Urban rail station door fault dispatching method, device, computer equipment, and storage medium
By automatically judging and handling urban rail transit platform gate failures and generating scheduling instructions, the problem of low manual handling efficiency is solved, and the fault handling efficiency and operation service quality are improved.
Patent Information
- Application Number
- CN202211710787.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-29
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-12-29
AI Technical Summary
Operational interruptions and passenger stranding caused by platform door failure in urban rail transit are uncertain and inefficient in existing technology relying on manual disposal.
By obtaining platform door status information, the fault type is automatically judged and dispatching instructions are generated, including automatic execution of vehicle closure, remote door shutdown test, dynamic adjustment of operation diagrams, etc., to reduce the work intensity of dispatchers and improve the efficiency of fault handling.
It realizes automated fault handling and real-time online adjustments, improves the quality of operational services, and reduces the impact of passengers.
Smart Images

Figure CN116009511B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of urban rail dispatching, and in particular to an urban rail platform door fault dispatching method, device, computer equipment, and storage medium. Background Art
[0002] Urban rail transit often encounters some unpredictable abnormal events in daily operation that affect the normal operation of the system. These abnormal events may cause delays of several trains or even cause problems such as passenger detention and operation interruption. Platform door failure is one of the more common types of failures in urban rail transit operations. This failure has a high occurrence rate. If the dispatcher does not handle it in time, it is very easy to cause train delays, which in turn causes passenger detention and even disrupts the operation order, affecting the quality of passenger service. In order to ensure that platform door failures can be handled in a timely and appropriate manner, the operation department has formulated a corresponding handling plan. However, in the current operation organization work, the dispatcher is relied on to manually handle the failure under the fault state. The handling effect depends on the handling experience and feedback efficiency of the dispatcher, driver, and station staff, and there is great uncertainty.
[0003] However, the current handling of fault incidents mostly relies on the experience of dispatchers, and fault handling is carried out manually. Dispatchers often find it difficult to accurately judge the impact of faults based on their experience. At the same time, the capabilities of dispatchers are uneven. Some dispatchers are less familiar with equipment and lack the necessary fault handling experience, which can easily lead to problems such as untimely response and improper handling. Summary of the invention
[0004] In order to solve one of the above-mentioned technical defects, an urban rail platform door fault scheduling method, device and computer equipment are provided in the embodiments of the present application.
[0005] According to a first aspect of an embodiment of the present application, a method for scheduling urban rail platform door failures is provided, the method comprising:
[0006] Obtain the status information of the platform door of the urban rail train, and determine the type of platform door failure when a platform door failure occurs;
[0007] Generate and execute fault dispatch instructions according to the platform door fault type; fault dispatch instructions include issuing manual fault handling instructions;
[0008] Generate a dynamic adjustment preview plan for the operation diagram according to the platform door fault type and the repair status of the platform door fault, receive manual instructions based on the platform door fault type, the repair status of the platform door fault and the dynamic adjustment preview plan for the operation diagram, and load and execute the dynamic adjustment preview plan for the operation diagram according to the manual instructions.
[0009] In an optional embodiment of the present application, the part of the method of generating and executing the fault dispatch instruction according to the platform door fault type further includes:
[0010] When the platform door fault type is any of the following: the platform door is open during the train entering or leaving the station, the single or / multi-stage platform door cannot be closed, the entire train of platform doors cannot be opened, and the entire train of platform doors cannot be closed, the fault dispatch instruction also includes automatically executing the detaining of the train affected by the fault.
[0011] In an optional embodiment of the present application, the part of the method of generating and executing the fault dispatch instruction according to the platform door fault type further includes:
[0012] When the platform door fault type is any of the following: single-stage or multi-stage platform doors cannot be closed, or the entire row of platform doors cannot be closed, the fault dispatch instruction also includes generating and issuing a remote door closing test instruction;
[0013] When the platform door fault type is that the entire row of platform doors cannot be opened, the fault dispatch instruction also includes generating and issuing a remote door opening test instruction.
[0014] In an optional embodiment of the present application, the method generates a dynamic adjustment preview scheme of the operation diagram according to the platform door fault type and the repair status of the platform door fault, and receives a manual instruction based on the platform door fault type, the repair status of the platform door fault and the dynamic adjustment preview scheme of the operation diagram, and the part of loading and executing the dynamic adjustment preview scheme of the operation diagram according to the manual instruction further includes:
[0015] When the platform door failure type is the platform door opening during the train entering or leaving the station, the single-stage or / multi-stage platform door cannot be closed, the entire train of platform doors cannot be opened, or the entire train of platform doors cannot be closed, after the station issues an instruction to release the train detention operation, the operation diagram is generated according to the train delay situation, train resources, and line topology to dynamically adjust the preview plan.
[0016] In an optional embodiment of the present application, the method generates a dynamic adjustment preview scheme of the operation diagram according to the platform door fault type and the repair status of the platform door fault, and receives a manual instruction based on the platform door fault type, the repair status of the platform door fault and the dynamic adjustment preview scheme of the operation diagram, and the part of loading and executing the dynamic adjustment preview scheme of the operation diagram according to the manual instruction further includes:
[0017] When the platform door fault type is that the platform door cannot be opened during the train entering or leaving the station, if fault recovery or fault platform door bypass information is received, the operation diagram is generated to dynamically adjust the preview plan based on the train delay situation, train resources, and line topology.
[0018] In an optional embodiment of the present application, the part of the method of generating and executing the fault dispatch instruction according to the platform door fault type further includes:
[0019] When the platform door fault type is any of the following: single-stage or / multi-stage platform doors cannot be closed and the fault is restored, or the entire row of platform doors cannot be closed and are in the platform door bypass state or the door is fully closed state, a manual monitoring instruction for the faulty platform door is issued.
[0020] In an optional embodiment of the present application, the part of the method of generating and executing the fault dispatch instruction according to the platform door fault type further includes:
[0021] When the platform door fault type is any of the following: single-stage or / multi-stage platform doors cannot be closed, the entire train of platform doors cannot be opened, or the entire train of platform doors cannot be closed, and the fault has not been restored, the manual monitoring instruction of the faulty platform door and the interlock release instruction for receiving and sending trains will be issued.
[0022] According to a second aspect of an embodiment of the present application, a city rail platform door fault dispatching device is provided, the device comprising a fault type determination module, a dispatching instruction generation module and a running diagram adjustment module; wherein:
[0023] The fault type judgment module obtains the status information of the platform door of the urban rail train and judges the fault type of the platform door when a fault occurs;
[0024] A dispatch instruction generation module is used to generate and execute fault dispatch instructions according to the platform door fault type; the fault dispatch instructions include issuing manual fault handling instructions;
[0025] The operation diagram adjustment module is used to generate a dynamic adjustment preview plan of the operation diagram according to the platform door fault type and the repair status of the platform door fault, and receive manual instructions based on the platform door fault type, the repair status of the platform door fault and the dynamic adjustment preview plan of the operation diagram, and load and execute the dynamic adjustment preview plan of the operation diagram according to the manual instructions.
[0026] According to a third aspect of an embodiment of the present application, there is provided a computer device, including: a memory;
[0027] A processor; and a computer program; wherein the computer program is stored in a memory and is configured to be executed by the processor to implement the steps of any method of the first aspect of the embodiment of the present application.
[0028] According to a fourth aspect of an embodiment of the present application, a computer-readable storage medium is provided, on which a computer program is stored; the computer program is executed by a processor to implement the steps of any method of the first aspect of the embodiment of the present application.
[0029] The urban rail platform door fault dispatching system provided in the embodiment of the present application is adopted. Through the fault information uploaded by the ATS system, the manual dispatching thinking of the train dispatcher is simulated, and the electronic dispatching command is issued according to the existing dispatching rules. The operation diagram adjustment plan under the fault condition is generated according to the fault time, impact range and other factors, and the operation diagram change is completed in real time online, realizing the automatic execution of adjustment measures such as train drop, skip stop, additional temporary train, and midway return. Thereby improving the efficiency of fault handling and reducing the workload of the dispatcher. Improving the quality of operation services. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0031] Figure 1 A flow chart of a method for dispatching urban rail platform door failures provided in an embodiment of the present application;
[0032] Figure 2 A structural diagram of a city rail platform door fault dispatching device provided in an embodiment of the present application;
[0033] Figure 3 A schematic diagram of the computer device structure provided for one embodiment of the present application. DETAILED DESCRIPTION
[0034] In order to make the technical solutions and advantages in the embodiments of the present application more clearly understood, the exemplary embodiments of the present application are further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than an exhaustive list of all the embodiments. It should be noted that the embodiments in the present application and the features in the embodiments can be combined with each other without conflict.
[0035] In order to solve the above problems, reduce the workload of dispatchers, and improve the efficiency and effectiveness of dispatching, this application proposes a method for dispatching urban rail platform door failures. Through the method flow, the dispatching automation level is improved, the dispatching manual operation process is reduced, and the dispatching efficiency is improved. Figure 1 The process shown:
[0036] S100: Obtaining the status information of the platform door of the urban rail train, and when a platform door fails, determining the type of the platform door failure;
[0037] S200: Generate and execute a fault dispatch instruction according to the platform door fault type; the fault dispatch instruction includes issuing a manual fault handling instruction;
[0038] S300: Generate a dynamic adjustment preview plan for the operation diagram according to the platform door failure type and the repair status of the platform door failure, receive manual instructions based on the platform door failure type, the repair status of the platform door failure and the dynamic adjustment preview plan for the operation diagram, and load and execute the dynamic adjustment preview plan for the operation diagram according to the manual instructions.
[0039] Based on this, the fault type is obtained automatically, and the first instruction based on manual processing is set. The operation diagram is further dynamically adjusted according to the repair situation. The operation plan of the online train can be adjusted in real time, with the goal of restoring the original operation plan as soon as possible, thereby maximizing the guarantee of normal train operation order.
[0040] In the specific implementation, when the platform door adjustment system collects platform door faults, it reports to the central ATS, and the central ATS system forwards the fault information and takes corresponding adjustment and control measures according to the location of the train, the impact of the fault, etc. According to the type of platform door fault, the following 5 faults may be prompted:
[0041] 1. The platform door is open when the train enters / exits the station;
[0042] 2. Single-stage / multi-stage platform doors cannot be opened;
[0043] 3. Single-stage / multi-stage platform doors cannot be closed;
[0044] 4. The platform door on the entire side cannot be opened;
[0045] 5. The platform doors on the entire side cannot be closed.
[0046] In a specific implementation, when the platform door fault type is any of the following: the platform door is open during the train entering or leaving the station, the single-stage or / multi-stage platform door cannot be closed, the entire train platform door cannot be opened, and the entire train platform door cannot be closed, the fault dispatch instruction also includes automatically executing the train detaining operation affected by the fault;
[0047] Based on this, in the above situation, after obtaining the fault information, the preliminary fault judgment and processing are carried out according to the platform door fault process, and the trains affected by the fault are detained, which can realize the scheduling automation of the train detention operation and ensure the normal handling of train faults.
[0048] In a specific implementation, when the platform door fault type is any of the following: a single or multiple platform doors cannot be closed, or the entire train of platform doors cannot be closed, the fault dispatch instruction also includes generating and issuing a remote door closing test instruction; when the platform door fault type is that the entire train of platform doors cannot be opened, the fault dispatch instruction also includes generating and issuing a remote door opening test instruction.
[0049] Based on this, in the above situation, after obtaining the fault information, the preliminary fault judgment and processing are carried out according to the platform door fault process. By generating and issuing remote door closing test and door opening test instructions, the automation of the scheduling and issuance of the two instructions is realized. The fault handling situation is further judged through the door opening test and door closing test to ensure the normal handling of the train fault.
[0050] In the specific implementation, when the platform door failure type is the platform door opening during the train entering or leaving the station, the single-stage or / multi-stage platform door cannot be closed, the platform door of the entire train cannot be opened, or the platform door of the entire train cannot be closed, after issuing the station's instruction to release the train detention operation, the operation diagram is generated according to the train delay situation, train resources, and line topology. Dynamic adjustment preview plan
[0051] Based on this, in the above situation, after obtaining the fault information, the preliminary fault judgment and processing are carried out according to the platform door fault process, and the automatic scheduling based on the vehicle detention instruction generates the instruction to release the vehicle detention operation to ensure the normal handling of the train fault.
[0052] In the specific implementation, when the platform door fault type is that the platform door cannot be opened during the train entering or leaving the station, if fault recovery or fault platform door bypass information is received, the operation diagram is generated according to the train delay situation, train resources, and line topology to dynamically adjust the preview plan.
[0053] Based on this, in the above case, after obtaining the fault information, the fault is initially judged and handled according to the platform door fault process. If fault recovery or fault platform door bypass information is received, it means that the impact of the fault has been relatively eliminated. The corresponding operation diagram plan can be automatically generated according to the situation to solve the problem in a targeted manner and ensure the normal handling of the train fault.
[0054] In the specific implementation, when the platform door fault type is any of the following: a single-stage or / multi-stage platform door cannot be closed and the fault is restored, or the entire row of platform doors cannot be closed and is in the platform door bypass state or the door is fully closed state, a manual monitoring instruction for the faulty platform door is issued.
[0055] Based on this, in the above case, after obtaining the fault information, the fault is initially judged and handled according to the platform door fault process. By generating and issuing manual monitoring instructions for the faulty platform door, the automation of the scheduling and issuance of monitoring instructions is realized, thereby realizing automated scheduling that combines human-machine linkage and virtuality with reality.
[0056] In the specific implementation, when the platform door fault type is any of the following: single-stage or / multi-stage platform doors cannot be closed, the entire train of platform doors cannot be opened, or the entire train of platform doors cannot be closed, and the fault has not been restored, the manual monitoring instruction of the faulty platform door and the interlock release instruction for receiving and sending trains are issued.
[0057] Based on this, in the above situation, after obtaining the fault information, the preliminary judgment and processing of the fault is carried out according to the platform door fault process. By generating and issuing manual monitoring instructions for the faulty platform door and interlocking release instructions for receiving and sending trains, the automation of the dispatching and issuing of monitoring instructions is realized, and automated dispatching that combines human-machine linkage and virtuality and reality is realized.
[0058] Furthermore, the present application further illustrates the process of the method with five fault examples. In the specific implementation, the various time limits and times described below are preferred solutions, but not the only solutions:
[0059] S1: When the platform door system detects a platform door fault, it reports it to the central ATS. The central ATS system forwards the fault information and takes corresponding adjustment and control measures based on the train's location, the impact of the fault, etc.
[0060] S2: When receiving a platform door opening failure during train entry / exit:
[0061] S2.1: Issue the first auxiliary decision-making strategy:
[0062] (1) The vehicles affected by the fault will be detained and automatically executed;
[0063] (2) Send an electronic dispatch command to notify the station attendant to assist in handling the platform door failure, which is automatically executed;
[0064] S2.2: If the platform door is closed / isolated after on-site personnel handle the situation, the second auxiliary decision-making strategy is issued:
[0065] Carry out the unblocking operation at relevant stations automatically;
[0066] The train's emergency braking is relieved and boarding and alighting operations continue; the timetable is adjusted based on train delays, train resources, line topology, etc., and the new timetable and its effects are pushed to the central dispatcher in a visual manner for confirmation.
[0067] S3: When receiving a single-stage / multi-stage platform door failure to open fault:
[0068] S3.1: Issue the first auxiliary decision-making strategy:
[0069] (1) Send an electronic dispatch command to notify the station attendant to assist in handling the platform door failure, which is automatically executed;
[0070] After this auxiliary decision is confirmed, if fault recovery or fault platform door bypass information is received, the fault is deemed to have been handled.
[0071] The timetable is adjusted based on train delays, train resources, line topology, etc., and the new timetable and its effects are pushed to the central dispatcher in a visual manner for confirmation.
[0072] S4: When receiving a single-stage / multi-stage platform door failure that cannot be closed, the required process is:
[0073] S4.1: Issue the first auxiliary decision-making strategy:
[0074] (1) The system automatically executes the intelligent vehicle detention operation at subsequent stations (excluding stations with platform door failure);
[0075] (2) Send electronic dispatching orders to station attendants to assist in handling platform door failures, which are automatically executed;
[0076] (3) Notify the vehicle dispatcher to conduct a remote door closing test manually;
[0077] After the first auxiliary decision is executed, the intelligent dispatching terminal at the station where the faulty vehicle is located immediately pops up a fault status confirmation dialog box. The pop-up window duration is optional and is 240s:
[0078] (1) The fault has been automatically restored;
[0079] (2) After manual processing, the platform door has been bypassed;
[0080] (3) After manual processing, the "close and lock signal" cannot be received
[0081] The station controller needs to select the status according to the fault handling situation. This dialog box cannot be closed or exited. The confirmation button is set for secondary confirmation. After selection, the next step will be taken according to the fault result.
[0082] S4.1.1: Failure Result (1)
[0083] When the station attendant selects fault recovery or after manual processing, the platform door has been bypassed, or the system receives the platform door bypass status / closed and locked signal information, the second auxiliary decision can be triggered:
[0084] (2) Carry out intelligent unblocking of vehicles at relevant stations and execute automatically;
[0085] (3) Send electronic dispatching orders to station attendants to monitor the faulty platform door and execute them automatically;
[0086] S4.1.2: Failure result (2)
[0087] After the station attendant selects manual processing, he cannot receive the "close and lock signal", and the intelligent dispatching second auxiliary decision prompts:
[0088] (1) Carry out intelligent unblocking of vehicles at relevant stations and execute automatically;
[0089] (2) Send electronic dispatching orders to station attendants to monitor the faulty platform door and execute them automatically;
[0090] (3) Send electronic dispatching orders to station attendants to release the interlocking of trains, which is automatically executed;
[0091] The second auxiliary decision is issued and confirmed. After receiving the bypass information or interlocking release information, if the train is delayed for more than 2 minutes, the operation diagram after the delay will be adjusted according to the train delay situation, train resources, line topology, etc., and the new operation diagram and its effects will be pushed to the central dispatcher in a visual manner for confirmation.
[0092] S5: When receiving a failure that the entire platform door cannot be opened, the required process is:
[0093] S5.1: The first decision-making assistance strategy is issued through the decision-making assistance module:
[0094] (1) Intelligent vehicle detention operations are automatically performed for vehicles affected by the fault;
[0095] (2) Send an electronic dispatch command to notify the station attendant to assist in handling the platform door failure, which is automatically executed;
[0096] (3) Notify the vehicle dispatcher to conduct a remote door opening test manually;
[0097] After the first auxiliary decision is executed, the intelligent dispatching terminal at the station where the faulty vehicle is located immediately pops up a fault status confirmation dialog box (240s):
[0098] (1) The fault has been automatically restored;
[0099] (2) After manual intervention, the platform door still cannot be opened;
[0100] S5.1.1: Failure Result (1)
[0101] After the door is opened remotely, the platform door status is restored, or the station controller selects that the fault has been automatically restored, and the intelligent dispatcher makes the second auxiliary decision (fault recovery):
[0102] Carry out intelligent unblocking of vehicles at relevant stations and execute it automatically;
[0103] S5.1.2: Failure Result (2)
[0104] After the station controller selects manual processing, the platform door still cannot be opened, and the intelligent dispatcher assists in the decision-making for the second time:
[0105] (1) Carry out intelligent unblocking of vehicles at relevant stations and execute automatically;
[0106] (2) Send an electronic dispatch command to station staff to manually unlock the door in an emergency;
[0107] (3) Send an electronic dispatching command to the station to wait for the train to board and disembark. If the train cannot depart normally, the station staff will use the interlock to release the train.
[0108] (4) Sending electronic dispatching commands to prompt subsequent stations to manually broadcast to passengers and execute manually;
[0109] (5) Dynamically adjust the operation diagram to preview the actual adjustment diagram and push it to the ATS system for loading and execution, and execute it automatically.
[0110] The second auxiliary decision is issued and confirmed. After receiving the bypass information or interlocking release information, if the train is delayed for more than 2 minutes, the operation diagram after the delay will be adjusted according to the train delay situation, train resources, line topology, etc., and the new operation diagram and its effects will be pushed to the central dispatcher in a visual manner for confirmation.
[0111] S6: When receiving a message that the entire platform door cannot be closed, the required process is:
[0112] S6.1: Issue the first auxiliary decision-making strategy:
[0113] (1) The system automatically executes the subsequent intelligent vehicle detention operation at the station;
[0114] (2) Notify the vehicle dispatcher to conduct a remote door closing test manually;
[0115] (3) Send electronic dispatch commands to notify station attendants to assist in handling platform door failures, which are automatically executed;
[0116] After the first auxiliary decision is executed, the intelligent dispatching terminal at the station where the faulty vehicle is located immediately pops up a fault status confirmation dialog box (240s):
[0117] (1) The fault has been restored;
[0118] (2) After manual processing, the platform door has been closed or bypassed;
[0119] (3) After manual processing, the "close and lock signal" cannot be received.
[0120] S6.1.1: Failure consequence (1)
[0121] The station controller selects that the fault has been restored, and the intelligent dispatcher makes the second auxiliary decision (fault recovery):
[0122] Carry out intelligent unblocking of vehicles at relevant stations and execute it automatically;
[0123] S6.1.2: Failure consequence (2)
[0124] If the system detects that the platform door is in bypass state or fully closed state, or the station controller selects that the platform door is closed or bypassed after manual processing, the second auxiliary decision prompt is:
[0125] (1) Carry out intelligent unblocking of vehicles at relevant stations and execute automatically;
[0126] (2) Send electronic dispatching orders to station attendants to monitor the faulty platform door and execute them automatically;
[0127] After this auxiliary decision is executed, the subsequent stations should lift the ban on vehicle detention.
[0128] S6.1.3: Failure result (3)
[0129] After the station controller selects manual processing, he still cannot receive the "close and lock signal", and the intelligent dispatching assists the decision-making prompt for the second time:
[0130] (1) Carry out intelligent unblocking of vehicles at relevant stations and execute automatically;
[0131] (2) Send electronic dispatching orders to station attendants to monitor the faulty platform door and execute them automatically;
[0132] (3) Send electronic dispatching orders to station attendants to release the interlocking of trains, which is automatically executed;
[0133] The second auxiliary decision is issued and confirmed. After receiving the bypass information or interlocking release information, if the train is delayed for more than 2 minutes, the operation diagram after the delay will be adjusted according to the train delay situation, train resources, line topology, etc., and the new operation diagram and its effects will be pushed to the central dispatcher in a visual manner for confirmation.
[0134] To sum up, the method proposed in the embodiment of the present application continuously monitors the status of the train platform doors, and implements different scheduling decisions (automatic execution) and handling methods (automatic or manual execution) for different types of platform door failures. In addition, it dynamically adjusts the operation diagram when the train is delayed for more than a certain period of time, thereby improving scheduling efficiency and reducing the impact on passengers' travel.
[0135] It should be understood that, although the various steps in the flow chart are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear description in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a portion of the steps in the figure may include multiple sub-steps or multiple stages, and these sub-steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these sub-steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a portion of the sub-steps or stages of other steps.
[0136] See also Figure 2 An embodiment of the present application provides a fault dispatching device for a city rail platform door, the device comprising a fault type determination module 10, a dispatching instruction generation module 20 and a running diagram adjustment module 30; wherein,
[0137] The fault type judgment module 10 obtains the status information of the platform door of the urban rail train and judges the fault type of the platform door when a fault occurs to the platform door;
[0138] The dispatch instruction generation module 20 is used to generate and execute fault dispatch instructions according to the platform door fault type; the fault dispatch instruction includes issuing manual fault handling instructions;
[0139] The operation diagram adjustment module 30 is used to generate a dynamic adjustment preview plan of the operation diagram according to the platform door fault type and the repair status of the platform door fault, and receive manual instructions based on the platform door fault type, the repair status of the platform door fault and the dynamic adjustment preview plan of the operation diagram, and load and execute the dynamic adjustment preview plan of the operation diagram according to the manual instructions.
[0140] For the specific definition of the above-mentioned urban rail platform door fault dispatching device, please refer to the definition of the urban rail platform door fault dispatching method mentioned above, which will not be repeated here. Each module in the above-mentioned urban rail platform door fault dispatching device can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.
[0141] In one embodiment, a computer device is provided, the internal structure diagram of which can be as follows: Figure 3As shown. The computer device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for scheduling urban rail platform door faults as described above is implemented. It includes: a memory and a processor, the memory stores a computer program, and when the processor executes the computer program, any step in the method for scheduling urban rail platform door faults as described above is implemented.
[0142] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, any step in the above urban rail platform door fault scheduling method can be implemented.
[0143] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer equipment, storage media. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code. The scheme in the embodiments of the present application may be implemented in various computer languages, for example, C language, VHDL language, Verilog language, object-oriented programming language Java, and literal scripting language JavaScript, etc.
[0144] The present application is described with reference to the flowcharts and / or block diagrams of the methods and devices according to the embodiments of the present application. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of the processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0145] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0146] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0147] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.
[0148] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims
1. A method for dispatching urban rail platform door failures. It is characterized in that include: Obtaining the status information of the platform door of the urban rail train, and when the platform door fails, determining the type of the platform door failure; Generate and execute fault dispatch instructions according to the platform door fault type; The fault dispatching instruction includes issuing a manual fault handling instruction; when the platform door fault type is any one of the following: the platform door is open during the train entering or leaving the station, a single or multiple platform doors cannot be closed, the entire train platform door cannot be opened, and the entire train platform door cannot be closed, the fault dispatching instruction also includes automatically executing the train number affected by the fault to detain the train; Generate a dynamic adjustment preview scheme of the operation diagram according to the platform door fault type and the repair status of the platform door fault, receive a manual instruction based on the platform door fault type, the repair status of the platform door fault and the dynamic adjustment preview scheme of the operation diagram, and load and execute the dynamic adjustment preview scheme of the operation diagram according to the manual instruction; further comprising: When the platform door fault type is any of the following: the platform door is open during the train entry and exit process, the single-stage or multi-stage platform door cannot be closed, the entire train platform door cannot be opened, and the entire train platform door cannot be closed, after obtaining the fault information, a preliminary fault judgment and processing is performed according to the platform door fault process, and after the station releases the vehicle detention operation instruction is generated according to the automatic dispatch of the vehicle detention instruction, the dynamic adjustment preview plan of the operation diagram is generated according to the train delay situation, train resources, and line topology; When the platform door fault type is that the platform door is open during the train entry and exit process, and the platform door is in a closed or isolated state, a station release train detention operation instruction is issued, and a dynamic adjustment preview plan of the operation diagram is generated; When the platform door fault type is that the single-stage or multi-stage platform door cannot be closed, and the fault is restored, the station releases the vehicle detention operation instruction and the fault platform door manual monitoring instruction, and generates the dynamic adjustment preview plan of the operation diagram; When the platform door fault type is that a single-stage or multiple-stage platform door cannot be closed, and the fault has not been restored, the station will issue an instruction to release the train detention operation, an instruction to manually monitor the faulty platform door, and an instruction to release the interlocking train reception and dispatching, and generate a dynamic adjustment preview plan for the operation diagram.
2. The urban rail platform door fault dispatching method according to claim 1, It is characterized in that The part of generating and executing the fault dispatch instruction according to the platform door fault type further includes: When the platform door fault type is any one of a single-stage or multiple-stage platform door failure to close, or a whole row of platform doors failure to close, the fault dispatch instruction further includes generating and issuing a remote door closing test instruction; When the platform door fault type is that the entire row of platform doors cannot be opened, the fault dispatch instruction also includes generating and issuing a remote door opening test instruction.
3. The urban rail platform door fault dispatching method according to claim 1, It is characterized in that Generating a dynamic adjustment preview scheme of the operation diagram according to the platform door fault type and the repair status of the platform door fault, and receiving a manual instruction based on the platform door fault type, the repair status of the platform door fault and the dynamic adjustment preview scheme of the operation diagram, and loading and executing the part of the dynamic adjustment preview scheme of the operation diagram according to the manual instruction further includes: When the platform door fault type is that the platform door cannot be opened during the train entering or leaving the station, if fault recovery or fault platform door bypass information is received, the operation diagram dynamic adjustment preview plan is generated according to the train delay situation, train resources, and line topology.
4. The urban rail platform door fault dispatching method according to claim 1, It is characterized in that The part of generating and executing the fault dispatch instruction according to the platform door fault type further includes: When the platform door fault type is that the entire row of platform doors cannot be closed and are in the platform door bypass state or the door fully closed state, a manual monitoring instruction for the faulty platform door is issued.
5. The urban rail platform door fault dispatching method according to claim 1, It is characterized in that The part of generating and executing the fault dispatch instruction according to the platform door fault type further includes: When the platform door fault type is any one of the following: the entire train of platform doors cannot be opened or the entire train of platform doors cannot be closed, and the fault has not been restored, a manual monitoring instruction for the faulty platform door and an interlock release instruction for receiving and dispatching trains are issued.
6. A fault dispatching device for urban rail station doors, It is characterized in that It includes a fault type judgment module, a dispatch instruction generation module and an operation diagram adjustment module; among which, A fault type judgment module obtains the status information of the platform door of the urban rail train and judges the fault type of the platform door when the platform door fails; A dispatching instruction generation module is used to generate and execute a fault dispatching instruction according to the platform door fault type; the fault dispatching instruction includes issuing a manual fault handling instruction; when the platform door fault type is any one of the platform door opening during the train entering or leaving the station, the single-stage or multi-stage platform door cannot be closed, the entire train platform door cannot be opened, and the entire train platform door cannot be closed, the fault dispatching instruction also includes automatically executing the train number affected by the fault to detain the train; The operation diagram adjustment module is used to generate a dynamic adjustment preview scheme of the operation diagram according to the platform door fault type and the repair status of the platform door fault, and receive manual instructions based on the platform door fault type, the repair status of the platform door fault and the dynamic adjustment preview scheme of the operation diagram, and load and execute the dynamic adjustment preview scheme of the operation diagram according to the manual instructions; further, when the platform door fault type is any of the following during the train entering and leaving the station, the platform door is open, the single-stage or multi-stage platform door cannot be closed, the entire train platform door cannot be opened, and the entire train platform door cannot be closed, after obtaining the fault information, the preliminary judgment and processing of the fault is carried out according to the platform door fault process, and after the station release operation instruction is generated according to the automatic scheduling of the vehicle detention instruction, the dynamic adjustment preview scheme of the operation diagram is generated according to the train delay situation, train resources, and line topology; When the platform door fault type is that the platform door is open during the train entry and exit process, and the platform door is in a closed or isolated state, a station release train detention operation instruction is issued, and a dynamic adjustment preview plan of the operation diagram is generated; When the platform door fault type is that the single-stage or multi-stage platform door cannot be closed, and the fault is restored, the station releases the vehicle detention operation instruction and the fault platform door manual monitoring instruction, and generates the dynamic adjustment preview plan of the operation diagram; When the platform door fault type is that a single-stage or multiple-stage platform door cannot be closed, and the fault has not been restored, the station will issue an instruction to release the train detention operation, an instruction to manually monitor the faulty platform door, and an instruction to release the interlocking train reception and dispatching, and generate a dynamic adjustment preview plan for the operation diagram.
7. A computer device, It is characterized in that include: Memory; processor; as well as Computer programs; The computer program is stored in the memory and is configured to be executed by the processor to implement the method according to any one of claims 1 to 5.
8. A computer-readable storage medium, It is characterized in that A computer program is stored thereon; the computer program is executed by a processor to implement the method according to any one of claims 1 to 5.