Tooling apparatus steel chimney high altitude assembly platform and method of use

By using a tool-type equipment high-altitude assembly platform for steel chimneys, and utilizing the design of support and sliding components, the problem of low construction efficiency caused by scaffolding erection in existing technologies has been solved. This enables rapid installation and dismantling of steel chimneys, improving construction efficiency and ensuring safety.

CN117166730BActive Publication Date: 2025-11-28CHINA MCC17 GRP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311260526.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-27
Publication Date
2025-11-28
Estimated Expiration
2043-09-27

Smart Images

  • Figure CN117166730B_ABST
    Figure CN117166730B_ABST
Patent Text Reader

Abstract

The application discloses a tool-type equipment steel chimney high-altitude group platform and a use method thereof, and relates to the field of chimney construction.The tool-type equipment steel chimney high-altitude group platform comprises a supporting assembly, the supporting assembly comprises a hoop, and the top of the hoop is provided with a sliding assembly.The supporting assembly and the sliding assembly are arranged, the sliding assembly provides sliding power for the supporting assembly, the first supporting plate and the second supporting plate in the supporting assembly can move up and down in close contact with the outer wall of the steel chimney, the operator can conveniently weld and assemble the sectional bodies of the steel chimney, the first supporting plate and the second supporting plate are connected in a clamping mode, and the first supporting plate and the second supporting plate are convenient to assemble and disassemble;the guardrails arranged at the top of the first supporting plate and the second supporting plate provide safety guarantee for the operator;the split assembly of the hoop avoids the use of a scaffold to sleevelink the hoop to the outer wall of the steel chimney, and thus the rapid installation of the steel chimney is realized.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the chimney construction technical field, specifically to a tool type equipment steel chimney high-altitude assembly platform and its using method. BACKGROUND

[0002] At present, most high-rise steel chimneys contain two parts, one part is chimney segmented body, and the other part is tower type frame which plays a supporting role outside the segmented body. When manufacturing, the steel chimney segmented body is generally prefabricated in segments, and the tower type frame is manufactured according to scattered components. When building, a large area of scaffold is set up around the entire steel chimney, the height of the scaffold is raised along with the installation of the steel chimney, and the prefabricated steel chimney segmented body and the tower type frame are hoisted to the position to be installed according to the scattered components by using hoisting equipment, and the installation operators stand on the scaffold to carry out the assembly and welding of the steel chimney.

[0003] When the steel chimney is built, the scaffold needs to be completely removed, which results in large workload and slow engineering progress, and reduces work efficiency. At this time, we need a high-altitude assembly platform. SUMMARY

[0004] The purpose of the present application is to solve the problem of using scaffolds in the traditional steel chimney building process, and to provide a tool type equipment steel chimney high-altitude assembly platform and its using method.

[0005] To achieve the above purpose, the present application provides the following technical scheme: a tool type equipment steel chimney high-altitude assembly platform and its using method, comprising a support assembly and a segmented body, the support assembly is built on the outer wall of the segmented body, the support assembly comprises a first support plate:

[0006] The side wall of the first support plate is slidingly connected with a second support plate, the first support plate and the second support plate are provided in plurality and are connected in series to form a closed loop, the top side of the first support plate and the second support plate is fixedly connected with a guardrail, the top side of the second support plate corresponding to the guardrail is fixedly connected with a support rod, the number of the support rod is matched with the number of the second support plate, the top of the support rod is fixedly connected with a clamp, and the clamp is used to support the first support plate and the second support plate.

[0007] As a further scheme of the present application: the outer wall of the clamp is provided with a sliding assembly, the sliding assembly comprises a fixed frame:

[0008] The fixed frame is fixedly connected to the top of the clamp, and the bottom of the fixed frame penetrates the inner wall and the outer wall of the clamp, the both sides of the bottom inner wall and the center of the top inner wall of the fixed frame are rotatably connected with shafts, the outer wall of the shaft is fixedly connected with a limiting block, the limiting block is provided in six, and two limiting blocks form a group.

[0009] As a further scheme of the present application: the first support plate and the second support plate are trapezoidal, and the first support plate and the second support plate are matched in size, the mounting block is arranged at the center of the side wall of the first support plate, and the mounting groove is arranged at the center of the top of the side wall of the second support plate, the mounting groove is matched with the mounting block in size, and the mounting block of one side wall of the first support plate is clamped and connected into the mounting grooves at the top of the side walls of two second support plates.

[0010] As a further scheme of the present application: the hoop is semicircular, and two hoops are arranged, the end of the hoop is provided with a protruding block, and the inside of the protruding block is provided with a hole, and the two hoops are bolted through the holes of the end walls of the protruding blocks to form a complete circle.

[0011] As a further scheme of the present application: the gap between the limiting blocks is used for placing a steel cable, the positions of the three rotating shafts form a triangle, the steel cable vertically extends to the ground through the gap between the limiting blocks of the outer walls of the three rotating shafts, and a triangle is formed with the steel cable at the starting end, so as to lift the first support plate and the second support plate.

[0012] A use method of a tool type equipment steel chimney high-altitude assembling platform, comprising the tool type equipment steel chimney high-altitude assembling platform, and specifically comprising the following steps:

[0013] In use, the steel chimney is divided into a plurality of segmented bodies, a crane is used to stack the segmented bodies to form the overall splicing of the steel chimney, and an operator needs to weld and fix the splicing part of the steel chimney to ensure the stability of the steel chimney.

[0014] The first support plate and the second support plate are clamped and connected to form an operation platform, and an operator can stand on the operation platform to assemble and weld the steel chimney, meanwhile, the guardrails form a closed shielding on the outer wall of the steel chimney along with the splicing of the first support plate and the second support plate, so as to ensure the safety of the operator, and the support frame fixedly connects the first support plate, the second support plate and the hoop, so that the first support plate and the second support plate can slide synchronously when the hoop slides up and down, thereby conveniently fixing the steel chimney.

[0015] The outer wall of the hoop is provided with a sliding assembly, and the sliding assembly comprises a fixed frame:

[0016] The fixed frame is fixedly connected to the top of the hoop, the bottom of the fixed frame penetrates the inner wall and the outer wall of the hoop, rotating shafts are rotatably connected to the inner wall of the bottom of the fixed frame and the center of the top inner wall, the outer wall of the rotating shaft is fixedly connected with a limiting block, the limiting block is provided with six limiting blocks, and two limiting blocks form a group.

[0017] The first support plate and the second support plate slide up and down along with the hoop, and in the process, the rotation of the rotating shaft drives the rotation of the limiting block, wherein the outer wall of the limiting block located at the bottom of the fixed frame close to the outer wall of the steel chimney is attached to the outer wall of the steel chimney. When the limiting block rotates, the outer wall of the limiting block attached to the outer wall of the steel chimney rotates, so that the limiting block drives the hoop to slide up and down, realizing the up and down movement of the first support plate and the second support plate.

[0018] The first support plate and the second support plate are trapezoidal, and the size of the first support plate and the second support plate is matched. The first support plate is provided with a mounting block at the center of the side wall, and the second support plate is provided with a mounting slot at the center of the top of the side wall. The size of the mounting slot and the mounting block is matched, and the mounting block of one side wall of the first support plate is connected in the mounting slot of the top of the side wall of two second support plates.

[0019] When the first support plate and the second support plate need to be assembled, the mounting block of the first support plate side wall is engaged in the mounting slot of the second support plate. Through one-by-one engagement connection, the first support plate and the second support plate are finally connected in a honeycomb shape, realizing the fixation of the first support plate and the second support plate in the horizontal direction. When the first support plate and the second support plate are lifted, due to the gravity of the human body, the first support plate and the second support plate are in a state of being pressed downward, so that the first support plate and the second support plate will not slide out in the vertical direction to cause safety accidents. When the first support plate and the second support plate need to be disassembled, the first support plate is pulled vertically, so that the mounting block and the mounting slot are separated from each other, thereby realizing the quick assembly and disassembly of the first support plate and the second support plate.

[0020] The hoop is semicircular and is provided with two, and the end of the hoop is provided with a protrusion, and the inside of the protrusion is provided with a hole. The two hoops are bolted through the holes of the end walls of the protrusions to form a complete circle.

[0021] When the steel chimney needs to be spliced, the segmented body of the steel chimney is spliced by the crane at this time. The hoop is attached to the outer wall of the steel chimney, and the end protrusions of the hoop are attached to each other. The hoop is fixed with bolts so that the hoop is sleeved on the outer wall of the steel chimney. At this time, the elevator is started to move the hoop upward by pulling the rope, thereby realizing the upward movement of the first support plate and the second support plate.

[0022] The gap between the limiting blocks is used to place the steel cable, wherein the positions of the three rotating shafts form a triangle, and the steel cable vertically extends to the ground through the gap between the limiting blocks of the outer walls of the three rotating shafts to form a triangle with the starting end of the steel cable, which is used to lift the first support plate and the second support plate.

[0023] The limiting block limits the steel cable, the steel cable slides and rubs the outer wall of the rotating shaft, so that the rotating shaft rotates, at this time, the limiting block rotates synchronously to drive the clamp to move, the clamp drives the first supporting plate and the second supporting plate to slide, and finally the operator can complete the welding work on the steel chimney.

[0024] Compared with the prior art, the beneficial effects of the present application are:

[0025] By setting the supporting assembly and the sliding assembly, the sliding assembly provides sliding power for the supporting assembly, so that the first supporting plate and the second supporting plate in the supporting assembly can move up and down in close contact with the outer wall of the steel chimney, facilitating the welding assembly of the segmented body of the steel chimney by the operator, and the first supporting plate and the second supporting plate are connected in a clamping manner, facilitating assembly and disassembly, the guardrails provided at the top thereof provide safety protection for the operator, and the split assembly of the clamp avoids the construction of a scaffold to sleeve the clamp on the outer wall of the steel chimney, so that the steel chimney is quickly installed. BRIEF DESCRIPTION OF DRAWINGS

[0026] Fig. 1 It is a structural schematic view of the present application;

[0027] Fig. 2 It is a structural schematic view of the sliding assembly of the present application;

[0028] Fig. 3 It is a structural schematic view of the mounting groove of the present application;

[0029] Fig. 4 It is a structural schematic view of the supporting assembly of the present application.

[0030] In the figure: 1, supporting assembly; 101, first supporting plate; 102, second supporting plate; 103, guardrail; 104, supporting frame; 105, clamp; 106, mounting groove; 2, segmented body; 3, sliding assembly; 301, fixing frame; 302, rotating shaft; 303, limiting block. DETAILED DESCRIPTION

[0031] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the present application.

[0032] Please refer to Figs. 1-4 In the embodiments of the present application, a tool-type equipment steel chimney high-altitude assembly platform and its use method include a supporting assembly 1 and a segmented body 2, the supporting assembly 1 is built on the outer wall of the segmented body 2, the supporting assembly 1 includes a first supporting plate 101:

[0033] The side wall of the first support plate 101 is slidably connected with the second support plate 102, the first support plate 101 and the second support plate 102 are provided with a plurality of and are connected in a closed loop, the top side of the first support plate 101 and the second support plate 102 is fixedly connected with the guardrail 103, the top of the second support plate 102 is fixedly connected with the support frame 104 on the side corresponding to the guardrail 103, the number of the support frame 104 is matched with the number of the second support plate 102, the top of the support frame 104 is fixedly connected with the hoop 105, and the hoop 105 is used for supporting the first support plate 101 and the second support plate 102.

[0034] In the embodiment, it needs to be explained that the steel chimney is divided into a plurality of segmented bodies 2, the segmented bodies 2 are stacked by using a crane to form overall splicing of the steel chimney, and the splicing part of the steel chimney needs to be welded and fixed by an operator to ensure the stability of the steel chimney.

[0035] The first support plate 101 and the second support plate 102 are connected with each other to form an operation platform, an operator can assemble and weld the steel chimney by standing on the operation platform, meanwhile, the guardrail 103 forms a closed shielding on the outer wall of the steel chimney along with the splicing of the first support plate 101 and the second support plate 102, so that the safety of the operator is ensured, and the support frame 104 fixedly connects the first support plate 101, the second support plate 102 and the hoop 105, so that the first support plate 101 and the second support plate 102 can slide synchronously when the hoop 105 slides up and down, and the steel chimney is conveniently fixed.

[0036] Please refer to Figs. 1-4 The outer wall of the hoop 105 is provided with a sliding assembly 3, and the sliding assembly 3 comprises a fixed frame 301.

[0037] The fixed frame 301 is fixedly connected to the top of the hoop 105, the bottom of the fixed frame 301 penetrates the inner wall and the outer wall of the hoop 105, the bottom inner wall and the top inner wall center of the fixed frame 301 are rotatably connected with shafts 302, the outer wall of the shaft 302 is fixedly connected with a limiting block 303, the limiting block 303 is provided with six, and two are a group.

[0038] In the embodiment, the hoop 105 slides up and down to drive the first support plate 101 and the second support plate 102 to slide up and down, in the process, the rotation of the shaft 302 drives the rotation of the limiting block 303, the outer wall of the limiting block 303 close to the outer wall of the steel chimney at the bottom of the fixed frame 301 is attached to the outer wall of the steel chimney, when the limiting block 303 rotates, the outer wall of the limiting block 303 close to the outer wall of the steel chimney rotates, so that the limiting block 303 drives the hoop 105 to slide up and down, and the first support plate 101 and the second support plate 102 move up and down.

[0039] Please focus on referring to Figs. 1-3 , the first support plate 101 and the second support plate 102 are trapezoidal, and the sizes of the first support plate 101 and the second support plate 102 are matched, the mounting block is arranged at the center of the side wall of the first support plate 101, and the mounting groove 106 is arranged at the center of the top of the side wall of the second support plate 102, and the size of the mounting groove 106 is matched with the mounting block, and the mounting block of the side wall of one first support plate 101 is clamped and connected in the mounting groove 106 of the top of the side wall of two second support plates 102.

[0040] In this embodiment: when the first support plate 101 and the second support plate 102 need to be assembled, the mounting block of the side wall of the first support plate 101 is clamped in the mounting groove 106 of the second support plate 102, and is clamped and connected one by one, and finally the first support plate 101 and the second support plate 102 are connected in a honeycomb shape, realizing the fixation of the first support plate 101 and the second support plate 102 in the horizontal direction, when the first support plate 101 and the second support plate 102 are lifted, due to the gravity of the human body, the first support plate 101 and the second support plate 102 are in a state of being pressed downward, so that the first support plate 101 and the second support plate 102 will not slide out in the vertical direction to cause safety accidents, when the first support plate 101 and the second support plate 102 need to be disassembled, the first support plate 101 is pulled vertically, so that the mounting block and the mounting groove 106 are separated from each other, so that the first support plate 101 and the second support plate 102 are quickly assembled and disassembled.

[0041] Please focus on referring to Figs. 1-4 , the hoop 105 is semicircular, and two hoops 105 are arranged, the end of the hoop 105 is provided with a protruding block, and the inside of the protruding block is provided with a hole, and the two hoops 105 are bolted through the holes of the end walls of the protruding blocks to form a complete circle.

[0042] In this embodiment: when the steel chimney needs to be spliced, the segmented body 2 of the steel chimney is spliced by the crane, at this time the hoop 105 is attached to the outer wall of the steel chimney, wherein the end protruding blocks of the hoop 105 are attached to each other, and the hoop 105 is fixed by bolts so that the hoop 105 is sleeved on the outer wall of the steel chimney, at this time the lifting machine is started to move upward by pulling the rope, and then the first support plate 101 and the second support plate 102 are lifted.

[0043] Please focus on referring to Fig. 2 , Fig. 3 , the gap between the limiting blocks 303 is used for placing the steel cable, wherein the positions of the three rotating shafts 302 form a triangle, and the steel cable vertically extends to the ground through the gap between the limiting blocks 303 of the outer walls of the three rotating shafts 302 to form a triangle with the steel cable at the starting end, which is used for lifting the first support plate 101 and the second support plate 102.

[0044] In the embodiment, the limiting block 303 limits the steel cable, the steel cable rubs the outer wall of the rotating shaft 302 while sliding, so that the rotating shaft 302 rotates, at this time, the limiting block 303 rotates synchronously to drive the clamp 105 to move, the clamp 105 drives the first support plate 101 and the second support plate 102 to slide, finally, the operator can complete the welding work on the steel chimney.

[0045] The above merely provides the preferred embodiments of the present application, but the protection scope of the present application is not limited thereto, and any person skilled in the art, according to the technical scheme and the inventive concept of the present application, can make equivalent replacements or changes within the technical range disclosed by the present application, which should be covered within the protection scope of the present application.

Claims

1. A tool-type equipment steel chimney high-altitude assembling platform, comprising a support assembly (1) and a segmented body (2), the support assembly (1) being built on the outer wall of the segmented body (2), characterized in that, The support assembly (1) comprises a first support plate (101): The side wall of the first support plate (101) is slidably connected with a second support plate (102), a plurality of the first support plate (101) and the second support plate (102) are provided and are connected in a closed loop, the top side of the first support plate (101) and the second support plate (102) is fixedly connected with a guardrail (103), the top side of the second support plate (102) corresponding to the guardrail (103) is fixedly connected with a support rod (104), the number of the support rod (104) is matched with the number of the second support plate (102), the top of the support rod (104) is fixedly connected with a hoop (105), and the hoop (105) is used for supporting the first support plate (101) and the second support plate (102); The outer wall of the hoop (105) is provided with a sliding assembly (3), and the sliding assembly (3) comprises a fixing frame (301): The fixing frame (301) is fixedly connected to the top of the hoop (105), and the bottom of the fixing frame (301) penetrates the inner wall and the outer wall of the hoop (105), the bottom inner wall and the top inner wall center of the fixing frame (301) are rotatably connected with shafts (302), the outer wall of the shaft (302) is fixedly connected with a limiting block (303), the limiting block (303) is provided with six, and two are a group; The first support plate (101) and the second support plate (102) are trapezoidal, and the size of the first support plate (101) and the second support plate (102) is matched, the side wall center of the first support plate (101) is provided with a mounting block, the top center of the side wall of the second support plate (102) is provided with a mounting groove (106), the size of the mounting groove (106) and the mounting block is matched, and the mounting block of the side wall of one first support plate (101) is clamped and connected in the mounting groove (106) of the top of the side wall of two second support plates (102); The hoop (105) is semicircular, and two hoops (105) are provided, the end of the hoop (105) is provided with a protrusion, and the inside of the protrusion is provided with a hole, and the two hoops (105) are bolted through the holes of the end walls of the protrusions to form a complete circle; The gap between the limiting blocks (303) is used for placing a steel cable, and the positions of the three shafts (302) form a triangle, the steel cable vertically extends to the ground through the gap between the limiting blocks (303) of the outer walls of the three shafts (302), and forms a triangle with the steel cable at the starting end, so as to lift the first support plate (101) and the second support plate (102).

2. A method of using a tooling equipment steel chimney high altitude mating platform characterized by: The tool type equipment steel chimney high-altitude group platform comprises a tool type equipment steel chimney high-altitude group platform as claimed in claim 1, and the specific operation is as follows: In use, the steel chimney is divided into a plurality of segmented bodies (2), the segmented bodies (2) are stacked by using a crane to form the overall splicing of the steel chimney, and the splicing part of the steel chimney needs to be welded and fixed by an operator to ensure the stability of the steel chimney. The first support plate (101) and the second support plate (102) are connected to each other to form an operation platform, and an operator can assemble and weld the steel chimney by standing on the operation platform, meanwhile, the guardrails (103) form a closed shielding on the outer wall of the steel chimney along with the splicing of the first support plate (101) and the second support plate (102), so as to ensure the safety of the operator, the support frame (104) is fixedly connected between the first support plate (101), the second support plate (102) and the hoop (105), so that the first support plate (101) and the second support plate (102) can slide synchronously when the hoop (105) slides up and down, so as to conveniently fix the steel chimney; The outer wall of the hoop (105) is provided with a sliding assembly (3), and the sliding assembly (3) comprises a fixing frame (301): The fixing frame (301) is fixedly connected to the top of the hoop (105), and the bottom of the fixing frame (301) penetrates the inner wall and the outer wall of the hoop (105), the bottom inner wall and the top inner wall of the fixing frame (301) are rotatably connected with shafts (302), the outer wall of the shaft (302) is fixedly connected with a limiting block (303), the limiting block (303) is provided with six, and two are a group; The hoop (105) slides up and down to drive the first support plate (101) and the second support plate (102) to slide up and down, in the process, the rotation of the shaft (302) drives the rotation of the limiting block (303), and the outer wall of the limiting block (303) close to the outer wall of the steel chimney at the bottom of the fixing frame (301) is attached to the outer wall of the steel chimney, when the limiting block (303) rotates, the outer wall of the limiting block (303) close to the outer wall of the steel chimney rotates, so that the limiting block (303) drives the hoop (105) to slide up and down, and the first support plate (101) and the second support plate (102) move up and down; The first support plate (101) and the second support plate (102) are trapezoidal, and the size of the first support plate (101) and the second support plate (102) is matched, the side wall center of the first support plate (101) is provided with a mounting block, the top center of the side wall of the second support plate (102) is provided with a mounting groove (106), the size of the mounting groove (106) and the mounting block is matched, and the mounting block of the side wall of one first support plate (101) is connected in the mounting groove (106) of the top of the side wall of two second support plates (102). When the first support plate (101) and the second support plate (102) need to be assembled, the mounting blocks of the side wall of the first support plate (101) are clamped in the mounting grooves (106) of the second support plate (102), and are connected one by one, finally the first support plate (101) and the second support plate (102) are connected in a honeycomb shape, realizing the fixation of the first support plate (101) and the second support plate (102) in the horizontal direction, when the first support plate (101) and the second support plate (102) are lifted, due to the gravity of the human body, the first support plate (101) and the second support plate (102) are in a state of being pressed downward, so that the first support plate (101) and the second support plate (102) will not slide out in the vertical direction to cause safety accidents, when the first support plate (101) and the second support plate (102) need to be disassembled, the first support plate (101) is pulled vertically, so that the mounting blocks and the mounting grooves (106) are separated from each other, thus realizing the quick assembly and disassembly of the first support plate (101) and the second support plate (102); The hoops (105) are semicircular and two are provided, the end of the hoop (105) is provided with a protruding block, and the inside of the protruding block is provided with a hole, and the two hoops (105) are bolted through the holes of the end walls of the protruding blocks to form a complete circle; When the steel chimney needs to be spliced, the segmented body (2) of the steel chimney is spliced by the crane, at this time the hoops (105) are attached to the outer wall of the steel chimney, wherein the end protruding blocks of the hoops (105) are attached to each other, and the hoops (105) are fixed by bolts so as to be sleeved on the outer wall of the steel chimney, at this time the elevator is started to move the hoops (105) upward by pulling the ropes, and then the first support plate (101) and the second support plate (102) are lifted; The gap between the limiting blocks (303) is used for placing the steel cable, wherein the positions of the three rotating shafts (302) form a triangle, the steel cable vertically extends to the ground through the gap between the limiting blocks (303) of the outer walls of the three rotating shafts (302), and forms a triangle with the steel cable at the starting end, which is used for lifting the first support plate (101) and the second support plate (102); The limiting blocks (303) limit the steel cable, and the steel cable slides while rubbing against the outer wall of the rotating shaft (302), so that the rotating shaft (302) rotates, at this time the limiting blocks (303) rotate synchronously to drive the hoops (105) to move, the hoops (105) drive the first support plate (101) and the second support plate (102) to slide, finally the operator completes the welding work of the steel chimney.