Automatic meter reading system and method for installing a plurality of battery powered fixed measuring devices at a plurality of distributed installation locations
By using the Automatic Meter Reading System (ARS) and mobile installation devices to transmit LPWAN connection candidate information and priority ranking search, the problems of long installation time and high power consumption of battery-powered measuring devices are solved, and a fast and energy-saving installation process is achieved.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- KAMSTRUP
- Filing Date
- 2021-11-23
- Publication Date
- 2026-05-26
AI Technical Summary
When installing battery-powered stationary measurement devices at multiple distributed installation locations, existing technologies suffer from long installation times and high battery consumption, especially when searching for a suitable LPWAN network. Traditional methods may require waiting for 15 minutes or more, resulting in low installation efficiency.
The Automatic Meter Reading System (ARS) is adopted, which uses a mobile installation device to send LPWAN connection candidate information, such as EARFCN, to the measuring device via short-range wireless communication. This helps the measuring device quickly establish an LPWAN connection. Combined with the LPWAN connection module, priority sorting search is performed, reducing installation time and battery consumption.
It significantly improves the efficiency of the installation process, reduces waiting time from minutes to seconds, and lowers battery consumption and installation costs.
Smart Images

Figure CN116547497B_ABST