A control method and monitoring system based on a planned curve

By receiving and analyzing the planned curves and feedback information in real time through the monitoring system, the control rate and target value are dynamically adjusted, which solves the problem of delayed adjustment of the planned curve and improves the real-time performance and reliability of power grid dispatch.

CN116846068BActive Publication Date: 2026-07-03NR ELECTRIC CO LTD +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
NR ELECTRIC CO LTD
Filing Date
2023-06-20
Publication Date
2026-07-03

Smart Images

  • Figure HDA0004299211850000011
    Figure HDA0004299211850000011
  • Figure HDA0004299211850000021
    Figure HDA0004299211850000021
  • Figure HDA0004299211850000031
    Figure HDA0004299211850000031
Patent Text Reader

Abstract

This invention discloses a control method and monitoring system based on a planned curve. The method includes: the monitoring system periodically issuing control commands to the controlled system based on the planned curve; the monitoring system receiving and collecting feedback from the controlled system in real time of the control rate, control target value, and actual electrical quantity values; the monitoring system monitoring in real time whether the planned curve is updated and whether the automatic control mode is engaged; in response to the planned curve update or the engagement of the automatic control mode, calculating the remaining adjustment time window and determining whether it is permissible to issue a temporary control command; in response to the permission to issue a temporary control command, determining whether there is an expected adjustment deviation; and in response to the existence of the expected adjustment deviation, determining the temporary control command and issuing it to the controlled system. This invention achieves immediate response of the control system after the planned curve is updated, automatic following after the planned curve is engaged, and post-adjustment of deviations in the control process, thereby improving the real-time performance and reliability of the planned curve control system's adjustment response.