Dynamic response calculation method for pile foundations in semi-circular valley topography
By combining the dynamic Winkler foundation model and the complex variable function method with the finite difference method, the gap in the simulation of dynamic response of semi-circular valley pile foundations was filled. This enabled accurate calculation of pile foundation dynamic response and revelation of its amplification law during earthquakes, thereby improving the safety of seismic design.
Patent Information
- Application Number
- CN202310473308.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-27
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2043-04-27
AI Technical Summary
Existing technologies cannot accurately simulate the dynamic response of semi-circular valley pile foundations during earthquakes, resulting in reduced safety redundancy in seismic design and an inability to reveal the amplification pattern of the dynamic response of pile foundations during earthquakes.
The dynamic Winkler foundation model combined with the complex variable function method was used to calculate the soil displacement field caused by seismic waves. The force equilibrium equation of the pile foundation was solved by the finite difference method to obtain the displacement, bending moment and shear force of the pile foundation, revealing the amplification law of the pile vibration response caused by the semi-circular valley topography.
It enables accurate calculation of the dynamic response of pile foundations during earthquakes, obtains dynamic time history curves, reveals the amplification law of the vibration response of pile foundations to semi-circular valley topography, and improves the accuracy and safety of seismic design.
Smart Images

Figure CN116484690B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of seismic design technology, and more specifically to a method for calculating the dynamic response of a pile foundation in a semi-circular valley terrain. Background Technology
[0002] With the continuous development of social productivity and the increasing progress of science and technology, seamless bridge construction can now be achieved even in some remote mountainous areas. This places higher demands on the stability of bridge pile foundations, as the amplification effect of earthquakes through semi-circular valleys and other terrain features further amplifies the vibration response of pile foundations, threatening their seismic safety. The dynamic response of pile foundations under seismic loads has always been a key research focus in related fields. This paper proposes a method for calculating the displacement of pile foundations in semi-circular valley terrain under seismic wave action, enabling more accurate calculation of pile foundation displacement and preventing engineering accidents. Current research on the vibration response of pile foundations in semi-circular valleys is lacking. Currently, international research on the vibration response of pile foundations in semi-circular valleys relies on simulating the residual deformation of the semi-circular valley after an earthquake using the limit method, and then converting this deformation into displacement loads to calculate the static stress and deformation of the piles. This method has the following problems:
[0003] 1. It can only simulate the influence of residual displacement of semi-circular valleys on the stress and deformation of pile foundations after an earthquake. However, the lowest seismic safety of pile foundations often occurs during the earthquake process rather than after the earthquake. This means that the seismic design theory of semi-circular valley pile foundations based on this method cannot calculate the most unfavorable seismic situation of semi-circular valley pile foundations.
[0004] 2. The semi-circular valley topography effect significantly amplifies the vibration response of pile foundations during earthquakes, but existing research theories cannot reveal this amplification pattern. Designing semi-circular valley pile foundations for seismic resistance based on existing theories will lead to a serious reduction in safety redundancy.
[0005] 3. It is impossible to simulate the vibration pattern of pile foundations during an earthquake, and it is impossible to obtain the dynamic response time history curve of pile foundations during an earthquake. Summary of the Invention
[0006] To address the existing gaps in research on the vibration response of pile foundations in semi-circular valleys and the aforementioned technical problems in simulating the residual deformation of semi-circular valleys after earthquakes using the limit method, this invention provides a method for calculating the dynamic response of pile foundations in semi-circular valley terrain.
[0007] The technical solution implemented by this invention is as follows: a method for calculating the displacement, bending moment, and shear force of a pile foundation in a semi-circular valley terrain under seismic wave action, with the following steps:
[0008] (1) Obtain the physical and mechanical parameters of the semi-circular valley topography, pile foundation and soil based on geological survey data;
[0009] (2) The soil displacement field caused by seismic wave vibration was calculated based on the complex variable function method;
[0010] (3) Based on the dynamic Winkler foundation model, the soil displacement field caused by seismic waves is transformed into additional stress at the pile foundation and applied to the pile foundation to establish the force balance equation of the pile foundation.
[0011] (4) When the pile top and pile bottom are both under free constraint, the pile displacement caused by uniformly distributed load and the bending moment and shear force are solved according to the established pile foundation force balance equation.
[0012] The physical and mechanical parameters include:
[0013] (1) Semicircular valley parameters: semicircular valley radius R, seismic wave dimensionless frequency η, incident angle γ;
[0014] (2) Pile foundation parameters: equivalent diameter D, depth of penetration L, elastic modulus of pile foundation E p pile moment of inertia I p ;
[0015] (3) Soil parameters: Elastic modulus E s Poisson's ratio of soil μ s .
[0016] The free field displacement is as follows:
[0017] w f (χ)=w s (χ)+w i (χ)+w r (χ); (1)
[0018] Among them, the scattered field w caused by the semi-circular valley topography s (χ) is:
[0019]
[0020] The incident field and the reflected field are respectively:
[0021]
[0022]
[0023] In the formula: γ is the incident angle of the seismic wave; k is the incident wave number, where η is the dimensionless frequency of the incident wave, x and y represent the coordinates in the Cartesian coordinate system, and z represents the coordinates in the complex coordinate system;
[0024] η is the dimensionless frequency of the incident wave. It is an nth-order Bessel function of the third kind; A n It is a coefficient that needs to be determined, and Let z = x + iy be the coordinates in the complex coordinate system.
[0025] The force balance equations for the pile foundation are as follows:
[0026]
[0027] In the formula: W(y) is the displacement function of the pile foundation; E p For the elastic modulus of the pile foundation; I p y is the moment of inertia of the pile foundation cross section; D is the equivalent width; k1 is the spring stiffness of the soil along the pile; P(y) is the vertical external load on the pile foundation.
[0028]
[0029] P(y) = k1·w f (y); (7)
[0030] In the formula: E s The elastic modulus of soil; μ s Poisson's ratio of the soil; w f (y) represents the free field displacement of the soil, w f (x,y)=w s (x,y)+w i (x,y)+w r (x,y).
[0031] The steps for solving the pile shear force Q and bending moment M caused by concentrated load when both the pile top and bottom are under free constraint are as follows:
[0032] The finite difference method is used to solve the force equilibrium equations of the pile foundation. The pile foundation is divided into n segments, each with a height of H = L / n, where L is the pile length. The pile nodes are numbered sequentially from the pile top to the pile tip as 0, 1, ..., n-1, n. During the calculation, two virtual nodes, -2, -1, and n+1, are added at the pile top and pile tip, respectively.
[0033] The force equilibrium equations for the pile foundation can be written in finite difference form:
[0034] αw i-2 +βw i-1 +γw i +βw i+1 +αw i+2 =p i (8)
[0035] In the formula:
[0036] The equation for the pile foundation displacement can be derived by combining the boundary conditions:
[0037]
[0038] Here, K can be viewed as an n+1*n+1 matrix;
[0039] Stiffness matrix as follows:
[0040]
[0041] The bending moment of the pile is as follows:
[0042]
[0043] The shear force of the pile body is as follows:
[0044]
[0045] The beneficial effects of the technical solution of the present invention are as follows: For the first time, the dynamic Winkler foundation model combined with wave function was used to solve the vibration response of the semi-circular valley pile foundation, the dynamic time history curve of the semi-circular valley pile foundation during the earthquake was obtained, and the amplification law of the semi-circular valley topographic effect on the pile vibration response was revealed. Attached Figure Description
[0046] The following figures illustrate exemplary embodiments of the present invention by way of example, and the same or similar reference numerals are used in the figures to denote the same or similar elements. In the figures:
[0047] Figure 1 This is a flowchart of the method described in this invention;
[0048] Figure 2 This is a diagram of the computational model of the method proposed in this invention;
[0049] Figure 3 This is a displacement curve diagram of the pile foundation soil in an embodiment of the present invention;
[0050] Figure 4 This is a pile foundation bending moment diagram in an embodiment of the present invention;
[0051] Figure 5 This is a shear force diagram of the pile foundation in an embodiment of the present invention. Detailed Implementation
[0052] To better explain and facilitate understanding of the present invention, the present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
[0053] This embodiment presents a method for calculating the dynamic response of pile foundations in a semi-circular valley terrain. The calculation process and calculation model are as follows: Figure 1 , Figure 2 As shown, the specific steps are as follows:
[0054] (1) Obtain the physical and mechanical parameters of the semi-circular valley topography, pile foundation, and soil based on geological survey data:
[0055] A. Parameters of the semi-circular valley: radius R = 1m, dimensionless frequency of seismic wave η = 0.1, incident angle γ = 0;
[0056] B. Pile foundation parameters: equivalent diameter D = 0.4m, embedment depth L = 25m, pile foundation elastic modulus E p =2×10 10 Pa, moment of inertia I of the pile foundation cross section p =1.2566×10 -3 m 4 ;
[0057] C. Soil parameters: Elastic modulus E s =2.5×10 7 Pa, Poisson's ratio of soil
[0058] (2) Substitute the parameters in A into equation (13) to calculate the free field displacement of the soil:
[0059] w f (χ)=w s (χ)+w i (χ)+w r (χ); (13)
[0060] Among them, the scattered field w caused by the semi-circular valley s (χ) is:
[0061]
[0062] In the formula, the incident field and the reflected field w i (χ), w r (χ) is:
[0063]
[0064]
[0065] (3) Based on the dynamic Winkler foundation model, the force equilibrium equations for the pile foundation are established:
[0066]
[0067] Where: Moment of inertia of the pile foundation cross section Then the spring stiffness of the soil along the pile
[0068] (4) The finite difference method is used to solve the equation. The pile foundation is divided into n segments, and the height of each segment is H = L / n, where L is the pile length. The pile foundation nodes are numbered sequentially from the pile top to the pile end as 0, 1, ..., n-1, n. During the calculation, two virtual nodes are added at the pile top and the pile end respectively: -2, -1, n+1, and n+2.
[0069] The force equilibrium equations for the pile foundation can be written in finite difference form:
[0070] αw i-2 +βw i-1 +γw i +βw i+1 +αw i+2 =p i (18)
[0071] (5) Based on equation (17), using the finite difference method and combining it with boundary conditions, the pile foundation displacement equation is obtained:
[0072]
[0073] Stiffness matrix as follows:
[0074]
[0075] The pile foundation displacement curve in this embodiment is as follows: Figure 3 As shown.
[0076] The bending moment of the pile body satisfies the following formula:
[0077]
[0078] The shear force of the pile body satisfies the following formula:
[0079]
[0080] The pile foundation bending moment and shear force curves in this embodiment are as follows: Figure 4 , Figure 5 As shown.
[0081] It is understood that the present invention has been described through some embodiments, and those skilled in the art will recognize that various changes or equivalent substitutions can be made to these features and embodiments without departing from the spirit and scope of the invention. Furthermore, under the teachings of the present invention, these features and embodiments can be modified to adapt to specific situations and materials without departing from the spirit and scope of the invention. Therefore, the present invention is not limited to the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application are within the protection scope of the present invention.
Claims
1. A method for calculating the dynamic response of pile foundations in a semi-circular valley terrain, characterized in that, Includes the following steps: (1) Obtain the physical and mechanical parameters of the semi-circular valley topography, pile foundation, and soil; the physical and mechanical parameters include: Semicircular valley parameters: radius of the semicircular valley Dimensionless frequency of seismic waves Seismic wave incident angle ; Pile foundation parameters: equivalent diameter burial depth Elastic modulus of pile foundation pile moment of inertia ; Soil parameters: elastic modulus Poisson's ratio of soil ; (2) The soil displacement field caused by seismic wave vibration was calculated based on the complex variable function method; (3) Based on the dynamic Winkler foundation model, the soil displacement field caused by seismic waves is transformed into additional stress at the pile foundation and applied to the pile foundation to establish the force balance equation of the pile foundation; (4) When the pile top and pile bottom are both under free constraint, solve for the pile foundation displacement caused by uniformly distributed load and the bending moment and shear force it is subjected to; In step (2), the soil displacement field includes the incident wave field and the reflected wave field formed by the seismic wave incident. and reflected wave field The calculation methods are as follows: ;(1) ;(2) in, The incident wave number is... ; The dimensionless frequency of the incident wave; , Coordinates in complex coordinate system , x and y represent coordinates in the Cartesian coordinate system, and z represents coordinates in the complex coordinate system; In step (2), the soil displacement field also includes the scattering field caused by the semi-circular valley topography. Scattered field caused by semi-circular valley topography The calculation method is as follows: ;(3) in, It is an nth-order Bessel function of the third kind; These are coefficients that need to be determined; In step (3), the force balance equation of the pile foundation is: ;(4) in, This is the displacement function of the pile foundation; The spring stiffness of the soil along the pile; This refers to the vertical external load on the pile foundation; ;(5) ;(6) In the formula, The elastic modulus of the soil; Poisson's ratio of the soil; This represents the free-field displacement of the soil. .
2. The method for calculating the dynamic response of pile foundations in a semi-circular valley terrain as described in claim 1, characterized in that, The solution involves determining the pile foundation displacement caused by a uniformly distributed load when both the pile top and bottom are under free constraint. The calculation formula is: ;(7) in, Let K be the stiffness matrix, and K be a (m+1)*(m+1) matrix.
3. The method for calculating the dynamic response of pile foundations in a semi-circular valley terrain as described in claim 2, characterized in that, The solution involves determining the pile shear force caused by a uniformly distributed load when both the pile top and bottom are under free constraint. and bending moment as follows: ;(8) ;(9)。
