A positioning structure and positioning method for reserved steel bars
Through the combination of formwork components and positioning components, the reserved steel bar positioning structure solves the problem of burying the bends of reserved steel bars during the concrete pouring process, simplifies the removal of formwork and improves the stability of building connections.
Patent Information
- Application Number
- CN202211595729.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-13
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2042-12-13
AI Technical Summary
During the concrete pouring process of high-rise buildings, the bends of the reserved steel bars are easily buried, resulting in unstable connections and increased difficulty in removing the formwork.
A reserved steel bar positioning structure including formwork components and positioning components is used. Through the combination of the inner formwork, main keel, secondary keel, positioning plate components and quick and easy closing net, the embedded section of the reserved steel bars is inserted into the quick and easy closing net, and the concrete It is not easy to overflow during pouring, avoids burial, and provides an ideal connection surface after pouring.
It reduces the possibility of burying the bends of reserved steel bars in concrete, simplifies the dismantling process of formwork components, provides an ideal connection surface for the laying of outer frame floor slabs, and improves the stability of the building structure.
Smart Images

Figure CN116005945B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of steel bar fixing structures, and in particular to a positioning structure for reserved steel bars. Background Art
[0002] At present, with the development of economy, more and more high-rise buildings are being built; in order to make the building structure more stable, most high-rise buildings use reserved steel bars to reinforce the joints of floors during the construction process.
[0003] In the related art, generally, the skeleton structure of a high-rise building includes outer floor slab steel bars and core tube steel bars, and the reserved steel bars include mutually perpendicular embedded sections and reserved sections; the embedded sections are connected to the horizontal steel bars of the core tube by binding, and then the formwork is closed to form a casting cavity, the core tube steel bars are placed in the casting cavity, and then concrete is poured into the casting cavity. After the concrete strength reaches the design requirements, the lateral formwork is removed, the reserved section is bent along the embedded section, and finally the reserved section is tied and connected to the outer floor slab steel bars, thereby making the connection between the core tube steel bars and the outer floor slab steel bars more stable.
[0004] Regarding the above-mentioned related technologies, in order to facilitate the removal of the formwork, a strip-shaped clearance groove will be opened at the reserved steel bars in the formwork. During the concrete pouring process, the concrete may overflow along the clearance groove, causing the bending part of the reserved steel bars to be buried, and ultimately making it difficult for the reserved section to bend along the embedded section. Summary of the invention
[0005] In order to reduce the possibility of concrete burying the bent parts of reserved steel bars during concrete pouring, the present application provides a positioning structure and a positioning method for reserved steel bars.
[0006] In the first aspect, the present application provides a positioning structure for reserved steel bars using the following technical solution:
[0007] A positioning structure for reserved steel bars, comprising a template assembly for forming a casting cavity and a positioning assembly for temporarily fixing the reserved steel bars;
[0008] The template assembly includes an inner template, a main keel and a secondary keel arranged in sequence from the inside to the outside along the casting cavity, the inner template is a partition, the main keel and the secondary keel are both columnar, and the main keel and the secondary keel are perpendicular to each other;
[0009] The positioning assembly includes a positioning plate component and a quick-closing net. One end face of the positioning plate component is in close contact with the end face of the inner layer formwork close to the casting cavity. The positioning plate component is detachably connected to the inner layer formwork. A clearance groove is provided on the positioning plate component. A protruding mounting seat is provided on the end face of the positioning plate component away from the inner layer formwork, and the quick-closing net is connected to the mounting seat.
[0010] By adopting the above technical solution, after the inner template is surrounded to form a casting cavity, the main keel and the secondary keel fix the inner template along the outer side of the inner template, making the overall structure more stable. Under the action of the mounting seat, there is a certain gap between the quick-and-easy closing net and the positioning plate component, and the embedded section of the reserved steel bar is inserted into the casting cavity along the quick-and-easy closing net, and the reserved section of the reserved steel bar is placed in the gap between the quick-and-easy closing net and the positioning plate component; during the pouring of concrete along the casting cavity, the concrete is not easy to overflow along the quick-and-easy closing net under the action of the quick-and-easy closing net, so it is not easy to bury the bent section of the reserved steel bar, so this solution reduces the possibility of concrete burying the bent part of the reserved steel bar during the concrete pouring process. At the same time, in this solution, the reserved steel bar is fixed by the positioning assembly, so the reserved steel bar does not need to pass along the inner template, so there is no need to open a clearance groove on the inner template for the reserved steel bar to bend, so that it is difficult for the concrete to overflow along the inner template, thereby greatly reducing the difficulty of removing the template assembly after the concrete pouring is completed. In addition, since there are dense mesh openings on the quick and easy closing net, after the concrete is poured, the end surface where the concrete contacts the quick and easy closing net forms a rough end surface under the action of the mesh openings, providing an ideal connecting surface for the next step of laying the outer frame floor.
[0011] Preferably, the positioning assembly further comprises a supporting component, wherein the supporting component is connected to the positioning plate component, and the supporting component is used to abut against the core tube steel bars to support the positioning plate component.
[0012] By adopting the above technical scheme, in this scheme, it is necessary to first insert the embedded section of the reserved steel bar into the mesh mouth of the quick-and-easy closing net, and then connect the positioning plate component to the inner layer formwork. Since the positioning component with embedded steel bars has a large mass, it is difficult to connect the positioning plate component to the inner layer formwork; therefore, the positioning plate component needs to first be offset against the steel bars on the core tube steel bars through the supporting component, and the supporting component supports the positioning plate component, and when the positioning plate component is supported by the supporting component, the positioning plate component is fixed relative to the inner layer formwork, so the supporting component can also play a positioning role on the positioning plate component, thereby making it easy to connect the positioning plate component to the inner layer formwork.
[0013] Preferably, the support component includes a rotating support member and a limiting member, the rotating support member is rotatably connected to the mounting seat, the limiting member can fix the rotating support member relative to the mounting seat, and the rotating shaft of the rotating support member is arranged outside the casting cavity.
[0014] By adopting the above technical scheme, before pouring concrete, the rotating support member rotates and abuts against the steel bars on the core tube steel bars, and then the rotating support member is fixed relative to the mounting seat by the limiting member, and then the positioning plate component is connected to the inner layer formwork, and the reserved section of the reserved steel bars is tied to the core tube steel bars, and then the limiting member is released, the rotating support member is rotated outside the pouring cavity, and then the rotating support member is fixed relative to the mounting seat by the limiting member, and finally the concrete is poured; in the process of pouring concrete in this scheme, the concrete will not bury the supporting member, so the supporting member can be repeatedly used together with the positioning plate component.
[0015] Preferably, a rotating connecting hole is provided on one end surface of the mounting seat close to the casting cavity, a rotating connecting column adapted to the rotating connecting hole is provided on the rotating support member, the limiting member is a bolt, a bolt hole adapted to the limiting member is provided on the bottom wall of the rotating connecting hole, a locking hole adapted to the outer diameter of the limiting member is provided on the rotating support member, and the locking hole is coaxially arranged with the rotating connecting column.
[0016] By adopting the above technical solution, when the bolts are loosened, the rotating support can rotate along the mounting seat, and when the bolts are tightened, the lower end face of the bolt nut is pressed against the end face of the rotating support, and the rotating support is fixed relative to the mounting seat. In different application scenarios, the position of the positioning plate component relative to the inner layer formwork may be different, and the distance between the core tube reinforcement and the positioning plate component may also be different. For the above situation, after the bolts are removed along the mounting seat, the rotating support can be separated from the mounting seat along the rotating connection hole. Therefore, the support component in this solution can be removed relative to the mounting seat. For different use scenarios, this solution can select different types of support components to adapt to the current application scenario.
[0017] Preferably, the quick-closing net and the mounting seat are detachably connected via a hanging net sheet, the end face area of the hanging net sheet is larger than the mesh opening area of the quick-closing net, the mounting seat is provided with bolt holes, the hanging net sheet is provided with through holes for bolts to pass through, and the bolt holes on the mounting seat correspond one-to-one to the through holes.
[0018] By adopting the above technical scheme, under the action of the hanging mesh, the quick and easy closing mesh is more firmly fixed relative to the mounting seat. Therefore, after the reserved steel bars complete the bending process, the reserved section is coaxial with the embedded section. During the process of disassembling the positioning plate component relative to the concrete, the quick and easy closing mesh can also be brought out, which simplifies the disassembly process. At the same time, after the bolts are removed from the bolt holes on the mounting seat, the hanging mesh and the quick and easy closing mesh are both released relative to the mounting seat. Therefore, this scheme can replace quick and easy closing meshes of different sizes to adapt to reserved steel bars of different diameters.
[0019] Preferably, the hanging mesh is provided with at least three perforations, and the midpoints of all the perforations are not collinear.
[0020] By adopting the above technical solution, the mounting seat has a multi-point fixing effect on the hanging mesh, so that the hanging mesh is more firmly fixed relative to the mounting seat, and finally the quick-closing net is more stable relative to the positioning plate component.
[0021] Preferably, the surface of the quick-closing net after fitting is wavy.
[0022] By adopting the above technical solution, after the concrete is poured, under the action of the quick-and-easy closing net, the part where the concrete end face contacts the quick-and-easy closing net presents a wavy rough surface, further providing an ideal connection surface for the next step of laying the outer frame floor slab.
[0023] Preferably, the quick-closing net is provided with a first net opening and a second net opening, and the radius of the first net opening is greater than the radius of the second net opening.
[0024] By adopting the above technical solution, the first mesh opening is used for the embedded section of the reserved steel bar to pass through, and the second mesh opening is used to form a raised column on the surface of the concrete during the pouring process; after the concrete is poured, the contact part between the concrete end face and the quick-closing mesh has a denser raised column, so this solution can further improve the roughness of the concrete end face, thereby further providing an ideal connection surface for the next step of laying the outer frame floor. At the same time, due to the small radius of the second mesh opening, it is more difficult for the concrete to overflow along the second mesh opening during the pouring process and cover the bend of the reserved steel bar.
[0025] Preferably, there are at least two of the make way slots, which are arranged in parallel, and the mounting seats include several groups, all the mounting seats in each group of the mounting seats are arranged in a row, and at least one group of the mounting seats is arranged between two adjacent make way slots.
[0026] By adopting the above technical scheme, a plurality of mounting seats are provided, and the positioning plate component can realize multi-point support for the quick and easy closing net through the plurality of mounting seats, so that the fixation between the quick and easy closing net and the positioning plate component is more firm; at the same time, each yielding groove can correspond to a row of reserved steel bars, so this scheme can position multiple rows of reserved steel bars through a positioning plate component.
[0027] In the second aspect, this solution provides a method for positioning reserved steel bars, using the following technical solutions:
[0028] A method for positioning reserved steel bars, comprising:
[0029] S1: The inner formwork forms a casting cavity;
[0030] S2: The main keel, secondary keel and fastening components lock the inner layer formwork;
[0031] S3: The quick-closing mesh is connected to the mounting base, and the embedded section of the reserved steel bar is inserted along the first mesh opening;
[0032] S4: The positioning plate component fits with the inner layer formwork, the rotating support member rotates, the clamping groove abuts against the core tube steel bar, and the limiting member fixes the rotating support member relative to the mounting seat;
[0033] S5: The positioning plate component is fixed to the internal formwork by means of positioning bolts, and the limiter releases the rotation support component from the mounting seat, and the rotation support component rotates to the outside of the casting cavity;
[0034] S6: pouring concrete into the pouring cavity;
[0035] S7: Remove the fastening components, secondary keels, main keels and inner formwork;
[0036] S8: The reserved section of the reserved steel bars is straightened relative to the embedded section;
[0037] S9: Remove the positioning plate assembly.
[0038] Through the above scheme: the formwork components and the positioning components can not be buried by concrete, can be used repeatedly, and the use cost is reduced.
[0039] In summary, the present application includes at least one of the following beneficial technical effects:
[0040] 1. After the inner template is surrounded to form the casting cavity, the main keel and the secondary keel fix the inner template along the outer side of the inner template, making the overall structure more stable. Under the action of the mounting seat, there is a certain gap between the quick-and-easy closing net and the positioning plate component, and the embedded section of the reserved steel bar is partially inserted into the casting cavity along the quick-and-easy closing net, and the reserved section of the reserved steel bar is placed in the gap between the quick-and-easy closing net and the positioning plate component; during the pouring of concrete along the casting cavity, the concrete is not easy to overflow along the quick-and-easy closing net under the action of the quick-and-easy closing net, so it is not easy to bury the bent section of the reserved steel bar. Therefore, this scheme reduces the possibility of concrete burying the bent part of the reserved steel bar during the concrete pouring process. At the same time, in this scheme, the reserved steel bar is fixed by the positioning assembly, so the reserved steel bar does not need to pass through along the inner template, so there is no need to open a clearance groove on the inner template for the reserved steel bar to bend, making it difficult for the concrete to overflow along the inner template, thereby greatly reducing the difficulty of removing the template assembly after the concrete pouring is completed. In addition, since the quick-close mesh has dense mesh openings, after the concrete is poured, the end surface where the concrete contacts the quick-close mesh forms a rough end surface under the action of the mesh openings, providing an ideal connection surface for the next step of laying the outer frame floor slab;
[0041] 2. In this scheme, it is necessary to first insert the embedded section of the reserved steel bar into the mesh opening of the quick-closed mesh, and then connect the positioning plate component to the inner layer formwork. Since the positioning component with embedded steel bars has a large mass, it is difficult to connect the positioning plate component to the inner layer formwork; therefore, the positioning plate component needs to first be offset against the steel bars on the core tube through the supporting component, and the supporting component supports the positioning plate component. When the positioning plate component is supported by the supporting component, the positioning plate component is fixed relative to the inner layer formwork, so the supporting component can also play a positioning role for the positioning plate component, so that the positioning plate component is easy to connect with the inner layer formwork;
[0042] 3. Under the action of the hanging mesh, the quick-and-easy closing mesh is more firmly fixed to the mounting seat. Therefore, after the reserved steel bars complete the bending process, the reserved section is coaxial with the embedded section. During the disassembly of the positioning plate component relative to the concrete, the quick-and-easy closing mesh can also be brought out, simplifying the disassembly process. At the same time, after the bolts are removed from the bolt holes on the mounting seat, the hanging mesh and the quick-and-easy closing mesh are both released from the mounting seat. Therefore, this solution can replace quick-and-easy closing meshes of different sizes to adapt to reserved steel bars of different diameters. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 It is a cross-sectional view of the positioning structure of reserved steel bars.
[0044] Figure 2 yes Figure 1 A in the middle is an enlarged view.
[0045] Figure 3 It is a schematic diagram of the main view of the positioning plate components.
[0046] Figure 4 This is the main view diagram of the quick and easy closing net.
[0047] Figure 5 It is a cross-sectional schematic diagram of a rotating support.
[0048] Figure 6 It is a main view schematic diagram of hanging mesh.
[0049] Figure 7 It is a schematic diagram of the reserved steel bar structure.
[0050] Figure 8 It is a schematic diagram of the main view of the arc fastener.
[0051] Explanation of the reference numerals: 1. Formwork assembly; 11. Inner formwork; 12. Main keel; 13. Secondary keel; 14. Fastening component; 141. Tensile reinforcement; 142. Arc-shaped fastener; 1421. Clearance hole; 2. Positioning assembly; 21. Positioning plate component; 211. Clearance groove; 212. Mounting seat; 2121. Rotational connection hole; 213. Positioning bolt; 22. Quick-closing net; 221. First mesh opening; 222. Second mesh opening; 23. Hanging mesh; 231. Perforation; 24. Support component; 241. Rotational support; 2411. Rotational connection column; 2412. Locking hole; 2413. Snap-in groove; 242. Limiting member; 3. Reserved reinforcement; 31. Embedded section; 32. Reserved section; 4. Casting cavity. DETAILED DESCRIPTION
[0052] The present application is further described in detail below in conjunction with all the accompanying drawings.
[0053] The embodiment of the present application discloses a positioning structure for reserved steel bars.
[0054] Reference Figure 1 and 7 A positioning structure for reserved steel bars includes a template component 1 and a positioning component 2, wherein the template component 1 is used to form a pouring cavity 4 for concrete pouring, and the positioning component 2 is used to position the reserved steel bars 3.
[0055] Reference Figure 1 Specifically, the formwork assembly 1 includes an inner layer formwork 11, a main keel 12, a secondary keel 13 and a fastening component 14, wherein the inner layer formwork 11 is a light plate, and the inner layer formwork 11 is used to surround and form a pouring cavity 4 for pouring concrete, the main keel 12 is a steel bar column arranged perpendicular to the horizontal plane, and the secondary keel 13 is a steel bar column arranged parallel to the horizontal plane. The inner layer formwork 11, the main keel 12 and the secondary keel 13 are arranged in sequence in a direction away from the pouring cavity 4, and the fastening component 14 is used to clamp the two opposite inner layer formworks 11. Through the above structure, the main keel 12 and the secondary keel 13 support the inner layer formwork 11 along the end face of the inner layer formwork 11 away from the pouring cavity 4, so that the inner layer formwork 11 remains stable during the pouring of concrete.
[0056] Reference Figure 1 and 8The fastening component 14 includes a tension steel bar 141 and two arc-shaped fasteners 142. The secondary purlins 13 include several groups. The spacing between two adjacent groups of secondary purlins 13 is equal. Each group of secondary purlins 13 includes two secondary purlins 13. The spacing between two secondary purlins 13 in the same group is adapted to the diameter of the tension steel bar 141. The arc-shaped fastener 142 is an arc-shaped steel sheet. At least two clearance holes 1421 for the tension steel bar 141 to pass through are opened on the arc-shaped fastener 142. The number of the tension steel bar 141 corresponds to the number of the clearance holes 1421 on the arc-shaped fastener 142. An arc-shaped fastener 142 is pressed against the secondary purlin 13 along a side of a group of secondary purlins 13 away from the inner layer formwork 11, and the arc-shaped opening of the arc-shaped fastener 142 faces the secondary purlin 13; another arc-shaped fastener 142 is pressed against another group of secondary purlins 13 on the opposite side of the casting cavity 4, and the tension steel bars 141 pass through the makeshift holes 1421 of the two arc-shaped fasteners 142. Threads are provided at both ends of the tension steel bars 141. After nuts are screwed on both ends of the tension steel bars 141, the nuts are pressed against the side of the arc-shaped fastener 142 away from the inner layer formwork 11, and the two inner layer formworks 11 are clamped by the fastening components 14.
[0057] Through the above structure, compared with the analysis of a single fastening component 14, multiple parallel-arranged tension steel bars 141 are clamped by two secondary purlins 13, and the secondary purlins 13 are arranged perpendicular to the tension steel bars 141. Under the action of the secondary purlins 13, the arc-shaped fasteners 142 and the nuts, the tension steel bars 141 have zero degree of freedom, and the structure is more stable; at the same time, two groups of secondary purlins 13 arranged relative to the pouring cavity 4 are clamped by the fastening component 14, so that the relative inner layer formwork 11 is finally clamped, which is not easy to move relative to each other during the concrete pouring process.
[0058] Reference Figure 1 and 2 Specifically, the positioning assembly 2 includes a positioning plate component 21, a quick and easy closing net 22, a hanging net sheet 23 and a supporting component 24. The height of the inner layer formwork 11 close to the outer floor slab side is greater than the height of other inner layer formworks 11. The positioning plate component 21 is connected to the inner layer formwork 11 close to the outer floor slab side. The protruding portion of the positioning plate component 21 is connected to the end surface of the inner layer formwork 11 close to the casting cavity 4 by bolts. A mounting seat 212 is protruded on the other opposite end surface of the positioning plate component 21. The quick and easy closing net 22 is connected to the mounting seat 212 by the hanging net sheet 23. The hanging net sheet 23 and the mounting seat 212 are connected by bolts. The hanging net sheet 23 is used to fix the quick and easy closing net 22; the supporting component 24 can be abutted against the core tube steel bars to temporarily fix the positioning plate component 21.
[0059] Reference Figure 1 and 2Through the above structure, under the action of the mounting seat 212, there is a certain gap between the quick-closing net 22 and the positioning plate component 21. After the embedded section 31 of the reserved steel bar 3 is inserted along the mesh opening of the quick-closing net 22, the reserved section 32 of the reserved steel bar 3 is placed in the gap between the quick-closing net 22 and the positioning plate component 21. The reserved steel bar 3 does not need to pass through the inner layer template 11, so there is no need to set a clearance groove on the inner layer template 11 for the reserved steel bar 3 to pass through. During the pouring process, it is difficult for concrete to overflow along the inner layer template 11, which greatly reduces the difficulty of disassembling the template assembly 1 after the concrete pouring process is completed. In addition, during the pouring process, the concrete can only overflow along the mesh opening of the quick-closing net 22. Due to the small mesh opening aperture, it is difficult for the concrete to overflow in large quantities along a single mesh opening, which ultimately reduces the possibility of the concrete overflowing along the mesh opening and burying the bent section of the reserved steel bar 3, making the reserved section 32 of the reserved steel bar 3 easy to bend.
[0060] Reference Figure 1 and 3 Specifically, the positioning plate component 21 is a rectangular wooden plate, and a plurality of positioning bolts 213 are embedded in the positioning plate component 21. The positioning bolts 213 are arranged in an array, and the studs of the positioning bolts 213 protrude along one end face of the positioning plate component 21. The extension direction of the studs of the positioning bolts 213 is perpendicular to the end face of the positioning plate component 21. The inner layer template 11 is provided with through holes for the positioning bolts 213 to pass through, and the through holes correspond to the positioning bolts 213 one by one. Through the above structure, the studs of the positioning bolts 213 pass through the through holes on the inner layer template 11, and the end face of the positioning plate component 21 is fitted with the end face of the inner layer template 11. Then, the nuts are tightened along the studs of the positioning bolts 213, and the nuts are pressed against the side of the inner layer template 11 away from the positioning plate component 21, so that the relative fixation between the inner layer template 11 and the positioning plate component 21 can be completed.
[0061] Reference Figure 1 The positioning plate component 21 is provided with a clearance groove 211. In this embodiment, the number of the clearance grooves 211 is two. In other embodiments, the number of the clearance grooves 211 can also be another integer. The clearance grooves 211 are arranged in parallel. A plurality of mounting seats 212 are protruded from the end surface of the positioning plate component 21 close to the casting cavity 4. The mounting seats 212 are arranged in an array. The mounting seats 212 are arranged in three rows. At least one row of mounting seats 212 is arranged between two adjacent mounting grooves.
[0062] Reference Figure 1 and 6Specifically, the mounting seat 212 is a rectangular parallelepiped, and a plurality of bolt holes are provided on one end face of the mounting seat 212 away from the positioning plate component 21. In the present embodiment, the number of bolt holes is four, and the four bolt holes are provided near the four corners of the mounting seat 212; in other embodiments, the number of bolt holes can also be other integers greater than two, and the midpoints of all the bolt holes are not collinear. The hanging mesh 23 is provided with through holes 231 for the bolts to pass through, and the through holes 231 correspond to the bolt holes on the end face of the mounting seat 212 one by one. One end face of the quick-closing net 22 is in close contact with the mounting seat 212, and the other end face of the quick-closing net 22 is in close contact with the hanging mesh 23. When the bolts pass through the through holes 231 on the hanging mesh 23 and the mesh opening of the quick-closing net 22 in sequence, and are tightened along the bolt holes on the end face of the mounting seat 212, the hanging mesh 23 and the mounting seat 212 clamp the quick-closing net 22.
[0063] Through the above structure, the hanging mesh 23 can be detachably connected to the mounting seat 212 by bolts, and each mounting seat 212 can support the corresponding hanging mesh 23 through multiple points, so that the fixation of a single hanging mesh 23 is more secure; at the same time, multiple support seats cooperate with the corresponding hanging mesh 23 to clamp the quick and easy closing net 22 along multiple areas, ultimately making the quick and easy closing net 22 more securely fixed relative to the positioning plate assembly.
[0064] Reference Figure 1 and 2 Specifically, a row of mounting seats 212 closest to the upper side of the positioning plate component 21 is placed outside the casting cavity 4, and the center of the mounting seat 212 placed outside the casting cavity 4 is concave to form a rotating connection hole 2121, and the rotating connection hole 2121 is cylindrical, and a threaded hole is opened on the bottom wall of the rotating connection hole 2121. The support component 24 includes a rotating support member 241 and a limiting member 242. The rotating support member 241 can rotate along the mounting seat 212 through the rotating connection hole 2121, and the limiting member 242 can lock the rotating support member 241 relative to the mounting seat 212, so that the rotating support member 241 is fixed relative to the mounting seat 212.
[0065] Reference Figure 2 and 5The rotating support member 241 is in the shape of a rectangular parallelepiped, and a cleaning rotating connecting column 2411 protrudes from one side of the rotating support member 241 along the length and width. The axis of the rotating connecting column 2411 is perpendicular to the surface surrounded by the length and width of the rotating support member 241. The rotating connecting column 2411 is arranged close to the wide side of the rotating support member 241, and the perpendicular bisector of the wide side of the rotating support member 241 intersects with the axis of the rotating connecting column 2411. The rotating connection column 2411 is adapted to the rotating connection hole 2121, and a locking hole 2412 is also provided on the rotating support 241. The locking hole 2412 is a through hole, and the locking hole 2412 is coaxially arranged with the rotating connection column 2411. The diameter of the locking hole 2412 is adapted to the threaded hole on the bottom wall of the rotating connection hole 2121. A semi-cylindrical clamping groove 2413 is also provided on the end face of the rotating support 241 away from the rotating connection column 2411, and the clamping groove 2413 is a semi-circular columnar body, and the axis of the clamping groove 2413 is perpendicular to the diameter of the rotating connection column 2411. The stopper 242 is a bolt adapted to the threaded hole on the bottom wall of the rotating connection hole 2121.
[0066] Through the above structure, when the rotating connecting column 2411 is inserted into the rotating connecting hole 2121, the rotating support member 241 can rotate along the mounting seat 212, and when the limiting member 242 passes through the locking hole 2412 and is tightened along the threaded hole on the bottom wall of the rotating connecting hole 2121, the rotating support member 241 is fixed relative to the mounting seat 212; since the row of mounting seats 212 closest to the upper side of the positioning plate component 21 is placed outside the casting cavity 4, the rotating shaft of the rotating support member 241 is located outside the casting cavity 4. Before pouring concrete, the rotating support 241 is rotated, and the groove wall of the clamping groove 2413 is against the steel bars on the core tube steel bars, and then the limiter 242 is tightened along the bolt hole on the bottom wall of the rotating connection hole 2121, and the rotating support 241 is fixed relative to the mounting seat 212; then the positioning plate component 21 is connected to the inner layer template 11 through the positioning bolt 213, and the reserved section 32 of the reserved steel bar 3 is tied to the core tube steel bar, and then the limiter 242 is loosened, and the rotating support 241 is rotated to the outside of the pouring cavity 4, and then the limiter 242 is tightened again along the bolt hole on the bottom wall of the rotating connection hole 2121, and the rotating support 241 is fixed relative to the mounting seat 212, and finally the concrete is poured. In the process of pouring concrete in this scheme, the concrete will not bury the support component 24, so the support component 24 can be repeatedly used together with the positioning plate component 21.
[0067] Reference Figure 1 and 4Specifically, the surface of the quick-closed net 22 after fitting is wavy. The quick-closed net 22 is provided with a first net opening 221 for the reserved steel bars 3 to pass through and a second net opening 222 for forming a rough surface during concrete pouring. The first net opening 221 and the second net opening 222 are arranged in an array, and the distance between two adjacent first net openings 221 is adapted to the distance between the reserved steel bars 3; the aperture of the second net opening 222 is adapted to the aperture of the threaded hole opened on the end surface of the mounting seat 212, the distance between the centers of two adjacent second net openings 222 is L, the radius of the second net opening 222 is R, 3R<L<4R.
[0068] Through the above structure, the bolts matched with the bolt holes on the end surface of the mounting seat 212 can pass through the quick-closed mesh 22 along the second mesh opening 222, and the aperture of the second mesh opening 222 is adapted to the bolt diameter, so the bolts can further limit the quick-closed mesh 22, thereby making the quick-closed mesh 22 more firmly fixed. In addition, since the end surface of the quick-closed mesh 22 is wavy, the end surface connected to the outer floor slab after the concrete is poured has convex and concave features, and the concrete partially overflows along the second mesh opening 222 to form dense convex columns, and the concrete end surface is rougher, thereby further providing an ideal connection surface for the next step of laying the outer frame floor slab.
[0069] In summary, the embedded section 31 of the reserved steel bar 3 can pass through the first mesh opening 221 of the quick-and-easy closing net 22, and the gap between the quick-and-easy closing net 22 and the positioning plate component 21 can accommodate the reserved section 32 of the reserved steel bar 3. At the same time, during the pouring process, it is difficult for the concrete to overflow excessively along the second mesh opening 222 of the quick-and-easy closing net 22 and bury the bending part of the reserved steel bar 3. Therefore, this solution can reduce the possibility of concrete burying the bending part of the reserved steel bar 3 during the concrete pouring process. At the same time, since the reserved steel bar 3 does not need to pass through the inner layer formwork 11, it is difficult for the concrete to overflow along the inner layer formwork 11, which greatly reduces the difficulty of disassembling the inner layer formwork 11 component 1. In addition, under the action of the quick-and-easy closing net 22, the connection surface between the poured concrete and the outer floor slab is rough and wavy, which provides a very ideal connection surface for the next step of laying the outer frame floor slab.
[0070] The implementation principle of a positioning structure for reserved steel bars in an embodiment of the present application is as follows: first, the inner layer formwork 11 encloses a casting cavity 4, and then the main keel 12, the secondary keel 13 and the fastening component 14 fix the inner layer formwork 11; then the quick-closing net 22 is connected to the positioning plate component 21 through a fixed mesh sheet, and then the embedded section 31 of the reserved steel bar 3 passes through the make way groove 211 and the first mesh opening 221 in sequence, and the reserved section 32 of the reserved steel bar 3 is placed in the gap between the quick-closing net 22 and the positioning plate component 21; next, the positioning plate component 21 is temporarily fixed by rotating the support member 241 against the horizontal steel bars of the core tube, and then the positioning plate component 21 and the inner layer formwork 11 are connected by positioning bolts 213, and then the embedded section 31 of the reserved steel bar 3 is tied to the steel bars of the core tube, and then the support member 241 is rotated to the outside of the casting cavity 4, and concrete pouring into the casting cavity 4 begins. After pouring is completed, the formwork assembly 1 is first removed, and then the positioning assembly 2 is removed, followed by bending the reserved section 32 of the reserved steel bar 3, and finally tying the reserved section 32 of the reserved steel bar 3 to the outer floor slab steel bar.
[0071] The embodiment of the present application also discloses a method for positioning reserved steel bars, and the method for positioning reserved steel bars comprises the following steps:
[0072] S1: The inner layer formwork 11 encloses the casting cavity 4;
[0073] S2: The main keel 12, the secondary keel 13 and the fastening component 14 lock the inner layer formwork 11;
[0074] S3: The quick-closing net 22 is connected to the mounting seat 212, and the embedded section 31 of the reserved steel bar 3 is inserted along the first net opening 221;
[0075] S4: The positioning plate component 21 is fitted with the inner layer formwork 11, the rotating support member 241 rotates, the clamping groove 2413 abuts against the core tube steel bar, and the limiting member 242 fixes the rotating support member 241 relative to the mounting seat 212;
[0076] S5: The positioning plate component 21 is fixed to the internal template by the positioning bolts 213, and the limiter 242 releases the rotation support member 241 from the mounting seat 212, and the rotation support member 241 rotates to the outside of the casting cavity 4;
[0077] S6: pouring concrete into the pouring cavity 4;
[0078] S7: Remove the fastening components 14, the secondary keel 3, the main keel 12 and the inner layer formwork 11;
[0079] S8: the reserved section 32 of the reserved steel bar 3 is straightened relative to the embedded section 31;
[0080] S9: Remove the positioning plate component 21.
[0081] Through the above steps, the present solution can reduce the possibility of concrete burying the bent parts of the reserved steel bars 3 during the concrete pouring process; the formwork assembly 1 and the positioning assembly 2 will not be buried by concrete during the concrete pouring process, so the formwork assembly 1 and the positioning assembly 2 can be reused, reducing the cost of use.
[0082] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A positioning structure for reserved steel bars, characterized in that: It comprises a template component (1) for forming a casting cavity (4) and a positioning component (2) for temporarily fixing a reserved steel bar (3); The formwork assembly (1) comprises an inner layer formwork (11), a main keel (12) and a secondary keel (13) which are arranged in sequence from the inside to the outside along the casting cavity (4); the inner layer formwork (11) is a partition; the main keel (12) and the secondary keel (13) are both columnar; and the main keel (12) and the secondary keel (13) are perpendicular to each other; The positioning assembly (2) comprises a positioning plate component (21) and a quick-closing net (22); one end face of the positioning plate component (21) is in close contact with the end face of the inner layer template (11) close to the casting cavity (4); the positioning plate component (21) is detachably connected to the inner layer template (11); a clearance groove (211) is provided on the positioning plate component (21); a protruding mounting seat (212) is provided on the end face of the positioning plate component (21) away from the inner layer template (11); and the quick-closing net (22) is connected to the mounting seat (212); The gap between the quick-closing net (22) and the positioning plate component (21) is capable of accommodating the reserved section (32) of the reserved steel bar (3).
2. A positioning structure for reserved steel bars according to claim 1, characterized in that: The positioning assembly (2) further comprises a supporting component (24), wherein the supporting component (24) is connected to the positioning plate component (21), and the supporting component (24) is used to abut against the core tube steel bars to support the positioning plate component (21).
3. A positioning structure for reserved steel bars according to claim 2, characterized in that: The support component (24) comprises a rotating support member (241) and a limiting member (242); the rotating support member (241) is rotatably connected to the mounting seat (212); the limiting member (242) can fix the rotating support member (241) relative to the mounting seat (212); and the rotating shaft of the rotating support member (241) is arranged outside the casting cavity (4).
4. A positioning structure for reserved steel bars according to claim 3, characterized in that: A rotation connection hole (2121) is provided on one end surface of the mounting seat (212) close to the casting cavity (4); a rotation connection column (2411) adapted to the rotation connection hole (2121) is provided on the rotation support member (241); the limiting member (242) is a bolt; a bolt hole adapted to the limiting member (242) is provided on the bottom wall of the rotation connection hole (2121); a locking hole (2412) adapted to the outer diameter of the limiting member (242) is provided on the rotation support member (241); the locking hole (2412) is coaxially arranged with the rotation connection column (2411).
5. The positioning structure of the reserved steel bars according to claim 1 is characterized in that: The quick-closing net (22) and the mounting seat (212) are detachably connected via a mesh hanging sheet (23); the end surface area of the mesh hanging sheet (23) is larger than the mesh opening area of the quick-closing net (22); the mounting seat (212) is provided with bolt holes; the mesh hanging sheet (23) is provided with through holes (231) for bolts to pass through; the bolt holes on the mounting seat (212) correspond one to one with the through holes (231).
6. A positioning structure for reserved steel bars according to claim 5, characterized in that: The hanging mesh sheet (23) is provided with at least three perforations (231), and the midpoints of all the perforations (231) are not collinear.
7. The positioning structure of the reserved steel bars according to claim 1, characterized in that: The surface of the quick-closing net (22) after fitting is wavy.
8. The positioning structure of the reserved steel bars according to claim 1, characterized in that: The quick-closing net (22) is provided with a first net opening (221) and a second net opening (222), and the radius of the first net opening (221) is greater than the radius of the second net opening (222).
9. The positioning structure for reserved steel bars according to claim 1, characterized in that: There are at least two of the clearance slots (211), which are arranged in parallel. The mounting seats (212) include a plurality of groups, all of the mounting seats (212) in each group of the mounting seats (212) are arranged in a row, and at least one group of the mounting seats (212) is arranged between two adjacent clearance slots (211).
10. A method for positioning reserved steel bars, characterized in that: A positioning structure for reserved steel bars according to any one of claims 1 to 9, comprising the following steps: S1: The inner layer formwork (11) encloses a casting cavity (4); S2: The main keel (12), the secondary keel (13) and the fastening component (14) lock the inner layer formwork (11); S3: The quick-closing net (22) is connected to the mounting seat (212), and the embedded section (31) of the reserved steel bar (3) is inserted along the first net opening (221); S4: the positioning plate component (21) is fitted with the inner layer template (11), the rotating support member (241) is rotated, the clamping groove (2413) is abutted against the core tube steel bar, and the limiting member (242) fixes the rotating support member (241) relative to the mounting seat (212); S5: The positioning plate component (21) is fixed to the internal template by means of positioning bolts (213), the limiting member (242) releases the rotation support member (241) from being fixed relative to the mounting seat (212), and the rotation support member (241) is rotated to the outside of the casting cavity (4); S6: pouring concrete into the pouring cavity (4); S7: removing the fastening components (14), the secondary keel (13), the main keel (12) and the inner formwork (11); S8: the reserved section (32) of the reserved steel bar (3) is straightened relative to the embedded section (31); S9: Remove the positioning plate component (21).