Pipe manufacturing method

By using a semi-finished tube structure on a tube with a small outer diameter, and utilizing the residual first layer and the virtual second layer, the problem of difficult machining by lathe clamping fixtures is solved, and the machining effect of successfully forming concave or convex parts on a tube with a small outer diameter is achieved.

CN116829284BActive Publication Date: 2026-11-10NANSIN CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202280013963.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2021-02-09
Filing Date
2022-01-31
Publication Date
2026-11-10
Estimated Expiration
2042-01-31

AI Technical Summary

Technical Problem

Existing technologies make it difficult to form concave or convex parts on pipes with very small outer diameters, especially since it is difficult to hold and cut them stably using lathe clamps.

Method used

The semi-finished tube structure consists of a first layer for forming residual finished tubes and a second layer for virtual purposes. The concave or convex parts are formed by cutting on a lathe. The second layer is used for clamping and cutting. The outer diameter of the first layer is small while the outer diameter of the second layer is large to facilitate processing.

Benefits of technology

It has enabled the successful formation of concave or convex parts on pipes with small outer diameters, solving the problem of difficult gripping with clamping fixtures and improving the feasibility and accuracy of lathe machining.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116829284B_ABST
    Figure CN116829284B_ABST
Patent Text Reader

Abstract

The semi-finished tube (1) of the present invention is a semi-finished tube (1) before it becomes a finished tube (2) by cutting on a lathe, comprising: a first layer (11) for forming a finished tube that remains even after cutting on a lathe; and a virtual second layer (12) formed on the outside of the first layer (11) that does not remain after cutting on a lathe. According to the semi-finished tube (1) of the present invention, a lathe that is difficult to hold with a clamping fixture and difficult to process if the outer diameter is small can be used to manufacture a semi-finished tube with a small outer diameter (finished tube).
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a method for manufacturing a semi-finished pipe, a semi-finished pipe, a pipe manufacturing method, and a pipe. Here, "semi-finished pipe" refers to a pipe that is an intermediate product, a product in a marketable state, and is considered a finished product. Background Technology

[0002] In recent years, the demand for slender tubes with very small outer diameters has increased in various fields. For example, metal tubes called microtubes and micropipes are used in tubes for semiconductor inspection contact probes, medical and printing nozzles, connectors for optical communications, and metalferrules for optical communications. In order to install the tube into the device to be installed or in the display tube manufacturer, it is sometimes desirable to form recesses or convexities on the surface of the tube. For example, when a contact pin (plunger) or a spring for restoring force is placed in a tube (barrel) and used as a contact probe for semiconductor inspection, if a protrusion is formed on the outside of the tube, it will engage with a recess provided in the mounting part, making it difficult for the contact probe to fall off. This allows for more reliable inspection of the electrodes of miniaturized and high-density semiconductors.

[0003] Patent documents Patent Document 1: Japanese Patent Application Publication No. 2001-162404 Summary of the Invention

[0004] In Patent Document 1, such as Figure 14As shown, a technique is disclosed that directly uses an existing lathe to machine the surface of a cylindrical workpiece, thereby manufacturing a cylindrical substrate with high precision. In this technique, a lathe jig holding the cylindrical workpiece 9120 has a pair of cylindrical pressing members 9112 and 9114, and the pressing members 9112 and 9114 have recesses 9122 and 9124 into which the end of a shaft 9116 can be inserted. Moreover, when using the lathe jig to machine the surface of the cylindrical workpiece, the shaft 9116 is inserted into the cylindrical workpiece 9120, and the cylindrical workpiece 9120 is held by filling the gap between the shaft 9116 and the cylindrical workpiece 9120 with a filling member 9118, and its surface is machined. The technology disclosed in Patent Document 1 is useful when the diameter of the cylindrical workpiece 9120 is large, such as the substrate for manufacturing a xerographic photoreceptor or an electrophotographic developing sleeve.

[0005] However, in very small tubes, such as those with an outer diameter of less than 0.6 to 1.0 mm, the inner diameter is even smaller. Therefore, it is almost impossible to insert a shaft 9116 as described in Patent Document 1 or to fill the gap with a filling member 9118, and it is difficult to machine the surface of the tube using the method of Patent Document 1. Moreover, it is usually impossible to hold tubes with very small outer diameters with lathe chucking jigs, or even if they are held, the holding becomes unstable, making it very difficult to provide tubes with surfaces that can be machined to form concave or convex features.

[0006] Therefore, the object of the present invention is to provide a method and the tube having concave or convex portions on its surface that can be manufactured even on a lathe that is difficult to hold and cut by a clamping fixture if the outer diameter is small. Furthermore, there is also a market demand for semi-finished tubes (not finished products), which are supplied as pre-finished products and then machined on a lathe to produce smaller-diameter tubes with desired surface concave or convex shapes. Therefore, the objective is to provide a lathe that, even when the outer diameter is small, is difficult to hold with a clamping fixture and thus difficult to machine, allows for the manufacture (advantageously, available) of smaller-diameter tubes with surface concave or convex shapes, as well as a method thereof.

[0007] The semi-finished tube (first semi-finished tube) of the present invention is used to become a finished tube by cutting on a lathe, characterized in that it comprises: a first layer for constituting a finished tube that remains even after cutting on the lathe; and a second layer formed on the outside of the first layer to serve as a dummy for the object to be cut on the lathe. "Finished pipe" is used in contrast to "semi-finished pipe" and refers to pipes that have become finished products. It does not limit the pipe itself to becoming a traded object or to the pipe becoming part of a product. "Virtual use" refers to use for holding via clamping fixtures, rather than indicating use for finished pipe construction. In addition, the first layer can be made primarily of rare metals, and the second layer can be made of common metals (base metals).

[0008] According to such a semi-finished tube (first semi-finished tube), since a second layer for virtual cutting is formed on the outside of the first layer that remains even after cutting by a lathe, which is used to form the finished tube, a semi-finished tube with a small outer diameter that has concave or convex parts on its surface can be manufactured by holding the second layer for virtual cutting. In addition to grippers held by jaws, such as 3-jaw chucks and jaw chucks, the term "gripping fixture" in this specification also includes grippers held by contact or surface contact, such as opening fixtures and closing fixtures. Furthermore, a collet chuck is a type of closing fixture, and it is preferred to use a collet chuck as a gripping fixture in this application.

[0009] 2. In the above-mentioned semi-finished pipe (first semi-finished pipe), it is preferable that the outer diameter of the first layer is the outer diameter near that of the finished pipe.

[0010] 3. In the above-mentioned semi-finished tube (first semi-finished tube), it is preferable that the first layer has a smaller outer diameter that is difficult to hold by the clamping fixture of the lathe, and the second layer has a larger outer diameter that can be held by the clamping fixture of the lathe.

[0011] 4. In the aforementioned semi-finished pipe (first semi-finished pipe), preferably, the outer diameter of the first layer is 0.05 mm or more and less than 0.60 mm, and the outer diameter of the second layer is 0.40 mm or more and less than 3.00 mm. More preferably, the outer diameter of the first layer is 0.05 mm or more and less than 0.50 mm, and the outer diameter of the second layer is 0.50 mm or more and less than 2.00 mm. Even more preferably, the outer diameter of the first layer is 0.10 mm or more and less than 0.40 mm, and the outer diameter of the second layer is 0.40 mm or more and less than 1.00 mm. Even more preferably, the outer diameter of the first layer is 0.10 mm or more and less than 0.30 mm, and the outer diameter of the second layer is 0.40 mm or more and less than 0.60 mm.

[0012] 5. In the above-mentioned semi-finished tube (first semi-finished tube), it is preferable that the machinability of the second layer is at least better than that of the first layer and the adjacent portion of the second layer.

[0013] 6. In the above-mentioned semi-finished pipe (first semi-finished pipe), the first layer preferably has: a first outer layer forming an adjacent portion with the second layer; and a first inner layer formed on the inner side of the first outer layer, wherein the Vickers hardness of the first outer layer is in the range of 350 to 550 HV.

[0014] 7. In the above-mentioned semi-finished tube (first semi-finished tube), preferably the first inner layer is composed of any one of gold, gold-cobalt alloy, palladium, palladium alloy or a co-deposition of polytetrafluoroethylene and nickel, the first outer layer is composed of any one of nickel-cobalt alloy, nickel-manganese alloy or pure nickel, and the second layer is composed of any one of copper, pure nickel or nickel-manganese alloy. In addition, polytetrafluoroethylene (PTFE) is a fluororesin composed only of fluorine atoms and carbon atoms. Furthermore, pure nickel includes, for example, NC-Ni (Ni200) (usual pure nickel), LC-Ni (Ni201) (especially materials with reduced carbon content), D-Ni (materials with added small amounts of aluminum and titanium), A-Ni (high-purity nickel with a purity of 99.7% or higher), K-Ni (high-purity nickel with a purity of 99.5% or higher) and others (sold by Hitachi Metals Co., Ltd., etc.).

[0015] 8. The method for manufacturing a semi-finished tube (first semi-finished tube) according to the present invention is characterized by comprising: a step of preparing a wire; a step of forming a first layer for constituting a finished tube that remains even after cutting by the lathe on the outer periphery of the wire; and a step of forming a second layer on the outer periphery of the first layer for being a virtual object to be cut by the lathe. According to this semi-finished tube (first semi-finished tube) manufacturing method, since a first layer for forming a finished tube that remains even after cutting on a lathe is formed on the wire, and a second layer for being a virtual object to be cut on the lathe is formed on its outer side, it is possible to provide a semi-finished tube manufacturing method that can manufacture tubes (finished tubes) with concave or convex portions on the surface by holding the virtual second layer on the lathe, even if the outer diameter is small and it is difficult to hold and cut the lathe by using the lathe.

[0016] 9. The method for manufacturing a semi-finished tube (second semi-finished tube) according to the present invention is as follows: a second semi-finished tube that is closer to a finished tube is manufactured from a semi-finished tube (first semi-finished tube) using a lathe, characterized in that it includes: a step of preparing the above-mentioned semi-finished tube (first semi-finished tube); a holding step of holding the semi-finished tube (first semi-finished tube) from the outside of the second layer; a cutting step of forming a concave or convex portion on the first layer by cutting from the outside of the second layer; and a step of forming the second semi-finished tube in a state where the holding portion is connected to the portion where the concave or convex portion is formed. According to this method for manufacturing a semi-finished tube (second semi-finished tube), the first semi-finished tube is held from the outside of the second layer, and a recess or a protrusion can be formed on the first layer. Furthermore, since the semi-finished tube (second semi-finished tube) is manufactured with the holding portion connected to the portion where the recess or protrusion is formed, a finished tube can be manufactured simply by cutting the semi-finished tube (second semi-finished tube). Thus, according to this manufacturing method, even a lathe that is difficult to hold with a clamping fixture and difficult to machine if the outer diameter is small can be provided as a method for manufacturing a semi-finished tube (second semi-finished tube) with a small outer diameter and recesses or protrusions on its surface.

[0017] 10. The semi-finished tube (second semi-finished tube) of the present invention is used to become a finished tube by cutting a specified portion, characterized in that it comprises: a virtual layer stacked portion having a first layer for forming a finished tube and a virtual second layer formed outside the first layer; and a first layer concave-convex forming portion having a concave portion or a convex portion. With this configuration, since the virtual laminated portion is held, the finished tube can be made by cutting open the first layer of concave and convex portions. Therefore, a semi-finished tube (second semi-finished tube) can be provided for manufacturing a tube (finished tube) with a smaller outer diameter that has concave or convex portions on the surface.

[0018] 11. The tube (finished tube) manufacturing method of the present invention is characterized by comprising: a step of preparing the above-mentioned semi-finished tube (second semi-finished tube); a holding step of holding the semi-finished tube (second semi-finished tube) through the virtual lamination portion; and a cutting step of cutting the first layer of concave-convex forming portion from the side of the virtual lamination portion. According to this tube (finished tube) manufacturing method, since the virtual laminated layer is held, the finished tube can be made by cutting open the first layer of concave and convex forming parts. Therefore, a semi-finished tube (second semi-finished tube) can be provided for manufacturing tubes (finished tubes) with concave or convex parts on the surface and smaller outer diameter.

[0019] 12. The method for manufacturing a tube (finished tube) according to the present invention is as follows, wherein a finished tube is manufactured from a semi-finished tube (first semi-finished tube) using a lathe, characterized in that it includes: a step of preparing the above-mentioned semi-finished tube (first semi-finished tube); a holding step of holding the semi-finished tube (first semi-finished tube) from the outside of the second layer; a cutting step of forming a concave or convex portion on the first layer by cutting from the outside of the second layer; and a cutting step of cutting off a predetermined portion of the semi-finished tube (first semi-finished tube). According to such a pipe (finished pipe) manufacturing method, even if a lathe is difficult to hold and cut if the outer diameter is small, it can be used to manufacture semi-finished pipes with small outer diameters that have concave or convex parts on the surface by holding a virtual second layer.

[0020] 13. In the pipe (finished pipe) manufacturing method of the present invention, when manufacturing a semi-finished pipe (first semi-finished pipe or second semi-finished pipe), it is preferable to cut the second layer in such a way that a portion of it remains. According to this tube (finished tube) manufacturing method, by leaving a portion of the second layer, it is possible to adjust the depth of the concave part or the height of the convex part, as well as electromagnetic shielding (reinforcement), etc.

[0021] 14. The tube (finished tube) of the present invention is characterized in that the outer diameter of the metal is 0.05 mm or more and less than 0.60 mm, and the outer periphery has a concave or convex portion and cutting marks. Based on such tubes (finished tubes), due to their smaller outer diameter, it is possible to manufacture contact probes with smaller diameters (used in semiconductor inspection, etc.), which have been difficult to manufacture until now, making them suitable for multiple applications. Furthermore, in tubes with smaller outer diameters, a certain level of strength is required; the presence of cutting marks indicates that the outer diameter has been reduced through cutting, thus alleviating concerns about insufficient strength. If the outer layer is formed through sputtering or electroplating, the outer layer of the tube with cutting marks is thicker and stronger than that of a typical tube with a thin and weak outer layer.

[0022] 15. In the semi-finished tube (first semi-finished tube) described above (e.g., 1 to 5), it is preferable that the first layer and the second layer are composed of metals that are alloyed near the first layer of the first layer and the second layer when the semi-finished tube is heated. Furthermore, alloying refers to the mixing of a first layer of metal with a second layer of metal (through thermal diffusion). Alloying signifies the alloying of a first layer of metal with a second layer of metal. An alloy is an alloy of a first layer of metal with a second layer of metal. The first and second layers of metal being alloyed are not limited to pure metals; they can also be metals mixed with impurities. Thus, by heating, the first layer can be easily alloyed and hardened. Moreover, through alloying, the area near the first layer of the second layer can also harden. On the other hand, since the outer side of the second layer is not alloyed, or the degree of alloying (alloying rate) is low, it is easy to cut.

[0023] 16. In the semi-finished tube (first semi-finished tube) described above (e.g., 15), it is preferred that the first layer is made of palladium or silver and the second layer is made of copper or iron. Furthermore, "palladium," "silver," "copper," and "iron" indicate the main components of the constituent layers. Besides metals composed of a single element, this also includes metals containing impurities. This facilitates alloying.

[0024] 17. In the semi-finished tube (first semi-finished tube) described above (e.g., 15 or 16), it is preferable to further include: a third layer of metal formed inside the first layer; and an intermediate layer formed between the first layer and the third layer, wherein the intermediate layer prevents the metal of the third layer from being alloyed with the metal of the first layer and the second layer due to heating. In this way, when the first layer of metal is alloyed with the second layer of metal, it can prevent the third layer of metal from being alloyed with these metals as well. Furthermore, the third layer is preferably made of a material such as a metal with a thermal conductivity lower than that of the first layer (more preferably the first and third layers, and even more preferably the first, second, and third layers). Furthermore, rare metals can be used to form the intermediate layer. Also, rare metals can be used to form the third layer. Furthermore, alloys can be used to form the third layer.

[0025] 18. In the semi-finished tube (first semi-finished tube) described above (e.g., 17), the intermediate layer is preferably made of nickel. If the intermediate layer is made of nickel, since nickel has relatively low thermal conductivity among metals, even if various metals with higher thermal conductivity than nickel are used as the third layer, it is possible to prevent the third layer metal from alloying with the first layer (or the first and second layers) metal due to heating. Moreover, nickel is readily available. The intermediate layer can also be easily formed through electroplating or other methods.

[0026] 19. In the semi-finished tube (first semi-finished tube) described above (e.g., any one of 1 to 4), it is preferable that the first layer is made of an alloy, and the second layer is configured such that the degree of alloying is reduced (smaller) in the outward direction. In this way, the first layer can be hardened. Moreover, since the second layer is softer towards the outer direction (the direction that does not require precise cutting), it is easier to cut. On the other hand, since it is harder towards the opposite direction (towards the first layer, the direction that requires precise cutting), cutting errors can be suppressed.

[0027] 20. In the above-described (e.g., 8) method for manufacturing a semi-finished tube (first semi-finished tube), it is preferable that in the steps of forming the first layer and forming the second layer, the first layer and the second layer are formed using metals that are alloyed near the first layer of the first layer and the second layer when the semi-finished tube is heated. In this way, alloying can be easily carried out by heating the semi-finished tube.

[0028] 21. The tube manufacturing method of the present invention, which uses a lathe to manufacture a finished tube from a semi-finished tube, is characterized by comprising: a step of preparing (for example, as described in any one of 15 to 18) a semi-finished tube; a holding step of holding the semi-finished tube from the outside of the second layer; a cutting step of cutting the second layer from the outside of the second layer so that a portion of it remains; and an alloying step of heating the semi-finished tube to alloy the first layer and the remaining second layer. Thus, during the cutting process, the second layer is cut in a soft state before alloying, making machining easier. Furthermore, during the alloying process, the first layer and the remaining second layer are easily made into a homogeneous alloy. Furthermore, since alloys are generally harder than the first and second layers of metal, alloying allows for a thinner wall thickness compared to unalloyed pipes, while maintaining the same overall strength. It also enables a reduction in the outer diameter of the pipe.

[0029] 22. The tube manufacturing method of the present invention, which uses a lathe to manufacture a finished tube from a semi-finished tube, is characterized by comprising: a step of preparing (for example, as described in any one of 15 to 18) a semi-finished tube; an alloying step of heating the semi-finished tube to alloy the first layer and the vicinity of the first layer of the second layer; a holding step of holding the semi-finished tube from the outside of the second layer; and a cutting step of cutting the second layer to the vicinity of the first layer by cutting from the outside of the second layer. Thus, in the cutting process, the outer direction of the second layer is softer (the direction that does not require precise cutting), making cutting the outer side of the second layer easier. On the other hand, the opposite direction (towards the first layer, the direction that requires precise cutting) is harder, thus suppressing cutting errors on the outer periphery of the finished tube. Furthermore, since alloys are generally harder than the first and second layers of metal, alloying allows for a thinner wall thickness compared to unalloyed pipes, while maintaining the same overall strength. It also enables a reduction in the outer diameter of the pipe. Attached Figure Description

[0030] Figure 1 This is a diagram used to illustrate the semi-finished tube 1 (first semi-finished tube) and finished tube 2 involved in Embodiment 1. Figure 2 This is a diagram illustrating the manufacturing method of the semi-finished tube 1 according to Embodiment 1. Figure 3 This is a diagram illustrating the manufacturing method of the finished tube 2 according to Embodiment 1. Figure 4 It is a diagram (graph) used to illustrate the dimensions of the semi-finished tube 1, finished tube 2, etc. involved in Embodiment 1. Figure 5 This is a diagram illustrating an example of the use of the finished tube 2 involved in Embodiment 1. Figure 6 These are diagrams (graphs) used to illustrate the dimensions of the semi-finished tube 1, finished tube 2, etc., involved in embodiments 2 to 8. Figure 7 These are diagrams used to illustrate embodiments 9 to 11. Figure 8 These are diagrams (graphs) used to illustrate the dimensions of the semi-finished tube 1, finished tube 2, etc., involved in embodiments 9 to 11. Figure 9 This is a diagram used to illustrate embodiment 12 (a method of cutting after alloying). Figure 10 This is a diagram used to illustrate embodiment 12 (a method of cutting before alloying). Figure 11 These are diagrams (graphs) used to illustrate the dimensions of the semi-finished tube 1, finished tube 2, etc., involved in embodiments 12 to 16. Figure 12 This is a diagram used to illustrate an example of cutting deformation in the first layer 11. Figure 13 This is a diagram used to illustrate variations of the first layer 11 and the second layer 12. Figure 14 It is a diagram used to illustrate existing technology. Symbol Explanation 1- Semi-finished tube (first semi-finished tube); 11- First layer; 11A- Inner layer of the first layer; 11B- Outer layer of the first layer; 11C- Middle layer of the first layer; 11E- Adjacent part of the first layer and the second layer; 111- First layer before cutting; 112- First layer after cutting (with cutting marks); 115- Protrusion; 116- Recess; 1Y- Part held by a clamping fixture; 1N- Part other than held by a clamping fixture; 12- Second layer; 12A- Inner layer of the second layer; 12B- Outer layer of the second layer; 12E- Near the first layer of the second layer; 121- Part of the second layer remaining even after cutting; 19- Hollow part; 2- Finished tube; 200- Alloy layer ; 215-Protrusion; 3-Wire (core wire); 51-Clamping fixture; 52-Cutting fixture; 53-Cutting fixture; 6-Contact probe; 61-Cylinder; 62-Plunger; 63-Spring; 64-Spring mounting; 7-Semiconductor inspection device; 71-Contact probe mounting; 72-Matching part; 73-Wire conductor; 8-Semiconductor element; 81-Electrode; 9-Semi-finished tube (second semi-finished tube); D1-Outer diameter of the first layer; D2-Minimum diameter that can be clamped; D3-Outer diameter of the second layer; D19-Outer diameter of the wire (inner diameter of the semi-finished tube or finished tube); 9112, 9114-Pressing member; 9118-Filling member; 9120-Workpiece; 9122, 9124-Recess. Detailed Implementation

[0031] The following uses Figures 1 to 13 The present invention will describe the semi-finished tube, the method for manufacturing the semi-finished tube, the tube, and the method for manufacturing the tube. Furthermore, the figures described below are simplified schematic diagrams showing the actual shape, structure, and method.

[0032] Implementation Method 1 use Figures 1-5 The semi-finished tube 1 (first semi-finished tube), the manufacturing method of the semi-finished tube 1, the tube (finished tube 2), and the tube manufacturing method involved in Embodiment 1 will be described. In addition, the semi-finished tube 9 (second semi-finished tube) and the manufacturing method of the semi-finished tube 9 will also be described.

[0033] Regarding semi-finished tube 1 and finished tube 2 Figure 1 is a diagram for illustrating the semi-finished tube 1 (first semi-finished tube) and finished tube 2 according to Embodiment 1. Figure 1 (a) is a diagram for illustrating a cross-sectional view of the semi-finished tube 1 in the long axis direction, Figure 1 (b) is a diagram for illustrating a cross-sectional view of the finished tube 2 in the long axis direction. The outer sides in the short axis direction of the semi-finished tube 1 and the finished tube 2 are substantially circular. In addition, in this specification, the "finished tube" may be referred to as "tube". As Figure 1 shown, the semi-finished tube 1 according to Embodiment 1 is a semi-finished tube 1 before being turned into the finished tube by lathe cutting, and includes: a first layer 11 for forming the finished tube that remains even after lathe cutting; and a virtual second layer 12 formed on the outer side of the first layer 11, which is the object to be cut by the lathe.

[0034] The outer diameter D1 of the first layer 11 of the semi-finished tube 1 is an outer diameter near the outer diameter D5 (the outermost diameter) of the finished tube 2. "Near" means "adjacent", "close" and the like, and means that the outer diameter D1 is close to D5, including the case where D1 and D5 are the same. In Embodiment 1, the outer diameter D1 of the first layer 11 is the same as the outer diameter D5 of the finished tube 2. D19 is the inner diameter of the semi-finished tube 1 or the finished tube 2, which is the same as the outer diameter of the wire 3 to be described later.

[0035] In the above semi-finished tube 1, the first layer 11 has a small outer diameter D1 that is difficult to be gripped by the clamping jig 51 of the lathe, and the second layer 12 has a large outer diameter D3 that can be gripped by the clamping jig 51 of the lathe. The outer diameter D2 in the figure is the minimum diameter that can be gripped by the clamping jig 51. The outer diameters D1, D2 and D3 have a relationship of D1<D2<D3. D5 is the outer diameter of the finished tube 2. In Embodiment 1, the outer diameter D5 of the finished tube 2 is the same as the outer diameter D1 of the first layer 11.

[0036] In the above semi-finished tube 1, the outer diameter D1 of the first layer 11 is 0.05 mm or more and less than 0.60 mm, and the outer diameter D3 of the second layer 12 is 0.04 mm or more and 3.00 mm or less.

[0037] In the above semi-finished tube 1, the machinability of the second layer 12 is at least better than that of the adjacent portion 11E of the first layer 11 adjacent to the second layer 12.

[0038] In the above semi-finished tube 1, the first layer 11 has: a first layer outer portion 11B that forms the adjacent portion 11E with the second layer 12; and a first layer inner portion 11A formed on the inner side of the first layer outer portion 11B, and the Vickers hardness of the first layer outer portion 11B is in the range of 350 to 550 HV. In embodiment 1, the first inner layer 11A is a gold-cobalt alloy, the first outer layer 11B is a nickel-cobalt alloy (Vickers hardness 400-550HV), and the second layer 12 is copper (Vickers hardness 150-230HV).

[0039] In addition, such as Figure 1 As shown, in the semi-finished tube 1, the first layer 11 has a first inner layer 11A and a first outer layer 11B. The inner side of the first inner layer 11A is a hollow portion 19. In Embodiment 1, the second layer 12 is cut away, and a portion of the first outer layer 11B is cut away to form a protrusion 115 and a recess 116. The symbol 111 indicates the first layer before cutting, and 112 indicates the first layer after cutting. There are cutting marks on the first layer 112 after cutting.

[0040] Manufacturing method of semi-finished pipe 1 Figure 2 This is a diagram illustrating the manufacturing method of the semi-finished tube 1 according to Embodiment 1. Figure 2 (a) to (f) are diagrams used to illustrate the process. For example... Figure 2 As shown, the manufacturing method of the semi-finished tube 1 involved in Embodiment 1 is a manufacturing method of the semi-finished tube 1 before it becomes the finished tube 2 by cutting on a lathe, including: a process of preparing wire 3 ( Figure 2 (a)); the process of forming the first layer 11 for the finished tube structure on the wire 3 ( Figure 2 (b), (c)); and the process of forming a second layer 12 outside the first layer 11 as a virtual object to be cut by the lathe ( Figure 2 (d)).

[0041] Specifically, first prepare 3 pieces of stainless steel wire (wire) with a diameter (outer diameter D19) of 0.20mm. Figure 2 (a) "Stainless steel wire" refers to stainless steel made into wire. Stainless steel is an alloy steel with iron (Fe) as its main component, containing less than 1.2% (mass percentage concentration) of carbon and more than 10.5% of chromium. Then, a first inner layer 11A (1μm thick) of gold-cobalt alloy is formed on wire 3 (stainless steel wire) by electroplating. Figure 2 (b) A first outer layer 11B (outer diameter D1 is 0.25 mm) of nickel-cobalt alloy (thickness 24 μm) is formed on its outer side by electroplating. Figure 2 (c) Thus, a first layer 11 for forming a finished tube having a first inner layer 11A and a first outer layer 11B is formed on the wire 3. Then, a second layer 12 (outer diameter D3 is 1.25 mm) of copper (thickness 500 μm) is formed on the outside of the first layer 11 by electroplating. Figure 2(d)). The second layer 12 is a virtual layer used to represent the object being cut by the lathe. Then, pull out and remove wire 3 ( Figure 2 (e)). exist Figure 2 In (f), it is indicated that the above-mentioned Figure 2 The semi-finished pipe 1 (inner diameter D19, outer diameter D3) is manufactured by processes (a) to (e).

[0042] Manufacturing method of finished tube 2 Figure 3 This is a diagram illustrating the manufacturing method of the finished tube 2 according to Embodiment 1. Figure 3 (a) to (d) are diagrams illustrating the steps of the manufacturing process. For example... Figure 3 As shown, the manufacturing method of the finished tube 2 involved in Embodiment 1 is a tube manufacturing method that uses a lathe to manufacture the finished tube 2 from the semi-finished tube 1, including: the process of preparing the above-mentioned semi-finished tube 1 ( Figure 3 (a)); the process of holding the semi-finished pipe 1 from the outside of the second layer 12 ( Figure 3 (a)); a cutting process in which the second layer 12, excluding the portion 1N held from the outside, is cut to form a recess 116 or a protrusion 115 by cutting a predetermined portion of the first layer 11. Figure 3 (b)); and the cutting process of cutting (splitting) the holding part 1Y (virtual laminated layer part) ( Figure 3 (c)).

[0043] Specifically, first prepare the semi-finished pipe 1 for manufacturing the finished pipe 2. Figure 3 (a)). Semi-finished pipe 1 is already in Figure 1 This has been explained in the document. Then, the semi-finished tube 1 is held from the outside of the second layer 12 by clamping fixtures 51 such as collets. Figure 3 (a)). The outer diameter D3 of the second layer 12 is formed to a size that allows it to be held by the clamping fixture 51. Furthermore, the process of preparing the semi-finished tube 1 and the process of holding the semi-finished tube 1 are summarized in the same table. Figure 3 (a) in.

[0044] Then, bypassing the portion 1Y already held by the clamping fixture 51, the second layer 12 of the portion 1N other than the held portion is cut from the outside by the cutting fixture 52 such as a cutting tool, forming a recess 116 or a protrusion 115 at a predetermined location in the first layer 11. Figure 3(b) The cutting depth is 0.01 mm. The portion of the first layer 11 that is cut in the thickness direction (minor axis direction) is called a recess 116, and the portion that is not cut is called a convex portion 115. Furthermore, as a method for forming the recess 116 or the convex portion 115, the following method is used: while moving the cutting jig 52 relative to the semi-finished tube 1 in the long axis direction, the second layer 12 and the first layer 11 in a specified portion are cut sequentially, thereby forming the recess 116 or the convex portion 115; or the second layer 12 is cut into a specified length portion in the long axis direction of the semi-finished tube 1, and then the recess 116 or the convex portion 115 is formed on the first layer 11 within the specified length portion.

[0045] Then, while holding the semi-finished tube 1, the cut portion is cut off by a cutting fixture 53, such as a cutting tool. Figure 3 (c) Furthermore, when the length of the finished tube 2 is relatively short, such as 1 to 5 mm, and the length of the semi-finished tube 1 is relatively long, such as 1 to 1.5 m, the length of the finished tube 2 is cut off from the opposite end of the held portion 1Y. Figure 3 (d) indicates via Figure 3 Finished tube 2 is manufactured by processes (a) to (c).

[0046] Figure 4 It is a diagram (graph) used to illustrate the dimensions of the semi-finished tube 1, finished tube 2, etc. involved in Embodiment 1. Figure 4 The document describes the materials, thicknesses, and outer diameters D of the wire 3 (core wire), first layer 11, second layer 12, and finished tube 2 used in Embodiment 1. Figure 4 The term "machinability" indicates the degree of machinability of pure nickel, which is not easily machinable. ○ indicates good, and ◎ indicates very good. When a protrusion is present, the outer diameter D5 of the finished tube 2 is the outermost diameter including the protrusion. In the case of descriptions of content, for example, "AuCo alloy (Co 0.1~1.0%)" indicates that the cobalt content (by weight) in the gold-cobalt alloy is 0.1~1.0% and the remainder is gold. However, there are also cases where trace additives are included. The descriptions of other alloys are the same. (The above explanation is in...) Figure 6 and Figure 8 (The same applies to China).

[0047] Second semi-finished pipe 9 Although the semi-finished tube 1 (first semi-finished tube) described so far is in a state before the second layer 12 is cut, it can also be used as a semi-finished tube 9 (second semi-finished tube) even after the second layer 12 is cut and before the specified part is cut off (see reference). Figure 3 (c)). Manufacturing method of the second semi-finished product tube 9 The manufacturing method of the semi-finished tube 9 (second semi-finished tube) is a method of manufacturing a second semi-finished tube that is closer to the finished tube 2 from a semi-finished tube (first semi-finished tube) using a lathe. The method includes: a process of preparing the semi-finished tube (first semi-finished tube 1); a process of holding the semi-finished tube (first semi-finished tube) from the outside of the second layer 12; a process of forming a recess 116 or a protrusion 115 on the first layer 11 by cutting from the outside of the second layer 12; and a process of forming the second semi-finished tube 9 in a state where the holding part 1Y is connected to the part where the recess 116 or the protrusion 115 is formed.

[0048] Furthermore, the manufactured semi-finished tube (second semi-finished tube 9) is used to become the finished tube 2 by cutting a specified portion, comprising: a virtual layered portion having a first layer 11 for forming the finished tube and a virtual second layer 12 formed on the outside of the first layer 11; and a first layer of concave-convex forming portion having a recess 116 or a protrusion 115. In other words, as long as a recess 116 or a protrusion 115 is formed on the outside and the specified portion is cut (cut open), it can become the finished tube 2.

[0049] When using the second semi-finished tube 9 to manufacture a tube (finished tube 2), the tube (finished tube 2) manufacturing method includes: a process of preparing the above-mentioned semi-finished tube (second semi-finished tube 9); a process of holding the semi-finished tube (second semi-finished tube 9) through the virtual lamination portion 1Y; and a cutting process of cutting the first layer of concave-convex forming portion from the virtual lamination portion side.

[0050] Finished pipe 2 exist Figure 3 (d) The finished tube 2 involved in Embodiment 1 shown in the figure is made of metal and has an outer diameter D5 of 0.05 mm or more and less than 0.60 mm. It has a concave portion 116 or a convex portion 115 on its outer periphery and cutting marks on the cutting portion.

[0051] Example of use of finished pipe 2 Figure 5 This diagram illustrates an example of the use of the finished tube 2 according to Embodiment 1. It also shows an example of its use in a semiconductor inspection apparatus 7. In this usage example, the finished tube 2 is used as a cylinder 61 containing a plunger 62 and a spring 63 for a contact probe 6. A spring mounting member 64 is provided on the upper part of the cylinder 61, and a spring 63 is mounted on the spring mounting member 64. The protrusion 115 of the finished tube 2 (cylinder 61) of the contact probe 6 is fitted into the fitting part 72 of the semiconductor inspection device 7 and housed within the contact probe mounting member 71 of the semiconductor inspection device 7. Moreover, the contact probe 6 moves up and down as shown by the arrow in the figure, thereby causing the plunger 62 to contact or not contact the electrode 81 of the semiconductor element 8. When the plunger 62 contacts the electrode, the plunger 62 makes contact with appropriate pressure due to the elastic force of the spring 63. Then, a signal sent to or received from the electrode 81 is transmitted or received via the wiring conductor 73, thereby performing semiconductor inspection.

[0052] Effects of Implementation Method 1 According to the semi-finished tube 1 of embodiment 1, since a second layer 12 for virtual cutting on a lathe is formed on the outside of the first layer 11 for forming the finished tube, it is possible to provide a semi-finished tube 1 that can be manufactured with a small outer diameter tube (finished tube 2) having concave or convex portions on its surface by holding the second layer 12, even if the outer diameter is small and it is difficult to hold the lathe by clamping the jig and thus difficult to cut.

[0053] Furthermore, since the outer diameter D1 of the first layer 11 is formed near the outer diameter D5 of the finished tube 2, it is possible to provide a semi-finished tube 1 that is easy to cut for the virtual second layer 12 and easy to form a recess 116 or a protrusion 115 on the surface of the first layer 11.

[0054] Moreover, even if the outer diameter D1 of the first layer 11 is a small size that is difficult to hold by the clamping fixture 51 of the lathe, the outer second layer 12 is configured to have a larger outer diameter D2 that can be held by the clamping fixture of the lathe. Therefore, a semi-finished tube 1 can be provided that can be easily machined by the lathe by holding the second layer 12 by the clamping fixture.

[0055] Even if the outer diameter D1 of the first layer 11 of the semi-finished tube 1 involved in Embodiment 1 is 0.05 mm or more and less than 0.60 mm, it is difficult to hold because the outer diameter D1 is small and it is difficult to form concave and convex shapes by lathe. However, because a second layer 12 with an outer diameter D3 of 0.40 mm or more and less than 3.00 mm is formed on its outer side, it can be machined by cutting.

[0056] Furthermore, since the machinability of the second layer 12 is at least better than that of the adjacent portion 11E of the first layer 11 and the second layer 12, the virtual second layer 12 can be easily cut.

[0057] Furthermore, the first layer 11 has: a first outer layer 11B forming an adjacent portion 11E to the second layer 12; and a first inner layer 11A formed inside the first outer layer 11B. The first outer layer 11B has a Vickers hardness in the range of 350 to 550 HV, so it is not easily cut by a lathe, but can be machined by a lathe. Moreover, for example, a functional forming layer (a layer that imparts good conductivity, etc.) of the finished tube 2 can be formed on the first inner layer 11A, and it is protected by the harder first outer layer 11B formed on the outside.

[0058] According to the manufacturing method of the semi-finished tube 1 (a semi-finished tube 1 for becoming a finished tube 2 by cutting on a lathe) according to Embodiment 1, since it includes: a process of preparing wire 3; a process of forming a first layer 11 on the outer periphery of wire 3 for forming a finished tube 2 that will remain even after cutting on a lathe; and a process of forming a second layer 12 on the outer periphery of the first layer 11 for becoming a virtual object to be cut on a lathe, even if the outer diameter is small, it is difficult to hold the lathe by the clamping fixture and the cutting process is difficult. It is possible to manufacture a semi-finished tube 1 for manufacturing a tube (finished tube 2) with a small outer diameter having a concave portion 116 or a convex portion 115 on the surface using this lathe.

[0059] According to the tube manufacturing method of Embodiment 1 (a tube manufacturing method for manufacturing a finished tube 2 from a semi-finished tube 1 using a lathe), since it includes: a process of preparing a semi-finished tube 1; a holding process of holding the semi-finished tube 1 from the outside of the second layer 12; a cutting process of forming a concave or convex portion on the first layer 11 by cutting from the outside of the second layer 12; and a cutting process of cutting off a predetermined portion of the semi-finished tube 1, even if the outer diameter is small, it is difficult to hold the tube by the clamping fixture and the cutting process is difficult. The lathe can be used to manufacture tubes (finished tube 2) with concave portions 116 or convex portions 115 on the surface.

[0060] According to Embodiment 1, the semi-finished tube 9 (a tube manufacturing method for manufacturing a second semi-finished tube 9 that is closer to the finished tube 2 from the semi-finished tube 1) includes: a process of preparing the semi-finished tube 1; a process of holding the semi-finished tube 1 from the outer side 12 of the second layer; a process of forming a recess 116 or a protrusion 115 on the first layer 11 by cutting from the outer side of the second layer 12; and a process of forming the second semi-finished tube 9 in a state where the holding part 1Y is connected to the part where the recess 116 or the protrusion 115 is formed, thus a second semi-finished tube 9 that is close to the finished tube 2 can be manufactured.

[0061] According to Embodiment 1, the semi-finished tube 9 (a semi-finished tube 9 for cutting a specified portion to become a finished tube 2) includes: a virtual layer stacked portion having a first layer 11 for forming a finished tube and a virtual second layer 12 formed on the outside of the first layer 11; and a first layer concave-convex forming portion having a concave portion 116 or a convex portion 115. Therefore, by holding the virtual layer stacked portion and cutting a specified portion of the first layer concave-convex forming portion, a finished tube 2 can be formed.

[0062] According to the tube manufacturing method of Embodiment 1 (a tube manufacturing method for manufacturing finished tube 2 from second semi-finished tube 9), since it includes: a process of preparing semi-finished tube 9 (second semi-finished tube); a holding process of holding semi-finished tube 9 through virtual lamination portion; and a cutting process of cutting open the first layer of concave-convex forming portion from the virtual lamination portion side, finished tube 2 can be easily manufactured from second semi-finished tube 9.

[0063] According to the tube (finished tube 2) involved in Embodiment 1, due to its small outer diameter, it is possible to manufacture a small-diameter contact probe 6, which has been difficult to manufacture until now (see [reference]). Figure 5 Furthermore, because of the cutting marks, it is known that it can be used without concerns about superior strength because it is manufactured by cutting rather than by sputtering or electroplating.

[0064] Implementation methods 2-8 Figure 6 These are diagrams (graphs) used to illustrate the dimensions, etc., of the semi-finished tube 1, finished tube 2, etc., involved in embodiments 2 to 8. Figure 6 The document describes the materials, thicknesses, and outer diameters (D) of the wire 3, first layer 11, second layer 12, and finished tube 2 in embodiments 2 to 8. The pipes (semi-finished pipes 1 and 9, finished pipe 2) and their manufacturing methods in embodiments 2 to 8 are basically the same as those in embodiment 1, but... Figure 6 As shown, the materials used to make these components are different from those in Embodiment 1. That is, in embodiments 2 to 8, the first inner layer 11A is composed of any one of gold, gold-cobalt alloy, palladium, palladium alloy or a co-deposition of polytetrafluoroethylene and nickel, the first outer layer 11B is composed of any one of nickel-cobalt alloy, nickel-manganese alloy or pure nickel, and the second layer 12 is composed of any one of copper, pure nickel or nickel-manganese alloy. Furthermore, regarding the materials and dimensions of the first layer, second layer, etc., in embodiments 2 to 8, Figure 6 The content recorded refers to the content recorded in the instruction manual, and omits [the following]. Figure 6 The recorded content was made into an article (in the above). Figure 4 And then Figure 8 (The same applies to China).

[0065] Effects of Implementation Methods 2-8 The first inner layer 11A, the first outer layer 11B, and the second layer 12 are made of components of appropriate materials, thus providing a method and the tube that can be more easily manufactured with a lathe having concave or convex portions on the surface, even if the outer diameter is small and the lathe is difficult to hold by a clamping fixture and difficult to cut.

[0066] Furthermore, the tube's function is that the first inner layer 11A protects the first outer layer 11B, and the outer layer 11B can be machined by a lathe. The material that meets these requirements can be appropriately selected.

[0067] For example, if the first inner layer 11A is formed with gold (pure gold), it can provide good electrical conductivity, good rust resistance, and flexibility. If formed using a gold-cobalt alloy, it can be made even harder than pure gold, and can provide excellent electrical conductivity, excellent rust resistance, and other functions.

[0068] If palladium is used, it can absorb hydrogen and act as a catalyst to remove harmful substances from automobile exhaust. If palladium alloys are used, in addition to hydrogen absorption and catalytic functions, they can also provide biocompatibility and corrosion resistance. Examples of palladium alloys include those with silver as the main component, to prevent silver sulfidation, and 12% gold-silver-palladium alloys, to which gold is added for corrosion resistance. The 12% gold-silver-palladium alloy is composed of 12% gold, 20% palladium, approximately 50% silver, approximately 50% copper, and indium, among other components.

[0069] The co-deposition of polytetrafluoroethylene (PTFE) and nickel can exhibit sliding or lubricating properties. This is because if the surface wears down, new PTFE particles will form, maintaining a low coefficient of friction. Furthermore, PTFE is a polymer of tetrafluoroethylene, a fluororesin composed solely of fluorine and carbon atoms (fluorocarbon resin).

[0070] Furthermore, if the outermost layer 11B is made of either a nickel-cobalt alloy or a nickel-manganese alloy, it will be harder and thus protect the innermost layer 11A. However, it can also be machined on a lathe, which can also create the irregularities.

[0071] Moreover, if the second layer 12 is made of copper or pure nickel, it is easy to hold and has good machinability.

[0072] Furthermore, if the first inner layer 11A, the first outer layer 11B, and the second layer 12 are made of the above-mentioned materials, it is easy to achieve the formation of the laminate.

[0073] Furthermore, regarding points other than those described in Embodiments 2 to 6, the structures, methods, effects, etc., described in Embodiment 1 can also be directly applied in Embodiments 2 to 6.

[0074] Implementation methods 9-11 Figure 7 These are cross-sectional views used to illustrate embodiments 9 to 11. Figure 8 These are diagrams (graphs) used to illustrate the dimensions of the semi-finished tube 1, finished tube 2, etc., involved in embodiments 9 to 11. The structure of the semi-finished tubes 1 and 9 and the finished tube 2 involved in Embodiments 9 to 11, or the manufacturing method of these, are basically the same as those in Embodiment 1, but... Figure 7 (or Figure 8 As shown, the difference lies in the fact that even after the second layer 12 is cut, a portion of the second layer 12 remains on the semi-finished tube 9 or the finished tube 2. Symbol 121 represents a portion of the second layer that remains even after cutting (see reference). Figure 7 , Figure 8 When its surface is cut, cutting marks are left at the cutting points. If the manufacturing method of the tube (finished tube 2) in Embodiments 9 to 11 is described, the manufacturing method is basically the same as the manufacturing method described in Embodiment 1. However, the difference lies in the fact that when manufacturing the finished tube 2 (or the second semi-finished tube 9) from the semi-finished tube (first semi-finished tube 1), the second layer 12 is cut in a manner that leaves a portion 121 remaining in the cutting process of cutting the second layer 12.

[0075] If embodiment 9 is described, the materials, thicknesses, outer diameters, etc., of the first layer 11 and the second layer 12, or the manufacturing methods thereof, are basically the same as in embodiment 1. However, when the first semi-finished tube 1 becomes the finished tube 2 (or the second semi-finished tube 9), the cutting is performed with a portion 121 of the second layer 12 remaining (see reference). Figure 7 , Figure 8 In the finished tube 2 (or the second semi-finished tube 9), in Embodiment 1, the second layer 12 is completely cut off, and the first layer 11 is cut off such that a protrusion 115 or a recess 116 is formed and the (outer) outer diameter becomes 0.25 mm. In contrast, in Embodiment 9, the second layer 12 is cut off such that a portion 121 remains (i.e., a 50 μm thickness remains above the protrusion 115). Therefore, the (outer) outer diameter of the finished tube 2 (or the second semi-finished tube 9) becomes 0.27 mm, which is greater than the outer diameter of the first layer 11 (0.25 mm). Furthermore, the protrusion 115 or the recess 116 is formed on the first layer 11.

[0076] Furthermore, Embodiment 10 is a slight modification of Embodiment 9. In Embodiment 10, the materials of the first layer 11 and the second layer 12, or the thickness of the inner layer of the first layer, are the same as in Embodiment 9, but the thickness of the second layer 12 before cutting and the thickness of a portion 121 of the second layer 12 remaining even after cutting are different. Also, the outer diameter of the finished tube 2 (or the second semi-finished tube 9) is different from that in Embodiment 9. However, it is the same as Embodiment 9 in that a portion 121 of the second layer 12 remains even after cutting.

[0077] Implementation 11 differs from Implementation 9 in the material, layer thickness, outer diameter, and the thickness of a portion 121 of the second layer 12 remaining even after cutting, as well as a portion of the outer diameter of the finished tube 2 (or the second semi-finished tube 9). (Refer to Implementation 9) Figure 8 However, it is the same as in embodiment 9 in that a portion 121 of the second layer 12 remains even after cutting.

[0078] Effects of Implementation Methods 9-11 In this way, when the finished tube 2 (or the second semi-finished tube 9) is manufactured from the semi-finished tube (first semi-finished tube 1), if the second layer 12 is cut in such a way that a portion of its 121 remains in the cutting process of cutting the second layer 12, the height of the protrusion 115 can be easily adjusted, the surface of the protrusion 115 can be formed more softly or more rigidly, or the shielding can be further improved.

[0079] Furthermore, regarding points other than those described in Embodiments 9 to 11, the configurations, methods, effects, etc., described in Embodiment 1 can also be directly applied in Embodiments 9 to 11.

[0080] Implementation methods 12-16 Embodiments 12 to 16 are basically the same as Embodiment 1, except that they are used as components of the finished tube 2 when a portion of the first layer 11 and the second layer 12 are alloyed.

[0081] Implementation Method 12 The following description uses Implementation Method 12. Figure 9 and Figure 10 All figures are used to illustrate implementation method 12. Figure 9 This diagram illustrates the method of machining after alloying. Figure 10 This diagram illustrates a method of cutting before alloying. Figure 11 These are diagrams (graphs) used to illustrate the dimensions, etc., of the semi-finished tube 1, finished tube 2, etc., involved in embodiments 12 to 16. Figure 11In this context, the metals listed as "Pg," "Ag," and "Ni" as constituent materials refer to those elements that are the main components. They are not limited to pure metals; they can also contain impurities.

[0082] Methods for machining after alloying (see...) Figure 9 ) In the method of cutting after alloying, the first step is to prepare semi-finished tube 1 (first semi-finished tube) (refer to...). Figure 9 (a)). To make the hollow part 19 (inner diameter D19, 0.200mm, see dimensions for reference). Figure 11 The wire 3 (not shown) used is made of stainless steel. The first layer 11 (2μm thick) is made of palladium and is formed by electroplating (outer diameter D1, 0.204mm). The second layer 12 (523μm thick) is made of copper and is formed by electroplating (outer diameter D3, 1.250mm). Then, a semi-finished tube 1 is made by pulling out and removing the wire 3 (not shown).

[0083] Next, place the semi-finished tube 1 into the heating furnace for heating (refer to...). Figure 9 (b)). For example, heating to 400–500°C. Thus, the first layer 11 (palladium) and the adjacent 12E (copper) of the second layer 12 undergo thermal diffusion and are alloyed (copper-palladium alloy). The closer the second layer 12 is to the first layer 11, the higher the degree of alloying; the farther away, the lower the degree of alloying. The degree of alloying can be changed by heating time or temperature.

[0084] Next, cut the semi-finished pipe 1 (refer to...) Figure 9 (c)). For example, the end (one or both ends) of the semi-finished tube 1 along its long axis is held by clamping jig 51, and cutting is performed by cutting jig 52 to a specified outer diameter D6 (0.220 mm) for the second layer 12 (copper). At this time, a protrusion can also be formed (see reference). Figure 9 (d) or recess (not shown). However, even when forming a protrusion or recess, it is still a part, and is generally cut in a manner that becomes the specified outer diameter D6 (0.220 mm). Then, the part held by the clamping jig 51 is cut off with a cutting tool (not shown). If the length of the semi-finished tube 1 is as long as 1 to 1.5 m, it is cut off by the length of the finished tube 2, which is relatively short relative to the length of the finished tube 2.

[0085] Thus, the finished pipe 2 is manufactured (refer to...) Figure 9 (d) ). The symbol 111 indicates an alloy layer (copper-palladium alloy layer) in which the first layer (palladium) and the second layer 12 (copper) are alloyed near the first layer 12E. Furthermore, when the second layer 12 (copper) is cut while leaving a layer with a relatively high degree of alloying at 8 μm, the alloy layer 200 (copper-palladium alloy layer) becomes an alloy layer in which copper (8 μm) and palladium (2 μm) are alloyed in a ratio of approximately 8:2 (for the layer thickness, outer diameter D6, etc. of the finished tube 2, please refer to...). Figure 11 (Chart).

[0086] The method of alloying after cutting (see reference) Figure 10 ) First, the method of cutting after alloying (see...) Figure 9 (a) Similarly, prepare semi-finished pipe 1 (first semi-finished pipe) (refer to Figure 10 (a)). (Make a semi-finished tube 1 with the wire 3 (not shown) pulled out and removed.)

[0087] Next, cut the semi-finished pipe 1 (refer to...) Figure 10 (b)). For example, the end (one end or both ends) of the semi-finished tube 1 along its long axis is held by the clamping jig 51, and the cutting jig 52 is used to cut the second layer 12 (copper) to a specified outer diameter D6 (0.220 mm). At this time, a protrusion (see diagram) or a recess (not shown) may also be formed. However, even when a protrusion or recess is formed, it is only a part, and is generally cut to a specified outer diameter D6 (0.220 mm).

[0088] Then, use a cutting tool (not shown) such as a cutting tool to cut off the portion held by the clamping clamp 51. If the length of the semi-finished tube 1 is 1 to 1.5 m, which is relatively short compared to the length of the finished tube 2, then cut off the portion of the finished tube 2 by the length of the finished tube 2. This forms the shape of the finished tube 2. Alternatively, instead of cutting off the part held by the clamping fixture 51, the part is left (the part other than the part held by the clamping fixture 51 takes the shape of the finished tube 2).

[0089] Next, the semi-finished tube 1 after the second layer 12 is cut is placed into the heating furnace for heating (refer to...). Figure 10 (c) Thus, the first layer 11 (palladium) and the second layer 12 (copper) near the first layer 12E undergo thermal diffusion and are alloyed to form an alloy layer 200 (copper-palladium alloy layer). When the second layer 12 (copper) is cut while leaving an 8μm thick layer, the alloy layer 200 (copper-palladium alloy layer, 10μm) becomes an alloy layer in which copper (8μm) and palladium (2μm) are generally uniformly alloyed in a ratio of approximately 8:2. Even when there are protrusions or recesses in a portion, the alloy layer as a whole includes that portion and is generally uniformly alloyed.

[0090] Furthermore, when the portion of the semi-finished tube 1 held by the clamping fixture 51 is cut off and shaped into the finished tube 2, it directly becomes the finished tube 2 with the alloy layer 200 (see reference). Figure 10 (d)). On the other hand, if the portion of the semi-finished tube 1 held by the clamping fixture 51 is left uncut, then cutting off this portion results in a finished tube 2 with an alloy layer 200 (for details regarding the layer thickness, outer diameter D6, etc. of the finished tube 2, please refer to...). Figure 11 (See the diagram). Symbol 215 indicates the convex portion when it has already been formed.

[0091] In addition, it is also possible to Figure 9 (a) The tube shown is Figure 9 (d) shows the pipes between the pipes (e.g., Figure 9 (b) or Figure 9 (c) shows the pipe as the semi-finished pipe 1, which is the object of the transaction. Moreover, it can also be Figure 10 (a) The tube shown is Figure 10 (d) shows the pipes between the pipes (e.g., Figure 10 (b) or Figure 10 (c) shows the pipe as the semi-finished pipe 1, which is the object of the transaction.

[0092] Implementation Method 13 Implementation method 13 is basically the same as implementation method 12, except that the first layer 11 of the semi-finished tube 1 is used as the first inner layer 11A (silver) and the first outer layer 11B (palladium), the second layer 12 is used as copper, and the alloy layer of the finished tube 2 is used as a copper-silver-palladium alloy layer (see reference). Figure 11 ).

[0093] In other words, on the outside of the wire 3, a first inner layer 11A (silver, 1μm), a first outer layer 11B (palladium, 1μm), and a second layer 12 (copper, 523μm) are formed by electroplating. Then, a semi-finished tube 1 is made by pulling out and removing the wire 3 (not shown). By heating the semi-finished tube 1, the first inner layer 11A (silver), the first outer layer 11B (palladium), and the second layer 12 (copper) are alloyed to produce a finished tube 2 with an alloy layer (10μm, copper-silver-palladium alloy, copper:silver:palladium ratio of approximately 8:1:1). (For details regarding the layer thickness, outer diameter D6, etc. of the finished tube 2, please refer to...) Figure 11 (Chart).

[0094] Implementation Method 14 Implementation method 14 is basically the same as implementation method 12, but differs in that the semi-finished tube 1 is constructed from the inside out as a laminated structure of a third layer (gold-cobalt alloy layer, not shown), an intermediate layer (nickel layer, not shown), a first layer 11 (palladium layer), and a second layer 12 (copper layer), while the finished tube 2 is constructed as a laminated structure of a third layer (gold-cobalt alloy layer), an intermediate layer (nickel layer), and an alloy layer (copper-palladium alloy layer) (see reference). Figure 11 ). Furthermore, the third layer and the intermediate layer are layers formed inside the first layer 11. Although they are not the first layer 11, for convenience, they are referred to as such. Figure 11 It is recorded in column 11 of the first layer.

[0095] In other words, a third layer (gold-cobalt alloy layer, 1μm), an intermediate layer (nickel layer, 1μm), a first layer 11 (palladium layer, 2μm) and a second layer 12 (copper layer, 188.5μm) are formed on the outside of the wire 3 by electroplating. Then, a semi-finished tube 1 is made by pulling out and removing the wire 3 (not shown). By heating the semi-finished tube 1, the first layer 11 (palladium layer) and the second layer 12 (copper layer) are alloyed to produce a finished tube 2 with a multilayer structure consisting of a third layer (gold-cobalt alloy layer, 1μm), an intermediate layer (nickel layer, 1μm), and an alloy layer (copper-palladium alloy layer, 10.5μm, copper:palladium ratio approximately 8.5:2). (For details regarding the layer thickness, outer diameter D6, etc. of the finished tube 2, please refer to...) Figure 11 (Chart). Furthermore, as mentioned above, since the thermal conductivity of nickel is less than that of palladium, when alloying the metal of the first layer with the metal of the second layer, it is possible to prevent the metal of the third layer from being alloyed as well.

[0096] Implementation Method 15 Implementation method 15 is basically the same as implementation method 12, but differs in that the semi-finished tube 1 is constructed from the inside out as a laminated structure consisting of a third layer (gold-cobalt alloy layer, not shown), an intermediate layer (nickel layer, not shown), a first inner layer 11A (silver layer), a first outer layer 11B (palladium layer), and a second layer 12 (copper layer), while the finished tube 2 is constructed as a laminated structure consisting of a third layer (gold-cobalt alloy layer), an intermediate layer (nickel layer), and an alloy layer (copper-silver-palladium alloy layer) (see reference). Figure 11 ).

[0097] In other words, the outer side of the wire 3 is formed by electroplating to form a third layer (gold-cobalt alloy layer, 1μm), an intermediate layer (nickel layer, 1μm), a first inner layer 11A (silver layer, 3μm), a first outer layer 11B (palladium layer, 3μm), and a second layer 12 (copper layer, 202μm). Then, a semi-finished tube 1 is made by pulling out and removing the wire 3 (not shown). By heating the semi-finished tube 1, the first inner layer 11A (silver layer) and the first outer layer 11B (palladium layer) are alloyed with the second layer 12 (copper layer), thus manufacturing a finished tube 2 with a laminated structure having a third layer (gold-cobalt alloy layer, 1μm), an intermediate layer (nickel layer, 1μm), and an alloy layer (copper-silver-palladium alloy layer, 18μm, copper:silver:palladium ratio of approximately 12:3:3). (For details regarding the layer thickness, outer diameter D6, etc. of the finished tube 2, please refer to...) Figure 11 (Chart). Furthermore, as mentioned above, since the thermal conductivity of nickel is less than that of silver (or silver and palladium), when alloying the metal of the first layer with the metal of the second layer, it is possible to prevent the metal of the third layer from being alloyed as well.

[0098] Implementation Method 16 Implementation method 16 is basically the same as implementation method 12, but differs in that the semi-finished tube 1 is constructed from the inside out as a laminated structure of a third layer (gold-nickel alloy layer, not shown), an intermediate layer (nickel layer, not shown), a first layer 11 (palladium layer), and a second layer 12 (copper layer), while the finished tube 2 is constructed as a laminated structure of a third layer (gold-nickel alloy layer), an intermediate layer (nickel layer), and an alloy layer (copper-palladium alloy layer) (see reference). Figure 11 ).

[0099] In other words, a third layer (gold-nickel alloy layer, 2μm), an intermediate layer (nickel layer, 1μm), a first layer 11 (palladium layer, 3μm) and a second layer 12 (copper layer, 254μm) are formed on the outside of the wire 3 by electroplating. Then, a semi-finished tube 1 is made after the wire 3 (not shown) has been pulled out and removed. By heating the semi-finished tube 1, the first layer 11 (palladium layer) and the second layer 12 (copper layer) are alloyed to produce a finished tube 2 with a multilayer structure consisting of a third layer (gold-nickel alloy layer, 2μm), an intermediate layer (nickel layer, 1μm), and an alloy layer (copper-palladium alloy layer, 7μm, copper:palladium ratio approximately 4:3). (For details regarding the layer thickness, outer diameter D6, etc. of the finished tube 2, please refer to...) Figure 11 (Chart). Furthermore, as mentioned above, since the thermal conductivity of nickel is less than that of palladium, when alloying the metal of the first layer with the metal of the second layer, it is possible to prevent the metal of the third layer from being alloyed as well.

[0100] In the above embodiments 12 to 16, although copper (Cu) is used in the second layer 12, iron (Fe) can also be used to replace copper (Cu). If iron is used instead of copper, then Figure 11In Embodiment 12, the second layer 12 is made of iron, and the alloy of the finished tube 2 is an iron-palladium alloy. In Embodiment 13, the second layer 12 is made of iron, and the alloy of the finished tube 2 is an iron-silver-palladium alloy. In Embodiment 14, the second layer 12 is made of iron, and the alloy (outer layer) of the finished tube 2 is an iron-palladium alloy. In Embodiment 15, the second layer 12 is made of iron, and the alloy (outer layer) of the finished tube 2 is an iron-silver-palladium alloy. In Embodiment 16, the second layer 12 is made of iron, and the alloy (outer layer) of the finished tube 2 is an iron-palladium alloy. Figure 11 The other points shown (composing materials, dimensions, etc.) do not change.

[0101] Summary of Implementation Methods 12-16 (Structure, Method) The structure and method of the above-described embodiments 12 to 16 are summarized as follows. In the semi-finished product tube 1 (first semi-finished product tube), the first layer 11 and the second layer 12 (a part of the second layer 12, near the first layer 12E) can be configured such that, if the semi-finished product tube 1 is heated, it is composed of metal alloyed from the first layer 11 and the second layer 12 (near the first layer 12E of the second layer 12) (see reference). Figures 9-11 ).

[0102] The preferred semi-finished tube 1 (first semi-finished tube) has a first layer 11 made of palladium or silver, and a second layer 12 made of copper or iron (see reference). Figure 11 ). Examples of combinations of the first / second layer 12 (comprising materials) include palladium / copper, palladium / iron, silver / copper, silver / iron, silver-palladium / copper, and silver-palladium / iron. Furthermore, "palladium," "silver," "copper," or "iron" refers to metals whose main components are these elements. They are not limited to pure metals; they can also contain impurities.

[0103] Such a semi-finished tube 1 can also be configured to include: a third layer of metal formed on the inner side of the first layer 11; and an intermediate layer formed between the first layer 11 and the third layer, the intermediate layer serving as a layer to prevent the metal of the third layer from alloying with the metal of the first layer 11 and the second layer 12 due to heating. Furthermore, the third layer is preferably a layer with a thermal conductivity lower than that of the first layer (more preferably the first layer 11 and the third layer, and even more preferably the first layer 11, the second layer 12, and the third layer). Moreover, a rare metal can be used to form the intermediate layer. Furthermore, a rare metal can be used to form the third layer. An alloy can also be used to form the third layer.

[0104] Nickel can be used to form such an intermediate layer (composed of nickel). The thermal conductivity (W / mK) of nickel (99.2%) at 1 atm and 20°C is 59. This is lower than that of silver (418) and palladium (70).

[0105] In such a semi-finished pipe 1, for example Figure 9 As shown in (b) the semi-finished tube 1, it can also be configured such that the first layer 11 is made of alloy, and the second layer 12 has a lower degree of alloying as it moves outward.

[0106] In the above-described (e.g., 8) method for manufacturing a semi-finished tube, in the steps of forming the first layer 11 and forming the second layer 12, the semi-finished tube can also be manufactured in such a way that if the semi-finished tube 1 is heated, the first layer 11 and the second layer 12 are formed from the metal alloyed near the first layer (12E) of the first layer 11 and the second layer 12 (see reference). Figure 9 , Figure 10 wait).

[0107] As a tube manufacturing method that uses a lathe to manufacture finished tubes from semi-finished tubes, such as using Figure 10 As described above, it may also include: a process of preparing the semi-finished tube 1 as described above (e.g., any one of 15 to 18); a holding process of holding the semi-finished tube 1 from the outside of the second layer 12; a cutting process of cutting the second layer 12 by cutting from the outside of the second layer 12 so that a portion of it remains; and an alloying process of heating the semi-finished tube 1 to alloy the first layer 11 and the remaining second layer 12 (121).

[0108] Furthermore, as a pipe manufacturing method that uses a lathe to manufacture finished pipes from semi-finished pipes, such as using... Figure 9 As described above, it may also include: a process of preparing the semi-finished tube 1 as described above (e.g., any one of 15 to 18); an alloying process of heating the semi-finished tube 1 to alloy the first layer 11 and the first layer 12 near the first layer 12E; a holding process of holding the semi-finished tube 1 from the outside of the second layer 12; and a cutting process of cutting the second layer 12 to the first layer near the first layer 12E by cutting from the outside of the second layer 12.

[0109] Effects of Implementation Methods 12-16 As described in embodiments 12-16, in the semi-finished tube 1 (first semi-finished tube), if the first layer 11 and the second layer 12 (a portion of the second layer 12, the first layer's vicinity 12E) are composed of metals that alloy the first layer 11 and the first layer's vicinity 12E when the semi-finished tube 1 is heated, then the first layer 11 is easily alloyed due to heating and can become hard. Moreover, the vicinity of the first layer of the second layer 12 can also become hard due to alloying. On the other hand, since the outer side of the second layer 12 is not alloyed, or the degree of alloying is low, it is easy to cut.

[0110] If the first layer 11 of the semi-finished tube 1 (first semi-finished tube) is made of palladium or silver and the second layer 12 is made of copper or iron, alloying is easy.

[0111] In such a semi-finished tube 1, there is also a third layer of metal formed on the inner side of the first layer 11; and an intermediate layer formed between the first layer 11 and the third layer. If the intermediate layer is configured to prevent the metal of the third layer from alloying with the metal of the first layer 11 and the second layer 12 due to heating, then when the metal of the first layer 11 and the metal of the second layer 12 are alloyed, the metal of the third layer can be prevented from being alloyed together with them.

[0112] Furthermore, if the intermediate layer is made of nickel (comprising nickel), since nickel has relatively low thermal conductivity among metals, even if various metals with higher thermal conductivity than nickel are used as the third layer, it is possible to prevent the third layer metal from alloying with the first layer 11 (or the first layer 11 and the second layer 12) metals due to heating. Moreover, nickel is readily available. Furthermore, layers can be easily formed through electroplating or the like.

[0113] In the semi-finished tube 1, if the first layer 11 is made of an alloy, the second layer 12 is configured such that the degree of alloying decreases as it moves outward (see reference). Figure 9 (b) can harden the first layer 11. Moreover, since the second layer 12 is softer towards the outer direction (the direction that does not require fine cutting), it is easier to cut. On the other hand, since it is harder towards the opposite direction (towards the first layer, the direction that requires fine cutting), cutting errors can be suppressed.

[0114] In the above-described (e.g., 8) semi-finished tube manufacturing method, in the process of forming the first layer 11 and the process of forming the second layer 12, if the first layer 11 and the second layer 12 are made of metals that are alloyed near the first layer (12E) when the semi-finished tube 1 is heated, then alloying can be easily performed by heating the semi-finished tube 1.

[0115] A tube manufacturing method for producing a finished tube from a semi-finished tube using a lathe, comprising: a step of preparing a semi-finished tube 1 as described above (e.g., any one of 15 to 18); a holding step of holding the semi-finished tube 1 from the outside of the second layer 12; a cutting step of cutting the second layer 12 from the outside of the second layer 12 so that a portion of it remains; and an alloying step of heating the semi-finished tube 1 to alloy the first layer 11 and the remaining second layer 12 (121) (see reference). Figure 10 In the cutting process, since the second layer 12 is cut in a soft state before being alloyed, the cutting process is easy. Moreover, in the alloying process, the first layer 11 and the remaining second layer 12 (121) can be easily made into a homogeneous alloy. Furthermore, by alloying, it is possible to make the metal harder than the first layer 11 and the second layer 12, and the layer thickness (wall thickness) of the finished tube 2 can be reduced. In addition, the outer diameter D6 of the tube can also be reduced.

[0116] Furthermore, the tube manufacturing method for producing a finished tube from a semi-finished tube using a lathe may include: a process of preparing the semi-finished tube 1 as described above (e.g., any one of 15 to 18); an alloying process of heating the semi-finished tube 1 to alloy the first layer 11 and the first layer 12 near the first layer 12E; a holding process of holding the semi-finished tube 1 from the outside of the second layer 12; and a cutting process of cutting the second layer 12 to the first layer near the first layer 12E by cutting from the outside of the second layer 12 (see [reference]). Figure 9 In the cutting process, the outer side of the second layer 12 is softer, making cutting easier. On the other hand, the opposite direction (towards the first layer 11, where fine cutting is required) is harder, thus suppressing cutting errors on the outer periphery of the finished tube 2. Furthermore, by alloying, it is possible to make the metal harder than the first layer 11 and the second layer 12, and the layer thickness (wall thickness) of the finished tube 2 can be reduced. In addition, the outer diameter D6 of the tube can also be reduced.

[0117] Furthermore, regarding points other than those described in Embodiments 12 to 16, the configurations, methods, effects, etc., described in Embodiments 1 or 12 to 16 can also be directly applied to Embodiments 1 or 2 to 11.

[0118] Variations While the present invention has been described above based on the embodiments described, the present invention is not limited to the embodiments described above. Modifications can be made without departing from its spirit, for example, the following variations can be made.

[0119] (1) In the above-described embodiment 1, although a concave portion 116 is formed by cutting a wider area of ​​the exposed surface 113 of the first layer 11 and a convex portion 115 is formed in the narrower area left, the proportion, shape, and formation method of the concave portion 116 or the convex portion 115 are not limited thereto. Figure 12 This is a diagram used to illustrate an example of cutting deformation in the first layer 11. For example... Figure 12 As shown, a narrower region of a portion of the exposed surface 113 of the first layer 11 can also be cut to form a recess 116, such that the proportion of the region occupied by the convex portion 115 is greater than the proportion of the region occupied by the recess 116. (In Figure 12 In the diagram, the dashed line 111 represents the first surface before cutting, and the solid line 112 represents the surface after cutting. Alternatively, the areas of the convex portion 115 and the concave portion 116 can each occupy half the area. In this way, the ratio of the areas of the convex portion 115 and the concave portion 116 can be arbitrary. Thus, for example, if the first outer layer 11B becomes hard or its machinability is not necessarily good, the amount or area of ​​cutting the first outer layer 11B can be reduced, thereby improving cutting efficiency. Furthermore, the number or shape of the recesses 116 or the protrusions 115 can be arbitrary. Moreover, instead of being vertical, the stepped portion between the protrusions 115 and the recesses 116 can also be inclined.

[0120] (2) In the above-described embodiment 1, although the first layer 11 is composed of the first inner layer 11A and the first outer layer 11B, and the second layer 12 is composed of a single layer, the composition of the first layer 11 and the second layer 12 is not limited to this composition. For example, the following modifications can be made: the first layer 11 and the second layer 12 can be made into a single layer, or the first layer 11 can be made into a single layer and the second layer 12 can be made into multiple layers (the number of layers is arbitrary), or the first layer 11 can be made into multiple layers (the number of layers is arbitrary) and the second layer 12 can be made into a single layer, or both the first layer 11 and the second layer 12 can be made into multiple layers (the number of layers for each layer is arbitrary).

[0121] Figure 13 This is a diagram illustrating a variation in the construction of the first layer 11 or the second layer 12 of the semi-finished pipe 1. For example, as shown... Figure 13 As shown in (a), the first layer 11 can also be constructed as a single layer. This simplifies the construction of the first layer 11, making the formation of the first layer 11 or the manufacture of the semi-finished tube 1 easier. Moreover, such as Figure 13As shown in (b), the first layer 11 can also be composed of three layers, such as the first inner layer 11A, the first outer layer 11B, and the first intermediate layer 11C between the first inner layer 11A and the first outer layer 11B. Thus, for example, if the adhesion between the first inner layer 11A and the first outer layer 11B is poor, the adhesion can be improved by using the first intermediate layer 11C. Moreover, such as Figure 13 As shown in (c), the second layer 12 can be constructed from two or more layers, just like the second inner layer 12A and the second outer layer 12B. Thus, for example, when it is desired to form a harder layer for gripping purposes, the second outer layer 12B of the single-layer second layer 12 is easily hardened, and when it is desired to form a softer layer for cutting purposes, the second inner layer 12A of the single-layer second layer 12 is easily softened, and so on.

[0122] (3) In embodiments 1 to 16 described above, although stainless steel wire is used as wire 3 (core wire), wire 3 is not limited to stainless steel wire. For example, instead of stainless steel wire, nichrome wire or iron-chromium wire can also be used as wire 3. Nickel-chromium alloy wire is made from an alloy primarily composed of nickel and chromium (nickel-chromium alloy) and formed into wire. It may sometimes contain small amounts of manganese, iron, carbon, silicon, etc. Iron-chromium wire is made from iron with added chromium and aluminum and formed into wire. For example, iron-chromium wire is sold under the name Kanthal (a registered trademark).

[0123] (4) Although some parts are repeated from the description so far, in the above embodiments 1 to 16, the semi-finished tube 1 (first semi-finished tube 1, second semi-finished tube 9) or the finished tube 2 may not have a protrusion (115, 215) or a recess (116). That is, it may have only a protrusion, or only a recess, or both a protrusion and a recess, or neither a protrusion nor a recess (see Figure 4 , Figure 6 , Figure 8 , Figure 11 wait).

Claims

1. A method for manufacturing a pipe, comprising using a lathe to manufacture a finished pipe from a semi-finished pipe, characterized in that, The process includes: preparing a semi-finished tube, wherein the semi-finished tube is a semi-finished tube intended to become the finished tube by cutting on the lathe, the semi-finished tube comprising: a first layer for forming the finished tube even after cutting on the lathe; and a second layer formed outside the first layer for serving as a virtual object to be cut on the lathe, the first layer and the second layer being composed of metal alloyed near the first layer of the first layer and the second layer when the semi-finished tube is heated; The process of holding the semi-finished tube from the outside of the second layer; A cutting process that cuts the second layer by cutting from the outside of the second layer in such a way that a portion of it remains; The alloying process involves heating the semi-finished tube to alloy the first layer and the remaining second layer.

2. The tube manufacturing method according to claim 1, characterized in that, In the process of preparing the semi-finished tube, the semi-finished tube further includes: a third layer of metal formed inside the first layer; and an intermediate layer formed between the first layer and the third layer, the intermediate layer being a layer that prevents the metal of the third layer from alloying with the metal of the first layer and the second layer due to heating.

3. A method for manufacturing a pipe, comprising using a lathe to manufacture a finished pipe from a semi-finished pipe, characterized in that, The process includes: preparing a semi-finished tube, wherein the semi-finished tube is a semi-finished tube intended to become the finished tube by cutting on the lathe, the semi-finished tube comprising: a first layer for forming the finished tube even after cutting on the lathe; and a second layer formed outside the first layer for serving as a virtual object to be cut on the lathe, the first layer and the second layer being composed of metal alloyed near the first layer of the first layer and the second layer when the semi-finished tube is heated; An alloying process in which the first layer and the vicinity of the first layer of the second layer are alloyed by heating the semi-finished tube; The process of holding the semi-finished tube from the outside of the second layer; And a cutting process that involves cutting the second layer to a depth near the first layer by cutting from the outside of the second layer.

4. The tube manufacturing method according to claim 3, characterized in that, In the process of preparing the semi-finished tube, the semi-finished tube further includes: a third layer of metal formed inside the first layer; and an intermediate layer formed between the first layer and the third layer, the intermediate layer being a layer that prevents the metal of the third layer from alloying with the metal of the first layer and the second layer due to heating.

Citation Information

Patent Citations

  • Jig for lathe, method of manufacturing for cylindrical base body, and cylindrical base body

    JP2001162404A

  • Member for lathe machining

    CN102105246A

  • Glow plug and method of manufacturing the same

    JP2019116981A