Control method of discrete flexible machining production line based on parallel production of multiple workpieces
By adopting a multi-workpiece parallel production control method on the discrete flexible machining production line, and using state machines and process circles to divide the workpiece production process, the problem of scattered production equipment and high labor intensity of manual handling is solved, and production efficiency and equipment utilization are improved. , achieving controllability of product quality and real-time traceability of the production process.
Patent Information
- Application Number
- CN202111366749.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-18
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-11-18
AI Technical Summary
The existing discrete flexible machining production lines have problems such as scattered production equipment, high labor intensity of manual handling, poor product quality consistency, low production efficiency, and low level of automation and informatization, causing enterprises to face high labor costs and unstable production.
A discrete flexible machining production line control method based on parallel production of multiple workpieces is adopted. By constructing a single workpiece production process flow and a multi-workpiece parallel production line control method, the state machine and process circle are used to segment and schedule the workpiece production process to achieve automated handling and production. Status determination, optimizing production equipment utilization and production efficiency.
It improves the efficiency of the production line and equipment utilization, reduces the standby time, achieves controllability of product quality and real-time traceability of the production process, reduces labor costs, and improves the automation and informatization level of the enterprise.
Smart Images

Figure CN116149263B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of discrete flexible machining production line parallel control, and provides a discrete flexible machining production line control method based on multi-workpiece parallel production. Background Art
[0002] The production equipment involved in the production line includes: 4 vertical machine tools, 1 three-coordinate machine, 1 cleaning machine, 1 loading platform, 1 docking platform, 2 buffering platforms, 2 vertical barcode scanners, 2 flipping platforms, 2 abnormal exits, and 2 unloading platforms. The production equipment is arranged in parallel in a straight line and arranged on both sides of the ground track. There are two six-axis robots R1 and R2 on the ground track, which are responsible for the handling operation of the workpiece during the production process and complete the loading and unloading of the workpiece on different production equipment, as shown in the attached figure. Figure 1 shown.
[0003] Since R1 and R2 can only perform one-way round-trip operation on the same ground track, the activity area is limited and is divided into the "R1 activity area" and the "R2 activity area". They cannot cross the area to transport each other, so the layout of production equipment is as symmetrical as possible, including "cache", "code scanning", "flip", "machine tool", etc. However, since there is only one coordinate measuring machine and cleaning machine involved and they occupy a large area, they cannot be shared by two robots at the same time, and are placed in the "R1 activity area" and "R2 activity area" respectively. When three-coordinate measurement and cleaning by the cleaning machine are required, the middle "public area" is used to "dock" the workpieces for three-coordinate measurement and cleaning by the cleaning machine, realize the exchange of workpieces, and continue to complete specific processing operations. At the same time, in order to make the material loading on the production line as concentrated as possible, the "loading table" is also arranged in the "public area". When R1 and R2 are picking up and placing materials on the "loading table" or "docking table", they need to judge and apply for the public area, and leave the "public area" immediately after the execution.
[0004] The existing production mode is manual operation, and production is carried out in discrete production equipment rooms by carts and manual loading and unloading. The production equipment is scattered, and manual handling is labor-intensive; for the loading and processing of precision equipment such as machine tools, the installation consistency is poor; there is too much manual intervention in the production process, and it is difficult to effectively guarantee product quality; the process flow card is used to record the production process, and it is impossible to effectively record and trace the products in real time. Enterprise production faces problems such as low production efficiency, poor product quality consistency, excessive labor cost investment, and constraints on the level of enterprise automation and informationization. Summary of the invention
[0005] The control of the production line involves the complete production process of the workpiece, and the production process, from the workpiece going online to processing and production, and then to the product going offline, requires automated handling and production status determination. During the production process of the workpiece, the robot will be idle and waiting, at which time other workpieces can continue to be handled to achieve parallel production. In order to maximize the efficiency of the production line, reduce failures, shorten the standby time, and increase the controllability and observability of the intelligent production line, the present invention proposes a discrete flexible machining production line control method based on multi-workpiece parallel production.
[0006] The technical solution adopted by the present invention to achieve the above-mentioned purpose is:
[0007] The control method of a discrete flexible machining production line based on parallel production of multiple workpieces includes the following steps:
[0008] For the production line of a single workpiece, a single workpiece production process control method is constructed;
[0009] According to the single-workpiece production process control method of each workpiece, a multi-workpiece parallel production line control method is constructed to meet the production needs of multi-workpiece parallel production.
[0010] The method for constructing a single workpiece production process flow control method comprises the following steps:
[0011] The production process of the workpiece is divided according to the process nodes, and divided into different production processes, which are recorded as process circles, and are marked with process numbers. The process circles are connected in series;
[0012] The process circle contains multiple production steps, and the production steps are scheduled in an internal cycle along with the state machine;
[0013] When a single process circle is completed, the next process is entered, and after all process circles are completed, the product is offline;
[0014] When a measurement anomaly or recognition error occurs, the workpiece production process is interrupted and the problematic workpiece is discharged through the abnormal exit.
[0015] The process node is the connection point between two adjacent processes.
[0016] The process circle contains multiple production steps, and the production steps are scheduled in an internal cycle along with the state machine, including the following steps:
[0017] a) The state machine mode is used to divide the state of the work step into four states: waiting, handling, processing, and completion;
[0018] b) When the workpiece enters this process from the previous process, it is in a waiting state;
[0019] c) When the handling robot is idle and the production equipment corresponding to the current production step is also idle, the workpiece can be handled, which is the handling state;
[0020] d) When the workpiece is transported to the production unit and the robot is withdrawn, the production equipment is operated, which is the processing state;
[0021] e) When the production equipment completes the operation, the handling robot is idle, and the production equipment corresponding to the next step is also idle, it enters the handling state again;
[0022] f) Cycle from step b) to step e), the workpiece continuously completes the corresponding processing steps while being transported and processed, and finally completes all the steps and enters the completion state, completing the cycle scheduling of this process circle and is about to flow into the next process.
[0023] The method for constructing a multi-workpiece parallel production line control method comprises the following steps:
[0024] According to the working time of production equipment, production equipment is divided into time-consuming equipment and non-time-consuming equipment. Non-time-consuming equipment works within the process circle, and time-consuming equipment works at the process node.
[0025] When the time-consuming equipment is processing a certain workpiece, the handling robot is in an idle state. At this time, the handling robot cooperates with the non-time-consuming equipment to process the process circles of other workpieces according to the single-workpiece production process flow control method until the cycle scheduling of the process circle is completed;
[0026] When multiple workpieces call the same robot to execute a process circle, they are scheduled according to production priority. Workpieces with low priority are temporarily in a waiting state. After the handling robot completes the high-priority process circle, the low-priority workpiece scheduling is executed.
[0027] The tasks performed by the time-consuming equipment include: machine tool processing, three-coordinate measurement, and cleaning by a cleaning machine.
[0028] The tasks performed by the non-time-consuming equipment include: caching, code scanning, flipping, docking, loading and unloading.
[0029] The present invention has the following beneficial effects and advantages:
[0030] 1. The present invention adopts "process circle" and "process node" to reorganize the workpiece production process, realize the automatic operation of production equipment and handling equipment, and reflect the production status in real time through the state machine and process number.
[0031] 2. The present invention can realize effective production scheduling for machining production of multiple workpieces in the early stage of production operation, and realize high-efficiency parallel production by reasonably scheduling the distribution of the "process circle" of multiple workpieces on the production timeline.
[0032] 3. The present invention adopts this method to carry out production scheduling and actual operation of multiple workpieces, which can obtain the production bottleneck factors of the current production line and point out the direction for further improving the efficiency of the production line.
[0033] 4. The present invention can effectively evaluate and analyze the production capacity of the production line and the utilization rate of the production equipment through statistical analysis of the number of online workpieces and the status of the production equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 This is a schematic diagram of the equipment distribution and composition of the production line;
[0035] Figure 2 It is a schematic diagram of the single-workpiece production process flow based on the state machine;
[0036] Figure 3 Schematic diagram for parallel production of multiple workpieces;
[0037] Figure 4 Produce timing diagrams for multiple workpieces in parallel. DETAILED DESCRIPTION
[0038] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.
[0039] This method re-divides the workpiece production process under the automated production line based on the specific production process of the workpiece. The different processes are divided into multiple "process circles" by using the more time-consuming production links such as machining, measurement, and cleaning as "process nodes" to re-form a complete production process. The state machine mode is used inside the "process circle" for workpiece handling and workpiece processing. By connecting each "process circle" in series according to a specific "process number", a complete single-workpiece observable and controllable production process flow is built, as shown in the attached figure. Figure 2 shown.
[0040] For the parallel production of multiple workpieces, a single workpiece can be compared to an "energy ball", and the production equipment and handling equipment can be compared to a "processing pool". Increasing the number of target objects (workpieces) means putting multiple "energy balls" into the "processing pool", which increases the dimension of production control scheduling. Figure 3 As shown. Through the parallel single-workpiece production control method, combined with the real-time status of the production and processing equipment, the production needs of multi-workpiece parallel production can be realized. On the one hand, it can reduce the waiting time of the production line, improve the operation efficiency and production line saturation, and on the other hand, through the statistical analysis of the number of online workpieces and the status of production equipment, the production capacity of the production line and the utilization rate of production equipment can be effectively evaluated and analyzed.
[0041] The design principle and technical solution of the present invention are described in detail below:
[0042] 1. Single-workpiece production process design based on state machine
[0043] Smart machining production lines usually include multiple processing equipment (CNC machine tools), testing equipment (three-coordinate machines), cleaning equipment, specific workstations (identification, positioning, position conversion), loading areas, unloading areas, abnormal exits, etc., and are production units with fixed positions in space. Smart production lines also include six-axis robots with ground rails. The robots are equipped with fixed tooling (grippers or interfaces) that can pick up workpieces, drag the robots through the ground rails to transport workpieces, and then complete the loading and unloading of workpieces in various production units. They are transport units with variable positions in space.
[0044] According to the different attributes, the production line control of a single workpiece is divided into three parts: "transportation", "status" and "processing", such as Figure 2 As shown. The role of the two robots R1 and R2 (including the ground rail) is called "handling". The production unit with a fixed position in space is used to complete the processing, measurement, flipping, alignment, recording and other operations of the workpiece, which is collectively called "processing". During the production process, the workpiece is "handled" by R1 and R2, and undergoes different "processing", thereby changing the production "state" of the workpiece.
[0045] The production scheduling of a single workpiece's complete production cycle is designed according to the process requirements. First, the production process is divided into different production processes according to the specific "process nodes" mentioned above, recorded as "process circles", and marked with "process numbers" (see Appendix). Figure 2 1-m). The "process circle" contains multiple production steps, and the production steps are scheduled in an internal cycle with the state machine. When a single "process circle" is completed, it enters the next process. After all "process circles" are executed, the product is offline. The "process circles" are connected in series. When measurement abnormalities or identification errors occur, the workpiece production process can be interrupted and the problematic workpiece can be discharged through the abnormal exit.
[0046] The "process circle" uses a state machine to schedule the process steps in a loop. Through the "transportation" of the robot, the "processing" operation of multiple processing equipment in the current specific process is executed. For example, the "process circle" with process number 1 (that is, the attached Figure 2#=1), the associated "processing" operations include: equipment 1, equipment 2, equipment 3. The processing operations of the workpiece have a specific execution order, that is, the various steps within the process. In order to achieve the observable and controllable production status of the workpiece, the state machine mode is used to divide the step status into four states: "waiting 00", "transporting 01", "processing 10", and "completion 11". When the workpiece enters this process from the previous process, it is in the "waiting 00" state. When the robot is idle and the corresponding production unit is also idle, the transportation of this workpiece can be executed, which is the "transporting 01" state. When transported to the production unit and the robot is withdrawn, the production equipment performs related "operations", which is the "processing 10" state. When the production equipment completes the "operation", the robot is idle, and the production equipment corresponding to the next step is also idle, it enters the "transporting 01" state again. In this way, the workpiece continuously completes the corresponding processing steps under the processing of "Transport 01" and "Processing 10", and finally completes all the steps and enters the "Completion 11" state, completing the cyclic scheduling of this "process circle" and is about to flow into the next process.
[0047] The control method for designing the single-workpiece production process based on the state machine can realize production scheduling by simply judging the corresponding equipment status and robot status. At the same time, the production status of the workpiece is effectively described by the process number and the state machine, the production process is observable and controllable, and the automated production of a single workpiece is realized.
[0048] 2. Design principles and technical solutions for parallel production of multiple workpieces
[0049] The intelligent machining production line needs to meet the production requirements of multiple workpieces online at the same time, with multiple production equipment working in parallel. Robots can move multiple workpieces according to the status of the production line to maximize the production efficiency of the production line.
[0050] Since a single-workpiece production process design based on a state machine is adopted, for a single workpiece, it is only necessary to determine the state within the current "process circle" and find the corresponding work step to link to the required production equipment, and then further production or waiting can be carried out through the "state" (idle or busy) of the production equipment. For multiple workpieces, the workpieces can be compared to "energy balls", and the production equipment and handling equipment can be compared to "processing pools". When the workpiece runs to a specific work step, it is necessary to call specific equipment to operate. Through the "state" of the production equipment and the "process number" of the workpiece, multi-workpiece production control and optimized production can be carried out according to conditions, as explained below.
[0051] The production equipment of the production line is divided into two categories, "time-consuming" equipment and "non-time-consuming" equipment. Usually, machine tool processing, three-coordinate measurement and cleaning machine cleaning take a long time and are defined as "time-consuming" equipment. The rest, such as "caching", "scanning code", "flipping", "docking", "loading" and "unloading", are "non-time-consuming" equipment, which can be completed by the robot after a short wait. The "process node" of the "process circle" is divided by the "time-consuming" equipment. This has two advantages: first, the production process can be controlled through segmentation, and the nodes are clear. By querying the "process number", it can directly reflect the degree of completion of the workpiece, that is, the maturity of the workpiece "energy ball"; second, through segmentation, the robot's idle time can be better reserved. When multiple workpieces are produced, the "process circle" is used as an independent part. The robot can only perform the "handling" operation of other workpieces at the process nodes outside the "process circle", which neither affects the completeness and fluency of the execution of a single workpiece nor wastes the waiting time of the robot at the "time-consuming" equipment. The production line control that uses "process circle" and "process node" for parallel production of multiple workpieces takes advantage of the short execution cycle of the "process circle" and the long waiting time of the "process node". The parallel production of multiple workpieces is carried out by only inserting the "process circle" tasks of other workpieces at the "process node". By reasonably scheduling the distribution of the "process circle" of multiple workpieces on the production timeline, efficient parallel production can be achieved.
[0052] As mentioned above, when multiple workpieces are produced, multiple "energy balls" are put into the "processing pool", and the production equipment performs parallel production of multiple workpieces under the scheduling of the "process circle" of multiple workpieces. When the "time-consuming" equipment is in the "busy" state, the production line is temporarily saturated and stops adding new blank "energy balls". When a product is offline (the "energy ball" is mature), new "energy balls" can continue to be added. When a measurement abnormality or recognition error occurs, the "energy ball" can be discharged through the abnormal outlet.
[0053] The production control method of the parallel single-workpiece state machine is combined with the "process circle", "process node" and the current real-time status of the production equipment, that is, a discrete flexible machining production line control method based on parallel production of multiple workpieces.
[0054] The system of the present invention comprises the following components:
[0055] 1) Ground rail
[0056] 2) Two six-axis robots R1 and R2
[0057] 3) Machine tool 1, machine tool 2, machine tool 3, machine tool 4
[0058] 4) Cleaning machine
[0059] 5) Three-coordinate machine
[0060] 6) Scanning, caching, flipping, abnormality, and unloading in the R1 activity area
[0061] 7) Scanning, caching, flipping, abnormality, and unloading in the R2 activity area
[0062] 8) Loading table, docking table
[0063] The control method used in this paper is based on the flexible production line construction project of a large aviation machining plant. Figure 1 , Figure 3 , Figure 4 And actual production cases are used to illustrate.
[0064] like Figure 1 , Figure 3 As shown, the production equipment includes: three-coordinate machine, machine tool 2, machine tool 1, code scanning, cache, flipping, abnormality (abnormal exit), exit (i.e. unloading platform) in the R1 activity area, cleaning machine, machine tool 3, machine tool 4, code scanning, cache, flipping, abnormality (abnormal exit), exit (i.e. unloading platform) in the R2 activity area, entrance (loading platform) and docking in the public area. It includes two robots and mobile ground rails, denoted as R1 and R2.
[0065] The workpiece energy ball enters the processing pool formed by the production equipment and the handling equipment through the entrance. Through the continuous scheduling and production update of the "process circle", the energy ball circulates in each unit of the production equipment, continues to mature, and is finally discharged through the outlet to complete the full cycle machining production of the workpiece. Figure 4 A case study of actual production and processing of multiple workpieces.
[0066] Since four machine tools are used for processing and production, the parallel production of four workpieces on the front and back is taken as an example. First, the production process of the workpiece is reorganized, and the production equipment in the R1 active area is marked as 1, and the production equipment in the R2 active area is marked as 2 (as shown in the following table). The workpiece is matched with independent machine tools for front and back processing, workpiece 1-machine tool 1, workpiece 2-machine tool 3, workpiece 3-machine tool 2, workpiece 4-machine tool 4. At the same time, workpiece 1 and workpiece 2 are measured by three-coordinate machine for random inspection, and workpiece 3 and workpiece 4 are not inspected. Therefore, the following process division can be carried out:
[0067] Workpiece 1 is produced by machine tool 1, and the production cycle includes the following 10 steps:
[0068]
[0069] Workpiece 2 is produced by machine tool 3, and the production cycle includes the following 7 steps:
[0070]
[0071]
[0072] Workpiece 3 is produced by machine tool 2, and the production cycle includes the following 8 steps:
[0073]
[0074] Workpiece 4 is produced by machine tool 4, and the production cycle includes the following five steps:
[0075]
[0076] The "process circle" of the workpiece is executed in the order of "process number". After all processes are completed, the product is offline. The connection between processes is the "process node". At the "process node", the robot is idle and the "time-consuming" equipment is producing. At this time, the robot can be scheduled by the "process circle" of other workpieces. The state machine method is used to call the robot for cyclic execution inside the "process circle". The "process circle" is full of "non-time-consuming" equipment with a short execution cycle. The robot is in a busy state and executes until the end of the "process circle", which usually takes no more than 2.5 minutes. Therefore, production is arranged according to the production time sequence of the workpiece. When multiple workpieces call the same robot to execute the "process circle", a process conflict occurs. At this time, it needs to be scheduled according to the production priority. The workpiece with low priority is temporarily in a waiting state. The robot can only be scheduled for the workpiece with low priority after the robot completes the high-priority process circle.
[0077] As attached Figure 4 As shown in the figure, the execution time of all "process circles" is calculated based on a maximum of 2.5 minutes. The front processing time of the machine tool is 30 minutes, the back processing time is 15 minutes, the cleaning time of the cleaning machine is 5 minutes, and the measurement time of the three-coordinate machine is 7.5 minutes. Therefore, a timing diagram for parallel production of multiple workpieces can be drawn. In the figure, R1 and R2 represent the "process circles" in which the corresponding robots execute the corresponding steps, and the other different patterns represent "process nodes", that is, the "time-consuming" equipment is producing here, and R1 and R2 are idle at this time. Through the process timing diagram, multi-workpiece process scheduling of R1 and R2 is carried out to reduce the waiting time of R1 and R2, improve the utilization rate of production equipment, and thus improve the utilization efficiency of the production line.
[0078] As can be seen from the figure, before 30 minutes, R1 and R2 were in an idle waiting state because the workpieces were all transported to the machine tool and the four workpieces were processed in the "time-consuming" equipment. With the gradual development of the production process, R1 and R2 are basically in a saturated production state through the process scheduling of multiple workpieces. At the same time, through analysis, it can be seen that the cleaning machine is basically in a busy state after 35 minutes. Since both sides need to be cleaned after processing, the cleaning machine is very saturated. The three-coordinate machine is used as a sampling inspection equipment, and only measures workpieces 1 and 2 before they go off the line. The overall production time of the four workpieces is 105 minutes, 85 minutes, 102.5 minutes and 112.5 minutes respectively. The time distribution is relatively even, which can reasonably meet the synchronous production needs of the four workpieces, with a total time of 112.5 minutes.
[0079] Among them, the actual production time of workpiece 1 is 92.5 minutes, the idle time is 12.5 minutes, and the efficiency is 88.10%;
[0080] The actual production time of workpiece 2 is 80 minutes, with 5 minutes of idle time and an efficiency of 94.12%;
[0081] The actual production time of workpiece 3 is 75 minutes, with 27.5 minutes of idle time and an efficiency of 73.17%;
[0082] The actual production time of workpiece 4 is 67.5 minutes, with 45 minutes of idle time and an efficiency of 60%;
[0083] Excluding the initial waiting time, the time for R1, R2, and the cleaning machine is measured starting from 32.5 minutes, as follows:
[0084] The actual production time of R1 is 25 minutes, the idle time is 47.5 minutes, and the efficiency is 34.48%;
[0085] R2's actual production time is 40 minutes, idle time is 40 minutes, and efficiency is 50%;
[0086] The actual production time of the cleaning machine is 40 minutes, the idle time is 40 minutes, and the efficiency is 50%;
[0087] By adopting the method of the present invention to arrange the process diagram reasonably, the parallel production of multiple workpieces is realized, the production saturation is greatly increased, and the overall production efficiency is improved. At the same time, through the analysis of the process diagram, it can be seen that the workpiece basically spends more time on the cleaning machine and the process corresponding to the cleaning machine, which is basically occupied by R2 and cleaning time, and is also a key bottleneck factor affecting the production capacity of the production line. If the efficiency of the production line is further improved, it can be considered to add a cleaning machine on the R1 side, or place the cleaning machine in the public area.
Claims
1. A discrete flexible machining production line control method based on multi-workpiece parallel production, characterized in that: The following steps are involved: For the production line of a single workpiece, a single workpiece production process control method is constructed; According to the single workpiece production process control method of each workpiece, a multi-workpiece parallel production line control method is constructed to meet the production needs of multi-workpiece parallel production; The method for constructing a single workpiece production process flow control method comprises the following steps: The production process of the workpiece is divided according to the process nodes, and divided into different production processes, which are recorded as process circles, and are marked with process numbers. The process circles are connected in series; The process circle contains multiple production steps, and the production steps are scheduled in an internal cycle along with the state machine; When a single process circle is completed, the next process is entered, and after all process circles are completed, the product is offline; When measurement anomalies or identification errors occur, the workpiece production process is interrupted and the problematic workpiece is discharged through the abnormal exit; The method for constructing a multi-workpiece parallel production line control method comprises the following steps: According to the working time of production equipment, production equipment is divided into time-consuming equipment and non-time-consuming equipment. Non-time-consuming equipment works within the process circle, and time-consuming equipment works at the process node. When the time-consuming equipment is processing a certain workpiece, the handling robot is in an idle state. At this time, the handling robot cooperates with the non-time-consuming equipment to process the process circles of other workpieces according to the single-workpiece production process flow control method until the cycle scheduling of the process circle is completed; When multiple workpieces call the same robot to execute a process circle, they are scheduled according to production priority. Workpieces with low priority are temporarily in a waiting state. After the handling robot completes the high-priority process circle, the low-priority workpiece scheduling is executed.
2. The discrete flexible machining production line control method based on multi-workpiece parallel production according to claim 1 is characterized in that: The process node is the connection point between two adjacent processes.
3. The discrete flexible machining production line control method based on multi-workpiece parallel production according to claim 1 is characterized in that: The process circle contains multiple production steps, and the production steps are scheduled in an internal cycle along with the state machine, including the following steps: a) The state machine mode is used to divide the state of the work step into four states: waiting, handling, processing, and completion; b) When the workpiece enters this process from the previous process, it is in a waiting state; c) When the handling robot is idle and the production equipment corresponding to the current production step is also idle, the workpiece can be handled, which is the handling state; d) When the workpiece is transported to the production unit and the robot is withdrawn, the production equipment is operated, which is the processing state; e) When the production equipment completes the operation, the handling robot is idle, and the production equipment corresponding to the next step is also idle, it enters the handling state again; f) Cycle from step b) to step e), the workpiece continuously completes the corresponding processing steps while being transported and processed, and finally completes all the steps and enters the completion state, completing the cycle scheduling of this process circle and is about to flow into the next process.
4. The discrete flexible machining production line control method based on multi-workpiece parallel production according to claim 1 is characterized in that: The tasks performed by the time-consuming equipment include: machine tool processing, three-coordinate measurement, and cleaning by a cleaning machine.
5. The discrete flexible machining production line control method based on multi-workpiece parallel production according to claim 1 is characterized in that: The tasks performed by the non-time-consuming equipment include: caching, code scanning, flipping, docking, loading and unloading.
Citation Information
Patent Citations
Non-assembly-line production manufacturing process quantitative management method and tool
CN111242417A
Scheduling optimization method for multi-process machining unit mobile robot
CN111340268A