A grid-based precise dredging method

Through the gridded precision dredging method, satellite positioning and sludge hoods are used to form an independent space at the bottom of the water body for disturbance and suction, which solves the problems of low accuracy and water pollution of traditional dredging methods, and achieves efficient silt cleaning and Water protection.

CN117144845BActive Publication Date: 2024-10-29CHINESE RES ACAD OF ENVIRONMENTAL SCI +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311365061.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-10-20
Publication Date
2024-10-29
Estimated Expiration
2043-10-20

AI Technical Summary

Technical Problem

Traditional underwater dredging methods have problems such as low accuracy, large project volume, high cost and water pollution. In particular, it is difficult to effectively clean organic sludge with a thickness of more than 50cm in urban rivers and lakes.

Method used

The grid-based precision dredging method is used to divide the dredging grid through satellite positioning. The dredging cover is used to form an independent space at the bottom of the water body for disturbance and suction. It is combined with a stirrer or jet fluid to disturb and suction the silt, and the conditioning is carried out directly. and dehydration treatment to avoid the use of sedimentation tanks.

Benefits of technology

It achieves the accuracy and efficiency of dredging operations, increases the solid content of silt, reduces the dredging period and cost, protects the ecological environment of the water body, and avoids secondary pollution of the water body.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117144845B_ABST
    Figure CN117144845B_ABST
Patent Text Reader

Abstract

The invention discloses a grid-based precise dredging method, which relates to the technical field of comprehensive water environment management. The dredging method comprises the following steps: step one, dividing dredging grids according to water body topography and determining coordinate positions; step two, automatically entering into position and performing underwater measurement in the corresponding dredging grids; step three, moving the dredging grids one by one to perform dredging operations; step four, judging whether the sludge in each dredging grid has been cleaned up according to the measurement result in step two; step five, conditioning and dehydration treatment; step six, clear water return; by arranging a sludge collection cover in a sludge pumping component, utilizing the sludge collection cover and bottom plate soil to form an independent space, disturbing the sludge in the independent space and pumping it, the solid content of the sludge pumped ashore is greatly improved, so that conditioning and dehydration treatment can be directly performed, thereby solving the problem of difficult site selection and high cost of sedimentation tanks in the prior art, and solving the problem of water pollution when disturbing sludge in the prior art.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of comprehensive water environment management, and in particular to a grid-based precise dredging method. Background Art

[0002] At the upstream water inlet of urban rivers and lakes, since the sludge from the upstream river or sewer flows into or settles at the water inlet, when heavy rain occurs, the water level and water flow rate in the river will surge, thus washing a large amount of sludge usually deposited in the sewage ditch into the urban river or lake, so urban rivers and lakes need to carry out large-scale underwater dredging operations regularly;

[0003] However, traditional underwater dredging operations are roughly divided into the following methods:

[0004] 1. Dredging with suction dredgers: The dredging depth is directly set, and then the suction dredger dredges underwater according to the set dredging depth. This method of dredging is not accurate, and some of the bottom soil of rivers and lakes is dug out as silt, which is easy to damage the ecology of the bottom of rivers and lakes, and also increases the amount of engineering work and reduces efficiency. At the same time, this type of dredging requires the construction of sedimentation tanks on the banks of rivers and lakes, and the site selection of sedimentation tanks is very difficult in crowded urban areas;

[0005] 2. Dry dredging (drainage dredging): It is necessary to build a temporary cofferdam in the river channel, divert the upstream water, and then suck out the mud in the cofferdam; this method is more demanding on the terrain conditions. When the river channel is in the main urban area, there is no condition for building a cofferdam and diversion. Even if there is, the cost of building a cofferdam and diversion is quite high;

[0006] In addition to the above-mentioned traditional underwater dredging methods, the new type of bottom mud washing dredging technology produces relatively constrained turbulence in an open box with an inverted mud surface. Under the action of the turbulent flow on the mud surface, the colloidal sediment mud at the mud-water interface is disturbed and dispersed. Through rolling, collision and friction, the particle dispersion becomes higher and higher, and the elution becomes more and more thorough. The inorganic granular sediment with larger particle size settles by gravity and covers in situ, and the granular pollutants with smaller particle size are pumped out with water, transported out after flocculation and separation, and the clean water after flocculation and separation returns to the water body; however, this method cannot verify whether the dredging is qualified. The silt in the rivers and lakes that really need to be dredged is more than 50 cm thick and more than 90% is organic rotten silt. The content of inorganic granular sediment is very low, and this gravity sedimentation method cannot be completely cleaned; in addition, a large amount of flocculants will flow back into the water body with the so-called clean water, causing serious secondary pollution, and the actual dredging effect is not significant;

[0007] To this end, we provide a grid-based precise dredging method that avoids the shortcomings of the above-mentioned dredging methods, can dredge accurately and efficiently, and completely solves the pain points and problems of various traditional dredging methods. Summary of the invention

[0008] The purpose of the present invention is to provide a grid-based precise dredging method.

[0009] The technical problems solved by the present invention are:

[0010] (1) How to divide the water body to be desilted into grids and use satellite positioning function to locate the position, desilt each grid one by one and confirm whether the desilting is completed, so as to solve the problem of difficulty in confirming the desilting completion degree in the prior art;

[0011] (2) How to set a mud collection cover in the mud pumping assembly, use the mud collection cover and the bottom plate soil to form an independent space, disturb the sludge in the independent space and pump it out, thereby greatly improving the solid content of the sludge pumped ashore, so that it can be directly conditioned and dehydrated, thereby solving the problem of difficult and high cost site selection for sedimentation tanks in the prior art, and solving the problem of water pollution when disturbing sludge in the prior art.

[0012] The present invention can be implemented by the following technical solution: a grid-based precise dredging method, the dredging method comprising the following steps:

[0013] Step 1: Divide the dredging grid and determine the coordinate position according to the water body topography and the distribution of the water body sediment;

[0014] Step 2: Automatically enter the position and conduct underwater measurement within the corresponding dredging grid;

[0015] Step 3: Move the dredging grids one by one to carry out dredging operations;

[0016] Step 4: self-check and determine the sludge cleaning effect in each dredging grid according to the measurement results in step 2;

[0017] Step 5: The desilted sludge directly enters the sludge solidification station for conditioning and dehydration;

[0018] Step 6: The mud cake is transported out and the clean water is returned.

[0019] A further technical improvement of the present invention is that in step one, the dredging grids are evenly divided according to the area of ​​the water body to be dredged, and the engineering drawings of the water body to be dredged are imported into the travel control system of the dredging vessel by using engineering drawings, and the coordinate position of each dredging grid is determined by combining the satellite positioning function and the proportional conversion relationship.

[0020] A further technical improvement of the present invention is that the automatic entry in step 2 means that the dredging ship automatically moves to the position of the coordinate point of the corresponding dredging grid, uses sound and light detection technology or a probe rod to measure the depth of silt under the water body and estimates the silt amount of the corresponding dredging grid.

[0021] A further technical improvement of the present invention is that the dredging operation in step 3 includes:

[0022] S1: The dredging vessel is positioned at the operation location, and the suction assembly is hoisted and sunk to the bottom of the water body;

[0023] S2: The suction assembly disturbs the silt filled inside it and simultaneously sucks it out to the surface of the water body.

[0024] A further technical improvement of the present invention is that the suction assembly includes a mud collection cover and a mud pump and a sludge disturbance device arranged inside the mud collection cover. In step S1, the mud collection cover contacts the bottom soil of the water body to form a relatively closed independent space, and the sludge is disturbed and sucked in the independent space.

[0025] A further technical improvement of the present invention is that the sludge disturbance device is evenly arranged on the outside of the mud pump, and the sludge disturbance device is specifically arranged as an agitator or a nozzle for spraying high-speed fluid.

[0026] A further technical improvement of the present invention is that the number of agitators or nozzles is at least two and they are evenly arranged at equal angles.

[0027] A further technical improvement of the present invention is that the determination process in step 4 includes comparing the amount of silt in the dredging grid estimated in step 2 with the amount of silt sucked out, and when the comparison difference is less than the allowable offset value, it is determined that the corresponding dredging grid is cleaned.

[0028] A further technical improvement of the present invention is that the sucked-up sludge skips the sedimentation process and directly enters the conditioning process in step five, followed by dehydration treatment.

[0029] Compared with the prior art, the present invention has the following beneficial effects:

[0030] 1. By dividing the water body to be desilted into grids and using the satellite positioning function to locate the position, desilting is carried out grid by grid, making the desilting operation more streamlined and refined. At the same time, through the estimation of the amount of silt in the early stage and the statistics after the later operation, the completion of desilting can be confirmed, thereby providing data support for the desilting quality;

[0031] 2. By setting a mud collection cover in the suction assembly, an independent working space is formed with the bottom soil of the water body, which increases the solid content of the sucked mud, thereby eliminating the need for a sedimentation tank to increase the solid content. This completely solves the problems of difficult site selection, difficult construction and high cost of sedimentation tanks in dredging projects. At the same time, omitting the sedimentation process also greatly shortens the dredging period and improves efficiency.

[0032] 3. The disturbance is carried out in the independent space of the mud collecting cover, which will not cause the silt to spread to the surrounding water body, thus avoiding the problem of secondary pollution of the water body. At the same time, the existence of the mud collecting cover plays a limiting role, which will not cause the silt stirring device to damage the bottom soil, thereby protecting the living environment of aquatic organisms. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0034] Figure 1 It is a schematic diagram of the dredging method process of the present invention. DETAILED DESCRIPTION

[0035] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation methods, structures, features and effects of the present invention are described in detail below in conjunction with the accompanying drawings and preferred embodiments.

[0036] See also Figure 1 As shown, a grid-based precise dredging method specifically includes the following steps:

[0037] Step 1: Divide the dredging grid and determine the coordinate position

[0038] Delimit the desilting area on the water body to be desilted, and draw an engineering drawing corresponding to the desilting area in a certain proportion in a mapping software, and import the engineering drawing into the travel control system of the desilting vessel; in this embodiment, the engineering drawing can be set as a CAD drawing;

[0039] The travel control system divides the dredging area map on the CAD drawing into grids, and the size of the dredging grid can be determined according to the operating radius when the dredging ship is anchored;

[0040] At the same time, the positioning function is integrated into the travel control system to determine the coordinates of the center position of each grid corresponding to the CAD drawing;

[0041] Step 2: Automatically move to the corresponding dredging grid according to positioning to prepare for measurement

[0042] The dredging vessel automatically moves to the corresponding dredging grid under the guidance of the positioning function, and quickly measures the silt depth distribution in the dredging grid before the dredging operation. The measurement method can be selected from one or more of the sonar detector, laser scanner or depth probe.

[0043] According to the silt depth in the corresponding dredging grid, dredging covers of different height specifications or dredging covers with adjustable height can be used to match the silt depth in the corresponding dredging grid; at the same time, the dredging area can determine the time required for the dredging operation of the dredging ship at a certain power and the amount of silt that can be processed, and at the same time, it can be used to determine whether the silt in the dredging grid has been cleaned up;

[0044] Specifically, a K90 high-precision positioning and orientation instrument is installed on the mud mining cover, and the dredging grid map and coordinates are imported into the positioning and orientation instrument. The mud mining cover automatically moves into the corresponding dredging grid according to the positioning of the K90 high-precision positioning and orientation instrument, and the position of the mud mining cover and the dredging amount are displayed in real time on the ship;

[0045] It should be noted that the K90 high-precision positioning and orientation instrument adopts complex base station mobile RTK technology, integrating RTK and beacon functions, and can display the tide level and ship posture in real time, and can obtain high-precision positioning / orientation results;

[0046] Among them, sonar detectors use the emission of sound waves and measuring their return time to determine the location and depth of underwater objects. The mud on the bottom of the water usually causes the sound waves to be reflected, so the depth of the mud can be estimated by a sonar depth sounder.

[0047] Laser scanners can quickly measure the elevation differences between different areas of the lake bottom. The scanner sends a laser beam underwater and then measures the return time of the laser beam to calculate the silt depth. This method can provide higher accuracy.

[0048] Depth probe is a method to directly measure the depth of silt, but it is time-consuming and labor-intensive. By drilling depth samples at the bottom of the lake and then measuring the length of the depth samples, the depth of silt can be estimated;

[0049] Step 3: Desilt grids one by one

[0050] S1: The mud collecting cover mentioned in step 2 is wrapped and set on the outside of the mud pump. When the dredging boat reaches the operating position of the dredging grid, the positioning piles on the dredging boat are vertically erected to position the dredging boat in the water body. The lifting equipment on the dredging boat immerses the mud pump covered with the mud collecting cover into the water body until the bottom of the mud collecting cover contacts the bottom plate soil of the river or lake;

[0051] Since the bottom silt of the river and lake water bodies is a soft stacked structure, the silt above the covered bottom plate soil is filled in the silt mining cover;

[0052] S2: at least two agitators are arranged symmetrically at the outer periphery of the mud pump to agitate the mud inside the mud mining cover, and at the same time, the mud pump is started to pump the disturbed sludge to the solidification station;

[0053] It should be noted that in order to prevent the agitator from entangling plants such as waterweed growing on the bottom plate soil or pollutants such as plastic bags and textiles deposited in the silt during the mixing process or entering the mud pump to cause equipment damage, thereby affecting the subsequent dredging operation, a mesh structure in a grid is set at the bottom of the mud collection cover. On the one hand, it can suppress the waterweed from entering the mud collection cover and being stirred up, protecting the ecology of the bottom of the river and lake from being destroyed; on the other hand, it also plays a filtering role to prevent strip-shaped and flaky pollutants from entering the mud collection cover; in addition, this setting can also play a certain limiting role, preventing large pieces of protruding bottom plate soil or stones from entering the mud pump, which will not only damage the equipment, but also cause damage to the ecology of the bottom of the water body;

[0054] More specifically, in this embodiment, the disturbance of the sludge is mechanically stirred by a stirrer. In other embodiments, a high-pressure nozzle may be used to spray high-speed water or air flow, and the disturbance is performed by the impact of high-speed water or air flow. This method reduces the moving structure under the water body, makes the lifting easier, and is not easily entangled by pollutants in the sludge, causing damage.

[0055] Moreover, the mud cover and the bottom plate soil also form a relatively closed space. As the mud cover sinks until it contacts the bottom plate, the upper water of the silt is discharged from the water permeable holes above the mud cover under the pressure of the internal pressure. At this time, the solid content in the mud cover is relatively high, and the solid content of the mud sucked up by the mud pump reaches between 15% and 20%. The mud with this solid content does not need to pass through the sedimentation tank to increase the solid content of the mud, thus solving the pain point of the difficulty in site selection and construction of sedimentation tanks in dredging urban lakes or rivers, saving a lot of cost and dredging operation time;

[0056] Moreover, stirring and suctioning in this relatively closed space will not cause sludge to overflow and pollute the surrounding water bodies, ensuring that the aquatic ecology will not be affected during the dredging process, which is a truly environmentally friendly operation;

[0057] Step 4:

[0058] After a desilting grid is cleaned, the number of cubic meters of silt extracted is compared with the estimated amount of silt in the desilting grid, so as to accurately determine whether the silt in the desilting grid has been sucked out:

[0059] When the difference between the two is less than the allowable deviation value, it is judged that the dredging is completed; then, according to the positioning function of K90 and the travel control system, it moves to the next dredging grid, otherwise it continues to dredge in the original place;

[0060] Step 5: Conditioning and dehydration

[0061] The sucked mud directly enters the conditioning tank of the solidification station, and after adding chemicals and conditioning, it is transported to the filter press for filtration and dehydration treatment, thereby forming plate-like mud blocks with a moisture content of less than 50%. The plate-like mud blocks are disinfected and then industrially backfilled;

[0062] Step 6: Clean water return

[0063] The clean water dehydrated by filter pressing flows back to the river or inner lake through pipes, completing the entire grid dredging operation.

[0064] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the technical solution of the present invention.

Claims

1. A grid-based precise dredging method, characterized in that: The dredging method comprises the following steps: Step 1: Divide the dredging grid and determine the coordinate position according to the water body topography and the distribution of the water body sediment, including: The dredging grids are evenly divided according to the area of ​​the water body to be dredged, and the engineering drawings of the water body to be dredged are imported into the travel control system of the dredging vessel by using engineering drawings, and the coordinate positions of each dredging grid are determined by combining the satellite positioning function and the proportional conversion relationship; Step 2: Automatically enter the position and conduct underwater measurement within the corresponding dredging grid, specifically including: The automatic entry means that the dredging vessel automatically moves to the location of the coordinate point of the corresponding dredging grid, uses the acoustic and optical detection technology to measure the depth of the silt under the water body and estimate the silt amount of the corresponding dredging grid; The K90 high-precision positioning and orientation instrument is installed on the mud mining cover. The dredging grid map and coordinates are imported into the positioning and orientation instrument. The mud mining cover automatically moves into the corresponding dredging grid according to the positioning of the K90 high-precision positioning and orientation instrument, and the position of the mud mining cover and the dredging amount are displayed in real time on the ship. Step 3: Move the dredging grids one by one to carry out dredging operations, including: S1: The dredging vessel is positioned at the operation location, and the suction assembly is hoisted and sunk to the bottom of the water body; S2: The suction component disturbs the silt filled inside it and sucks it out of the water surface; The suction assembly includes a mud collecting cover, a mud pump and a mud disturbance device arranged inside the mud collecting cover. In step S1, the mud collecting cover contacts with the bottom soil of the water body, thereby forming a relatively closed independent space, and the mud disturbance and suction are carried out in the independent space; in the process of the mud collecting cover sinking until it contacts with the bottom soil, the upper layer of the mud is discharged from the water permeable hole above the mud collecting cover under the pressure of the internal pressure, and the solid content in the mud collecting cover is relatively high at this time; A grid-like mesh structure is provided at the bottom of the mud collecting cover to suppress water plants from entering the mud collecting cover; the grid-like mesh structure plays a limiting role to prevent large pieces of bottom soil or stones from entering the mud pump; the grid-like mesh structure also plays a filtering role to prevent strip-like and flake-like pollutants from entering the mud collecting cover; Step 4: Based on the measurement results in step 2, self-check and determine the sludge cleaning effect in each dredging grid, including: The self-checking and judging process includes comparing the silt volume of the desilting grid estimated in step 2 with the silt volume sucked out. When the comparison difference is less than the allowable offset value, it is determined that the corresponding desilting grid is cleaned, and then the K90 positioning function and the walking control system cooperate to move to the next desilting grid, otherwise the desilting operation continues at the original location; Step 5: The desilted sludge directly enters the sludge solidification station for conditioning and dehydration; the pumped sludge skips the sedimentation process and directly enters the conditioning process, followed by dehydration; Step 6: The mud cake is transported out and the clean water is returned; The sludge disturbance device is evenly arranged on the outside of the mud pump, and the sludge disturbance device is specifically configured as a stirrer or a nozzle for spraying high-speed fluid.

2. A grid-based precise dredging method according to claim 1, characterized in that: The number of the agitators or nozzles is at least two and they are evenly arranged at equal angles.

Citation Information

Patent Citations

  • Urban river ecological dredging system and construction technology

    CN114855905A

  • Large -sized and medium -sized reservoirs integration ecological dredging system

    CN206376307U