A method for replanting peach trees in old peach orchards in rainy areas

By using technical means such as catch basins, planting platforms and planting bags in old peach orchards in rainy areas in the south, the problem of continuous cropping obstacles has been solved, the growth of peach seedlings and tree health have been promoted, and the soil environment has been optimized and yields increased.

CN116210508BActive Publication Date: 2024-10-01JINHUA ACAD OF AGRI SCI +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211731315.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-30
Publication Date
2024-10-01
Estimated Expiration
2042-12-30

AI Technical Summary

Technical Problem

There are continuous cropping obstacles when replanting peach trees in old peach orchards in rainy areas in the south, resulting in premature decline of tree vigor, low yield and dead trees. The main reasons include allelopathy, harmful soil microorganisms, changes in soil community structure and deterioration of physical and chemical properties.

Method used

Technical means such as water collection tanks, planting platforms and planting bags are used to form an optimized soil environment by clearing and disinfecting the garden, laying fully biodegradable mulch, applying compound microbial agents and organic fertilizers, and using rainwater for soil cleaning and improvement.

Benefits of technology

It effectively solves the obstacles of continuous cropping, promotes the growth of peach seedlings, extends the economic life of the tree, increases the yield, improves the soil environment, and overcomes the shortcomings of using quicklime or cotton wool alone.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116210508B_ABST
    Figure CN116210508B_ABST
Patent Text Reader

Abstract

The present invention provides a method for replanting peach trees in old peach orchards in rainy areas, aiming to solve the problem of continuous cropping obstacles in the existing technology when replanting peach trees in old peach orchards in rainy areas. The method for replanting peach trees in old peach orchards in rainy areas comprises: cleaning and disinfecting the orchard; raising the ridges used to plant new peach trees and surrounding them with water retaining stems to form a water collecting trough; applying pesticides at the planting sites in the water collecting trough and covering them with a fully biodegradable mulch film; laying a filling medium on the fully biodegradable mulch film to form a planting platform, the height of the planting platform being higher than the water retaining stems of the water collecting trough; placing a planting bag filled with planting soil and permeable to the roots of peach seedlings on the planting platform, and planting peach seedlings in the planting bag. The bottom of the water collecting trough is raised to be higher than the ordinary ground, and the stored rainwater penetrates through the soil at the bottom of the water collecting trough to the drainage slope and is discharged, thereby cleaning the soil in the water collecting trough, and harmful substances in the soil can be taken away by cleaning the soil.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of peach planting in southern rainy areas, and particularly relates to a method for replanting peach trees in old peach orchards in rainy areas. Background Art

[0002] Peach is an important fruit tree native to my country, which can reach full production quickly and produce high yields with good economic benefits. However, peach trees are prone to gum flow, especially in the rainy southern regions, where gum flow is more serious, which can easily cause premature aging of the tree and shorten the economic life of the tree.

[0003] The biggest problem and difficulty in replanting peach trees in old peach orchards is continuous cropping. Peach trees that have been continuously cropped grow slowly, stagnate or become weak. Leaves lose their green color, gum oozes from branches and trunks, roots are infected with pests and diseases, and resistance to stress is weak, resulting in low yields and even death. The main reasons for peach replanting problems are: (1) allelopathic effects (autotoxic substances), (2) harmful microorganisms in the soil, (3) changes in soil community structure, and (4) deterioration of soil physical and chemical properties. my country has more than 13 million mu of peach orchards, making it the country with the largest peach cultivation area in the world. Every year, hundreds of thousands of mu of peach orchards face renewal and replanting. The continuous cropping and replanting problem has become a major bottleneck restricting the sustainable development of the peach industry. Summary of the invention

[0004] The invention provides a method for replanting peach trees in old peach orchards in rainy areas, aiming to solve the problem of continuous cropping obstacles in the prior art when replanting peach trees in old peach orchards in rainy areas.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0006] A method for replanting peach trees in old peach orchards in rainy areas, comprising the following steps:

[0007] Orchard cleaning and disinfection: From August to October of the same year after the peaches in the old peach orchard are picked, the old peach trees to be replaced are dug out and the old peach orchard is cleaned out; the soil in the orchard is disinfected;

[0008] Build a water collection trough: Raise the ground in the ridge where new peach trees are planted and surround it with water retaining stalks to form a water collection trough; set a drainage slope on the outside of the water collection trough;

[0009] Laying a planting platform: determining a planting site for a new peach tree in the water collection tank, applying pesticides on the planting site and covering it with a fully biodegradable mulch film; laying a filling medium on the fully biodegradable mulch film to form a planting platform, the height of the planting platform being higher than the water retaining stem of the water collection tank; the filling medium includes leisure soil and organic fertilizer;

[0010] Planting green manure: Fertilize and sow white clover from mid-to-late September to mid-October of the same year;

[0011] Peach seedling planting: placing a planting bag filled with planting soil and through which the roots of the peach seedlings can penetrate on a planting platform, planting peach seedlings in the planting bag from late November of the current year to early March of the following year, and filling the planting bag with a medium; a composite microbial agent is added to the planting soil;

[0012] Planting bed trimming: From September to October of the second year, the whole garden is fertilized, compound microbial agents are added, and the soil is plowed into the soil together with the clover; the ground in the center of the planting bed is piled up to 5-10cm lower than the planting bag, and the planting bag and filling medium are buried in the planting bed, and the water retaining stems are removed.

[0013] Further improved plan: In the process of disinfecting the orchard soil, 200-400kg of quicklime and 100-200kg of biochar are evenly spread on every 667㎡ of the bed surface, and the entire garden is dug once with a digging depth of 40-80cm to complete the disinfection of the orchard soil.

[0014] Based on the above scheme, the present invention proposes a mixed treatment method of quicklime + biochar, which has an effect equivalent to that of dazomet treatment, and has a very obvious effect on promoting the growth of peach seedlings compared with quicklime disinfection alone; at the same time, it overcomes the problems that dazomet treatment at lower temperatures is not ideal, a long interval is required for planting after treatment, and the treatment method is relatively complicated; in order to overcome the problem of poor effect of quicklime alone and high cost of dazomet treatment, an economical and efficient quicklime + biochar mixed disinfection treatment method is proposed, which has good promotion value in production.

[0015] A further improved solution: a drainage ditch is provided on the outside of the water collecting trough, and the water in the water collecting trough penetrates into the drainage ditch through the drainage slope.

[0016] Based on the above scheme, by setting up drainage ditches, rainwater that has washed the soil and seeped out from the drainage slope can be drained away, thereby preventing rainwater containing toxic substances from remaining in the old peach orchard.

[0017] Further improved plan: In the process of building the water collection trough, the width of the bed used to plant new peach trees is 4-8m, the height of the water retaining ridge is 5-10cm; the depth of the drainage ditch is 20-50cm.

[0018] A further improved solution: when laying the planting platform, 50-200g of 98% dazomethane is spread within a diameter of 1.0-1.5m with the planting site as the center, and the application is turned into the soil, and covered with a fully biodegradable mulch film with a degradation period of 6-12 months; a filling medium with a thickness of 10-20cm is laid on the fully biodegradable mulch film with the planting site as the center, and the filling medium is prepared with organic fertilizer, rice husk, and leisure soil in a mass ratio of 1:1:1; the filling medium has a covering diameter of 0.6-1.0m, and is mixed with 0.25-0.5kg of balanced slow-release fertilizer and 0.5-1.0kg of calcium magnesium phosphate fertilizer.

[0019] Based on the above scheme, by setting up a planting platform with a horizontal height that is 5-10cm higher than the water retaining ridge around the ridge, it can be ensured that the peach seedlings that are afraid of waterlogging will not be affected by rainwater stored in the sump for a long time; the fully biodegradable film padded at the bottom can be biodegraded in the later stage and does not need to be treated later.

[0020] Further improvement plan: During the planting process of peach seedlings, a 0.1-0.2m thick 3 / Fill the medium around the plants;

[0021] The planting bag is a non-woven bag with a bag diameter of 40-60 cm, a bag height of 40-50 cm and a layer density of 50-100 g / ㎡;

[0022] The planting soil comprises: 16-18 parts by mass of sandy loam, 3-4 parts by mass of peat and 3-4 parts by mass of organic fertilizer; the planting soil is filled with 50-300g / m 3 , Mineral source potassium humate 50-200g / m 3 and polyglutamic acid 3-15g / m 3 .

[0023] Based on the above scheme, peach seedlings are planted in planting bags to avoid direct contact with continuous cropping soil within one year, which can create conditions for the growth of seedlings, promote the early growth of peach seedlings, accelerate the formation of gardens, and achieve early production. Since the selected planting bags are thin and easy for roots to penetrate, there is no need to deal with them in the later stage, and they will not affect the subsequent growth of peach trees.

[0024] Further improvement plan: In the process of planting green manure,

[0025] After cleaning and disinfecting the garden, apply 1500-2000kg of organic fertilizer per 667㎡ in the bed, and mix in 25kg of superphosphate as base fertilizer;

[0026] Sow white clover from mid-to-late September to mid-October of the same year, with a seed rate of 0.5-0.75kg / 667㎡; soak the seeds in 1500 times ammonium molybdate solution for 12 hours before sowing, then mix 5-10kg of calcium magnesium phosphate fertilizer with fine soil and sow;

[0027] Apply high-nitrogen compound fertilizer 5-10kg / 667㎡ 15 days after germination to promote strong seedlings;

[0028] At the end of March to the beginning of April in the second year, re-sow upland rice in plots with poor germination; before sowing upland rice, soak the seeds in clean water for 12-24 hours, then soak and disinfect them in 300 times strong chlorine solution or 4000 times 70% 402 emulsifiable concentrate for 12-24 hours, wash the disinfected seeds with clean water, soak them again for 24 hours after disinfection, and sow them in the cleared vacant land at a seed rate of 5-6kg / 667㎡ after the seeds turn white;

[0029] The upland rice seeds should be mowed and returned to the soil half a month before maturity, leaving 5-10cm stumps after mowing.

[0030] Based on the above scheme: white clover and upland rice can fertilize the soil; because clover is not tolerant to waterlogging, upland rice can be planted through the above method to effectively supplement the large area of ​​bare ridge surface caused by waterlogging on the ridge surface platform, so that the green manure mixed on the ground grows uniformly, achieving a better soil improvement effect.

[0031] Further improvement plan: In the planting bed trimming, the steps of fertilizing the whole garden and plowing it into the soil together with the clover include:

[0032] In September and October of the second year, apply 1500-2000kg of organic fertilizer evenly per 667㎡, mix it with 50kg of superphosphate as base fertilizer, and apply 1000-2000g / 667㎡ of compound microbial agents, 1000-5000g / 667㎡ of potassium humate and 50-100g / 667㎡ of polyglutamic acid; deep plowing of the whole garden is carried out, and clover, upland rice green manure and organic fertilizer are applied into the soil.

[0033] A further improved solution: the composite microbial agent is prepared by mixing brown nitrogen-fixing bacteria, Bacillus subtilis and yeast in a volume ratio of 1:1:1.

[0034] The beneficial effects of the present invention are:

[0035] In the method for replanting peach trees in old peach orchards in rainy areas, the bed of new peach seedlings is innovatively transformed into a water collection tank, and the water collection tank can be used to store rainwater by utilizing the natural factor of abundant rainfall in rainy areas. Since the bottom of the water collection tank is raised to be higher than the ordinary ground, the stored rainwater penetrates through the soil at the bottom of the water collection tank to the drainage slope and is discharged, thereby cleaning the soil in the water collection tank (bed). By cleaning the soil, harmful substances in the soil can be taken away; thereby improving the soil environment for replanting peach trees in old peach orchards.

[0036] In addition, pests in the soil can be eliminated through garden cleaning and disinfection. After disinfection, the bacterial colonies in the soil are also killed. Adding complex microbial agents to the planting soil and when trimming the planting bed can improve the soil community. The physical and chemical properties of the soil can be optimized by planting green manure and amending the planting bed. The toxic substances in the soil can be cleaned and removed by using a water collection trough. This solves the problem of peach tree replanting obstacles in an all-round way. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.

[0038] Figure 1 It is a structural schematic diagram of the water collecting tank in the present invention.

[0039] Description of the numbers in the figure:

[0040] 1-water collection trough; 2-water retaining ridge; 3-peach seedlings; 4-planting platform; 5-planting bag; 6-drainage ditch. DETAILED DESCRIPTION

[0041] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work belong to the protection scope of the present invention.

[0042] This embodiment provides a method for replanting peach trees in an old peach orchard in a rainy area, comprising the following steps:

[0043] Orchard cleaning and disinfection: From August to October of the same year after the peaches in the old peach orchard are picked, the old peach trees to be replaced are dug out and the old peach orchard is cleaned out; the soil in the orchard is disinfected;

[0044] Specifically, in the process of disinfecting the orchard soil, 200-400kg of quicklime and 100-200kg of biochar are evenly spread on every 667㎡ of the bed surface, and the entire garden is dug once with a digging depth of 40-80cm to complete the disinfection of the orchard soil.

[0045] When cleaning the orchard, all dug-out branches, stumps, roots, diseased and damaged branches and fruits should be cleared out of the old peach orchard.

[0046] Build a water collection trough: Raise the ground in the bed where the new peach trees are planted and surround it with water retaining stalks 2 to form a water collection trough 1, such as Figure 1 ; A drainage slope is provided on the outside of the water collection tank 1;

[0047] Specific as Figure 1 As shown, a drainage ditch 6 is provided on the outside of the water collection tank 1, and the water in the water collection tank 1 penetrates into the drainage ditch 6 through the drainage slope. In the process of building the water collection tank, the width of the bed used to plant new peach trees is 4-8m, the height of the water retaining ridge 2 is 5-10cm; the depth of the drainage ditch 6 is 20-50cm.

[0048] Two adjacent water collection tanks share a drainage ditch, and the drainage ditch can be set all around the water collection tank or only on one side.

[0049] Laying a planting platform: determining a planting site for a new peach tree in the water collection tank, applying pesticides on the planting site and covering it with a fully biodegradable mulch film; laying a filling medium on the fully biodegradable mulch film to form a planting platform 4, the height of the planting platform 4 being higher than the water retaining stem 2 of the water collection tank 1; the filling medium includes leisure soil and organic fertilizer;

[0050] Specifically, when laying the planting platform, 50-200g of 98% dazomethane is spread within a range of 1.0-1.5m in diameter with the planting site as the center, turned into the soil, and covered with a fully biodegradable mulch film with a degradation period of 6-12 months; a filling medium with a thickness of 10-20cm is laid on the fully biodegradable mulch film with the planting site as the center, and the filling medium is prepared with organic fertilizer, rice husk, and leisure soil in a mass ratio of 1:1:1; the filling medium has a covering diameter of 0.6-1.0m, and is mixed with 0.25-0.5kg of balanced slow-release fertilizer and 0.5-1.0kg of calcium magnesium phosphate fertilizer.

[0051] Among them, organic fertilizer can be fully decomposed organic fertilizer or commercial organic fertilizer; fallow soil refers to non-continuously cropped soil;

[0052] Among them, the horizontal height of the filling medium should be 5-10cm higher than the water retaining ridge around the ridge.

[0053] Planting green manure: Fertilize and sow white clover from mid-to-late September to mid-October of the same year;

[0054] Specifically, in the process of planting green manure,

[0055] After cleaning and disinfecting the garden, apply 1500-2000kg of organic fertilizer per 667㎡ in the bed, and mix in 25kg of superphosphate as base fertilizer;

[0056] Sow white clover from mid-to-late September to mid-October of the same year, with a seed rate of 0.5-0.75kg / 667㎡; soak the seeds in 1500 times ammonium molybdate solution for 12 hours before sowing, then mix 5-10kg of calcium magnesium phosphate fertilizer with fine soil and sow;

[0057] Apply high-nitrogen compound fertilizer 5-10kg / 667㎡ 15 days after germination to promote strong seedlings;

[0058] At the end of March to the beginning of April in the second year, re-sow upland rice in plots with poor germination; before sowing upland rice, soak the seeds in clean water for 12-24 hours, then soak and disinfect them in 300 times strong chlorine solution or 4000 times 70% 402 emulsifiable concentrate for 12-24 hours, wash the disinfected seeds with clean water, soak them again for 24 hours after disinfection, and sow them in the cleared vacant land at a seed rate of 5-6kg / 667㎡ after the seeds turn white;

[0059] The upland rice seeds should be mowed and returned to the soil half a month before maturity, leaving 5-10cm stumps after mowing.

[0060] Among them, because ridges are built in the ridges to collect water, in years with heavy rainfall, especially in plots with heavy soil, water is easily accumulated in the ridges, resulting in a low germination rate, so it is necessary to replant upland rice; among them, upland rice varieties such as Hanyou 73 can be selected.

[0061] Peach seedling planting: a planting bag 5 filled with planting soil and through which the roots of the peach seedlings can penetrate is placed on a planting platform 4, peach seedlings 3 are planted in the planting bag 5 from late November of the current year to early March of the next year, and a medium is filled around the planting bag; a composite microbial agent is added to the planting soil;

[0062] Specifically, during the planting process of peach seedlings, a 0.1-0.2m 3 / Fill the medium around the plants;

[0063] The planting bag is a non-woven bag with a bag diameter of 40-60 cm, a bag height of 40-50 cm and a layer density of 50-100 g / ㎡;

[0064] The planting soil comprises: 16-18 parts by mass of sandy loam, 3-4 parts by mass of peat and 3-4 parts by mass of organic fertilizer; the planting soil is filled with 50-300g / m 3 , Mineral source potassium humate 50-200g / m 3and polyglutamic acid 3-15g / m 3 .

[0065] Among them, sandy loam chooses leisure soil; a certain amount of filling medium is placed around the planting bag, which is conducive to moisture retention and the later peach seedling roots penetrate the non-woven bag to absorb nutrients.

[0066] After the peach seedlings are planted, the focus is on water management. In the rainy season, if the water accumulates in the ridges for more than 3 consecutive days, the ridges should be broken to drain the water. After that, when the weather is sunny and the ground is dry for many consecutive days, the ridges should be re-enclosed to collect water. When the dry season comes, watering or micro-sprinkler irrigation should be installed to replenish water. Because the fertilizer mixed into the planting soil is sufficient, the main method in the later stage is foliar topdressing; the peach trees are pruned in a "Y" shape or a natural open heart shape between the two main trees; other management such as pest control is carried out according to the routine.

[0067] Planting bed trimming: From September to October of the second year, the whole garden is fertilized, compound microbial agents are added, and the soil is plowed into the soil together with the clover; the ground in the center of the planting bed is piled up to 5-10cm lower than the planting bag, and the planting bag and filling medium are buried in the planting bed, and the water retaining stems are removed.

[0068] Specifically, in the planting bed trimming, the steps of fertilizing the whole garden and plowing it into the soil together with the clover include:

[0069] In September and October of the second year, apply 1500-2000kg of organic fertilizer evenly per 667㎡, mix it with 50kg of superphosphate as base fertilizer, and apply 1000-2000g / 667㎡ of compound microbial agents, 1000-5000g / 667㎡ of potassium humate and 50-100g / 667㎡ of polyglutamic acid; deep plowing of the whole garden is carried out, and clover, upland rice green manure and organic fertilizer are applied into the soil.

[0070] After the above steps, Taoyuan was transferred to daily management.

[0071] In this embodiment, the composite microbial agent is prepared by mixing Azotobacter sphaeroides, Bacillus subtilis and yeast in a volume ratio of 1:1:1.

[0072] The present embodiment is further described below in conjunction with experiments:

[0073] Experiment 1: Effects of different disinfection treatments and growth promoter treatments on the growth of peach seedlings under continuous cropping conditions

[0074] The above-mentioned embodiments were used to evaluate the disinfection effect of quicklime + biochar and dazomethan, and the growth-promoting effect of potassium humate, polyglutamic acid, and composite microbial agents. The experiment was conducted in a peach orchard that had been continuously cultivated for 10 years.

[0075] Disinfection before peach seedlings are planted (processed in October 2018):

[0076] Treatment group 1: quicklime 200kg + biochar 100kg / 667㎡; continuous soil disinfection treatment;

[0077] Treatment group 2: quicklime 200kg / 667㎡;

[0078] Treatment group 3: 98% dazomethane 40kg / 667㎡ was used to disinfect the continuous cropping soil;

[0079] Control group 4 (CK): continuous cropping soil was disinfected with clean water;

[0080] In mid-March 2019, peach seedlings were planted in the continuous cropping soil and treated with growth promoters after planting:

[0081] Treatment group 5: potassium humate 4000g / 667㎡;

[0082] Treatment group 6: composite microbial agent (brown nitrogen-fixing bacteria: Bacillus subtilis: yeast = 1:1:1 mass ratio) 1000g / 667㎡;

[0083] Treatment group 7: polyglutamic acid 50 g / 667 m2;

[0084] Each treatment group treated 1㎡, and repeated three times; in mid-to-late June, the number of new shoots, new shoot length, leaf length, leaf width, chlorophyll content and other indicators of the continuous cropping peach seedlings were measured. Table 1:

[0085] Table 1 Effects of different disinfection treatments and growth promoter treatments on the growth of peach seedlings under continuous cropping conditions

[0086]

[0087] As shown in Table 1, the treatments of quicklime + biochar and dazomethane are significantly better than the control in terms of shoot length, leaf length, leaf width and number of new shoots per plant, and are significantly better than other growth-promoting treatments. The chlorophyll content and leaf N content are also better than the control. The leaf color is greener, and there is no leaf yellowing, which is common in the control seedlings. The comprehensive growth indicators are the best two treatment groups. At the same time, the comparison of quicklime + biochar and quicklime alone shows that the biochar treatment has a very obvious effect on the growth of peach seedlings, while the effect of quicklime alone is not obvious compared with the control.

[0088] Under continuous cropping, the peach seedlings were treated with biostimulants such as potassium humate, compound microbial agents, polyglutamic acid, etc., which also had a certain growth-promoting effect on the growth of the peach seedlings. The chlorophyll content in the leaves, the length of the new shoots and the number of new shoots per plant were significantly higher than those of the control, the leaf color was dark green, and there was no obvious difference in leaf length, leaf width and other indicators compared with the control.

[0089] Through comprehensive analysis of this experiment, it was concluded that quicklime + biochar and dazomethane disinfection treatment had a better effect on overcoming the obstacles of continuous cropping of peach seedlings. At the same time, the comprehensive treatment of disinfectants in the early stage and biological stimulation such as potassium humate, composite microorganisms, and polyglutamic acid in the later stage had a good effect on promoting the growth of peach seedlings in continuous cropping soil, promoting the differentiation of flower buds of adult fruit trees, and improving quality.

[0090] Experiment 2: Effects of different continuous cropping treatments on the growth of peach seedlings in the same year of planting

[0091] This embodiment:

[0092] (1) Orchard cleaning and disinfection: The previous crop was an old peach orchard with more than 15 years of continuous cropping. In September 2019, the old peach trees to be replaced were dug out one by one with an excavator, and all the excavated branches, stumps, roots, and diseased and damaged branches and fruits were cleared out of the orchard. 200 kg of quicklime + 100 kg of biochar were evenly spread on every 667 m2 of the bed surface, and then the entire orchard was dug up with an excavator to turn out the remaining thick roots in the orchard and pick them up and leave the orchard. The digging depth was 40 cm to complete the disinfection of the orchard soil.

[0093] (2) Construction of water collection trough: According to the width of the replanted bed of 4m, a 10cm high water retaining ridge is built around the bed, and the inner surface of the bed is leveled to make a horizontal low and shallow water collection trough; drainage slopes and drainage ditches are set on the outside of the water collection trough; the depth of the drainage ditch is 20cm. The constructed low and shallow water collection trough is used to collect natural precipitation, wash away harmful substances such as self-toxic substances produced by allelopathic factors in the soil of the bed, and rainwater penetrates into the drainage ditch through the drainage slope.

[0094] (3) Laying the planting platform: According to the planting row spacing (4m*3m) of the newly planted peach orchard, determine the planting site by staking out, spread 60g of 98% dazomethane within a diameter of 1.0m with the planting site as the center, turn it into the soil, and cover it with a fully biodegradable mulch film with a degradation cycle of 9 months. Prepare the filling medium (hereinafter referred to as the filling medium) by mixing fully decomposed organic fertilizer or commercial organic fertilizer, rice husk, and leisure soil (non-continuous cropping soil) in a ratio of 1:1:1. Lay a 15cm thick filling medium on the film with the planting site as the center (the horizontal height exceeds the water retaining ridge around the ridge by 5-10cm), the filling medium has a covering diameter of 0.6m, and mix in 0.25kg of balanced slow-release fertilizer and 0.5kg of calcium magnesium phosphate fertilizer.

[0095] (4) Peach seedling planting: Use non-woven bags for root control cultivation; a. Selection of root control non-woven bags: According to the planting density, use a non-woven bag with a diameter of 40 cm, a bag height of 40 cm, and a non-woven bag layer density of 80 g / m2; b. Planting soil configuration: 2 / 3 sandy loam (requires leisure soil, not continuous cropping soil), 1 / 6 peat, 1 / 6 decomposed sheep manure, and 100 g / m2 of composite microbial agent (brown nitrogen-fixing bacteria: Bacillus subtilis: yeast = 1:1:1 ratio)3 , mineral source potassium humate 100g / m 3 , polyglutamic acid 5g / m 3 , mix the above materials evenly and put them into planting bags; c. Planting peach seedlings: put the planting bag filled with planting soil on the planting table, place it in the center, select strong seedlings, plant peach seedlings in the center of the planting bag in early March of the second year, and put a certain amount of filling medium around the planting bag. Use 0.1m of filling medium for each plant. 3 .

[0096] (5) Planting green manure: After cleaning and disinfecting the garden, apply 1500kg of organic fertilizer per 667㎡ in the ridge, mix with 25kg of superphosphate as base fertilizer, and plough shallowly and harrow evenly. Sow white clover from mid-to-late September to mid-October, with a seed rate of 0.5kg / 667㎡. Sow seeds in 1500 times ammonium molybdate solution for 12 hours before sowing, then mix 10kg of calcium magnesium phosphate fertilizer with fine soil and sow. Generally, apply 5kg / 667㎡ of high-nitrogen compound fertilizer 15 days after emergence to promote strong seedlings. At the end of March of the second year, check the emergence of clover in the whole garden, and sow dry rice varieties such as Hanyou 73 in plots with poor emergence. Before sowing dry rice, shallow tillage and weeding should be carried out on low-lying waterlogged plots and plots with poor clover growth. The dry grain seeds should be soaked in clean water for 12 hours, and then soaked and disinfected in 300 times strong chlorine solution for 12 hours. The disinfected seeds should be washed with clean water, and then soaked for 24 hours after disinfection. After the seeds turn white, they should be manually sown in the cleared vacant land. Based on the actual reseeding area, the seed rate is 5kg / 667㎡. Mow and return the soil in early July, and leave 5-10cm stumps after mowing to promote the second crop of seedlings. While making full use of the rainy characteristics of the south to wash the continuous crop soil to suppress bacteria and reduce toxins, the soil is fertilized through green manure.

[0097] (6) Daily management of peach orchards: The focus is on water management. In the rainy season, if the ridges are flooded for more than 3 consecutive days, the ridges should be broken to drain the water. After that, when the weather is sunny and the ground is dry for several consecutive days, the ridges should be rebuilt to collect water. When the dry season comes, micro-sprinkler irrigation is installed to replenish water. Because the fertilizer mixed into the planting soil is sufficient, the main method in the later stage is foliar topdressing. Peach trees are pruned according to their natural open-heart shape.

[0098] (7) Switch to routine management. In October of the second year, apply 1500kg of organic fertilizer evenly per 667㎡, mix with 50kg of superphosphate as base fertilizer, add 1000g / 667㎡ of compound microbial agent (brown nitrogen-fixing bacteria: Bacillus subtilis: yeast = 1:1:1 ratio), 4000g / 667㎡ of potassium humate, and 50g / 667㎡ of polyglutamic acid and mix well with organic fertilizer and apply. First, mow the high-growing dry rice twice, then deep plow the whole garden, and apply green manure such as clover and organic fertilizer into the soil. Re-level the ridges, pile the ground in the center of the ridge to 5-10cm lower than the planting bag, bury the planting bag and filling medium in the ridge, and slightly lower the two sides of the ridge. No water retaining ridges are set, and the drainage ditch is cleaned. After that, the peach orchard switches to normal management. Because the planting bags used are thin and easy for roots to penetrate, and the bottom is padded with biodegradable film, no treatment is required and it will not affect the subsequent growth of the peach trees.

[0099] Control group: Compared with the present embodiment, the steps of building a water collection trough and laying a planting table were deleted, and the rest were the same as the present embodiment.

[0100] Ten plants were surveyed in each treatment group, and the growth of peach seedlings was investigated in late November of the second year;

[0101] Table 2 Effects of different continuous cropping treatments on the growth of peach seedlings in the year of planting

[0102]

[0103] The test investigation shows that the cultivation method of the embodiment of the present invention washes the soil, which significantly promotes the one-year-old peach seedlings to have a thick tree diameter, a large crown, vigorous new shoot growth, large and dark green leaves, and fast tree formation, which is basically not affected by the continuous cropping soil. On the contrary, through the control group, it can be seen that the continuous cropping soil is not cleaned, and the growth of peach seedlings directly planted in the continuous cropping soil is significantly suppressed, the growth is weak, and a high seedling mortality rate occurs, which is greatly affected by continuous cropping cultivation. This shows that the treatment of the present invention is better in overcoming the continuous cropping obstacles in old peach orchards.

[0104] Experiment 3: Local test:

[0105] The local area (Jinhua, Zhejiang) has an annual rainfall of about 1400 mm. Through the above-mentioned water collection treatment, more than 80% of the precipitation can infiltrate out from under the bed through the collection trough, which is equivalent to a very good soil leaching process, and has a good cleansing effect on the allelopathic substances (toxic substances) in the soil; in November of the second year after the treatment, bare-root peach seedlings were planted in the old peach orchard for continuous cropping. Observations in the spring of the third year showed that the peach seedlings grew well, and no obvious symptoms of continuous cropping such as leaf yellowing appeared.

[0106] The present invention is not limited to the above-mentioned optional implementation modes. Anyone can derive other various forms of products under the inspiration of the present invention. However, no matter what changes are made in the shape or structure, all technical solutions that fall within the scope defined by the claims of the present invention fall within the protection scope of the present invention.

Claims

1. A method for replanting peach trees in old peach orchards in rainy areas, characterized in that: The following steps are involved: Orchard cleaning and disinfection: From August to October of the same year after the peaches in the old peach orchard are picked, the old peach trees to be replaced are dug out and the old peach orchard is cleaned out; the soil in the orchard is disinfected; Build a water collection trough: The bed used to plant new peach trees is raised and surrounded by water retaining stalks to form a water collection trough; a drainage slope is set on the outside of the water collection trough; Laying a planting platform: determining a planting site for a new peach tree in the water collection tank, applying pesticides on the planting site and covering it with a fully biodegradable mulch film; laying a filling medium on the fully biodegradable mulch film to form a planting platform, the height of the planting platform being higher than the water retaining stem of the water collection tank; the filling medium includes leisure soil and organic fertilizer; Planting green manure: Fertilize and sow white clover from mid-to-late September to mid-October of the same year; Planting peach seedlings: Place a planting bag filled with planting soil and through which the roots of peach seedlings can penetrate on a planting platform, plant peach seedlings in the planting bag from late November of the current year to early March of the following year, and fill the planting bag with medium; the planting soil is added with a composite microbial agent; Planting bed repair: In September and October of the second year, mix the compound microbial agent with organic fertilizer and apply it to the whole garden, and plow it into the soil together with the clover; pile the ground in the center of the planting bed to 5-10cm lower than the planting bag, and bury the planting bag and filling medium in the planting bed, and remove the water retaining stem; In the process of disinfecting the orchard soil, 200-400kg of quicklime and 100-200kg of biochar are evenly spread on every 667㎡ of the bed surface, and the whole garden is dug once, with a digging depth of 40-80cm to complete the disinfection of the orchard soil; A drainage ditch is provided on the outside of the water collection tank, and the water in the water collection tank infiltrates into the drainage ditch through the drainage slope; In the process of building the water collection trough, the width of the bed used to plant new peach trees is 4-8m, the height of the water retaining ridge is 5-10cm; the depth of the drainage ditch is 20-50cm; When laying the planting platform, spread 50-200g of 98% dazomethane in a range of 1.0-1.5m in diameter with the planting site as the center, turn it into the soil, and cover it with a fully biodegradable mulch film with a degradation period of 6-12 months; A filling medium with a thickness of 10-20 cm is spread on the fully biodegradable mulch with the planting site as the center. The filling medium is made of organic fertilizer, rice husk and leisure soil in a mass ratio of 1:1:1; the filling medium has a covering diameter of 0.6-1.0 m, and is mixed with 0.25-0.5 kg of balanced slow-release fertilizer and 0.5-1.0 kg of calcium magnesium phosphate fertilizer.

2. The method for replanting peach trees in an old peach orchard in a rainy area according to claim 1, wherein: During the planting process of peach seedlings, the surrounding area of ​​the planting bag should be 0.1-0.2m 3 / Fill the medium around the plants; The planting bag is a non-woven bag with a bag diameter of 40-60 cm, a bag height of 40-50 cm and a layer density of 50-100 g / ㎡; The planting soil comprises: 16-18 parts by mass of sandy loam, 3-4 parts by mass of peat and 3-4 parts by mass of organic fertilizer; the planting soil is filled with 50-300g / m 3 , Mineral source potassium humate 50-200g / m 3 and polyglutamic acid 3-15g / m 3 .

3. The method for replanting peach trees in old peach orchards in rainy areas according to claim 1, characterized in that: In the process of planting green manure, After cleaning and disinfecting the garden, apply 1500-2000kg of organic fertilizer per 667㎡ in the bed, and mix in 25kg of superphosphate as base fertilizer; Sow white clover from mid-to-late September to mid-October of the same year, with a seed rate of 0.5-0.75kg / 667㎡; soak the seeds in 1500 times ammonium molybdate solution for 12 hours before sowing, then mix 5-10kg of calcium magnesium phosphate fertilizer with fine soil and sow; Apply high-nitrogen compound fertilizer 5-10kg / 667㎡ 15 days after germination to promote strong seedlings; At the end of March to the beginning of April in the second year, re-sow upland rice in plots with poor germination; before sowing upland rice, soak the seeds in clean water for 12-24 hours, then soak and disinfect them in 300 times strong chlorine solution or 4000 times 70% 402 emulsifiable concentrate for 12-24 hours, wash the disinfected seeds with clean water, soak them again for 24 hours after disinfection, and sow them in the cleared vacant land at a seed rate of 5-6kg / 667㎡ after the seeds turn white; The upland rice seeds should be mowed and returned to the soil half a month before maturity, leaving 5-10cm stumps after mowing.

4. The method for replanting peach trees in old peach orchards in rainy areas according to claim 3, characterized in that: In the planting bed preparation, the steps to fertilize the whole garden and till it into the soil with the clover include: In September and October of the second year, apply 1500-2000kg of organic fertilizer evenly per 667㎡, mix it with 50kg of superphosphate as base fertilizer, and apply 1000-2000g / 667㎡ of compound microbial agents, 1000-5000g / 667㎡ of potassium humate and 50-100g / 667㎡ of polyglutamic acid; deep plowing of the whole garden is carried out, and clover, upland rice green manure and organic fertilizer are applied into the soil.

5. The method for replanting peach trees in old peach orchards in rainy areas according to claim 1, characterized in that: The composite microbial inoculant is prepared from round brown nitrogen-fixing bacteria, Bacillus subtilis and yeast in a volume ratio of 1:1:1.