New Generation Substation and Central Control Station Network Anomaly Dynamic Model Testing System and Method

By simulating network anomaly messages in a new generation of independently controllable substations and centralized control stations, the impact of network anomalies on secondary system equipment was resolved, enabling equipment performance verification and design guidance.

CN116346655BActive Publication Date: 2024-11-26CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211642271.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-20
Publication Date
2024-11-26
Estimated Expiration
2042-12-20

AI Technical Summary

Technical Problem

In the new generation of self-reliant and controllable substations and centralized control stations, network anomalies can seriously affect the data interaction of secondary system equipment, and existing technologies lack effective methods for simulating and testing network anomalies.

Method used

A network anomaly dynamic simulation test system is provided, including a dynamic simulation test system, substation secondary equipment, central control station equipment, and network test equipment. By simulating the actual operating environment, network anomaly messages are applied for testing to ensure that the protection unit can receive anomaly messages while receiving normal messages, thus performing network anomaly testing.

Benefits of technology

It enables network anomaly simulation of the secondary systems of independently controllable new-generation substations and centralized control stations, verifies equipment performance, ensures normal operation under real network anomaly environments, and provides design and R&D guidance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116346655B_ABST
    Figure CN116346655B_ABST
Patent Text Reader

Abstract

The present invention discloses a new generation of network abnormal dynamic model testing system and method for substations and centralized control stations. The system includes: centralized control station equipment, substation secondary equipment, network testing equipment and dynamic model testing system, wherein the dynamic model testing system is used to simulate the operating environment of the actual substation system, and provide voltage analog quantity, current analog quantity and switch quantity to the substation secondary equipment; the substation secondary equipment is used to perform fault calculation according to the received voltage analog quantity, current analog quantity and switch quantity, and output action GOOSE digital signal and communication message are transmitted to other secondary equipment and centralized control station equipment in the substation secondary equipment through the station control layer network; the network testing equipment is connected to the station control layer network of the substation secondary equipment, and various network abnormality messages are applied in the station control layer network; the centralized control station equipment exchanges data with the substation secondary equipment through the station control layer network, so as to realize remote operation of the substation secondary equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power system automation technology, and more specifically, to a network abnormality dynamic model testing system and method for a new generation of substations and centralized control stations. Background Art

[0002] In response to the technical status quo and improvement needs of substation secondary systems, State Grid Corporation of China proposes to use "autonomous controllable, safe and reliable, advanced and applicable, intensive and efficient" as the overall principles, inherit and develop the existing achievements and experience in smart substation design, construction and operation, and comprehensively carry out the construction of a new generation of autonomous and controllable substation secondary systems.

[0003] At present, SV sampling has been cancelled in high-voltage substations. In order to save switches and simplify networking, the new generation of autonomous and controllable substations have cancelled the process layer network, and GOOSE is transmitted via the station control layer network. The station control layer network is responsible for the transmission of GOOSE messages and station control layer messages. If the network is abnormal, it will have a serious impact on the data interaction of the secondary system equipment of the substation and the centralized control station. Therefore, it is necessary to study the network abnormality simulation method of the new generation of substations and centralized control stations, and test the performance of secondary equipment under network abnormalities. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a new generation of network abnormal dynamic model testing system and method for substations and centralized control stations.

[0005] According to one aspect of the present invention, a new generation of network abnormal dynamic model testing system for substations and centralized control stations is provided, comprising:

[0006] Centralized control station equipment, substation secondary equipment, network test equipment and dynamic model test system, including

[0007] The dynamic model test system is used to simulate the operating environment of the actual substation system and provide voltage simulation, current simulation and switch quantity to the substation secondary equipment;

[0008] The substation secondary equipment is used to perform fault calculation based on the received voltage analog quantity, current analog quantity, and switch quantity, and output action GOOSE digital signals and communication messages are transmitted to other secondary equipment and centralized control station equipment in the substation secondary equipment through the station control layer network;

[0009] The network test equipment is connected to the station control layer network of the substation secondary equipment, and various network abnormality messages are applied to the station control layer network, so that the protection units in the same network can receive network abnormality messages while receiving normal messages, thereby performing network abnormality testing;

[0010] The centralized control station equipment exchanges data with the substation secondary equipment through the station control layer network to realize remote operation of the substation secondary equipment.

[0011] Optionally, the dynamic model test system includes a generator physical simulation unit, a step-up transformer physical simulation unit, a switch physical simulation unit, a transmission line physical simulation unit, a busbar physical simulation unit, a transformer physical simulation unit, an infinite power source physical simulation unit and a transformer physical simulation unit, wherein

[0012] The busbar physical simulation unit consists of two busbars, the first busbar and the second busbar, forming a double busbar connection mode;

[0013] The generator physical simulation unit is connected to the first bus at the machine end through the step-up transformer physical simulation unit, the transmission line physical simulation unit, the transformer physical simulation unit, and the switch physical simulation unit;

[0014] The infinite power source physical simulation unit is connected to the second bus;

[0015] The transformer physical simulation unit is connected to the second busbar.

[0016] Optionally, the dynamic mold test system further includes: a plurality of fault simulation switches and a control system arranged at different positions, wherein

[0017] A plurality of fault simulation switches are connected to the control system via cables, and the time and duration of the fault occurrence are controlled by a pre-set program.

[0018] Optionally, the station control layer network includes: a station control layer network of a zone I substation and a station control layer network of a zone II substation, wherein

[0019] Firewall configuration for the station control network of Zone I substation and Zone II substation

[0020] The substation control layer network in Zone I accesses the real-time data of the main equipment and the important measurement and key alarm data of the auxiliary equipment through the real-time gateway of the substation, and sends the control instructions to the primary equipment of the switch / knife switch. The main equipment includes protection devices and measurement and control devices, and the auxiliary equipment includes auxiliary monitoring equipment, dynamic ring, lock control, safety defense, and fire protection.

[0021] The substation control network in Zone II obtains protection information, recording data, auxiliary equipment and operation and maintenance diagnosis information on demand through the substation service gateway, and issues auxiliary equipment operation instruction information.

[0022] Optionally, the substation secondary equipment includes: a collection execution unit physical simulation unit, a line protection physical simulation unit, a busbar protection physical simulation unit, a transformer protection physical simulation unit, a multifunctional measurement and control physical simulation unit, an intelligent fault recording physical simulation unit, and an isolation device simulation unit, wherein

[0023] The physical simulation unit of the acquisition execution unit is used to receive voltage analog quantity, current analog quantity and switch quantity, and output voltage and current digital quantity and GOOSE digital signal through digital-to-analog conversion, and send them to the line protection physical simulation unit, busbar protection physical simulation unit, transformer protection physical simulation unit, multi-functional measurement and control physical simulation unit and intelligent fault recording physical simulation unit in a point-to-point manner;

[0024] The line protection physical simulation unit, busbar protection physical simulation unit, transformer protection physical simulation unit, and multifunctional measurement and control physical simulation unit perform fault calculations on the voltage and current digital quantities, output communication messages, and output communication messages and GOOSE digital signals to the station control layer network of the Zone I substation;

[0025] The intelligent fault recording physical simulation unit is connected to the substation control layer network of Zone II through the networking port, and is used to record the GOOSE and communication message information output by the substation secondary equipment.

[0026] Optionally, the substation secondary equipment also includes: an intelligent fault recorder, which obtains voltage and current digital quantities from the acquisition execution unit physical simulation unit in a point-to-point manner, and records the action GOOSE digital signals and communication messages of the substation secondary equipment through the station control layer network.

[0027] Optionally, the centralized control station equipment includes: a physical simulation unit for acquisition and application server in zone I and a physical simulation unit for acquisition and application server in zone II, wherein

[0028] The physical simulation unit of the acquisition and application server in zone I performs data interaction with the station control layer network of the zone I substation through the centralized control station network via the vertical encryption physical simulation unit and the real-time gateway physical simulation unit;

[0029] The physical simulation unit of the acquisition and application server in Zone II exchanges data with the station control layer network of the substation in Zone II through the centralized control station network.

[0030] Optionally, the zone I collection and application server physical simulation unit and the zone II collection and application server physical simulation unit are configured with a firewall.

[0031] According to another aspect of the present invention, a network abnormal dynamic model testing method for a new generation substation and a centralized control station is provided, comprising:

[0032] The network test equipment inputs network abnormality messages to the station control layer network of the substation secondary equipment;

[0033] Under the action of network abnormality messages, the protection device of the secondary equipment of the substation performs logical operations according to the voltage analog quantity, current analog quantity, switch quantity and network abnormality messages received from the dynamic model test system, and outputs action GOOSE signals and communication messages to realize the network abnormality dynamic model test of the new generation of substations and centralized control stations. The protection device includes a line protection physical simulation unit, a busbar protection physical simulation unit, a transformer protection physical simulation unit and a multi-functional measurement and control physical simulation unit.

[0034] Optionally, the network abnormality dynamic model test of the new generation substation and centralized control station includes: network stress test, network attack test, single network abnormality test and network reliability test.

[0035] Therefore, the network abnormality dynamic model testing system for the new generation substation and centralized control station provided by the present invention is suitable for the primary and secondary joint testing of the autonomous and controllable new generation substation and centralized control station. It builds a real autonomous and controllable new generation substation and centralized control station secondary system joint testing dynamic model system and substation communication network, which can simulate the real network abnormality environment on site. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] A more complete understanding of exemplary embodiments of the present invention may be obtained by referring to the following drawings:

[0037] Figure 1 It is a schematic diagram of a network abnormal dynamic model testing system for a new generation substation and a centralized control station according to the first aspect of an embodiment of the present invention;

[0038] Figure 2 It is a specific structural diagram of the network abnormal dynamic model testing system of the new generation substation and centralized control station described in the first aspect of the embodiment of the present invention;

[0039] Figure 3 is a schematic diagram of a dynamic mold test system according to the first aspect of an embodiment of the present invention;

[0040] Figure 4 It is a schematic diagram of a centralized control station and a substation secondary system network anomaly test platform according to the first aspect of an embodiment of the present invention;

[0041] Figure 5 It is a flow chart of a network abnormal dynamic model testing method for a new generation substation and a centralized control station described in the second aspect of an embodiment of the present invention. DETAILED DESCRIPTION

[0042] Below, the exemplary embodiments according to the present invention will be described in detail with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments of the present invention, and it should be understood that the present invention is not limited to the exemplary embodiments described here.

[0043] It should be noted that the relative arrangement of components and steps, the numerical expressions and numerical values ​​set forth in these embodiments do not limit the scope of the present invention unless specifically stated otherwise.

[0044] Those skilled in the art can understand that the terms "first" and "second" in the embodiments of the present invention are only used to distinguish different steps, devices or modules, etc., and neither represent any specific technical meaning nor indicate the necessary logical order between them.

[0045] It should also be understood that, in the embodiments of the present invention, “plurality” may refer to two or more than two, and “at least one” may refer to one, two or more than two.

[0046] It should also be understood that any component, data or structure mentioned in the embodiments of the present invention can generally be understood as one or more, unless explicitly limited or otherwise indicated in the context.

[0047] In addition, the term "and / or" in the present invention is only a description of the association relationship of the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in the present invention generally indicates that the associated objects before and after are in an "or" relationship.

[0048] It should also be understood that the description of the various embodiments of the present invention focuses on the differences between the various embodiments, and the same or similar aspects thereof can be referenced to each other, and for the sake of brevity, they will not be described one by one.

[0049] At the same time, it should be understood that for the convenience of description, the sizes of the various parts shown in the drawings are not drawn according to the actual proportional relationship.

[0050] The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application, or uses.

[0051] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered part of the specification.

[0052] It should be noted that like reference numerals and letters refer to similar items in the following figures, and therefore, once an item is defined in one figure, it need not be further discussed in subsequent figures.

[0053] Embodiments of the present invention can be applied to electronic devices such as terminal devices, computer systems, servers, etc., which can operate with many other general or special computing system environments or configurations. Examples of well-known terminal devices, computing systems, environments and / or configurations suitable for use with electronic devices such as terminal devices, computer systems, servers, etc. include, but are not limited to: personal computer systems, server computer systems, thin clients, thick clients, handheld or laptop devices, microprocessor-based systems, set-top boxes, programmable consumer electronics, network personal computers, small computer systems, large computer systems, and distributed cloud computing technology environments including any of the above systems, etc.

[0054] Electronic devices such as terminal devices, computer systems, servers, etc. can be described in the general context of computer system executable instructions (such as program modules) executed by computer systems. Generally, program modules can include routines, programs, object programs, components, logic, data structures, etc., which perform specific tasks or implement specific abstract data types. Computer systems / servers can be implemented in a distributed cloud computing environment, where tasks are performed by remote processing devices linked through a communication network. In a distributed cloud computing environment, program modules can be located on local or remote computing system storage media including storage devices.

[0055] Figure 1 This is the intention of the first aspect of the embodiment of the present invention to provide a new generation of substation and centralized control station network abnormal dynamic model testing system. Figure 1 As shown in the figure, the new generation of substation and centralized control station network abnormal dynamic model test system includes: centralized control station equipment, substation secondary equipment, network test equipment and dynamic model test system, among which

[0056] The dynamic model test system is used to simulate the operating environment of the actual substation system and provide voltage simulation, current simulation and switch quantity to the substation secondary equipment;

[0057] The substation secondary equipment is used to perform fault calculation based on the received voltage analog quantity, current analog quantity, and switch quantity, and output action GOOSE digital signals and communication messages are transmitted to other secondary equipment and centralized control station equipment in the substation secondary equipment through the station control layer network;

[0058] The network test equipment is connected to the station control layer network of the substation secondary equipment, and various network abnormality messages are applied to the station control layer network, so that the protection units in the same network can receive network abnormality messages while receiving normal messages, thereby performing network abnormality testing;

[0059] The centralized control station equipment exchanges data with the substation secondary equipment through the station control layer network to realize remote operation of the substation secondary equipment.

[0060] Optionally, the dynamic model test system includes a generator physical simulation unit, a step-up transformer physical simulation unit, a switch physical simulation unit, a transmission line physical simulation unit, a busbar physical simulation unit, a transformer physical simulation unit, an infinite power source physical simulation unit and a transformer physical simulation unit, wherein

[0061] The busbar physical simulation unit consists of two busbars, the first busbar and the second busbar, forming a double busbar connection mode;

[0062] The generator physical simulation unit is connected to the first bus at the machine end through the step-up transformer physical simulation unit, the transmission line physical simulation unit, the transformer physical simulation unit, and the switch physical simulation unit;

[0063] The infinite power source physical simulation unit is connected to the second bus;

[0064] The transformer physical simulation unit is connected to the second busbar.

[0065] Optionally, the dynamic mold test system further includes: a plurality of fault simulation switches and a control system arranged at different positions, wherein

[0066] A plurality of fault simulation switches are connected to the control system via cables, and the time and duration of the fault occurrence are controlled by a pre-set program.

[0067] Optionally, the station control layer network includes: a station control layer network of a zone I substation and a station control layer network of a zone II substation, wherein

[0068] Firewall configuration for the station control network of Zone I substation and Zone II substation

[0069] The substation control layer network in Zone I accesses the real-time data of the main equipment and the important measurement and key alarm data of the auxiliary equipment through the real-time gateway of the substation, and sends the control instructions to the primary equipment of the switch / knife switch. The main equipment includes protection devices and measurement and control devices, and the auxiliary equipment includes auxiliary monitoring equipment, dynamic ring, lock control, safety defense, and fire protection.

[0070] The substation control network in Zone II obtains protection information, recording data, auxiliary equipment and operation and maintenance diagnosis information on demand through the substation service gateway, and issues auxiliary equipment operation instruction information.

[0071] Optionally, the substation secondary equipment includes: a collection execution unit physical simulation unit, a line protection physical simulation unit, a busbar protection physical simulation unit, a transformer protection physical simulation unit, a multifunctional measurement and control physical simulation unit, an intelligent fault recording physical simulation unit, and an isolation device simulation unit, wherein

[0072] The physical simulation unit of the acquisition execution unit is used to receive voltage analog quantity, current analog quantity and switch quantity, and output voltage and current digital quantity and GOOSE digital signal through digital-to-analog conversion, and send them to the line protection physical simulation unit, busbar protection physical simulation unit, transformer protection physical simulation unit, multi-functional measurement and control physical simulation unit and intelligent fault recording physical simulation unit in a point-to-point manner;

[0073] The line protection physical simulation unit, busbar protection physical simulation unit, transformer protection physical simulation unit, and multifunctional measurement and control physical simulation unit perform fault calculations on the voltage and current digital quantities, output communication messages, and output communication messages and GOOSE digital signals to the station control layer network of the Zone I substation;

[0074] The intelligent fault recording physical simulation unit is connected to the substation control layer network of Zone II through the networking port, and is used to record the GOOSE and communication message information output by the substation secondary equipment.

[0075] Optionally, the substation secondary equipment also includes: an intelligent fault recorder, which obtains voltage and current digital quantities from the acquisition execution unit physical simulation unit in a point-to-point manner, and records the action GOOSE digital signals and communication messages of the substation secondary equipment through the station control layer network.

[0076] Optionally, the centralized control station equipment includes: a physical simulation unit for acquisition and application server in zone I and a physical simulation unit for acquisition and application server in zone II, wherein

[0077] The physical simulation unit of the acquisition and application server in zone I performs data interaction with the station control layer network of the zone I substation through the centralized control station network via the vertical encryption physical simulation unit and the real-time gateway physical simulation unit;

[0078] The physical simulation unit of the acquisition and application server in Zone II exchanges data with the station control layer network of the substation in Zone II through the centralized control station network.

[0079] Optionally, the zone I collection and application server physical simulation unit and the zone II collection and application server physical simulation unit are configured with a firewall.

[0080] Specifically, refer to Figure 1 and Figure 2 As shown, the network abnormal dynamic model testing system for the new generation substation and centralized control station provided by this application includes:

[0081] Dynamic model test system, substation secondary equipment, centralized control station equipment and network test equipment are described in detail as follows:

[0082] (1) The dynamic model test system is used to simulate the operating environment of the actual substation system and provide voltage analog quantity, current analog quantity and switch quantity to the acquisition execution unit (see Figure 3 As shown). The busbar physical simulation unit of the system consists of two busbar simulation units forming a double busbar connection mode. The generator physical simulation unit is connected to the busbar through the step-up transformer physical simulation unit, the transmission line physical simulation unit, the transformer simulation unit, the switch simulation unit, the infinite power supply physical simulation unit, and the transformer physical simulation unit. Multiple fault simulation switches are also arranged in the system, which are connected to the control system through cables. The time and duration of the fault are controlled through program settings.

[0083] (2) Substation secondary equipment includes: line protection physical simulation unit, busbar protection physical simulation unit, transformer protection physical simulation unit, multi-functional measurement and control physical simulation unit, intelligent fault recording unit, isolation equipment simulation unit, etc.

[0084] (3) The equipment of the centralized control station includes: physical simulation unit of zone I data acquisition and application server and physical simulation unit of zone II data acquisition and application server.

[0085] (4) Network testing equipment includes network testers.

[0086] The overall architecture of the coordinated test of the centralized control station and substation, as well as the network architecture and networking of the station control layer, are described in detail as follows:

[0087] (1) Overall architecture of the monitoring system of the centralized control station

[0088] The centralized control station equipment is based on the basic platform and builds centralized control related application functions in security zone I and security zone II. According to the security protection requirements, firewalls are configured between security zone I and security zone II. The centralized control station equipment realizes application functions and information interaction based on public services such as service bus and message bus provided by the basic platform.

[0089] Safety Zone I accesses the real-time data of main equipment, important measurement and key alarm data of auxiliary equipment, and issues equipment control instructions through the substation real-time gateway; Safety Zone II obtains information such as security, recording, auxiliary equipment and operation and maintenance diagnosis on demand through the substation service gateway, and issues information such as auxiliary equipment operation instructions.

[0090] (2) Station control layer network architecture and networking

[0091] The station control layer network should be divided into safety zone I and safety zone II. The line protection physical simulation unit, transformer protection physical simulation unit, busbar protection physical simulation unit, and multifunctional measurement and control physical simulation unit (hereinafter referred to as protection unit) are connected to the station control layer network of zone I.

[0092] The intelligent fault recording physical simulation unit acquisition unit receives the acquisition execution unit SV / GOOSE message in a point-to-point manner and accesses the station control layer network of area II. The station control layer network uses a firewall to isolate the cross-area transmission of GOOSE data in the I / II interval.

[0093] The connectivity relationship between the various equipment units in the overall test model system of the autonomous and controllable new generation substation and centralized control station secondary system is as follows:

[0094] 1) The physical simulation unit of the acquisition execution unit acquires the voltage analog quantity, current analog quantity and switch quantity signal provided by the dynamic model test system, and after analog-to-digital conversion, outputs SV and GOOSE digital signals and sends them to the line protection physical simulation unit, busbar protection physical simulation unit, transformer protection physical simulation unit, multi-functional measurement and control physical simulation unit and intelligent fault recording physical simulation unit in a point-to-point manner.

[0095] 2) The line protection physical simulation unit, busbar protection physical simulation unit, transformer protection physical simulation unit, security control physical simulation unit, and multifunctional measurement and control physical simulation unit send GOOSE signals and DL / T 860 communication messages to the station control layer network of Zone I substation through the networking port. The main and auxiliary integrated monitoring host physical simulation unit and the real-time gateway physical simulation unit are also connected to the station control layer network of Zone I substation, and perform data interaction operations with the protection unit through the station control layer network.

[0096] 3) The physical simulation unit of the acquisition and application server in zone I of the centralized control station interacts with the substation control layer network through the centralized control station network via the vertical encryption physical simulation unit and the real-time gateway physical simulation unit.

[0097] 4) The intelligent fault recording physical simulation unit, the service gateway physical simulation unit and the comprehensive application host physical simulation unit are connected to the station control layer network of Zone II substation through the networking port. The Zone II acquisition and application server physical simulation unit exchanges data with the station control layer network of Zone II substation through the centralized control station network via the longitudinal encryption physical simulation unit and the service gateway physical simulation unit.

[0098] 5) The Zone I and Zone II networks can exchange data through the firewall.

[0099] The present invention provides a test platform for the abnormal network of the secondary system of the centralized control station and the substation. Based on the overall test model system of the secondary system of the autonomous and controllable new generation substation and the centralized control station, a physical simulation unit of the network tester is connected to the station control layer network (see Figure 4The physical simulation unit of the network tester applies various network abnormality messages in the station control layer network, so that the protection unit in the same network can receive the network abnormality message while receiving the normal message. The intelligent fault recording physical simulation unit receives the action tripping GOOSE signal output by the protection unit through the station control layer network.

[0100] Therefore, the network abnormality dynamic model testing system for the new generation substation and centralized control station provided by the present invention is suitable for the primary and secondary joint testing of the autonomous and controllable new generation substation and centralized control station. It builds a real autonomous and controllable new generation substation and centralized control station secondary system joint testing dynamic model system and substation communication network, which can simulate the real network abnormality environment on site.

[0101] also, Figure 5 This is a flow chart of a method for testing a network abnormal dynamic model of a new generation substation and a centralized control station according to the second aspect of an embodiment of the present application, with reference to Figure 5 As shown, the method 500 includes the following steps:

[0102] Step 501, the network test equipment inputs a network abnormality message to the station control layer network of the substation secondary equipment;

[0103] Step 502, under the action of the network abnormality message, the protection device of the secondary equipment of the substation performs logical operations according to the voltage analog quantity, current analog quantity, switch quantity and network abnormality message received from the dynamic model test system, and outputs the action GOOSE signal and communication message to realize the network abnormality dynamic model test of the new generation substation and centralized control station, wherein the protection device includes a line protection physical simulation unit, a busbar protection physical simulation unit, a transformer protection physical simulation unit and a multifunctional measurement and control physical simulation unit.

[0104] Optionally, the network abnormality dynamic model test of the new generation substation and centralized control station includes: network stress test, network attack test, single network abnormality test and network reliability test.

[0105] Specifically, different types of network abnormality messages are applied through a network tester, and a short circuit fault is simulated in the system during the network abnormality to implement a performance test on the protection unit.

[0106] Network abnormal conditions include but are not limited to network pressure, network attacks, single network abnormalities, network reliability, etc.:

[0107] Network stress test: Based on the original network data flow of the station control layer, use a network tester to apply GOOSE, ARP and other types of messages to the switch port. During the continuous network stress, simulate system failures to check the action of the protection device and the information transmission.

[0108] Network attack test: Simulate network attacks on the substation network and the centralized control station network. During various attacks, simulate system failures, check the protection action status, and whether the alarm information data can be correctly sent to the station control system and the centralized control station monitoring system.

[0109] (3) Single network abnormality test: Simulate the abnormality of a single network in the station control layer network. At this time, simulate system failures, remote control requests initiated by the centralized control station, and check the response of protection, measurement and control, real-time gateway and other equipment.

[0110] (4) Network reliability test: Simulate network pressure caused by messages of any VLAN number in network A. Simulate system failures and remote control requests initiated by the centralized control station to check the response of protection, measurement and control, real-time gateway and other equipment.

[0111] Simulate multiple system failures and check whether network messages are lost.

[0112] (1) Network stress test

[0113] 1) Compared with the previous smart substations, the autonomous and controllable new generation substations eliminate the process layer network through the point-to-point connection mode of the acquisition execution unit. The GOOSE messages in the process layer network of the previous smart station are circulated in the station control layer network of the autonomous and controllable new generation substation, and data is exchanged with the relay protection device through the station control layer network. The network stress test method in the present invention is different from the network stress test method in the existing patent, as follows:

[0114] 2) Different network architectures. The network pressure in existing patents is divided into process layer network pressure and station control layer network pressure, while the network pressure in the present invention is only applied in the station control layer network.

[0115] 3) The data flows applied in the network architecture are different. In the process layer network stress test in the existing patent, the data flows are GOOSE and SV, and the network stress of the station control layer is broadcast messages. The network stress in the present invention is only applied in the station control layer, and the data flows in the test are GOOSE and broadcast messages.

[0116] 4) Added network stress test for centralized control station. The network stress test in the present invention adds network stress test for centralized control station switches, and the data flow in the test is a broadcast message.

[0117] The data flow transmission of the network stress test is as follows:

[0118] The dynamic model test system is connected to the physical simulation unit of the acquisition and execution unit, providing voltage, current AC quantities and switch quantities. The acquisition and execution unit is connected to the protection unit in a point-to-point wiring manner, providing SV and GOOSE signals. At the same time, the GOOSE signal of the protection unit action is also provided to the acquisition and execution unit.

[0119] The physical simulation unit of the network tester is connected to the station control layer network, and network abnormal messages including non-subscription / subscription GOOSE messages and broadcast messages are applied to the station control layer network respectively. The network abnormal messages flow to the networking port of the protection unit through the station control layer network, become the message information obtained by the protection unit, and enter the internal logic operation of the device.

[0120] At the same time, the network messages of the station control layer network (including the protection unit action GOOSE signal) also enter the network intelligent fault recording unit through the networking port optical fiber to record all network message information.

[0121] The network stress testing method in the present invention is specifically as follows:

[0122] 1) Based on the original network data traffic of the station control layer, use a network tester to apply non-subscribed GOOSE, ARP and other types of messages to the switch port, inject traffic (100M-actual measured basic traffic), and the network pressure lasts for no less than 2 minutes. During the continuous network pressure, simulate the faults inside and outside the area and the faults related to the messages of each subscribed GOOSE control block (such as circuit breaker failure, dead zone fault or manual circuit breaker failure, etc.), and check the action of the protection device and the information sending status. The change type of non-subscribed GOOSE pressure message can be set to repeated message (stNum unchanged, sqNum unchanged), heartbeat message (stNum unchanged, sqNum increasing), and position change message (stNum increasing, sqNum is 0, and the channel does not change). Refer to Table 1 for the added non-subscribed message types.

[0123] Table 1: Non-subscription message types

[0124]

[0125]

[0126] 2) Based on the original network data flow of the substation control layer, use a network tester to apply a single or multiple subscribed GOOSE messages to the switch port, and the network pressure lasts for no less than 2 minutes. During the network pressure, simulate the faults inside and outside the area and the faults related to the subscribed GOOSE control block messages (such as circuit breaker failure, dead zone fault or manual circuit breaker failure, etc.). The types of messages applied are as follows:

[0127] a) Subscribe to GOOSE repeated message stress test: stNum remains unchanged, sqNum remains unchanged, and the injected traffic is 1M~(100M-actual measured basic traffic);

[0128] b) Subscribe to GOOSE heartbeat message stress test: stNum remains unchanged, sqNum increases, and 1 frame of GOOSE change message is sent every 0.833ms for each control block;

[0129] c) Subscribe to GOOSE change message stress test: stNum increases, sqNum is 0, and 1 frame of GOOSE change message is sent every 0.833ms for each control block.

[0130] 3) Remove the broadcast storm suppression of the station control layer network switch, and use the network tester to inject broadcast messages (ARP, UDP, TCP) into the switch port based on the original network data flow, with the injection flow of 1M~(100M-actual measured basic flow). During the continuous network pressure, simulate the faults inside and outside the area and the faults related to the messages of each subscribed GOOSE control block (such as circuit breaker failure, dead zone fault or manual circuit breaker failure, etc.), and check the action of the protection device and the information transmission.

[0131] 4) Remove the broadcast storm suppression of the network switch of the centralized control station, and use the network tester to inject broadcast messages (ARP, UDP, TCP) into the switch port based on the original network data flow, with the injection flow of 1M~(100M-actual measured basic flow). During the continuous network pressure, simulate the faults inside and outside the area and the faults related to the messages of each subscribed GOOSE control block (such as circuit breaker failure, dead zone fault or manual circuit breaker failure, etc.), and check the action of the protection device and the information transmission.

[0132] (2) Network attack test

[0133] During the network attack test, the transmission of each data stream is as follows:

[0134] The physical simulation unit of the network tester imposes network abnormal messages including simulated data flooding attacks, simulated fuzzy attacks on communication protocols, and simulated denial of service attacks in the station control layer networks of substations and centralized control stations. The network attack messages flow to the networking port of the protection unit through the station control layer network and enter the protection unit for logical operations.

[0135] At the same time, the network messages of the station control layer network (including the protection unit action GOOSE signal) also enter the network intelligent fault recording unit through the networking port optical fiber to record all network message information.

[0136] The network attack test method is as follows:

[0137] 1) Simulate data flooding attacks on substation networks and centralized control station networks;

[0138] 2) Simulate fuzzy attacks on communication protocols in substation networks and centralized control station networks;

[0139] 3) Simulate denial of service attacks on substation networks and centralized control station networks;

[0140] 4) During various attacks, simulate a system failure inside and outside the protection zone of the station to check whether the protection operates correctly to eliminate the fault, whether the data such as equipment status monitoring, event alarm, equipment status alarm, etc. in the station can be correctly sent to the station control system and the centralized control station monitoring system, and whether the status change information and abnormal alarm signals of the main equipment can correctly link the auxiliary equipment.

[0141] (3) Single network anomaly test

[0142] During the single network abnormality test, the transmission of each data stream is as follows:

[0143] The physical simulation unit of the network tester applies network message information greater than 100mb / s in the station control layer network, causing abnormalities in the station control layer network. The protection unit connects to the station control layer network through the networking port to obtain message information.

[0144] The intelligent fault recording unit is connected to the station control layer through the networking port to receive the action GOOSE signal of the protection unit and record the action performance of the protection device.

[0145] The test method is as follows:

[0146] Simulate single network abnormalities at the station control layer, including interruptions, network pressure and other abnormal conditions. At this time, simulate system failures (should include circuit breaker failures, dead zone failures or manual circuit breaker failures, etc.), centralized control stations initiating remote control requests and other operations, and check the response of protection, measurement and control, real-time gateways and other equipment.

[0147] (4) Network reliability test

[0148] During the network reliability test, the transmission of each data stream is as follows:

[0149] The physical simulation unit of the network tester applies network pressure message information of a single VLAN number in the station control layer network, causing abnormalities in the station control layer network. The protection unit connects to the station control layer network through the networking port to obtain message information.

[0150] The intelligent fault recording unit is connected to the station control layer through the networking port to receive the action GOOSE signal of the protection unit and record the action performance of the protection device.

[0151] The network reliability test method is as follows:

[0152] 1) Simulate the network pressure of the message with VLAN number 2 in a single network. At this time, simulate the system failure (which should include circuit breaker failure, dead zone failure or manual circuit breaker failure, etc.), the centralized control station initiates remote control request and other operations, and check the response of protection, measurement and control, real-time gateway and other equipment;

[0153] 2) Simulate the network pressure of the message with VLAN number 3 in a single network. At this time, simulate the system failure (which should include circuit breaker failure, dead zone failure or manual circuit breaker failure, etc.), the centralized control station initiates remote control request and other operations, and check the response of protection, measurement and control, real-time gateway and other equipment;

[0154] 3) Simulate multiple system failures and check whether network messages are lost.

[0155] It should be stated that the content of the invention and the specific implementation methods of the present invention are intended to demonstrate the practical application of the technical solution provided by the present invention and should not be interpreted as limiting the scope of protection of the present invention. Inspired by the spirit and principle of the present invention, those skilled in the art may make various modifications, equivalent substitutions, or improvements. However, these changes or modifications are within the scope of protection of the application to be approved.

[0156] Therefore, the present invention provides a network abnormal dynamic model testing method for a new generation of autonomous and controllable substations and centralized control stations, which can verify the performance of secondary system equipment in substations and centralized control stations, and can also provide guidance and reference for the design and development of secondary systems and equipment.

[0157] The basic principle of the present invention is described above in conjunction with specific embodiments. However, it should be pointed out that the advantages, strengths, effects, etc. mentioned in the present invention are only examples and not limitations, and it cannot be considered that these advantages, strengths, effects, etc. must be possessed by each embodiment of the present invention. In addition, the specific details disclosed above are only for the purpose of illustration and facilitation of understanding, rather than limitation, and the above details do not limit the present invention to being implemented by adopting the above specific details.

[0158] Each embodiment in this specification is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the system embodiment, since it basically corresponds to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0159] The block diagrams of the devices, systems, equipment, and systems involved in the present invention are only illustrative examples and are not intended to require or imply that they must be connected, arranged, and configured in the manner shown in the block diagram. As will be appreciated by those skilled in the art, these devices, systems, equipment, and systems can be connected, arranged, and configured in any manner. Words such as "including", "comprising", "having", etc. are open words, referring to "including but not limited to", and can be used interchangeably with them. The words "or" and "and" used here refer to the words "and / or" and can be used interchangeably with them, unless the context clearly indicates otherwise. The word "such as" used here refers to the phrase "such as but not limited to", and can be used interchangeably with it.

[0160] The method and system of the present invention may be implemented in many ways. For example, the method and system of the present invention may be implemented by software, hardware, firmware or any combination of software, hardware, firmware. The above order of steps for the method is only for illustration, and the steps of the method of the present invention are not limited to the order specifically described above, unless otherwise specifically stated. In addition, in some embodiments, the present invention may also be implemented as a program recorded in a recording medium, which includes machine-readable instructions for implementing the method according to the present invention. Thus, the present invention also covers a recording medium storing a program for executing the method according to the present invention.

[0161] It should also be noted that in the system, device and method of the present invention, each component or each step can be decomposed and / or recombined. These decompositions and / or recombinations should be regarded as equivalent schemes of the present invention. The above description of the disclosed aspects is provided to enable any technician in the field to make or use the present invention. Various modifications to these aspects are very obvious to those skilled in the art, and the general principles defined here can be applied to other aspects without departing from the scope of the present invention. Therefore, the present invention is not intended to be limited to the aspects shown here, but in accordance with the widest range consistent with the principles and novel features disclosed here.

[0162] The above description has been given for the purpose of illustration and description. In addition, this description is not intended to limit the embodiments of the present invention to the forms disclosed herein. Although a number of example aspects and embodiments have been discussed above, those skilled in the art will recognize certain variations, modifications, changes, additions and sub-combinations thereof.

Claims

1. A new generation of network abnormal dynamic model testing system for substations and centralized control stations, characterized in that: include: Centralized control station equipment, substation secondary equipment, network test equipment and dynamic model test system, including The dynamic model test system is used to simulate the operating environment of the actual substation system, and provide voltage simulation, current simulation and switch quantity to the substation secondary equipment; The substation secondary equipment is used to perform fault calculation according to the received voltage analog quantity, current analog quantity and switch quantity, and output GOOSE digital signals and communication messages to be transmitted to other secondary equipment and centralized control station equipment in the substation secondary equipment through the station control layer network; The network test device is connected to the station control layer network of the substation secondary equipment, and a network abnormality message is applied to the station control layer network, so that the protection device in the same network receives the network abnormality message while receiving the normal message, thereby performing a network abnormality test; The centralized control station equipment exchanges data with the substation secondary equipment through the station control layer network to realize remote operation of the substation secondary equipment; The dynamic model test system includes a generator physical simulation unit, a step-up transformer physical simulation unit, a switch physical simulation unit, a transmission line physical simulation unit, a busbar physical simulation unit, a transformer physical simulation unit, an infinite power source physical simulation unit and a mutual inductor physical simulation unit, wherein The busbar physical simulation unit is composed of two busbars, a first busbar and a second busbar, forming a double busbar connection mode; The generator physical simulation unit is connected to the first bus through the step-up transformer physical simulation unit, the transmission line physical simulation unit, the transformer physical simulation unit and the switch physical simulation unit. The infinite power source physical simulation unit is connected to the second bus; The transformer physical simulation unit is connected to the second bus; The dynamic mold test system also includes: a plurality of fault simulation switches and a control system arranged at different positions, wherein The multiple fault simulation switches are connected to the control system via cables, and the time and duration of the fault occurrence are controlled by a pre-set program; The station control layer network includes: the station control layer network of zone I substation and the station control layer network of zone II substation, wherein The station control layer network of the zone I substation and the station control layer network of the zone II substation are configured with firewalls; The substation control layer network of Zone I accesses the protection device and the measurement and control device through the substation real-time gateway to obtain real-time data and important measurement and key alarm data of auxiliary equipment; The substation control layer network of Zone II obtains protection information, recording data, auxiliary equipment and operation and maintenance diagnosis information on demand through the substation service gateway, and issues auxiliary equipment operation instruction information; The substation secondary equipment includes: protection device, measurement and control device, acquisition execution unit, physical simulation unit, intelligent fault recording physical simulation unit and isolation equipment simulation unit, wherein the protection device includes: line protection physical simulation unit, busbar protection physical simulation unit, transformer protection physical simulation unit and multifunctional measurement and control physical simulation unit, wherein The acquisition execution unit physical simulation unit is used to receive the voltage analog quantity, the current analog quantity and the switch quantity, and output the voltage and current digital quantity and the GOOSE digital signal through digital-to-analog conversion, and send them to the line protection physical simulation unit, the bus protection physical simulation unit, the transformer protection physical simulation unit, the multifunctional measurement and control physical simulation unit and the intelligent fault recording physical simulation unit in a point-to-point manner; The line protection physical simulation unit, the busbar protection physical simulation unit, the transformer protection physical simulation unit and the multifunctional measurement and control physical simulation unit perform fault calculation on the voltage and current digital quantities, output communication messages, and output the communication messages and the GOOSE digital signals to the station control layer network of the zone I substation; The intelligent fault recording physical simulation unit is connected to the station control layer network of the zone II substation through a networking port, and is used to record the GOOSE digital signal and the communication message output by the secondary equipment of the substation; The substation secondary equipment also includes: an intelligent fault recorder, which obtains voltage and current digital quantities from the physical simulation unit of the acquisition execution unit in a point-to-point manner, and records the GOOSE digital signal and the communication message of the substation secondary equipment through the station control layer network.

2. The system according to claim 1, characterized in that The centralized control station equipment includes: a physical simulation unit for acquisition and application server in zone I and a physical simulation unit for acquisition and application server in zone II, wherein The physical simulation unit of the zone I acquisition and application server performs data interaction operation with the station control layer network of the zone I substation through the centralized control station network via the vertical encryption physical simulation unit and the substation real-time gateway machine; The physical simulation unit of the zone II acquisition and application server exchanges data with the station control layer network of the zone II substation through the centralized control station network.

3. The system according to claim 2, characterized in that The zone I acquisition and application server physical simulation unit and the zone II acquisition and application server physical simulation unit are configured with a firewall.

4. The network abnormal dynamic model testing method for a new generation of substations and centralized control stations implemented by the network abnormal dynamic model testing system for a new generation of substations and centralized control stations according to any one of claims 1 to 3 is characterized in that: include: The network test equipment inputs network abnormality messages to the station control layer network of the substation secondary equipment; Under the action of the network abnormality message, the protection device of the secondary equipment of the substation performs logical operations according to the voltage analog quantity, current analog quantity, switch quantity and the network abnormality message received from the dynamic model test system, outputs GOOSE signals and communication messages, and realizes the network abnormality dynamic model test of the new generation of substations and centralized control stations.

5. The method according to claim 4, characterized in that The network abnormality dynamic model test of the new generation substation and centralized control station includes: network stress test, network attack test, single network abnormality test and network reliability test.