Pile erection and construction method of cast-in-place pile in deep water
By utilizing buoyancy and a rotation mechanism to vertically set the cast-in-place piles in deep water, combined with limiting piles and a split casing structure, the problems of high cost and difficulty in deep-water pile construction have been solved, achieving efficient and low-cost cast-in-place pile construction.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CCCC FIRST HARBOR ENGINEERING CO LTD
- Filing Date
- 2023-05-11
- Publication Date
- 2026-05-29
AI Technical Summary
Existing technologies require large construction vessels for deep-water vertical cast-in-place pile construction, resulting in high costs, large land occupation, and high difficulty in pile erection. Existing methods are not suitable for deep-water construction.
The buoyancy of the piles is used to rotate them in the water and set them vertically. The position and orientation of the piles are constrained by limiting piles and rotating mechanisms. The verticality of the piles can be detected and adjusted by combining buoyancy and gravity. A split-type casing structure is used to simplify construction.
It reduced reliance on large construction vessels, simplified the pile-erecting process, lowered construction costs, and improved construction efficiency and verticality control.