Internet of Things trust analysis method and system for monitoring frequency regulation transactions of hydropower units

Through statistical analysis and fuzzy set calculation, the trust degree of the power Internet of Things is evaluated, which solves the trust correlation problem in the calculation of trust degree of frequency modulation transactions of hydropower units, and provides an effective evaluation and monitoring of the trust degree of the power Internet of Things.

CN116485076BActive Publication Date: 2024-10-25GUANGDONG POWER GRID CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310478759.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-27
Publication Date
2024-10-25
Estimated Expiration
2043-04-27

AI Technical Summary

Technical Problem

Existing technology lacks effective methods for calculating trust in the Internet of Things for monitoring frequency regulation transactions of hydropower units. It fails to fully reflect the time correlation, contextual correlation and development trend of trust, and the evaluation of trust in the power Internet of Things is insufficient.

Method used

The statistical analysis method is used to calculate the three-dimensional trapezoidal fuzzy set of the frequency regulation price, frequency regulation power demand and quotation of the power system. Combined with the data transmission rate and data storage sharing scale of the Internet of Things monitoring data center, the information gain and information loss values ​​are calculated, and then the power is evaluated. Trust in the Internet of Things.

Benefits of technology

It realizes the calculation of trust in frequency regulation transactions of hydropower units, reflects the impact of sensing system, data transmission rate and data storage sharing, and provides theoretical guidance and technical support for the trust assessment of power Internet of Things.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116485076B_ABST
    Figure CN116485076B_ABST
Patent Text Reader

Abstract

The present application discloses an Internet of Things trust analysis method and system for monitoring the frequency regulation trading of hydropower units. The method considers the data information formed by data transmission rate and data storage sharing, and the data errors and omissions formed by data collection. The trust of the power Internet of Things is calculated using the information sufficiency and omission, and the impact of the trust on the frequency regulation trading of hydropower units is evaluated. The present application can calculate the trust of the power Internet of Things for the frequency regulation trading of hydropower units, and at the same time reflects the impact of the perception system, data transmission rate, and data storage sharing, providing theoretical guidance for the trust evaluation of the power Internet of Things for the frequency regulation trading of hydropower units, and providing necessary technical support for the frequency regulation trading based on the Internet of Things.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of electric power technology, and in particular to an Internet of Things trust analysis method and system for monitoring frequency regulation transactions of hydropower units. Background Art

[0002] The three major application scenarios of 5G are a further deepening of the three major application scenarios of data transmission solutions in the power Internet of Things. Relevant experts and scholars at home and abroad have also divided the power Internet of Things business according to the three major application scenarios of 5G and carried out relevant research work.

[0003] The eMBB scenario mainly meets the needs of some high-bandwidth services, which is an enhancement of data collection application scenarios and business information transmission scenarios. At present, the application of the power Internet of Things in this regard is mainly the big video of the power grid, including substation robot inspection, transmission line drone online monitoring, distribution room video monitoring, mobile on-site construction operation control and emergency on-site self-organizing network comprehensive application. Many researchers have tried to apply 5G technology to certain scenarios and have achieved certain results.

[0004] In terms of trust calculation, there are many research results, such as: calculating the reputation value of nodes in the global scope through multiple iterations of the trust chain, introducing probability theory to solve the trust problem, and giving a trust model algorithm performance based on Bayesian network. The algorithm's time decay and penalty factor are considered when calculating trust, which improves the accuracy of the algorithm and its ability to resist strategic attacks. Trust is dynamically established and developed, and its development trend has certain rules. At the same time, there is a certain correlation between two adjacent transactions. The existing algorithms do not well reflect the time correlation, context correlation and development trend of trust. In order to better describe these characteristics of trust, on the basis of the existing Markov chain model, the steady-state probability is introduced to describe the development trend of trust. After each transaction is completed, the transfer matrix is ​​dynamically updated to more accurately describe the context correlation of trust. At the same time, the time decay factor and penalty incentive factor are added to improve the algorithm's ability to resist attacks. However, there is still little research on the existing technology in the calculation method of the Internet of Things trust for monitoring the frequency regulation transaction of hydropower units. Therefore, there is an urgent need for an Internet of Things trust analysis method for monitoring the frequency regulation transaction of hydropower units to calculate the trust of the power Internet of Things and evaluate the impact of trust on the frequency regulation transaction of hydropower units. Summary of the invention

[0005] The present application provides an Internet of Things trust analysis method and system for monitoring frequency regulation transactions of hydropower units, which are used to calculate the trust of the power Internet of Things and evaluate the impact of trust on frequency regulation transactions of hydropower units.

[0006] In view of this, the first aspect of the present application provides an Internet of Things trust analysis method for monitoring frequency regulation transactions of hydropower units, the method comprising:

[0007] According to the frequency regulation price data, frequency regulation power demand data, frequency regulation power data of the hydropower units involved in frequency regulation, and quotation data of the power system, a statistical analysis method is used to calculate the three-dimensional trapezoidal fuzzy set of the frequency regulation price, frequency regulation power demand, frequency regulation power, and quotation collection error of the power system during the period, and the three-dimensional trapezoidal fuzzy set is used as the first fuzzy set;

[0008] According to the data transmission rate data and data storage sharing scale data of the IoT monitoring data center, a statistical analysis method is used to calculate and determine the data transmission rate and a number of fuzzy uncertainties of different levels of data storage sharing scale, and use them as the second fuzzy set;

[0009] According to the first fuzzy set, respectively calculate the frequency regulation power acquisition error of the hydropower units participating in the frequency regulation and the frequency regulation quotation acquisition error formed in the power Internet of Things;

[0010] According to the second fuzzy set, the information benefit values ​​of the power Internet of Things at the perception layer, platform layer and network layer are calculated respectively;

[0011] According to the frequency regulation power collection error and the frequency regulation quotation collection error, the information loss value of the frequency regulation transaction caused by the frequency regulation power and quotation collection error of the hydropower units participating in the frequency regulation formed in the power Internet of Things is calculated;

[0012] According to the information loss value and the information gain value, the average value of the trust of all users in the power Internet of Things for frequency regulation transactions of hydropower units is calculated.

[0013] Optionally, the method further includes calculating, according to the information loss value and the information gain value, an average value of the trust of all users of the power Internet of Things in the power Internet of Things for frequency regulation transactions of hydropower units, and then further including:

[0014] According to the average trust level of the power Internet of Things in all users, the trust level of the power Internet of Things is divided and defined.

[0015] Optionally, according to the frequency regulation price data of the power system, a statistical analysis method is used to calculate the frequency regulation price of the power system in each time period, specifically including:

[0016] Using the IoT sensing system, the power market monitoring data center is used to obtain data information on the frequency modulation price of the power system;

[0017] According to the frequency modulation price data information, the statistical analysis method is used to calculate and determine the time period t, t=1,2,...,N e, N e is the number of time periods, and the three-dimensional trapezoidal fuzzy set of the power system frequency regulation price collection error

[0018]

[0019]

[0020]

[0021] In the formula, and are the three-dimensional trapezoidal fuzzy set of the frequency regulation price acquisition error of the power system in period t or the fuzzy numbers and membership coefficients corresponding to the lower bound, middle bound and upper bound of the three-dimensional trapezoid, respectively. j = 1, 2, 3, 4, and They are the fuzzy numbers and membership coefficients corresponding to the lower bound, middle bound and upper bound of the three-dimensional trapezoidal fuzzy set of the frequency regulation price collection error of the power system in time period t.

[0022] Optionally, according to the data transmission rate data of the IoT monitoring data center, a statistical analysis method is used to calculate and determine a number of three-dimensional trapezoidal fuzzy sets of fuzzy uncertainties at different levels of data transmission rate, specifically including:

[0023] In the network layer of the power Internet of Things, the data information of the data transmission rate is obtained through the Internet of Things monitoring data center, and the statistical analysis method is used to calculate and determine the three-dimensional trapezoidal fuzzy set v of nine fuzzy uncertainties of data transmission rate: extremely low, very low, low, relatively low, medium, relatively high, high, very high, and extremely high. Di (i=1,2,...,9):

[0024] v Di =(v DiL ,v DiM ,v DiU )=[(v DiL1 ,v DiL2 ,v DiL3 ,v DiL4 ;k DviL ),

[0025] (v DiM1 ,v DiM2 ,v DiM3 ,v DiM4 ;k DviM ),

[0026] (v DiU1 ,v DiU2 ,v DiU3 ,v DiU4 ;k DviU )];

[0027] In the formula, v Di is the i-th three-dimensional trapezoidal fuzzy set of daily power generation, v DiL 、v DiM 、v DiU and k DviL , k DviM , k DviU are the fuzzy sets and membership coefficients of the lower, middle and upper bounds of the i-th three-dimensional trapezoidal fuzzy set of data transmission rate, respectively. DiLj 、v DiMj 、v DiUj , j = 1, 2, 3, 4, which are the fuzzy numbers of the lower bound, middle bound and upper bound fuzzy sets of the i-th three-dimensional trapezoidal fuzzy set of data transmission rate respectively.

[0028] Optionally, calculating the frequency regulation power quantity acquisition error of the hydropower units involved in frequency regulation formed in the power Internet of Things according to the first fuzzy set specifically includes:

[0029] According to the three-dimensional trapezoidal fuzzy set of the frequency regulation power acquisition error of hydropower units, thermal power units, nuclear power units, gas power units, energy storage units, and west-to-east power transmission units involved in frequency regulation, the frequency regulation power acquisition error of hydropower units involved in frequency regulation formed in the power Internet of Things is calculated.

[0030]

[0031] In the formula, is the three-dimensional trapezoidal fuzzy set of the power demand collection error of the power system frequency regulation. for They are the three-dimensional trapezoidal fuzzy sets of the acquisition errors of the frequency regulation power quantities of the hydropower units, thermal power units, nuclear power units, gas power units, energy storage units, and west-to-east power transmission units involved in frequency regulation; Represents the union of fuzzy sets.

[0032] Optionally, calculating the information benefit value of the power Internet of Things at the perception layer according to the second fuzzy set specifically includes:

[0033] Based on the information benefit value calculation formula of the perception layer, the information benefit value of the power Internet of Things at the perception layer is calculated according to the second fuzzy set;

[0034] Among them, the information benefit value calculation formula of the perception layer is:

[0035]

[0036] In the formula, R RP1 The information benefit value generated by the power Internet of Things providing data collection to users in frequency regulation transactions; k Mi M His the information benefit value formed by the Internet of Things providing data collection for hydropower units at the perception layer; E[] is the expected value of []. Denotes the second fuzzy set.

[0037] Optionally, the calculating, based on the frequency regulation power amount collection error and the frequency regulation quotation collection error, the information loss value of the frequency regulation transaction caused by the frequency regulation power amount and quotation collection error of the hydropower units participating in the frequency regulation formed in the power Internet of Things specifically includes:

[0038] Substituting the frequency regulation power quantity collection error and the frequency regulation quotation collection error into the information loss value calculation formula, the frequency regulation power quantity and quotation collection error of the hydropower units participating in the frequency regulation formed in the power Internet of Things will be solved to obtain the information loss value of the frequency regulation transaction caused by the frequency regulation power quantity and quotation collection error;

[0039] Wherein, the information loss value calculation formula is:

[0040]

[0041] Where, L RP The frequency regulation power and quotation collection errors of the hydropower units involved in frequency regulation in the power Internet of Things will cause information loss value of frequency regulation transactions; It is the influence coefficient or weight coefficient of the frequency regulation power acquisition error of the hydropower units involved in frequency regulation formed in the power Internet of Things. It is the unit loss value caused by the frequency regulation power collection error of the hydropower units involved in frequency regulation formed in the power Internet of Things; It is the influence coefficient or weight coefficient of the frequency regulation quotation collection error of the hydropower units involved in frequency regulation formed in the power Internet of Things. It is the unit loss value caused by the frequency regulation quotation collection error of the hydropower units involved in frequency regulation in the power Internet of Things. is the frequency modulation power acquisition error, The frequency modulation quotation collection error.

[0042] Optionally, the calculating, according to the information loss value and the information gain value, an average value of the trust of the power Internet of Things for all users in the power Internet of Things for frequency regulation transactions of hydropower units, specifically includes:

[0043] Substituting the information loss value and the information gain value into the average value calculation formula, and solving to obtain the average value of the trust of the power Internet of Things to all users;

[0044] Wherein, the average value calculation formula is:

[0045]

[0046] In the formula, B Iis the average trust of all users in the power Internet of Things, R RP1 is the information benefit value of the perception layer, R RP2 is the information benefit value of the platform layer, R RP3 is the information benefit value of the network layer, L RP is the information loss value.

[0047] A second aspect of the present application provides an Internet of Things trust analysis system for monitoring frequency regulation transactions of hydropower units, the system comprising:

[0048] The first calculation unit is used to calculate the frequency regulation price, frequency regulation power demand, frequency regulation power, and quotation collection error of the power system in a certain period of time by using a statistical analysis method according to the frequency regulation price data, frequency regulation power demand data, frequency regulation power data of the hydropower units involved in frequency regulation, and quotation data of the power system, and use the three-dimensional trapezoidal fuzzy set as the first fuzzy set;

[0049] A second calculation unit is used to calculate and determine the data transmission rate and a plurality of three-dimensional trapezoidal fuzzy sets of different levels of fuzzy uncertainty of the data transmission rate and the data storage sharing scale of the data center monitored by the Internet of Things by using a statistical analysis method, and use the three-dimensional trapezoidal fuzzy sets as the second fuzzy sets;

[0050] A third calculation unit is used to calculate the frequency regulation power acquisition error of the hydropower units participating in the frequency regulation and the frequency regulation quotation acquisition error formed in the power Internet of Things according to the first fuzzy set;

[0051] A fourth calculation unit, used to calculate the information benefit values ​​of the power Internet of Things at the perception layer, the platform layer and the network layer respectively according to the second fuzzy set;

[0052] A fifth calculation unit is used to calculate the information loss value of the frequency regulation transaction caused by the frequency regulation power and quotation collection error of the hydropower units participating in the frequency regulation formed in the power Internet of Things according to the frequency regulation power collection error and the frequency regulation quotation collection error;

[0053] The sixth calculation unit is used to calculate the average value of the trust of the power Internet of Things for all users based on the information loss value and the information gain value.

[0054] Optionally, it also includes: an evaluation unit, used to divide and define the trust level of the power Internet of Things according to the average value of the trust of the power Internet of Things in all users.

[0055] It can be seen from the above technical solutions that this application has the following advantages:

[0056] The present application provides an Internet of Things trust analysis method for monitoring the frequency regulation transactions of hydropower units. It takes into account the data information formed by data transmission rate and data storage sharing, and the data errors and omissions formed by data collection. It uses the amount of information sufficiency and the amount of missing information to calculate the trust of the power Internet of Things, and evaluates the impact of trust on the frequency regulation transactions of hydropower units.

[0057] The technical effect of this application is: using the Internet of Things trust analysis method for monitoring hydropower unit frequency regulation transactions proposed in this application, the trust of the power Internet of Things for hydropower unit frequency regulation transactions can be calculated. This Internet of Things trust calculation method for monitoring hydropower unit frequency regulation transactions simultaneously reflects the influence of the perception system, data transmission rate, and data storage sharing, provides theoretical guidance for the trust evaluation of the power Internet of Things for hydropower unit frequency regulation transactions, and provides necessary technical support for frequency regulation transactions based on the Internet of Things. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] Figure 1 A flow chart of an Internet of Things trust analysis method for monitoring frequency regulation transactions of hydropower units provided in an embodiment of the present application;

[0059] Figure 2 This is a structural schematic diagram of an Internet of Things trust analysis system for monitoring frequency regulation transactions of hydropower units provided in an embodiment of the present application. DETAILED DESCRIPTION

[0060] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0061] See also Figure 1 , an Internet of Things trust analysis method for monitoring frequency regulation transactions of hydropower units provided in an embodiment of the present application includes:

[0062] Step 101: According to the frequency regulation price data, frequency regulation power demand data, frequency regulation power data of the hydropower units involved in frequency regulation, and quotation data of the power system, a statistical analysis method is used to respectively calculate the three-dimensional trapezoidal fuzzy set of the frequency regulation price, frequency regulation power demand, frequency regulation power, and quotation acquisition error of the power system in a certain period of time, and use it as the first fuzzy set;

[0063] It should be noted that step 101 describes the process and method of error assessment of frequency regulation transaction data collection of hydropower units in the Internet of Things.

[0064] At the perception layer of the power Internet of Things, relevant data information is obtained, such as the fuzzy and uncertain power system frequency regulation price, the power demand for power system frequency regulation, the frequency regulation power of hydropower units participating in frequency regulation and their quotations, the frequency regulation power of thermal power units participating in frequency regulation and their quotations, the frequency regulation power of nuclear power units participating in frequency regulation and their quotations, the frequency regulation power of gas-fired power units participating in frequency regulation and their quotations, the frequency regulation power of energy storage units participating in frequency regulation and their quotations, and the frequency regulation power of west-to-east power transmission units participating in frequency regulation and their quotations.

[0065] Specifically include:

[0066] 1011. Use the IoT sensing system to obtain relevant data information on the power system frequency regulation price from the power market monitoring data center. According to the data on the power system frequency regulation price obtained from the power market, use statistical analysis methods to calculate and determine the time period t (t = 1, 2, ..., N e , N e The three-dimensional trapezoidal fuzzy set of the frequency regulation price collection error of the power system (time period number)

[0067]

[0068]

[0069]

[0070] In the formula and are the three-dimensional trapezoidal fuzzy set of the frequency regulation price acquisition error of the power system in period t or the fuzzy numbers and membership coefficients corresponding to the lower bound, middle bound and upper bound of the three-dimensional trapezoid, respectively. and They are the fuzzy numbers and membership coefficients corresponding to the lower bound, middle bound and upper bound of the three-dimensional trapezoidal fuzzy set of the frequency regulation price collection error of the power system in time period t.

[0071] 1012. Use the IoT sensing system to obtain relevant data information on the power demand for power system frequency regulation from the power market monitoring data center. According to the data on the power demand for power system frequency regulation obtained from the power market, use statistical analysis methods to calculate and determine the time period t (t = 1, 2, ..., N RP 3D trapezoidal fuzzy set for power system frequency regulation power demand acquisition error

[0072]

[0073]

[0074]

[0075] In the formula and are the three-dimensional trapezoidal fuzzy set of the power demand for frequency regulation of the power system during period t or the fuzzy numbers and membership coefficients corresponding to the lower bound, middle bound and upper bound of the three-dimensional trapezoidal fuzzy set, respectively. and They are the fuzzy numbers and membership coefficients corresponding to the lower bound, middle bound and upper bound of the three-dimensional trapezoidal fuzzy set of the frequency regulation power demand acquisition error of the power system in time period t.

[0076] 1013. Use the IoT sensing system to obtain relevant data information on the frequency regulation power of the hydropower units participating in the frequency regulation from the power market monitoring data center. According to the frequency regulation power data of the hydropower units participating in the frequency regulation in the power market, use the statistical analysis method to calculate and determine the time period t (t = 1, 2, ..., N RP 3D trapezoidal fuzzy set of frequency regulation power acquisition error of hydropower units involved in frequency regulation

[0077]

[0078]

[0079]

[0080] In the formula, and are the frequency regulation power acquisition error three-dimensional trapezoidal fuzzy set of the hydropower units participating in frequency regulation in period t or the fuzzy numbers and membership coefficients corresponding to the lower bound, middle bound and upper bound of the three-dimensional trapezoid, respectively. and They are the fuzzy numbers and membership coefficients corresponding to the lower bound, middle bound and upper bound of the three-dimensional trapezoidal fuzzy set of the frequency regulation power acquisition error of the hydropower units participating in frequency regulation in time period t.

[0081] 1014. Use the Internet of Things sensing system to obtain relevant data information on the quotations of hydropower units participating in frequency regulation from the power market monitoring data center. According to the quotations of hydropower units participating in frequency regulation in the power market, a statistical analysis method is used to calculate and determine the time period t (t = 1, 2, ..., N RP 3D trapezoidal fuzzy set of bid collection error of hydropower units involved in frequency regulation

[0082]

[0083]

[0084]

[0085] In the formula, and are the three-dimensional trapezoidal fuzzy set of the bid collection error of the hydropower units participating in frequency regulation in time period t or the fuzzy numbers and membership coefficients corresponding to the lower bound, middle bound and upper bound of the three-dimensional trapezoid, and They are the fuzzy numbers and membership coefficients corresponding to the lower bound, middle bound and upper bound of the three-dimensional trapezoidal fuzzy set of the quotation collection error of the hydropower units participating in frequency regulation during time period t.

[0086] Through steps 1011-1014, the three-dimensional trapezoidal fuzzy sets of the frequency regulation price, frequency regulation power demand, frequency regulation power and quotation collection error of the power system in a certain period are calculated. For the convenience of description, these fuzzy sets are integrated into the first fuzzy set.

[0087] Step 102: According to the data transmission rate data and the data storage sharing scale data of the IoT monitoring data center, a statistical analysis method is used to calculate and determine a number of three-dimensional trapezoidal fuzzy sets of fuzzy uncertainties of different levels of data transmission rate and data storage sharing scale, and the three-dimensional trapezoidal fuzzy sets are used as the second fuzzy sets.

[0088] It should be noted that step 102 describes the process and method of monitoring the data transmission rate of the power Internet of Things for power market frequency regulation transactions; and the process and method of evaluating the data storage sharing scale of the power Internet of Things for power market frequency regulation transactions.

[0089] Among them, 1021. The process and method of monitoring the data transmission rate of the power Internet of Things for power market frequency regulation transactions specifically include:

[0090] In the network layer of the power Internet of Things, the relevant data information of the data transmission rate is obtained from the Internet of Things monitoring data center, and the statistical analysis method is used to calculate and determine the three-dimensional trapezoidal fuzzy set v of nine fuzzy uncertainties of data transmission rate: extremely low, very low, low, relatively low, medium, relatively high, high, very high, and extremely high. Di (i=1,2,...,9):

[0091] v Di =(v DiL ,v DiM ,v DiU )=[(v DiL1 ,v DiL2 ,v DiL3 ,v DiL4 ;k DviL ),

[0092] (v DiM1 ,v DiM2 ,v DiM3 ,v DiM4 ;kDviM ),

[0093] (v DiU1 ,v DiU2 ,v DiU3 ,v DiU4 ;k DviU )]

[0094] In the formula, v Di is the i-th three-dimensional trapezoidal fuzzy set of daily power generation, v DiL 、v DiM 、v DiU and k DviL , k DviM , k DviU are the fuzzy sets and membership coefficients of the lower, middle and upper bounds of the i-th three-dimensional trapezoidal fuzzy set of data transmission rate, respectively. DiLj 、v DiMj 、v DiUj (j=1, 2, 3, 4) are the fuzzy numbers of the lower bound, middle bound and upper bound fuzzy sets of the i-th three-dimensional trapezoidal fuzzy set of data transmission rate.

[0095] 1022. The process and method for evaluating the scale of power Internet of Things data storage and sharing for power market frequency regulation transactions, specifically including:

[0096] At the platform layer of the power Internet of Things, relevant data information on the scale of data storage sharing is obtained from the Internet of Things monitoring data center, and a statistical analysis method is used to calculate and determine the three-dimensional trapezoidal fuzzy set S of nine fuzzy uncertainties: extremely low, very low, low, relatively low, medium, relatively high, high, very high, and extremely high. Di (i=1,2,...,9):

[0097] S Di =(S DiL ,S DiM ,S DiU )=[(S DiL1 ,S DiL2 ,S DiL3 ,S DiL4 ;k DSiL ),

[0098] (S DiM1 ,S DiM2 ,S DiM3 ,S DiM4 ;k DSiM ),

[0099] (S DiU1 ,S DiU2 ,S DiU3 ,S DiU4 ;k DSiU )]

[0100] In the formula, S Di is the i-th three-dimensional trapezoidal fuzzy set of data storage sharing scale, S DiL , S DiM , S DiU and k DSiL , k DSiM , k DSiU They are the fuzzy sets and membership coefficients of the lower, middle and upper bounds of the i-th three-dimensional trapezoidal fuzzy set for data storage sharing scale, S DiLj , S DiMj , S DiUj (j=1, 2, 3, 4) are the fuzzy numbers of the lower bound, middle bound and upper bound fuzzy sets of the i-th three-dimensional trapezoidal fuzzy set of the data storage sharing scale respectively.

[0101] Step 103, respectively calculating the frequency regulation power acquisition error of the hydropower units participating in the frequency regulation and the frequency regulation quotation acquisition error formed in the power Internet of Things according to the first fuzzy set;

[0102] It should be noted that step 103 describes the process and method for calculating the error in collecting the frequency regulation power of the hydropower units involved in the frequency regulation formed in the power Internet of Things; and the process and method for calculating the error in collecting the frequency regulation quotations of the hydropower units involved in the frequency regulation formed in the power Internet of Things.

[0103] Among them, 1031. The process and method for calculating the error of frequency regulation power acquisition of hydropower units involved in frequency regulation formed in the power Internet of Things specifically include:

[0104] The frequency regulation power collection error of the hydropower units involved in frequency regulation formed in the power Internet of Things is jointly determined by the frequency regulation power demand of the power system and the frequency regulation power collection error of various types of generator sets. The frequency regulation power collection error of various types of generator sets includes: the frequency regulation power of the hydropower units involved in frequency regulation, the frequency regulation power of the thermal power units involved in frequency regulation, the frequency regulation power of the nuclear power units involved in frequency regulation, the frequency regulation power of the gas power units involved in frequency regulation, the frequency regulation power of the energy storage units involved in frequency regulation, and the frequency regulation power collection error of the west-to-east power transmission units involved in frequency regulation. Therefore, the frequency regulation power collection error of the hydropower units involved in frequency regulation formed in the power Internet of Things is calculated according to the following formula:

[0105]

[0106] In the formula Represents the union of fuzzy sets.

[0107] 1032. The process and method for calculating the error in collecting the frequency regulation quotation of hydropower units involved in frequency regulation formed in the power Internet of Things, specifically including:

[0108] The frequency regulation quotation collection error of hydropower units participating in frequency regulation formed in the power Internet of Things is jointly determined by the frequency regulation power demand of the power system and the frequency regulation quotation collection error of various generator sets. The frequency regulation quotation collection error of various generator sets includes the frequency regulation quotation of hydropower units participating in frequency regulation, the frequency regulation quotation of thermal power units participating in frequency regulation, the frequency regulation quotation of nuclear power units participating in frequency regulation, the frequency regulation quotation of gas power units participating in frequency regulation, the frequency regulation quotation of energy storage units participating in frequency regulation, and the frequency regulation quotation collection error of west-to-east power transmission units participating in frequency regulation. Therefore, the frequency regulation quotation collection error of hydropower units participating in frequency regulation formed in the power Internet of Things is calculated according to the following formula:

[0109]

[0110] Step 104: Calculate the information benefit values ​​of the power Internet of Things at the perception layer, platform layer, and network layer respectively according to the second fuzzy set;

[0111] It should be noted that step 105 is a process and method for calculating the information benefit value of the power Internet of Things in frequency modulation transactions.

[0112] Among them, 1041, the information benefit value calculation of the perception layer. In the perception layer, the perception system is used to obtain data information such as electricity market prices, power demand for power system frequency regulation and its quotation, and frequency regulation power of various generator sets and their quotations. The information benefit value calculation formula of the perception layer is as follows:

[0113]

[0114] Where R RP1 The information benefit value generated by the power Internet of Things providing data collection to users in frequency regulation transactions; k Mi M H is the information benefit value formed by the Internet of Things providing data collection for hydropower units at the perception layer; E[] is the expected value of []. Represents the union of 9 fuzzy sets.

[0115] M H It can be expressed by three-dimensional trapezoidal fuzzy sets, and the specific formula is as follows:

[0116] M H =(M HL ,M HM ,M HU )=[(M HL1 ,M HL2 ,M HL3 ,M HL4 ;k HL ),

[0117] (M HM1 ,M HM2,M HM3 ,M HM4 ;k HM ),

[0118] (M HU1 ,M HU2 ,M HU3 ,M HU4 ;k HU )]

[0119] Where M H The three-dimensional trapezoidal fuzzy set of the data collection scale provided by the Internet of Things for hydropower units at the perception layer, M HL 、M HM 、M HU and k HL , k HM , k HU The fuzzy sets and their membership coefficients are the lower, middle and upper bounds of the three-dimensional trapezoidal fuzzy set of the data collection scale provided by the Internet of Things for the hydropower unit at the perception layer, respectively. HLj 、M HMj 、M HUj (j=1,2,3,4) are the fuzzy numbers of the lower, middle and upper bounds of the three-dimensional trapezoidal fuzzy set of the data collection scale provided by the Internet of Things for the hydropower units at the perception layer.

[0120] 1042. Calculation of information benefit value at the platform level. At the platform level, with the help of the big data system, the sharing and interaction of power system frequency regulation data can be realized. The information benefit value calculation formula at the platform level is as follows:

[0121]

[0122] Where R RP2 The information revenue value generated by providing data storage and sharing to users in frequency regulation transactions through the power Internet of Things; In order to provide users with the information benefit value of data storage sharing with 9 fuzzy uncertainty scales of very low, very low, low, lower, medium, higher, high, very high and very high, k DSi It is the unit profit value brought to users by the data storage sharing at the i-th rate provided by the power Internet of Things.

[0123] 1043. Calculation of information benefit value at the network layer. At the network layer, with the help of the network system, data transmission is realized, so that frequency modulation users can obtain sufficient information and gain benefits by using the Internet of Things. The calculation formula of information benefit value at the network layer is as follows:

[0124]

[0125] Where R RP3 The information revenue value generated by the power Internet of Things providing data transmission to users in frequency modulation transactions; In order to provide users with the information benefit value formed by data transmission at 9 fuzzy uncertainty rates of very low, very low, low, lower, medium, higher, high, very high and very high, k Dvi is the unit profit value brought to users by the data transmission rate of the power Internet of Things.

[0126] Step 105: Calculate the information loss value of the frequency regulation transaction caused by the frequency regulation power and quotation collection errors of the hydropower units participating in the frequency regulation formed in the power Internet of Things according to the frequency regulation power collection errors and the frequency regulation quotation collection errors;

[0127] It should be noted that step 105 describes the process and method of calculating the information loss value of the power Internet of Things in frequency modulation trading.

[0128] The frequency regulation power and quotation collection errors of the hydropower units involved in frequency regulation formed in the power Internet of Things will cause information loss in frequency regulation transactions, and its value is calculated according to the following formula:

[0129]

[0130] Where, L RP The frequency regulation power and quotation collection errors of the hydropower units involved in frequency regulation in the power Internet of Things will cause information loss value of frequency regulation transactions; It is the influence coefficient or weight coefficient of the frequency regulation power acquisition error of the hydropower units involved in frequency regulation formed in the power Internet of Things. It is the unit loss value caused by the frequency regulation power collection error of the hydropower units involved in frequency regulation formed in the power Internet of Things; It is the influence coefficient or weight coefficient of the frequency regulation quotation collection error of the hydropower units involved in frequency regulation formed in the power Internet of Things. It is the unit loss value caused by the error in collecting frequency quotation of hydropower units participating in frequency regulation in the power Internet of Things.

[0131] Step 106: Calculate the average value of the trust of all users in the power Internet of Things for frequency regulation transactions of hydropower units based on the information loss value and the information gain value.

[0132] It should be noted that step 106 is the process and method for calculating the trust of the power Internet of Things. In the power Internet of Things for hydropower unit frequency regulation transactions, users at the perception layer, network layer and platform layer provide information and enable users to obtain benefits. From this, the average trust of the power Internet of Things for all users can be calculated, and the calculation formula is:

[0133]

[0134] In the formula, B I is the average trust of all users in the power Internet of Things, RRP1 is the information benefit value of the perception layer, R RP2 is the information benefit value of the platform layer, R RP3 is the information benefit value of the network layer, L RP is the information loss value.

[0135] In one embodiment, the IoT trust analysis method of the present application further includes:

[0136] According to the average trust level of the power Internet of Things in all users, the trust level of the power Internet of Things is divided and defined.

[0137] It should be noted that the trust level of all users can be evaluated based on the calculated average trust of the power Internet of Things:

[0138] When B I =1, the power Internet of Things is fully adapted to the application of frequency regulation trading of hydropower units.

[0139] When 0.8≤B I When <1, the power Internet of Things is well adapted to the application of frequency regulation trading of hydropower units.

[0140] When 0.5≤B I When <0.8, the power Internet of Things is better used in the frequency regulation trading of hydropower units.

[0141] When 0.3≤B I When <0.5, the power Internet of Things is suitable for the application of frequency regulation trading of hydropower units.

[0142] When 0≤B I When <0.3, the power Internet of Things cannot adapt to the application of frequency regulation trading of hydropower units.

[0143] The IoT trust analysis method for monitoring the frequency regulation transaction of hydropower units in this embodiment provides an IoT trust calculation method for monitoring the frequency regulation transaction of hydropower units. The method targets the data information formed by data transmission rate, data storage sharing, and data errors and omissions formed by data collection, reflecting the impact of IoT data information on the frequency regulation transaction of hydropower units.

[0144] The above is an Internet of Things trust analysis method for monitoring frequency regulation transactions of hydropower units provided in an embodiment of the present application, and the following is an Internet of Things trust analysis system for monitoring frequency regulation transactions of hydropower units provided in an embodiment of the present application.

[0145] See also Figure 2 , an Internet of Things trust analysis system for monitoring frequency regulation transactions of hydropower units provided in an embodiment of the present application includes:

[0146] The first calculation unit 201 is used to calculate the frequency regulation price, frequency regulation power demand, frequency regulation power, and quotation collection error of the power system in a certain period of time by using a statistical analysis method according to the frequency regulation price data, frequency regulation power demand data, frequency regulation power data of the hydropower units involved in frequency regulation, and quotation data of the power system, and use the three-dimensional trapezoidal fuzzy set as the first fuzzy set;

[0147] The second calculation unit 202 is used to calculate and determine the data transmission rate and the data storage sharing scale data of the IoT monitoring data center by using a statistical analysis method, and a plurality of three-dimensional trapezoidal fuzzy sets of fuzzy uncertainties of different levels of the data transmission rate and the data storage sharing scale, and use them as the second fuzzy set;

[0148] The third calculation unit 203 is used to calculate the frequency regulation power acquisition error of the hydropower units participating in the frequency regulation and the frequency regulation quotation acquisition error formed in the power Internet of Things according to the first fuzzy set;

[0149] The fourth calculation unit 204 is used to calculate the information benefit values ​​of the power Internet of Things at the perception layer, the platform layer and the network layer respectively according to the second fuzzy set;

[0150] The fifth calculation unit 205 is used to calculate the information loss value of the frequency regulation transaction caused by the frequency regulation power and quotation collection errors of the hydropower units participating in the frequency regulation formed in the power Internet of Things according to the frequency regulation power collection error and the frequency regulation quotation collection error;

[0151] The sixth calculation unit 206 is used to calculate the average value of the trust of the power Internet of Things for all users according to the information loss value and the information gain value.

[0152] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0153] The terms "first", "second", "third", "fourth", etc. in the specification of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein, for example. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0154] It should be understood that in the present application, "at least one (item)" means one or more, and "plurality" means two or more. "And / or" is used to describe the association relationship of associated objects, indicating that three relationships may exist. For example, "A and / or B" can mean: only A exists, only B exists, and A and B exist at the same time, where A and B can be singular or plural. The character " / " generally indicates that the objects associated before and after are in an "or" relationship. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single or plural items. For example, at least one of a, b or c can mean: a, b, c, "a and b", "a and c", "b and c", or "a and b and c", where a, b, c can be single or multiple.

[0155] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.

[0156] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0157] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0158] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (full name in English: Read-Only Memory, English abbreviation: ROM), random access memory (full name in English: Random Access Memory, English abbreviation: RAM), disk or optical disk and other media that can store program codes.

[0159] As described above, the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. An IoT trust analysis method for monitoring frequency regulation transactions of hydropower units. It is characterized in that include: According to the frequency regulation price data, frequency regulation power demand data, frequency regulation power data of the hydropower units involved in frequency regulation, and quotation data of the power system, a statistical analysis method is used to calculate the three-dimensional trapezoidal fuzzy set of the frequency regulation price, frequency regulation power demand, frequency regulation power, and quotation collection error of the power system during the period, and the three-dimensional trapezoidal fuzzy set is used as the first fuzzy set; According to the data transmission rate data and data storage sharing scale data of the IoT monitoring data center, a statistical analysis method is used to calculate and determine the data transmission rate and a number of fuzzy uncertainties of different levels of data storage sharing scale, and use them as the second fuzzy set; According to the first fuzzy set, respectively calculate the frequency regulation power acquisition error of the hydropower units participating in the frequency regulation and the frequency regulation quotation acquisition error formed in the power Internet of Things; According to the second fuzzy set, the information benefit values ​​of the power Internet of Things at the perception layer, platform layer and network layer are calculated respectively; According to the frequency regulation power collection error and the frequency regulation quotation collection error, the information loss value of the frequency regulation transaction caused by the frequency regulation power and quotation collection error of the hydropower units participating in the frequency regulation formed in the power Internet of Things is calculated; According to the information loss value and the information gain value, an average value of the trust of the power Internet of Things to all users in the power Internet of Things for hydropower unit frequency regulation transactions is calculated; Among them, the three-dimensional trapezoidal fuzzy set of the acquisition error of the power system frequency regulation price, frequency regulation power demand, frequency regulation power, and quotation of the power system in the determined period is calculated by using the statistical analysis method according to the frequency regulation price data, frequency regulation power demand data, frequency regulation power data of the hydropower units involved in the frequency regulation, and the quotation data, and is used as the first fuzzy set, specifically including: Using the IoT sensing system, the power market monitoring data center is used to obtain data information on the frequency modulation price of the power system; According to the frequency modulation price data information, the statistical analysis method is used to calculate and determine the time period t, t=1,2,...,N e , N e is the number of time periods, and the three-dimensional trapezoidal fuzzy set of the power system frequency regulation price collection error In the formula, and are the three-dimensional trapezoidal fuzzy set of the frequency regulation price acquisition error of the power system in period t or the fuzzy numbers and membership coefficients corresponding to the lower bound, middle bound and upper bound of the three-dimensional trapezoid, respectively. j = 1, 2, 3, 4, and They are the fuzzy numbers and membership coefficients corresponding to the lower bound, middle bound and upper bound of the three-dimensional trapezoidal fuzzy set of the frequency regulation price acquisition error of the power system during period t; According to the data transmission rate data and data storage sharing scale data of the IoT monitoring data center, a statistical analysis method is used to calculate and determine the data transmission rate and a number of fuzzy uncertainties of different levels of data storage sharing scale, and the three-dimensional trapezoidal fuzzy sets are used as the second fuzzy set, specifically including: In the network layer of the power Internet of Things, the data information of the data transmission rate is obtained through the Internet of Things monitoring data center, and the statistical analysis method is used to calculate and determine the three-dimensional trapezoidal fuzzy set v of nine fuzzy uncertainties of data transmission rate: extremely low, very low, low, relatively low, medium, relatively high, high, very high, and extremely high. Di (i=1,2,...,9): v Di =(v DiL ,v DiM ,v DiU )=[(v DiL1 ,v DiL2 ,v DiL3 ,v DiL4 ;k DviL ),(v DiM1 ,v DiM2 ,v DiM3 ,v DiM4 ;k DviM ),(v DiU1 ,v DiU2 ,v DiU3 ,v DiU4 ;k DviU )]; In the formula, v Di is the i-th three-dimensional trapezoidal fuzzy set of daily power generation, v DiL 、v DiM 、v DiU and k DviL , k DviM , k DviU are the fuzzy sets and membership coefficients of the lower, middle and upper bounds of the i-th three-dimensional trapezoidal fuzzy set of data transmission rate, respectively. DiLj 、v DiMj 、v DiUj , j = 1, 2, 3, 4, which are the fuzzy numbers of the lower bound, middle bound and upper bound fuzzy sets of the i-th three-dimensional trapezoidal fuzzy set of data transmission rate respectively; The calculating, according to the first fuzzy set, respectively the frequency regulation power quantity acquisition error of the hydropower units participating in the frequency regulation and the frequency regulation quotation acquisition error formed in the power Internet of Things specifically includes: According to the three-dimensional trapezoidal fuzzy set of the frequency regulation power acquisition error of hydropower units, thermal power units, nuclear power units, gas power units, energy storage units, and west-to-east power transmission units involved in frequency regulation, the frequency regulation power acquisition error of hydropower units involved in frequency regulation formed in the power Internet of Things is calculated. In the formula, is the three-dimensional trapezoidal fuzzy set of the power demand collection error of the power system frequency regulation. for They are the three-dimensional trapezoidal fuzzy sets of the acquisition errors of the frequency regulation power quantities of the hydropower units, thermal power units, nuclear power units, gas power units, energy storage units, and west-to-east power transmission units involved in frequency regulation; represents the union of fuzzy sets; The information benefit values ​​of the power Internet of Things at the perception layer, platform layer and network layer are calculated respectively according to the second fuzzy set, specifically including: Based on the information benefit value calculation formula of the perception layer, the information benefit value of the power Internet of Things at the perception layer is calculated according to the second fuzzy set; Among them, the information benefit value calculation formula of the perception layer is: In the formula, R RP1 The information benefit value generated by the power Internet of Things providing data collection to users in frequency regulation transactions; k Mi M H is the information benefit value formed by the Internet of Things providing data collection for hydropower units at the perception layer; E[] is the expected value of []. represents the second fuzzy set; The calculating, based on the frequency regulation power amount acquisition error and the frequency regulation quotation acquisition error, of the information loss value of the frequency regulation transaction caused by the frequency regulation power amount and quotation acquisition error of the hydropower units participating in the frequency regulation formed in the power Internet of Things specifically includes: Substituting the frequency regulation power quantity collection error and the frequency regulation quotation collection error into the information loss value calculation formula, the frequency regulation power quantity and quotation collection error of the hydropower units participating in the frequency regulation formed in the power Internet of Things will be solved to obtain the information loss value of the frequency regulation transaction caused by the frequency regulation power quantity and quotation collection error; Wherein, the information loss value calculation formula is: Where, L RP The frequency regulation power and quotation collection errors of the hydropower units involved in frequency regulation in the power Internet of Things will cause information loss value of frequency regulation transactions; It is the influence coefficient or weight coefficient of the frequency regulation power acquisition error of the hydropower units involved in frequency regulation formed in the power Internet of Things. It is the unit loss value caused by the frequency regulation power collection error of the hydropower units involved in frequency regulation formed in the power Internet of Things; It is the influence coefficient or weight coefficient of the frequency regulation quotation collection error of the hydropower units involved in frequency regulation formed in the power Internet of Things. It is the unit loss value caused by the frequency regulation quotation collection error of the hydropower units involved in frequency regulation in the power Internet of Things. is the frequency modulation power acquisition error, The frequency modulation quotation collection error; The calculation of the average trust of the power Internet of Things for all users in the power Internet of Things for hydropower unit frequency regulation transactions based on the information loss value and the information gain value specifically includes: Substituting the information loss value and the information gain value into the average value calculation formula, and solving to obtain the average value of the trust of the power Internet of Things to all users; Wherein, the average value calculation formula is: In the formula, B I is the average trust of all users in the power Internet of Things, R RP1 is the information benefit value of the perception layer, R RP2 is the information benefit value of the platform layer, R RP3 is the information benefit value of the network layer, L RP is the information loss value.

2. According to claim 1, the Internet of Things trust analysis method for monitoring frequency regulation transactions of hydropower units, It is characterized in that The method further comprises calculating the average trust of all users of the power Internet of Things in the power Internet of Things for hydropower unit frequency regulation transactions according to the information loss value and the information gain value, and then further comprising: According to the average trust level of the power Internet of Things in all users, the trust level of the power Internet of Things is divided and defined.

3. An IoT trust analysis system for monitoring frequency regulation transactions of hydropower units. It is characterized in that include: The first calculation unit is used to calculate the frequency regulation price, frequency regulation power demand, frequency regulation power, and quotation collection error of the power system in a certain period of time by using a statistical analysis method according to the frequency regulation price data, frequency regulation power demand data, frequency regulation power data of the hydropower units involved in frequency regulation, and quotation data of the power system, and use the three-dimensional trapezoidal fuzzy set as the first fuzzy set; A second calculation unit is used to calculate and determine the data transmission rate and a plurality of three-dimensional trapezoidal fuzzy sets of different levels of fuzzy uncertainty of the data transmission rate and the data storage sharing scale of the data center monitored by the Internet of Things by using a statistical analysis method, and use the three-dimensional trapezoidal fuzzy sets as the second fuzzy sets; A third calculation unit is used to calculate the frequency regulation power acquisition error of the hydropower units participating in the frequency regulation and the frequency regulation quotation acquisition error formed in the power Internet of Things according to the first fuzzy set; A fourth calculation unit, used to calculate the information benefit values ​​of the power Internet of Things at the perception layer, the platform layer and the network layer respectively according to the second fuzzy set; A fifth calculation unit is used to calculate the information loss value of the frequency regulation transaction caused by the frequency regulation power and quotation collection error of the hydropower units participating in the frequency regulation formed in the power Internet of Things according to the frequency regulation power collection error and the frequency regulation quotation collection error; A sixth calculation unit, configured to calculate an average value of the trust of the power Internet of Things for all users according to the information loss value and the information gain value; Wherein, the first computing unit is specifically used for: Using the IoT sensing system, the power market monitoring data center is used to obtain data information on the frequency modulation price of the power system; According to the frequency modulation price data information, the statistical analysis method is used to calculate and determine the time period t, t=1,2,...,N e , N e is the number of time periods, and the three-dimensional trapezoidal fuzzy set of the power system frequency regulation price collection error In the formula, and are the three-dimensional trapezoidal fuzzy set of the frequency regulation price acquisition error of the power system in period t or the fuzzy numbers and membership coefficients corresponding to the lower bound, middle bound and upper bound of the three-dimensional trapezoid, respectively. j = 1, 2, 3, 4, and They are the fuzzy numbers and membership coefficients corresponding to the lower bound, middle bound and upper bound of the three-dimensional trapezoidal fuzzy set of the frequency regulation price acquisition error of the power system during period t; The second computing unit is specifically configured to: In the network layer of the power Internet of Things, the data information of the data transmission rate is obtained through the Internet of Things monitoring data center, and the statistical analysis method is used to calculate and determine the three-dimensional trapezoidal fuzzy set v of nine fuzzy uncertainties of data transmission rate: extremely low, very low, low, relatively low, medium, relatively high, high, very high, and extremely high. Di (i=1,2,...,9): v Di =(v DiL ,v DiM ,v DiU )=[(v DiL1 ,v DiL2 ,v DiL3 ,v DiL4 ;k DviL ),(v DiM1 ,v DiM2 ,v DiM3 ,v DiM4 ;k DviM ),(v DiU1 ,v DiU2 ,v DiU3 ,v DiU4 ;k DviU )]; In the formula, v Di is the i-th three-dimensional trapezoidal fuzzy set of daily power generation, v DiL 、v DiM 、v DiU and k DviL , k DviM , k DviU are the fuzzy sets and membership coefficients of the lower, middle and upper bounds of the i-th three-dimensional trapezoidal fuzzy set of data transmission rate, respectively. DiLj 、v DiMj 、v DiUj , j = 1, 2, 3, 4, which are the fuzzy numbers of the lower bound, middle bound and upper bound fuzzy sets of the i-th three-dimensional trapezoidal fuzzy set of data transmission rate respectively; The third computing unit is specifically used for: According to the three-dimensional trapezoidal fuzzy set of the frequency regulation power acquisition error of hydropower units, thermal power units, nuclear power units, gas power units, energy storage units, and west-to-east power transmission units involved in frequency regulation, the frequency regulation power acquisition error of hydropower units involved in frequency regulation formed in the power Internet of Things is calculated. In the formula, is the three-dimensional trapezoidal fuzzy set of the power demand collection error of the power system frequency regulation. for They are the three-dimensional trapezoidal fuzzy sets of the acquisition errors of the frequency regulation power quantities of the hydropower units, thermal power units, nuclear power units, gas power units, energy storage units, and west-to-east power transmission units involved in frequency regulation; represents the union of fuzzy sets; The fourth computing unit is specifically configured to: Based on the information benefit value calculation formula of the perception layer, the information benefit value of the power Internet of Things at the perception layer is calculated according to the second fuzzy set; Among them, the information benefit value calculation formula of the perception layer is: In the formula, R RP1 The information benefit value generated by the power Internet of Things providing data collection to users in frequency regulation transactions; k Mi M H is the information benefit value formed by the Internet of Things providing data collection for hydropower units at the perception layer; E[] is the expected value of []. represents the second fuzzy set; The fifth computing unit is specifically configured to: Substituting the frequency regulation power quantity collection error and the frequency regulation quotation collection error into the information loss value calculation formula, the frequency regulation power quantity and quotation collection error of the hydropower units participating in the frequency regulation formed in the power Internet of Things will be solved to obtain the information loss value of the frequency regulation transaction caused by the frequency regulation power quantity and quotation collection error; Wherein, the information loss value calculation formula is: Where, L RP The frequency regulation power and quotation collection errors of the hydropower units involved in frequency regulation in the power Internet of Things will cause information loss value of frequency regulation transactions; It is the influence coefficient or weight coefficient of the frequency regulation power acquisition error of the hydropower units involved in frequency regulation formed in the power Internet of Things. It is the unit loss value caused by the frequency regulation power collection error of the hydropower units involved in frequency regulation formed in the power Internet of Things; It is the influence coefficient or weight coefficient of the frequency regulation quotation collection error of the hydropower units involved in frequency regulation formed in the power Internet of Things. It is the unit loss value caused by the frequency regulation quotation collection error of the hydropower units involved in frequency regulation in the power Internet of Things. is the frequency modulation power acquisition error, The frequency modulation quotation collection error; The sixth computing unit is specifically configured to: Substituting the information loss value and the information gain value into the average value calculation formula, and solving to obtain the average value of the trust of the power Internet of Things to all users; Wherein, the average value calculation formula is: In the formula, B I is the average trust of all users in the power Internet of Things, R RP1 is the information benefit value of the perception layer, R RP2 is the information benefit value of the platform layer, R RP3 is the information benefit value of the network layer, L RP is the information loss value.

4. According to claim 3, the Internet of Things trust analysis system for monitoring frequency regulation transactions of hydropower units, It is characterized in that Also includes: The evaluation unit is used to divide and define the trust level of the power Internet of Things according to the average trust level of all users of the power Internet of Things.