the high-support formwork monitoring site into regions based on the site layout information to obtain a monitoring region division result;

[0086] A monitoring factor analysis module, the monitoring factor analysis module is used to analyze monitoring factors based on the preset high-support formwork monitoring indicator set to obtain monitoring factor analysis results;

[0087] The monitoring point planning scheme determination module is used to input the monitoring area division result and the monitoring element analysis result into the monitoring planning model to obtain the monitoring point planning scheme.

[0088] Furthermore, the system also includes:

[0089] A sample index obtaining module, wherein the sample index obtaining module is used to obtain a plurality of sample high-support formwork monitoring indicators;

[0090] A sample element acquisition module, wherein the sample element acquisition module is used to obtain a plurality of sample high-support formwork monitoring elements;

[0091] A mapping relationship construction module, wherein the mapping relationship construction module is used to construct an indicator-element mapping relationship based on the multiple sample high-formwork monitoring indicators and the multiple sample high-formwork monitoring elements;

[0092] A monitoring element parsing library determination module, the monitoring element parsing library determination module is used to construct a monitoring element parsing library based on the multiple sample high-support formwork monitoring indicators, the multiple sample high-support formwork monitoring elements, and the indicator-element mapping relationship;

[0093] The first execution module is used to input the preset high-support formwork monitoring indicator set into the monitoring element analysis library to obtain the monitoring element analysis results.

[0094] Furthermore, the system also includes:

[0095] A working condition detection module, the working condition detection module is used to perform working condition detection on the multiple monitoring devices to obtain multiple working condition detection results;

[0096] A second execution module, the second execution module is used to obtain a plurality of operating condition constraints based on the plurality of monitoring devices;

[0097] A working condition judgment module, the working condition judgment module is used to judge whether the multiple working condition detection results meet the multiple working condition constraint conditions;

[0098] The operating condition warning module is used to obtain an operating condition warning instruction if the operating condition detection result does not meet the operating condition constraint condition, and adjust the multiple monitoring devices based on the operating condition warning instruction.

[0099] Furthermore, the system also includes:

[0100] A principal component analysis module, wherein the principal component analysis module is used to perform principal component analysis based on the real-time monitoring data set to obtain a reduced-dimensionality monitoring data set;

[0101] A cluster analysis module, wherein the cluster analysis module is used to perform cluster analysis on the reduced-dimensional monitoring data set based on the preset high-support formwork monitoring indicator set to obtain a foundation pit monitoring data set and a slope monitoring data set;

[0102] The third execution module is used to input the foundation pit monitoring data set and the slope monitoring data set into the foundation pit-slope safety assessment model to obtain the foundation pit-slope safety assessment result.

[0103] Furthermore, the system also includes:

[0104] A fourth execution module, the fourth execution module is used to obtain a first feature monitoring data set according to the real-time monitoring data set;

[0105] A decentralized processing module, wherein the decentralized processing module is used to perform decentralized processing on the first feature monitoring data set to obtain a second feature monitoring data set;

[0106] A covariance matrix determination module, wherein the covariance matrix determination module is used to obtain a covariance matrix of the first monitoring data set according to the second feature monitoring data set;

[0107] A fifth execution module, wherein the fifth execution module is used to obtain an eigenvalue of the first monitoring data set and an eigenvector of the first monitoring data set according to the covariance matrix of the first monitoring data set;

[0108] A reduced-dimensionality monitoring data set determination module is used to obtain the reduced-dimensionality monitoring data set according to the eigenvalues ​​of the first monitoring data set and the eigenvectors of the first monitoring data set.

[0109] Furthermore, the system also includes:

[0110] A sixth execution module, wherein the sixth execution module is used for the foundation pit-slope safety assessment model including a foundation pit safety assessment model and a slope safety assessment model;

[0111] A foundation pit safety assessment module, wherein the foundation pit safety assessment model includes a plurality of preset foundation pit safety assessment indicators, and the foundation pit monitoring data set is input into the foundation pit safety assessment model to obtain a plurality of foundation pit safety assessment coefficients;

[0112] A slope safety assessment module, wherein the slope safety assessment model includes a plurality of preset slope safety assessment indicators, and the slope monitoring data set is input into the slope safety assessment model to obtain a plurality of slope safety assessment coefficients;

[0113] A seventh execution module, the seventh execution module is used to obtain the foundation pit-slope safety assessment result based on the multiple foundation pit safety assessment coefficients and the multiple slope safety assessment coefficients.

[0114] A foundation pit and slope early warning system based on real-time monitoring provided by an embodiment of the present invention can execute a foundation pit and slope early warning method based on real-time monitoring provided by any embodiment of the present invention, and has functional modules and beneficial effects corresponding to the execution method.

[0115] The modules included are only divided according to functional logic, but are not limited to the above division, as long as the corresponding functions can be realized; in addition, the specific names of the functional modules are only for the convenience of distinguishing each other and are not used to limit the scope of protection of the present invention.

[0116] Embodiment 3

[0117] Figure 4 The schematic diagram of the structure of the electronic device provided in the third embodiment of the present invention shows a block diagram of an exemplary electronic device suitable for implementing the implementation mode of the present invention. Figure 4 The electronic device shown is only an example and should not limit the functions and scope of use of the embodiments of the present invention. Figure 4 As shown, the electronic device includes a processor 31, a memory 32, an input device 33 and an output device 34; the number of processors 31 in the electronic device can be one or more. Figure 4 Taking a processor 31 as an example, the processor 31, memory 32, input device 33 and output device 34 in the electronic device can be connected through a bus or other means. Figure 4 The example of connecting through bus is taken in the following.

[0118] The memory 32 is a computer-readable storage medium that can be used to store software programs, computer executable programs and modules, such as program instructions / modules corresponding to a foundation pit and slope early warning method based on real-time monitoring in an embodiment of the present invention. The processor 31 executes various functional applications and data processing of the computer device by running the software programs, instructions and modules stored in the memory 32, that is, realizing the above-mentioned foundation pit and slope early warning method based on real-time monitoring.

[0119] The present application provides a foundation pit and slope early warning method based on real-time monitoring, wherein the method is applied to a foundation pit and slope early warning system based on real-time monitoring, and the method includes: obtaining a monitoring site information set by collecting basic information of the high-support formwork monitoring site; performing monitoring point planning and analysis on the high-support formwork monitoring site through the monitoring site information set and a preset high-support formwork monitoring indicator set to obtain a monitoring point planning scheme; deploying multiple monitoring devices at the high-support formwork monitoring site through the monitoring point planning scheme; when the deployment is completed, performing real-time monitoring of the high-support formwork monitoring site through a high-support formwork monitoring module to obtain a real-time monitoring data set; inputting the real-time monitoring data set into a foundation pit-slope safety assessment model to obtain a foundation pit-slope safety assessment result; judging whether the foundation pit-slope safety assessment result meets the foundation pit-slope safety constraint condition, if the foundation pit-slope safety assessment result does not meet the foundation pit-slope safety constraint condition, obtaining a foundation pit-slope safety early warning signal, and sending the foundation pit-slope safety early warning signal to the staff at the high-support formwork monitoring site. It solves the technical problem that the existing technology of safety monitoring of foundation pits and slopes is not accurate enough, which leads to low quality of safety warning for foundation pits and slopes. It achieves the technical effect of improving the accuracy of safety monitoring of foundation pits and slopes, realizing intelligent, timely and efficient safety warning for foundation pits and slopes, and improving the quality of safety warning for foundation pits and slopes.

[0120] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.

Claims

1. A foundation pit and slope early warning method based on real-time monitoring, characterized in that: The method is applied to a foundation pit and slope early warning system based on real-time monitoring, the system includes a high-support formwork monitoring module, and the method includes: Obtain high-support formwork monitoring site; Based on the high-support formwork monitoring site, basic information is collected to obtain a monitoring site information set; Obtaining a preset high formwork monitoring indicator set, wherein the preset high formwork monitoring indicator set includes a plurality of preset foundation pit monitoring indicators and a plurality of preset slope monitoring indicators; Based on the monitoring site information set and the preset high-support formwork monitoring indicator set, a monitoring point planning analysis is performed on the high-support formwork monitoring site to obtain a monitoring point planning scheme; Deploy multiple monitoring devices at the high-support formwork monitoring site based on the monitoring point planning scheme; When the deployment is completed, based on the preset high-support formwork monitoring indicator set, the high-support formwork monitoring site is monitored in real time through the high-support formwork monitoring module to obtain a real-time monitoring data set; Inputting the real-time monitoring data set into a foundation pit-slope safety assessment model to obtain a foundation pit-slope safety assessment result; Determine whether the foundation pit-slope safety assessment result meets the foundation pit-slope safety constraint conditions. If the foundation pit-slope safety assessment result does not meet the foundation pit-slope safety constraint conditions, obtain a foundation pit-slope safety warning signal, and send the foundation pit-slope safety warning signal to the staff at the high-support formwork monitoring site.

2. The method according to claim 1, characterized in that The method of obtaining the monitoring point planning scheme further includes: Based on the monitoring site information set, obtaining site layout information; Divide the high-support formwork monitoring site into regions based on the site layout information to obtain monitoring area division results; Perform monitoring factor analysis based on the preset high-support formwork monitoring indicator set to obtain monitoring factor analysis results; The monitoring area division result and the monitoring element analysis result are input into the monitoring planning model to obtain the monitoring point layout planning scheme.

3. The method according to claim 2, characterized in that Based on the preset high-support formwork monitoring indicator set, monitoring factor analysis is performed to obtain monitoring factor analysis results, and the method further includes: Obtain multiple sample high-support formwork monitoring indicators; Obtain multiple sample high-formwork monitoring elements; Based on the multiple sample high formwork monitoring indicators and the multiple sample high formwork monitoring elements, construct an indicator-element mapping relationship; Based on the multiple sample high-formwork monitoring indicators, the multiple sample high-formwork monitoring elements, and the indicator-element mapping relationship, a monitoring element parsing library is constructed; The preset high-support formwork monitoring indicator set is input into the monitoring element analysis library to obtain the monitoring element analysis results.

4. The method according to claim 1, characterized in that The method further comprises: Performing working condition detection on the multiple monitoring devices to obtain multiple working condition detection results; Based on the multiple monitoring devices, obtaining multiple operating condition constraints; Determining whether the plurality of operating condition detection results satisfy the plurality of operating condition constraint conditions; If the operating condition detection result does not meet the operating condition constraint condition, an operating condition warning instruction is obtained, and the multiple monitoring devices are adjusted based on the operating condition warning instruction.

5. The method according to claim 1, characterized in that Obtaining foundation pit-slope safety assessment results, the method further includes: Performing principal component analysis based on the real-time monitoring data set to obtain a reduced-dimensionality monitoring data set; Based on the preset high-support formwork monitoring indicator set, cluster analysis is performed on the dimension reduction monitoring data set to obtain a foundation pit monitoring data set and a slope monitoring data set; The foundation pit monitoring data set and the slope monitoring data set are input into the foundation pit-slope safety assessment model to obtain the foundation pit-slope safety assessment result.

6. The method according to claim 5, characterized in that Performing principal component analysis based on the real-time monitoring data set to obtain a reduced-dimensionality monitoring data set, the method further includes: Obtaining a first feature monitoring data set according to the real-time monitoring data set; Decentralizing the first feature monitoring data set to obtain a second feature monitoring data set; Obtaining a covariance matrix of the first monitoring data set according to the second feature monitoring data set; Obtaining, according to the covariance matrix of the first monitoring data set, an eigenvalue of the first monitoring data set and an eigenvector of the first monitoring data set; The reduced-dimensionality monitoring dataset is obtained according to the eigenvalue of the first monitoring dataset and the eigenvector of the first monitoring dataset.

7. The method according to claim 5, characterized in that The method further comprises: The foundation pit-slope safety assessment model includes a foundation pit safety assessment model and a slope safety assessment model; The foundation pit safety assessment model includes a plurality of preset foundation pit safety assessment indicators, and the foundation pit monitoring data set is input into the foundation pit safety assessment model to obtain a plurality of foundation pit safety assessment coefficients; The slope safety assessment model includes a plurality of preset slope safety assessment indicators, and the slope monitoring data set is input into the slope safety assessment model to obtain a plurality of slope safety assessment coefficients; Based on the multiple foundation pit safety assessment coefficients and the multiple slope safety assessment coefficients, the foundation pit-slope safety assessment result is obtained.

8. A foundation pit and slope early warning system based on real-time monitoring, characterized in that: The system includes a high formwork monitoring module, and the system includes: A monitoring site determination module, the monitoring site determination module is used to obtain a high-support formwork monitoring site; An information collection module, the information collection module is used to collect basic information based on the high-support formwork monitoring site to obtain a monitoring site information set; A preset monitoring indicator acquisition module, the preset monitoring indicator acquisition module is used to obtain a preset high-support formwork monitoring indicator set, wherein the preset high-support formwork monitoring indicator set includes a plurality of preset foundation pit monitoring indicators and a plurality of preset slope monitoring indicators; A monitoring point planning and analysis module, the monitoring point planning and analysis module is used to perform monitoring point planning and analysis on the high-support formwork monitoring site based on the monitoring site information set and the preset high-support formwork monitoring indicator set to obtain a monitoring point planning scheme; A deployment module, the deployment module is used to deploy multiple monitoring devices at the high-support formwork monitoring site based on the monitoring point planning scheme; A real-time monitoring module, which is used to perform real-time monitoring of the high-support formwork monitoring site through the high-support formwork monitoring module to obtain a real-time monitoring data set after the deployment is completed based on the preset high-support formwork monitoring indicator set; A safety assessment module, wherein the safety assessment module is used to input the real-time monitoring data set into a foundation pit-slope safety assessment model to obtain a foundation pit-slope safety assessment result; A safety warning module is used to determine whether the pit-slope safety assessment result meets the pit-slope safety constraint conditions. If the pit-slope safety assessment result does not meet the pit-slope safety constraint conditions, a pit-slope safety warning signal is obtained, and the pit-slope safety warning signal is sent to the staff at the high-support formwork monitoring site.

9. An electronic device, characterized in that: The electronic device comprises: A memory for storing executable instructions; The processor is used to implement a foundation pit and slope early warning method based on real-time monitoring as described in any one of claims 1 to 7 when executing the executable instructions stored in the memory.

10. A computer readable medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, a foundation pit and slope early warning method based on real-time monitoring as described in any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Civil engineering monitoring system

    CN102236962A

  • Pre-warning system for automatic monitoring of foundation pit engineering

    CN110306605A