Image recognition-based monitoring and early warning system and method for height difference and main beam deformation at front and rear support points of bridge erection machine main beam

Through a monitoring system based on image recognition, computer vision technology is used to real-time monitor the height difference at the front and rear fulcrums of the main beam of the bridge erecting machine and the deformation of the main beam, which solves the problem of poor monitoring in the existing technology and achieves stability in the girder erection process. Monitoring and early warning simplify on-site operations and improve safety.

CN116678337BActive Publication Date: 2024-10-01RES INST OF HIGHWAY MINIST OF TRANSPORT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310675889.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-06-08
Publication Date
2024-10-01
Estimated Expiration
2043-06-08

AI Technical Summary

Technical Problem

The existing technology lacks effective methods to monitor and provide early warning of the height difference between the front and rear fulcrums of the bridge erecting machine and the deformation of the main beam, which makes it difficult to ensure the stability of the girder erection process. Moreover, the existing monitoring technology causes great interference to the construction site, affecting actual use. Effect.

Method used

A monitoring system based on image recognition is adopted. Through the image acquisition module, target detection module, image segmentation module, distortion correction module and early warning module, computer vision technology is used to real-time monitor the height difference at the front and rear fulcrums of the main beam of the bridge erecting machine and the deformation of the main beam. Use the trained target detection model and Zhang Zhengyou calibration method for data processing, calculate and compare the preset limits, and issue early warning signals.

Benefits of technology

Real-time monitoring of the height difference at the front and rear fulcrums of the main beam of the bridge erecting machine and the deformation of the main beam is achieved, which avoids complex equipment layout, simplifies on-site operations, and improves the safety and stability of the girder erection process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116678337B_ABST
    Figure CN116678337B_ABST
Patent Text Reader

Abstract

The present invention provides a monitoring and early warning system and method for height difference and main beam deformation at front and rear fulcrums of a bridge erecting machine based on image recognition, including a target, an image acquisition module, an input module, a target detection module, an image segmentation module, a distortion correction module, a bridge erecting machine main beam height difference and main beam deformation calculation module and an early warning module. The system is based on the monitoring and early warning technology of the bridge erecting machine using computer vision technology, and can utilize the existing video monitoring equipment of the bridge erecting machine to monitor the indicators that affect the stability of the bridge erecting machine during the beam erecting process, such as height difference at the front and rear fulcrums of the bridge erecting machine, main beam deformation, etc., and can avoid the layout of complex monitoring equipment and cables, making it convenient for on-site use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of safety warning, and in particular to a system and method for monitoring and warning the height difference at front and rear fulcrums of a main beam of a bridge erecting machine and deformation of the main beam based on image recognition. Background Art

[0002] For monitoring of key indicators that affect the stability of the bridge erection process, such as the height difference between the front and rear fulcrums and the deformation of the main beam, the common practice at the construction site is to use a level to measure before erecting the beam, or even use a ruler to make a rough measurement. There is a lack of corresponding monitoring methods and systems for the changes in the above indicators during the beam erection process, and it is impossible to ensure the monitoring perception of the safe status of the bridge erection machine during the beam erection process. At the same time, the existing monitoring technology requires the deployment of complex sensors, cables, and data acquisition instruments on the bridge erection machine, which greatly interferes with the beam erection project site and is often damaged during the construction process, seriously affecting the actual use effect. Summary of the invention

[0003] The object of the present invention is to provide a bridge erection machine main beam height difference at the front and rear fulcrums and main beam deformation monitoring and early warning system and method based on image recognition, so as to solve the above-mentioned problems existing in the prior art.

[0004] In order to achieve the above object, the technical solution adopted by the present invention is as follows:

[0005] A monitoring and early warning system for height difference and main beam deformation at front and rear fulcrums of a bridge-building machine main beam based on image recognition, comprising an image acquisition module, an input module, a target detection module, an image segmentation module, a distortion correction module, a module for calculating height difference and main beam deformation at front and rear fulcrums, and an early warning module. The image acquisition module acquires the original data of the bridge-building machine main beam to be monitored by acquiring images of targets installed at the ends of the bridge-building machine main beam, and transmits the data to the input module; the input module dynamically controls the original data input by the image acquisition module, pre-selects image data that meets the conditions, and transmits the data to the target detection module; the target detection module uses a trained target detection model to quickly lock the target in the image The position in the image is determined, and the position of the target area is marked; the image segmentation module performs pixel segmentation on the marked target area position to obtain a segmented target image; the distortion correction module uses Zhang Zhengyou calibration method to perform distortion correction on the segmented target image to obtain a horizontal rectangular vertical displacement and a vertical rectangular horizontal displacement; the height difference at the front and rear fulcrums and main beam deformation calculation module calculates the height difference at the front and rear fulcrums according to the horizontal displacement of the horizontal rectangle after distortion correction, and calculates the main beam deformation according to the horizontal displacement of the vertical rectangle after distortion correction; the early warning module compares the calculated height difference at the front and rear fulcrums and the main beam deformation of the bridge erecting machine main beam with the preset limit value, and issues an early warning if it is greater than the limit value.

[0006] Preferably, the target detection module uses a trained target detection model to quickly lock the position of the target in the image and mark the position of the target area, specifically including:

[0007] Train the object detection model:

[0008] Obtain target images at any position and mark them, marking the position of the target in the image as a data set; divide the obtained data set into a training set and a verification set to train and verify the target detection model; obtain the trained target detection model;

[0009] Target Detection:

[0010] The images collected by the image acquisition module are respectively input into the trained target detection model for target detection, and the upper left corner coordinates and lower right corner coordinates of each image and the rectangular area determined by the upper left corner coordinates and the lower right corner coordinates are obtained, which is the target area.

[0011] Preferably, the image segmentation module uses a Mask rcnn segmentation network to segment the detected target area into fine target positions, specifically including:

[0012] The target area is cropped from the original image and input into the segmentation network to segment the target area consisting of several pixel positions to obtain a segmented image; the pixel values ​​of the non-target area in the segmented image are set to (0, 0, 0), and the pixel values ​​of the target area are the pixel values ​​of the corresponding area in the image; the boundaries of each checkerboard grid in the target are extracted using the Sobel operator.

[0013] Preferably, the distortion correction module performs distortion correction on the segmented image area by using the Zhang Zhengyou calibration method, which specifically includes the following contents:

[0014] The artificially defined world coordinate system is fixed on the chessboard in the segmented target. Since the size of each grid on the world coordinate system calibration plate is known, the physical coordinates of any point on the chessboard are W = 0. The physical coordinates of each corner point on the chessboard in the world coordinate system are calculated to be (U, V, W = 0), and the corresponding pixel coordinates are (u, v);

[0015] The internal and external parameter matrices and distortion parameters are calculated by Zhang Zhengyou calibration method, and the distortion of the segmented image is corrected to obtain the corrected image.

[0016] Preferably, the height difference at the front and rear fulcrums and the main beam deformation calculation module converts the corrected image into a binary image according to a conversion rule, and calculates the center position coordinates (x, y) of the checkerboard area respectively;

[0017] The conversion rules are as follows:

[0018]

[0019] The formula for calculating the center coordinates (x, y) of the chessboard area is:

[0020]

[0021]

[0022] i and j represent the horizontal and vertical coordinates of the pixel position in the image;

[0023] The coordinates of the center position of the chessboard area are mapped to the original image to obtain the position of the target in the original image before and after the deformation of the main beam of the bridge erection machine;

[0024] (x7,y7)=(x1+x5,y1+y5)

[0025] (x8,y8)=(x2+x6,y2+y6)

[0026] The height difference and deformation of the main beam of the bridge erection machine are calculated by the difference between the two coordinates: The pixel height difference d at the front and rear supports of the main beam of the bridge erection machine pixl_h = abs(y7-y8), pixel displacement of the main beam of the bridge erection machine d pixl_l = abs(x7-x8);

[0027] Map the pixel distance calculated above to the actual distance through the scaling factor. Given the area occupied by the white area in the checkerboard area, real , count the area of ​​the white area in the fifth and sixth images pixl :

[0028]

[0029] The actual height difference between the front and rear support points of the main beam of the bridge erector is: d real_h =ratio×d pixl_h , the actual displacement of the main beam of the bridge erection machine is: d real_l =ratio×d pixl_l , the specific calculation process of the proportional factor is as follows:

[0030]

[0031] Another object of the present invention is to provide a method for monitoring and early warning of height difference at front and rear fulcrums of a main beam of a bridge erecting machine and deformation of the main beam based on image recognition, comprising the following steps:

[0032] S1, using the image acquisition module to successively obtain two images of the main beam of the bridge erection machine with targets during the beam erection process, and transmit them to the target detection module through the input module, which are recorded as the first image and the second image;

[0033] S2, the target detection module uses the trained target detection model to perform target detection on the first image and the second image respectively, and obtains that the target area in the first image is a rectangular area determined by (x1, y1) and (x2, y2), (x1, y1) is the upper left corner coordinate of the rectangular area, and (x2, y2) is the lower right corner coordinate of the rectangular area; the target area in the second image is a rectangular area determined by (x3, y3) and (x4, y4), (x3, y3) is the upper left corner coordinate of the rectangular area, and (x4, y4) is the lower right corner coordinate of the rectangular area;

[0034] S3, the image segmentation module cuts out the target areas of the first image and the second image as the third image and the fourth image respectively, inputs them into the Mask rcnn segmentation network to segment them into columns of pixel positions, sets the pixel values ​​of the non-target areas in the third image and the fourth image to (0, 0, 0), and sets the pixel values ​​of the target areas to the pixel values ​​of the corresponding areas in the images;

[0035] The boundaries of each grid in the target are extracted using the Sobel operator;

[0036] S4, using a distortion correction module to perform distortion correction on the segmented image area by using the Zhang Zhengyou calibration method to obtain a corrected third image and a fourth image;

[0037] S5, using the height difference at the front and rear fulcrums and the main beam deformation calculation module to convert the third and fourth images after distortion correction into binary images, to obtain the fifth and sixth images, to calculate the center positions (x5, y5) and (x6, y6) of the fifth and sixth images in the checkerboard area, to map the center positions of the checkerboard area to the original image, to obtain the positions (x7, y7) and (x8, y8) of the targets in the image before and after the deformation of the main beam of the bridge erection machine;

[0038] S6, calculate the pixel height difference d at the front and rear support points of the main beam of the bridge erector by the difference between the two coordinates pixl_h = abs(y7-y8) and the main beam pixel displacement d pixl_l = abs(x7-x8), mapped to the actual distance through the scale factor, the area occupied by the white area in the known chessboard area real , count the area of ​​the white area in the fifth and sixth images pixl ;

[0039] S7, calculate the actual height difference between the front and rear support points of the main beam of the bridge erector: d real_h =ratio×d pixl_h , the actual displacement of the main beam of the bridge erection machine is: d real_l =ratio×dpixl_l ,

[0040] Ratio is the proportional factor, and the specific calculation process is as follows:

[0041]

[0042] Preferably, step S4 specifically includes:

[0043] The artificially defined world coordinate system is fixed on the chessboard in the segmented target. Since the size of each grid on the world coordinate system calibration plate is known, the physical coordinates of any point on the chessboard are W = 0. The physical coordinates of each corner point on the chessboard in the world coordinate system are calculated to be (U, V, W = 0), and the corresponding pixel coordinates are (u, v);

[0044] The pixel coordinates (u, v) of each corner point and the physical coordinates (U, V, W = 0) of each corner point in the world coordinate system are used to calculate the internal and external parameter matrices and distortion parameters, and the third and fourth images are corrected for distortion using the internal and external parameter matrices and distortion parameters.

[0045] Preferably, in step S5, calculating the center positions (x5, y5) and (x6, y6) of the fifth image and the sixth image in the checkerboard area specifically includes:

[0046]

[0047]

[0048] The center position of the chessboard area is mapped to the original image, and the positions of the targets of the bridge erection machine main beam before and after deformation in the first image and the second image are obtained (x7, y7) and (x8, y8). The calculation formula is as follows:

[0049] (x7,y7)=(x1+x5,y1+y5)

[0050] (x8,y8)=(x2+x6,y2+y6).

[0051] In step S6, the areas of the white areas in the fifth image and the sixth image are counted. pixl , the calculation formula is:

[0052]

[0053] Preferably, the early warning method further comprises step S8,

[0054] S8, the early warning module compares the calculated height difference at the front and rear support points of the main beam of the bridge-building machine and the deformation of the main beam with the preset limit values. If any value is greater than the limit value, an alarm signal is sent and the alarm device notifies the operator of the result.

[0055] The beneficial effects of the present invention are:

[0056] The present invention provides a system and method for monitoring and early warning of height difference and main beam deformation at front and rear supporting points of a bridge-building machine based on image recognition. The system is based on the monitoring and early warning technology of the bridge-building machine using computer vision technology. The system can utilize the existing video monitoring equipment of the bridge-building machine to monitor the height difference at front and rear supporting points of the bridge-building machine during the beam-building process, main beam deformation and other indicators that affect the stability of the bridge-building machine during the beam-building process. The system can avoid the arrangement of complicated monitoring equipment and cables, and is convenient for on-site use. BRIEF DESCRIPTION OF THE DRAWINGS

[0057] Figure 1 It is a schematic diagram of the principle of the monitoring and early warning system for the height difference at the front and rear supporting points of the main beam of the bridge erecting machine and the deformation of the main beam based on image recognition provided in Example 1;

[0058] Figure 2 is the target used in Example 1;

[0059] Figure 3 It is a binary image converted from the distortion-corrected image. DETAILED DESCRIPTION

[0060] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation methods described herein are only used to explain the present invention and are not used to limit the present invention.

[0061] Example 1

[0062] This embodiment provides a monitoring and early warning system for the height difference at the front and rear support points of the main beam of a bridge erecting machine and the deformation of the main beam based on image recognition. Figure 1 As shown, it includes a target, an image acquisition module, an input module, a target detection module, an image segmentation module, a distortion correction module, a height difference calculation module at the front and rear support points of the main beam of the bridge erection machine and a main beam deformation calculation module, and an early warning module.

[0063] The target in this embodiment is a black backplane with an nxn checkerboard calibration plate on the backplane. The checkerboard calibration plate can be located at any position on the backplane. Each side of the checkerboard calibration plate needs to be at a certain distance from the backplane boundary. Figure 2 The target is placed on one end of the bridge erection machine to detect the height difference at the front and rear support points of the main beam and the deformation of the main beam.

[0064] The image acquisition module, target detection module, image segmentation module, distortion correction module, height difference at the front and rear fulcrums of the main beam of the bridge erection machine and the main beam deformation calculation module are installed at the camera end and placed at the other end of the bridge erection machine; the early warning module is installed at the prompt device end which is closer to the staff. The camera end acquires images and calculates the height difference at the front and rear fulcrums of the main beam of the bridge erection machine and the main beam deformation through a calculation device, and then transmits the results to the early warning device through the network, and the early warning device alarms the height difference at the front and rear fulcrums of the main beam of the bridge erection machine and the main beam deformation.

[0065] The image acquisition module in this embodiment is composed of a camera and a transmission port, and is connected to a computing device via USB, a network, or the like. The image acquisition module takes pictures after receiving a shooting command, and transmits the captured pictures to the computing device for storage and subsequent transmission to other modules.

[0066] The input module is mainly used to dynamically control the template image and cache image, control the cache image addition and deletion logic according to time, interval and significant visual changes, transmit the newly collected image of the camera to the preset storage space of the computing device, enter the queue to be executed, and delete the relevant out-of-queue data.

[0067] The target detection module in this embodiment uses the yolov5 detection network to quickly locate the position of the target area in the collected image. The specific method is as follows:

[0068] Place the target at any position in the real environment and collect a batch of pictures. Label the collected pictures and mark the position of the target in the image. Divide the obtained data set into training set and verification set to train and verify the model. After the model is trained, deploy the model on the computing device to obtain the target detection module. The target detection module inputs the two images collected by the image acquisition module into the target detection module for target detection.

[0069] The target area in the first image obtained after target detection is the rectangular area determined by (x1, y1) and (x2, y2), (x1, y1) is the upper left corner coordinate of the rectangular area, (x2, y2) is the lower right corner coordinate of the rectangular area; the target area in the second image is the rectangular area determined by (x3, y3) and (x4, y4), (x3, y3) is the upper left corner coordinate of the rectangular area, (x4, y4) is the lower right corner coordinate of the rectangular area.

[0070] The image segmentation module in this embodiment uses a Mask rcnn segmentation network to segment the fine target position in the detected target area.

[0071] The target area detected in the first image (the rectangular area consisting of (x1, y1) and (x2, y2)) is cropped from the original image as the third image;

[0072] The third image is input into the segmentation network to segment the fine target area, which is composed of some pixel positions;

[0073] The pixel values ​​of the non-target area in the third image are set to (0, 0, 0), and the pixel values ​​of the target area are set to the pixel values ​​of the corresponding area in the image;

[0074] The boundaries of each grid in the target are extracted using the Sobel operator.

[0075] The above processing is also performed on the second image to obtain the fourth image and the boundaries of each grid in the target.

[0076] The distortion correction module in this embodiment performs distortion correction on the segmented image area through the Zhang Zhengyou calibration method. The Zhang Zhengyou calibration method fixes the world coordinate system on the chessboard, and the physical coordinate W of any point on the chessboard is 0. Since the world coordinate system of the calibration board is artificially defined in advance, the size of each grid on the calibration board is known, and the physical coordinates of each corner point in the world coordinate system (U, V, W = 0) can be calculated.

[0077] The pixel coordinates (u, v) of each corner point are calculated by the checkerboard area segmented above. The pixel coordinates (u, v) of each corner point and the physical coordinates of each corner point in the world coordinate system (U, V, W = 0) are used to calculate the internal and external parameter matrix and distortion parameters. Then, the third and fourth images are distorted by the internal and external parameter matrix and distortion parameters.

[0078] The height difference at the front and rear support points and the main beam deformation calculation module in this embodiment calculates the height difference at the front and rear support points according to the vertical displacement of the horizontal rectangle after distortion correction, and calculates the main beam deformation according to the horizontal displacement of the vertical rectangle after distortion correction.

[0079] The third and fourth images after distortion correction are converted into binary images to obtain the fifth and sixth images. The specific conversion rules are as follows:

[0080]

[0081] Get as Figure 3 Image shown.

[0082] The center positions (x5, y5) and (x6, y6) of the checkerboard area are calculated for the fifth and sixth images respectively. The calculation formulas are as follows:

[0083]

[0084]

[0085] The center position of the checkerboard area is mapped to the original image, and the positions of the targets in the image before and after the deformation of the main beam of the bridge erection machine are obtained (x7, y7) and (x8, y8).

[0086] (x7,y7)=(x1+x5,y1+y5)

[0087] (x8,y8)=(x2+x6,y2+y6)

[0088] The height difference and deformation of the main beam of the bridge erection machine are calculated by the difference between the two coordinates. pixl_h = abs(y7-y8), pixel displacement of the main beam of the bridge erection machine d pixl_l =abs(x7-x8).

[0089] Map the pixel distance calculated above to the actual distance through the scaling factor. Given the area occupied by the white area in the checkerboard area, real , count the area of ​​the white area in the fifth and sixth images pixl :

[0090]

[0091] The specific calculation process of the proportional factor is as follows:

[0092]

[0093] The actual height difference between the front and rear support points of the main beam of the bridge erector is: d real_h =ratio×d pixl_h , the actual displacement of the main beam of the bridge erection machine is: d real_l =ratio×d pixl_l .

[0094] The early warning module in this embodiment compares the calculated height difference at the front and rear fulcrums of the main beam of the bridge-building machine and the deformation of the main beam with the preset limit values. If any value is greater than the limit value, the computing device sends an alarm signal to the alarm device, and the alarm device notifies the operator of the result.

[0095] The deflection limit at the mid-span of the main beam of the bridge erection machine is S / 400 (S is the supporting span of the main beam). The height difference limit at the front and rear support points of the main beam of the bridge erection machine is generally given by the bridge erection machine manufacturer. For example, a certain bridge erection machine requires that the front support point of the main beam is 0-20cm higher than the rear support point. 60% of the limit value is the safe value, 60%-80% of the limit value is the warning value, and exceeding 80% of the limit value is the alert value.

[0096] Example 2

[0097] This embodiment provides a method for monitoring and early warning of height difference at front and rear fulcrums of a main beam of a bridge erecting machine and deformation of the main beam based on image recognition, comprising the following steps:

[0098] S1, using the image acquisition module to successively obtain two images of the main beam of the bridge erection machine with targets during the beam erection process, and transmit them to the target detection module through the input module, which are recorded as the first image and the second image;

[0099] S2, the target detection module uses the trained target detection model to perform target detection on the first image and the second image respectively, and obtains that the target area in the first image is a rectangular area determined by (x1, y1) and (x2, y2), (x1, y1) is the upper left corner coordinate of the rectangular area, and (x2, y2) is the lower right corner coordinate of the rectangular area; the target area in the second image is a rectangular area determined by (x3, y3) and (x4, y4), (x3, y3) is the upper left corner coordinate of the rectangular area, and (x4, y4) is the lower right corner coordinate of the rectangular area;

[0100] S3, the image segmentation module cuts out the target areas of the first image and the second image as the third image and the fourth image respectively, inputs them into the Mask rcnn segmentation network to segment them into columns of pixel positions, sets the pixel values ​​of the non-target areas in the third image and the fourth image to (0, 0, 0), and sets the pixel values ​​of the target areas to the pixel values ​​of the corresponding areas in the images;

[0101] The boundaries of each grid in the target are extracted using the Sobel operator;

[0102] S4, using a distortion correction module to perform distortion correction on the segmented image area by using the Zhang Zhengyou calibration method to obtain a corrected third image and a fourth image;

[0103] S5, using the height difference at the front and rear fulcrums and the main beam deformation calculation module to convert the third and fourth images after distortion correction into binary images, to obtain the fifth and sixth images, to calculate the center positions (x5, y5) and (x6, y6) of the fifth and sixth images in the checkerboard area, to map the center positions of the checkerboard area to the original image, to obtain the positions (x7, y7) and (x8, y8) of the targets in the image before and after the deformation of the main beam of the bridge erection machine;

[0104] S6, calculate the pixel height difference d at the front and rear support points of the main beam of the bridge erector by the difference between the two coordinates pixl_h = abs(y7-y8) and the main beam pixel displacement d pixl_l = abs(x7-x8), mapped to the actual distance through the scale factor, the area occupied by the white area in the known chessboard area real, count the area of ​​the white area in the fifth and sixth images pixl ;

[0105] S7, calculate the actual height difference between the front and rear support points of the main beam of the bridge erector: d real_h =ratio×d pixl_h , the actual displacement of the main beam of the bridge erection machine is: d real_l =ratio×d pixl_l ,

[0106] Ratio is the proportional factor, and the specific calculation process is as follows:

[0107]

[0108] In this embodiment, step S4 specifically includes:

[0109] The artificially defined world coordinate system is fixed on the chessboard in the segmented target. Since the size of each grid on the world coordinate system calibration plate is known, the physical coordinates of any point on the chessboard are W = 0. The physical coordinates of each corner point on the chessboard in the world coordinate system are calculated to be (U, V, W = 0), and the corresponding pixel coordinates are (u, v);

[0110] The pixel coordinates (u, v) of each corner point and the physical coordinates (U, V, W = 0) of each corner point in the world coordinate system are used to calculate the internal and external parameter matrices and distortion parameters, and the third and fourth images are corrected for distortion using the internal and external parameter matrices and distortion parameters.

[0111] In this embodiment, in step S5, the center positions (x5, y5) and (x6, y6) of the fifth image and the sixth image in the chessboard area are calculated, and the calculation formula specifically includes:

[0112]

[0113]

[0114] The center position of the chessboard area is mapped to the original image, and the positions of the targets of the bridge erection machine main beam before and after deformation in the first image and the second image are obtained (x7, y7) and (x8, y8). The calculation formula is as follows:

[0115] (x7,y7)=(x1+x5,y1+y5)

[0116] (x8,y8)=(x2+x6,y2+y6).

[0117] In this embodiment, in step S6, the areas of the white areas in the fifth image and the sixth image are counted. pixl , the calculation formula is:

[0118] i and j represent the horizontal and vertical coordinates of the pixel position in the image.

[0119] By adopting the above technical solution disclosed in the present invention, the following beneficial effects are obtained:

[0120] The present invention provides a system and method for monitoring and early warning of height difference and main beam deformation at front and rear supporting points of a bridge-building machine based on image recognition. The system is based on the monitoring and early warning technology of the bridge-building machine using computer vision technology. The system can utilize the existing video monitoring equipment of the bridge-building machine to monitor the height difference at front and rear supporting points of the bridge-building machine during the beam-building process, main beam deformation and other indicators that affect the stability of the bridge-building machine during the beam-building process. The system can avoid the arrangement of complicated monitoring equipment and cables, and is convenient for on-site use.

[0121] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be considered as the scope of protection of the present invention.

Claims

1. A monitoring and early warning system for the height difference and deformation of the main beam of a bridge erecting machine based on image recognition. It is characterized in that It includes an image acquisition module, an input module, a target detection module, an image segmentation module, a distortion correction module, a height difference calculation module at the front and rear support points and a main beam deformation calculation module, and an early warning module. The image acquisition module acquires the original data of the main beam of the bridge-building machine to be monitored by acquiring the image of the target installed at the end of the main beam of the bridge-building machine, and transmits it to the input module; the input module dynamically controls the original data input by the image acquisition module, pre-selects the image data that meets the conditions and transmits it to the target detection module; the target detection module uses a trained target detection model to quickly lock the position of the target in the image, and marks the position of the target area; The image segmentation module performs pixel segmentation on the marked target area position to obtain a segmented target image; the distortion correction module uses Zhang Zhengyou calibration method to perform distortion correction on the segmented target image to obtain the horizontal rectangle vertical displacement and the vertical rectangle horizontal displacement; the front and rear support point height difference and main beam deformation calculation module calculates the front and rear support point height difference according to the horizontal rectangle vertical displacement after distortion correction, and calculates the main beam deformation according to the vertical rectangle horizontal displacement after distortion correction; the early warning module compares the calculated front and rear support point height difference and main beam deformation of the bridge erection machine main beam with the preset limit value, and issues an early warning if it is greater than the limit value; The image segmentation module uses the Mask rcnn segmentation network to segment the detected target area into fine target locations, specifically including: The target area is cropped from the original image and input into the segmentation network to segment the target area consisting of several pixel positions to obtain the segmented image; The pixel values ​​of the non-target area in the segmented image are set to (0, 0, 0), and the pixel values ​​of the target area are the pixel values ​​of the corresponding area in the image; the boundaries of each grid in the target are extracted by the Sobel operator; The height difference at the front and rear support points and the main beam deformation calculation module converts the corrected image into a binary image according to the conversion rule, and calculates the center position coordinates (x, y) of the chessboard area respectively; The conversion rules are as follows: The formula for calculating the center coordinates (x, y) of the chessboard area is: i and j represent the horizontal and vertical coordinates of the pixel position in the image; The coordinates of the center position of the chessboard area are mapped to the original image to obtain the position of the target in the original image before and after the deformation of the main beam of the bridge erection machine; (x 7 ,and 7 )=(x 1 +x 5 ,and 1 +y 5 ) (x 8 ,and 8 )=(x 3 +x 6 ,and 3 +y 6 ) The height difference and deformation of the main beam of the bridge erection machine are calculated by the difference between the two coordinates: The pixel height difference d at the front and rear supports of the main beam of the bridge erection machine pixl_h = abs(y 7 -y 8 ), pixel displacement of the main beam of the bridge erection machine d pixl_l =abs(x 7 -x 8 ); Map the pixel distance calculated above to the actual distance through the scaling factor. Given the area occupied by the white area in the checkerboard area, real , count the area of ​​the white area in the fifth and sixth images pixl : The actual height difference between the front and rear support points of the main beam of the bridge erector is: d real_h =ratio×d pixl_h , the actual displacement of the main beam of the bridge erection machine is: d real_l =ratio×d pixl_l , the specific calculation process of the proportional factor is as follows:

2. The image recognition-based monitoring and early warning system for the height difference at the front and rear support points of the main beam of the bridge erecting machine and the deformation of the main beam according to claim 1, It is characterized in that The target detection module uses the trained target detection model to quickly lock the position of the target in the image and mark the position of the target area, specifically including: Train the object detection model: Obtain target images at any position and mark them, marking the position of the target in the image as a data set; divide the obtained data set into a training set and a verification set to train and verify the target detection model; obtain the trained target detection model; Target Detection: The images collected by the image acquisition module are respectively input into the trained target detection model for target detection, and the upper left corner coordinates and lower right corner coordinates of each image and the rectangular area determined by the upper left corner coordinates and the lower right corner coordinates are obtained, which is the target area.

3. The image recognition-based monitoring and early warning system for the height difference at the front and rear support points of the main beam of the bridge erecting machine and the deformation of the main beam according to claim 1, It is characterized in that The distortion correction module performs distortion correction on the segmented image area by using the Zhang Zhengyou calibration method, which specifically includes the following contents: The artificially defined world coordinate system is fixed on the chessboard in the segmented target. Since the size of each grid on the world coordinate system calibration plate is known, the physical coordinates of any point on the chessboard are W = 0. The physical coordinates of each corner point on the chessboard in the world coordinate system are calculated to be (U, V, W = 0), and the corresponding pixel coordinates are (u, v); The internal and external parameter matrices and distortion parameters are calculated by Zhang Zhengyou calibration method, and the distortion of the segmented image is corrected to obtain the corrected image.

4. A method for monitoring and early warning of height difference and main beam deformation at the front and rear support points of a bridge erection machine based on image recognition. It is characterized in that The following steps are involved: S1, using the image acquisition module to successively obtain two images of the main beam of the bridge erection machine with targets during the beam erection process, and transmit them to the target detection module through the input module, which are recorded as the first image and the second image; S2, the target detection module uses the trained target detection model to perform target detection on the first image and the second image respectively, and obtains the target area in the first image as (x 1 ,y 1 )、(x 2 ,y 2 ) is the rectangular area determined by (x 1 ,y 1 ) is the coordinate of the upper left corner of the rectangular area, (x 2 ,y 2 ) is the coordinate of the lower right corner of the rectangular area; the target area in the second image is (x 3 ,y 3 )、(x 4 ,y 4 ) is the rectangular area determined by (x 3 ,y 3 ) is the coordinate of the upper left corner of the rectangular area, (x 4 ,y 4 ) is the coordinate of the lower right corner of the rectangular area; S3, the image segmentation module cuts out the target areas of the first image and the second image as the third image and the fourth image respectively, inputs them into the Mask rcnn segmentation network to segment them into columns of pixel positions, sets the pixel values ​​of the non-target areas in the third image and the fourth image to (0, 0, 0), and sets the pixel values ​​of the target areas to the pixel values ​​of the corresponding areas in the images; The boundaries of each grid in the target are extracted using the Sobel operator; S4, using a distortion correction module to perform distortion correction on the segmented image area by using the Zhang Zhengyou calibration method to obtain a corrected third image and a fourth image; S5, using the height difference at the front and rear support points and the main beam deformation calculation module to convert the third and fourth images after distortion correction into binary images, obtain the fifth and sixth images, and calculate the center positions (x 5 ,y 5 )、(x 6 ,y 6 ), the center position of the chessboard area is mapped to the original image, and the position of the target in the image before and after the deformation of the main beam of the bridge erection machine is obtained (x 7 ,y 7 )、(x 8 ,y 8 ); S6, calculate the pixel height difference d at the front and rear support points of the main beam of the bridge erector by the difference between the two coordinates pix_hl =ab(sy 7 -y 8 ) and the main beam pixel displacement d pixl_l = abs(x 7 -x 8 ), mapped to the actual distance through the scale factor, the area occupied by the white area in the known chessboard area real , count the area of ​​the white area in the fifth and sixth images pixl ; S7, calculate the actual height difference between the front and rear support points of the main beam of the bridge erector: d real_h =ratio×d pixl_h , the actual displacement of the main beam of the bridge erection machine is: d real_l =ratio×d pixl_l , Ratio is the proportional factor, and the specific calculation process is as follows: In step S5, the center positions (x 5 ,y 5 )、(x 6 ,y 6 ), including: The center position of the chessboard area is mapped to the original image to obtain the position of the target in the first image and the second image before and after the deformation of the bridge crane main beam (x 7 ,y 7 )、(x 8 ,y 8 ), the calculation formula is as follows: (x 7 ,and 7 )=(x 1 +x 5 ,and 1 +y 5 ) (x 8 ,and 8 )=(x 3 +x 6 ,and 3 +y 6 ); In step S6, the areas of the white areas in the fifth image and the sixth image are counted. pixl , the calculation formula is:

5. The method for monitoring and early warning of height difference at front and rear supporting points of the main beam of a bridge erecting machine and deformation of the main beam based on image recognition according to claim 4, It is characterized in that Step S4 specifically includes: The artificially defined world coordinate system is fixed on the chessboard in the segmented target. Since the size of each grid on the world coordinate system calibration plate is known, the physical coordinates of any point on the chessboard are W = 0. The physical coordinates of each corner point on the chessboard in the world coordinate system are calculated to be (U, V, W = 0), and the corresponding pixel coordinates are (u, v); The pixel coordinates (u, v) of each corner point and the physical coordinates (U, V, W = 0) of each corner point in the world coordinate system are used to calculate the internal and external parameter matrices and distortion parameters, and the third and fourth images are corrected for distortion using the internal and external parameter matrices and distortion parameters.

6. The method for monitoring and early warning of height difference at front and rear supporting points of the main beam of a bridge erecting machine and deformation of the main beam based on image recognition according to claim 4, It is characterized in that Also includes step S8, S8, the early warning module compares the calculated height difference at the front and rear support points of the main beam of the bridge erecting machine and the deformation of the main beam with the preset limit values. If it is greater than the limit value, an alarm signal is sent and the alarm device notifies the operator of the result.