A construction site safety management system combined with BIM
By combining BIM's construction site safety management system, the problems of data quality and real-time consistency of models are solved, and more accurate and efficient construction site safety management is achieved.
Patent Information
- Application Number
- CN202311043350.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-18
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2043-08-18
AI Technical Summary
Existing BIM models lead to inaccuracy in construction site safety management when data quality is low or lack of accuracy, and it is difficult to ensure real-time and consistency of models in collaboration with multiple personnel and teams.
A construction site safety management system combining BIM is designed, including data integration subsystem, BIM model construction subsystem, security detection subsystem and management subsystem, through data collection, standardized processing, redundant processing, model update and collaboration mechanism , ensure data quality and model real-time.
Improves data quality and model real-time and consistency, ensuring the accuracy and effectiveness of construction site safety management, especially in multiple personnel and team collaboration environments.
Smart Images

Figure CN117036107B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of safety management, and in particular relates to a construction site safety management system combined with BIM. Background Art
[0002] The BIM model integrates data from the design, construction, and maintenance stages, and can provide comprehensive views and information, enabling all relevant parties to collaboratively manage and view data and information on construction site safety management on a single platform. The BIM model can present safety management data in a visual way, such as charts, graphs, dashboards, etc., converting abstract data into intuitive images, which helps to understand and analyze the safety situation of the construction site and improve the accuracy of decision-making. The BIM model has the functions of conflict detection and collision warning, which can identify existing safety conflicts and potential risks before construction, take corresponding preventive measures in a timely manner, and reduce the occurrence of accidents and unexpected events.
[0003] However, the current use of BIM models is based on accurate and complete data. If the data quality is not high or lacks accuracy, it may lead to inaccurate safety plans and conflict analysis. Therefore, ensuring data quality and accuracy is key, and effective data collection and verification are required. At the same time, the construction site is a dynamic environment, and the BIM model needs to be updated in a timely manner to reflect the actual situation. However, there may be difficulties in managing model versions and updates, especially when collaborating between multiple people and teams. Ensuring the timeliness and consistency of the model may require the establishment of an effective version control and collaboration mechanism. Summary of the invention
[0004] The purpose of the present invention is to provide a construction site safety management system combined with BIM to solve the problems existing in the above-mentioned prior art.
[0005] To achieve the above object, the present invention provides a construction site safety management system combined with BIM, comprising:
[0006] The data integration subsystem is used to collect and integrate data from the construction site to obtain integrated data;
[0007] A BIM model construction subsystem is connected to the data integration subsystem and is used to construct a BIM model, integrate the integration data into the BIM model for construction, and obtain an on-site BIM model;
[0008] A safety detection subsystem is connected to the BIM model building subsystem and is used to create a visual safety plan through the BIM model, perform safety detection based on the visual safety plan, and obtain detection results;
[0009] The management subsystem is connected to the safety detection subsystem and is used to manage the safety of the construction site based on the detection results.
[0010] Preferably, the data integration subsystem includes:
[0011] Data collection module, used to collect data on design, construction, maintenance and safety management;
[0012] A data calculation module, used to perform redundant data calculation on the design, construction, maintenance and safety management data to obtain calculation data;
[0013] The integration module is used to integrate the calculated data to obtain the integrated data.
[0014] Preferably, the data calculation module includes:
[0015] A data classification unit, used to classify and standardize the design, construction, maintenance and safety management data to obtain consistent data;
[0016] A data conversion unit, used for converting the format of the consistency data to obtain converted data;
[0017] The redundant data processing unit is used to perform redundant data processing on the converted data to obtain the calculated data.
[0018] Preferably, the BIM model building subsystem includes:
[0019] Model building module, used to build BIM models;
[0020] A data import module, used for importing the integrated data into the BIM model to obtain an integrated model;
[0021] The detection module is used to detect the integrated model based on the on-site conditions to obtain the on-site BIM model.
[0022] Preferably, the data import module includes:
[0023] A data association unit, used for setting attributes and parameters of the integrated data to obtain set data;
[0024] An importing unit, used for inputting the set data into the BIM model to obtain the integrated model;
[0025] The data updating unit is used to update the set data and integrate the updated data into the integrated model.
[0026] Preferably, the safety detection subsystem includes:
[0027] Data visualization module, used to visualize data;
[0028] A plan building module, used to build the visual safety plan through the on-site BIM model;
[0029] The detection module is used to perform safety detection on the construction site based on the visual safety plan to obtain the detection result.
[0030] Preferably, the data visualization module comprises:
[0031] A chart making unit, used for making charts of the data in the BIM model to obtain chart visualization data;
[0032] The heat map making unit is used to make a risk heat map of the data in the BIM model to obtain heat map visualization data.
[0033] Preferably, the plan establishment module includes:
[0034] A rendering unit, used to add safety information to the BIM model, render the construction site safety through the BIM model, and obtain a rendering result;
[0035] A safety plan creation unit is used to plan the safety situation through the rendering results and the visualization data to obtain the visualization safety plan.
[0036] Preferably, the management subsystem includes:
[0037] Simulation training module, used for safety training and simulation of construction sites through visual safety plans; data recording module, used for recording and analyzing safety data on construction sites through BIM models
[0038] The early warning module is used to combine the BIM model and sensors deployed on site to conduct real-time monitoring and early warning of the construction site.
[0039] Preferably, the integrated data includes: building design, building materials, equipment information, construction progress, number of workers, pipelines, and electrical systems.
[0040] The technical effects of the present invention are:
[0041] The present invention makes the data more complete and improves the data quality by standardizing and redundancy processing of the data. In addition, the present invention can update the data in the BIM model in a timely manner to reflect the actual situation on the construction site by processing the data in a unified manner, especially when multiple personnel and teams collaborate, so as to ensure the real-time and consistency of the model. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0043] Figure 1 Schematic diagram of a security management system in an embodiment of the present invention. DETAILED DESCRIPTION
[0044] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0045] Embodiment 1
[0046] like Figure 1 As shown, this embodiment provides a construction site safety management system combined with BIM, including:
[0047] The data integration subsystem is used to collect and integrate data from the construction site to obtain integrated data. First, it is necessary to collect data related to construction site safety management. This includes design documents, construction plans, safety specifications and standards, inspection records, accident reports, etc. The data can come from different sources, such as engineering teams, safety experts, supervisors, and contractors.
[0048] A BIM model construction subsystem is connected to the data integration subsystem and is used to construct a BIM model, integrate the integration data into the BIM model for construction, and obtain an on-site BIM model;
[0049] A safety detection subsystem is connected to the BIM model building subsystem and is used to create a visual safety plan through the BIM model, perform safety detection based on the visual safety plan, and obtain detection results;
[0050] The management subsystem is connected to the safety detection subsystem and is used to manage the safety of the construction site based on the detection results.
[0051] Further optimizing the scheme, the data integration subsystem includes:
[0052] Data collection module, used to collect data on design, construction, maintenance and safety management;
[0053] A data calculation module, used to perform redundant data calculation on the design, construction, maintenance and safety management data to obtain calculation data;
[0054] The integration module is used to integrate the calculated data to obtain the integrated data.
[0055] Convert the collected data into a format that can be recognized by BIM. This can be done through various methods, such as manually entering data, importing into Excel tables, or using data conversion tools. The data should be organized and collated according to the attributes and formats required by the BIM model.
[0056] Further optimizing the scheme, the data calculation module includes:
[0057] A data classification unit, used to classify and standardize the design, construction, maintenance and safety management data to obtain consistent data;
[0058] A data conversion unit, used for converting the format of the consistency data to obtain converted data;
[0059] The redundant data processing unit is used to perform redundant data processing on the converted data to obtain the calculated data.
[0060] Further optimizing the scheme, the BIM model building subsystem includes:
[0061] Model building module, used to build BIM models;
[0062] A data import module, used for importing the integrated data into the BIM model to obtain an integrated model;
[0063] The detection module is used to detect the integrated model based on the on-site conditions to obtain the on-site BIM model.
[0064] Further optimizing the scheme, the data import module includes:
[0065] A data association unit, used for setting attributes and parameters of the integrated data to obtain set data;
[0066] Associate the collected data with the elements in the BIM model. This can be done by setting properties, parameters or tags in the BIM software. Make sure each element is associated with the corresponding data so that relevant information and data can be obtained in the BIM model.
[0067] An importing unit, used for inputting the set data into the BIM model to obtain the integrated model;
[0068] The data updating unit is used to update the set data and integrate the updated data into the integrated model.
[0069] During the construction process, as data is updated and changed, new data needs to be integrated into the BIM model in a timely manner. This can be achieved by updating the attributes, parameters or tags of the model. At the same time, ensure that the data is effectively managed, including backup, version control and permission management.
[0070] Further optimizing the scheme, the safety detection subsystem includes:
[0071] Data visualization module, used to visualize data;
[0072] By using the visualization function of BIM software, the integrated data can be presented in the model in the form of charts, graphs or symbols. This helps to intuitively display the safety data of the construction site and provide decision support and monitoring analysis.
[0073] A plan building module, used to build the visual safety plan through the on-site BIM model;
[0074] The detection module is used to perform safety detection on the construction site based on the visual safety plan to obtain the detection result.
[0075] Further optimizing the scheme, the data visualization module includes:
[0076] A chart making unit, used for making charts of the data in the BIM model to obtain chart visualization data;
[0077] The heat map making unit is used to make a risk heat map of the data in the BIM model to obtain heat map visualization data.
[0078] To further optimize the scheme, the plan establishment module includes:
[0079] A rendering unit, used to add safety information to the BIM model, render the construction site safety through the BIM model, and obtain a rendering result;
[0080] A safety plan creation unit is used to plan the safety situation through the rendering results and the visualization data to obtain the visualization safety plan.
[0081] Further optimizing the solution, the management subsystem includes:
[0082] Simulation training module for safety training and simulation of construction sites through visual safety plans;
[0083] Simulation and training based on BIM models can create virtual scenes, simulate safety conditions on construction sites, and allow workers to conduct actual drills and training in virtual environments, cultivate safety awareness and emergency response capabilities, and reduce the occurrence of safety accidents.
[0084] Data logging module for recording and analyzing safety data on construction sites through BIM models
[0085] The early warning module is used to combine the BIM model and on-site sensor deployment to achieve real-time monitoring and early warning of the construction site.
[0086] Combining sensor deployment and BIM models, the safety of the construction site can be monitored in real time, various safety indicators and data can be collected, and real-time analysis can be performed. This helps to identify risks and problems in a timely manner, take preventive and improvement measures, and improve the safety performance of the construction site.
[0087] To further optimize the solution, the integrated data includes: building design, building materials, equipment information, construction progress, number of workers, pipelines, and electrical systems.
[0088] The above is only a preferred specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A construction site safety management system combined with BIM, characterized in that: include: The data integration subsystem is used to collect and integrate data from the construction site to obtain integrated data; A BIM model construction subsystem is connected to the data integration subsystem and is used to construct a BIM model, integrate the integration data into the BIM model for construction, and obtain an on-site BIM model; A safety detection subsystem is connected to the BIM model building subsystem and is used to create a visual safety plan through the BIM model, perform safety detection based on the visual safety plan, and obtain detection results; A management subsystem, connected to the safety detection subsystem, for managing the safety of the construction site based on the detection results; The BIM model construction subsystem includes: Model building module, used to build BIM models; A data import module, used for importing the integrated data into the BIM model to obtain an integrated model; A detection module, used to detect the integrated model based on the on-site conditions to obtain the on-site BIM model; The data import module includes: A data association unit, used for setting attributes and parameters of the integrated data to obtain set data; An importing unit, used for inputting the set data into the BIM model to obtain the integrated model; A data updating unit, used for updating the set data and integrating the updated data into the integrated model; The safety detection subsystem comprises: Data visualization module, used to visualize data; A plan building module, used to build the visual safety plan through the on-site BIM model; A detection module, used to perform safety detection on the construction site based on the visual safety plan to obtain the detection result; The data visualization module includes: A chart making unit, used for making charts of the data in the BIM model to obtain chart visualization data; A heat map making unit is used to make a risk heat map of the data in the BIM model to obtain heat map visualization data; The plan building module includes: A rendering unit, used to add safety information to the BIM model, render the construction site safety through the BIM model, and obtain a rendering result; A safety plan creation unit, used to plan the safety situation through the rendering results and the visualization data to obtain the visualization safety plan; The data integration subsystem includes: Data collection module, used to collect data on design, construction, maintenance and safety management; A data calculation module, used to perform redundant data calculation on the design, construction, maintenance and safety management data to obtain calculation data; An integration module, used for integrating the calculated data to obtain the integrated data; The data calculation module includes: A data classification unit, used to classify and standardize the design, construction, maintenance and safety management data to obtain consistent data; A data conversion unit, used for converting the format of the consistency data to obtain converted data; A redundant data processing unit, used for performing redundant data processing on the converted data to obtain the calculated data; The management subsystem includes: Simulation training module for safety training and simulation of construction sites through visual safety plans; Data recording module, used to record and analyze safety data of construction sites through BIM models; The early warning module is used to combine the BIM model with sensors deployed on site to conduct real-time monitoring and early warning of the construction site; The integrated data includes: building design, building materials, equipment information, construction progress, number of workers, pipelines, and electrical systems.
