A method for checking the bolt preload torque of nuclear power equipment

By deriving the preload torque formula for threaded connectors and conducting finite element analysis, the problem of inconsistent stiffness in bolted connections in nuclear power equipment was solved, achieving uniform stress distribution in bolted connections and improving equipment stiffness.

CN116776657BActive Publication Date: 2026-11-10CHINA NUCLEAR CONTROL SYST ENG
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210223880.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-09
Publication Date
2026-11-10
Estimated Expiration
2042-03-09

AI Technical Summary

Technical Problem

Inconsistent bolt connection stiffness in nuclear power equipment due to different manufacturers and manual operation affects the uniformity of stress on the equipment under seismic conditions, resulting in uneven stiffness of the overall equipment.

Method used

By deriving the formula for the preload torque of threaded fasteners and combining it with finite element analysis, the maximum and minimum preload stresses of the bolts are calculated. The preload torque is then corrected to regulate the stiffness of the bolt connection. The results are verified using coarse thread and friction torque theory.

Benefits of technology

It achieves uniformity of bolt connection stiffness, reduces human error, and improves the uniformity of stress and structural bearing capacity of equipment under seismic conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure SMS_4
    Figure SMS_4
  • Figure SMS_17
    Figure SMS_17
  • Figure SMS_22
    Figure SMS_22
Patent Text Reader

Abstract

This invention relates to a method for verifying the bolt preload torque of nuclear power equipment. It verifies the bolt preload torque through seismic simulation analysis, thereby standardizing the tightening range of bolt preload torque for the equipment under the same operating conditions. The invention derives a correction coefficient for the tightening torque from the principle formula of thread stress, and then calculates the maximum preload stress during screw installation to verify the stress it experiences. While meeting the stress requirements, the rationality of the preload torque coefficient value is verified. This invention corrects the numerical coefficient in the theoretical calculation, standardizing the preload torque and further reducing human error during tooling operation. This ensures that nuclear power equipment achieves good stiffness requirements during design and testing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a method for checking the bolt preload torque of nuclear power equipment. The bolt preload torque is checked by calculating the results of seismic simulation analysis, thereby standardizing the tightening range of the bolt preload torque of the equipment under the same working conditions. Background Technology

[0002] Currently, the structures of nuclear power equipment are mostly welded and bolted connections. To meet engineering requirements, the structures often need to satisfy specific safety levels and seismic resistance standards. Given the extensive use of bolts in nuclear power equipment, tooling is required according to the torque range of the bolts to ensure reasonable overall equipment rigidity. However, due to differences in torque ranges provided by different manufacturers and specifications, as well as errors in manual operation, tooling cannot be assembled according to uniform values. This results in inconsistent rigidity of bolt connections of the same specification. The accumulation of excessive connection rigidity can cause uneven stress on the overall equipment under testing conditions. Therefore, shortening the torque range and standardizing the uniform stress distribution of bolts of the same specification under seismic conditions can lay a structural foundation for the practical engineering application of the equipment. Summary of the Invention

[0003] The purpose of this invention is to provide a method for checking the bolt preload torque of nuclear power equipment. This method aims to ensure that, while meeting seismic performance and testing requirements, the bolt assembly connection stiffness during tooling meets the operational needs of nuclear power products, improves structural bearing capacity, and optimizes the internal stress distribution of components within the equipment. This method standardizes the bolt preload torque during tooling.

[0004] To achieve the above objectives, the technical solution adopted by the present invention is as follows: A method for checking the bolt preload torque of nuclear power equipment. I. Based on the simplified formula for preload torque in engineering Frictional torque between screw pairs Frictional torque between the nut and the support surface The preload torque coefficient is obtained through derivation: In the formula: —Major diameter of the thread; —Minor diameter of the thread; —Thread pitch diameter; — Bolt hole diameter; —Outer diameter of the nut's annular support surface; —Thread helix angle; —Equivalent friction angle of the helical pair; —Preload of threaded connections; —The coefficient of friction between the nut and the supporting surface; 2. When using coarse threads to connect structural components, at this time... and All are known, including the shear stress generated in the bolt shank due to torsion. Thus introducing K After the value is obtained, In the formula: III. The calculated stress under the pre-tightened bolt condition is: Extracting the stress of bolts under external loads If the tensile stress increased on the threaded portion of the bolt is At this point, the calculated stress of the bolt is In the formula: —Maximum preload stress, ΔF The added tensile force to the threaded portion, A The stress area of ​​the thread, minimum preload stress and K Related, can be obtained ; From the above formula, it can be seen that, based on the obtained and The preload and preload torque are calculated based on the value and the bolt specifications selected in the tooling, thereby achieving the desired result. K The value is used to correct the preload torque value in the tooling.

[0005] According to the fourth strength theory, the calculated stress under bolt preload is: .

[0006] The stress of the bolt under external load was extracted using finite element analysis. .

[0007] The beneficial effects achieved by this invention are as follows: This invention derives a correction coefficient for the tightening torque from the principle formula of threaded stress, and then calculates the maximum preload stress during screw installation to verify the stress it experiences. While meeting the stress requirements, it verifies the rationality of the preload torque coefficient value. This invention corrects the numerical coefficient in the theoretical calculation, standardizing the preload torque and further reducing human error during tooling operation. This ensures that nuclear power equipment achieves good stiffness requirements during design and testing. Detailed Implementation

[0008] The present invention will now be described in detail with reference to specific embodiments.

[0009] The core of this invention is to derive an empirical formula for calculating bolt preload using the fundamental theoretical formula for preload in threaded connections, thereby explaining the preload coefficient. Considering the stiffness of bolted connections under external dynamic loads, the stress in the threaded portion is corrected by incorporating the external dynamic load. This yields the maximum and minimum preload stresses in the threaded portion, ultimately correcting the preload torque value. The specific implementation method is as follows: I. Based on the simplified formula for preload torque in engineering Frictional torque between screw pairs Frictional torque between the nut and the support surface The preload torque coefficient is obtained through derivation: In the formula: —Major diameter of the thread; —Minor diameter of the thread; —Thread pitch diameter; — Bolt hole diameter; —Outer diameter of the nut's annular support surface; —Thread helix angle; —Equivalent friction angle of the helical pair; —Preload of threaded connections; — The coefficient of friction between the nut and the supporting surface.

[0010] II. Coarse threads are often chosen in tooling for connecting structural components. and All are known, including the shear stress generated in the bolt shank due to torsion. Thus introducing K After the value is obtained, In the formula: III. According to the fourth strength theory, the calculated stress under the preloaded state of the bolt is: , The stress of the bolt under external load was extracted using finite element analysis. If the tensile stress increased on the threaded portion of the bolt is At this point, the calculated stress of the bolt is In the formula: —Maximum preload stress, ΔF The added tensile force to the threaded portion, A The stress area of ​​the thread, minimum preload stress It is related to the coefficient of friction, that is, with K Related, can be obtained .

[0011] From the above formula, it can be seen that, based on the obtained and The preload and preload torque are calculated based on the value and the bolt specifications selected in the tooling, thereby achieving the desired result. K The value is used to correct the preload torque value in the tooling.

Claims

1. A method for checking the bolt preload torque of nuclear power equipment, characterized in that: I. Based on the simplified formula for preload torque in engineering Frictional torque between screw pairs Frictional torque between the nut and the support surface The preload torque coefficient is obtained through derivation: In the formula: —Major diameter of the thread; —Minor diameter of the thread; —Thread pitch diameter; — Bolt hole diameter; —Outer diameter of the nut's annular support surface; —Thread helix angle; —Equivalent friction angle of the helical pair; —Preload of threaded connections; —The coefficient of friction between the nut and the supporting surface; Second, select coarse threads for connecting structural components. and All are known, including the shear stress generated in the bolt shank due to torsion. Thus introducing K After the value is obtained, In the formula: III. The calculated stress under the pre-tightened bolt condition is: Extracting the stress of bolts under external loads If the tensile stress increased on the threaded portion of the bolt is At this point, the calculated stress of the bolt is In the formula: —Maximum preload stress, ΔF The added tensile force to the threaded portion, A The stress area of ​​the thread, minimum preload stress and K Related, can be obtained ; From the above formula, it can be seen that, based on the obtained and The preload and preload torque are calculated based on the value and the bolt specifications selected in the tooling, thereby achieving the desired result. K The value is used to correct the preload torque value in the tooling.

2. The method for checking the bolt preload torque of nuclear power equipment according to claim 1, characterized in that: According to the fourth strength theory, the calculated stress under bolt preload is: .

3. The method for checking the bolt preload torque of nuclear power equipment according to claim 1, characterized in that: The stress of the bolt under external load was extracted using finite element analysis. .

Citation Information

Patent Citations

  • Electronic equipment screw tightening torque coefficient measuring method and system

    CN109556783A

  • Method for checking design size of double-cone expansion coupling sleeve

    CN109753756A