Modular building floor and method for using home floor drain in modular building floor
By opening through holes and give way slots on the modular building floor, installing PVC flanges and short pipes, and laying a waterproof layer, the problem of the inability to fix the floor drain on the modular building floor is solved, convenient installation and cross-module connection are achieved, and waterproofness and sealing are improved.
Patent Information
- Application Number
- CN202310383947.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-06
- Publication Date
- 2025-09-02
- Estimated Expiration
- 2043-04-06
AI Technical Summary
Modular building floors cannot fix ordinary floor drains, resulting in inconvenient connection.
Open through holes and give way slots on cement fiberboard, install PVC flanges and short pipes, and lay a waterproof layer to simulate the installation conditions of traditional concrete floors and realize the installation of conventional floor drains; PVC short pipes are used to connect the adapter pipe and connect the drain pipes across modules.
It is convenient to install floor drains, improves the waterproofness and sealing of modular building floors, prevents the odor of drain pipes, and realizes the convenience of cross-module connections.
Smart Images

Figure CN116254983B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of modular buildings, and in particular to a modular building floor and a method for using a home floor drain in a modular building floor. Background Art
[0002] Modular construction is an emerging building structure system that uses each room as a modular unit. All units are prefabricated in the factory, transported to the site, and assembled into the entire building through reliable connection methods. The modular building floor is a plate-like structure and is installed on the ground through keels.
[0003] Regarding the above-mentioned related technologies, since modular building floors do not have drainage pipes pre-buried in the floor slabs, and there are no drainage pipes preset in the sedimentation tank, ordinary floor drains cannot be fixed for use, and there is a defect that it is inconvenient to connect the floor drain. Summary of the Invention
[0004] In order to solve the defect of being inconvenient to connect a floor drain, the present application provides a modular building floor and a method for using a home floor drain in the modular building floor.
[0005] In the first aspect, the present application provides a modular building floor, which adopts the following technical solution: a cement fiber board is provided with two layers, and the two layers of cement fiber boards are fixedly connected; the cement fiber board is provided with a through hole, and the through hole passes through the cement fiber board; the cement fiber board located above is provided with a makeshift groove; a PVC flange is inserted into the through hole, and the flange plate of the PVC flange is inserted into the makeshift groove; the PVC flange is fixedly connected to the cement fiber board; a PVC short pipe is inserted into the PVC flange and fixedly connected to the PVC flange; a waterproof layer is laid on the upper surface of the cement fiber board and the PVC flange.
[0006] By adopting the above technical solution, when installing a floor drain on a modular building floor, first, through holes and make-shift grooves are opened in sequence on the cement fiber board, and then the PVC short pipe and the PVC flange are fixed and then fixed to the cement fiber board, and then a waterproof layer is laid; after laying the waterproof layer, the installation conditions of a traditional concrete floor are simulated, and the installation of a conventional floor drain is realized, which facilitates the connection of the floor drain; at the same time, the remaining end of the PVC short pipe is convenient for connecting other transfer pipes, which facilitates the subsequent connection of different drainage pipes across modules.
[0007] Preferably, the waterproof layer is also laid inside the PVC flange.
[0008] By adopting the above technical solution, the waterproof layer is laid in the PVC flange to improve the overall waterproofness of the modular building floor. Since the PVC short pipe is inserted into the PVC flange, the sealing performance of the PVC short pipe and the PVC flange is improved.
[0009] Preferably, an adapter tube is connected to one end of the PVC short tube away from the PVC flange.
[0010] By adopting the above technical solution, the provision of the transfer pipe can facilitate workers to connect different drainage pipes across modules.
[0011] Preferably, a check assembly is provided in the PVC short tube, and the check assembly includes: a check ring, which is horizontally arranged and fixedly connected to the PVC section tube; a check tube, which is fixedly connected to the lower surface of the check ring and is connected to the PVC short tube; a check bowl, which is located below the check tube, and the upper end surface of the check bowl is higher than the lower surface of the check tube; an adjusting rod, which is fixedly connected to the upper surface of the check ring, and the adjusting rod intersects with the mid-vertical line of the check ring; a connecting rod, which is vertically arranged, with one end fixedly connected to the check bowl, and the remaining end passes through the check tube and the check ring and passes through the adjusting rod, and the connecting rod is slidably connected to the adjusting rod; a limit rod, which is located above the adjusting rod and fixedly connected to the connecting rod; a limit spring, which is sleeved on the circumferential outer wall of the connecting rod, fixedly connected to the limit rod and pressed against the adjusting rod.
[0012] By adopting the above technical solution, when the floor drain is in normal use, part of the discharged water remains in the check bowl, and the upper end surface of the check bowl is higher than the lower end surface of the check pipe, so the odor from the drain pipe will not be back into the room; when impurities are deposited, press the connecting rod downward, and the gap between the check bowl and the check ring will increase, and the impurities will be discharged.
[0013] Preferably, a clamping groove is provided on the inner wall of the check tube; a clamping part is connected to the upper surface of the check bowl, and the clamping part includes a clamping rod and a clamping block. The length direction of the clamping rod is the same as the length direction of the check tube. The clamping rod is fixedly connected to the check bowl and the clamping block, and the clamping block is clamped in the clamping groove.
[0014] By adopting the above technical solution, when the drain has not been used for a long time, the connecting rod is pulled upwards, and the connecting rod drives the clamping block to move upwards. When the clamping block is inserted into the clamping groove, the lower end surface of the check pipe is pressed against the upper surface of the check bowl, thereby achieving an odor-proof effect.
[0015] In a second aspect, the present application provides a method for using a household floor drain in a modular building floor, which adopts the following technical solution:
[0016] The method for using a home floor drain in a modular building floor comprises the following steps:
[0017] S1. Preparation of cement fiberboard: Two layers of cement fiberboard are bonded and fixed, and a through hole is provided. A recess is provided on the upper cement fiberboard, and the recess is provided coaxially with the through hole.
[0018] S2. Prepare and install the PVC flange and PVC short pipe; insert the PVC short pipe into the PVC flange and glue it in place; place the PVC flange into the through hole and the groove, glue it in place, and fill the gap between the cement fiberboard and the PVC flange so that the upper surface of the PVC flange is flush with the upper surface of the cement fiberboard.
[0019] S3, waterproof layer laying;
[0020] S4, laying floor tiles;
[0021] S5. Install floor drain.
[0022] By adopting the above technical solution, the conditions for installing floor drains on traditional concrete floors are simulated through the setting of through holes, recesses, PVC flanges, and PVC short pipes, thereby achieving the effect of facilitating the installation of floor drains; at the same time, the setting of the waterproof layer improves the overall waterproof sealing.
[0023] Preferably, in step S3, the waterproof layer is made of waterproof coiled material or painted with waterproof paint; and the waterproof layer is painted or pasted on the inner wall of the PVC short tube inserted in the PVC flange.
[0024] Preferably, in step S2, the connecting rod is pulled, the connecting rod drives the check bowl to press against the check tube, and the clamping block is inserted into the clamping groove; the connecting rod is pushed, and the clamping block is disengaged from the clamping groove.
[0025] By adopting the above technical solution, when the drain has not been used for a long time, the connecting rod is pulled upwards, and the connecting rod drives the clamping block to move upwards. When the clamping block is inserted into the clamping groove, the lower end surface of the check pipe is pressed against the upper surface of the check bowl, thereby achieving an odor-proof effect.
[0026] To sum up, the present application includes at least one of the following beneficial technical effects: when installing a floor drain on a modular building floor, first, through holes and makeshift grooves are opened on the cement fiber board in sequence, and then the PVC short pipe and the PVC flange are fixed and then fixed to the cement fiber board, and then a waterproof layer is laid; after laying the waterproof layer, the installation conditions of the traditional concrete floor are simulated and the installation of the conventional floor drain is realized, which facilitates the connection of the floor drain; at the same time, the remaining end of the PVC short pipe is convenient for connecting other transfer pipes, which facilitates the subsequent connection of different drainage pipes across modules.
[0027] 1. When installing a floor drain on a modular building floor, first, create through holes and make way grooves on the cement fiberboard, then secure the PVC short pipe and PVC flange to the cement fiberboard, and finally lay a waterproof layer. After laying the waterproof layer, the installation conditions of a traditional concrete floor are simulated, allowing for the installation of a conventional floor drain, making it easier to connect the floor drain. At the same time, the remaining end of the PVC short pipe is convenient for connecting to other adapter pipes, making it easier to connect different drainage pipes across modules.
[0028] 2. When the floor drain is in normal use, part of the discharged water remains in the check bowl. The upper end surface of the check bowl is higher than the lower end surface of the check pipe. Therefore, the odor from the drain pipe will not be returned to the room. When impurities are deposited, press the connecting rod downward. At this time, the gap between the check bowl and the check ring increases, and the impurities are discharged.
[0029] 3. When the drain has not been used for a long time, pull the connecting rod upwards. At this time, the connecting rod drives the clamping block to move upwards. When the clamping block is inserted into the clamping groove, the lower end surface of the check pipe presses against the upper surface of the check bowl, thereby achieving the deodorizing effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 This is a schematic diagram showing a cement fiber board according to an embodiment of the present application;
[0031] Figure 2 It is to show the cross-section of the backstop assembly;
[0032] Figure 3 This is the overall picture after the floor drain is installed in the modular building floor.
[0033] In the figure, 1. cement fiber board; 11. through hole; 12. give way groove; 2. PVC flange; 3. PVC short pipe; 4. waterproof layer; 5. adapter pipe; 6. check assembly; 61. check ring; 62. check pipe; 621. snap-fit groove; 63. check bowl; 64. adjusting rod; 65. connecting rod; 66. limit rod; 67. limit spring; 7. snap-fit part; 71. snap-fit rod; 72. snap-fit block; 8. floor tile; 9. floor drain. DETAILED DESCRIPTION
[0034] The following is combined with Figure 1-3 This application is described in further detail.
[0035] The embodiment of the present application discloses a modular building floor.
[0036] refer to Figure 1The modular building floor comprises a cement fiber board 1, a PVC flange 2, a PVC short pipe 3, and a waterproof layer 4. The cement fiber board 1 is provided with at least two layers, and in this embodiment, two layers are used. The two layers of cement fiber board 1 are fixedly connected, specifically by gluing or self-tapping screws. The cement fiber board 1 has a through hole 11 extending through the two cement fiber boards 1. The upper cement fiber board 1 has a recess 12 formed on its upper surface. The PVC flange 2 is inserted into the through hole 11, and the flange plate of the PVC flange 2 is inserted into the recess 12. The PVC flange 2 and the cement fiber board 1 are then bonded together. The PVC short pipe 3 is inserted into the PVC flange 2 and fixedly connected. Specifically, the connection between the PVC short pipe 3 and the PVC flange 2 can be bonded together. In this embodiment, the PVC flange 2 and the PVC short pipe 3 can be fixed together first, and then the PVC flange 2 and the cement fiber board 1 are connected. During the connection process, the upper surface of the PVC flange 2 is coplanar with the upper surface of the cement fiber board 1.
[0037] refer to Figure 1 and Figure 3 A waterproof layer 4 is applied to the cement fiber board 1 and the PVC flange 2, and is also applied to the inside of the PVC flange 2. The waterproof layer 4 can be made of a waterproof membrane or a waterproof coating. The waterproof layer 4 is applied by brushing or adhering to the inner wall of a short PVC tube 3 inserted into the PVC flange 2. An adapter tube 5 is connected to the end of the short PVC tube 3 facing away from the PVC flange 2.
[0038] When installing the floor drain 9 on the modular building floor, first, a through hole 11 and a makeshift groove 12 are opened in sequence on the cement fiber board 1, and then the PVC short pipe 3 and the PVC flange 2 are fixed and then fixed to the cement fiber board 1, and then the waterproof layer 4 is laid; after laying the waterproof layer 4, the installation conditions of the traditional concrete floor are simulated and the installation of the conventional floor drain 9 is realized, which achieves the effect of facilitating the connection of the floor drain 9; at the same time, the remaining end of the PVC short pipe 3 is convenient for connecting to other transfer pipes 5, which facilitates the subsequent connection of different drainage pipes across modules.
[0039] refer to Figure 2 and Figure 3A check assembly 6 is provided in the PVC short tube 3. The check assembly 6 includes a check ring 61, a check tube 62, a check bowl 63, an adjusting rod 64, a connecting rod 65, a limit rod 66, and a limit spring 67. The check ring 61 is an annular plate structure. The check ring 61 is horizontally arranged and fixedly connected to the PVC short tube 3. The check tube 62 is fixedly connected to the lower surface of the check ring 61, and the check tube 62 is connected to the PVC short tube 3. The check bowl 63 is located below the check tube 62, and the upper end surface of the check bowl 63 is higher than the lower surface of the check tube 62. The adjusting rod 64 is fixedly connected to the upper surface of the check ring 61, and the adjusting rod 64 intersects with the mid-perpendicular line of the check ring 61. The connecting rod 65 is vertically arranged. One end of the connecting rod 65 is fixedly connected to the check bowl 63, and the remaining end passes through the check tube 62 and the check ring 61 and passes through the adjusting rod 64. The connecting rod 65 is slidably connected to the adjusting rod 64. The limiting rod 66 is located above the adjusting rod 64 and is fixedly connected to the connecting rod 65 ; the limiting spring 67 is sleeved on the circumferential outer wall of the connecting rod 65 , and the top end of the limiting spring 67 is fixedly connected to the limiting rod 66 , and the bottom end of the limiting spring 67 is pressed against the adjusting rod 64 .
[0040] refer to Figure 2 and Figure 3 A clamping groove 621 is provided on the inner wall of the check tube 62, and a clamping part 7 is connected to the upper surface of the check bowl 63. The clamping part 7 includes a clamping rod 71 and a clamping block 72. The length direction of the clamping rod 71 is the same as the length direction of the check tube 62. The clamping rod 71 is fixedly connected to the check bowl 63 and the clamping block 72, and the clamping block 72 is clamped in the clamping groove 621.
[0041] When the floor drain 9 is in normal use, part of the drained water remains in the check bowl 63. The upper end surface of the check bowl 63 is higher than the lower end surface of the check tube 62, so that the odor from the drain pipe does not enter the room. When impurities are deposited, the connecting rod 65 is pressed downward, and the gap between the check bowl 63 and the check ring 61 increases, and the impurities are discharged. When the floor drain 9 has not been used for a long time, the connecting rod 65 is pulled upward, and the connecting rod 65 drives the clamping block 72 to move upward. When the clamping block 72 is inserted into the clamping groove 621, the lower end surface of the check tube 62 presses against the upper surface of the check bowl 63, thereby achieving a deodorizing effect.
[0042] The implementation principle of the modular building floor of the embodiment of the present application is as follows: when installing the floor drain 9 on the modular building floor, first, a through hole 11 and a makeshift groove 12 are opened in sequence on the cement fiber board 1, and then the PVC short pipe 3 and the PVC flange 2 are fixed and then fixed to the cement fiber board 1, and then the waterproof layer 4 is laid; after laying the waterproof layer 4, the installation conditions of the traditional concrete floor are simulated and the installation of the conventional floor drain 9 is realized, which achieves the effect of facilitating the connection of the floor drain 9; at the same time, the remaining end of the PVC short pipe 3 is convenient for connecting to other transfer pipes 5, which facilitates the subsequent connection of different drainage pipes across modules.
[0043] The embodiments of the present application also disclose a method for using a household floor drain in a modular building floor.
[0044] The method for using a home floor drain in a modular building floor comprises the following steps: S1, preparing a cement fiber board 1; bonding and fixing two layers of cement fiber boards 1, and forming a through hole 11; forming a recess 12 on the upper cement fiber board 1, and forming the recess 12 coaxially with the through hole 11;
[0045] Prepare and install S2, the PVC flange 2, and the PVC short tube 3. Insert the PVC short tube 3 into the PVC flange 2 and secure it with glue. Place the PVC flange 2 into the through-hole 11 and the clearance groove 12, secure it with glue, and fill the gap between the cement fiber board 1 and the PVC flange 2, making the upper surface of the PVC flange 2 flush with the upper surface of the cement fiber board 1. Pull the connecting rod 65, which drives the check bowl 63 against the check tube 62, and the clamping block 72 is inserted into the clamping groove 621. Push the connecting rod 65, and the clamping block 72 disengages the clamping groove 621.
[0046] S3. Lay the waterproof layer 4; lay the waterproof layer 4 on the upper surface of the cement fiber board 1 and the upper surface of the PVC flange 2; use waterproof membrane or apply waterproof paint for the waterproof layer 4; and apply or stick the waterproof layer 4 to the inner wall of the PVC short pipe 3 inserted in the PVC flange 2 for at least 50 mm.
[0047] S4, laying floor tiles 8;
[0048] S5. Install floor drain 9.
[0049] The embodiments of this specific implementation method are all preferred embodiments of the present application and are not intended to limit the scope of protection of the present application. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the scope of protection of the present application.
Claims
1. Modular building floor, characterized by: include: The cement fiber board (1) is provided with two layers, and the two layers of cement fiber board (1) are fixedly connected; The cement fiber board (1) is provided with a through hole (11), and the through hole (11) passes through the cement fiber board (1); the cement fiber board (1) located above is provided with a clearance groove (12); The PVC flange (2) is inserted into the through hole (11), and the flange plate of the PVC flange (2) is inserted into the clearance groove (12); the PVC flange (2) is fixedly connected to the cement fiber board (1); A short PVC tube (3) is inserted into the PVC flange (2) and fixedly connected to the PVC flange (2); A waterproof layer (4) is laid on the upper surface of the cement fiber board (1) and the PVC flange (2); A check assembly (6) is provided in the PVC short pipe (3), and the check assembly (6) comprises: A check ring (61) is horizontally arranged and fixedly connected to the inside of the PVC pipe segment; A check pipe (62) is fixedly connected to the lower surface of the check ring (61) and the check pipe (62) is connected to the PVC short pipe (3); The check bowl (63) is located below the check tube (62), and the upper end surface of the check bowl (63) is higher than the lower surface of the check tube (62); An adjusting rod (64) is fixedly connected to the upper surface of the check ring (61), and the adjusting rod (64) intersects with the mid-vertical line of the check ring (61); A connecting rod (65) is vertically arranged, one end of which is fixedly connected to the check bowl (63), and the remaining end passes through the check tube (62) and the check ring (61) and penetrates the adjustment rod (64), and the connecting rod (65) is slidably connected to the adjustment rod (64); A limiting rod (66) is located above the adjusting rod (64) and is fixedly connected to the connecting rod (65); The limiting spring (67) is sleeved on the circumferential outer wall of the connecting rod (65), fixedly connected to the limiting rod (66) and pressed against the adjusting rod (64).
2. The modular building floor according to claim 1, characterized in that: The waterproof layer (4) is also laid inside the PVC flange (2).
3. The modular building floor according to claim 1, characterized in that: One end of the PVC short tube (3) facing away from the PVC flange (2) is connected to a transfer tube (5).
4. The modular building floor according to claim 1, characterized in that: The inner wall of the check tube (62) is provided with a clamping groove (621); the upper surface of the check bowl (63) is connected with a clamping member (7), the clamping member (7) comprises a clamping rod (71) and a clamping block (72), the length direction of the clamping rod (71) is the same as the length direction of the check tube (62), the clamping rod (71) is fixedly connected to the check bowl (63) and the clamping block (72), and the clamping block (72) is clamped in the clamping groove (621).
5. A method for using a household floor drain in a modular building floor, characterized in that: The method for applying the modular building floor as claimed in claim 1 comprises the following steps: S1, cement fiber board (1) preparation; two layers of cement fiber board (1) are bonded and fixed, and a through hole (11) is provided, and a clearance groove (12) is provided on the upper cement fiber board (1), and the clearance groove (12) is provided coaxially with the through hole (11); S2, PVC flange (2) and PVC short pipe (3) are prepared and installed; the PVC short pipe (3) is inserted into the PVC flange (2) and fixed by gluing; the PVC flange (2) is placed into the through hole (11) and the clearance groove (12), fixed by gluing, and the gap between the cement fiber board (1) and the PVC flange (2) is filled, so that the upper surface of the PVC flange (2) is flush with the upper surface of the cement fiber board (1); S3, waterproof layer (4) laying; S4, laying floor tiles (8); S5. Install the floor drain (9).
6. The method for using a household floor drain in a modular building floor according to claim 5, characterized in that: In step S3, the waterproof layer (4) is made of waterproof coiled material or painted with waterproof paint; and the waterproof layer (4) is located below the flange surface and is painted or adhered to the inner wall of the PVC short pipe (3).
7. The method for using a household floor drain in a modular building floor according to claim 5, characterized in that: In step S2, the connecting rod (65) is pulled, and the connecting rod (65) drives the check bowl (63) to press against the check tube (62), and the clamping block (72) is inserted into the clamping groove (621); the connecting rod (65) is pushed, and the clamping block (72) is separated from the clamping groove (621).
Citation Information
Patent Citations
Drop down water tank structure
CN205077597U
Flexible seal with modular spacers
US20140062035A1