Suction cylinder foundation for submarine booster station and calculation method of its installation resistance

By combining suction cylinder foundations and steel frame structures, the problem of excessive steel consumption in the foundation structure of offshore substations is solved, achieving the effects of saving steel, reducing costs, and facilitating installation. This method is suitable for subsea substations.

CN117166438BActive Publication Date: 2024-11-12CHINA THREE GORGES CORPORATION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311156610.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-07
Publication Date
2024-11-12
Estimated Expiration
2043-09-07

AI Technical Summary

Technical Problem

Existing offshore booster station foundations consume large amounts of steel, resulting in low cost-effectiveness and excessively high costs when used in deep sea environments.

Method used

The system employs a combination of suction cylinder foundations and steel frame structures to fix the offshore substation using a negative pressure installation method. Multiple suction cylinder foundations and steel frame structures support the upper modules, preventing relative movement and tilting, and reducing the use of steel.

Benefits of technology

It saves steel, reduces costs, improves cost-effectiveness, is easy to install, reduces the impact on the seabed environment, extends service life, and reduces the impact of typhoons.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117166438B_ABST
    Figure CN117166438B_ABST
Patent Text Reader

Abstract

The present invention relates to a suction cylinder foundation suitable for a submarine booster station and a method for calculating its installation resistance. The suction cylinder foundation of the submarine booster station includes: a steel frame structure, a first connection structure is formed on the top of the steel frame structure; a plurality of suction cylinder foundations; a support structure, the support structure includes a plurality of first support portions formed at the bottom of the steel frame structure and extending downward, the first support portions are connected to the plurality of suction cylinder foundations one by one; and / or, the support structure includes a second support portion formed at the top of the suction cylinder foundation and extending upward, the plurality of second support portions are suitable for connection with the steel frame structure; an upper block, a second connection structure suitable for connection with the first connection structure is formed at the bottom of the upper block. The suction cylinder foundation of the present invention can save steel, is easy to install, has little impact on the submarine environment, can significantly reduce the impact of typhoons on the booster station, helps to reduce the maintenance frequency of the booster station, and extends the service life of the booster station.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of marine engineering foundation structures, and in particular to a suction cylinder foundation suitable for a submarine booster station and a method for calculating the installation resistance thereof. Background Art

[0002] The offshore booster station is a place where the electricity generated by offshore wind turbines is collected and boosted. The submarine booster station serving on the seabed can not only greatly reduce the power loss in the process of power transmission, but also save a lot of material consumption for infrastructure construction, which has great economic benefits for the development of offshore wind power industry in the deep sea. Therefore, its basic form will become an important part of the vigorous development of submarine booster stations.

[0003] In order to fix the offshore substation, a foundation needs to be set up separately for it. The existing offshore substation foundation generally includes steel pipe piles and conductor frames. During the installation and construction of the offshore substation, it is usually necessary to first drive the steel pipe pile foundation into the seabed to a certain depth, and then put the legs of the conductor frame on the steel pipe piles one by one. Since the conductor frame needs to extend from the seabed to the sea surface, as the development of offshore wind power stations gradually moves towards deep sea waters, the deeper the water, the more steel the conductor frame uses, which leads to the existing offshore substation foundation structure cost is too high and low cost performance. Summary of the invention

[0004] Therefore, the technical problem to be solved by the present invention is to overcome the defect in the prior art that the foundation structure of the offshore booster station requires consumption of a large amount of steel, thereby providing a suction cylinder foundation and an installation resistance calculation method for a suction cylinder foundation suitable for a submarine booster station that can save steel and is more cost-effective.

[0005] In order to solve the above problems, the present invention provides a suction cylinder foundation suitable for a submarine booster station in a first aspect, comprising: a steel frame structure, a first connection structure formed on the top of the steel frame structure;

[0006] Multiple suction cylinder foundations;

[0007] A support structure, the support structure includes a plurality of first support parts formed at the bottom of the steel frame structure and extending downward, the plurality of first support parts are connected to a plurality of suction cylinder foundations, and the connection relationship is one-to-one; and / or, the support structure includes a second support part formed at the top of the suction cylinder foundation and extending upward, the plurality of second support parts are suitable for connecting to the steel frame structure;

[0008] The upper block has a bottom formed with a second connection structure suitable for connecting with the first connection structure.

[0009] Furthermore, the first support part includes a plurality of support columns formed at the corners of the steel frame structure, the second support part includes a column formed at the top of the suction cylinder foundation, and the plurality of first support parts are fixedly connected to the plurality of second support parts, and the connection relationship corresponds one to one.

[0010] Furthermore, the length directions of the plurality of suction cylinder foundations are perpendicular to the plane where the steel frame structure is located, and the projection of the steel frame structure toward the suction cylinder foundation at least covers the connection point between the steel frame structure and the suction cylinder foundation.

[0011] Furthermore, the steel frame structure is a rectangular plate, and the four suction tube foundations are connected to the four corners of the rectangular plate, and the connection relationship corresponds one to one.

[0012] Further, a pumping device is formed on the top of the suction cylinder foundation.

[0013] Furthermore, at least one group of lifting lugs is arranged on the steel frame structure, and each group of lifting lugs includes two lifting lugs symmetrically arranged with the center of the steel frame structure as the symmetry center.

[0014] The second aspect of the present invention relates to a method for calculating the installation resistance of a suction cylinder foundation applicable to a submarine booster station, which is applied to the suction cylinder foundation of the first aspect of the present invention. The method for calculating the installation resistance includes:

[0015] Obtain the side friction resistance Vs of a single suction cylinder foundation and the end resistance Vb of the suction cylinder foundation;

[0016] According to the side friction resistance Vs of the suction cylinder foundation, the end resistance Vb of the suction cylinder foundation and formula 1, the vertical resistance V1 of a single suction cylinder foundation is determined. Formula 1 is: V1 = Vs + Vb;

[0017] The total vertical resistance V of the suction cylinder foundation is calculated using Formula 2 and the vertical resistance V1 of the suction cylinder foundation. Formula 2 is: V = nβV1;

[0018] Among them, n is the number of suction tube foundations in the suction tube foundation, and β is the tube group effect coefficient.

[0019] Furthermore, the side friction resistance Vs of a single suction cylinder foundation is obtained, including:

[0020] Obtain the viscosity coefficient α of the seabed soil where the suction tube foundation is installed, the tube skirt length L of the suction tube foundation, the outer diameter D of the suction tube foundation, and the undrained shear strength S of the seabed soil u ;

[0021] Use formula 3 to calculate the side friction resistance Vs of a single suction cylinder foundation;

[0022] Formula 3: Vs = απLDS u .

[0023] Furthermore, the end resistance Vb of the suction cylinder foundation is obtained, including:

[0024] Obtain the bearing capacity coefficient N of the suction tube foundation c , depth coefficient d of suction tube foundation c v, the top cover area A of the suction tube foundation, the undrained shear strength S of the seabed soil u ;

[0025] Use Formula 4 to obtain the end resistance Vb of a single suction cylinder foundation:

[0026] Formula 4 is: Vb = N c d c vA u .

[0027] Further, the depth coefficient d of the suction cylinder foundation is obtained c vIncludes:

[0028] Obtain the skirt length of the suction tube foundation and the outer diameter D of the suction tube foundation;

[0029] Use formula 5 to obtain the depth coefficient d of the suction tube foundation c v;

[0030] Formula 5 is: c v=1+1.02-0.42 2 .

[0031] The present invention has the following advantages:

[0032] The suction cylinder foundation of the first aspect of the present invention uses multiple suction cylinder foundations and a steel frame structure to support the upper assembly. The provision of multiple suction cylinder foundations helps to improve the stability of the suction cylinder foundation and avoid safety hazards such as cable breakage caused by the relative movement between the suction cylinder foundation and the seabed. At the same time, when the suction cylinder foundation tilts during the installation process, the operator can level the suction cylinder foundation by controlling the drainage speed of the multiple suction cylinder foundations, further improving the stability of the suction cylinder foundation. In addition, the provision of the support structure can make the steel frame structure have a certain distance from the seabed, so as to avoid the problem of tilting of the upper assembly caused by the uneven seabed.

[0033] Therefore, during the installation process, the suction cylinder foundation of the present invention can ensure that the upper assembly of the booster station is in a stable state when connecting various cables, avoiding safety hazards such as cable breakage caused by the relative movement of the booster station foundation and the seabed, so that the upper assembly of the booster station can be arranged to be at least partially below the sea level, thereby greatly saving the amount of steel used in the suction cylinder foundation, reducing the cost of the basic structure of the submarine booster station, and improving the cost-effectiveness of the suction cylinder foundation.

[0034] At the same time, the steel frame structure can provide sufficient space for the setting of the suction cylinder foundation, and can avoid the suction cylinder foundation being too close to each other to cause a cluster effect, which cannot fully stimulate the bearing capacity of each suction cylinder foundation.

[0035] In addition, the suction cylinder foundation of this embodiment only needs to be installed by negative pressure during the installation process, without the need for piling, which makes the installation more convenient and causes less disturbance to the seabed, thereby reducing the impact of the installation process on the seabed environment.

[0036] Furthermore, the suction cylinder foundation of the present invention arranges the upper assembly of the booster station to be at least partially below sea level, which also has an unexpected technical effect, namely, it can significantly reduce the impact of typhoons on the booster station, help reduce the maintenance frequency of the booster station, and extend the service life of the booster station.

[0037] In summary, the suction cylinder foundation of the submarine booster station in the first aspect of the present invention can overcome the defect that the basic structure of the offshore booster station in the prior art needs to consume a large amount of steel. Even if it is set in the deep sea, it will not consume too much steel. It has a higher cost performance and is easy to install. It has little impact on the submarine environment and can significantly reduce the impact of typhoons on the booster station, which helps to reduce the maintenance frequency of the booster station and extend the service life of the booster station.

[0038] The method for calculating the installation resistance of the suction cylinder foundation of the submarine booster station of the second aspect of the present invention can concisely, efficiently and accurately evaluate the vertical resistance of the suction cylinder foundation of the first aspect of the present invention, and provide normative guidance for the design of the suction cylinder foundation. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0040] Figure 1 The suction cylinder foundation of the embodiment 1 of the present invention in the use state is schematically shown;

[0041] Figure 2 A three-dimensional diagram of the suction cylinder foundation of Example 1 of the present invention;

[0042] Figure 3 It is a front view of the suction cylinder foundation of Example 1 of the present invention;

[0043] Figure 4 A top view of the suction cylinder foundation of Example 1 of the present invention;

[0044] Figure 5 It is a front view of the steel frame structure of the suction cylinder foundation of Example 1 of the present invention;

[0045] Figure 6 A top view of the steel frame structure of the suction cylinder foundation of Example 1 of the present invention;

[0046] Figure 7 A three-dimensional diagram of an upper assembly block of a suction cylinder foundation according to Embodiment 1 of the present invention;

[0047] Figure 8 This is a diagram of the construction process of the suction cylinder foundation of Example 1 of the present invention, at which the steel frame structure and the suction cylinder foundation welded together are being hoisted to the seabed by hoisting equipment;

[0048] Fig. 9 This is a diagram of the construction process of the suction cylinder foundation of Example 1 of the present invention. At this time, the steel frame structure and the suction cylinder foundation welded together partially penetrate into the seabed by their own weight;

[0049] Fig.10 This is a diagram of the construction process of the suction cylinder foundation of Example 1 of the present invention, at which the hoisting equipment is hoisting the upper assembly of the submarine booster station onto the steel frame structure;

[0050] Fig.11 This is a flow chart of a method for calculating the installation resistance of a suction cylinder foundation according to Embodiment 2 of the invention.

[0051] Description of reference numerals:

[0052] 1. Steel frame structure; 11. First connection structure; 12. First support part; 13. Lifting ear; 2. Suction tube foundation; 21. Second support part; 22. Column wing plate; 24. Reinforcement rib; 25. Pumping device; 3. Upper assembly block; 31. Second connection structure; 32. Cable trough; 4. Cable. DETAILED DESCRIPTION

[0053] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0054] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0055] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0056] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0057] Example 1

[0058] like Figure 1 and Figure 2 As shown, Embodiment 1 of the present invention relates to a suction cylinder foundation of a submarine booster station, including a steel frame structure 1, a suction cylinder foundation 2, a support structure and an upper assembly block 3. Among them, a first connecting structure 11 is formed at the top of the steel frame structure 1. The support structure includes a plurality of first support portions 12 formed at the bottom of the steel frame structure 1 and extending downward. The plurality of first support portions 12 are connected to the plurality of suction cylinder foundations 2, and the connection relationship corresponds one to one. The support structure includes a second support portion 21 formed at the top of the suction cylinder foundation 2 and extending upward. The plurality of second support portions 21 are suitable for connecting to the steel frame structure 1. A second connecting structure 31 suitable for connecting to the first connecting structure 11 is formed at the bottom of the upper assembly block 3. Preferably, the upper surface of the steel frame structure 1 is a plane, which can facilitate reliable support of the upper assembly block 3.

[0059] like Figure 1As shown, in the suction cylinder foundation of this embodiment, at least part of the depth of the upper block 3 of the booster station is below sea level. During the research and development process, the applicant found that turning the booster station system into a seabed can greatly reduce the amount of steel used in the booster station foundation, reduce the cost of the booster station foundation, and improve the cost-effectiveness of the booster station foundation. However, the existing booster station foundation is prone to relative movement with the seabed, and there is a risk of the cables being broken during the process of connecting the booster station system to each cable 4. Therefore, it is very difficult to set the upper block 3 of the booster station underwater.

[0060] The suction cylinder foundation of Example 1 of the present invention uses multiple suction cylinder foundations 2 and a steel frame structure 1 to support the upper assembly 3. The provision of multiple suction cylinder foundations 2 helps to improve the stability of the suction cylinder foundation and avoid safety hazards such as the cable 4 being pulled apart due to the relative movement between the suction cylinder foundation and the seabed. At the same time, when the suction cylinder foundation tilts during the installation process, the operator can level the suction cylinder foundation by controlling the drainage speed of the multiple suction cylinder foundations 2, further improving the stability of the suction cylinder foundation. In addition, the provision of the support structure can make the steel frame structure 1 have a certain distance from the seabed, so as to avoid the problem of the upper assembly 3 tilting due to the uneven seabed.

[0061] Therefore, during the installation process, the suction cylinder foundation of the present invention can ensure that the upper module 3 of the booster station is in a stable state when connecting various cables 4, avoiding safety hazards such as cable 4 being pulled apart due to the relative movement between the booster station foundation and the seabed, so that the upper module 3 of the booster station can be arranged to be at least partially below the sea level, thereby greatly saving the amount of steel used in the suction cylinder foundation, reducing the cost of the basic structure of the submarine booster station, and improving the cost-effectiveness of the suction cylinder foundation.

[0062] At the same time, the steel frame structure 1 can provide enough space for the setting of the suction cylinder foundation 2, and can avoid the suction cylinder foundation 2 being too close to each other to cause a cluster effect, which cannot fully stimulate the bearing capacity of each suction cylinder foundation 2.

[0063] In addition, the suction cylinder foundation of this embodiment only needs to be installed by negative pressure during the installation process, without piling, which makes the installation more convenient, and the disturbance to the seabed is small, reducing the impact of the installation process on the seabed environment. Therefore, the suction cylinder foundation of Example 1 of the present invention can overcome the defect that the foundation structure of the offshore booster station in the prior art needs to consume a large amount of steel. It can save steel, has a higher cost-effectiveness, is convenient to install, and has little impact on the seabed environment. Furthermore, the suction cylinder foundation of this embodiment sets the upper block 3 of the booster station to be at least partially below the sea level, which also has an unexpected technical effect, that is, it can significantly reduce the impact of typhoons on the booster station, help reduce the maintenance frequency of the booster station, and extend the service life of the booster station.

[0064] In summary, the suction cylinder foundation of Example 1 of the present invention can overcome the defect that the basic structure of the offshore booster station in the prior art needs to consume a large amount of steel. It can save steel, has a higher cost performance, is easy to install, has little impact on the seabed environment, and can significantly reduce the impact of typhoons on the booster station, which helps to reduce the maintenance frequency of the booster station and extend the service life of the booster station.

[0065] In this embodiment, the suction cylinder foundation 2 includes a cylinder skirt and a top cover arranged on the top of the cylinder skirt. The number of suction cylinder foundations 2 can be selected to be three, four, five or more. Preferably, in this embodiment, the steel frame structure 1 is a square platform structure, and the number of suction cylinder foundations 2 is four and they are respectively arranged at the four corners of the steel frame structure 1. The upper assembly block 3 and the steel frame structure 1 can be connected to each other through a connection structure such as a card and structure, a riveted structure, and the cooperation of bolts and ear plates.

[0066] Preferably, if Figure 7 As shown, in this embodiment, the first connection structure 11 includes a connection column formed on the steel frame structure 1, and the second connection structure 31 includes a connection groove formed at the bottom of the upper block 3. The connection column can be inserted into the connection groove and complete the connection between the upper block 3 and the steel frame structure 1. Further, a cable trough 32 is also provided on the upper block 3, and the suction cylinder foundation also includes a cable 4 connected between the wind turbine and the cable trough 32. The electric energy generated by the wind turbine is transmitted to the upper block 3 of the booster station through the cable 4 for step-up and transformation.

[0067] like Figure 3 and Figure 4 As shown, the outer diameter of the suction cylinder foundation 2 is defined as D, and the length of the cylinder skirt is defined as L. Preferably, in this embodiment, D≤10 meters, L≤3D, which can avoid the increased construction difficulty and excessive installation costs caused by excessive installation resistance. The distance between the center of the suction cylinder foundation 2 and the center of the steel frame structure 1 is defined as S. Preferably, S≥2D, which can avoid the mutual disturbance of the suction cylinder foundations 2 caused by the group cylinder effect, thereby fully stimulating the vertical bearing performance of the suction cylinder foundation 2.

[0068] The first support portion 12 and the second support portion 21 are preferably, but not limited to, protrusions or columns. Preferably, in this embodiment, the first support portion 12 includes a plurality of support columns formed at the corners of the steel frame structure 1. The second support portion 21 includes a column formed at the top of the suction cylinder foundation 2. The plurality of first support portions 12 are fixedly connected to the plurality of second support portions 21, and the connection relationship corresponds one to one. The first support portion 12 and the second support portion 21 are preferably, but not limited to, welded.

[0069] The length direction of the plurality of suction cylinder foundations 2 is perpendicular to the plane where the steel frame structure 1 is located, and the projection of the steel frame structure 1 in the direction of the suction cylinder foundation 2 at least covers the connection point between the steel frame structure 1 and the suction cylinder foundation 2. Setting the direction of the suction cylinder foundation 2 to be perpendicular to the steel frame structure 1 can transfer all vertical loads of the steel frame structure 1 and the submarine booster station to the suction cylinder foundation 2. The projection of the steel frame structure 1 in the direction of the suction cylinder foundation 2 is set to at least cover the connection point between the steel frame structure 1 and the suction cylinder foundation 2, which can reduce the stress concentration effect at the steel frame structure 1 to improve the fatigue life of the steel frame structure 1.

[0070] The steel frame structure 1 is a rectangular plate, and the four suction cylinder foundations 2 are connected to the four corners of the rectangular plate, and the connection relationship corresponds one to one. Setting the suction cylinder foundations 2 at the corners of the rectangular plate can avoid the distance between the suction cylinder foundations 2 being too close, resulting in a group cylinder effect, causing the bearing mechanism of each suction cylinder foundation 2 to have overlapping disturbance zones, and failing to fully stimulate the bearing capacity of each suction cylinder foundation 2. Preferably, the four suction cylinder foundations 2 are set equidistantly from the center of the steel frame structure 1.

[0071] In this embodiment, if Figure 2 As shown, the suction cylinder foundation 2 also includes a column wing plate 22 connected between the side wall of the column and the top wall of the suction cylinder foundation 2. There are multiple column wing plates 22 and they are radially distributed with the column as the center. The column wing plates 22 can increase the structural strength of the column. Preferably, a plurality of column wing plates 22 are arranged in a radial shape with equal angles, and extend from the column to the edge of the top cover of the suction cylinder foundation 2, which can enhance the structural strength of the column with maximum strength. In a more preferred embodiment, the side walls of two adjacent column wing plates 22 are connected with reinforcing ribs 24, which further enhances the structural strength of the column. Preferably, the bottom of the steel frame structure 1 can also be optionally provided with a supporting column wing plate connected between the side wall of the supporting column and the bottom wall of the steel frame structure 1, and reinforcing ribs 24 can be selectively connected between adjacent supporting column wing plates, which can enhance the structural strength of the supporting column.

[0072] In this embodiment, a pumping device 25 is formed on the top of the suction cylinder foundation 2. The pumping device 25 is a water pump installed on the cylinder cover of the suction cylinder foundation 2. The input end of the water pump is connected to the suction hole of the suction cylinder foundation 2, and can be remotely controlled to pump out the water in the suction cylinder foundation 2. The valve of the pumping device 25 can drain water when it is opened, so that a pressure difference is generated inside and outside the suction cylinder foundation 2, so that the suction cylinder foundation 2 and the steel frame structure 1 are further penetrated into the seabed under the overall negative pressure. The operation of opening and closing the valve can be optionally performed manually. Preferably, in this embodiment, the operation of opening and closing the valve can be optionally performed by an underwater robot, so that the valve of the pumping device 25 is opened by the underwater robot, and water is collected by the pumping device 25. In a more preferred embodiment, the pumping device 25 can be detachably installed on the cylinder cover of the suction cylinder foundation 2. After the suction cylinder foundation 2 is installed, the underwater robot can remove the pumping device 25 and then install it on the cylinder cover of other suction cylinder foundations 2, so that the pumping device 25 can be recycled to reduce the cost of the suction cylinder foundation 2.

[0073] Preferably, in this embodiment, if Figure 5 and Figure 6 As shown, at least one set of lifting lugs 13 is also provided on the steel frame structure 1. Each set of lifting lugs 13 includes two lifting lugs 13 symmetrically arranged with the center of the steel frame structure 1 as the symmetry center. When installing the suction cylinder foundation, the lifting lugs 13 can allow the steel cable of the lifting equipment to pass through and lift the welded steel frame structure 1 and the suction cylinder foundation 2 to the seabed. The lifting lugs 13 are arranged to be symmetrically distributed along the center of the steel frame structure 1, which can prevent the steel frame structure 1 from tilting during the lifting process. Among them, the lifting equipment can be selected as a crane installed on a towing ship.

[0074] Next, the installation method of the suction cylinder foundation of Example 1 is described:

[0075] First, the second support part 21 of the suction cylinder foundation 2 is welded to the first support part 12 of the steel frame structure 1 on land in a one-to-one correspondence, and then the steel frame structure 1 and the suction cylinder foundation 2 welded together are transported to the designated location by a towing ship, and the steel cable of the lifting equipment is connected to the lifting lug 13, and the steel frame structure 1 and the suction cylinder foundation 2 are hoisted as a whole by the hoisting equipment, and then slowly sunk to the seabed. During the sinking process, the pumping device 25 is in an open state to discharge the water in the suction cylinder foundation 2 (see Figure 8 ), which can reduce the hydrodynamic effect of the top cover of the suction tube foundation 2 on the seabed soil.

[0076] Then, if Fig. 9As shown, the suction cylinder foundation 2 and the steel frame structure 1 can penetrate to a certain depth of the seabed by their own weight until the penetration depth no longer changes, and use an underwater robot to control the pumping device 25 to drain water, so that a pressure difference is generated inside and outside the suction cylinder foundation 2, and the steel frame structure 1 is further penetrated into the seabed under the action of negative pressure. Preferably, during the process of the suction cylinder foundation 2 penetrating into the seabed, its penetration speed is ≤5 meters / hour. During the penetration process, an underwater robot is used to perform a horizontal detection on the steel frame structure 1, and the steel frame structure 1 is leveled by adjusting the drainage rate of different suction cylinder foundations 2 until the suction cylinder foundation 2 penetrates to the designed depth.

[0077] Then, if Fig.10 As shown, the upper block 3 of the booster station is suspended by a hoisting device. The connection groove of the upper block 3 is fixedly connected to the connection column of the steel frame structure 1, so that the upper block 3 of the booster station is fixed on the steel frame structure 1, and one end of the cable 4 is connected to the cable groove 32 of the upper block 3 of the booster station.

[0078] Finally, the other end of the cable 4 is connected to the fixed fan, so that the fan power enters the upper block 3 of the booster station through the cable 4, completing the installation of the suction cylinder foundation.

[0079] In summary, the suction cylinder foundation of Embodiment 1 of the present invention has the following beneficial effects:

[0080] 1. The suction cylinder foundation of this embodiment connects the suction cylinder foundation 2 with the upper assembly block 3 of the booster station through a steel frame structure 1, without the need for a pipe frame structure, which can save steel costs and significantly improve cost performance.

[0081] 2. The suction cylinder foundation of this embodiment can avoid the problem of upper structure tilting due to the uneven seabed.

[0082] 3. The suction cylinder foundation of this embodiment adopts the suction cylinder foundation 2, which is more convenient to install than the traditional suction cylinder foundation. It does not require piling and is installed by negative pressure, which causes little disturbance to the seabed and reduces the impact of the installation process on the seabed environment.

[0083] 4. Compared with the traditional suction cylinder foundation, the suction cylinder foundation of this embodiment has a simple structure, small volume, easy construction, transportation and installation, and a short construction period. It does not require rock embedding construction and is suitable for soft soil layers.

[0084] 5. The suction tube foundation of this embodiment can be recycled after the service is completed, reducing the long-term impact on the seabed environment.

[0085] Example 2

[0086] Example 2 involves a method for calculating the installation resistance of a suction cylinder foundation, which is used to calculate the installation resistance of the suction cylinder foundation involved in Example 1, such as Fig.11 As shown, the installation resistance calculation method includes step S1, step S2 and step S3.

[0087] Step S1: Obtain the side friction resistance Vs of a single suction cylinder foundation 2 and the end resistance Vb of the suction cylinder foundation 2.

[0088] Step S2: According to the side friction resistance Vs of the suction cylinder foundation 2, the end resistance Vb of the suction cylinder foundation 2 and Formula 1, the vertical resistance V1 of the single suction cylinder foundation 2 is determined.

[0089] Formula 1 is: V1=Vs+Vb.

[0090] Step S3: Calculate the total vertical resistance V of the suction cylinder foundation using Formula 2 and the vertical resistance V1 of the suction cylinder foundation 2. Formula 2 is: V=nβV1.

[0091] Wherein, n is the number of suction tube foundations 2 in the suction tube foundation, and β is the tube group effect coefficient.

[0092] For example, in Figure 1 In the embodiment shown, n is 4. β is the pile group effect coefficient. The pile group effect refers to the phenomenon that when multiple pile foundations act together on the same soil layer, they affect each other and cause changes in the resistance and deformation characteristics of the pile foundation. When the distance between pile foundations is less than a certain value, the pile foundations will interact with each other, so that the resistance and deformation characteristics of the pile foundation are affected. The pile group effect coefficient refers to the ratio of the resistance of the pile group to the resistance of a single pile. It represents the degree of increase in resistance when multiple pile foundations act together. For example, in this embodiment, β is selected to be 0.94.

[0093] The resistance calculation method of the suction cylinder foundation of Example 2 of the present invention can evaluate the vertical resistance of the suction cylinder foundation concisely, efficiently and accurately, and provide normative guidance for the design of the suction cylinder foundation.

[0094] In this embodiment, the side friction resistance Vs of a single suction cylinder foundation 2 is obtained, including:

[0095] Obtain the viscosity coefficient α of the seabed soil at the suction tube foundation installation location, the tube skirt length L of the suction tube foundation 2, the outer diameter D of the suction tube foundation 2, and the undrained shear strength Su of the seabed soil;

[0096] The side friction resistance Vs of a single suction tube foundation 2 is calculated using formula 3;

[0097] Formula 3 is: Vs = απLDSu.

[0098] In this embodiment, α=1. The skirt length L of the suction tube foundation 2 and the outer diameter D of the suction tube foundation 2 can be obtained by measuring the suction tube foundation 2, and the unit is meter. Undrained shear strength S of the seabed uIt can be measured through on-site in-situ tests or indoor advanced geotechnical tests, and the unit is kPa.

[0099] In this embodiment, obtaining the end resistance Vb of the suction cylinder foundation 2 includes:

[0100] Get the bearing capacity coefficient N of suction tube foundation 2 c , depth coefficient d of suction tube foundation 2 c v, the top cover area A of the suction tube foundation 2, the undrained shear strength S of the seabed soil u .

[0101] The end resistance Vb of a single suction tube foundation 2 is obtained using Formula 4.

[0102] Formula 4 is: Vb = N c d c vA u .

[0103] The top cover area A can be calculated by the outer diameter D, and the unit is square meters. For example, when the top cover of the suction cylinder foundation 2 is square, the top cover area A = D 2 When the top cover of the suction cylinder foundation 2 is circular, the top cover area A=πD 2 / 2.

[0104] In this embodiment, the depth coefficient d of the suction cylinder foundation 2 is obtained. c vIncludes:

[0105] Obtain the skirt length L of the suction cylinder foundation 2 and the outer diameter D of the suction cylinder foundation 2.

[0106] Use formula 5 to obtain the depth coefficient d of the suction tube foundation 2 c v.

[0107] Formula 5 is: c v=1+1.02(L / D)-0.42(L / D) 2 .

[0108] The units of the skirt length L and the outer diameter D of the suction tube foundation 2 are meters.

[0109] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.

Claims

1. A method for calculating the installation resistance of the suction cylinder foundation applicable to a submarine booster station. It is characterized in that The suction cylinder foundation suitable for the submarine booster station comprises: A steel frame structure (1), wherein a first connecting structure (11) is formed on the top of the steel frame structure (1); Multiple suction cylinder foundations (2); A support structure, the support structure comprising a plurality of first support portions (12) formed at the bottom of the steel frame structure (1) and extending downward, the plurality of first support portions (12) being connected to the plurality of suction cylinder foundations (2), and the connection relationship being one-to-one; and / or the support structure comprising a second support portion (21) formed at the top of the suction cylinder foundation (2) and extending upward, the plurality of second support portions (21) being suitable for connecting to the steel frame structure (1); An upper assembly block (3), wherein a second connection structure (31) suitable for connecting to the first connection structure (11) is formed at the bottom of the upper assembly block (3); The installation resistance calculation method includes: Obtain the side friction force V of a single suction cylinder foundation (2) s and the end resistance V of the suction tube foundation (2) b ; According to the lateral friction V of the suction tube foundation (2) s , the end resistance V of the suction cylinder foundation (2) b And formula 1, determine the vertical resistance V of a single suction tube foundation (2) 1 , the formula 1 is: V 1 =V s +V b ; Using formula 2 and the vertical resistance V of the suction tube foundation (2) 1 Calculate the total vertical resistance V of the suction cylinder foundation, the formula 2 is: V = nβV 1 ; Wherein, n is the number of the suction cylinder foundations (2) in the suction cylinder foundation, and β is the cylinder group effect coefficient; The side friction force V of the single suction cylinder foundation (2) is obtained. s ,include: Obtain the viscosity coefficient α of the seabed soil at the installation location of the suction tube foundation, the tube skirt length L of the suction tube foundation (2), the outer diameter D of the suction tube foundation (2), and the undrained shear strength S of the seabed soil. u ; The side friction resistance V of the single suction tube foundation (2) is calculated using formula 3: s ; The formula 3 is: V s =απLDS u ; The end resistance V of the suction cylinder foundation (2) is obtained b ,include: Obtain the bearing capacity coefficient N of the suction tube foundation (2) c , the depth coefficient d of the suction tube foundation (2) c v, the top cover area A of the suction tube foundation (2), the undrained shear strength S of the seabed soil u ; Use formula 4 to obtain the end resistance V of a single suction tube foundation (2): b : The formula 4 is: V b = N c d c vA u ; The depth coefficient d of the suction cylinder foundation (2) is obtained c vIncludes: Obtaining the skirt length L of the suction cylinder foundation (2) and the outer diameter D of the suction cylinder foundation (2); The depth coefficient d of the suction tube foundation (2) is obtained using formula 5: c v; The formula 5 is: c v=1+1.02(L / D)-0.42(L / D) 2 .

2. The installation resistance calculation method according to claim 1, It is characterized in that The first support portion (12) comprises a plurality of support columns formed at the corners of the steel frame structure (1), the second support portion (21) comprises a column formed at the top of the suction cylinder foundation (2), and the plurality of first support portions (12) are fixedly connected to the plurality of second support portions (21), and the connection relationship is one-to-one corresponding.

3. The installation resistance calculation method according to claim 2, It is characterized in that The length directions of the plurality of suction cylinder foundations (2) are perpendicular to the plane where the steel frame structure (1) is located, and the projection of the steel frame structure (1) in the direction of the suction cylinder foundation (2) at least covers the connection point between the steel frame structure (1) and the suction cylinder foundation (2).

4. The installation resistance calculation method according to claim 2, It is characterized in that The steel frame structure (1) is a rectangular plate, and the four suction tube foundations (2) are connected to the four corners of the rectangular plate, and the connection relationship corresponds one to one.

5. The installation resistance calculation method according to any one of claims 1 to 4, It is characterized in that A pumping device (25) is formed on the top of the suction cylinder foundation (2).

6. The installation resistance calculation method according to any one of claims 1 to 4, It is characterized in that At least one group of lifting lugs (13) is also provided on the steel frame structure (1), and each group of lifting lugs (13) comprises two lifting lugs (13) symmetrically arranged with the center of the steel frame structure (1) as the symmetry center.