By using automatic control methods, the loading and unloading process is executed separately or in combination using two pipelines, which solves the problem of inaccurate operation during the transition cycle of the fuel loading and unloading system of high-temperature gas-cooled reactors, and improves operating efficiency and stability.
Patent Information
- Application Number
- CN202310326907.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-30
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2043-03-30
AI Technical Summary
The existing control method for the transition cycle phase of the fuel loading and unloading system in high-temperature gas-cooled reactors relies on manual operation, which leads to inaccurate operation and affects the system's operating efficiency.
An automatic control method is adopted, which uses two pipelines to execute the processes of loading fuel balls, unloading graphite balls, and circulating graphite balls separately or in combination. Large and small cycles are set, and the equipment is automatically controlled to start and stop according to the number set by the operator to ensure that the number of balls in each cycle meets the requirements.
It improved the operating efficiency of the fuel loading and unloading system, reduced the operator's workload and operating errors, and achieved stable operation of the high-temperature gas-cooled reactor.
Smart Images

Figure CN116230267B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of high-temperature gas-cooled reactor technology, specifically relating to a process control method and apparatus for the transition cycle stage of a high-temperature gas-cooled reactor. Background Technology
[0002] In high-temperature gas-cooled reactors, the fuel loading and unloading system performs the functions of loading and unloading components, which directly affects the continuous and reliable operation of the high-temperature gas-cooled reactor. It is an important and complex system in high-temperature reactors.
[0003] The initial core setup process for a high-temperature gas-cooled reactor (HTGR) involves a gradual transition from a core composed of a mixture of fuel spheres and graphite spheres to a core consisting solely of fuel spheres. During this transition, the proportion of fuel spheres gradually increases. Specifically, in the initial transition phase, fuel spheres are loaded, and some of the graphite spheres discharged from the core are removed, while the remainder are returned to the core. In the later transition phase, fuel spheres are loaded, and all graphite spheres discharged from the core are removed.
[0004] Currently, the control method for the transition cycle of the fuel loading and unloading system is manual control by the operator. This can lead to inaccurate operation, resulting in deviations from actual operation, affecting the normal operation of the fuel loading and unloading system, and causing low operating efficiency.
[0005] To address this, the present invention proposes a process control method and apparatus for the transition cycle stage of a high-temperature gas-cooled reactor, in order to achieve automatic control and improve the operating efficiency of the fuel loading and unloading system. Summary of the Invention
[0006] The present invention aims to solve at least one of the technical problems existing in the prior art, and provides a method and apparatus for process control during the transition cycle stage of a high-temperature gas-cooled reactor.
[0007] In one aspect, the present invention provides a process control method for the transition cycle stage of a high-temperature gas-cooled reactor, applied to a fuel loading and unloading system of a high-temperature gas-cooled reactor, the system comprising a first set of pipelines and a second set of pipelines connected to the reactor core; the method comprising:
[0008] When the components removed from the reactor core are graphite balls, and it is required that at least some of the graphite balls be recycled back to the reactor core, the first set of pipelines simultaneously performs the process of loading fuel balls and unloading graphite balls, while the second set of pipelines performs the process of recycling graphite balls.
[0009] When the components removed from the reactor core are fuel balls or graphite balls, and it is required that at least some of the graphite balls be recycled back to the reactor core, the first set of pipelines separately performs the processes of unloading graphite balls, recycling fuel balls, and loading fuel balls, while the second set of pipelines performs the processes of recycling graphite balls and fuel balls.
[0010] When the components removed from the reactor core are fuel balls or graphite balls, and all graphite balls are required to be removed, the first and second sets of pipelines simultaneously perform the graphite ball removal and fuel ball circulation processes, while the first set of pipelines performs the fuel ball loading process alone.
[0011] Optionally, the first set of pipelines simultaneously performs the processes of loading fuel balls and unloading graphite balls, while the second set of pipelines performs a process of circulating graphite balls, including:
[0012] Trigger the first start command, and simultaneously start the loading motor and unloading motor of the first column pipeline and the unloading motor of the second column pipeline, so that fuel balls are loaded and graphite balls are unloaded through the first column pipeline at the same time, and graphite balls are circulated through the second column pipeline.
[0013] When the number of fuel balls loaded into the first pipeline, the number of graphite balls unloaded, and the number of graphite ball cycles in the second pipeline all reach preset values, the loading motor and unloading motor of the first pipeline and the unloading motor of the second pipeline are stopped respectively to complete a first small cycle process.
[0014] Re-trigger the first startup command to enter the next first mini-cycle process;
[0015] When the actual number of the first small cycle exceeds the preset number of the first small cycle, the process is stopped and the actual number of the first small cycle is reset to complete the first large cycle process.
[0016] Optionally, the components unloaded from the reactor core are fuel balls or graphite balls, and when a fuel ball is encountered during the unloading of the graphite ball, the fuel ball is recycled back to the reactor core.
[0017] Optionally, the first set of pipelines separately performs the processes of unloading graphite balls, circulating fuel balls, and loading fuel balls, while the second set of pipelines performs the process of circulating graphite balls and fuel balls, including:
[0018] Trigger the second start command to start the unloading motors of the first column pipeline and the second column pipeline, so as to unload the graphite balls through the first column pipeline and circulate the graphite balls through the second column pipeline;
[0019] When the number of graphite balls discharged from the first column of pipelines reaches a preset value, the unloading motor of the first column of pipelines is stopped, and the loading motor of the first column of pipelines is started at the same time to perform the process of loading fuel balls.
[0020] When the number of fuel balls loaded in the first pipeline reaches a preset value, the loading motor is stopped. When the total number of graphite balls and fuel balls circulated within a second small cycle reaches a preset value, the unloading motor in the second pipeline is stopped to complete a second small cycle.
[0021] Re-trigger the second startup command to enter the next second sub-cycle process;
[0022] When the actual number of the second smallest cycle exceeds the preset number of the second smallest cycle, the process is stopped and the actual number of the second smallest cycle is reset to complete the second largest cycle process.
[0023] Optionally, the first and second sets of pipelines simultaneously perform the graphite ball unloading and fuel ball circulation processes, while the first set of pipelines separately performs the fuel ball loading process, including:
[0024] Trigger the third start command to start the unloading motors of the first column pipeline and the second column pipeline, so as to unload graphite balls through the first column pipeline and the second column pipeline respectively;
[0025] When the total number of graphite balls discharged from the first and second pipelines reaches a preset value, the unloading motor of the first pipeline is stopped and the loading motor of the first pipeline is started to perform the fuel ball loading process.
[0026] When the number of fuel balls loaded into the first pipeline reaches a preset value, the loading motor is stopped to complete a third small cycle process;
[0027] The unloading motor of the first pipeline is started according to the fourth start command to enter the next third small cycle process;
[0028] When the actual number of the third minor cycle exceeds the preset number of the third minor cycle, the process is stopped and the actual number of the third minor cycle is reset to complete the third major cycle process.
[0029] Optionally, the first and second sets of pipelines simultaneously perform the graphite ball unloading process, while the first set of pipelines separately performs the fuel ball loading process, further comprising:
[0030] When the next third small cycle number is the preset third small cycle number, the graphite balls are discharged through the first column of pipelines and the second column of pipelines;
[0031] When the total number of graphite balls discharged from the first and second pipelines reaches a preset value, the unloading motor of the first pipeline is stopped, the loading motor is started to perform the fuel ball loading process, and the unloading motor of the second pipeline is stopped.
[0032] When the number of fuel balls loaded into the first pipeline reaches a preset value, the loading motor is stopped.
[0033] In another aspect, the present invention provides a process control device for the transition cycle stage of a high-temperature gas-cooled reactor, applied to a fuel loading and unloading system of a high-temperature gas-cooled reactor, the system comprising a first set of pipelines and a second set of pipelines connected to the reactor core; the device comprises:
[0034] The first execution unit is used to simultaneously perform the loading of fuel balls and the unloading of graphite balls when the components unloaded from the reactor core are graphite balls and it is required that at least some of the graphite balls be recycled back to the reactor core. The first set of pipelines performs the process of loading fuel balls and unloading graphite balls, and the second set of pipelines performs the process of recycling graphite balls.
[0035] The second execution unit is used when the components unloaded from the reactor core are fuel balls or graphite balls, and it is required that at least some of the graphite balls be recycled back to the reactor core. The first set of pipelines separately performs the processes of unloading graphite balls, recycling fuel balls, and loading fuel balls, while the second set of pipelines performs the processes of recycling graphite balls and fuel balls.
[0036] The third execution unit is used when the components unloaded from the reactor core are fuel balls or graphite balls, and when all graphite balls are required to be unloaded, the first and second sets of pipelines simultaneously perform the graphite ball unloading and fuel ball circulation processes, while the first set of pipelines performs the fuel ball loading process alone.
[0037] Optionally, the first execution unit includes:
[0038] The first starting module is used to simultaneously start the loading motor and unloading motor of the first column pipeline and the unloading motor of the second column pipeline according to the first starting command, so as to simultaneously load fuel balls and unload graphite balls through the first column pipeline and circulate graphite balls through the second column pipeline.
[0039] The first stop module is used to stop the loading motor and unloading motor of the first pipeline and the unloading motor of the second pipeline respectively when the number of fuel balls loaded, the number of graphite balls unloaded and the number of graphite ball cycles in the first pipeline reach preset values, so as to complete a first small cycle process.
[0040] The first trigger module is used to re-trigger the first start command to enter the next first sub-cycle process;
[0041] The first reset module is used to stop the process and reset the actual number of the first small cycles when the number of the first small cycles actually running is greater than the preset number of the first small cycles, so as to complete the first large cycle process.
[0042] Optionally, the second execution unit includes:
[0043] The second start module is used to start the unloading motor of the first column pipeline and the unloading motor of the second column pipeline according to the second start command, so as to unload the graphite balls through the first column pipeline and circulate the graphite balls through the second column pipeline.
[0044] The second stop module is used to stop the unloading motor of the first column of pipeline when the number of graphite balls unloaded in the first column of pipeline reaches a preset value, and at the same time start the loading motor of the first column of pipeline to perform the loading of fuel balls.
[0045] The second stop module is also used to stop the loading motor when the number of fuel balls loaded in the first column of pipelines reaches a preset value, and to stop the unloading motor of the second column of pipelines when the total number of graphite balls and fuel balls circulated in a second small cycle process reaches a preset value, so as to complete a second small cycle process.
[0046] The second trigger module is used to re-trigger the second start command to enter the next second sub-cycle process;
[0047] The second reset module is used to stop the process and reset the actual number of the second small cycles when the number of the second small cycles actually running is greater than the preset number of the second small cycles, so as to complete the second large cycle process.
[0048] Optionally, the third execution unit includes:
[0049] The third starting module is used to start the unloading motor of the first column pipeline and the unloading motor of the second column pipeline according to the third starting command, so as to unload the graphite balls through the first column pipeline and the second column pipeline respectively.
[0050] The third stop module is used to stop the unloading motor of the first column of pipelines and start the loading motor of the column of pipelines when the total number of graphite balls unloaded in the first column of pipelines and the second column of pipelines reaches a preset value, so as to perform the process of loading fuel balls.
[0051] The third stop module is also used to stop the charging motor when the number of fuel balls loaded in the first pipeline reaches a preset value, so as to complete a third small cycle process;
[0052] The third trigger module is used to trigger the fourth start command to start the unloading motor of the first pipeline to enter the next third small cycle process;
[0053] The third reset module is used to stop the process and reset the actual number of the third small cycles when the number of the third small cycles actually running is greater than the preset number of the third small cycles, so as to complete the third large cycle process.
[0054] This invention proposes a process control method and apparatus for the transition cycle stage of a high-temperature gas-cooled reactor. The invention sets up a large cycle and a small cycle in the transition cycle stage. Each small cycle includes three processes: unloading graphite balls, circulating graphite balls / fuel balls, and loading fuel balls. Based on the number of graphite balls unloaded, the number of graphite balls / fuel balls circulated, and the number of fuel balls loaded in each small cycle set by the operator, the invention automatically controls the start-up, shutdown, and operation mode of the equipment. This ensures that the number of balls loaded / unloaded / circulated in each small cycle meets the operator's set requirements, improving operating efficiency and reducing the operator's workload. Attached Figure Description
[0055] Figure 1 This is a process flow diagram of a fuel loading and unloading system in the transition cycle stage according to an embodiment of the present invention;
[0056] Figure 2 This is a flowchart of a process control method for the transition cycle stage of a high-temperature gas-cooled reactor according to another embodiment of the present invention.
[0057] Figure 3 This is a logic diagram of transition loop stage 1 according to another embodiment of the present invention;
[0058] Figure 4 This is a logic diagram of transition loop stage 2 according to another embodiment of the present invention;
[0059] Figure 5 This is a logic diagram of transition loop stage 3 according to another embodiment of the present invention;
[0060] Figure 6 This is a timing diagram of the TP module according to another embodiment of the present invention;
[0061] Figure 7 This is a timing diagram of the TON module according to another embodiment of the present invention;
[0062] Figure 8 This is a schematic diagram of the process control device for the transition cycle stage of a high-temperature gas-cooled reactor according to another embodiment of the present invention. Detailed Implementation
[0063] To enable those skilled in the art to better understand the technical solutions of the present invention, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. All other embodiments obtained by those skilled in the art based on the described embodiments of the present invention without creative effort are within the protection scope of the present invention.
[0064] Unless otherwise specifically stated, the technical or scientific terms used in this invention should be understood in their ordinary sense by one of ordinary skill in the art to which this invention pertains. The terms "comprising" or "including," as used in this invention, do not limit the shapes, numbers, steps, actions, operations, and / or groups thereof mentioned, nor do they exclude the appearance or inclusion of one or more other different shapes, numbers, steps, actions, operations, and / or groups thereof. Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number and order of the indicated technical features.
[0065] It should be noted that the fuel loading and unloading system during the transition cycle of the high-temperature gas-cooled reactor includes two rows of pipelines connected to each reactor core. Please refer to [link / reference needed] for details. Figure 1 , Figure 1 Only one column of pipes is shown in the image; the other column has the exact same configuration. The following section will illustrate this. Figure 1 The process flow of the loading and unloading system is explained by taking one of the columns as an example.
[0066] Specifically, such as Figure 1 As shown, the reactor core 110 is connected to a first set of pipelines, which includes a vertical pipe 120, a lifting pipe 130, and a discharge pipe 140 and a charging pipe 150 connected to the vertical pipe 120. A first discharge motor 160 is installed on the vertical pipe 120 near the reactor core 110. A flow deflector 170 is installed below the vertical pipe 120. A burnup measurement and positioning device 180 is installed at the connection between the vertical pipe 120 and the discharge pipe 140. A first charging motor 190 is installed on the charging pipe 150. Of course, a second discharge motor, a second charging motor, and a burnup measurement and positioning device are also installed on a second set of pipelines (not shown) connected to the reactor core 110.
[0067] Based on the above structure, the process of unloading graphite balls is as follows: from the core unloading motor to the burnup measurement and positioning device to the unloading pipeline; the process of loading fuel balls is as follows: from the loading motor to the loading pipeline to the flow deflector to the lift pipeline. The process of circulating graphite balls / fuel balls uses the route from the core unloading motor to the burnup measurement and positioning device to the flow deflector to the lift pipeline.
[0068] It should be further clarified that, since all fuel spheres exiting the reactor core need to be recycled back to the core, when only graphite spheres are discharged from the core, the fuel sphere loading process and the graphite sphere unloading process can be performed simultaneously. However, when the core discharges either fuel spheres or graphite spheres, the graphite sphere unloading process and the fuel sphere loading process can only be performed separately. The graphite sphere / fuel sphere recycling process can only be performed independently. The specific control methods and devices for the transition cycle phase of the high-temperature gas-cooled reactor will be given below.
[0069] like Figure 2 As shown, one aspect of the present invention provides a process control method S200 for the transition cycle stage of a high-temperature gas-cooled reactor, comprising steps S210 to S230:
[0070] It should be noted that, in order to reduce the operator's workload and error, and to achieve automatic control functions for different transition stages, this embodiment sets a large cycle and a small cycle for each transition cycle stage. A large cycle includes multiple small cycles. Each small cycle includes three processes: unloading graphite balls, circulating graphite balls / fuel balls, and loading fuel balls. Since each reactor has two identical pipelines that can independently realize loading / unloading / circulation, these three processes may have different combinations, either serial or parallel. After obtaining the statistical counts of unloaded graphite balls, circulating graphite balls, circulating fuel balls, and loaded fuel balls, based on the operator's settings for the number of unloaded graphite balls, circulating graphite balls / fuel balls, and loaded fuel balls in each small cycle, when the loading / unloading / circulation process reaches the set number of balls in each small cycle, the process automatically stops and switches to the next loading / unloading / circulation process. This continues until the total number of loaded / unloaded / circulated balls reaches the set value, at which point the process automatically enters the next small cycle. N small cycles constitute one large cycle.
[0071] S210, Transitional Cycle Stage 1: When the components unloaded from the reactor core are all graphite balls, and it is required that some graphite balls be recycled back to the reactor core, the first set of pipelines is used to simultaneously perform the process of loading fuel balls and unloading graphite balls, and the second set of pipelines is used to perform the process of recycling graphite balls. When the number of unloaded graphite balls, the number of recycled graphite balls, and the number of loaded fuel balls reach the set values within the first small cycle, the next first small cycle is automatically entered.
[0072] Specifically, a first start command is triggered, simultaneously starting the first loading motor and the first unloading motor of the first pipeline and the second unloading motor of the second pipeline, so that fuel balls are loaded and graphite balls are unloaded through the first pipeline, and graphite balls are circulated through the second pipeline; when the number of fuel balls loaded, the number of graphite balls unloaded, and the number of graphite balls circulated in the first pipeline reach preset values, the first loading motor, the first unloading motor, and the second unloading motor are stopped respectively to complete one first small cycle process; the first start command is triggered again to enter the next first small cycle process; when the actual number of first small cycles is greater than the preset number of first small cycles, the process is stopped and the actual number of first small cycles is reset to complete the first large cycle process.
[0073] Furthermore, the control logic for starting each motor is as follows: Figure 3As shown, ZQ is the number of the first small cycle currently being executed in transition cycle phase 1. The initial state is 0. When the operator clicks the process start button START, START is connected to the RESET of CTU01 via OR(16) to reset the CV pin, in case ZQ is not 0 when the last stop. After a 1-second delay via TON101, START triggers the CU pin of CTU01 once, and ZQ is incremented by 1, becoming 1. START is extended into an 11-second pulse via TP100, and then delayed for 10 seconds via TON100 (the 10 seconds here is the automatic interval time of each first small cycle, which can be modified according to requirements, and is not specifically limited) before triggering CX_START. CX_START is a restart instruction after the end of each first small cycle. This instruction will start the first loading motor and the first unloading motor of the first pipeline and the second unloading motor of the second pipeline.
[0074] It should be noted that during the first startup, the operator clicks the start button. During normal operation, after completing the preset number of first small cycles, the first large cycle of transition cycle phase 1 is completed. After the first large cycle is completed, the system automatically resets the number of first small cycles. However, to prevent the system from being manually stopped before the first large cycle is completed, ZQ will not be zero at this time. Therefore, it needs to be reset upon restarting to prevent the system from failing to start and run normally. Thus, the CV pin needs to be reset after the operator clicks the start button.
[0075] Furthermore, the control logic for stopping each motor is as follows: Please refer to [link / reference needed]. Figure 3 When the number of fuel balls loaded into the first pipeline ZR_RLQ1 reaches ZQ (which is 1 at this time) multiplied by the operator-set value ZR_RLQ1_SD for the number of fuel balls loaded into the first pipeline, the first loading motor is stopped via Z1; when the number of graphite balls discharged from the first pipeline XC_SMQ1 reaches ZQ (which is 1 at this time) multiplied by the operator-set value XC_SMQ1_SD for the number of graphite balls discharged from the first pipeline, the first unloading motor of the first pipeline is stopped via C1; when the number of circulating graphite balls XH_SMQ2 in the second pipeline reaches ZQ (which is 1 at this time) multiplied by the operator-set value XH_SMQ2_SD for the number of circulating graphite balls in the second pipeline, the second unloading motor of the second pipeline is stopped via S1.
[0076] Furthermore, the control logic for re-triggering the first start command to enter the next first small cycle process is as follows: Please refer to... Figure 3, when Z1, C1, and S1 are all TRUE, a first minor cycle ends, AND(10) is TRUE, the CU of CTU01 is triggered once via OR(18), ZQ increases by 1 and becomes 2. At this time, the loading of fuel spheres and discharging of graphite spheres in the first row of pipelines, and the circulation of graphite spheres in the second row of pipelines are no longer equal to ZQ multiplied by the operator-set value, and the output of AND(10) immediately becomes FALSE. Therefore, TP100 is required to hold the output of AND(10) for 11 seconds, so that TON100 can achieve a 10-second delay and output the restart command CX_START, to restart the first loading motor and first discharging motor in the first row of pipelines, and the second discharging motor in the second row of pipelines, and start the process of the next first minor cycle.
[0077] Further, the control logic for resetting the actual running number of first minor cycles is as follows: please continue to refer to Figure 3 , when the number of first minor cycles reaches the operator-set number N-1 of first minor cycles, and Z1, C1, and S1 of the (N-1)th first minor cycle are all TRUE, ZQ is still N-1, ZQ<N(9) is still TRUE, and AND(12) will still output TRUE once. At the same time, AND(10) triggers the CU of CTU01 once via OR(18), and ZQ increases by 1 to become N. When the number of first minor cycles reaches the operator-set number N of first minor cycles, and Z1, C1, and S1 of the Nth first minor cycle are all TRUE, ZQ is N at this time, ZQ<N(9) is FALSE, and AND(12) will no longer be triggered to TRUE. At the same time, AND(10) triggers the CU of CTU01 once via OR(18), and ZQ increases by 1 to become N+1. Since the PV of CTU01 is equal to N+1, CTU01.Q is triggered to TRUE at this time, ZQ is reset to 0 via OR(16), and one first major cycle ends.
[0078] S220, Transition Circulation Phase 2: When the elements discharged from the reactor core are fuel spheres or graphite spheres, that is, what is discharged from the reactor core may be fuel spheres or graphite spheres, and it is required that a part of the graphite spheres be circulated back to the reactor core, the first row of pipelines independently performs the processes of discharging graphite spheres, circulating fuel spheres, and loading fuel spheres, during which fuel spheres encountered are circulated back to the core, and the second row of pipelines performs the processes of circulating graphite spheres and circulating fuel spheres.
[0079] Specifically, a second start command is triggered, activating the first unloading motor of the first pipeline and the second unloading motor of the second pipeline to unload graphite balls through the first pipeline and circulate them through the second pipeline. When the number of graphite balls unloaded from the first pipeline reaches a preset value, the first unloading motor is stopped, and simultaneously the first loading motor of the first pipeline is started to load fuel balls. When the number of fuel balls loaded into the first pipeline reaches a preset value, the first loading motor of the first pipeline is stopped, and the graphite ball unloading process is repeated. The second pipeline is used to circulate graphite balls, during which fuel balls are also circulated back to the core. When the total number of graphite balls and fuel balls circulated within a second small cycle reaches a preset value, the second unloading motor is stopped to complete a second small cycle. The second start command is then triggered again to enter the next second small cycle. When the actual number of second small cycles exceeds the preset number, the process is stopped and the actual number of second small cycles is reset to complete a second large cycle.
[0080] It should be noted that the logic of transition loop phase 2 is similar to that of transition loop phase 1; please refer to [link / reference]. Figure 4 The differences lie in the following two points:
[0081] (1) During the first pipeline of transition cycle 1, the loading of fuel balls and the unloading of graphite balls are performed simultaneously. During the first pipeline of transition cycle 2, the unloading of graphite balls is performed first. During this process, the fuel balls encountered will be recycled back to the core. After the unloading process is completed, the loading of fuel balls is performed. Therefore, the restart command CX_START after the end of each second small cycle only starts the first unloading motor of the first pipeline and the second unloading motor of the second pipeline, and does not start the first loading motor of the first pipeline. When the number of unloaded graphite balls XC_SMQ1 of the first pipeline reaches ZQ (which is 1 at this time) multiplied by the operator-set value XC_SMQ1_SD of the number of unloaded graphite balls of the first pipeline, the first unloading motor of the first pipeline is stopped by C1, and the first loading motor of the first pipeline is started at the same time. When the fuel ball ZR_RLQ1 of the first pipeline reaches the number ZQ (which is 1 at this time) multiplied by the fuel ball setting value ZR_RLQ1_SD of the first pipeline set by the operator, the first loading motor of the first pipeline is stopped by Z1, and at the same time AND(10) is triggered to TRUE. After a 10-second delay by TON100, the next second small cycle begins.
[0082] (2) In each second small cycle of the second column of pipeline in transition cycle 1, the number of circulating graphite balls is counted. In each second small cycle of the second column of pipeline in transition cycle 2, the total number of circulating graphite balls and fuel balls is counted. When the total number of circulating balls XH_ZQ2 in the second column of pipeline reaches ZQ multiplied by the operator-set value XH_ZQ2_SD of the total number of circulating balls in the second column of pipeline, the second unloading motor of the second column of pipeline is triggered to stop through S1.
[0083] S230, Transition Cycle Phase 3: When the components unloaded from the reactor core are either fuel balls or graphite balls (either is acceptable), and all graphite balls are required to be unloaded, the first and second pipelines simultaneously perform the graphite ball unloading process. If fuel balls are encountered during this process, they are recycled back to the core. After the sum of graphite balls unloaded by the two pipelines reaches the set value within the third small cycle, the first pipeline is used to perform the fuel ball loading process, while the second pipeline continues to perform the graphite ball unloading process. After the first pipeline completes the fuel ball loading, it performs the graphite ball unloading process again, and this cycle repeats.
[0084] Specifically, a third start command is triggered to start the first unloading motor and the second unloading motor, so as to unload graphite balls through the first and second pipelines respectively; when the total number of graphite balls unloaded from the first and second pipelines reaches a preset value, the first unloading motor of the first pipeline is stopped and the first loading motor is started to perform the fuel ball loading process; when the number of fuel balls loaded in the first pipeline reaches a preset value, the first loading motor is stopped to complete a third small cycle process; according to the fourth start command, the first unloading motor of the first pipeline is started to enter the next third small cycle process; when the actual number of third small cycles is greater than the preset number of third small cycles, the process is stopped and the actual number of third small cycles is reset to complete a third large cycle process.
[0085] It should be noted that when the next third small cycle number is the preset third small cycle number, graphite balls are unloaded through the first and second pipelines; when the total number of graphite balls unloaded through the first and second pipelines reaches the preset value, the first unloading motor is stopped, the first loading motor is started to perform the fuel ball loading process, and the second unloading motor is stopped; when the number of fuel balls loaded into the first pipeline reaches the preset value, the first loading motor is stopped.
[0086] Furthermore, the control logic for starting each motor is as follows: Please refer to... Figure 5ZQ is the current small cycle number, initially 0. When the operator clicks START to start the process, START resets the CV pin via OR(15) connected to CTU01's RESET to prevent ZQ from being non-zero during the last stop. After a 1-second delay via TON101, START triggers the CU pin of CTU01, incrementing ZQ by 1. START directly triggers CX_START, which is a restart instruction after the end of each third small cycle. This instruction starts the first unloading motor of the first pipeline and the second unloading motor of the second pipeline.
[0087] Furthermore, the control logic for stopping each motor is as follows: Please refer to [link / reference needed]. Figure 5 When the number of graphite balls discharged from the first pipeline XC_SMQ1 plus the number of graphite balls discharged from the second pipeline XC_SMQ2 reaches ZQ (which is 1 at this time) multiplied by the operator-set value XC_SMQ_SD for discharging graphite balls from the two pipelines, the first unloading motor of the first pipeline is stopped and the first loading motor of the first pipeline is started via C1; when the number of fuel balls loaded into the first pipeline ZR_RLQ1 reaches ZQ (which is 1 at this time) multiplied by the operator-set value ZR_RLQ1_SD for loading fuel balls into the first pipeline, the first loading motor of the first pipeline is stopped via Z1 and the first unloading motor of the first pipeline is started via Z2 (at this time, S1 is FALSE). At this time, Z1 and C1 are both TRUE, AND (14) is TRUE, and the CU pin of CTU01 is triggered once via OR (17), ZQ is incremented by 1, becoming 2. The process of discharging graphite balls from the first and second pipelines continues.
[0088] Furthermore, please continue to refer to... Figure 5When the number of the third small cycle reaches the operator-set number N, the process of unloading graphite balls from the first and second pipelines in the Nth third small cycle begins. When the number of unloaded graphite balls reaches ZQ (which is N at this time) multiplied by the set value XC_SMQ_SD for unloaded graphite balls in both pipelines, C1 becomes TRUE, the first unloading motor of the first pipeline stops, and the first loading motor of the first pipeline starts. At the same time, S1 becomes TRUE, and the second unloading motor of the second pipeline stops. When the number of fuel balls loaded into the first pipeline ZR_RLQ1 reaches ZQ (which is N at this time) multiplied by the set value ZR_RLQ1_SD for loaded fuel balls in the first pipeline, Z1 becomes TRUE, and the first loading motor of the first pipeline stops. Since S1 is TRUE at this time, Z2 will not be triggered to TRUE, meaning the first unloading motor of the first pipeline will not be started again. Z1 and C1 are both TRUE. ZQ is incremented by 1, becoming N+1. Since the PV of CTU01 is equal to N+1, CTU01.Q is triggered as TRUE at this time. ZQ is reset to 0 by OR(15), and the third major cycle ends.
[0089] It should be noted that the function block TP used in the above control logic can change the pulse width. When the input pin IN is triggered to 1, the output pin Q will output a pulse with a width of PT time. The timing diagram of this module is as follows. Figure 6 As shown.
[0090] It should be further noted that the function block TON used in the above control logic can delay the output pulse. When the input pin IN is triggered to 1, the output pin Q will output 1 after PT time. The width of the Q output 1 is the width of the input IN pulse minus PT time. When the width of the input IN pulse is less than PT time, Q will not output 1, but will remain 0. The timing diagram of this module is as follows. Figure 7 As shown.
[0091] It should be noted that the function block CTU used in the above control logic can count the number of rising edges of the switching quantity. The switching quantity is connected to the CU pin, and the CV pin is for counting the number of analog outputs. When RESET is triggered to 1, the count is cleared to 0. When CV reaches the PV value, Q outputs a TRUE level signal.
[0092] like Figure 8As shown, in another aspect of the present invention, a process control device 300 for the transition cycle stage of a high-temperature gas-cooled reactor is also proposed, comprising: a first execution unit 310, a second execution unit 320, and a third execution unit 330; wherein, the first execution unit 310 is used to simultaneously execute the loading of fuel balls and the unloading of graphite balls in a first set of pipelines when the components unloaded from the reactor core are graphite balls and a portion of the graphite balls are required to be recycled back to the reactor core, and the second set of pipelines executes the recycling process of the graphite balls; the second execution unit 320 is used for When the components unloaded from the reactor core are fuel balls or graphite balls, and it is required that some graphite balls be recycled back to the reactor core, the first set of pipelines separately performs the processes of unloading graphite balls, recycling fuel balls, and loading fuel balls, while the second set of pipelines performs the processes of recycling graphite balls and fuel balls; the third execution unit 330 is used when the components unloaded from the reactor core are fuel balls or graphite balls, and it is required that all graphite balls be unloaded, the first set of pipelines and the second set of pipelines simultaneously perform the graphite ball unloading process, while the first set of pipelines separately performs the process of loading fuel balls.
[0093] It should be noted that in this embodiment, the first execution unit corresponds to the control flow of transition loop stage 1, the second execution unit corresponds to the control flow of transition loop stage 2, and the third execution unit corresponds to the control flow of transition loop stage 3.
[0094] Specifically, the first execution unit includes a first start module, a first stop module, a first trigger module, and a first reset module. The first start module is used to simultaneously start the first loading motor, the first unloading motor, and the second unloading motor according to a first start command, so as to simultaneously load fuel balls and unload graphite balls through the first set of pipelines, and circulate graphite balls through the second set of pipelines. The first stop module is used to stop the first loading motor, the first unloading motor, and the second unloading motor respectively when the number of fuel balls loaded into the first set of pipelines, the number of graphite balls unloaded, and the number of graphite balls circulated in the second set of pipelines all reach preset values, thereby completing one first small cycle process. The first trigger module is used to re-trigger the first start command to enter the next first small cycle process. The first reset module is used to stop the process and reset the actual number of first small cycles when the actual number of first small cycles exceeds the preset number of first small cycles, thereby completing the first large cycle process.
[0095] Specifically, the control logic of the first startup module is as follows, please refer to... Figure 3ZQ is the number of the first small cycle currently being executed in transition cycle phase 1. The initial state is 0. When the operator clicks the process start button START, START is connected to the RESET of CTU01 via OR(16) to reset the CV pin, in case ZQ is not 0 when the last stop. After a 1-second delay via TON101, START triggers the CU pin of CTU01 once, and ZQ is incremented by 1, becoming 1. START is extended into an 11-second pulse via TP100, and then delayed for 10 seconds via TON100 (the 10 seconds here is the automatic interval time of each first small cycle, which can be modified according to requirements) before triggering CX_START. CX_START is a restart instruction after the end of each first small cycle. This instruction will start the first loading motor and the first unloading motor of the first pipeline and the second unloading motor of the second pipeline.
[0096] Furthermore, the control logic of the first stop module is as follows: Please refer to [link / reference needed]. Figure 3 When the number of fuel balls loaded into the first pipeline ZR_RLQ1 reaches ZQ (which is 1 at this time) multiplied by the operator-set value ZR_RLQ1_SD for the number of fuel balls loaded into the first pipeline, the first loading motor is stopped via Z1; when the number of graphite balls discharged from the first pipeline XC_SMQ1 reaches ZQ (which is 1 at this time) multiplied by the operator-set value XC_SMQ1_SD for the number of graphite balls discharged from the first pipeline, the first unloading motor of the first pipeline is stopped via C1; when the number of circulating graphite balls XH_SMQ2 in the second pipeline reaches ZQ (which is 1 at this time) multiplied by the operator-set value XH_SMQ2_SD for the number of circulating graphite balls in the second pipeline, the second unloading motor of the second pipeline is stopped via S1.
[0097] Furthermore, the control logic of the first trigger module is as follows: Please refer to [link / reference needed]. Figure 3 When Z1, C1, and S1 are all TRUE, a first small cycle ends, AND(10) becomes TRUE, and OR(18) triggers the CU of CTU01 once, ZQ is incremented by 1, becoming 2. At this time, the fuel balls loaded in the first pipeline, the graphite balls unloaded, and the circulating graphite balls in the second pipeline are no longer equal to ZQ multiplied by the operator setting value, and the output of AND(10) immediately becomes FALSE. Therefore, TP100 needs to be used to maintain the output of AND(10) for 11 seconds so that a delay of 10 seconds can be achieved through TON100, and a restart command CX_START is output to restart the first loading motor, the first unloading motor in the first pipeline, and the second unloading motor in the second pipeline, starting the next first small cycle.
[0098] Furthermore, the control logic of the first reset module is as follows: Please refer to [link / reference needed]. Figure 3, when the number of first minor cycles reaches the operator-set first minor cycle number N-1, and Z1, C1, S1 of the (N-1)th first minor cycle are all TRUE, at this time ZQ is still N-1, ZQ<N(9) is still TRUE, and AND(12) will still output TRUE once. At the same time, AND(10) triggers the CU of CTU01 once through OR(18), ZQ is incremented by 1 and becomes N. When the number of first minor cycles reaches the operator-set first minor cycle number N, and Z1, C1, S1 of the Nth first minor cycle are all TRUE, at this time ZQ is N, ZQ<N(9) is FALSE, and AND(12) will no longer be triggered to TRUE. At the same time, AND(10) triggers the CU of CTU01 once through OR(18), ZQ is incremented by 1 and becomes N+1. Since the PV of CTU01 is equal to N+1, CTU01.Q is triggered to TRUE at this time, ZQ is reset to 0 through OR(16), and one first major cycle ends.
[0099] Further, the second execution unit includes a second start module, a second stop module, a second trigger module, and a second reset module; wherein the second start module is configured to start the first discharge motor and the second discharge motor according to a second start instruction, so as to discharge graphite spheres through the first row of pipelines and circulate graphite spheres through the second row of pipelines; the second stop module is configured to stop the first discharge motor when the number of discharged graphite spheres in the first row of pipelines reaches a preset value, and simultaneously start the first charging motor to perform the fuel sphere loading process; the second stop module is further configured to stop the first charging motor when the number of loaded fuel spheres in the first row of pipelines reaches a preset value, and stop the second discharge motor when the total number of cycles of graphite spheres and fuel spheres in one second minor cycle process reaches a preset value, so as to complete one second minor cycle process; the second trigger module is configured to re-trigger the second start instruction to enter the next second minor cycle process; the second reset module is configured to stop the process and reset the number of actually operated second minor cycles when the number of actually operated second minor cycles is greater than the preset number of second minor cycles, so as to complete the second major cycle process.
[0100] It should be noted that the logic of the transition circulation phase 2 is similar to the logic of the transition circulation phase 1, please refer to Figure 4 , the differences between its second execution unit and the first execution unit lie in the following two points:
[0101] (1) During the first pipeline of transition cycle 1, the loading of fuel balls and the unloading of graphite balls are performed simultaneously. During the first pipeline of transition cycle 2, the unloading of graphite balls is performed first. During this process, the fuel balls encountered will be recycled back to the core. After the unloading process is completed, the loading of fuel balls is performed. Therefore, the restart command CX_START after the end of each second small cycle only starts the first unloading motor of the first pipeline and the second unloading motor of the second pipeline, and does not start the first loading motor of the first pipeline. When the number of unloaded graphite balls XC_SMQ1 of the first pipeline reaches ZQ (which is 1 at this time) multiplied by the operator-set value XC_SMQ1_SD of the number of unloaded graphite balls of the first pipeline, the first unloading motor of the first pipeline is stopped by C1, and the first loading motor of the first pipeline is started at the same time. When the fuel ball ZR_RLQ1 of the first pipeline reaches the number ZQ (which is 1 at this time) multiplied by the fuel ball setting value ZR_RLQ1_SD of the first pipeline set by the operator, the first loading motor of the first pipeline is stopped by Z1, and at the same time AND(10) is triggered to TRUE. After a 10-second delay by TON100, the next second small cycle begins.
[0102] (2) In each second small cycle of the second column of pipeline in transition cycle 1, the number of circulating graphite balls is counted. In each second small cycle of the second column of pipeline in transition cycle 2, the total number of circulating graphite balls and fuel balls is counted. When the total number of circulating balls XH_ZQ2 in the second column of pipeline reaches ZQ multiplied by the operator-set value XH_ZQ2_SD of the total number of circulating balls in the second column of pipeline, the second unloading motor of the second column of pipeline is triggered to stop through S1.
[0103] Furthermore, the third execution unit includes a third start module, a third stop module, a third trigger module, and a third reset module. The third start module is used to start the first unloading motor and the second unloading motor according to a third start command, so as to unload graphite balls through the first and second pipelines respectively. The third stop module is used to stop the first unloading motor and start the first loading motor when the total number of graphite balls unloaded from the first and second pipelines reaches a preset value, so as to execute the fuel ball loading process. The third stop module is also used to stop the first loading motor when the number of fuel balls loaded into the first pipeline reaches a preset value, so as to complete one third small cycle process. The third trigger module is used to trigger a fourth start command to start the first unloading motor in the first pipeline, so as to enter the next third small cycle process. The third reset module is used to stop the process and reset the actual number of third small cycles when the actual number of third small cycles exceeds a preset number of third small cycles, so as to complete the third large cycle process.
[0104] The control logic of the third startup module is as follows: Please refer to... Figure 5ZQ is the current third small cycle number, initially 0. When the operator clicks START to start the process, START resets the CV pin via OR(15) connected to CTU01's RESET to prevent ZQ from being non-zero during the last stop. After a 1-second delay via TON101, START triggers the CU pin of CTU01, incrementing ZQ by 1. START directly triggers CX_START, which is a restart instruction after the end of each third small cycle. This instruction starts the first unloading motor of the first pipeline and the second unloading motor of the second pipeline.
[0105] Furthermore, the control logic of the third stop module is as follows: Please refer to [link / reference needed]. Figure 5 When the number of graphite balls discharged from the first pipeline XC_SMQ1 plus the number of graphite balls discharged from the second pipeline XC_SMQ2 reaches ZQ (which is 1 at this time) multiplied by the operator-set value XC_SMQ_SD for discharging graphite balls from the two pipelines, the first unloading motor of the first pipeline is stopped and the first loading motor of the first pipeline is started via C1; when the number of fuel balls loaded into the first pipeline ZR_RLQ1 reaches ZQ (which is 1 at this time) multiplied by the operator-set value ZR_RLQ1_SD for loading fuel balls into the first pipeline, the first loading motor of the first pipeline is stopped via Z1 and the first unloading motor of the first pipeline is started via Z2 (at this time, S1 is FALSE). At this time, Z1 and C1 are both TRUE, AND (14) is TRUE, and the CU pin of CTU01 is triggered once via OR (17), ZQ is incremented by 1, becoming 2. The process of discharging graphite balls from the first and second pipelines continues.
[0106] Furthermore, please continue to refer to... Figure 5The control logic of the third execution unit also includes: when the number of the third small cycles reaches the operator-set number N, the process of unloading graphite balls from the first and second columns of pipelines in the Nth third small cycle begins. When the number of unloaded graphite balls reaches ZQ (which is N at this time) multiplied by the two columns' unloaded graphite ball setting value XC_SMQ_SD, C1 is TRUE, the first unloading motor of the first column of pipeline is stopped, and the first loading motor of the first column of pipeline is started simultaneously. At the same time, S1 is TRUE, and the second unloading motor of the second column of pipeline is stopped. When the number of fuel balls loaded into the first column of pipeline ZR_RLQ1 reaches ZQ (which is N at this time) multiplied by the first column of pipeline's loaded fuel ball setting value ZR_RLQ1_SD, Z1 is TRUE, and the first loading motor of the first column of pipeline is stopped. Since S1 is TRUE at this time, Z2 will not be triggered to TRUE, that is, the first unloading motor of the first column of pipeline will not be started again. Z1 and C1 are both TRUE. ZQ is incremented by 1, becoming N+1. Since the PV of CTU01 is equal to N+1, CTU01.Q is triggered as TRUE at this time. ZQ is reset to 0 by OR(15), and the third major cycle ends.
[0107] It should be noted that the system embodiments described in this invention are merely illustrative. For example, the division of units can be a logical functional division, and in actual implementation, there may be other division methods. For instance, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the couplings or direct couplings or communication connections shown or discussed may be through some interfaces, indirect couplings or communication connections between units or modules, and may be electrical or other forms.
[0108] This invention proposes a process control method and device for the transition cycle stage of a high-temperature gas-cooled reactor, which has the following beneficial effects: During the transition cycle stage of a high-temperature gas-cooled reactor, this invention can automatically control the start-up and shutdown and operation mode of the equipment according to the number of graphite balls unloaded, the number of graphite / fuel balls recycled, and the number of fuel balls loaded in each small cycle set by the operator, so as to ensure that the number of balls loaded / unloaded / recycled in each small cycle meets the requirements of the number of balls set by the operator, thereby improving operating efficiency and reducing the operator's workload.
[0109] It is understood that the above embodiments are merely exemplary implementations used to illustrate the principles of the present invention, and the present invention is not limited thereto. For those skilled in the art, various modifications and improvements can be made without departing from the spirit and essence of the present invention, and these modifications and improvements are also considered to be within the scope of protection of the present invention.
Claims
1. A process control method for the transition cycle stage of a high-temperature gas-cooled reactor, characterized in that, An application to a fuel loading and unloading system for a high-temperature gas-cooled reactor, the system comprising a first set of pipes and a second set of pipes connected to the reactor core; the method comprising: When the components removed from the reactor core are graphite balls, and it is required that at least some of the graphite balls be recycled back to the reactor core, the first set of pipelines simultaneously performs the process of loading fuel balls and unloading graphite balls, while the second set of pipelines performs the process of recycling graphite balls. When the components removed from the reactor core are fuel balls or graphite balls, and it is required that at least some of the graphite balls be recycled back to the reactor core, the first set of pipelines separately performs the processes of unloading graphite balls, recycling fuel balls, and loading fuel balls, while the second set of pipelines performs the processes of recycling graphite balls and fuel balls. When the components removed from the reactor core are fuel balls or graphite balls, and all graphite balls are required to be removed, the first and second sets of piping lines simultaneously perform the graphite ball removal and fuel ball recycling processes, while the first set of piping lines separately performs the fuel ball loading process; wherein... The first set of pipelines simultaneously performs the processes of loading and unloading fuel balls, while the second set of pipelines performs a process of circulating graphite balls, including: The number of the first small cycle currently being executed is reset to prevent it from being non-zero when it was stopped last time. After a delay, the first start command is triggered, and the loading motor and unloading motor of the first column pipeline and the unloading motor of the second column pipeline are started at the same time, so that fuel balls are loaded and graphite balls are unloaded through the first column pipeline, and graphite balls are circulated through the second column pipeline. When the number of fuel balls loaded into the first pipeline, the number of graphite balls unloaded, and the number of graphite ball cycles in the second pipeline all reach preset values, the loading motor and unloading motor of the first pipeline and the unloading motor of the second pipeline are stopped respectively to complete a first small cycle process. Re-trigger the first startup command to enter the next first mini-cycle process; When the actual number of the first small cycle exceeds the preset number of the first small cycle, the process is stopped and the actual number of the first small cycle is reset to complete the first large cycle process.
2. The process control method for the transition cycle stage of a high-temperature gas-cooled reactor according to claim 1, characterized in that, The components removed from the reactor core are fuel balls or graphite balls, and when a fuel ball is encountered during the removal of the graphite ball, the fuel ball is recycled back to the reactor core.
3. The process control method for the transition cycle stage of a high-temperature gas-cooled reactor according to claim 2, characterized in that, The first set of pipelines independently performs the processes of unloading graphite balls, circulating fuel balls, and loading fuel balls. The second set of pipelines performs the process of circulating graphite balls and fuel balls, including: Trigger the second start command to start the unloading motors of the first column pipeline and the second column pipeline, so as to unload the graphite balls through the first column pipeline and circulate the graphite balls through the second column pipeline; When the number of graphite balls discharged from the first column of pipelines reaches a preset value, the unloading motor of the first column of pipelines is stopped, and the loading motor of the first column of pipelines is started at the same time to perform the process of loading fuel balls. When the number of fuel balls loaded in the first pipeline reaches a preset value, the loading motor is stopped. When the total number of graphite balls and fuel balls circulated within a second small cycle reaches a preset value, the unloading motor in the second pipeline is stopped to complete a second small cycle. Re-trigger the second startup command to enter the next second sub-cycle process; When the actual number of the second smallest cycle exceeds the preset number of the second smallest cycle, the process is stopped and the actual number of the second smallest cycle is reset to complete the second largest cycle process.
4. The process control method for the transition cycle stage of a high-temperature gas-cooled reactor according to claim 2, characterized in that, The first and second sets of pipelines simultaneously perform the graphite ball unloading and fuel ball circulation processes, while the first set of pipelines independently performs the fuel ball loading process, including: Trigger the third start command to start the unloading motors of the first column pipeline and the second column pipeline, so as to unload graphite balls through the first column pipeline and the second column pipeline respectively; When the total number of graphite balls discharged from the first and second pipelines reaches a preset value, the unloading motor of the first pipeline is stopped and the loading motor of the first pipeline is started to perform the fuel ball loading process. When the number of fuel balls loaded into the first pipeline reaches a preset value, the loading motor is stopped to complete a third small cycle process; The unloading motor of the first pipeline is started according to the fourth start command to enter the next third small cycle process; When the actual number of the third minor cycle exceeds the preset number of the third minor cycle, the process is stopped and the actual number of the third minor cycle is reset to complete the third major cycle process.
5. The process control method for the transition cycle stage of a high-temperature gas-cooled reactor according to claim 4, characterized in that, The first and second sets of pipelines simultaneously perform the graphite ball unloading process, while the first set of pipelines separately performs the fuel ball loading process, and also includes: When the next third small cycle number is the preset third small cycle number, the graphite balls are discharged through the first column of pipelines and the second column of pipelines; When the total number of graphite balls discharged from the first and second pipelines reaches a preset value, the unloading motor of the first pipeline is stopped, the loading motor is started to perform the fuel ball loading process, and the unloading motor of the second pipeline is stopped. When the number of fuel balls loaded into the first pipeline reaches a preset value, the loading motor is stopped.
6. A process control device for the transition cycle stage of a high-temperature gas-cooled reactor, characterized in that, An apparatus for use in a high-temperature gas-cooled reactor fuel loading and unloading system, the system comprising a first set of pipes and a second set of pipes connected to the reactor core; the apparatus comprising: A first execution unit is configured to, when the components removed from the reactor core are graphite balls and at least some of the graphite balls are required to be recycled back to the reactor core, simultaneously perform the loading of fuel balls and the unloading of graphite balls in the first set of piping lines, and the second set of piping lines performs the recycling of graphite balls; the first execution unit includes: The first start module is used to reset the number of the first small cycle currently being executed to prevent it from being non-zero when it stopped last time. After a delay, it triggers the first start command and simultaneously starts the loading motor and unloading motor of the first column pipeline and the unloading motor of the second column pipeline, so that fuel balls are loaded and graphite balls are unloaded through the first column pipeline at the same time, and graphite balls are circulated through the second column pipeline. The first stop module is used to stop the loading motor and unloading motor of the first pipeline and the unloading motor of the second pipeline respectively when the number of fuel balls loaded, the number of graphite balls unloaded and the number of graphite ball cycles in the first pipeline reach preset values, so as to complete a first small cycle process. The first trigger module is used to re-trigger the first start command to enter the next first mini-cycle process; The first reset module is used to stop the process and reset the actual number of the first small cycles when the number of the first small cycles actually running is greater than the preset number of the first small cycles, so as to complete the first large cycle process. The second execution unit is used when the components unloaded from the reactor core are fuel balls or graphite balls, and it is required that at least some of the graphite balls be recycled back to the reactor core. The first set of pipelines separately performs the processes of unloading graphite balls, recycling fuel balls, and loading fuel balls, while the second set of pipelines performs the processes of recycling graphite balls and fuel balls. The third execution unit is used when the components unloaded from the reactor core are fuel balls or graphite balls, and when all graphite balls are required to be unloaded, the first and second sets of pipelines simultaneously perform the graphite ball unloading and fuel ball circulation processes, while the first set of pipelines performs the fuel ball loading process alone.
7. The process control device for the transition cycle stage of a high-temperature gas-cooled reactor according to claim 6, characterized in that, The second execution unit includes: The second start module is used to start the unloading motor of the first column pipeline and the unloading motor of the second column pipeline according to the second start command, so as to unload the graphite balls through the first column pipeline and circulate the graphite balls through the second column pipeline. The second stop module is used to stop the unloading motor of the first column of pipeline when the number of graphite balls unloaded in the first column of pipeline reaches a preset value, and at the same time start the loading motor of the first column of pipeline to perform the loading of fuel balls. The second stop module is also used to stop the loading motor when the number of fuel balls loaded in the first column of pipelines reaches a preset value, and to stop the unloading motor of the second column of pipelines when the total number of graphite balls and fuel balls circulated in a second small cycle process reaches a preset value, so as to complete a second small cycle process. The second trigger module is used to re-trigger the second start command to enter the next second sub-cycle process; The second reset module is used to stop the process and reset the actual number of the second small cycles when the number of the second small cycles actually running is greater than the preset number of the second small cycles, so as to complete the second large cycle process.
8. The process control device for the transition cycle stage of a high-temperature gas-cooled reactor according to claim 6, characterized in that, The third execution unit includes: The third starting module is used to start the unloading motor of the first column pipeline and the unloading motor of the second column pipeline according to the third starting command, so as to unload the graphite balls through the first column pipeline and the second column pipeline respectively. The third stop module is used to stop the unloading motor of the first column of pipelines and start the loading motor of the column of pipelines when the total number of graphite balls unloaded in the first column of pipelines and the second column of pipelines reaches a preset value, so as to perform the process of loading fuel balls. The third stop module is also used to stop the charging motor when the number of fuel balls loaded in the first pipeline reaches a preset value, so as to complete a third small cycle process; The third trigger module is used to trigger the fourth start command to start the unloading motor of the first pipeline to enter the next third small cycle process; The third reset module is used to stop the process and reset the actual number of the third small cycles when the number of the third small cycles actually running is greater than the preset number of the third small cycles, so as to complete the third large cycle process.
Citation Information
Patent Citations
Pebble-bed module type high-temperature gas cooled reactor fuel loading and unloading system
CN103474113A
Detection device for spherical element in high-temperature gas cooled reactor, system and method
CN111028966A
Rotating disc type pebble conveying device and method and pebble bed type high-temperature gas cooled reactor
CN113488210A