A clean room modular equipment assembly convenient to disassemble
The modular wall panel design and quick-release structure solve the problem of disassembling and assembling equipment components in cleanrooms, enabling rapid disassembly and maintenance, facilitating water pump position adjustment, improving equipment flexibility and air cleanliness, and making it suitable for modular equipment components in cleanrooms.
Patent Information
- Application Number
- CN202310478604.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-28
- Publication Date
- 2025-11-07
- Estimated Expiration
- 2043-04-28
AI Technical Summary
Traditional cleanroom modular equipment components suffer from problems such as difficulty in quick disassembly and maintenance, serious waste of resources, and easy entry of dust and impurities during disassembly and maintenance.
The modular wall panel design utilizes a quick-release structure with prefabricated water pipes, T-shaped slides, and water connectors to enable rapid connection and position adjustment of the water pump. Combined with the T-shaped guide rails and slide blocks, the water pump can be quickly assembled and disassembled. Air cleanliness and humidity can be adjusted through air guide components and electric push rods.
It enables rapid disassembly and maintenance of modular equipment components for cleanrooms, reduces pipeline layout, improves equipment flexibility and maintenance convenience, and enhances air cleanliness and humidity control capabilities.
Smart Images

Figure CN116497944B_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of clean plant, in particular to a clean plant modular equipment assembly convenient to disassemble. BACKGROUND
[0002] The clean plant refers to a room specially designed to exclude pollutants such as particulate matter, harmful air, bacteria, etc. in the air within a certain space, and to control the indoor temperature, cleanliness, indoor pressure, air flow velocity and distribution, noise and vibration, and lighting, electrostatic, within a certain requirement range. Regardless of the change of external air conditions, the room can maintain the performance of the set requirements of cleanliness, temperature and humidity, and pressure.
[0003] Traditional clean plants are customized according to the actual space of the on-site plant, which is very cumbersome in production and installation, and cannot be reused once removed, which easily causes resource waste. With the development of industrial equipment modularization, the emergence of modular clean plant technology can overcome the problems of traditional clean plants, greatly improving the construction efficiency of clean plants. However, during the installation process of the modular clean plant, a series of problems of maintenance and repair space occlusion caused by the high integration of components occur, such as the replacement of the machine seal of the centrifugal pump in the clean medium distribution system module. The centrifugal pump itself is heavy and fixed in position due to the hard connection of the related stainless steel pipe fittings, making it difficult to disassemble quickly. Moreover, a large amount of piping needs to be laid, resulting in a large amount of engineering. When impurities accumulate in the pipeline, it is easy to cause pipeline blockage and is not convenient to clean, making maintenance difficult. Moreover, dust and impurities from the outside are easily introduced into the clean plant during ventilation.
[0004] Therefore, it is necessary to invent a clean plant modular equipment assembly convenient to disassemble to solve the above problems. SUMMARY
[0005] The present application aims to provide a clean plant modular equipment assembly convenient to disassemble to solve the problems raised in the background.
[0006] To achieve the above-mentioned purpose, the present application provides the following technical scheme: a clean plant modular equipment assembly convenient to disassemble, comprising a modular wallboard, the modular wallboard is composed of a first wallboard and a second wallboard, a prefabricated water supply pipe is arranged horizontally on the bottom of the side of the first wallboard close to the second wallboard, a T-shaped sliding groove corresponding to the prefabricated water supply pipe is formed on the bottom of the side of the first wallboard away from the second wallboard, water connection holes communicating with the prefabricated water supply pipe are uniformly formed on the inner side of the T-shaped sliding groove, a water connector is slidably connected to the T-shaped sliding groove, the water connector is connected to any one of the water connection holes in the T-shaped sliding groove, and an air guide assembly is arranged on the top of the first wallboard.
[0007] The side away from the second wallboard of the first wallboard is provided with a T-shaped guide rail, a sliding seat is slidably connected to the T-shaped guide rail, and a water pump is fixed to the sliding seat.
[0008] The water joint is internally provided with a water cavity, a water inlet valve core is slidably connected to the water cavity, the inner end of the water inlet valve core is correspondingly inserted into the water inlet hole, a water outlet hole groove is formed in the outer end side of the water inlet valve core, a position opposite to the water inlet valve core of the positioning bolt is correspondingly provided with an electromagnet.
[0009] Preferably, the output port of the water pump is provided with a connecting pipe, the top of the end of the connecting pipe away from the water pump is obliquely provided with a spray head, a connecting head is arranged on the side of the connecting pipe close to the water pump, a valve is arranged on the connecting head, an electromagnetic valve is arranged on the connecting pipe between the spray head and the connecting head, and a flowmeter is arranged on the end of the connecting pipe close to the water pump.
[0010] Preferably, the joint end of the water inlet valve core and the water inlet hole is a tapered necking, and the outer end port of the water inlet hole is a tapered slot matched with the water inlet valve core.
[0011] Preferably, the water inlet hole is internally provided with a sliding cavity, a water closing valve core corresponding to the water inlet valve core is slidably connected to the sliding cavity, a water inlet hole groove is formed in the inner end outer wall of the water closing valve core, a top ring is arranged on the end of the water closing valve core close to the water inlet valve core, a pressure spring is arranged outside the water closing valve core, and the two ends of the pressure spring are respectively in contact with the top ring and the side wall of the sliding cavity.
[0012] Preferably, a first thimble is arranged at one end inside the water inlet valve core, the first thimble is coaxially arranged with the water inlet valve core, a second thimble corresponding to the first thimble is arranged at one end inside the water closing valve core, and a positioning bolt is screwed on the outer side wall of the water joint.
[0013] Preferably, a sealing compression ring is arranged at the inner end of the water closing valve core, and a sealing rubber ring gasket is arranged at a position corresponding to the sealing compression ring on the inner wall of the prefabricated water delivery pipe.
[0014] Preferably, a rack is arranged on the outer side guide rail surface of the T-shaped guide rail, a pair of buckle supports are arranged on the side walls of the sliding seat, the middle part of the buckle is hingedly connected to the two buckle supports through a pin rod, the buckle teeth of the buckle are matched with the tooth grooves of the rack of the T-shaped guide rail, a torsional spring is arranged on the pin rod connected between the buckle and the buckle support, and the two ends of the torsional spring are respectively connected to the buckle and the buckle support.
[0015] Preferably, the air guide assembly comprises an air guide box embedded in the top of the modular wall panel, the sidewall of the air guide box is provided with an air inlet pipe, the air guide box is provided with an air guide curtain, the air guide curtain is composed of a plurality of air guide vanes arranged in the vertical direction, the air guide vanes are connected to the inner wall of the air guide box through a rotating shaft, the inner side edge of the air guide vanes is provided with a hinged joint, and the hinged joints of the plurality of air guide vanes are connected through a connecting rod.
[0016] Preferably, the inner cavity of the air guide box is provided with an electric push rod at the bottom, the top end of the electric push rod is provided with a distance measuring sensor, the telescopic rod of the electric push rod extends vertically upward, and the upper end of the telescopic rod of the electric push rod is connected with a connecting piece, the other end of the connecting piece is connected with the connecting rod.
[0017] Preferably, the upper and lower surfaces close to the inner end of the air guide box are both bonded and fixed with a second sound insulation cotton layer, and the outer part of the prefabricated water pipe is provided with a first sound insulation cotton layer.
[0018] Compared with the prior art, the present application has the following technical effects:
[0019] 1、The wall panel is modularized, which is convenient for disassembly and maintenance, the prefabricated water pipe on the modular wall panel is connected quickly through the quick release structure and the water connector, the water pump is quickly connected, the cooperation of the T-shaped guide rail and the sliding seat facilitates the quick disassembly and assembly of the water pump, the position of the water pump can be freely adjusted according to the work and maintenance needs, and the position of the water pump can be quickly fixed, so that the quick disassembly and assembly of the modular equipment assembly of the clean room are facilitated, the maintenance in the later period is facilitated, and the water module on the wall panel module can cooperate with the air guide assembly to adjust the humidity in the clean room on the basis of ensuring the respective work.
[0020] 2、The present application is pressed to make the teeth of the fastener and the tooth groove of the rack disengaged, at this time the sliding seat can slide along the guide of the T-shaped guide rail, thereby changing the position of the water pump, by loosening the fastener, the teeth of the fastener and the tooth groove of the rack are engaged, the fixing of the water pump is completed, the quick adjustment of the position of the water pump is realized, and the guide rail is provided in the shape of T, so that the bearing capacity of the water pump can be improved.
[0021] 3、When the water connection is connected after adjusting the position of the water pump, the water valve core inner end is sealingly inserted into the water connection hole by turning the adjusting bolt, in the process of the water valve core being inwardly pushed, the first thimble pushes the second thimble, so that the water inlet hole groove of the closed water valve core is pushed into the prefabricated water pipe, so that the water connection is connected quickly, the arrangement of the pipeline is reduced, and the structure is more tidy.
[0022] 4. At the same time of starting the electric push rod to control the air curtain to open, the electromagnetic valve is opened, and the water pump is started, the water in the water supply pipe is pumped into the connecting pipe, and is sprayed upward through the spray head, so that the air entering the factory building is sprayed, the dust and impurities in the air are removed, the cleanliness of the air is increased, the air can be humidified, and the humidity in the factory building is adjusted.
[0023] 5. The water receiving valve core and the water closing valve core are quickly reset, the water closing valve core is elongated to the original length, and the cycle is performed, so that the water receiving valve core and the water closing valve core vibrate, and the blockage attached to the water outlet hole groove and the water inlet hole groove is shaken off. BRIEF DESCRIPTION OF DRAWINGS
[0024] Figure 1 It is a structural schematic diagram of the application;
[0025] Figure 2 It is an exploded structural schematic diagram of the three-dimensional structure of the application;
[0026] Figure 3 It is Figure 2 It is an enlarged structural schematic diagram of position A in the middle;
[0027] Figure 4 It is a sliding seat structural schematic diagram of the application;
[0028] Figure 5 It is Figure 4 It is an enlarged structural schematic diagram of position B in the middle;
[0029] Figure 6 It is a side cross-sectional structural schematic diagram of the application;
[0030] Figure 7 It is Figure 6 It is an enlarged structural schematic diagram of position C in the middle;
[0031] Figure 8 It is a water connector and water closing valve core cross-sectional structural schematic diagram of the application;
[0032] Figure 9 It is Figure 8 It is an enlarged structural schematic diagram of position D in the middle.
[0033] In the figure: 1, modular wallboard; 101, first wallboard; 1011, prefabricated water pipe; 1012, T-shaped chute; 1013, water connection hole; 1014, T-shaped guide rail; 102, second wallboard; 2, water connector; 201, water cavity; 202, water valve core; 2021, water outlet hole groove; 2022, first thimble; 203, closed water valve core; 2031, water inlet hole groove; 2032, second thimble; 2033, pressure spring; 2034, sealing compression ring; 2035, sealing rubber ring pad; 204, position adjusting bolt; 3, sliding seat; 301, fastener; 302, fastener support; 303, fastener tooth; 304, torsional spring; 4, water pump; 401, metal pipe; 402, connecting pipe; 403, spray head; 404, connector; 405, electromagnetic valve; 5, air guide assembly; 501, air guide box; 502, air guide curtain; 5021, hinged node; 503, connecting rod; 504, connecting piece; 505, electric push rod; 6, first sound insulation cotton layer; 601, second sound insulation cotton layer; 7, flow meter; 8, electromagnet. DETAILED DESCRIPTION
[0034] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative labor are within the scope of protection of the present application.
[0035] The modular clean plant generally includes frame modules, wallboard modules, ventilation and purification modules, fire-fighting modules, water and electricity modules, and automation control system modules. When building a modular clean plant, first build the frame module, which generally uses an aluminum alloy material frame to ensure weight control while improving support strength. After the frame module is built, build the wallboard module based on the frame, and then seal the wallboard module after it is built. After the base frame is built, build the ventilation and purification module, the fire-fighting module, the water and electricity module, and the automation control system module.
[0036] The present application provides a clean plant modular equipment assembly convenient to disassemble, which is mainly based on the actual problems faced during the construction of wallboard modules and water and electricity modules, ventilation and purification modules on site. Specifically, as Figures 1-8As shown, the modular wallboard 1 is composed of a first wallboard 101 and a second wallboard 102, the first wallboard 101 is provided with a prefabricated water pipe 1011 arranged horizontally at the bottom of the side close to the second wallboard 102, the bottom of the side away from the second wallboard 102 of the first wallboard 101 is provided with a T-shaped sliding groove 1012 corresponding to the prefabricated water pipe 1011, the inner side of the T-shaped sliding groove 1012 is uniformly provided with a water connection hole 1013 in communication with the prefabricated water pipe 1011, a water connector 2 is slidably connected to the T-shaped sliding groove 1012, the water connector 2 can be connected to any one of the water connection holes 1013 of the T-shaped sliding groove 1012, and the first wallboard 101 is provided with a wind guide assembly 5 at the top.
[0037] The side away from the second wallboard 102 of the first wallboard 101 is provided with a T-shaped guide rail 1014, a sliding seat 3 is slidably connected to the T-shaped guide rail 1014, and a water pump 4 is fixed to the sliding seat 3.
[0038] The water pump 4 is guided and slid along the T-shaped guide rail 1014, the installation position is adjusted according to the actual installation requirement, the water connector 2 is docked with the corresponding water connection hole 1013 in the T-shaped sliding groove 1012, the water pump 4 is connected to the prefabricated water pipe 1011, the pipeline arrangement is reduced, the installation is flexible, and the adjustment is convenient.
[0039] The water joint 2 is internally provided with a water cavity 201, the water cavity 201 is internally and slidably connected with a water valve core 202, the inner end of the water valve core 202 is correspondingly inserted into the water connecting hole 1013, the outer end of the water valve core 202 is provided with a water outlet slot 2021 on the side surface, the outer end of the water joint 2 is screwed with a position adjusting bolt 204, the inner end of the water valve core 202 is inserted into the water connecting hole 1013 by turning the position adjusting bolt 204 and feeding the position adjusting bolt 204, the water path is connected, the joint end of the water valve core 202 and the water connecting hole 1013 is a tapered neck, the outer end of the water connecting hole 1013 is a tapered slot matched with the water valve core 202, the connection sealing performance is improved, the water connecting hole 1013 is internally provided with a sliding cavity, the sliding cavity is slidably connected with a water closing valve core 203 corresponding to the water valve core 202, the inner end of the water closing valve core 203 is provided with a water inlet slot 2031, one end of the water valve core 202 is internally provided with a first thimble 2022, the first thimble 2022 is coaxially arranged with the water valve core 202, one end of the water closing valve core 203 is internally provided with a second thimble 2032 corresponding to the first thimble 2022, the first thimble 2022 presses the second thimble 2032 in the process of the water valve core 202 being inwardly pressed, so that the water inlet slot 2031 of the water closing valve core 203 is pressed into the prefabricated water conveying pipe 1011, so that the water path is connected; one end of the water closing valve core 203 close to the water valve core 202 is provided with a top ring, the water closing valve core 203 is externally provided with a pressure spring 2033, the two ends of the pressure spring 2033 are respectively in contact with the top ring and the side wall of the sliding cavity, when the water valve core 202 is pulled out and separated, the water inlet slot 2031 of the water closing valve core 203 is reset and shrunk into the sliding cavity under the action of the pressure spring 2033, at this time, the water path is disconnected, the inner end of the water closing valve core 203 is provided with a sealing compression ring 2034, the inner wall of the prefabricated water conveying pipe 1011 and the position corresponding to the sealing compression ring 2034 are provided with a sealing rubber ring 2035, so as to ensure the sealing performance of the connection after the water path is disconnected.
[0040] The outer guide rail surface of the T-shaped guide rail 1014 is provided with a rack, the side wall of the sliding seat 3 is provided with a pair of buckle supports 302, the two buckle supports 302 are hingedly connected with the middle part of the buckle 301 through a pin rod, the buckle teeth 303 of the buckle 301 are matched with the tooth grooves of the rack of the T-shaped guide rail 1014, the pin rod connected between the buckle 301 and the buckle support 302 is provided with a torsion spring 304, the two ends of the torsion spring 304 are respectively connected with the buckle 301 and the buckle support 302, by pressing the buckle 301, the buckle teeth 303 of the buckle 301 are separated from the tooth grooves of the rack, at this time, the sliding seat 3 can slide along the T-shaped guide rail 1014, and the position of the water pump 4 is changed, by loosening the buckle 301, the buckle teeth 303 of the buckle 301 are engaged with the tooth grooves of the rack, the fixing of the water pump 4 is completed.
[0041] The first wallboard 101 is provided with a wind guide assembly 5 at the top, which comprises a wind guide box 501 embedded in the top of the modular wallboard 1, the side wall of the wind guide box 501 is provided with an air inlet pipe, the wind guide box 501 is provided with a wind guide curtain 502, the wind guide curtain 502 is composed of a plurality of wind guide vanes arranged in the vertical direction, the wind guide vanes are connected to the inner wall of the wind guide box 501 through a rotating shaft, the inner side edge of the wind guide vanes is provided with a hinged node 5021, and the hinged nodes 5021 of the plurality of wind guide vanes are connected through a connecting rod 503, the bottom of the inner cavity of the wind guide box 501 is provided with an electric push rod 505, the telescopic rod of the electric push rod 505 extends vertically upward, and the upper end of the telescopic rod of the electric push rod 505 is connected with a connecting piece 504, the other end of the connecting piece 504 is connected with the connecting rod 503, under the action of the electric push rod 505, the telescopic rod of the electric push rod 505 pulls the connecting rod 503 through the connecting piece 504, and the connecting rod 503 drives the plurality of wind guide vanes to adjust the upward and downward deflection of the wind guide vanes, effectively guiding the air into the workshop interior, and improving the working environment quality in the workshop interior.
[0042] The upper and lower surfaces close to the inner end of the wind guide box 501 are both bonded and fixed with a second sound insulation cotton layer 601, and the outside of the prefabricated water pipe 1011 is provided with a first sound insulation cotton layer 6, so as to reduce the noise generated during the transmission of the air path or the water path.
[0043] When the device of the embodiment is used, the following technical solutions can be used for assembly:
[0044] Install the second wallboard 102: use the hoisting device to hoist the modular wallboard and accurately place it at the installation position, after the second wallboard 102 is in place and the position is corrected, the embedded parts on the second wallboard 102 and the embedded parts on the external connecting structure are welded firmly with connecting steel plates, the connecting steel plates must be three-face-welded, the steel plate embedded parts must not protrude from the structure wall surface, and then the wallboard gap is filled with cement mortar.
[0045] Assemble the first wallboard 101: assemble the wind guide curtain 502, the electric push rod 505, the connecting rod 503 and the connecting piece 504 in the wind guide box 501, then embed the wind guide box 501 in the top of the first wallboard 101, and then bond one side of the two second sound insulation cotton layers 601 to the side of the first wallboard 101, and make the opposite sides of the two second sound insulation cotton layers 601 respectively adhere to the upper and lower sides of the wind guide box 501, and then bond the two first sound insulation cotton layers 6 to the upper and lower sides of the prefabricated water pipe 1011 respectively.
[0046] The first wallboard 101 is combined with the second wallboard 102: the first wallboard 101 is hoisted and placed in the position corresponding to the second wallboard 102 by using a hoisting device, the second wallboard 102 is attached to the first wallboard 101 in correspondence, and the inner side of the second wallboard 102 is bonded with the first sound insulation cotton layer 6, the second sound insulation cotton layer 601 and the side of the air guide box 501 by using a quick release connector.
[0047] After the modular wallboard is assembled, the water connector 2 is slidably connected in the T-shaped sliding groove 1012, and the sliding seat 3 provided with the water pump 4 is slidably connected on the T-shaped sliding rail 1014, and the buckle tooth 303 is correspondingly matched with the tooth groove on the side of the T-shaped guide rail 1014. By pressing the buckle 301, the buckle tooth 303 is separated from the tooth groove on the side of the T-shaped guide rail 1014. The sliding seat 3 can be slid to move the water pump 4 to the position corresponding to the metal pipe 401, and the end of the metal pipe 401 is connected with the input port of the water pump 4. Thus, during the sliding of the sliding seat 3, the water connector 2 can be slid synchronously through the metal pipe 401. After the water pump 4 is moved to the specified position, the buckle 301 is released, and the buckle tooth 303 is correspondingly matched with the tooth groove on the side of the T-shaped guide rail 1014 again to realize the positioning of the water pump 4. Thus, the quick assembly of the modular equipment assembly of the clean room is realized, and the water pump can be quickly disassembled for convenient maintenance.
[0048] When the device is used, the water pump 4 slides along the T-shaped guide rail 1014, the installation position is adjusted according to the actual installation requirement, the water connector 2 is connected with the water connection hole 1013 in the T-shaped sliding groove 1012 in correspondence, and the water pump 4 is connected with the water channel of the prefabricated water pipe 1011. The installation is flexible.
[0049] Specifically, by pressing the buckle 301, the buckle tooth 303 of the buckle 301 is separated from the tooth groove of the rack, and at this time the sliding seat 3 can slide along the guide of the T-shaped guide rail 1014, and then the position of the water pump 4 is changed. By loosening the buckle 301, the buckle tooth 303 of the buckle 301 is engaged with the tooth groove of the rack, and the fixing of the water pump 4 is completed. The adjustment and limiting of the water pump 4 are simple and convenient.
[0050] Specifically, when the water channel is connected after the position of the water pump 4 is adjusted, the inner end of the water valve core 202 is sealingly inserted into the water connection hole 1013 by turning the adjustment bolt 204. In the process of the water valve core 202 being inwardly inserted, the first thimble 2022 presses the second thimble 2032, so that the water inlet hole groove 2031 of the closed water valve core 203 is inserted into the prefabricated water pipe 1011, so that the water channel is connected quickly, the arrangement of the pipeline is reduced, and the structure is more tidy.
[0051] Specifically, under the operation of the electric push rod 505, the telescopic rod of the electric push rod 505 pulls the connecting rod 503 through the connector 504, and the connecting rod 503 drives the multiple guide fan blades to adjust the up and down deflection of the guide fan blades, effectively and evenly introducing air into the workshop and improving the quality of the working environment inside the workshop.
[0052] Furthermore, such as Figure 9 As shown, based on the modular cleanroom equipment component that is easy to assemble and disassemble provided in the first embodiment, during actual use, when the air guide component 5 pours outside air into the workshop, impurities, dust and floating objects contained in the outside air will enter the workshop, affecting the environment inside the workshop; and during the water pumping process, since the prefabricated water pipe 1011 is placed horizontally, after a long period of use, a lot of solid particle impurities will accumulate on the arc surface of the inner bottom of the prefabricated water pipe 1011 and the bottom of the water cavity 201, which will cause the water inlet groove 2031 and the water outlet groove 2021 located at the bottom to become blocked, affecting the water output.
[0053] To solve the above problems, the output port of the water pump 4 is provided with a connecting pipe 402. The top of the end of the connecting pipe 402 away from the water pump 4 is inclined and a nozzle 403 is provided. The side of the connecting pipe 402 is provided with a connector 404 near the water pump 4. A valve is provided on the connector 404. A solenoid valve 405 is provided on the connecting pipe 402 between the nozzle 403 and the connector 404. A flow meter 7 is provided at the end of the connecting pipe 402 near the water pump 4. An electromagnet 8 is provided on the opposite end of the adjusting bolt 204 to the water valve core 202. A distance sensor is provided at the top of the electric push rod 505.
[0054] In use, the water connector 2 is slid to the position corresponding to the water connection hole 1013, the two opposite electromagnets 8 are started, and the opposite sides of the two electromagnets 8 have the same polarity. By rotating the positioning bolt 204, the repulsive force between the two electromagnets 8 is used to push the water inlet valve core 202 to slide, and at the same time, the first thimble 2022 pushes the second thimble 2032 to move until the water inlet valve core 202 is completely connected with the water connection hole 1013. At this time, the water inlet hole groove 2031 is completely inserted into the prefabricated water conveying pipe 1011, and the compression spring 2033 is compressed to realize the communication between the water cavity 201 and the prefabricated water conveying pipe 1011. When the air duct 501 needs to be opened to ventilate the factory building, the valve on the connecting head 404 is closed, the electromagnetic valve 405 is opened, and the water pump 4 is started at the same time that the electric push rod 505 controls the air duct curtain 502 to open. The water in the prefabricated water conveying pipe 1011 enters the connecting pipe 402 through the water pump 4, and is sprayed upward through the spray head 403, thereby spraying the air entering the factory building to remove impurities in the air and increase the cleanliness of the air. At the same time, the air can be humidified to adjust the humidity in the factory building. In addition, by connecting the external hose to the connecting head 404 and opening the valve, water supply in the factory building can be realized while purifying the air.
[0055] In addition, in order to prevent the spray head 403 from being blocked, the current on the two electromagnets 8 is reduced synchronously, the repulsive force between the two electromagnets 8 is reduced, and the end of the water inlet valve core 202 is close to the positioning bolt 204. At the same time, due to the abutment of the opposite ends of the first thimble 2022 and the second thimble 2032, the compression spring 2033 releases part of the length under the action of the compression spring 2033, thereby causing the sealing compression ring 2034 to shrink, thereby shortening the extension length of the water inlet hole groove 2031 and reducing the effective water inlet area of the water inlet hole groove 2031, thereby realizing the filtration of the water source before the water enters the closed water valve core 203 and preventing impurities from entering the spray head 403 to cause blockage.
[0056] In addition, according to Figure 2 and Figure 3As can be seen, as the electric push rod 505 retracts, the air guide curtain 502 gradually moves upward on the side close to the first wall panel 101, that is, the opening between the air guide curtains 502 on the side close to the first wall panel 101 gradually moves from bottom to top until the air guide curtain 502 is in a horizontal position, in the process, the opening between the air guide curtains 502 on the side close to the first wall panel 101 gradually increases, and at the same time, the exhaust air volume increases, so it can be inferred that the retraction of the electric push rod 505 increases the intake air volume, but when the exhaust air volume increases, it will cause the water spray volume of the spray head 403 to be unable to meet the purification demand of the entering air, therefore, while the electric push rod 505 retracts, the distance between the telescopic end of the electric push rod 505 and the bottom surface of the air guide box 501 gradually decreases, the current on the two electromagnets 8 is simultaneously controlled to be enhanced, so that the repulsive force between the two electromagnets 8 increases, since the water inlet hole groove 2031 is a strip-shaped structure, the extension length of the water inlet hole groove 2031 is thus prolonged, and the water inlet volume of the water inlet hole groove 2031 is thus increased, and the water spray volume of the spray head 403 is thus improved, so as to thoroughly and comprehensively purify the air entering the factory building.
[0057] It should be noted that when the opening between the air guide curtains 502 on the side close to the first wall panel 101 gradually moves from bottom to top, the exhaust air angle also gradually moves upward, and the exhaust air height increases, when the exhaust air height reaches the maximum value, the exhaust air height should be lower than the water spray height of the spray head 403 at all times, and in order to make the spray head 403 fully cover the air guide box 501, the spray head 403 should be located in the middle of the air guide box 501 when purifying the exhaust air, and the water mist sprayed by the spray head 403 should be fan-shaped and upwardly divergent.
[0058] In addition, after long time use, the bottom of the water cavity 201, the bottom of the prefabricated water pipe 1011 and the bottom of the sliding cavity will gather more solid particles, affecting the water discharge, and thus reducing the water output of the water pump 4. The flow meter 7 monitors the water output of the water pump 4 in real time. In the case of normal operation of the water pump 4, when the water output of the output port of the water pump 4 is reduced to the threshold value of the flow meter 7, it is judged that there is a blockage inside the water cavity 201, the water inlet valve core 202 and the water closing valve core 203. At this time, by disconnecting the power supply of the electromagnet 8, the repulsive force between the two electromagnets 8 disappears suddenly. Under the action of the pressure spring 2033, the water inlet valve core 202 and the water closing valve core 203 are quickly reset. After resetting, power is supplied to the two electromagnets 8 again, so that the water closing valve core 203 is elongated to the original length. This cycle is repeated to achieve the rapid reciprocating motion of the water inlet valve core 202 and the water closing valve core 203, thereby achieving vibration. In the rapid reciprocating motion, the impact of water on the water inlet valve core 202 and the water closing valve core 203 can be used to clean the inside and outside of the water inlet valve core 202 and the water closing valve core 203, as well as the water outlet hole groove 2021 and the water inlet hole groove 2031. At the same time of reciprocating motion, the water inlet valve core 202 and the water closing valve core 203 reset at the same time, and the two electromagnets 8 collide with each other, and the end face of the water closing valve core 203 collides with the inner end face of the sliding cavity, so that the water inlet valve core 202 and the water closing valve core 203 vibrate, thereby shaking off the blockage attached to the water outlet hole groove 2021 and the water inlet hole groove 2031.
[0059] In addition, during the intermittent power supply of the two electromagnets 8, the water inlet valve core 202 and the water closing valve core 203 reciprocate, thereby playing a stirring role on the water in the water cavity 201 and the prefabricated water pipe 1011. The solid particles deposited at the bottom of the water cavity 201 and the prefabricated water pipe 1011 float in the water under the action of stirring. At this time, the water pump 4 can continue to discharge water outward, so as to extract and discharge the solid particles floating in the water to the outside, thereby achieving the removal of the deposited solid particles.
[0060] Moreover, the bottom area between the inner end face of the sliding cavity and the end face of the water closing valve core 203 is also prone to accumulate solid impurities. When the accumulation of solid impurities is too much, it will affect the resetting of the water closing valve core 203, thereby causing water leakage of the water inlet hole 1013. Therefore, the reciprocating motion of the sealing compression ring 2034 in the above operation makes the solid impurities accumulated at the bottom of the area float, and then the solid impurities accumulated in the area are discharged by the water pump 4.
[0061] It should be noted that while the accumulated solid impurities are discharged outward, the electromagnetic valve 405 is closed to avoid the impurities entering the nozzle 403 and causing the nozzle 403 to be blocked.
[0062] Finally, it should be noted that the above only describes the preferred embodiments of the present application and is not intended to limit the present application. Although the present application has been described in detail with reference to the foregoing embodiments, those skilled in the art will appreciate that the technical solutions described in the foregoing embodiments can be modified or some technical features thereof can be replaced by equivalent features, and any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A clean room modular equipment assembly that facilitates disassembly, characterized by, The utility model provides modularized wallboard, the modularized wallboard is by first wallboard and second wallboard, the first wallboard is equipped with prefabricated water supply pipe of horizontal arrangement near the side bottom of second wallboard, the first wallboard is equipped with T type slide groove with prefabricated water supply pipe corresponding in the side bottom far from second wallboard, the inside of T type slide groove is evenly equipped with water interface hole with prefabricated water supply pipe communication, the T type slide groove is slidably connected with water connector, and the water connector is connected with any one water interface hole on the T type slide groove, and the top of first wallboard is equipped with air guide subassembly. The side of the first wallboard away from the second wallboard is provided with a T-shaped guide rail, the T-shaped guide rail is slidably connected with a sliding seat, and the sliding seat is fixedly connected with a water pump. The water connector is internally provided with a water cavity, the water cavity is slidably connected with a water valve core, and the inner end of the water valve core is correspondingly inserted into the water interface hole.
2. The modular clean room assembly of claim 1, wherein: The output port of the water pump is provided with a connecting pipe, the top of the end of the connecting pipe away from the water pump is obliquely provided with a spray head, the side of the connecting pipe close to the water pump is provided with a connecting head, the connecting head is provided with a valve, the connecting pipe between the spray head and the connecting head is provided with an electromagnetic valve, and the end of the connecting pipe close to the water pump is provided with a flowmeter.
3. The modular clean room assembly of claim 2, wherein: The joint end of the water valve core and the water interface hole is conical, and the outer end of the water interface hole is a conical groove matched with the water valve core.
4. The modular clean room assembly of claim 2, wherein: The water interface hole is internally provided with a sliding cavity, the sliding cavity is slidably connected with a water closing valve core corresponding to the water valve core, the inner end of the water closing valve core is provided with a water inlet hole groove, the end of the water closing valve core close to the water valve core is provided with a top ring, the water closing valve core is externally provided with a pressure spring, and the two ends of the pressure spring are respectively in contact with the top ring and the side wall of the sliding cavity.
5. The modular clean room assembly of claim 4, wherein: The inner end of the water closing valve core is provided with a sealing compression ring, and the inner wall of the prefabricated water supply pipe is provided with a sealing rubber ring pad corresponding to the sealing compression ring.
6. The modular clean room assembly of claim 4, wherein: The outer side of the T-shaped guide rail is provided with a rack, the side wall of the sliding seat is provided with a pair of fastener supports, the middle part of the fastener is hingedly connected to the two fastener supports through a pin rod, the fastener teeth of the fastener are matched with the tooth grooves of the rack of the T-shaped guide rail, the pin rod connected between the fastener and the fastener support is provided with a torsional spring, and the two ends of the torsional spring are respectively connected to the fastener and the fastener support.
7. The modular clean room assembly of claim 1, wherein: The air guide assembly comprises an air guide box embedded in the top of the modularized wallboard, the side wall of the air guide box is provided with an air inlet pipe, the air guide box is provided with an air guide curtain, the air guide curtain is composed of a plurality of air guide vanes arranged in the vertical direction, the air guide vanes are connected to the inner wall of the air guide box through shafts, the inner side edge of the air guide vanes is provided with a hinge joint, and the hinge joints of the plurality of air guide vanes are connected through a connecting rod.
8. The modular clean room assembly of claim 1, wherein: 9. The modular clean room assembly of claim 8, wherein: The bottom of the air duct inner cavity is provided with an electric push rod, the top end of the electric push rod is provided with a distance measuring sensor, the telescopic rod of the electric push rod extends vertically upward, and the upper end of the telescopic rod of the electric push rod is connected with a connecting piece, and the other end of the connecting piece is connected with a connecting rod.
10. The modular clean room assembly of claim 8, wherein: The upper and lower surfaces close to the inner end of the air duct are both fixedly bonded with a second sound insulation cotton layer, and the outside of the prefabricated water conveying pipe is provided with a first sound insulation cotton layer.
Citation Information
Patent Citations
Fabricated underground diaphragm wall and working method thereof
CN115573372A
Method, System, and Apparatus for Modular Central Plant
US20080127662A1