A kind of reverse drilling construction technology

By designing symmetrical crushing drill bits and drill pipes during raise drilling construction, combined with hydraulic drive and flushing fluid systems, the problem of low drilling efficiency under closed tunnel conditions is solved, and a stable and efficient drilling process and waste disposal are achieved.

CN117166926BActive Publication Date: 2024-10-18ANHUI UNIV OF SCI & TECH
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202311226842.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-22
Publication Date
2024-10-18
Estimated Expiration
2043-09-22

AI Technical Summary

Technical Problem

During mine construction, when the tunnel at the lower entrance of the raise drilling is closed, the reaming drill bit cannot be transferred to the lower entrance of the tunnel for assembly, resulting in low construction efficiency.

Method used

By designing four symmetrical crushing bits and drill rods at the bottom of the cutterhead frame on the drill bit, combined with the hydraulic drive system and water supply pipes, top-down hole expansion drilling is achieved, and the flushing fluid is used to suppress dust and cool down the crushing bits. Ensure drilling stability and smooth waste discharging.

Benefits of technology

It improves the drilling efficiency, reduces the wear of the cutterhead frame, reduces environmental pollution, ensures the stability of the broken drill bit and the smooth discharge of waste materials, and solves the technical problems existing in the raise construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117166926B_ABST
    Figure CN117166926B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of mine construction technology, specifically to a reverse drilling construction process, including pouring a concrete foundation, drilling a guide hole, installing a reverse drilling machine, drilling a blanking hole with a hole-opening drill bit, replacing a hole-reaming drill bit for hole-reaming drilling, and continuously flushing the hole-reaming drilling process. The present invention changes the design of the hole-reaming drill bit to set four symmetrical crushing drill bits at the bottom of the cutter head frame, and sets a drill rod at the middle of the bottom of the cutter head frame. The four crushing drill bits and the drill rod at the bottom of the cutter head frame are used to simultaneously perform hole-reaming drilling from top to bottom. The symmetrical design of the four crushing drill bits at the bottom of the cutter head frame increases the stability of hole-reaming drilling. At the same time, by changing the traditional bottom-up construction process of reverse drilling, a matching hole-reaming drill bit is reasonably designed, and the effective coordination of the main cutter and the auxiliary cutter during the drilling process is achieved, the drilling efficiency is improved, the wear of the cutter head frame is reduced, and the technical problems existing in the reverse drilling process are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of mine construction technology, specifically a reverse drilling construction process. Background Technology

[0002] Mining operations often involve the generation of large amounts of harmful gases, which can lead to serious accidents if ventilation is not provided in time. Therefore, mines need to be equipped with ventilation ducts. Raise-the-well drilling rigs can be used to excavate ventilation ducts from the bottom up. During the excavation preparation process, the reaming drill bit needs to be transported to the bottom of the roadway for assembly. In actual operation, some coal mines have closed roadways at the lower entrance of the raise-the-well drilling site, and the conditions for reopening are not yet available. That is, after the pilot hole is completed, the reaming drill bit cannot be transported to the lower entrance of the roadway for assembly. To improve work efficiency and enable drilling operations even under closed roadway conditions, we have improved the original process and equipment, proposing a raise-the-well drilling construction process. Summary of the Invention

[0003] To address the shortcomings of existing technologies, this invention provides a reverse drilling construction process that enables drilling operations even when the roadway is closed, thereby improving the efficiency of reverse drilling operations.

[0004] To achieve the above objectives, the present invention provides the following technical solution: a reverse drilling construction process, specifically comprising the following steps:

[0005] Step 1: Before construction, investigate the geological data provided by the geological and design departments, then excavate the foundation of the raise boring machine and the foundation of the directional drilling machine in the construction area, and pour the concrete foundation at the same time. Install the directional drilling machine on the concrete foundation and drill the pilot hole downward in the construction area.

[0006] Step 2: Install the raise boring machine, install the drill bit at the bottom of the drive rod, use the hydraulic drive system on the raise boring machine to control the rotation of the drive rod, and at the same time set up a water supply pipe at the top of the drive rod. Drill the guide hole through the drill bit at the bottom of the drive rod based on the guide hole to form the material drop hole.

[0007] Step 3: Replace the drill bit at the bottom of the drive rod with a reaming drill bit. Use the reaming drill bit to drill along the material drop hole. The waste material generated during the reaming process falls into the interior of the tunnel through the material drop hole.

[0008] Step 4: Connect the drive rod and the water supply pipe through the drill rod at the bottom of the reaming drill bit. Send flushing fluid into the drive rod through the water supply pipe. The flushing fluid flushes the area below the reaming drill bit through the drill rod at the bottom of the reaming drill bit, flushing the waste box inside the material drop hole and the lower entrance of the roadway. At the same time, the flushing fluid above the reaming drill bit sprays out in all directions to suppress the dust generated inside the reaming hole until the bottom of the reaming drill bit drills into the lower entrance of the roadway, completing the reverse drilling operation.

[0009] Preferably, in step 1, an engineering inspection hole is drilled near the well shaft, and the geological conditions of the adjacent well shaft are collected in detail, and the information is compared, verified and analyzed to investigate the engineering geology and hydrogeology of the strata.

[0010] Preferably, in step 2, after the drilling bit completes the drilling of the material drop hole along the guide hole, the entire drilling bit connected to the drive rod is lifted, and the drilling bit at the bottom of the drive rod is removed.

[0011] Preferably, in step 3, the reaming drill bit includes a cutter head holder and a breaker drill bit. The top of the reaming drill bit is provided with a drive rod, and the top of the drive rod is provided with a water supply pipe. The bottom of the cutter head holder is provided with breaker drill bits around its perimeter, and a mounting bracket is also provided in the middle of the bottom of the cutter head holder. A drill rod is also provided at the bottom of the mounting bracket. A connecting rod is provided at the top of the cutter head holder, and the top of the connecting rod is connected to the bottom of the drive rod.

[0012] Preferably, the surface of the connecting rod is provided with a connecting frame, and the bottom of the connecting frame is connected to the perimeter of the top of the cutter head holder. The interior of the connecting frame is provided with a plurality of first spray holes, and the interior of the plurality of first spray holes is connected to the interior of the connecting rod.

[0013] Preferably, one end of each of the first spray holes extends to the outside of the connecting frame.

[0014] Preferably, the connecting rod has a guide hole inside, and one end of the guide hole passes through the cutter head holder and extends into the interior of the mounting frame. The mounting frame has a plurality of second spray holes inside, and the interior of the plurality of second spray holes is connected to the interior of the guide hole. The drill rod has a flushing hole inside, and one end of the flushing hole passes through the drill rod and extends to the bottom end of the drill rod.

[0015] Preferably, one end of each of the second spray holes extends to the outside of the mounting bracket.

[0016] Compared with existing technologies, it has the following advantages:

[0017] By redesigning the reaming bit to include four symmetrical breaker bits at the bottom of the cutterhead, along with a drill rod in the center of the bottom of the cutterhead, top-down reaming drilling is performed simultaneously using the four breaker bits and the drill rod. The symmetrical design of the four breaker bits at the bottom of the cutterhead increases the stability of the reaming process. Furthermore, by changing the traditional bottom-up reaming construction process and rationally designing the matching reaming bit, effective coordination between the main and auxiliary cutters is achieved during drilling, improving drilling efficiency, reducing cutterhead wear, and solving technical challenges in reaming operations. Additionally, during reaming drilling using the reaming bit, flushing fluid is introduced into the drive rod through a water supply pipe, and the flushing fluid enters the connecting rod through the drive rod. First, the flushing fluid is sprayed onto the cutter head frame through several first spray holes inside the connecting frame, effectively suppressing the dust generated during the reaming process and reducing environmental pollution. Then, the flushing fluid enters the mounting frame through the guide hole and is sprayed onto the surrounding crushing drill bits through several second spray holes inside the mounting frame. This cools the crushing drill bits to prevent overheating during operation and washes away the mud adhering to them, ensuring their stability during operation. Finally, the flushing fluid is flushed into the material discharge hole through the flushing hole inside the drill rod, preventing waste from clogging the discharge hole and ensuring smooth waste discharge. Attached Figure Description

[0018] Figure 1 This is a flowchart of a reverse drilling construction process according to an embodiment of the present invention;

[0019] Figure 2 This is a schematic diagram of the drilling process of the reaming drill bit according to an embodiment of the present invention;

[0020] Figure 3 This is a schematic diagram of the reaming drill bit structure according to an embodiment of the present invention;

[0021] Figure 4 This is a schematic diagram of the cutter head holder and drill rod structure according to an embodiment of the present invention;

[0022] Figure 5 This is a schematic diagram of the cutter head holder and connecting rod structure according to an embodiment of the present invention;

[0023] Figure 6 This is a schematic diagram of the internal structure of the mounting bracket and connecting rod in an embodiment of the present invention.

[0024] In the diagram, 10 is the reaming drill bit; 20 is the drive rod; 30 is the water supply pipe; 40 is the material drop hole; 50 is the lower entrance of the tunnel; 11 is the cutter head holder; 12 is the crushing drill bit; 13 is the mounting bracket; 14 is the drill rod; 15 is the connecting rod; 16 is the connecting bracket; 21 is the first spray hole; 22 is the guide hole; 23 is the second spray hole; and 24 is the flushing hole. Detailed Implementation

[0025] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0026] Example 1

[0027] Please see Figures 1 to 6 As shown, a reverse drilling construction process specifically includes the following steps:

[0028] Step 1: Before construction, investigate the geological data provided by the geological and design departments, then excavate the foundation of the raise boring machine and the foundation of the directional drilling machine in the construction area, and pour the concrete foundation at the same time. Install the directional drilling machine on the concrete foundation and drill the pilot hole downward in the construction area.

[0029] Step 2: Install the raise boring machine, install the drilling bit at the bottom of the drive rod 20, use the hydraulic drive system on the raise boring machine to control the rotation of the drive rod 20, and at the same time set up a water supply pipe 30 at the top of the drive rod 20. Drill the guide hole based on the guide hole through the drilling bit at the bottom of the drive rod 20 to form the material drop hole 40.

[0030] Step 3: Replace the drill bit at the bottom of the drive rod 20 with the reaming drill bit 10. Use the reaming drill bit 10 to ream the hole along the material drop hole 40. The waste material generated during the reaming process falls into the interior of the tunnel lower entrance 50 through the material drop hole 40.

[0031] Step 4: Connect the drive rod 20 and the water supply pipe 30 through the drill rod 14 at the bottom of the reaming drill bit 10. Send flushing fluid into the drive rod 20 through the water supply pipe 30. The flushing fluid flushes the area below the reaming drill bit 10 through the drill rod 14 at the bottom of the reaming drill bit 10, and flushes the waste box inside the material drop hole 40 and the lower entrance 50 of the roadway. At the same time, the flushing fluid above the reaming drill bit 10 is sprayed out in all directions to suppress the dust generated inside the reaming hole until the bottom end of the reaming drill bit 10 drills into the interior of the lower entrance 50 of the roadway, completing the reverse drilling operation.

[0032] As a further explanation in this embodiment, in step 1, an engineering inspection hole is drilled near the well shaft, and the geological conditions of the adjacent well shaft are collected in detail, and the comparison, verification and analysis are carried out to investigate the engineering geology and hydrogeology of the strata.

[0033] As a further explanation in this embodiment, in step 2, after the drilling bit completes the drilling of the material drop hole 40 along the guide hole, the drive rod 20 is lifted as a whole with the drilling bit, and the drilling bit at the bottom of the drive rod 20 is removed.

[0034] As a further explanation in this embodiment, in step 3, the reaming drill bit 10 includes a cutter head holder 11 and a breaking drill bit 12. The top of the reaming drill bit 10 is provided with a drive rod 20, and the top of the drive rod 20 is provided with a water supply pipe 30. Breaking drill bits 12 are provided around the bottom of the cutter head holder 11, and a mounting bracket 13 is also provided in the middle of the bottom of the cutter head holder 11. A drill rod 14 is also provided at the bottom of the mounting bracket 13. A connecting rod 15 is provided at the top of the cutter head holder 11, and the top of the connecting rod 15 is connected to the bottom of the drive rod 20. A connecting frame 16 is provided on the surface of the connecting rod 15, and the bottom of the connecting frame 16 is connected to the top of the cutter head holder 11.

[0035] It should be noted that when using the reaming bit 10 for reaming drilling, the drive rod 20 is connected to the top of the connecting rod 15. Then, the drive rod 20 drives the cutter head 11 to rotate as a whole through the connecting rod 15. The four breaker bits 12 at the bottom of the cutter head 11 and the drill rod 14 simultaneously perform reaming drilling from top to bottom. The symmetrical design of the four breaker bits 12 at the bottom of the cutter head 11 increases the stability of reaming drilling. At the same time, by changing the traditional bottom-up construction process of reverse well and rationally designing the matching reaming bit 10, the effective cooperation between the main cutter and the auxiliary cutter is achieved during the drilling process, which improves drilling efficiency, reduces the wear of the cutter head 11, and solves the technical problems existing in the reverse well construction process.

[0036] As a further explanation of this embodiment, the connecting frame 16 is provided with a plurality of first spray holes 21 inside, and the interior of each plurality of first spray holes 21 is connected to the interior of the connecting rod 15. One end of each plurality of first spray holes 21 extends to the outside of the connecting frame 16. The connecting rod 15 is provided with a guide hole 22 inside, and one end of the guide hole 22 passes through the cutter head holder 11 and extends to the interior of the mounting frame 13. The mounting frame 13 is provided with a plurality of second spray holes 23 inside, and the interior of each plurality of second spray holes 23 is connected to the interior of the guide hole 22. One end of each plurality of second spray holes 23 extends to the outside of the mounting frame 13. The drill rod 14 is provided with a flushing hole 24 inside, and one end of the flushing hole 24 passes through the drill rod 14 and extends to the bottom end of the drill rod 14.

[0037] It should be noted that during reaming using the reaming drill bit 10, flushing fluid is supplied to the drive rod 20 via the water supply pipe 30. The flushing fluid enters the connecting rod 15 through the drive rod 20 and is first sprayed onto the cutter head holder 11 through several first spray holes 21 inside the connecting frame 16. This effectively suppresses the dust generated during reaming and reduces environmental pollution during the reaming process. Then, the flushing fluid enters the mounting frame 13 through the guide hole 22 and flows through the mounting frame... The several second spray holes 23 inside the drill rod 13 spray the flushing fluid onto the surrounding crushing drill bit 12. On the one hand, this cools the crushing drill bit 12 to prevent it from overheating during operation. On the other hand, it washes away the mud adhering to the crushing drill bit 12, ensuring its stability during operation. Finally, the flushing fluid flows through the flushing hole 24 inside the drill rod 14 into the material discharge hole 40 to prevent waste from clogging the material discharge hole 40 and ensure smooth waste discharge.

[0038] Furthermore, any content not described in detail in this specification is existing technology known to those skilled in the art.

[0039] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.

[0040] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A reverse drilling construction process, characterized in that: The specific steps include: Step 1: Before construction, the geological data provided by the geological and design departments are investigated, and then the raise boring machine foundation and directional drilling foundation are excavated in the construction area, and the concrete foundation is poured at the same time. The directional drilling machine is installed on the concrete foundation, and the guide hole is drilled downward in the construction area; Step 2: Install the raise boring machine, install a hole-opening drill bit at the bottom end of the driving rod (20), use the hydraulic drive system on the raise boring machine to control the driving rod (20) to rotate, and at the same time, set up a water supply pipe (30) at the top end of the driving rod (20), and use the hole-opening drill bit at the bottom end of the driving rod (20) to perform a pilot hole drilling construction on the basis of the guide hole to form a blanking hole (40); Step 3: Replace the drill bit at the bottom end of the driving rod (20), replace the hole-opening drill bit with a hole-reaming drill bit (10), and use the hole-reaming drill bit (10) to carry out hole-reaming drilling along the blanking hole (40), and waste materials generated during the hole-reaming drilling process fall into the interior of the tunnel lower opening (50) through the blanking hole (40); Step 4: The driving rod (20) is connected to the inside of the water supply pipe (30) through the drill rod (14) provided at the bottom of the reaming drill bit (10), and a flushing liquid is supplied to the inside of the driving rod (20) through the water supply pipe (30). The flushing liquid flushes the bottom of the reaming drill bit (10) through the drill rod (14) at the bottom of the reaming drill bit (10), and the waste accumulated inside the blanking hole (40) is flushed into the inside of the tunnel lower opening (50). At the same time, the flushing liquid above the reaming drill bit (10) is sprayed to the surroundings to suppress the dust generated inside the reaming hole, until the bottom end of the reaming drill bit (10) drills into the inside of the tunnel lower opening (50), and the reverse drilling construction is completed; In step 1, an engineering inspection hole is drilled near the wellbore, and the geological conditions of the nearby wellbore are collected in detail, and compared, verified and analyzed to investigate the engineering geology and hydrogeology of the stratum; In step 2, after the hole-opening drill bit completes the drilling construction of the blanking hole (40) along the guide hole, the driving rod (20) connected to the hole-opening drill bit is lifted as a whole, and the hole-opening drill bit at the bottom end of the driving rod (20) is removed; In step 3, the reaming drill bit (10) comprises a cutter head frame (11) and a crushing drill bit (12), a driving rod (20) is arranged at the top of the reaming drill bit (10), and a water supply pipe (30) is arranged at the top of the driving rod (20), crushing drill bits (12) are arranged around the bottom of the cutter head frame (11), and a mounting frame (13) is also arranged in the middle of the bottom of the cutter head frame (11), and a drill rod (14) is also arranged at the bottom of the mounting frame (13), and a connecting rod (15) is arranged at the top of the cutter head frame (11), and the top end of the connecting rod (15) is connected to the bottom end of the driving rod (20); A connecting frame (16) is provided on the surface of the connecting rod (15), and the bottom of the connecting frame (16) is connected to the four sides of the top of the cutter head frame (11), and a plurality of first spray holes (21) are provided inside the connecting frame (16), and the interiors of the plurality of first spray holes (21) are all connected to the interior of the connecting rod (15), and one end of the plurality of first spray holes (21) extends to the outside of the connecting frame (16); A guide hole (22) is provided inside the connecting rod (15), and one end of the guide hole (22) penetrates the cutter head frame (11) and extends to the inside of the mounting frame (13); a plurality of second spray holes (23) are provided inside the mounting frame (13), and the interiors of the plurality of second spray holes (23) are all connected to the interior of the guide hole (22); a flushing hole (24) is provided inside the drill rod (14), and one end of the flushing hole (24) penetrates the drill rod (14) and extends to the bottom end of the drill rod (14); and one end of the plurality of second spray holes (23) extends to the outside of the mounting frame (13).

Citation Information

Patent Citations

  • Local excavation pre-supporting raise boring technology

    CN103835661A

  • Reaming cutting head of blind raise boring machine

    CN203742454U

  • Novel raise boring machine head of just drilling

    CN206346702U