Method and system for compiling subway co-line operation train diagram based on flexible formation

In the co-line operation of urban rail transit, the number of train groups is adjusted based on the co-line line topology and passenger flow characteristics, and the train operation diagram is optimized to solve the operational problems caused by unbalanced passenger flow, improve the passing capacity and passenger service level, and reduce the operating costs.

CN116039726BActive Publication Date: 2024-10-18BEIJING JIAOTONG UNIV
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211674526.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-26
Publication Date
2024-10-18
Estimated Expiration
2042-12-26

AI Technical Summary

Technical Problem

Under the common-line operation mode of urban rail transit, the uneven distribution of passenger flow leads to complex train operation organization, which makes it difficult to meet the operational needs of branch line sections during peak hours. Moreover, the full load rate of trains during off-peak hours is too low, increasing operating costs. The existing solutions are subject to Limited by rail transit signaling systems and equipment limitations, it is unable to effectively alleviate the problems of insufficient passing capacity and full load rate.

Method used

Based on the collinear line topology and passenger flow characteristics, by adjusting the number of train groups, a flexible marshalling operation diagram model is constructed to optimize the arrival and departure times of trains on main lines and branch lines, and combine marshalling/demarshalling operations to minimize the number of trains. Use the number, minimize the number of people waiting in the station and maximize the number of passengers on the train.

Benefits of technology

It improves the passing capacity of common line sections, reduces operating costs, improves passenger service levels, can reduce train intervals during peak hours, alleviate the problem of low full load rates during off-peak hours, and meet the operational needs of branch line sections.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116039726B_ABST
    Figure CN116039726B_ABST
Patent Text Reader

Abstract

The present invention provides a method and system for compiling a subway co-line operation train diagram based on flexible marshaling, which belongs to the field of urban rail transit operation and maintenance management technology. Based on the topological structure characteristics of the co-line line, combined with the passenger flow characteristics of the train in different time periods, the number of trains of flexible marshaling is adjusted, and by characterizing the arrival time of the front car in the marshaling on the main line, the departure time on the main line, the arrival time on the branch line, the departure time on the branch line, and the marshaling status with the rear car, a train flexible marshaling operation diagram compilation model is constructed with minimizing the number of car bottoms used, minimizing the number of waiting people in the station, and maximizing the number of passengers on the train as the objective function; the train flexible marshaling operation diagram compilation model is solved to obtain a train flexible marshaling train diagram under co-line conditions. The present invention constructs a train operation diagram compilation model based on flexible marshaling in the station, and the drawn train operation diagram is applied to the operation management system, which reduces the operating cost and improves the passenger service level.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of urban rail transit operation and maintenance management, and in particular to a method and system for compiling a subway co-line operation train diagram based on flexible marshaling. Background Art

[0002] As the mileage of urban rail transit lines continues to increase, the phenomenon of line overlap has become increasingly prominent, resulting in an increasing complexity in the organization of train operations. The co-line operation of urban rail transit refers to the operation of not only trains on a rail transit line, but also trains of other urban rail transit lines that enter the line by crossing the line, forming a train operation organization method in which trains from two or more lines enter the same line together in certain sections. The co-line operation method can reduce the construction cost of newly built lines from an engineering perspective, improve the directness of trains, reduce the number of transfers for passengers, and save vehicle and depot resources.

[0003] However, the current passenger flow distribution is obviously unbalanced in time and space, making the problems of the shared line operation mode increasingly prominent. In particular, under the parallel through operation mode, trains enter each branch line alternately. During peak hours, the passenger flow demand is large. Due to the limited capacity of the shared line section, it is difficult to meet the operation needs of the branch line section, resulting in long waiting time for passengers at the branch line platform, and even accumulation of passengers on the platform; when the passenger flow demand is small during off-peak hours, in order to meet the operation needs of the branch line section, the full load rate of the shared line section train is too low, which increases the operating costs of the operator.

[0004] In response to the problems of co-line operation, the existing solutions are to adapt to the uneven distribution of passenger flow in time by changing the departure interval between trains or adopting mixed marshaling according to the passenger flow demand at different times. Flexible marshaling (marshaling / dismarshaling capabilities are only available at crossing stations. Crossing stations refer to the intersection stations of branch lines and trunk lines) can be used to adapt to the uneven distribution of passenger flow in space, and by optimizing the route plan, the line capacity can be improved and the use of the vehicle bottom can be reduced. However, the above existing solutions still have the following defects: due to the limitations of the existing signal system and equipment of rail transit, the departure intervals between trains cannot be reduced indefinitely, and therefore cannot effectively alleviate the demand of passengers on branch lines and the problem of saturation of the capacity of shared-line sections; in order to ensure the travel experience of passengers, the departure intervals between trains cannot be expanded indefinitely even when the passenger flow is very small, and therefore cannot effectively alleviate the problem of low train load rate in shared-line sections during off-peak hours; for the travel problems of passengers on trunk and branch lines under the shared-line operation mode, the needs of passengers on trunk and branch lines can be met to a certain extent by simply optimizing the route plan, but the problem of insufficient capacity of shared-line sections cannot be effectively alleviated.

[0005] In summary, the existing methods to alleviate the problem of shared-line operation caused by unbalanced passenger flow are, on the one hand, limited by the existing rail transit signal equipment and the inability to simultaneously reduce operating costs and meet passenger needs. That is, due to the existence of the block system, the departure interval between trains cannot be too small, and considering that the waiting time of passengers on the branch line cannot be too long, the interval between trains cannot be too large. On the other hand, it cannot alleviate the phenomenon that the capacity of the shared-line section tends to be saturated. The use of only the crossing station with marshaling / disassembling capabilities can increase the density of trains on the branch line, but it cannot alleviate the problem of insufficient capacity due to the large intervals between trains in the shared-line section. Summary of the invention

[0006] The object of the present invention is to provide a method and system for compiling a subway co-line operation train diagram based on flexible formation, so as to solve at least one technical problem existing in the above-mentioned background technology.

[0007] In order to achieve the above object, the present invention adopts the following technical solutions:

[0008] On the one hand, the present invention provides a method for compiling a subway co-line operation train diagram based on flexible marshaling, comprising:

[0009] Based on the topological structure characteristics of the collinear line and the passenger flow characteristics of the trains at different times, the number of trains of flexible marshaling is adjusted. By characterizing the arrival time of the leading train on the main line, the departure time on the main line, the arrival time on the branch line, the departure time on the branch line, and the marshaling status with the following train, the objective function is to minimize the number of car bottoms used, minimize the number of waiting people in the station, and maximize the number of passengers on the train, and to build a model for the compilation of the train flexible marshaling operation diagram.

[0010] Solve the model for compiling the flexible train marshaling operation diagram and obtain the flexible train marshaling operation diagram under the co-linear condition.

[0011] Preferably, in the collinear line topology structure, the trunk line is represented by L1, and the branch lines are represented by L2 and L3 respectively, wherein the first station of the L1 line is station 1 and the J1 stations of the L1 line are numbered in sequence, and the first station of the L2 branch line is station J1+1 and the stations of the L2 line are numbered in sequence, and the first station of the L3 branch line is station J1+J2+1 and the stations of the L3 line are numbered in sequence;

[0012] The station set is represented as: J = {1, 2, ..., J1, J1+1, ..., J1+J2, J1+J2+1, ..., J1+J2+J3};

[0013] The station number is represented by j, j∈J, and the train number is represented by i, i∈I;

[0014] For adjacent stations, the departure time of train number i at station j is and arrival time There are the following relationships: in, Indicates the stop time. Indicates the section running time, and up indicates the upward running direction of the train.

[0015] Preferably, the decision variable Indicates whether the train number i enters the L2 branch line or the L3 branch line from the L1 trunk line; Indicates that train number i enters L2 branch line from L1 trunk line through rail station; if It means that train No. i enters L3 branch line from L1 trunk line through the station;

[0016] When a train passes through the track crossing station J1 between the main line and the branch line, it will enter any branch line and arrive at the first station of the branch line. Considering that any train can only enter one of the branches after passing the track crossing station, the following formula is needed for the arrival time of the first station of the branch line:

[0017]

[0018]

[0019] Where M represents a sufficiently large integer. When train number i chooses to enter the L2 branch line, the arrival time at the first station J1+1 of the L2 branch line depends on the departure time at the crossing station J1 and the interval running time.

[0020] When train number i chooses to enter other branches, since M makes the inequality always true, the arrival time of the first station of the L2 branch line is not determined by the departure time of the crossing station;

[0021] Similarly, when the train enters the L3 branch line through the track crossing station:

[0022]

[0023]

[0024] Preferably, the decision variable To indicate whether the train continues to run after completing a full turn; when When , it means that the train number i1 has turned back at the last stop in the down direction and switched to the up direction to continue running, and connected to a new train number i2:

[0025]

[0026] Among them, r turn,max is the maximum return operation time, rturn,min is the minimum return operation time, M is represented by a sufficiently large positive number;

[0027] The arrival and departure times of adjacent trains at the same station both meet the time constraints of the running interval:

[0028]

[0029]

[0030]

[0031]

[0032] in, is a Boolean variable used to indicate whether train number i and train number i+1 (the following train) are in a marshaling state when they leave / arrive at station j; is the time when train number i leaves / arrives at station j.

[0033] Preferably, when two trains are marshaled, the stop time of the front train is required to be within a specified range and the marshaling operation time is additionally increased; when two trains are unmarshaled, the stop time of the rear train is required to be within a specified range and the unmarshaling operation time is additionally increased, and the formula is expressed as follows:

[0034]

[0035]

[0036] Where D is the additional time required for marshaling / unmarshaling operations.

[0037] Preferably, the objective function with minimizing the number of vehicle bottoms in use, minimizing the number of people waiting in the station and maximizing the number of passengers on the train as the optimization goal is:

[0038]

[0039] in, Indicates the number of people waiting on the platform in the upward direction. Indicates the number of people waiting on the platform in the down direction. represents the number of passengers in the train in the upward direction, Indicates the number of passengers in the train in the down direction.

[0040] In a second aspect, the present invention provides a subway co-line operation train diagram compilation system based on flexible marshaling, comprising:

[0041] A construction module is used to adjust the number of flexible marshaling trains based on the topological structure characteristics of the collinear line and the passenger flow characteristics of the trains at different time periods. By characterizing the arrival time of the leading train on the main line, the departure time on the main line, the arrival time on the branch line, the departure time on the branch line, and the marshaling status with the following train, a train flexible marshaling operation diagram compilation model is constructed with the objective function of minimizing the number of vehicle bottoms in use, minimizing the number of waiting people in the station, and maximizing the number of passengers on the train.

[0042] The solution module is used to solve the train flexible marshaling operation diagram compilation model and obtain the train flexible marshaling train operation diagram under the co-line condition.

[0043] In a third aspect, the present invention provides a non-transitory computer-readable storage medium, which is used to store computer instructions. When the computer instructions are executed by a processor, the method for compiling a subway co-line operation train diagram based on flexible formation as described above is implemented.

[0044] In a fourth aspect, the present invention provides a computer program product, including a computer program, which, when running on one or more processors, is used to implement the method for compiling a subway co-line operation train diagram based on flexible formation as described above.

[0045] In a fifth aspect, the present invention provides an electronic device, comprising: a processor, a memory and a computer program; wherein the processor is connected to the memory, the computer program is stored in the memory, and when the electronic device is running, the processor executes the computer program stored in the memory so that the electronic device executes instructions for implementing the method for compiling a subway co-line operation train diagram based on flexible formation as described above.

[0046] The beneficial effects of the present invention are as follows: the flexible marshaling method in the common line section station is adopted, and the number of train marshalings in the line is flexibly adjusted according to the passenger flow characteristics of the subway line in different sections and time periods, so as to better adapt to the passenger flow demand on the branch line and alleviate the problem of insufficient passing capacity of the common line section; with minimizing the number of car bottoms used, minimizing the number of waiting people in the station and maximizing the number of passengers on the train as the objective function, a train operation diagram compilation model based on flexible marshaling in the station is constructed, and the drawn train operation diagram is applied to the operation management system, which reduces the operation cost and improves the passenger service level.

[0047] Additional advantages of the present invention will be more clearly given in the following description or learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0049] Figure 1 This is a topological structure diagram of a co-linear operation in which two branches are branched off at one end of a trunk line according to an embodiment of the present invention.

[0050] Figure 2 This is a topological structure diagram of a co-linear operation in which two branches are branched off at the ends of a trunk line according to an embodiment of the present invention.

[0051] Figure 3 This is a topological diagram of a co-linear operation in which two branches are separated from a trunk line according to an embodiment of the present invention.

[0052] Figure 4 This is a topological structure diagram of a co-linear operation with a ring branch line in the middle of a trunk line according to an embodiment of the present invention.

[0053] Figure 5 This is a schematic diagram of the co-linear operation mode in which the branch line does not extend at the end of the main line according to an embodiment of the present invention.

[0054] Figure 6 This is a schematic diagram of the co-linear operation of a branch line extending at the end of a trunk line according to an embodiment of the present invention.

[0055] Figure 7 This is a schematic diagram of a train operation diagram for a Y-type line co-line operation mode based on flexible marshaling conditions according to an embodiment of the present invention. DETAILED DESCRIPTION

[0056] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements with the same or similar functions. The embodiments described below by the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be interpreted as limiting the present invention.

[0057] It should be understood by those skilled in the art that unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by those skilled in the art to which this invention belongs.

[0058] It should also be understood that terms, such as those defined in commonly used dictionaries, should be understood to have a meaning consistent with that in the context of the prior art and will not be interpreted in an idealized or overly formal sense unless as defined herein.

[0059] Those skilled in the art will appreciate that, unless otherwise stated, the singular forms "a", "an", "said" and "the" used herein may also include plural forms. It should be further understood that the term "comprising" used in the specification of the present invention refers to the presence of the features, integers, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements and / or groups thereof.

[0060] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification and the features of different embodiments or examples, unless they are contradictory.

[0061] To facilitate understanding of the present invention, the present invention is further explained below with reference to specific embodiments in conjunction with the accompanying drawings, and the specific embodiments do not constitute a limitation on the embodiments of the present invention.

[0062] Those skilled in the art should understand that the drawings are merely schematic diagrams of embodiments, and the components in the drawings are not necessarily necessary for implementing the present invention.

[0063] Example 1

[0064] This embodiment 1 provides a subway common line operation train diagram compilation system based on flexible marshaling, including:

[0065] A construction module is used to adjust the number of flexible marshaling trains based on the topological structure characteristics of the collinear line and the passenger flow characteristics of the trains at different time periods. By characterizing the arrival time of the leading train on the main line, the departure time on the main line, the arrival time on the branch line, the departure time on the branch line, and the marshaling status with the following train, a train flexible marshaling operation diagram compilation model is constructed with the objective function of minimizing the number of vehicle bottoms in use, minimizing the number of waiting people in the station, and maximizing the number of passengers on the train.

[0066] The solution module is used to solve the train flexible marshaling operation diagram compilation model and obtain the train flexible marshaling train operation diagram under the co-line condition.

[0067] In this embodiment 1, the above system is used to implement a method for compiling a subway co-line operation train diagram based on flexible marshaling, including:

[0068] Based on the topological structure characteristics of the collinear line and the passenger flow characteristics of the trains at different times, the number of trains of flexible marshaling is adjusted. By characterizing the arrival time of the leading train on the main line, the departure time on the main line, the arrival time on the branch line, the departure time on the branch line, and the marshaling status with the following train, the objective function is to minimize the number of car bottoms used, minimize the number of waiting people in the station, and maximize the number of passengers on the train, and to build a model for the compilation of the train flexible marshaling operation diagram.

[0069] Solve the model for compiling the flexible train marshaling operation diagram and obtain the flexible train marshaling operation diagram under the co-linear condition.

[0070] In the collinear line topology structure, the trunk line is represented by L1, and the branch lines are represented by L2 and L3 respectively, wherein the first station of the L1 line is station 1, and the J1 stations of the L1 line are numbered in sequence, and the first station of the L2 branch line is station J1+1, and the stations of the L2 line are numbered in sequence, and the first station of the L3 branch line is station J1+J2+1, and the stations of the L3 line are numbered in sequence;

[0071] The station set is represented by J = {1, 2, ..., J1, J1+1, ..., J1+J2, J1+J2+1, ..., J1+J2+J3};

[0072] The station number is represented by j, j∈J, the train set is represented by I={1,2,...,I}, and the train number is represented by i, i∈I;

[0073] For adjacent stations, the departure time of train number i at station j is and arrival time There are the following relationships: in, Indicates the stop time. Indicates the section running time, and up indicates the upward running direction of the train.

[0074] Introducing decision variables Respectively indicate whether the train number i enters the L2 branch line or the L3 branch line from the L1 trunk line; if Indicates that train number i enters L2 branch line from L1 trunk line through rail station; if It means that train No. i enters L3 branch line from L1 trunk line through the station;

[0075] When a train passes through the track crossing station J1 between the main line and the branch line, it will enter any branch line and arrive at the first station of the branch line. Considering that any train can only enter one of the branches after passing the track crossing station, the following formula is needed for the arrival time of the first station of the branch line:

[0076]

[0077]

[0078] Where M represents a sufficiently large positive number. When train number i chooses to enter the L2 branch line, the arrival time at the first station J1+1 of the L1 branch line depends on the departure time at the crossing station J1 and the interval running time.

[0079] When train number i chooses to enter other branches, since M makes the inequality always true, the arrival time of the first station of the L1 branch line is not determined by the departure time of the crossing station;

[0080] Similarly, when the train enters the L3 branch line through the track crossing station:

[0081]

[0082]

[0083] Introducing decision variables To indicate whether the train continues to run after completing a full turn; when When , it means that the train number i1 has turned back at the last stop in the down direction and switched to the up direction to continue running, and connected to a new train number i2:

[0084]

[0085] Among them, r turn,max is the maximum return operation time, r turn,min is the minimum return operation time, R represents a sufficiently large positive number different from M;

[0086] The arrival and departure times of adjacent trains at the same station both meet the time constraints of the running interval:

[0087]

[0088]

[0089]

[0090]

[0091] in, is a Boolean variable used to indicate whether train number i and train number i+1 (the following train) are in a marshaling state when they leave / arrive at station j; is the time when train number i leaves / arrives at station j.

[0092] When two trains are marshaled, the stop time of the front train is required to be within the specified range, and the marshaling operation time is increased; when two trains are unmarshaled, the stop time of the rear train is required to be within the specified range, and the unmarshaling operation time is increased. The formula is expressed as follows:

[0093]

[0094]

[0095] Where D is the additional time required for marshaling / unmarshaling operations.

[0096] The objective function with minimizing the number of car bottoms in use, minimizing the number of people waiting in the station and maximizing the number of passengers on the train as the optimization goal is:

[0097]

[0098] in, Indicates the number of people waiting on the platform in the upward direction. Indicates the number of people waiting on the platform in the down direction. represents the number of passengers in the train in the upward direction, Indicates the number of passengers in the train in the down direction.

[0099] Example 2

[0100] At present, the co-linear forms of urban rail transit lines can be roughly divided into two line structures: branch lines extending at the end of the main line and branch lines not extending at the end of the main line.

[0101] like Figure 1 , Figure 2 This is a schematic diagram of the collinear form of the branch line extending at the end of the main line, where Figure 1 It means that two branches are branched at one end of the main line. This type of line is called a Y-type line. Y-type lines are mainly used to connect the city center and the suburbs. By branching off at the end of the city center line to different directions, the needs of different passengers can be better met. Figure 2 It means that branches in different directions extend from both ends of the main line. This type of co-line can meet the different needs of more passengers, reduce the number of transfers between passengers, improve the service level of passengers, and also reduce the area occupied by urban rail transit lines to a certain extent. However, this type of co-line requires the main line to have a high throughput capacity, and it is necessary to ensure that the operation of trains on any line will not affect other lines.

[0102] Figure 3 , Figure 4 It is a collinear form where the branch line does not extend to the end of the main line, Figure 3In order to branch off multiple routes in the middle of a line, passengers can choose any route to go from station A to station B or from station B to station A. This co-line form can improve the transportation capacity between station A and station B, and can also better meet the different needs of passengers. Figure 4 It is a colinear form in which the loop line and the non-loop line partially overlap.

[0103] In order to construct a model for compiling a flexible train marshaling operation diagram under co-linear operation conditions, in this embodiment 2, the problem is first simplified and reasonable assumptions are made:

[0104] (1) The line has only one depot and is connected to the first station on the main line.

[0105] (2) The first station on the main line is the departure station. The train passes through the track crossing station and arrives at the reversing station at the end of the branch line. The train then turns around at the reversing station to change its running direction. When the train returns to the main line via the track crossing station, it returns to the departure station and waits for instructions to return or reversing.

[0106] (3) The number of train bodies in stock can meet the demand for operation, and the minimum train formation unit has the same model and length.

[0107] (4) The running time of the train in each section is determined and known, and the stop time of the train at stations that do not have the ability to marshal / disarmament is also known.

[0108] (5) The stations on the trunk line section of the line have the conditions for marshaling / disbanding and can carry out marshaling / disbanding operations. The stations on the branch line section do not have the conditions for marshaling / disbanding.

[0109] (6) Trains are not allowed to cross other lines on the route and must stop at every station.

[0110] (7) The passenger getting-off rate at the same station does not change over time and is a constant value.

[0111] (8) All passengers have the same passenger attributes and the same time value. After entering the station, they will not leave the station before the train arrives due to long waiting time, and they will not change carriages after entering the train.

[0112] (9) Passengers know the train composition and will choose the train car heading to their destination in advance.

[0113] (10) According to assumption (8), passengers will not change carriages. Therefore, in order to ensure that passengers can reach their respective destinations, it is required that at the crossing station from the main line to the branch line, passengers need to get off the train first, and then be redistributed on the platform before taking the train in the corresponding branch line direction.

[0114] The collinear form in which the branch line does not extend to the end of the trunk line can be obtained by expanding the collinear form in which the branch line extends to the end of the trunk line. Figure 5 The figure shows a schematic diagram of the line structure in which the branch line does not extend to the end of the main line, where stations A, B, C and D are located on the main line, and station B is a track crossing station. Two branch lines L2 and L3 are branched from the track crossing station B, and then the branch lines L2 and L3 pass through the track crossing station C to merge into a main line. In this co-linear form, all trains depart from the depot, enter the main line, and then pass through the track crossing station B to enter any branch line, then pass through the track crossing station C to return to the main line for operation, and after arriving at the reversing station D, they turn around and pass through the track crossing station C again to enter any branch line, and then arrive at the track crossing station B to enter the main line and return to station A. Figure 6 As shown in the figure, it shows a schematic diagram of the line structure in which the branch line extends at the end of the main line, where stations A and B are located on the main line, station B is a track crossing station, and two branch lines L2 and L3 are branched from the track crossing station B. In this collinear form, all trains depart from the depot, first pass through station A, then pass through the track crossing station B and enter one of the branch lines, and after arriving at the reversing station C or D, perform a reversing operation to run in the downward direction, and then pass through the track crossing station B to enter the main line and return to station A. If it is assumed that the station arrived at by the train after the reversing operation at the reversing station C or D is the next station in the upward direction, and there is no reversing operation in the line, the collinear form in which the branch line extends at the end of the main line can be expanded to the collinear form in which the branch line does not extend at the end of the main line. That is, the collinear form in which there is a reversing operation and the branch line extends at the end of the main line is equivalent to the collinear form in which the branch line does not extend at the end of the main line under certain parameter settings.

[0115] In this embodiment 2, based on the above assumptions, a method for compiling a subway co-line operation train diagram based on flexible marshaling is provided. This method is based on the co-line form in which the branch line extends at the end of the main line, and a train flexible marshaling operation diagram compilation model is constructed as follows:

[0116] The common line structure of the subway, the trunk line is represented by L1, and the branch lines are represented by L2 and L3 respectively. The first station of L1 line is station 1, and the J1 station of L1 line is numbered in sequence. The first station of L2 branch line is station J1+1, and the stations of L2 line are numbered in sequence. The first station of L3 branch line is station J1+J2+1, and the stations of L3 line are numbered in sequence.

[0117] The station set is represented as: J = {1, 2, ..., J1, J1+1, ..., J1+J2, J1+J2+1, ..., J1+J2+J3};

[0118] The station number is represented by j, j∈J, the train set is represented by I={1,2,...,I}, and the train number is represented by i, i∈I;

[0119] For adjacent stations, the departure time of train number i at station j is and arrival time There are the following relationships: in, Indicates the stop time. Indicates the section running time, and up indicates the upward running direction of the train.

[0120] In this embodiment, all trains make a full turn in the line, including both up and down directions, and the modeling method for the down direction is the same as that for the up direction.

[0121] On a shared line, after a train passes a crossing station, it can enter the L2 branch or the L3 branch. Therefore, it is necessary to distinguish and describe the state of the train from the crossing station to determine which branch the train enters. The decision variable Indicates whether the train number i enters the L2 branch line or the L3 branch line from the L1 trunk line; Indicates that train number i enters L2 branch line from L1 trunk line through rail station; if It means that train No. i enters L3 branch line from L1 trunk line through the station;

[0122] After any train passes through the track station, it can only enter one of the branch lines, so there are:

[0123]

[0124] When a train passes through the track crossing station J1 between the main line and the branch line, it will enter any branch line and arrive at the first station of the branch line. Considering that any train can only enter one of the branches after passing the track crossing station, the following formula is needed for the arrival time of the first station of the branch line:

[0125]

[0126]

[0127] Where M is a sufficiently large positive integer. When train number i chooses to enter the L2 branch line, the arrival time at the first station J1+1 of the L1 branch line depends on the departure time at the crossing station J1 and the interval running time. When train number i chooses to enter other branches, since M makes the inequality always true, the arrival time of the first station of the L1 branch line is not determined by the departure time of the crossing station. Similarly, when the train enters the L3 branch line through the crossing station, there is:

[0128]

[0129]

[0130] The train makes a full turnaround on the line. When the down train runs to the last station (the first station in the up direction), it can choose to return to the depot or make a turnaround to continue running. Therefore, a new decision variable needs to be introduced To indicate whether the train will continue to run after completing a full turn. When , it means that the train number i1 has turned back at the last stop in the down direction and switched to the up direction to continue running, and connected to a new train number i2. It can be expressed as:

[0131]

[0132]

[0133] Among them, r turn,max is the maximum return operation time, r turn,min is the minimum return operation time, and R is a sufficiently large positive number different from M.

[0134] In order to ensure the safety of train operation, a certain time interval must be maintained between two adjacent trains. Considering that trains can be marshaled / disassembled at the station, this method refers to both the arrival time and the departure time to determine the running interval, that is, to ensure that the arrival time and departure time of adjacent trains at the same station meet the time constraint of the running interval:

[0135]

[0136]

[0137]

[0138]

[0139] in is a Boolean variable used to indicate whether train number i and train number i+1 (the following train) are in a marshaling state when they leave / arrive at station j; M is a sufficiently large positive number; is the time when train number i leaves / arrives at station j.

[0140] Considering that it is impossible to ensure that adjacent trains run on the same branch line under the co-linear condition, in order to ensure that the running interval between adjacent trains with non-adjacent train numbers running on the same branch line meets the requirements, new constraints need to be introduced:

[0141]

[0142]

[0143]

[0144] For branch lines where trains are not running, assuming that the branch lines where trains are not running are in a marshaling state with the trains running behind, then on this branch line, the arrival and departure times of the trains that are not running are the same as those of the trains running behind, so as to ensure that the branch lines where trains are running can still meet the running intervals even if they are not continuous.

[0145] On the L1 main line, the maximum number of train formations in a train formation is There are at most continuous The grouping state variables are in the grouping state, which can be expressed as:

[0146]

[0147] Assume (5) that the station on the branch line does not have the ability to marshal / disarm trains, so the number of trains on the branch line will not change, and the following formula is used:

[0148]

[0149] All trains in the same formation must have the same arrival and departure times, but the front and rear trains that are not in formation do not need to have the same time relationship, which can be expressed as:

[0150]

[0151]

[0152] When two trains are marshaled, the stop time of the front train is required to be within the specified range, and the marshaling operation time is increased; when two trains are unmarshaled, the stop time of the rear train is required to be within the specified range, and the unmarshaling operation time is increased. The formula is expressed as follows:

[0153]

[0154]

[0155] Where D is the additional time required for marshaling / unmarshaling operations.

[0156] Assume (6) that trains cannot overtake other trains on the line. The model is expressed as:

[0157]

[0158] In order to make the optimization results of the shared line operation meaningful, any existing branch line needs to have a train running in, and in order to ensure the normal operation of each line, at least two trains need to have operated in each branch line, thus the constraints can be obtained:

[0159]

[0160]

[0161] In order to better describe the changes in passenger flow in time and space, the train operation period at the station is divided into smaller time periods, represented by the symbol m, and the time period set is expressed as M = {1, 2, ..., M}. In each hour period, the passenger arrival rate of the station can be considered as a constant. The departure time of any train must fall within a certain time period, which can be expressed as:

[0162]

[0163] in is the end time of station j in the upward direction in time period m, is an integer variable, if The exit time is in time period m, otherwise

[0164] Number of new passengers arriving at the platform It is defined as the total number of passengers arriving at station j between the departure time of the previous train number i-1 and the departure time of the current train number i. The calculation formula can be expressed as:

[0165]

[0166] in It is expressed as the arrival rate of station j in the upward direction in time period m.

[0167] Number of passengers boarding It is defined as all passengers who board the train between the arrival time and the departure time of train number i, which can be calculated as:

[0168]

[0169] Among them, T cap Indicates the number of passengers on a train. represents the average passenger getting off rate at station j.

[0170] Number of people waiting at the platform It can be simply calculated as the sum of the number of passengers stranded on the platform after the previous train departed and the number of passengers newly arrived at the platform before the current train departed, minus the number of passengers boarding the current train, which can be calculated as:

[0171]

[0172] Number of passengers on the train It can be simply calculated as the number of passengers after train number i arrives at station j and the number of passengers who get off the train plus the number of passengers who get on the train, which can be expressed as the following constraint:

[0173]

[0174] The method described in this implementation 2 is intended to improve the passenger service level and reduce the operating costs of the operator. Therefore, minimizing the number of car bottoms used, minimizing the number of people waiting in the station and maximizing the number of passengers on the train are used as optimization goals. The objective function is:

[0175]

[0176] like Figure 7 This is a train operation diagram based on the Y-type line co-line operation mode under flexible marshaling conditions. Stations A, B, and C are located on the main line, among which Station C is a track crossing station. After passing through Station C, the line forks and branches into two branches L2 and L3. Stations D and E are located on the L2 branch line, and stations E and G are located on the L3 branch line. Stations A, E, and G are turnaround stations. Train No. 1 passes through the main line stations A, B, and C, and then enters the L2 branch line to reach Station E, and then returns to Station A for a turnaround operation; for Train No. 02, it passes through the main line stations A, B, and C, and then enters the L3 branch line to reach Station G, and then returns to Station A for a turnaround operation; Train No. 3 and Train No. 4 are disassembled at Station B on the main line, split into two independent trains, and then enter the L2 branch line and L3 branch line respectively after passing through Station C; and for Train No. 8 and Train No. 9, they are disassembled at Station C on the main line, split into two independent trains, and enter different branches respectively.

[0177] In summary, in this embodiment 2, a flexible marshaling operation mode is adopted to optimize the co-line operation of subway trains. First, the co-line form of the subway line and the train operation mode are analyzed. Then, the marshaling status of trains on each trunk line and branch line under the condition of flexible marshaling co-line operation, as well as the new characteristics of the train departure and arrival time are considered. With minimizing the number of car bottoms used, minimizing the number of waiting people in the station and maximizing the number of passengers on the train as the objective function, a mixed integer nonlinear model is constructed and the optimal solution is obtained. Finally, a flexible marshaling train operation diagram for co-line operation is drawn.

[0178] Example 3

[0179] Embodiment 3 of the present invention provides a non-transitory computer-readable storage medium, wherein the non-transitory computer-readable storage medium is used to store computer instructions. When the computer instructions are executed by a processor, a method for compiling a subway co-line operation train diagram based on flexible marshaling is implemented. The method includes:

[0180] Based on the topological structure characteristics of the collinear line and the passenger flow characteristics of the trains at different times, the number of trains of flexible marshaling is adjusted. By characterizing the arrival time of the leading train on the main line, the departure time on the main line, the arrival time on the branch line, the departure time on the branch line, and the marshaling status with the following train, the objective function is to minimize the number of car bottoms used, minimize the number of waiting people in the station, and maximize the number of passengers on the train, and to build a model for the compilation of the train flexible marshaling operation diagram.

[0181] Solve the model for compiling the flexible train marshaling operation diagram and obtain the flexible train marshaling operation diagram under the co-linear condition.

[0182] Example 4

[0183] Embodiment 4 of the present invention provides a computer program (product), including a computer program, wherein when the computer program is executed on one or more processors, the method for compiling a subway co-line operation train diagram based on flexible marshaling is implemented, and the method includes:

[0184] Based on the topological structure characteristics of the collinear line and the passenger flow characteristics of the trains at different times, the number of trains of flexible marshaling is adjusted. By characterizing the arrival time of the leading train on the main line, the departure time on the main line, the arrival time on the branch line, the departure time on the branch line, and the marshaling status with the following train, the objective function is to minimize the number of car bottoms used, minimize the number of waiting people in the station, and maximize the number of passengers on the train, and to build a model for the compilation of the train flexible marshaling operation diagram.

[0185] Solve the model for compiling the flexible train marshaling operation diagram and obtain the flexible train marshaling operation diagram under the co-linear condition.

[0186] Example 5

[0187] Embodiment 5 of the present invention provides an electronic device, including: a processor, a memory, and a computer program; wherein the processor is connected to the memory, the computer program is stored in the memory, and when the electronic device is running, the processor executes the computer program stored in the memory, so that the electronic device executes instructions for implementing a method for compiling a subway co-line operation train diagram based on flexible marshaling, the method comprising:

[0188] Based on the topological structure characteristics of the collinear line and the passenger flow characteristics of the trains at different times, the number of trains of flexible marshaling is adjusted. By characterizing the arrival time of the leading train on the main line, the departure time on the main line, the arrival time on the branch line, the departure time on the branch line, and the marshaling status with the following train, the objective function is to minimize the number of car bottoms used, minimize the number of waiting people in the station, and maximize the number of passengers on the train, and to build a model for the compilation of the train flexible marshaling operation diagram.

[0189] Solve the model for compiling the flexible train marshaling operation diagram and obtain the flexible train marshaling operation diagram under the co-linear condition.

[0190] In summary, the method and system for compiling a subway co-linear operation train diagram based on flexible formation described in the embodiment of the present invention establish a flexible train formation diagram model under co-linear conditions by characterizing the arrival and departure times of the train (front car) on the main line and the branch line and the formation status of the rear car; draw a train diagram of flexible train formation under co-linear conditions based on the results obtained by optimizing the model; and realize a method for making the co-linear form in which the branch line extends at the end of the main line equivalent to the co-linear form in which the branch line does not extend at the end of the main line.

[0191] The flexible marshaling operation mode is adopted. By realizing the marshaling / disassembling operation of trains at the stations in the trunk line section, the trains can be marshaled during peak hours to shorten the running interval between trains and thus improve the throughput capacity of the shared line section. Disassembling the marshaling during off-peak hours can alleviate the problem of low train load rate. The trains can also be marshaled and disassembled at the crossing station, and the trains can be split into two trains to run to different branch lines respectively, so as to meet the operation needs of the branch line section and reduce the waiting time of passengers on the branch line platform. Trains from different branch lines can also be marshaled into the same train to run in the trunk line section, shortening the running interval between trains and improving the throughput capacity of the shared line section.

[0192] In the embodiment of the present invention, trains are only allowed to perform marshaling and unmarshaling operations in stations to change the number of train marshalings. If "marshaling and unmarshaling are not allowed in stations, but marshaling and unmarshaling are allowed in sections" or "marshaling and unmarshaling are allowed both in stations and in sections", a flexible marshaling operation diagram of subway lines can also be realized. Passenger flow section data is used for passenger flow data. If OD passenger flow data is used, the passenger flow section data can also be obtained by calculation and subsequent calculations can be completed. The collinear form is based on the model established by the Y-type line. If the equivalent method provided in the embodiment of the present invention is used, the collinear form of the Y-type line can be equivalent to other collinear forms, and the model can also obtain optimization results for other collinear forms.

[0193] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0194] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0195] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0196] These computer program instructions can also be loaded onto a computer or other programmable data processing device, and a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, so that the instructions executed on the computer or other programmable device provide for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0197] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Technical personnel in the relevant field should understand that various modifications or variations that can be made by those skilled in the art without creative work on the basis of the technical solution disclosed in the present invention should be included in the scope of protection of the present invention.

Claims

1. A method for compiling a subway co-line operation train diagram based on flexible marshaling, characterized in that: include: Based on the topological structure characteristics of the collinear line and the passenger flow characteristics of the trains at different times, the number of trains of flexible marshaling is adjusted. By characterizing the arrival time of the leading train on the main line, the departure time on the main line, the arrival time on the branch line, the departure time on the branch line, and the marshaling status with the following train, the objective function is to minimize the number of car bottoms used, minimize the number of waiting people in the station, and maximize the number of passengers on the train, and to build a model for the compilation of the train flexible marshaling operation diagram. Solve the model for compiling the flexible train marshaling operation diagram and obtain the flexible train marshaling operation diagram under the collinear condition; Among them, the decision variable is introduced Indicates whether the train number i enters the L2 branch line or the L3 branch line from the L1 trunk line; Indicates that train number i enters L2 branch line from L1 trunk line through rail station; if It means that train No. i enters L3 branch line from L1 trunk line through the station; When a train passes through the track crossing station J1 between the main line and the branch line, it will enter any branch line and arrive at the first station of the branch line. Considering that any train can only enter one of the branches after passing the track crossing station, the following formula is needed for the arrival time of the first station of the branch line: Where M represents an integer. When train number i chooses to enter the L2 branch line, the arrival time at the first station J1+1 of the L1 branch line depends on the departure time at the crossing station J1 and the interval running time. When train number i chooses to enter other branches, since M makes the inequality always true, the arrival time of the first station of the L1 branch line is not determined by the departure time of the crossing station; Similarly, when the train enters the L3 branch line through the track crossing station: Introducing decision variables To indicate whether the train continues to run after completing a full turn; when When , it means that the train number i1 has turned back at the last stop in the down direction and switched to the up direction to continue running, and connected to a new train number i2: Among them, r turn,max is the maximum return operation time, r turn,min is the minimum return operation time, R represents a sufficiently large positive number different from M; The arrival and departure times of adjacent trains at the same station both meet the time constraints of the running interval: in, is a Boolean variable used to indicate whether train number i and train number i+1 are in the marshaling state when they leave / arrive at station j; is the time when train number i leaves / arrives at station j.

2. The method for compiling a subway co-line operation train diagram based on flexible marshaling according to claim 1 is characterized in that: In the collinear line topology structure, the trunk line is represented by L1, and the branch lines are represented by L2 and L3 respectively, wherein the first station of the L1 line is station 1, and the J1 stations of the L1 line are numbered in sequence, and the first station of the L2 branch line is station J1+1, and the stations of the L2 line are numbered in sequence, and the first station of the L3 branch line is station J1+J2+1, and the stations of the L3 line are numbered in sequence; The station set is represented as: J = {1, 2, ..., J1, J1+1, ..., J1+J2, J1+J2+1, ..., J1+J2+J3}; The station number is represented by j, j∈J, the train set is represented by I={1,2,...,I}, and the train number is represented by i, i∈I; For adjacent stations, the departure time of train number i at station j is and arrival time There are the following relationships: in, Indicates the stop time. Indicates the section running time, and up indicates the upward running direction of the train.

3. The method for compiling a subway co-line operation train diagram based on flexible marshaling according to claim 1 is characterized in that: When two trains are marshaled, the stop time of the front train is required to be within the specified range, and the marshaling operation time is increased; when two trains are unmarshaled, the stop time of the rear train is required to be within the specified range, and the unmarshaling operation time is increased. The formula is expressed as follows: Where D is the additional time required for marshaling / unmarshaling operations.

4. The method for compiling a subway co-line operation train diagram based on flexible marshaling according to claim 3 is characterized in that: The objective function with minimizing the number of car bottoms in use, minimizing the number of people waiting in the station and maximizing the number of passengers on the train as the optimization goal is: in, Indicates the number of people waiting on the platform in the upward direction. Indicates the number of people waiting on the platform in the down direction. represents the number of passengers in the train in the upward direction, Indicates the number of passengers in the train in the down direction.

5. A subway co-line operation train diagram compilation system based on flexible marshaling based on the train diagram compilation method according to any one of claims 1 to 4, characterized in that: include: A construction module is used to adjust the number of flexible marshaling trains based on the topological structure characteristics of the collinear line and the passenger flow characteristics of the trains at different time periods. By characterizing the arrival time of the leading train on the main line, the departure time on the main line, the arrival time on the branch line, the departure time on the branch line, and the marshaling status with the following train, a train flexible marshaling operation diagram compilation model is constructed with the objective function of minimizing the number of vehicle bottoms in use, minimizing the number of waiting people in the station, and maximizing the number of passengers on the train. The solution module is used to solve the train flexible marshaling operation diagram compilation model and obtain the train flexible marshaling train operation diagram under the co-line condition.

6. A non-transitory computer-readable storage medium, characterized in that: The non-transitory computer-readable storage medium is used to store computer instructions. When the computer instructions are executed by the processor, the method for compiling a subway co-line operation train diagram based on flexible formation as described in any one of claims 1 to 4 is implemented.

7. A computer program product, characterized in that It comprises a computer program, which, when running on one or more processors, is used to implement the method for compiling a subway co-line operation train diagram based on flexible formation as described in any one of claims 1 to 4.

8. An electronic device, characterized in that: include: A processor, a memory and a computer program; wherein the processor is connected to the memory, the computer program is stored in the memory, and when the electronic device is running, the processor executes the computer program stored in the memory so that the electronic device executes instructions for implementing the method for compiling a subway co-line operation train diagram based on flexible formation as described in any one of claims 1 to 4.

Citation Information

Patent Citations

  • Full-day train working diagram generation method based on time-sharing scheme and activity event relationship

    CN111391896A

  • Method and system for automatically compiling multi-route multi-period all-day train working diagram

    CN114179873A