Substation safety measures generation method based on multiple databases

Through the generation method of substation safety measures based on multiple databases, the problem of insufficient consideration of safety measures in substation maintenance is solved, and a more efficient and safer maintenance process is realized, which is suitable for large and complex maintenance sites.

CN116596505BActive Publication Date: 2024-10-18STATE GRID JIANGSU ELECTRIC POWER CO LTD NANJING POWER SUPPLY COMPANY
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202310437787.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-21
Publication Date
2024-10-18
Estimated Expiration
2043-04-21

AI Technical Summary

Technical Problem

During the substation maintenance process, the professional skills of personnel are uneven, making it difficult to comprehensively consider safety measures, resulting in increased operational safety risks, especially in large and complex sites.

Method used

Using a multi-database-based substation safety measure generation method, by establishing equipment distribution models, generating circuit-related databases, determining power outage protection strategies, setting fences and hanging signs, automatically generate work tickets and safety measure execution items to ensure the safety of the maintenance process. Safety and efficiency.

Benefits of technology

It reduces the dependence on the experience and on-site familiarity of maintenance personnel, improves the safety and efficiency of operations, reduces errors in the implementation of safety measures, and improves the overall safety and stability of substation maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116596505B_ABST
    Figure CN116596505B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of substation management, and discloses a substation safety measure generation method based on multiple databases, including: establishing a substation equipment distribution model according to a substation equipment ledger database and a substation equipment plane distribution database; defining the functions of i substation equipment, and correlating the i substation equipment with each other according to the circuit connection relationship between the substation equipment and the mutual control relationship between the substation equipment, and generating a circuit correlation database; selecting n substation equipment for maintenance in the substation equipment distribution model, and marking the selected n substation equipment as maintenance equipment; generating safety measure execution items for the maintenance equipment according to a power failure protection strategy, a fence setting strategy, and a signboard hanging strategy; retrieving information corresponding to the maintenance equipment, information corresponding to the associated equipment, and safety measure execution items corresponding to the maintenance equipment, and generating a work ticket.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of substation management, and more specifically, to a substation security measure generation method based on multiple databases. Background Art

[0002] In order to ensure the safety, stability and economic operation of the power grid, substations face regular maintenance, fault elimination and technical transformation. Setting safety measures is an important part of these tasks and an important protection for the personal safety of on-site workers. At present, the professional level of personnel is uneven, and the business is highly dependent on experience. They are not familiar with the work site, which makes it difficult to fully consider the safety measures. At the same time, after the maintenance is completed, it is difficult to fully consider the removal of safety measures (i.e., dismantling safety measures), which increases the safety risks of subsequent operations. The problems of large and complex maintenance sites are more prominent.

[0003] In view of this, the inventor of the present application invented a substation safety measure generation method based on multiple databases. Summary of the invention

[0004] In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides a substation safety measure generation method based on multiple databases.

[0005] To achieve the above object, the present invention provides the following technical solution: a substation safety measure generation method based on multiple databases, the method comprising:

[0006] A substation equipment distribution model is established based on the substation equipment ledger database and the substation equipment plane distribution database. The substation equipment distribution model includes information such as the circuit connection relationship between substation equipment, the location coordinates of substation equipment, and substation equipment information;

[0007] The functions of i substation equipment are defined, where i is an integer greater than 1, and the mutual control relationship between substation equipment is determined according to the functions of the substation equipment. The i substation equipment are associated with each other according to the circuit connection relationship between the substation equipment and the mutual control relationship between the substation equipment to generate a circuit association database. The functions of the substation equipment at least include circuit isolation function and protection function;

[0008] In the substation equipment distribution model, n substation equipment is selected for maintenance, where n is an integer greater than or equal to 1, the selected n substation equipment is marked as maintenance equipment, and the substation equipment associated with the maintenance equipment is retrieved from the circuit association database and marked as associated equipment;

[0009] Generate safety measures execution items for maintenance equipment according to power-off protection strategy, fence setting strategy and sign hanging strategy;

[0010] Retrieve the information corresponding to the maintenance equipment, the information corresponding to the associated equipment, and the safety measures execution items corresponding to the maintenance equipment, and generate a work ticket;

[0011] Remove the safety measure execution items according to the removal strategy.

[0012] In a preferred embodiment, the circuit connection relationship between substation equipment and substation equipment information in the substation equipment distribution model is determined according to the substation equipment ledger database; the substation equipment location coordinates in the substation equipment distribution model are determined according to the substation equipment plane distribution database.

[0013] In a preferred embodiment, the substation equipment information includes the name corresponding to the substation equipment and the unique identification code corresponding to the substation equipment; the substation equipment includes primary equipment and secondary equipment, and the functions of the primary equipment and the secondary equipment are defined respectively. The power-off protection strategy performs power-off protection operations on the primary equipment and the secondary equipment with different functions according to the functional definitions of the primary equipment and the secondary equipment. The power-off protection operation includes cutting off the circuit and connecting the circuit.

[0014] In a preferred embodiment, the primary equipment includes a transformer, a circuit breaker, a disconnector and an earthing switch, and the secondary equipment includes a pressure plate and an air switch on the protection panel cabinet in the relay protection room of the substation; the functions of the circuit breaker, disconnector, pressure plate and air switch are defined as circuit isolation functions, and the function of the earthing switch is defined as a protection function.

[0015] In a preferred embodiment, the power-off protection strategy generation logic includes: generating a disconnection instruction for an associated device with a circuit isolation function among the associated devices, and the associated device with the circuit isolation function disconnects the circuit for the maintenance equipment according to the disconnection instruction; generating a connection instruction for an associated device with a protection function among the associated devices, and the associated device with the protection function connects the circuit for the maintenance equipment according to the connection instruction.

[0016] In a preferred embodiment, the fence setting strategy generation logic includes: extracting the location coordinates of the maintenance equipment from the substation equipment distribution model, and establishing an actual coordinate range according to the location coordinates of the maintenance equipment; establishing an adjacent coordinate range with the location coordinates corresponding to the associated equipment with the circuit isolation function; drawing a first edge line parallel to the Y axis at the maximum X value position in the actual coordinate range, drawing a second edge line parallel to the X axis at the maximum Y value position in the actual coordinate range, drawing a third edge line parallel to the Y axis at the minimum X value position in the actual coordinate range, and drawing a fourth edge line parallel to the X axis at the minimum Y value position in the actual coordinate range;

[0017] Mark the coordinates of the intersection of the first edge line and the second edge line as the first maximum coordinates, and mark the coordinates of the intersection of the third edge line and the fourth edge line as the first minimum coordinates;

[0018] Draw a fifth edge line parallel to the Y axis at the X value position in the adjacent coordinate range closest to the maximum X value position in the actual coordinate range, draw a sixth edge line parallel to the X axis at the Y value position in the adjacent coordinate range closest to the maximum Y value position in the actual coordinate range, draw a seventh edge line parallel to the Y axis at the X value position in the adjacent coordinate range closest to the minimum X value position in the actual coordinate range, and draw an eighth edge line parallel to the X axis at the Y value position in the adjacent coordinate range closest to the minimum Y value position in the actual coordinate range;

[0019] Mark the coordinate of the intersection of the fifth edge line and the sixth edge line as the second maximum coordinate, and mark the coordinate of the intersection of the seventh edge line and the eighth edge line as the second minimum coordinate;

[0020] The average coordinate of the first maximum coordinate and the second maximum coordinate is taken as the first endpoint, the average coordinate of the first minimum coordinate and the second minimum coordinate is taken as the second endpoint, a rectangle is drawn with the first endpoint and the second endpoint as endpoints, and a fence is set at the rectangular position.

[0021] In a preferred embodiment, the sign hanging strategy generation logic includes: hanging signs on the fence, and hanging signs includes hanging an "enter here" sign at the fence entrance and hanging an "under maintenance" sign on the fence surface.

[0022] In a preferred embodiment, after the maintenance equipment is selected on the substation equipment distribution model, a visual preview of the maintenance equipment is performed on the substation equipment distribution model according to the preview strategy.

[0023] In a preferred embodiment, the rehearsal strategy includes: marking the area where the maintenance equipment is located on the substation equipment distribution model with a first color, marking the area where the associated equipment is located on the substation equipment distribution model with a second color, the first color is different from the second color, disconnecting the circuit symbol corresponding to the associated equipment with a circuit isolation function, and connecting the circuit symbol corresponding to the associated equipment with a protection function;

[0024] According to the fence setting strategy, the fence mark corresponding to the maintenance equipment is set, and the area where the fence is located on the substation equipment distribution model is marked with a third color, which is different from the first color and the second color; according to the sign hanging strategy, the sign is marked on the fence accordingly.

[0025] In a preferred embodiment, the substation equipment distribution model includes a primary wiring model and a primary plane model, both of which are established based on the substation equipment ledger database and the substation equipment plane distribution database, the area where the maintenance equipment is located on the primary wiring model is marked with a first color, the area where the associated equipment is located on the primary wiring model is marked with a second color, the first color is different from the second color, the circuit symbol corresponding to the associated equipment with a circuit isolation function is disconnected, and the circuit symbol corresponding to the associated equipment with a protection function is connected;

[0026] According to the fence setting strategy, the fence mark corresponding to the maintenance equipment is set, and the area where the fence is located on the plane model is marked with a third color, which is different from the first color and the second color; according to the sign hanging strategy, the sign is marked on the fence accordingly.

[0027] In a preferred embodiment, the safety measure execution item is released according to the removal strategy;

[0028] The dismantling strategy includes: obtaining y work tickets corresponding to n maintenance equipment, where y is equal to n, extracting the names of the related associated equipment in the safety measures execution items corresponding to the n maintenance equipment in the y work tickets, and the unique identification codes corresponding to the associated equipment, counting the number of unique identification codes, resetting the associated equipment corresponding to the unique identification codes whose number is equal to 1, and not resetting the associated equipment corresponding to the unique identification codes whose number is greater than 1.

[0029] In a preferred embodiment, the associated device resetting step includes:

[0030] Generate a first reset instruction for an associated device with a circuit isolation function, and the corresponding associated device connects the circuit for the maintenance device according to the first reset instruction;

[0031] A second reset instruction is generated for the associated equipment with the protection function, and the corresponding associated equipment disconnects the grounding circuit for the maintenance equipment according to the second reset instruction.

[0032] The present invention also provides a computer-readable storage medium on which a computer program is stored, and when the program is executed by a processor, the steps of the above method are implemented.

[0033] The present invention also provides a device, including a device body and a controller, the controller including a memory, a processor and a computer program stored in the memory and executable on the processor, and the steps of the above method are implemented when the processor executes the program.

[0034] The technical effects and advantages of the substation safety measures generation method based on multiple databases of the present invention are as follows:

[0035] (1) The system first generates safety measures execution items for the maintenance equipment according to the power-off protection strategy, fence setting strategy and signboard hanging strategy, and then automatically generates a work ticket export document according to the information corresponding to the maintenance equipment, the information corresponding to the associated equipment and the safety measures execution items corresponding to the maintenance equipment, so as to facilitate the maintenance personnel to formulate the optimal work ticket content; reduce the maintenance personnel's dependence on experience and level and the interference of unfamiliar factors at the work site, and take comprehensive considerations according to the automatically generated safety measures execution items. It is less prone to errors than manual operation, and has higher operation safety, effectively improving the operating efficiency of substations facing regular maintenance, fault elimination and technical transformation, ensuring the safe, stable and economical operation of the power grid, and also providing an important protection for the personal safety of on-site maintenance personnel. The present invention is suitable for complex maintenance sites of large substations.

[0036] (2) According to the rehearsal strategy, the maintenance equipment is visually rehearsed on the substation equipment distribution model, which helps maintenance personnel master the implementation of safety measures and become familiar with the work site. This can further reduce the interference of maintenance personnel with unfamiliar factors at the work site, and further improve maintenance efficiency and work safety.

[0037] (3) When multiple maintenance equipment are being repaired at the same time, when releasing the safety measure execution item, the present invention releases the safety measure execution item through a dismantling strategy, thereby avoiding interference with other maintenance equipment that has not completed maintenance when releasing the safety measure execution item, and avoiding connecting the circuit or disconnecting the grounding circuit of other maintenance equipment that has not completed maintenance, thereby further improving the personal safety of maintenance personnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 This is a schematic diagram of a multi-database based optimized security measure generation system in Embodiment 1 of the present invention;

[0039] Figure 2 This is a schematic diagram of edge line setting in Embodiment 1 of the present invention;

[0040] Figure 3 This is a schematic diagram of a multi-database based optimized security measure generation system in Embodiment 2 of the present invention;

[0041] Figure 4 The figure is a schematic diagram of a method for generating substation safety measures based on multiple databases according to the present invention. Implementation

[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Example

[0043] See also Figure 1 As shown, the optimal safety measure generation system based on multiple databases described in this embodiment includes a modeling module 1, a circuit association module 2, a maintenance setting module 3, a safety measure generation module 4, a work ticket generation module 5 and a work ticket termination module 7, and the above modules are connected by wire or wirelessly.

[0044] Modeling module 1, establishes a substation equipment distribution model based on the substation equipment ledger database and the substation equipment plane distribution database.

[0045] Specifically, the circuit connection relationship between substation equipment and the substation equipment information in the substation equipment distribution model are determined according to the substation equipment inventory database; the substation equipment location coordinates in the substation equipment distribution model are determined according to the substation equipment plane distribution database. The substation equipment distribution model includes information such as the circuit connection relationship between substation equipment, the substation equipment location coordinates and the substation equipment information.

[0046] The substation equipment distribution model includes a primary wiring model, a primary plane model and a secondary plane model. The primary wiring model, the primary plane model and the secondary plane model are all established based on the substation equipment ledger database and the substation equipment plane distribution database. The primary wiring model is generated based on the substation equipment wiring diagram and the station topology structure. The primary wiring model contains the circuit connection relationship between the equipment. The primary plane model is a two-dimensional model of the substation primary substation equipment. The primary substation equipment includes circuit breakers and earthing switches, etc., and provides model support for the visualization of safety measures such as closing the earthing switch and the scope of operation. The secondary plane model is based on the survey results of the substation relay protection room, and the secondary panel cabinet and its devices are two-dimensionally modeled through a visual graphic editor. Combined with the substation equipment and the substation equipment ledger database, the circuit association relationship between all the panel devices in the substation provides model support for the visualization of secondary side safety measures.

[0047] The above-mentioned substation equipment includes primary equipment and secondary equipment. The primary equipment includes transformers, circuit breakers, disconnectors and earthing switches, etc. The secondary equipment includes pressure plates and air switches on the protection panel cabinets in the substation relay protection room; the substation equipment plane distribution database includes the location coordinates of the substation equipment; the substation equipment information includes the name corresponding to the substation equipment and the unique identification code corresponding to the substation equipment; the above information data constitutes the basic data for constructing the substation equipment distribution model. The substation equipment distribution model is constructed by connecting the above-mentioned basic data to the modeling model system. The distribution model can be a two-dimensional model or a three-dimensional model.

[0048] The circuit association module 2 is used to define the functions of i substation equipment, where i is an integer greater than 1. The mutual control relationship between substation equipment is determined according to the functions of the substation equipment, and the i substation equipment is associated with each other according to the circuit connection relationship between the substation equipment and the mutual control relationship between the substation equipment to generate a circuit association database. The functions of the substation equipment at least include circuit isolation function and protection function.

[0049] The functions of substation equipment are defined. For example, circuit breakers, disconnectors, pressure plates and air switches are used to disconnect the circuit, and their functions are defined as circuit isolation functions; grounding switches are a mechanical grounding device that can ensure the personal safety of maintenance personnel during power outages for maintenance, and their functions are defined as protection functions; transformers are a device that uses electromagnetic mutual induction to transform voltage, current and impedance, and their functions are defined as transformation functions.

[0050] The mutual control relationship between substation equipment, for example, associating the circuit breaker and disconnector that control the transformer circuit, associating the grounding knife switch connected to the transformer, and associating the pressure plate in the substation relay protection room connected to the transformer, so that when the maintenance personnel are repairing the transformer, they can quickly find other equipment associated with the transformer, disconnect the circuit breaker and disconnector in other equipment, and withdraw the corresponding pressure plate in the substation relay protection room to ensure that the transformer is not energized during maintenance, and connect the grounding knife switch associated with the transformer. When the transformer is accidentally energized during maintenance, the current is introduced into the ground to ensure the life safety of the maintenance personnel. This association can be manually generated by the technician, or automatically generated by the system based on the circuit connection relationship between substation equipment (i.e., the substation equipment wiring diagram) and the mutual control relationship between substation equipment.

[0051] The maintenance setting module 3 selects n substation equipment for maintenance in the substation equipment distribution model, where n is an integer greater than or equal to 1, and marks the selected n substation equipment as maintenance equipment.

[0052] The safety measure generation module 4 generates safety measure execution items for the maintenance equipment according to the power-off protection strategy, the fence setting strategy and the sign hanging strategy.

[0053] The substation equipment includes primary equipment and secondary equipment, and the functions of the primary equipment and the secondary equipment are defined respectively. The power-off protection strategy performs power-off protection operations on the primary equipment and the secondary equipment with different functions according to the functional definitions of the primary equipment and the secondary equipment. The power-off protection operation includes cutting off the circuit and connecting the circuit.

[0054] The power-off protection strategy generation logic includes: retrieving the substation equipment associated with the maintenance equipment in the circuit association database, marking it as an associated equipment, generating a disconnection instruction for the associated equipment with a circuit isolation function among the associated equipment, and the associated equipment with the circuit isolation function disconnects the circuit for the maintenance equipment according to the disconnection instruction to ensure that the maintenance equipment is in a power-off state during maintenance, and generating a connection instruction for the associated equipment with a protection function among the associated equipment, and the associated equipment with the protection function connects the circuit for the maintenance equipment according to the connection instruction.

[0055] The safety measures execution items include primary safety measures execution items, secondary safety measures execution items and operation sequences. The primary safety measures execution items include disconnecting the corresponding circuit breaker, disconnecting the corresponding isolating switch and closing the corresponding earthing switch and other safety measures execution items. The secondary safety measures execution items include withdrawing the pressure plate on the protection panel cabinet in the corresponding substation relay protection room and disconnecting the corresponding air switch and other safety measures execution; the operation sequence is the disconnection sequence of associated equipment and the connection sequence of associated equipment.

[0056] See also Figure 2 As shown, the fence setting strategy generation logic includes: extracting the location coordinates of the maintenance equipment from the substation equipment distribution model, the substation equipment distribution model is a primary wiring model, which is convenient for visual preview (see the description of the second embodiment below for visual preview), establishing an actual coordinate range according to the location coordinates of the maintenance equipment; establishing an adjacent coordinate range with the location coordinates corresponding to the associated equipment with the circuit isolation function; drawing a first edge line parallel to the Y axis at the maximum X value position in the actual coordinate range, drawing a second edge line parallel to the X axis at the maximum Y value position in the actual coordinate range, drawing a third edge line parallel to the Y axis at the minimum X value position in the actual coordinate range, and drawing a fourth edge line parallel to the X axis at the minimum Y value position in the actual coordinate range, marking the coordinates of the intersection of the first edge line and the second edge line as the first maximum coordinate, and marking the coordinates of the intersection of the third edge line and the fourth edge line as the first minimum coordinate.

[0057] A fifth edge line parallel to the Y axis is drawn at the X value position in the adjacent coordinate range closest to the maximum X value position in the actual coordinate range, a sixth edge line parallel to the X axis is drawn at the Y value position in the adjacent coordinate range closest to the maximum Y value position in the actual coordinate range, a seventh edge line parallel to the Y axis is drawn at the X value position in the adjacent coordinate range closest to the minimum X value position in the actual coordinate range, an eighth edge line parallel to the X axis is drawn at the Y value position in the adjacent coordinate range closest to the minimum Y value position in the actual coordinate range, the coordinates of the intersection of the fifth edge line and the sixth edge line are marked as the second maximum coordinates, and the coordinates of the intersection of the seventh edge line and the eighth edge line are marked as the second minimum coordinates.

[0058] The average coordinate of the first maximum coordinate and the second maximum coordinate is taken as the first endpoint, the average coordinate of the first minimum coordinate and the second minimum coordinate is taken as the second endpoint, a rectangle is drawn with the first endpoint and the second endpoint as endpoints, and a fence is set at the rectangular position.

[0059] To further understand the fenced area setting strategy, Figure 2 middle D 1 、D 2 ......D n For maintenance equipment E 1 、E 2 ......E n For associated devices, point A is the first maximum coordinate, point B is the first minimum coordinate, point C is the second maximum coordinate, point D is the second minimum coordinate, the coordinate corresponding to point A and the coordinate corresponding to point C are the average of the first endpoint coordinates, and the coordinate corresponding to point B and the coordinate corresponding to point D are the second endpoint coordinates.

[0060] Fences set by fence area setting strategies are more accurate and reasonable than those set manually based on experience, and can better alert maintenance personnel on the job site, thereby ensuring the life safety of maintenance personnel on the job site.

[0061] The sign hanging strategy generation logic includes: hanging signs on the fence. Hanging signs include hanging an "enter here" sign at the entrance of the fence and hanging an "under maintenance" sign on the fence and other related signs, which are not listed here one by one.

[0062] The work ticket generation module 5 retrieves the information corresponding to the maintenance equipment, the information corresponding to the associated equipment, and the safety measures execution items corresponding to the maintenance equipment, and automatically generates a work ticket export document to facilitate maintenance personnel to formulate the optimal work ticket content; reduces the maintenance personnel's dependence on experience and level and the interference of unfamiliar factors at the work site, and takes comprehensive considerations based on the automatically generated safety measures execution items, which is less prone to errors than manual operations, and has higher work safety, effectively improving the operating efficiency of substations facing regular maintenance, defect elimination, and technical transformation, ensuring the safe, stable and economical operation of the power grid, and also providing an important protection for the personal safety of on-site maintenance personnel. The optimized safety measures generation system based on multiple databases provided in this embodiment is suitable for complex maintenance sites of large substations.

[0063] The contents of the work ticket include: planned working time, work tasks, safety measures implementation items and other items; the planned working time includes the start time and the end time; the work tasks include the work location, the dual name of the maintenance equipment, and the work content.

[0064] Work ticket termination module 7, work ticket termination module 7 dismantles the safety measure execution items according to the dismantling strategy.

[0065] The dismantling strategy includes: obtaining y work tickets corresponding to n maintenance equipment, where y is equal to n, extracting the names of the related associated equipment in the safety measures execution items corresponding to the n maintenance equipment in the y work tickets, and the unique identification codes corresponding to the associated equipment, counting the number of unique identification codes, resetting the associated equipment corresponding to the unique identification codes whose number is equal to 1, and not resetting the associated equipment corresponding to the unique identification codes whose number is greater than 1. For example, when a circuit breaker generates a safety measures execution item, it is in a disconnected state, which corresponds to cutting off the circuit, and the corresponding reset is to connect the circuit.

[0066] The steps to reset the associated device include:

[0067] Generate a first reset instruction for an associated device with a circuit isolation function, and the corresponding associated device connects the circuit for the maintenance device according to the first reset instruction;

[0068] A second reset instruction is generated for the associated equipment with the protection function, and the corresponding associated equipment disconnects the grounding circuit for the maintenance equipment according to the second reset instruction.

[0069] When multiple maintenance equipment are being inspected at the same time, when releasing the safety measure execution item, the present invention releases the safety measure execution item through a dismantling strategy, thereby avoiding interference with other maintenance equipment that has not completed maintenance when releasing the safety measure execution item, and avoiding connecting the circuit or disconnecting the grounding circuit of other maintenance equipment that has not completed maintenance, thereby further improving the personal safety of maintenance personnel. Example

[0070] See also Figure 3 As shown, this embodiment further improves the design on the basis of the first embodiment. The multi-database based optimized safety measure generation system provided in this embodiment also includes a safety measure visualization preview module 6. After the maintenance equipment is selected on the substation equipment distribution model, the maintenance equipment is visualized on the substation equipment distribution model according to the preview strategy, so as to facilitate the maintenance personnel to master the implementation of safety measures and become familiar with the work site, further reduce the interference of maintenance personnel with unfamiliar factors on the work site, and further improve the maintenance efficiency and operation safety.

[0071] The rehearsal strategy includes: marking the area where the maintenance equipment is located on the substation equipment distribution model with a first color, marking the area where the associated equipment is located on the substation equipment distribution model with a second color, the first color is different from the second color, and is convenient for maintenance personnel to observe during the rehearsal, disconnecting the circuit symbols corresponding to the associated equipment with a circuit isolation function, and connecting the circuit symbols corresponding to the associated equipment with a protection function; setting the fence mark corresponding to the maintenance equipment according to the fence setting strategy, marking the area where the fence is located on the substation equipment distribution model with a third color, the third color is different from the first color and the second color; marking the sign on the fence accordingly according to the sign hanging strategy.

[0072] Specifically, the area where the maintenance equipment is located on the primary wiring model is marked with a first color, and the area where the associated equipment is located on the primary wiring model is marked with a second color, the first color is different from the second color, the circuit symbols corresponding to the associated equipment with a circuit isolation function are disconnected, and the circuit symbols corresponding to the associated equipment with a protection function are connected; the fence mark corresponding to the maintenance equipment is set according to the fence setting strategy, and the area where the fence is located on the primary plane model is marked with a third color, the third color is different from the first color and the second color; the signboard is marked on the fence accordingly according to the signboard hanging strategy.

[0073] By displaying the safety measures implementation process in a visual way, a clearer and more intuitive display is helpful for maintenance personnel to become familiar with the maintenance work content through vivid pictures, and to discover and eliminate related safety hazards in advance. Example

[0074] See also Figure 4 As shown, the part not described in detail in this embodiment can be found in the description of the above embodiment. This embodiment provides a substation safety measure generation method based on multiple databases, and the method includes:

[0075] A substation equipment distribution model is established based on the substation equipment ledger database and the substation equipment plane distribution database. The substation equipment distribution model includes information such as the circuit connection relationship between substation equipment, the location coordinates of substation equipment, and substation equipment information;

[0076] The functions of i substation equipment are defined, where i is an integer greater than 1, and the mutual control relationship between substation equipment is determined according to the functions of the substation equipment. The i substation equipment are associated with each other according to the circuit connection relationship between the substation equipment and the mutual control relationship between the substation equipment to generate a circuit association database. The functions of the substation equipment at least include circuit isolation function and protection function;

[0077] In the substation equipment distribution model, n substation equipment is selected for maintenance, where n is an integer greater than or equal to 1, the selected n substation equipment is marked as maintenance equipment, and the substation equipment associated with the maintenance equipment is retrieved from the circuit association database and marked as associated equipment;

[0078] Generate safety measures execution items for maintenance equipment according to power-off protection strategy, fence setting strategy and sign hanging strategy;

[0079] Retrieve the information corresponding to the maintenance equipment, the information corresponding to the associated equipment, and the safety measures execution items corresponding to the maintenance equipment, and generate a work ticket;

[0080] Remove the safety measure execution items according to the removal strategy.

[0081] The circuit connection relationship between substation equipment and substation equipment information in the substation equipment distribution model are determined according to the substation equipment ledger database; the location coordinates of the substation equipment in the substation equipment distribution model are determined according to the substation equipment plane distribution database.

[0082] The substation equipment information includes the name corresponding to the substation equipment and the unique identification code corresponding to the substation equipment; the substation equipment includes primary equipment and secondary equipment, and the functions of the primary equipment and the secondary equipment are defined respectively. The power-off protection strategy performs power-off protection operations on the primary equipment and the secondary equipment with different functions according to the functional definitions of the primary equipment and the secondary equipment. The power-off protection operation includes cutting off the circuit and connecting the circuit.

[0083] The primary equipment includes transformers, circuit breakers, disconnectors and earthing switches; the secondary equipment includes pressure plates and air switches on the protection panel cabinets in the relay protection room of the substation; the functions of circuit breakers, disconnectors, pressure plates and air switches are defined as circuit isolation functions, and the function of earthing switches is defined as protection functions.

[0084] The power-off protection strategy generation logic includes: generating a disconnection instruction for an associated device with a circuit isolation function among the associated devices, and the associated device with the circuit isolation function disconnects the circuit for the maintenance equipment according to the disconnection instruction; generating a connection instruction for an associated device with a protection function among the associated devices, and the associated device with the protection function connects the circuit for the maintenance equipment according to the connection instruction.

[0085] The fence setting strategy generation logic includes: extracting the location coordinates of the maintenance equipment from the substation equipment distribution model, and establishing the actual coordinate range according to the location coordinates of the maintenance equipment; establishing an adjacent coordinate range with the location coordinates corresponding to the associated equipment with circuit isolation function; drawing a first edge line parallel to the Y axis at the maximum X value position in the actual coordinate range, drawing a second edge line parallel to the X axis at the maximum Y value position in the actual coordinate range, drawing a third edge line parallel to the Y axis at the minimum X value position in the actual coordinate range, and drawing a fourth edge line parallel to the X axis at the minimum Y value position in the actual coordinate range;

[0086] Mark the coordinates of the intersection of the first edge line and the second edge line as the first maximum coordinates, and mark the coordinates of the intersection of the third edge line and the fourth edge line as the first minimum coordinates;

[0087] Draw a fifth edge line parallel to the Y axis at the X value position in the adjacent coordinate range closest to the maximum X value position in the actual coordinate range, draw a sixth edge line parallel to the X axis at the Y value position in the adjacent coordinate range closest to the maximum Y value position in the actual coordinate range, draw a seventh edge line parallel to the Y axis at the X value position in the adjacent coordinate range closest to the minimum X value position in the actual coordinate range, and draw an eighth edge line parallel to the X axis at the Y value position in the adjacent coordinate range closest to the minimum Y value position in the actual coordinate range;

[0088] Mark the coordinate of the intersection of the fifth edge line and the sixth edge line as the second maximum coordinate, and mark the coordinate of the intersection of the seventh edge line and the eighth edge line as the second minimum coordinate;

[0089] The average coordinate of the first maximum coordinate and the second maximum coordinate is taken as the first endpoint, the average coordinate of the first minimum coordinate and the second minimum coordinate is taken as the second endpoint, a rectangle is drawn with the first endpoint and the second endpoint as endpoints, and a fence is set at the rectangular position.

[0090] The sign hanging strategy generation logic includes: hanging signs on the fence, and hanging signs includes hanging an "enter here" sign at the entrance of the fence and hanging an "under maintenance" sign on the surface of the fence.

[0091] After the maintenance equipment is selected on the substation equipment distribution model, a visual preview of the maintenance equipment is performed on the substation equipment distribution model according to the preview strategy.

[0092] The rehearsal strategy includes: marking the area where the maintenance equipment is located on the substation equipment distribution model with a first color, marking the area where the associated equipment is located on the substation equipment distribution model with a second color, the first color is different from the second color, disconnecting the circuit symbol corresponding to the associated equipment with a circuit isolation function, and connecting the circuit symbol corresponding to the associated equipment with a protection function;

[0093] According to the fence setting strategy, the fence mark corresponding to the maintenance equipment is set, and the area where the fence is located on the substation equipment distribution model is marked with a third color, which is different from the first color and the second color; according to the sign hanging strategy, the sign is marked on the fence accordingly.

[0094] The substation equipment distribution model includes a primary wiring model and a primary plane model. Both the primary wiring model and the primary plane model are established based on the substation equipment ledger database and the substation equipment plane distribution database. The area where the maintenance equipment is located on the primary wiring model is marked with a first color, and the area where the associated equipment is located on the primary wiring model is marked with a second color. The first color is different from the second color. The circuit symbol corresponding to the associated equipment with a circuit isolation function is disconnected, and the circuit symbol corresponding to the associated equipment with a protection function is connected;

[0095] According to the fence setting strategy, the fence mark corresponding to the maintenance equipment is set, and the area where the fence is located on the plane model is marked with a third color, which is different from the first color and the second color; according to the sign hanging strategy, the sign is marked on the fence accordingly.

[0096] Release the safety measures execution items according to the demolition strategy;

[0097] The dismantling strategy includes: obtaining y work tickets corresponding to n maintenance equipment, where y is equal to n, extracting the names of the related associated equipment in the safety measures execution items corresponding to the n maintenance equipment in the y work tickets, and the unique identification codes corresponding to the associated equipment, counting the number of unique identification codes, resetting the associated equipment corresponding to the unique identification codes whose number is equal to 1, and not resetting the associated equipment corresponding to the unique identification codes whose number is greater than 1.

[0098] The steps to reset the associated device include:

[0099] Generate a first reset instruction for an associated device with a circuit isolation function, and the corresponding associated device connects the circuit for the maintenance device according to the first reset instruction;

[0100] A second reset instruction is generated for the associated equipment with the protection function, and the corresponding associated equipment disconnects the grounding circuit for the maintenance equipment according to the second reset instruction.

[0101] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website, computer, server or data center to another website, computer, server or data center by wired (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.

[0102] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0103] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0104] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of the units is only one, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0105] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0106] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0107] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0108] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

[0109] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for generating substation safety measures based on multiple databases, characterized in that: The method comprises: A substation equipment distribution model is established based on the substation equipment ledger database and the substation equipment plane distribution database. The substation equipment distribution model includes information such as the circuit connection relationship between substation equipment, the location coordinates of substation equipment, and substation equipment information; The functions of i substation equipment are defined, where i is an integer greater than 1, and the mutual control relationship between substation equipment is determined according to the functions of the substation equipment. The i substation equipment are associated with each other according to the circuit connection relationship between the substation equipment and the mutual control relationship between the substation equipment to generate a circuit association database. The functions of the substation equipment at least include circuit isolation function and protection function; In the substation equipment distribution model, n substation equipment is selected for maintenance, where n is an integer greater than or equal to 1, the selected n substation equipment is marked as maintenance equipment, and the substation equipment associated with the maintenance equipment is retrieved from the circuit association database and marked as associated equipment; Generate safety measures execution items for maintenance equipment according to power-off protection strategy, fence setting strategy and sign hanging strategy; The fence setting strategy generation logic includes: extracting the location coordinates of the maintenance equipment from the substation equipment distribution model, and establishing the actual coordinate range according to the location coordinates of the maintenance equipment; establishing an adjacent coordinate range with the location coordinates corresponding to the associated equipment with circuit isolation function; drawing a first edge line parallel to the Y axis at the maximum X value position in the actual coordinate range, drawing a second edge line parallel to the X axis at the maximum Y value position in the actual coordinate range, drawing a third edge line parallel to the Y axis at the minimum X value position in the actual coordinate range, and drawing a fourth edge line parallel to the X axis at the minimum Y value position in the actual coordinate range; Mark the coordinates of the intersection of the first edge line and the second edge line as the first maximum coordinates, and mark the coordinates of the intersection of the third edge line and the fourth edge line as the first minimum coordinates; Draw a fifth edge line parallel to the Y axis at the X value position in the adjacent coordinate range closest to the maximum X value position in the actual coordinate range, draw a sixth edge line parallel to the X axis at the Y value position in the adjacent coordinate range closest to the maximum Y value position in the actual coordinate range, draw a seventh edge line parallel to the Y axis at the X value position in the adjacent coordinate range closest to the minimum X value position in the actual coordinate range, and draw an eighth edge line parallel to the X axis at the Y value position in the adjacent coordinate range closest to the minimum Y value position in the actual coordinate range; Mark the coordinate of the intersection of the fifth edge line and the sixth edge line as the second maximum coordinate, and mark the coordinate of the intersection of the seventh edge line and the eighth edge line as the second minimum coordinate; Take the average coordinate of the first maximum coordinate and the second maximum coordinate as the first endpoint, take the average coordinate of the first minimum coordinate and the second minimum coordinate as the second endpoint, draw a rectangle with the first endpoint and the second endpoint as endpoints, and set a fence at the position of the rectangle; Retrieve the information corresponding to the maintenance equipment, the information corresponding to the associated equipment, and the safety measures execution items corresponding to the maintenance equipment, and generate a work ticket; Remove the safety measure execution items according to the removal strategy.

2. The method for generating substation safety measures based on multiple databases according to claim 1 is characterized in that: The circuit connection relationship between substation equipment and substation equipment information in the substation equipment distribution model are determined according to the substation equipment ledger database; the location coordinates of the substation equipment in the substation equipment distribution model are determined according to the substation equipment plane distribution database.

3. The method for generating substation safety measures based on multiple databases according to claim 2 is characterized in that: The substation equipment information includes the name corresponding to the substation equipment and the unique identification code corresponding to the substation equipment; the substation equipment includes primary equipment and secondary equipment, and the functions of the primary equipment and the secondary equipment are defined respectively. The power-off protection strategy performs power-off protection operations on the primary equipment and the secondary equipment with different functions according to the functional definitions of the primary equipment and the secondary equipment. The power-off protection operation includes cutting off the circuit and connecting the circuit.

4. The method for generating substation safety measures based on multiple databases according to claim 3 is characterized in that: The primary equipment includes transformers, circuit breakers, disconnectors and earthing switches; the secondary equipment includes pressure plates and air switches on the protection panel cabinets in the relay protection room of the substation; the functions of circuit breakers, disconnectors, pressure plates and air switches are defined as circuit isolation functions, and the function of earthing switches is defined as protection functions.

5. The method for generating substation safety measures based on multiple databases according to claim 4 is characterized in that: The power-off protection strategy generation logic includes: generating a disconnection instruction for an associated device with a circuit isolation function among the associated devices, and the associated device with the circuit isolation function disconnects the circuit for the maintenance equipment according to the disconnection instruction; generating a connection instruction for an associated device with a protection function among the associated devices, and the associated device with the protection function connects the circuit for the maintenance equipment according to the connection instruction.

6. The method for generating substation safety measures based on multiple databases according to claim 5 is characterized in that: The sign hanging strategy generation logic includes: hanging signs on the fence, and hanging signs includes hanging an "enter here" sign at the entrance of the fence and hanging an "under maintenance" sign on the surface of the fence.

7. The method for generating substation safety measures based on multiple databases according to claim 6 is characterized in that: After the maintenance equipment is selected on the substation equipment distribution model, a visual preview of the maintenance equipment is performed on the substation equipment distribution model according to the preview strategy.

8. The method for generating substation safety measures based on multiple databases according to claim 7, characterized in that: The rehearsal strategy includes: marking the area where the maintenance equipment is located on the substation equipment distribution model with a first color, marking the area where the associated equipment is located on the substation equipment distribution model with a second color, the first color is different from the second color, disconnecting the circuit symbol corresponding to the associated equipment with a circuit isolation function, and connecting the circuit symbol corresponding to the associated equipment with a protection function; According to the fence setting strategy, the fence mark corresponding to the maintenance equipment is set, and the area where the fence is located on the substation equipment distribution model is marked with a third color, which is different from the first color and the second color; according to the sign hanging strategy, the sign is marked on the fence accordingly.

9. The method for generating substation safety measures based on multiple databases according to claim 8, characterized in that: The substation equipment distribution model includes a primary wiring model and a primary plane model. Both the primary wiring model and the primary plane model are established based on the substation equipment ledger database and the substation equipment plane distribution database. The area where the maintenance equipment is located on the primary wiring model is marked with a first color, and the area where the associated equipment is located on the primary wiring model is marked with a second color. The first color is different from the second color. The circuit symbol corresponding to the associated equipment with a circuit isolation function is disconnected, and the circuit symbol corresponding to the associated equipment with a protection function is connected; According to the fence setting strategy, the fence mark corresponding to the maintenance equipment is set, and the area where the fence is located on the plane model is marked with a third color, which is different from the first color and the second color; according to the sign hanging strategy, the sign is marked on the fence accordingly.

10. The method for generating substation safety measures based on multiple databases according to claim 9, characterized in that: Release the safety measures execution items according to the demolition strategy; The dismantling strategy includes: obtaining y work tickets corresponding to n maintenance equipment, where y is equal to n, extracting the names of the related associated equipment in the safety measures execution items corresponding to the n maintenance equipment in the y work tickets, and the unique identification codes corresponding to the associated equipment, counting the number of unique identification codes, resetting the associated equipment corresponding to the unique identification codes whose number is equal to 1, and not resetting the associated equipment corresponding to the unique identification codes whose number is greater than 1.

11. The method for generating substation safety measures based on multiple databases according to claim 10, characterized in that: The steps to reset the associated device include: Generate a first reset instruction for an associated device with a circuit isolation function, and the corresponding associated device connects the circuit for the maintenance device according to the first reset instruction; A second reset instruction is generated for the associated equipment with the protection function, and the corresponding associated equipment disconnects the grounding circuit for the maintenance equipment according to the second reset instruction.

12. A storage medium, characterized in that: Computer instructions or computer programs are stored, and when the computer instructions or computer programs are loaded or executed on a computer, the method according to any one of claims 1 to 11 is executed.

Citation Information

Patent Citations

  • Intelligent billing method for substation maintenance work ticket

    CN112256872A

  • Field operation safety measure execution process management and control method and device and storage medium

    CN113673718A

  • Intelligent operation and maintenance system for digital twin transformer substation

    CN115313658A