Optimization scheduling method considering photovoltaic capacity degradation

By establishing an optimized scheduling method based on line loss, voltage deviation, and photovoltaic proportional output function, the impact of photovoltaic capacity decay on the power grid was resolved, achieving a balance between power grid security and economy, and reducing the cost of photovoltaic integration.

CN116544990BActive Publication Date: 2026-11-10POWERCHINA HUADONG ENG CORP LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310476648.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-28
Publication Date
2026-11-10
Estimated Expiration
2043-04-28

AI Technical Summary

Technical Problem

Traditional scheduling algorithms fail to effectively consider the impact of photovoltaic capacity decay on the power grid, making it difficult to balance grid security and economy, especially with increased photovoltaic integration costs under high penetration rates.

Method used

An optimized scheduling method based on line loss function, voltage offset function and photovoltaic proportional output function is established. Through a two-stage optimization process, the energy storage system is configured and the photovoltaic output is optimized to reduce the impact of photovoltaic capacity decay on the power grid.

Benefits of technology

It effectively suppresses voltage drop caused by photovoltaic capacity decay, ensures system stability, and optimizes energy storage configuration to reduce curtailment and investment costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116544990B_ABST
    Figure CN116544990B_ABST
Patent Text Reader

Abstract

This invention relates to an optimized scheduling method considering photovoltaic (PV) capacity decay. This invention is applicable to the power system field. The technical solution adopted by this invention is: an optimized scheduling method considering PV capacity decay, characterized by comprising: establishing a line loss function, a voltage offset function, and a PV proportional output function based on the grid structure containing a PV grid, wherein the grid uses PV as the main energy source and is equipped with an energy storage system; establishing an optimized scheduling objective function based on the line loss function, voltage offset function, and PV proportional output function; and solving for the node voltage distribution and PV output characteristics in the grid by minimizing the value of the optimized scheduling objective function as the optimization objective.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to an optimized scheduling method that takes into account photovoltaic capacity degradation. It is applicable to the power system field. Background Technology

[0002] Solar energy, as the most widely distributed and easily accessible renewable energy source, is undoubtedly one of the key players in the development of the new energy industry. Photovoltaic cells, which utilize the photoelectric effect of semiconductor devices to convert solar energy into electrical energy, have become a focus of global attention and vigorous development. With the advancement and iteration of photovoltaic technology, the cost of photovoltaic power generation has been decreasing year by year, and the global installed capacity of photovoltaic systems has continued to grow. Therefore, the optimal scheduling of photovoltaic systems has become a key issue that needs to be considered.

[0003] When photovoltaic (PV) penetration is low, PV systems are typically operated in maximum power point tracking (MPPT) mode, with other power sources absorbing the fluctuations in PV output. However, as PV penetration increases, especially in isolated grids or grids dominated by renewable energy sources, the cost of integrating PV systems will also increase significantly. Therefore, under high penetration rates, MPPT is no longer the optimal operating mode for PV systems.

[0004] Traditional dispatching algorithms essentially aim to minimize generator fuel costs and line losses while meeting load demand. However, the situation differs when the power source is a photovoltaic (PV) system. As a renewable energy source, PV's generation cost is negligible after installation. Moreover, from the perspective of power users, they always want to generate as much electricity as possible to increase revenue from electricity sales. Therefore, PV dispatching considers its backup costs, grid losses, and node voltage deviations.

[0005] The goals of minimizing grid loss and minimizing hot standby cost are contradictory. Under a fixed load, reducing hot standby power means increasing active power consumption, and the only way to do this is to increase grid loss, which is obviously undesirable. Dispatch instructions are often based on the available power of photovoltaics at the current moment. During the time interval between dispatch instruction updates, the available capacity of photovoltaics will fluctuate uncertainly with changes in the environment. The optimization of photovoltaic output has failed to take into account the impact of uncertain capacity changes. Summary of the Invention

[0006] The technical problem to be solved by the present invention is to provide an optimized scheduling method that takes into account photovoltaic capacity decay, in order to address the above-mentioned problems.

[0007] The technical solution adopted in this invention is: an optimized scheduling method considering photovoltaic capacity degradation, characterized in that it includes:

[0008] Based on a power grid structure incorporating photovoltaic (PV) power, line loss functions, voltage deviation functions, and PV proportional output functions are established. This power grid uses PV as its primary energy source and is equipped with an energy storage system. The PV proportional output function is:

[0009]

[0010] In the formula, H is the set of all photovoltaic power generation nodes in the power grid, m is the number of all photovoltaic power generation nodes in the power grid, and P out,h P represents the actual power output of the photovoltaic system at node h. total,h P represents the available photovoltaic capacity at node h. out,i P represents the actual power output of the photovoltaic system at node i. total,i Let be the available photovoltaic capacity at node i;

[0011] An optimization scheduling objective function is established based on the line loss function, voltage offset function, and photovoltaic proportional output function.

[0012] The overall optimization process consists of two stages. The first stage is to complete the energy storage capacity configuration while ensuring that curtailment of solar power and investment are minimized. The second stage is to solve the voltage distribution of nodes in the power grid and the characteristics of photovoltaic power output with the goal of minimizing the value of the optimization scheduling objective function, so as to obtain photovoltaic scheduling instructions and system voltage and current conditions.

[0013] The scheduling objective function that includes the photovoltaic proportional output function can fully consider the voltage drop caused by photovoltaic capacity decay, thus ensuring the safety of the system.

[0014] The optimization scheduling objective function is:

[0015] f=αψ(I)+βΓ(V)+ηγ(P)

[0016] Where α, β, and η are weighting coefficients, respectively, and ψ(I), Γ(V), and γ(P) are the line loss function, voltage offset function, and photovoltaic proportional output function, respectively.

[0017] The capacity of the energy storage system is determined based on energy storage investment and grid curtailment function. An optimization function is established, taking into account both energy storage investment costs and power shortage.

[0018] f1=Φ(P ess )+Θ(P ess )

[0019] Where P ess The energy storage output, Φ(P) ess Let Θ(P) be the cost function for all energy storage investments. ess To account for the power waste function of the system after energy storage charging and discharging, the capacity of the energy storage system is obtained after optimization.

[0020] The optimization scheduling objective function has the following constraints:

[0021] The energy storage system output characteristic equation and its state of charge constraint, the photovoltaic system's power balance equation constraint, the relationship between node voltage and line current equation constraint, node voltage inequality constraint, line current inequality constraint, and photovoltaic output characteristic constraint.

[0022] The line loss function is:

[0023]

[0024] Let l be the set of all lines in the power grid, and let mn be the line connecting node m and node n. Let I be the current flowing through this line. mn The impedance on this line is denoted as R. mn When the system is fixed, its impedance is constant.

[0025] The voltage offset function is:

[0026]

[0027] Where N is the set of all nodes, M is the total number of nodes, and V n V i Let be the voltages at nodes i and n, respectively.

[0028] The beneficial effects of this invention are: this invention establishes an optimized scheduling objective function based on the line loss function, voltage offset function and photovoltaic proportional output function, and fully considers the voltage drop problem caused by photovoltaic capacity decay by introducing the photovoltaic proportional output function, thus ensuring the safety of the system; at the same time, it proposes an energy storage configuration scheme that considers the economics of the system.

[0029] When changes in solar irradiance cause photovoltaic (PV) capacity degradation, the available capacity of a PV node approximates the ratio of irradiance degradation. Within two PV scheduling cycles, the rate of change of PV capacity varies more frequently than the scheduling cycle itself; therefore, after one scheduling cycle, the reference value of its output power remains unchanged. Thus, when the next scheduling command is issued, if PV capacity has degraded, it is necessary to ensure that PV output remains proportionally constant to minimize the amount of PV power deficit. Therefore, comprehensively considering the proportional output function of PV in optimization can better adapt to PV degradation. Attached Figure Description

[0030] Figure 1 The diagram shows a power grid structure for an example. There are five nodes in the diagram, of which nodes 1, 2, 3 and 5 are connected to photovoltaic systems, and node 2 is equipped with energy storage.

[0031] Figure 2The graph shows the system node voltage changes after a 50% reduction in photovoltaic capacity. The lines marked with stars represent the optimized system node voltage amplitudes; the pure line segments represent the system voltage changes under the maximum power control strategy. The horizontal axis represents the node number, and the vertical axis represents the normalized voltage amplitude.

[0032] Figure 3 The graph shows the photovoltaic (PV) output characteristics at different nodes after a 50% capacity degradation. The circled lines represent PV output under maximum power point tracking (MPPT), while the starred lines represent PV output optimized using the proposed method. The horizontal axis represents the PV power station number, and the vertical axis represents the normalized active power. Detailed Implementation

[0033] This embodiment presents an optimized scheduling method that takes into account photovoltaic capacity degradation, specifically including the following steps:

[0034] S1. Based on the grid structure including photovoltaic DC grid, establish the line loss function, voltage offset function and photovoltaic proportional output function.

[0035] In this embodiment, the power grid uses photovoltaics as the main energy source. In order to better absorb photovoltaic power and reduce curtailment, the system is equipped with an energy storage system.

[0036] In this example, while ensuring the safe allocation of photovoltaic power generation to the power grid system, and considering the investment cost of energy storage and the power shortage, an energy storage capacity allocation optimization function is established:

[0037] f1=Φ(P ess )+Θ(P ess )

[0038] Where P ess For energy storage output, Φ(P) ess ) represents the cost function for all energy storage investments, using a standard quadratic function, Θ(P ess The power curtailment function of the grid system after energy storage charging and discharging is linear. After optimization, the energy storage system capacity is obtained.

[0039] Establish the line loss function:

[0040]

[0041] Let l be the set of all lines in the system, and let mn be the line connecting node m and node n. Let I be the current flowing through this line. mn The impedance on this line is denoted as R. mn When the system is fixed, its impedance is constant. This function applies to a typical high-penetration photovoltaic grid, therefore it is a DC network.

[0042] Establish the voltage offset function:

[0043]

[0044] Where N is the set of all nodes, M is the total number of nodes, and V n V i These are the voltages at node i and node n, respectively.

[0045] Establish the photovoltaic proportional output function:

[0046]

[0047] In the formula, H is the set of all photovoltaic power generation nodes, m is the total number of photovoltaic power generation nodes, and P out,h P represents the actual power output of the photovoltaic system at node h. total,h P represents the available photovoltaic capacity at node h. out,i P represents the actual power output of the photovoltaic system at node i. total,i Let represent the available photovoltaic capacity at node i.

[0048] S2. Establish an optimized scheduling objective function based on the line loss function, voltage offset function, and photovoltaic proportional output function.

[0049] To ensure that the voltage at each node of the power grid does not drop across a wide range under the condition of photovoltaic capacity decay, and to reduce the safety and stability problems caused by photovoltaic uncertainty to the receiving-end power grid, the optimization scheduling objective function considering photovoltaic decay is as follows:

[0050] f=αψ(I)+βΓ(V)+ηγ(P)

[0051] Where α, β, and η are weighting coefficients, α+β+η=1, and ψ(I), Γ(V), and γ(P) are the line loss function, voltage offset function, and photovoltaic proportional output function, respectively.

[0052] In this embodiment, the objective function for optimizing scheduling has the following constraints: the output characteristic equation and state of charge constraints established according to the energy storage system category, the power balance equation constraints of the photovoltaic system, the equation constraints of the relationship between node voltage and line current, the node voltage inequality constraints, the line current inequality constraints, and the output characteristic constraints of the photovoltaic system.

[0053] In this embodiment, the optimization objective consists of two parts. The first part is to maximize photovoltaic output while ensuring system safety; the second part is to optimize energy storage capacity while minimizing curtailment and investment. Therefore, the first stage of the optimization solution adopts the aforementioned constraints, considering energy storage investment costs and power shortages, and establishes an optimization function.

[0054] f1=Φ(P ess )+Θ(P ess )

[0055] Where P ess The energy storage output, Φ(P) ess Let Θ(P) be the cost function for all energy storage investments. ess The given value represents the power discard function of the system after energy storage charging and discharging. After optimization, the energy storage system capacity is obtained.

[0056] Subsequently, the objective function is defined as

[0057] f2=αΨ(I)+βΓ(V)+ηΥ(P)

[0058] The energy storage capacity obtained in the first stage is input as an optimization solution to obtain the node voltage distribution and photovoltaic output characteristics in the system.

[0059] In this embodiment, a mathematical optimization objective model is established, which can be further divided into the following three steps:

[0060] 1.1 Establish the optimization objective function;

[0061]

[0062] In the formula, the set of all lines in the system is denoted as l, the line connecting node m and node n is denoted as mn, and the current flowing through this line is I. mn The impedance on this line is denoted as R. mn N is the set of all nodes, M is the total number of nodes, and V is the set of all nodes. n V i Let be the voltages of nodes i and n, respectively; H be the set of all photovoltaic power generation nodes; m be the total number of photovoltaic power generation nodes; and P be the voltage of node i. out,h P represents the actual power output of the photovoltaic system at node h. total,h Let be the available photovoltaic capacity at node h; α, β, and η are weighting coefficients, respectively.

[0063] In the modeling of this system, the voltage variable V at each node i in the DC grid containing photovoltaics needs to be considered. i The power variable P generated by node i i g The power variable P of the load at node i i c Establish equations relating equality and inequality; the active power variable P flowing through line i~j ij The equations between the variables and the nodes are established. The optimization model mainly involves power flow constraints, energy constraints, voltage constraints, and output constraints of each load and generator; in addition, the network topology and wiring method of the power system also need to be considered.

[0064] Its equality constraint equations are:

[0065]

[0066] P i =∑P ij =∑P i g -P i c

[0067] For a photovoltaic node, which is a power generation node, its power is P. i g Energy storage nodes are also referred to as power generation nodes, but this value can be positive or negative. When the value is positive, it indicates that the node is discharging energy and is a power source; when the value is negative, it absorbs electrical energy and is equivalent to a negative power source, i.e., a load. For photovoltaic nodes, their output is limited by the maximum capacity, and the lower bound of their power constraint is usually 0, while the upper bound is the available photovoltaic capacity.

[0068] Its inequality constraint equations are:

[0069] P i cmin ≤P i c ≤P i cmax

[0070] -P ij max ≤P ij ≤P ij max

[0071] V i min ≤V i ≤V i max

[0072] Discard light constraint is

[0073] (P i g +P out,h -P i c )△t≤N b,max

[0074] In the formula, Δt is the sampling time period, and N is the sampling time interval. b,max This is the maximum capacity of the battery.

[0075] In this case, the energy storage method is a battery, and its constraints are:

[0076] SOC min ≤SOC≤SOC max

[0077] -P ess,max ≤P ess ≤P ess,max

[0078] P ess,max To constrain maximum charge and discharge power, SOC min and SOC max These represent the minimum and maximum states of charge, respectively. Simultaneously, an optimization objective function is established regarding energy storage investment and curtailment, f = Φ(P ess )+Θ(P ess The energy storage investment function adopts a standard quadratic function, while the curtailment function is linear. Where P... ess The energy storage output, Φ(P) ess Let Θ(P) be the cost function for all energy storage investments. ess () is the power curtailment function of the system after energy storage charging and discharging.

[0079] S3. The overall optimization process consists of two stages. The first stage is to complete the energy storage capacity configuration while ensuring that curtailment and investment are minimized. The second stage is to solve the node voltage distribution and photovoltaic output characteristics in the power grid with the goal of minimizing the value of the optimization scheduling objective function, and obtain photovoltaic scheduling instructions, as well as the system voltage and current conditions.

[0080] After optimizing the objective function based on energy storage investment and curtailment, the energy storage system capacity P is obtained. ess Substitute this value into the constraints and transform the optimization objective into...

[0081]

[0082] Optimization can be performed to obtain the photovoltaic output and the voltage and current values ​​of the system.

[0083] by Figure 1 Taking a power grid system as an example, this simulation test system is used to test the optimized scheduling method considering photovoltaic capacity degradation in this embodiment. Simulation results can be found in [link to simulation results]. Figure 2 and Figure 3 It is evident that the method proposed in this invention can effectively suppress the voltage drop caused by photovoltaic capacity decay, ensuring the stability of the system when the photovoltaic capacity decays.

[0084] The above description of the embodiments is provided to enable those skilled in the art to understand and apply the present invention. It will be apparent to those skilled in the art that various modifications can be made to the above embodiments, and the general principles described herein can be applied to other embodiments without inventive effort. Therefore, the present invention is not limited to the above embodiments, and any improvements and modifications made to the present invention by those skilled in the art based on the disclosure thereof should be within the scope of protection of the present invention.

Claims

1. An optimized scheduling method considering photovoltaic capacity degradation, characterized in that, include: Based on a power grid structure incorporating photovoltaic (PV) power, line loss functions, voltage deviation functions, and PV proportional output functions are established. This power grid uses PV as its primary energy source and is equipped with an energy storage system. The PV proportional output function is: ; In the formula, H is the set of all photovoltaic power generation nodes in the power grid, and m is the number of all photovoltaic power generation nodes in the power grid. This represents the actual power output of the photovoltaic system at node h. Let h be the available photovoltaic capacity at node h. The actual power output of the photovoltaic system at node i. Let be the available photovoltaic capacity at node i; An optimization scheduling objective function is established based on the line loss function, voltage offset function, and photovoltaic proportional output function. The overall optimization process consists of two stages. The first stage is to complete the energy storage capacity configuration while ensuring that curtailment of solar power and investment are minimized. The second stage is to solve the voltage distribution of nodes in the power grid and the characteristics of photovoltaic power output with the goal of minimizing the value of the optimization scheduling objective function, so as to obtain photovoltaic scheduling instructions and system voltage and current conditions.

2. The optimized scheduling method considering photovoltaic capacity degradation according to claim 1, characterized in that, The optimization scheduling objective function is: ; in, , , These are the weighting coefficients, , and These are the line loss function, voltage offset function, and photovoltaic proportional output function, respectively.

3. The optimized scheduling method considering photovoltaic capacity degradation according to claim 1 or 2, characterized in that, The capacity of the energy storage system is determined based on energy storage investment and grid curtailment function. An optimization function is established, taking into account both energy storage investment costs and power shortage. ; in For energy storage system capacity, For the cost function of all energy storage investments, To account for the power waste function of the system after energy storage charging and discharging, the energy storage system capacity is obtained after optimization.

4. The optimized scheduling method considering photovoltaic capacity degradation according to claim 3, characterized in that, The optimization scheduling objective function has the following constraints: The energy storage system output characteristic equation and its state of charge constraint, the photovoltaic system's power balance equation constraint, the relationship between node voltage and line current equation constraint, node voltage inequality constraint, line current inequality constraint, and photovoltaic output characteristic constraint.

5. The optimized scheduling method considering photovoltaic capacity degradation according to claim 1 or 2, characterized in that, The line loss function is: ; Let l be the set of all lines in the power grid, and mn be the line connecting node m and node n. The current flowing through this line is... The impedance on this line is denoted as When the system is fixed, its impedance is constant.

6. The optimized scheduling method considering photovoltaic capacity degradation according to claim 1 or 2, characterized in that, The voltage offset function is: ; Where N is the set of all nodes, M is the total number of nodes, and V n V i These are the voltages at node i and node n, respectively.

Citation Information

Patent Citations

  • Multi-objective optimization configuration method for distributed photovoltaic-energy storage system

    CN111490554A

  • Wind-solar-storage multi-energy complementary capacity optimization method considering installation scale constraint

    CN114825392A