Operational activity plan configuration methods, devices, computer equipment and storage media

By modularizing and tagging historical data, and combining it with operational activity plan recommendation algorithms, operational activity plans that meet target needs are automatically generated. This solves the problems of cumbersome and incomplete configuration in existing technologies, and improves configuration efficiency and accuracy.

CN116307579BActive Publication Date: 2026-11-17PING AN HEALTH INSURANCE CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202310259229.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-16
Publication Date
2026-11-17
Estimated Expiration
2043-03-16

AI Technical Summary

Technical Problem

The configuration of existing operational activity plan templates is cumbersome, time-consuming, and prone to omissions of details, requiring manual modification and resulting in low efficiency.

Method used

By acquiring historical operational activity plan data, template data, and example data, modularization and tagging are performed. The relevance is calculated using an operational activity plan recommendation algorithm, and plan modules that meet the target requirements are automatically recommended to generate recommended operational activity plans.

Benefits of technology

It avoids the omissions and tedious operations of manual configuration, improves the efficiency of configuring operational activity plans, and ensures that the plans are better matched with target needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116307579B_ABST
    Figure CN116307579B_ABST
Patent Text Reader

Abstract

This application discloses a method for configuring operational activity plans, applied in the field of artificial intelligence technology. The method includes: acquiring historical operational activity plan data as candidate operational activity plans; modularly splitting the candidate operational activity plans into candidate operational activity plan modules, and labeling the candidate operational activity plan modules to obtain first module feature tags; calculating a first correlation degree and a second correlation degree between the first module feature tags and the candidate operational activity plan modules and the target plan module, respectively; inputting the first correlation degree, the second correlation degree, and the target operational activity plan name coefficient into an operational activity plan recommendation algorithm to obtain a third correlation degree between the target plan module and the candidate operational activity plan modules; and selecting recommended operational activity plan modules from the candidate operational activity plan modules to form a recommended operational activity plan based on a preset correlation degree threshold and the third correlation degree.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of artificial intelligence, and in particular to a method, apparatus, computer equipment, and storage medium for configuring operational activity plans. Background Technology

[0002] In the course of business operations, there are numerous operational activity needs, requiring relevant operational personnel to design corresponding operational activity plans. However, analysis of existing operational activity plan data reveals that the processes, frameworks, and modules of various operational activities are largely similar. Therefore, current technology provides operational activity plan templates, which operational personnel then add or modify. However, the content provided by these templates may not fully meet the specific operational activity needs, such as the specific data for activities like inviting friends, lotteries, and task completion. Therefore, the task of manual modification by operational personnel is arduous, time-consuming, and prone to overlooking details. Summary of the Invention

[0003] This application provides a method, apparatus, computer equipment, and storage medium for configuring operational activity plans, in order to solve the problems in the prior art where it is cumbersome and time-consuming for operators to operate operational activity plan templates and that details are easily overlooked.

[0004] The first aspect of this application provides a method for configuring an operational activity plan, including:

[0005] Obtain historical operational activity plan data, operational activity plan template data, and operational activity plan example data obtained from third-party channels, and use the historical operational activity plans, operational activity plan template data, and operational activity plan example data as candidate operational activity plans;

[0006] The candidate operational activity plans are modularized to obtain candidate operational activity plan modules, and then the candidate operational activity plan modules are tagged to obtain first module feature tags.

[0007] Receive a first request to create a new operational activity plan based on the target business. The first request includes the target operational activity plan name, the target operational activity plan name coefficient, and the target plan module of the target operational activity plan.

[0008] Calculate the first correlation degree between each of the candidate operation activity plan modules and the corresponding feature tags of each of the first modules, and the second correlation degree between each of the target plan modules and the feature tags of each of the first modules;

[0009] The first correlation, the second correlation, and the target operational activity plan name coefficient are input into a preset operational activity plan recommendation algorithm to obtain the third correlation between the target plan module and the candidate operational activity plan module.

[0010] Based on the preset correlation threshold and the third correlation, a recommended operational activity plan module is selected from the candidate operational activity plan modules, and the recommended operational activity plan module is used to form a recommended operational activity plan.

[0011] A second aspect of this application provides an operational activity plan configuration device, comprising:

[0012] The first data acquisition module is used to acquire historical operational activity plan data, operational activity plan template data, and operational activity plan example data obtained from third-party channels, and to use the historical operational activity plans, the operational activity plan template data, and the operational activity plan example data as candidate operational activity plans.

[0013] The first module feature tag module is used to modularly decompose the candidate operation activity plan to obtain the candidate operation activity plan module, and then tag the candidate operation activity plan module to obtain the first module feature tag.

[0014] The operational activity plan request module is used to receive a first request to create an operational activity plan based on the target business. The first request includes the target operational activity plan name, the target operational activity plan name coefficient, and the target plan module of the target operational activity plan.

[0015] The correlation calculation module is used to calculate the first correlation degree between each of the candidate operation activity plan modules and the corresponding feature tags of each of the first modules, and the second correlation degree between each of the target plan modules and the feature tags of each of the first modules;

[0016] The operational activity plan recommendation algorithm module is used to input the first correlation degree, the second correlation degree and the target operational activity plan name coefficient into a preset operational activity plan recommendation algorithm to obtain the third correlation degree between the target plan module and the candidate operational activity plan module;

[0017] The operational activity plan recommendation and combination module is used to filter recommended operational activity plan modules from the candidate operational activity plan modules based on a preset correlation threshold and the third correlation, and to use the recommended operational activity plan modules to form a recommended operational activity plan.

[0018] A third aspect of this application provides a computer device including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the steps of the above-described operation activity scheme configuration method.

[0019] A fourth aspect of this application provides a computer-readable storage medium storing a computer program that, when executed by a processor, implements the steps of the above-described operational activity scheme configuration method.

[0020] The above-mentioned operational activity plan configuration method, device, computer equipment and storage medium, by acquiring historical operational activity plan data, performing modular processing and tag feature processing, and using an operational activity plan recommendation algorithm to generate recommended operational activity plans from the historical operational activity plan data, not only avoids the problem of details being omitted or errors caused by human factors during manual configuration, but also further improves the efficiency of operational activity plan configuration, avoiding the tedious and time-consuming operation of plan templates during manual configuration. Attached Figure Description

[0021] To more clearly illustrate the technical solutions of the embodiments of this application, the drawings used in the description of the embodiments of this application will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0022] Figure 1 This is a schematic diagram of an application environment for an operational activity scheme configuration method in one embodiment of this application;

[0023] Figure 2 This is a flowchart of an operational activity plan configuration method in one embodiment of this application;

[0024] Figure 3 This is a schematic diagram of the structure of the operation activity plan configuration device in one embodiment of this application;

[0025] Figure 4 This is a schematic diagram of a computer device according to an embodiment of this application. Detailed Implementation

[0026] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0027] The configuration method for the operational activity plan provided in this application can be applied to, for example... Figure 1 In this application environment, the computer equipment can be, but is not limited to, various personal computers and laptops. The computer equipment can also be a server, which can be a standalone server or a cloud server providing basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communication, middleware services, domain name services, security services, content delivery networks (CDNs), and big data and artificial intelligence platforms. This is understandable. Figure 1 The number of computer devices shown is merely illustrative and can be expanded in any number according to actual needs.

[0028] In one embodiment, such as Figure 2 As shown, a method for configuring an operational activity plan is provided, which can be applied to... Figure 1 The following steps, S101 to S106, are used as an example of computer equipment in the example:

[0029] S101. Obtain historical operational activity plan data, operational activity plan template data, and operational activity plan example data obtained from third-party channels, and use the historical operational activity plans, operational activity plan template data, and operational activity plan example data as candidate operational activity plans.

[0030] The historical operational activity plan data refers to historical plans that have been saved and implemented in the system, possessing certain data mining value. Secondly, the operational activity plan template data consists of relatively general data summarized by relevant business personnel based on their business experience, also possessing data mining value. Finally, relevant operational activity plan example data is obtained through accessed third-party data channels, further broadening the data acquisition channels and enriching the data diversity of the candidate operational activity plans. This allows the recommended operational activity plans generated in this embodiment to cover a wider range of operational activity needs. For example, a fintech platform, for its required operational activity plans for insurance business, obtains historical operational activity plan data and insurance business operational activity plan template data saved on the platform, as well as competitor's insurance business operational activity plan example data obtained through third-party channels as candidate operational activity plans.

[0031] S102. The candidate operation activity plan is modularly split to obtain the candidate operation activity plan module, and then the candidate operation activity plan module is tagged to obtain the first module feature tag.

[0032] The modularization of the candidate operational activity plans involves using a pre-trained artificial intelligence natural language processing (NLP) model to process the text content of the candidate operational activity plans. The NLP model performs textual form analysis and semantic analysis on the text content of the candidate operational activity plans to obtain modules into which the candidate operational activity plans can be divided. Then, the pre-trained NLP model is used to tag these modules, extracting or generating corresponding keywords and phrases from the text content of each module as the first module's feature tags. For example, a fintech platform modularizes a promotional activity plan for an insurance product from acquired insurance business, resulting in modules for tasks, inviting friends, and lotteries. The resulting lottery module is then tagged to obtain first module feature tags such as lottery method and prize pool.

[0033] S103. Receive a first request to create a new operation activity plan based on the target business. The first request includes the target operation activity plan name, the target operation activity plan name coefficient, and the target plan module of the target operation activity plan.

[0034] In general data processing and analysis methods, the name of the target operational activity plan has a relatively large weight. However, different activity plan names may not accurately express the semantic requirements of the target operational activity plan. Therefore, the target operational activity plan name coefficient is designed to adjust the weight of the target operational activity plan name during the matching process with the candidate operational activity plan modules. That is, during the matching process, more emphasis is placed on the activity theme expressed by the plan name or the module theme expressed by the target plan module. For example, the operational activities of a certain fintech platform will include shopping festival-themed activities such as Double Eleven and Double Twelve. The same themed activities in different years have a high degree of similarity. In this case, setting a larger target operational activity plan name coefficient will result in recommended plan modules with a high degree of similarity to previous years, making it convenient for relevant operational personnel of the target business to directly reuse the recommended plan modules. Setting a smaller target operational activity plan name coefficient will result in recommended plan modules with a lower degree of similarity to previous years but a high degree of matching with the target plan module, making it convenient for relevant operational personnel of the target business to modify and optimize the recommended plan modules.

[0035] S104. Calculate the first correlation degree between each of the candidate operation activity plan modules and the corresponding first module feature tags, and the second correlation degree between each of the target plan modules and the first module feature tags.

[0036] Although the first module feature label is obtained by tagging each of the candidate operation activity plan modules, the correlation between the first module feature label and the corresponding candidate operation activity plan module is not the same. Therefore, it is necessary to calculate the first correlation.

[0037] Furthermore, the first request also includes target scheme module features of the target operational activity plan. After calculating the first correlation degree between each candidate operational activity plan module and its corresponding first module feature tags, and the second correlation degree between each target scheme module and its corresponding first module feature tags, the request further includes: first, extracting keywords from the text content of the candidate operational activity plan modules as second module feature tags, and setting the tag weights of the second module feature tags. Then, calculating the fourth correlation degree between the target scheme module features and the second module feature tags. Finally, summing the product of the fourth correlation degree corresponding to the second module feature tags included in the candidate operational activity plan modules and the tag weights corresponding to the second module feature tags, and using the sum to update the first correlation degree.

[0038] S105. Input the first correlation degree, the second correlation degree, and the target operation activity plan name coefficient into the preset operation activity plan recommendation algorithm to obtain the third correlation degree between the target plan module and the candidate operation activity plan module.

[0039] Furthermore, the formula for the operational activity plan recommendation algorithm is:

[0040] P ui =∑w uv r vi k

[0041] Where u represents the candidate operational activity plan module, i represents the target plan module, v represents the currently calculated feature label of the first module, and w uv R represents the first degree of correlation. vi P represents the second degree of relevance, k represents the coefficient of the target operational activity plan name, and P represents the second degree of relevance. ui This indicates the third degree of correlation.

[0042] S106. Based on the preset correlation threshold and the third correlation, select the recommended operation activity plan module from the candidate operation activity plan module, and use the recommended operation activity plan module to form a recommended operation activity plan.

[0043] If a corresponding candidate historical operational activity plan module cannot be matched based on the correlation threshold, a corresponding recommended operational activity plan cannot be generated. In this case, the initiator of the first request needs to be notified that no recommendation result can be generated, and a new first request should be received containing a new target operational activity plan name, and / or a new target operational activity plan name coefficient, and / or a new target operational activity plan target plan module. Simultaneously, multiple recommended operational activity plans can also be generated based on the recommended operational activity plan module.

[0044] Furthermore, the recommended operational activity plan will be pushed to the relevant operational personnel of the target business, or the initiator of the first request. The relevant operational personnel or the initiator of the first request may directly accept and adopt the recommended operational activity plan, or may add, delete, or modify the recommended operational activity plan modules included in the recommended operational activity plan. Furthermore, the relevant operational personnel or the initiator of the first request may also directly accept and adopt the recommended operational activity plan modules, or may add, delete, or modify the second module feature tags corresponding to the recommended operational activity plan modules.

[0045] Further, after selecting recommended operational activity plan modules from the candidate operational activity plan modules based on a preset correlation threshold and the third correlation, and using the recommended operational activity plan modules to form a recommended operational activity plan, the process further includes: First, obtaining the adopted recommended operational activity plan as a first operational activity plan to be optimized, wherein the candidate operational activity plan modules of the first operational activity plan to be optimized either do not carry module modification records or carry module modification records. The module modification record refers to the fact that at least one of the recommended operational activity plan modules included in the recommended operational activity plan has been deleted, and / or at least one candidate operational activity plan module has been added to the recommended operational activity plan. Second, obtaining the candidate operational activity plan modules included in the first operational activity plan to be optimized as the first operational activity plan module to be optimized, wherein the second module feature tags of the first operational activity plan module to be optimized either do not carry tag modification records or carry tag modification records. Specifically, the tag modification record refers to the situation where at least one of the second module feature tags of the first operational activity plan module to be optimized has been deleted, and / or at least one of the second module feature tags has been modified, and / or at least one of the second module feature tags has been added to the first operational activity plan to be optimized. Then, the first operational activity plan module to be optimized carrying the module modification record is added to the corresponding candidate operational activity plan module. Finally, at least one candidate operational activity plan module carrying the module modification record of the first operational activity plan to be optimized is added to the candidate operational activity plan.

[0046] Furthermore, after obtaining the candidate operational activity plan modules included in the first operational activity plan to be optimized as the first operational activity plan module to be optimized, the method further includes: First, tagging the target operational activity plan name to obtain candidate operational activity plan name tags. Then, establishing a first association relationship between the candidate operational activity plan module corresponding to the first operational activity plan module to be optimized and the candidate operational activity plan name tags. Finally, using the first number of times the candidate operational activity plan module is selected in the first association relationship as the association weight of the candidate operational activity plan module in the first association relationship.

[0047] Further, the step of obtaining the candidate operational activity plan module included in the first operational activity plan to be optimized as the first operational activity plan module to be optimized, wherein after the second module feature tag of the first operational activity plan module to be optimized does not carry a tag modification record or carries a tag modification record, further includes: First, obtaining the second module feature tag carrying a tag modification record as the first tag to be optimized, generating a new second module feature tag corresponding to the first tag to be optimized, and a new tag weight corresponding to the new second module feature tag, wherein the tag modification record includes at least one of being added and being deleted. Then, obtaining the second module feature tag with a deleted record as the second tag to be optimized, and decreasing the tag weight corresponding to the second tag to be optimized. Obtaining the second module feature tag with an added record as the third tag to be optimized, and increasing the tag weight corresponding to the third tag to be optimized.

[0048] Furthermore, the recommended operation activity plan, the recommended operation activity plan module included in the recommended operation activity plan, and the feature tags of the second module included in the recommended operation activity plan module are uploaded to the blockchain. Specifically, corresponding summary information is obtained based on the recommended operation activity plan, the recommended operation activity plan module, and the feature tags of the second module. Specifically, the summary information is obtained by hashing the recommended operation activity plan, the recommended operation activity plan module, and the feature tags of the second module, for example, using the SHA256s algorithm. Uploading the summary information to the blockchain ensures its security and fairness and transparency to users. User devices can download the summary information from the blockchain to verify whether the first set information entropy, the first conditional entropy, the information gain, the leaf nodes corresponding to the decision tree, and the decision tree model have been tampered with. The blockchain referred to in this example is a new application model of computer technologies such as distributed data storage, peer-to-peer transmission, consensus mechanisms, and encryption algorithms. A blockchain is essentially a decentralized database, a chain of data blocks linked using cryptographic methods. Each data block contains information about a batch of network transactions, used to verify the validity of the information (anti-counterfeiting) and generate the next block. Blockchain can include the underlying blockchain platform, the platform product service layer, and the application service layer.

[0049] The operational activity plan configuration method provided in this embodiment acquires historical operational activity plan data, performs modular processing and tag feature processing, and uses an operational activity plan recommendation algorithm to generate recommended operational activity plans from the historical operational activity plan data. This not only avoids the omission or error of details caused by human factors during manual configuration, but also further improves the efficiency of operational activity plan configuration, avoiding the tedious and time-consuming operation of plan templates during manual configuration. Furthermore, by adding a name coefficient to the operational activity plan recommendation algorithm, the weight of custom theme activities can be flexibly adjusted, providing operational activity plan configuration recommendations that are more closely matched to the needs of the target operational activity plan.

[0050] It should be understood that the sequence number of each step in the above embodiments does not imply the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of this application.

[0051] In one embodiment, an operational activity plan configuration device 100 is provided, which corresponds one-to-one with the operational activity plan configuration method in the above embodiments. For example... Figure 3 As shown, the operational activity plan configuration device 100 includes a first data acquisition module 11, a first module feature tag module 12, an operational activity plan request module 13, a correlation calculation module 14, an operational activity plan recommendation algorithm module 15, and an operational activity plan recommendation combination module 16. Detailed descriptions of each functional module are as follows:

[0052] The first data acquisition module 11 is used to acquire historical operation activity plan data, operation activity plan template data, and operation activity plan example data obtained from third-party channels, and to use the historical operation activity plans, the operation activity plan template data, and the operation activity plan example data as candidate operation activity plans.

[0053] The first module feature tag module 12 is used to modularly decompose the candidate operation activity plan to obtain the candidate operation activity plan module, and then tag the candidate operation activity plan module to obtain the first module feature tag.

[0054] The operation activity plan request module 13 is used to receive a first request to create an operation activity plan based on the target business. The first request includes the target operation activity plan name, the target operation activity plan name coefficient, and the target plan module of the target operation activity plan.

[0055] The correlation calculation module 14 is used to calculate the first correlation degree between each of the candidate operation activity plan modules and the corresponding feature tags of each of the first modules, and the second correlation degree between each of the target plan modules and the feature tags of each of the first modules;

[0056] The operation activity plan recommendation algorithm module 15 is used to input the first correlation degree, the second correlation degree and the target operation activity plan name coefficient into the preset operation activity plan recommendation algorithm to obtain the third correlation degree between the target plan module and the candidate operation activity plan module;

[0057] The operational activity plan recommendation combination module 16 is used to filter out recommended operational activity plan modules from the candidate operational activity plan modules based on a preset correlation threshold and the third correlation, and to use the recommended operational activity plan modules to form a recommended operational activity plan.

[0058] Furthermore, the correlation calculation module 14 also includes:

[0059] The tag weighting submodule is used to extract keywords and phrases from the text content of the candidate operation activity plan module as feature tags for the second module, and to set the tag weights of the feature tags for the second module.

[0060] The fourth correlation submodule is used to calculate the fourth correlation between the feature of the target scheme module and the feature label of the second module;

[0061] The correlation update submodule is used to accumulate the product of the fourth correlation degree corresponding to the second module feature label included in the candidate operation activity plan module and the label weight corresponding to the second module feature label, and use the accumulated sum to update the first correlation degree.

[0062] Furthermore, the operational activity plan recommendation algorithm module 15 also includes:

[0063] The recommendation algorithm formula submodule is used to calculate the third correlation degree according to the following formula:

[0064] P ui =∑w uv r vi k

[0065] Where u represents the candidate operational activity plan module, i represents the target plan module, v represents the currently calculated feature label of the first module, and w uv R represents the first degree of correlation. vi P represents the second degree of relevance, k represents the coefficient of the target operational activity plan name, and P represents the second degree of relevance. ui This indicates the third degree of correlation.

[0066] Furthermore, the operational activity plan recommendation combination module 16 also includes:

[0067] The first optimization scheme submodule is used to obtain the adopted recommended operation activity scheme as the first optimization operation activity scheme, wherein the candidate operation activity scheme module of the first optimization operation activity scheme does not carry module modification records or carries module modification records.

[0068] The first sub-module to be optimized is used to obtain the candidate operation activity plan module included in the first operation activity plan to be optimized as the first operation activity plan to be optimized module, wherein the second module feature tag of the first operation activity plan module to be optimized either does not carry a tag modification record or carries a tag modification record.

[0069] Adding a sub-module to the candidate module is used to add the first operational activity plan module to be optimized, which carries the module modification record, to the corresponding candidate operational activity plan module.

[0070] The candidate scheme addition sub-module is used to add at least one of the candidate operation activity scheme modules, which carries the module modification record, to the candidate operation activity scheme.

[0071] Furthermore, the first sub-module to be optimized also includes:

[0072] The scheme name tag subunit is used to tag the target operation activity scheme name to obtain the candidate operation activity scheme name tag;

[0073] The first association subunit is used to establish a first association relationship between the candidate operation activity plan module corresponding to the first operation activity plan module to be optimized and the candidate operation activity plan name tag;

[0074] The association weight subunit is used to take the first number of times the candidate operation activity plan module is selected in the first association relationship as the association weight of the candidate operation activity plan module in the first association relationship.

[0075] Furthermore, the first sub-module to be optimized also includes:

[0076] The tag subunit to be optimized is used to obtain the second module feature tag carrying the tag modification record as the first tag to be optimized, generate a new second module feature tag corresponding to the first tag to be optimized, and a new tag weight corresponding to the new second module feature tag, wherein the tag modification record includes at least one of being added and being deleted;

[0077] The tag weight reduction subunit is used to obtain the feature tags of the second module with deleted records as the second tags to be optimized, and reduce the tag weights corresponding to the second tags to be optimized.

[0078] The label weighting subunit is used to obtain the second module feature label with added records as the third label to be optimized, and to increase the label weight corresponding to the third label to be optimized.

[0079] The terms "first" and "second" in the above-mentioned modules / units are only used to distinguish different modules / units and are not intended to specify which module / unit has a higher priority or any other limiting meaning. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion. For example, a process, method, system, product, or device that includes a series of steps or modules is not necessarily limited to those steps or modules explicitly listed, but may include other steps or modules not explicitly listed or inherent to these processes, methods, products, or devices. The module divisions appearing in this application are merely logical divisions; in actual applications, different division methods may be used.

[0080] Specific limitations regarding the operational activity plan configuration device can be found in the limitations of the operational activity plan configuration method described above, and will not be repeated here. Each module in the aforementioned operational activity plan configuration device can be implemented entirely or partially through software, hardware, or a combination thereof. These modules can be embedded in or independent of the processor in the computer device in hardware form, or stored in the memory of the computer device in software form, so that the processor can call and execute the operations corresponding to each module.

[0081] In one embodiment, a computer device is provided, which may be a server, and its internal structure diagram may be as follows: Figure 4 As shown, the computer device includes a processor, memory, network interface, and database connected via a system bus. The processor provides computing and control capabilities. The memory includes a non-volatile storage medium and internal memory. The non-volatile storage medium stores the operating system, computer programs, and the database. The internal memory provides an environment for the operation of the operating system and computer programs in the non-volatile storage medium. The database stores data involved in the operational activity plan configuration method. The network interface is used for communication with external terminals via a network connection. When the computer program is executed by the processor, it implements an operational activity plan configuration method.

[0082] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it implements the steps of the operational activity scheme configuration method described in the above embodiments, for example... Figure 2The steps S101 to S106 shown, as well as other extensions and related steps of the method, are examples. Alternatively, when the processor executes the computer program, it implements the functions of each module / unit of the operation activity scheme configuration device in the above embodiments, for example... Figure 3 The functions of modules 11 to 16 are shown. To avoid repetition, they will not be described again here.

[0083] The processor can be a Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor can be a microprocessor or any conventional processor. The processor is the control center of the computer device, connecting various parts of the computer device via various interfaces and lines.

[0084] The memory can be used to store the computer programs and / or modules. The processor implements various functions of the computer device by running or executing the computer programs and / or modules stored in the memory and by calling data stored in the memory. The memory may mainly include a program storage area and a data storage area. The program storage area may store the operating system, applications required for at least one function (such as sound playback function, image playback function, etc.), etc.; the data storage area may store data created based on the use of the mobile phone (such as audio data, video data, etc.).

[0085] The memory can be integrated into the processor or it can be set up separately from the processor.

[0086] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When executed by a processor, the computer program implements the steps of the operational activity scheme configuration method described in the above embodiments, for example... Figure 2 The steps S101 to S106 shown, as well as other extensions and related steps of the method, are examples. Alternatively, when the computer program is executed by a processor, it implements the functions of each module / unit of the operation activity scheme configuration device in the above embodiments, for example... Figure 3 The functions of modules 11 to 16 are shown. To avoid repetition, they will not be described again here.

[0087] Those skilled in the art will understand that all or part of the processes in the methods of the above embodiments can be implemented by a computer program instructing related hardware. The computer program can be stored in a non-volatile computer-readable storage medium, and when executed, it can include the processes of the embodiments of the above methods. Any references to memory, storage, databases, or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM), or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in various forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), dual data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link DRAM (SLDRAM), Rambus direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.

[0088] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the above-described division of functional units and modules is used as an example. In practical applications, the above functions can be assigned to different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.

[0089] The above-described embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this application, and should all be included within the protection scope of this application.

Claims

1. A method for configuring an operational activity plan, characterized in that, include: Obtain historical operational activity plan data, operational activity plan template data, and operational activity plan example data obtained from third-party channels, and use the historical operational activity plans, operational activity plan template data, and operational activity plan example data as candidate operational activity plans; The candidate operational activity plans are modularized to obtain candidate operational activity plan modules, and then the candidate operational activity plan modules are tagged to obtain first module feature tags. Receive a first request to create a new operational activity plan based on the target business. The first request includes the target operational activity plan name, the target operational activity plan name coefficient, and the target plan module of the target operational activity plan. Calculate the first correlation degree between each of the candidate operation activity plan modules and the corresponding feature tags of each of the first modules, and the second correlation degree between each of the target plan modules and the feature tags of each of the first modules; The first correlation, the second correlation, and the target operational activity plan name coefficient are input into a preset operational activity plan recommendation algorithm to obtain the third correlation between the target plan module and the candidate operational activity plan module. Based on the preset correlation threshold and the third correlation, a recommended operational activity plan module is selected from the candidate operational activity plan module, and the recommended operational activity plan module is used to form a recommended operational activity plan; The first request further includes target scheme module features of the target operational activity plan. After calculating the first correlation degree between each candidate operational activity plan module and its corresponding first module feature tags, and the second correlation degree between each target scheme module and its corresponding first module feature tags, the request further includes: extracting keywords from the text content of the candidate operational activity plan modules as second module feature tags, and setting the tag weights of the second module feature tags; calculating the fourth correlation degree between the target scheme module features and the second module feature tags; accumulating the product of the fourth correlation degree corresponding to the second module feature tags included in the candidate operational activity plan modules and the tag weights corresponding to the second module feature tags, and using the accumulated sum to update the first correlation degree. The process of selecting recommended operational activity plan modules from the candidate operational activity plan modules based on a preset correlation threshold and the third correlation, and then using these modules to compose a recommended operational activity plan, further includes: obtaining the adopted recommended operational activity plan as a first operational activity plan to be optimized, wherein the candidate operational activity plan modules of the first operational activity plan to be optimized either do not carry module modification records or carry module modification records; obtaining the candidate operational activity plan modules included in the first operational activity plan to be optimized as the first operational activity plan modules to be optimized, wherein the second module feature tags of the first operational activity plan modules to be optimized either do not carry tag modification records or carry tag modification records; adding the first operational activity plan modules to be optimized that carry module modification records to the corresponding candidate operational activity plan modules; and adding at least one candidate operational activity plan module carrying module modification records of the first operational activity plan to be optimized to the candidate operational activity plan.

2. The method for configuring an operational activity plan according to claim 1, characterized in that, The formula for the operational activity plan recommendation algorithm is: in, This refers to the module containing the proposed operational activity plans. This represents the target solution module. This represents the feature label of the first module currently being calculated. Indicates the first degree of correlation. This indicates the second degree of correlation. This represents the coefficient of the target operational activity plan name. This indicates the third degree of correlation.

3. The method for configuring an operational activity plan according to claim 1, characterized in that, After obtaining the candidate operation activity plan module included in the first operation activity plan to be optimized as the first operation activity plan module to be optimized, the method further includes: The names of the target operational activity plans are tagged to obtain the candidate operational activity plan name tags; Establish a first association relationship between the candidate operation activity plan module corresponding to the first operation activity plan module to be optimized and the candidate operation activity plan name tag; The first number of times the candidate operation activity plan module in the first association relationship is selected is used as the association weight of the candidate operation activity plan module in the first association relationship.

4. The method for configuring an operational activity plan according to claim 1, characterized in that, The step of obtaining the candidate operation activity plan module included in the first operation activity plan to be optimized as the first operation activity plan module to be optimized, wherein the second module feature tag of the first operation activity plan module to be optimized does not carry a tag modification record or carries a tag modification record, further includes: The second module feature label carrying the label modification record is obtained as the first label to be optimized, and a new second module feature label corresponding to the first label to be optimized and a new label weight corresponding to the new second module feature label are generated. The label modification record includes at least one of being added and being deleted. The feature labels of the second module with deleted records are obtained as the second labels to be optimized, and the label weights corresponding to the second labels to be optimized are reduced. The feature label of the second module with added records is obtained as the third label to be optimized, and the label weight corresponding to the third label to be optimized is increased.

5. An operational activity plan configuration device, characterized in that, include: The first data acquisition module is used to acquire historical operational activity plan data, operational activity plan template data, and operational activity plan example data obtained from third-party channels, and to use the historical operational activity plans, the operational activity plan template data, and the operational activity plan example data as candidate operational activity plans. The first module feature tag module is used to modularly decompose the candidate operation activity plan to obtain the candidate operation activity plan module, and then tag the candidate operation activity plan module to obtain the first module feature tag. The operational activity plan request module is used to receive a first request to create an operational activity plan based on the target business. The first request includes the target operational activity plan name, the target operational activity plan name coefficient, and the target plan module of the target operational activity plan. The correlation calculation module is used to calculate the first correlation degree between each of the candidate operation activity plan modules and the corresponding feature tags of each of the first modules, and the second correlation degree between each of the target plan modules and the feature tags of each of the first modules; The operational activity plan recommendation algorithm module is used to input the first correlation degree, the second correlation degree and the target operational activity plan name coefficient into a preset operational activity plan recommendation algorithm to obtain the third correlation degree between the target plan module and the candidate operational activity plan module; The operation activity plan recommendation and combination module is used to filter out recommended operation activity plan modules from the candidate operation activity plan modules according to a preset correlation threshold and the third correlation, and use the recommended operation activity plan modules to form a recommended operation activity plan; The relevance calculation module further includes: a tag weight submodule, used to extract keywords from the text content of the candidate operational activity plan module as second module feature tags, and set the tag weights of the second module feature tags; a fourth relevance submodule, used to calculate the fourth relevance between the target plan module features and the second module feature tags; and a relevance update submodule, used to accumulate the product of the fourth relevance corresponding to the second module feature tags contained in the candidate operational activity plan module and the tag weight corresponding to the second module feature tags, and use the accumulated sum to update the first relevance. The operational activity plan recommendation combination module further includes: a first optimization plan submodule, used to obtain the adopted recommended operational activity plan as the first optimization operational activity plan, wherein the candidate operational activity plan module of the first optimization operational activity plan does not carry a module modification record or carries a module modification record; a first optimization module submodule, used to obtain the candidate operational activity plan modules included in the first optimization operational activity plan as the first optimization operational activity plan modules, wherein the second module feature tag of the first optimization operational activity plan module does not carry a tag modification record or carries a tag modification record; a candidate module adding submodule, used to add the first optimization operational activity plan module carrying a module modification record to the corresponding candidate operational activity plan module; and a candidate plan adding submodule, used to add at least one of the candidate operational activity plan modules carrying a module modification record of the first optimization operational activity plan to the candidate operational activity plan.

6. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the computer program, it implements the steps of the operational activity scheme configuration method as described in any one of claims 1 to 4.

7. A computer-readable storage medium storing a computer program, characterized in that, When the computer program is executed by a processor, it implements the steps of the operational activity scheme configuration method as described in any one of claims 1 to 4.

Citation Information

Patent Citations

  • Webpage activity configuration system

    CN109948096A

  • Marketing activity operation method and device

    CN113283930A

  • Class case recommendation method and related device

    CN114398474A

  • Label-based digital solution recommendation method and device

    CN114610776A