Operation optimization method and system applied to power system

By extracting the operating state vector time series and fault prediction network of the power system, the fault point is determined, which solves the problem of difficult fault location in the power system, improves the accuracy and efficiency of fault prediction and optimization, and reduces the risk of accidents.

CN117200203BActive Publication Date: 2024-10-29BEIJING URBAN POWER SUPPLY DEVELOPMENT CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311154825.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-07
Publication Date
2024-10-29
Estimated Expiration
2043-09-07

AI Technical Summary

Technical Problem

During the operation of the power system, it is difficult to accurately find the system operation fault point and optimize it, leading to the possibility of major accidents.

Method used

By extracting the operating state vector time series, the fully connected output unit in the system operating fault prediction network is used to determine the initial fault location data, and based on these data, the system operating fault point is determined, and an optimization plan is generated to improve fault prediction accuracy and optimization efficiency.

Benefits of technology

It improves the accuracy of power system fault prediction and operation optimization efficiency, and reduces the risk of accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117200203B_ABST
    Figure CN117200203B_ABST
Patent Text Reader

Abstract

An embodiment of the present invention provides an operation optimization method and system for an electric power system, which determines first initial fault location data of electric power system operation data according to a first fully-connected output unit in a system operation fault prediction network, and when indicating that the electric power system operation data belongs to a set fault point queue, determines second initial fault location data of the electric power system operation data according to a second fully-connected output unit according to an operation state vector timing sequence, and determines a system operation fault point of the electric power system operation data according to the first initial fault location data and the second initial fault location data, or when indicating that the electric power system operation data does not belong to the set fault point queue, uses the system operation fault point represented by the first initial fault location data as the system operation fault point of the electric power system operation data, thereby improving the subsequent prediction accuracy of the electric power system operation fault point, thereby improving the subsequent operation optimization efficiency of the electric power system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of artificial intelligence technology, and in particular to an operation optimization method and system applied to a power system. Background Art

[0002] With the development of society, the technological innovation of the power industry is being promoted. The safe production of electricity is not only the premise and foundation for the development of the power industry, but also the guarantee for power enterprises to exert social benefits and improve their economic benefits. The principle of "safety first, prevention first" is the eternal theme of power production and construction. The overall goal of power production safety is to prevent accidents that have a serious impact on society, cause major losses to the development of productivity and the preservation and appreciation of state-owned assets, and especially to prevent personal injury accidents in power production. To achieve this overall goal, in the operation of the power system, when the system fails, how to accurately find the system operation fault point and optimize the system is a technical problem that needs to be solved urgently in this field. Summary of the invention

[0003] In view of this, an embodiment of the present invention aims to provide an operation optimization method and system applied to an electric power system, extract an operation state vector time series sequence of electric power system operation data to be subjected to system operation fault prediction, and determine the first initial fault location data of the electric power system operation data according to the operation state vector time series sequence and the first fully connected output unit in the system operation fault prediction network; wherein the system operation fault prediction network also includes one or more second fully connected output units; when the first initial fault location data indicates that the electric power system operation data belongs to a set fault point queue, the second initial fault location data of the electric power system operation data is determined according to the operation state vector time series sequence and the one or more second fully connected output units, and the system operation fault point of the electric power system operation data is determined according to the first initial fault location data and the second initial fault location data; when the first initial fault location data indicates that the electric power system operation data does not belong to the set fault point queue, the system operation fault point represented by the first initial fault location data is used as the system operation fault point of the electric power system operation data, thereby improving the subsequent prediction accuracy of the electric power system operation fault point, thereby improving the subsequent operation optimization efficiency of the electric power system.

[0004] According to one aspect of an embodiment of the present invention, there is provided an operation optimization method and system for a power system, the method comprising:

[0005] Extracting a time series sequence of operation state vectors of power system operation data for system operation fault prediction;

[0006] According to the operation state vector time series, determining the first initial fault location data of the power system operation data according to the first fully connected output unit in the system operation fault prediction network; wherein the system operation fault prediction network also includes one or more second fully connected output units;

[0007] If the first initial fault location data indicates that the power system operation data belongs to a set fault point queue, determining the second initial fault location data of the power system operation data according to the one or more second fully connected output units according to the operation state vector timing sequence, and determining the system operation fault point of the power system operation data according to the first initial fault location data and the second initial fault location data;

[0008] If the first initial fault location data represents that the power system operation data does not belong to the set fault point queue, the system operation fault point represented by the first initial fault location data is determined as the system operation fault point of the power system operation data, and a corresponding operation optimization plan is generated based on the system operation fault point of the power system operation data.

[0009] In an alternative implementation manner, determining the system operation fault point of the power system operation data according to the first initial fault location data and the second initial fault location data includes:

[0010] If the system operation fault point represented by the second initial fault location data belongs to the set fault point queue, determining the system operation fault point of the power system operation data as the set fault point queue;

[0011] If the system operation fault point represented by the second initial fault location data does not belong to the set fault point queue, a system operation fault point is determined from each candidate system operation fault point, and is determined as the system operation fault point of the power system operation data; wherein the candidate system operation fault points include the system operation fault points among the system operation fault points that can be output by the first fully-connected output unit except for the set fault point queue.

[0012] An alternative implementation manner further includes a salient feature focusing unit corresponding to each fully connected output unit before the fully connected output unit;

[0013] Before the step of determining the initial fault location data of the power system operation data according to any fully connected output unit according to the operation state vector timing sequence, the method further includes:

[0014] According to the significant feature focusing unit corresponding to the fully connected output unit, significant feature weights are assigned to the operation state vector time series sequence to generate the operation state vector time series sequence after significant feature weight assignment;

[0015] The determining of the initial fault location data of the power system operation data according to any fully connected output unit based on the operation state vector time sequence comprises:

[0016] According to the operating state vector time series sequence after the significant feature weights are assigned, initial fault location data of the power system operating data is determined according to the fully connected output unit.

[0017] In an alternative implementation, the operating state vector timing sequence includes:

[0018] An operation state vector diagram generated by one or more neurons; each salient feature focusing unit includes a self-salient feature focusing unit and a reconstruction salient feature focusing unit;

[0019] The significant feature focusing unit corresponding to the fully connected output unit performs significant feature weight allocation on the operation state vector time series sequence to generate the operation state vector time series sequence after significant feature weight allocation, including:

[0020] According to the self-significant feature focusing unit corresponding to the fully connected output unit, for each neuron, based on the significant feature weight learned for the neuron in the self-significant feature focusing unit of the fully connected output unit, the operation state vector diagram of the neuron is fused to generate a fused operation state vector diagram of the neuron;

[0021] According to the reconstructed significant feature focusing unit corresponding to the fully connected output unit, based on the significant feature weights learned by the reconstructed significant feature focusing unit of the fully connected output unit for each operating state vector node in the operating state vector diagram, the fused operating state vector diagram of the one or more neurons is fused to generate a processed operating state vector diagram of the one or more neurons, which is determined to be a time series sequence of the operating state vectors after the significant feature weights are assigned.

[0022] In an alternative embodiment, the system runs a training step of a fault prediction network, comprising:

[0023] Obtaining a long short-term memory network with initialized weight parameters; wherein the long short-term memory network with initialized weight parameters includes an encoder, a first initialized fully connected output unit, and one or more second initialized fully connected output units; the first initialized fully connected output unit and each second initialized fully connected output unit are respectively connected to the encoder;

[0024] According to the first template power system operation data sequence, updating the parameters of the first initialized fully-connected output unit, and using the updated first initialized fully-connected output unit as the first fully-connected output unit;

[0025] After the first fully-connected output unit is updated and generated, for each of the one or more second initialized fully-connected output units, parameters of the second initialized fully-connected output unit are updated according to the second template power system operation data sequence, and the updated second initialized fully-connected output unit is used as a second fully-connected output unit;

[0026] The long short-term memory network that is finally output is determined as the system operation fault prediction network.

[0027] In an alternative implementation, the updating of parameters of the first initialized fully connected output unit according to the first template power system operation data sequence includes:

[0028] Acquiring template power system operation data in a first template power system operation data sequence;

[0029] Extracting the operation state vector time sequence sequence of the template power system operation data according to the encoder;

[0030] According to the operation state vector timing sequence, and according to the first initialized fully connected output unit, initial fault location data of the template power system operation data is determined;

[0031] Determining a training error value based on a priori system operation fault points carried by the template power system operation data and the determined initial fault location data;

[0032] updating the first initialized fully connected output unit according to the determined training error value;

[0033] Return to execute the step of obtaining the template power system operation data in the first template power system operation data sequence until the iteration rounds of each template power system operation data in the first template power system operation data sequence are greater than the first set rounds; wherein the iteration round of each template power system operation data is the round for updating parameters based on the template power system operation data.

[0034] In an alternative implementation, the updating of parameters of the second initialized fully connected output unit according to the second template power system operation data sequence comprises:

[0035] Acquire the template power system operation data in the second template power system operation data sequence; extract the operation state vector time sequence sequence of the template power system operation data according to the encoder;

[0036] Determining initial fault location data of the template power system operation data according to the operation state vector timing sequence and the second initialized fully connected output unit;

[0037] Determining a training error value according to the a priori system operation fault point carried by the template power system operation data and the initial fault location data;

[0038] According to the determined training error value, the second initialized fully connected output unit is updated; the step of obtaining the template power system operation data in the second template power system operation data sequence is returned to execute until the iteration rounds of each template power system operation data in the second template power system operation data sequence are greater than the second set rounds; wherein the iteration round of each template power system operation data is the round of parameter update based on the template power system operation data.

[0039] In an alternative implementation, the system fault prediction data determined by each fully connected output unit includes:

[0040] The fully-connected output unit can output a classification index for each system operation fault point, wherein the classification index for each system operation fault point represents the possibility that the power system operation data output by the fully-connected output unit belongs to the system operation fault point; the system operation fault point represented by each system fault prediction data is: the system operation fault point with the largest classification index among the system operation fault points contained in the system fault prediction data.

[0041] According to another aspect of an embodiment of the present invention, there is provided an operation optimization method system applied to a power system, the system comprising:

[0042] An extraction unit, used for extracting a time series sequence of operation state vectors of power system operation data to be used for system operation fault prediction;

[0043] A first determination unit is used to determine the first initial fault location data of the power system operation data according to the operation state vector time series sequence and the first fully connected output unit in the system operation fault prediction network, and determine it as the first initial fault location data; wherein the system operation fault prediction network also includes one or more second fully connected output units;

[0044] a second determination unit, configured to determine, according to the operation state vector timing sequence and based on the one or more second fully-connected output units, second initial fault location data of the operation data of the power system, if the first initial fault location data indicates that the operation data of the power system belongs to a set fault point queue, and determine, according to the first initial fault location data and the second initial fault location data, a system operation fault point of the operation data of the power system;

[0045] A third determination unit is used to determine the system operation fault point represented by the first initial fault location data as the system operation fault point of the power system operation data if the first initial fault location data represents that the power system operation data does not belong to the set fault point queue, and generate a corresponding operation optimization plan based on the system operation fault point of the power system operation data.

[0046] According to another aspect of an embodiment of the present invention, there is provided an electronic device, including a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other via the communication bus; the memory is used to store computer programs; and the processor is used to implement the above-mentioned steps of the operation optimization method applied to the power system when executing the program stored in the memory.

[0047] In order to make the above-mentioned purposes, features and advantages of the embodiments of the present invention more obvious and easy to understand, the embodiments will be described in detail below in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0049] Figure 1 A schematic diagram showing components of a server provided by an embodiment of the present invention is shown;

[0050] Figure 2 A schematic diagram of a process flow of an operation optimization method and system for a power system provided by an embodiment of the present invention is shown;

[0051] Figure 3 A functional module block diagram of an operation optimization system applied to a power system provided by an embodiment of the present invention is shown. DETAILED DESCRIPTION

[0052] In order to enable students in the technical field to better understand the scheme of the present invention, the technical scheme in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is only a part of the embodiment of the present invention, not all the embodiments. According to the embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0053] The terms "first", "second", "third", etc. (if any) in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein, for example. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0054] Figure 1 An exemplary component diagram of a server 100 is shown. The server 100 may include one or more processors 104, such as one or more central processing units (CPUs), each of which may implement one or more hardware threads. The server 100 may also include any storage medium 106 for storing any kind of information such as code, settings, data, etc. Non-limitingly, for example, the storage medium 106 may include any one or more combinations of the following: any type of RAM, any type of ROM, flash memory device, hard disk, optical disk, etc. More generally, any storage medium may use any technology to store information. Further, any storage medium may provide volatile or non-volatile retention of information. Further, any storage medium may represent a fixed or removable component of the server 100. In one case, when the processor 104 executes an associated instruction stored in any storage medium or a combination of storage media, the server 100 may perform any operation of the associated instruction. The server 100 also includes one or more drive units 108 for interacting with any storage medium, such as a hard disk drive unit, an optical disk drive unit, etc.

[0055] The server 100 also includes input / output 110 (I / O) for receiving various inputs (via input unit 112) and for providing various outputs (via output unit 114). One specific output mechanism may include a presentation device 116 and an associated graphical user interface (GUI) 118. The server 100 may also include one or more network interfaces 120 for exchanging data with other devices via one or more communication units 122. One or more communication buses 124 couple the components described above together.

[0056] The communication unit 122 may be implemented in any manner, for example, through a local area network, a wide area network (e.g., the Internet), a point-to-point connection, etc., or any combination thereof. The communication unit 122 may include any combination of hardwired links, wireless links, routers, gateway functions, name servers 100, etc. governed by any protocol or combination of protocols.

[0057] Figure 2 The schematic diagram of the process of the operation optimization method and system applied to the power system provided by the embodiment of the present invention is shown. The operation optimization method and system applied to the power system can be Figure 1 The server 100 shown in FIG. 1 is executed, and the detailed steps of the operation optimization method and system applied to the power system are introduced as follows.

[0058] Step S110, extracting the operation state vector time series sequence of the power system operation data to be used for system operation fault prediction;

[0059] Step S120, determining the first initial fault location data of the power system operation data according to the operation state vector time series sequence and the first fully connected output unit in the system operation fault prediction network; wherein the system operation fault prediction network further includes one or more second fully connected output units;

[0060] Step S130, if the first initial fault location data indicates that the power system operation data belongs to a set fault point queue, determining the second initial fault location data of the power system operation data according to the operation state vector timing sequence and the one or more second fully connected output units, and determining the system operation fault point of the power system operation data according to the first initial fault location data and the second initial fault location data;

[0061] Step S140: If the first initial fault location data represents that the power system operation data does not belong to the set fault point queue, the system operation fault point represented by the first initial fault location data is determined as the system operation fault point of the power system operation data, and a corresponding operation optimization plan is generated based on the system operation fault point of the power system operation data.

[0062] In an alternative implementation manner, determining the system operation fault point of the power system operation data according to the first initial fault location data and the second initial fault location data includes:

[0063] If the system operation fault point represented by the second initial fault location data belongs to the set fault point queue, determining the system operation fault point of the power system operation data as the set fault point queue;

[0064] If the system operation fault point represented by the second initial fault location data does not belong to the set fault point queue, a system operation fault point is determined from each candidate system operation fault point, and is determined as the system operation fault point of the power system operation data; wherein the candidate system operation fault points include the system operation fault points among the system operation fault points that can be output by the first fully-connected output unit except for the set fault point queue.

[0065] An alternative implementation manner further includes a salient feature focusing unit corresponding to each fully connected output unit before the fully connected output unit;

[0066] Before the step of determining the initial fault location data of the power system operation data according to any fully connected output unit according to the operation state vector timing sequence, the method further includes:

[0067] According to the significant feature focusing unit corresponding to the fully connected output unit, significant feature weights are assigned to the operation state vector time series sequence to generate the operation state vector time series sequence after significant feature weight assignment;

[0068] The determining of the initial fault location data of the power system operation data according to any fully connected output unit based on the operation state vector time sequence comprises:

[0069] According to the operating state vector time series sequence after the significant feature weights are assigned, initial fault location data of the power system operating data is determined according to the fully connected output unit.

[0070] In an alternative implementation, the operating state vector timing sequence includes:

[0071] An operation state vector diagram generated by one or more neurons; each salient feature focusing unit includes a self-salient feature focusing unit and a reconstruction salient feature focusing unit;

[0072] The significant feature focusing unit corresponding to the fully connected output unit performs significant feature weight allocation on the operation state vector time series sequence to generate the operation state vector time series sequence after significant feature weight allocation, including:

[0073] According to the self-significant feature focusing unit corresponding to the fully connected output unit, for each neuron, based on the significant feature weight learned for the neuron in the self-significant feature focusing unit of the fully connected output unit, the operation state vector diagram of the neuron is fused to generate a fused operation state vector diagram of the neuron;

[0074] According to the reconstructed significant feature focusing unit corresponding to the fully connected output unit, based on the significant feature weights learned by the reconstructed significant feature focusing unit of the fully connected output unit for each operating state vector node in the operating state vector diagram, the fused operating state vector diagram of the one or more neurons is fused to generate a processed operating state vector diagram of the one or more neurons, which is determined to be a time series sequence of the operating state vectors after the significant feature weights are assigned.

[0075] In an alternative embodiment, the system runs a training step of a fault prediction network, comprising:

[0076] Obtaining a long short-term memory network with initialized weight parameters; wherein the long short-term memory network with initialized weight parameters includes an encoder, a first initialized fully connected output unit, and one or more second initialized fully connected output units; the first initialized fully connected output unit and each second initialized fully connected output unit are respectively connected to the encoder;

[0077] According to the first template power system operation data sequence, updating the parameters of the first initialized fully-connected output unit, and using the updated first initialized fully-connected output unit as the first fully-connected output unit;

[0078] After the first fully-connected output unit is updated and generated, for each of the one or more second initialized fully-connected output units, parameters of the second initialized fully-connected output unit are updated according to the second template power system operation data sequence, and the updated second initialized fully-connected output unit is used as a second fully-connected output unit;

[0079] The long short-term memory network that is finally output is determined as the system operation fault prediction network.

[0080] In an alternative implementation, the updating of parameters of the first initialized fully connected output unit according to the first template power system operation data sequence includes:

[0081] Acquiring template power system operation data in a first template power system operation data sequence;

[0082] Extracting the operation state vector time sequence sequence of the template power system operation data according to the encoder;

[0083] According to the operation state vector timing sequence, and according to the first initialized fully connected output unit, initial fault location data of the template power system operation data is determined;

[0084] Determining a training error value based on a priori system operation fault points carried by the template power system operation data and the determined initial fault location data;

[0085] updating the first initialized fully connected output unit according to the determined training error value;

[0086] Return to execute the step of obtaining the template power system operation data in the first template power system operation data sequence until the iteration rounds of each template power system operation data in the first template power system operation data sequence are greater than the first set rounds; wherein the iteration round of each template power system operation data is the round for updating parameters based on the template power system operation data.

[0087] In an alternative implementation, the updating of parameters of the second initialized fully connected output unit according to the second template power system operation data sequence comprises:

[0088] Acquire the template power system operation data in the second template power system operation data sequence; extract the operation state vector time sequence sequence of the template power system operation data according to the encoder;

[0089] Determining initial fault location data of the template power system operation data according to the operation state vector timing sequence and the second initialized fully connected output unit;

[0090] Determining a training error value according to the a priori system operation fault point carried by the template power system operation data and the initial fault location data;

[0091] According to the determined training error value, the second initialized fully connected output unit is updated; the step of obtaining the template power system operation data in the second template power system operation data sequence is returned to execute until the iteration rounds of each template power system operation data in the second template power system operation data sequence are greater than the second set rounds; wherein the iteration round of each template power system operation data is the round of parameter update based on the template power system operation data.

[0092] In an alternative implementation, the system fault prediction data determined by each fully connected output unit includes:

[0093] The fully-connected output unit can output a classification index for each system operation fault point, wherein the classification index for each system operation fault point represents the possibility that the power system operation data output by the fully-connected output unit belongs to the system operation fault point; the system operation fault point represented by each system fault prediction data is: the system operation fault point with the largest classification index among the system operation fault points contained in the system fault prediction data.

[0094] Figure 3 The functional module diagram of the operation optimization system 200 applied to the power system according to the embodiment of the present invention is shown. The functions implemented by the operation optimization system 200 applied to the power system can correspond to the steps performed by the above method. The operation optimization system 200 applied to the power system can be understood as the above server 100, or the processor of the server 100, or can be understood as a component independent of the above server 100 or the processor that implements the functions of the present invention under the control of the server 100, such as Figure 3 As shown, the functions of each functional module of the operation optimization system 200 applied to the power system are described in detail below.

[0095] An extraction unit 210 is used to extract an operation state vector time series sequence of power system operation data to be used for system operation fault prediction;

[0096] A first determination unit 220 is used to determine the first initial fault location data of the power system operation data according to the operation state vector time series sequence and the first fully connected output unit in the system operation fault prediction network, and determine it as the first initial fault location data; wherein the system operation fault prediction network also includes one or more second fully connected output units;

[0097] A second determining unit 230 is configured to determine, according to the operation state vector timing sequence and based on the one or more second fully connected output units, second initial fault location data of the operation data of the power system if the first initial fault location data indicates that the operation data of the power system belongs to a set fault point queue, and determine a system operation fault point of the operation data of the power system according to the first initial fault location data and the second initial fault location data;

[0098] The third determination unit 240 is used to determine the system operation fault point represented by the first initial fault location data as the system operation fault point of the power system operation data if the first initial fault location data represents that the power system operation data does not belong to the set fault point queue, and generate a corresponding operation optimization plan based on the system operation fault point of the power system operation data.

[0099] In an alternative implementation manner, the second determining unit 230 is further configured to:

[0100] If the system operation fault point represented by the second initial fault location data belongs to the set fault point queue, determining the system operation fault point of the power system operation data as the set fault point queue;

[0101] If the system operation fault point represented by the second initial fault location data does not belong to the set fault point queue, a system operation fault point is determined from each candidate system operation fault point, and is determined as the system operation fault point of the power system operation data; wherein the candidate system operation fault points include the system operation fault points among the system operation fault points that can be output by the first fully-connected output unit except for the set fault point queue.

[0102] In an alternative implementation manner, the second determining unit 230 is further configured to:

[0103] Before the step of determining the initial fault location data of the power system operation data according to any fully connected output unit according to the operation state vector timing sequence, the method further includes:

[0104] According to the significant feature focusing unit corresponding to the fully connected output unit, significant feature weights are assigned to the operation state vector time series sequence to generate the operation state vector time series sequence after significant feature weight assignment;

[0105] The determining of the initial fault location data of the power system operation data according to any fully connected output unit based on the operation state vector time sequence comprises:

[0106] According to the operating state vector time series sequence after the significant feature weights are assigned, initial fault location data of the power system operating data is determined according to the fully connected output unit.

[0107] In an alternative implementation manner, the extraction unit 210 is further configured to:

[0108] An operation state vector diagram generated by one or more neurons; each salient feature focusing unit includes a self-salient feature focusing unit and a reconstruction salient feature focusing unit;

[0109] The significant feature focusing unit corresponding to the fully connected output unit performs significant feature weight allocation on the operation state vector time series sequence to generate the operation state vector time series sequence after the significant feature weight allocation, including:

[0110] According to the self-significant feature focusing unit corresponding to the fully connected output unit, for each neuron, based on the significant feature weight learned for the neuron in the self-significant feature focusing unit of the fully connected output unit, the operation state vector diagram of the neuron is fused to generate a fused operation state vector diagram of the neuron;

[0111] According to the reconstructed significant feature focusing unit corresponding to the fully connected output unit, based on the significant feature weights learned by the reconstructed significant feature focusing unit of the fully connected output unit for each operating state vector node in the operating state vector diagram, the fused operating state vector diagram of the one or more neurons is fused to generate a processed operating state vector diagram of the one or more neurons, which is determined to be a time series sequence of the operating state vectors after the significant feature weights are assigned.

[0112] In an alternative implementation manner, the first determining unit 220 is further configured to:

[0113] Obtaining a long short-term memory network with initialized weight parameters; wherein the long short-term memory network with initialized weight parameters includes an encoder, a first initialized fully connected output unit, and one or more second initialized fully connected output units; the first initialized fully connected output unit and each second initialized fully connected output unit are respectively connected to the encoder;

[0114] According to the first template power system operation data sequence, updating the parameters of the first initialized fully-connected output unit, and using the updated first initialized fully-connected output unit as the first fully-connected output unit;

[0115] After the first fully-connected output unit is updated and generated, for each of the one or more second initialized fully-connected output units, parameters of the second initialized fully-connected output unit are updated according to the second template power system operation data sequence, and the updated second initialized fully-connected output unit is used as a second fully-connected output unit;

[0116] The long short-term memory network that is finally output is determined as the system operation fault prediction network.

[0117] In an alternative implementation manner, the first determining unit 220 is further configured to:

[0118] Acquiring template power system operation data in a first template power system operation data sequence;

[0119] Extracting the operation state vector time sequence sequence of the template power system operation data according to the encoder;

[0120] According to the operation state vector timing sequence, and according to the first initialized fully connected output unit, initial fault location data of the template power system operation data is determined;

[0121] Determining a training error value based on a priori system operation fault points carried by the template power system operation data and the determined initial fault location data;

[0122] updating the first initialized fully connected output unit according to the determined training error value;

[0123] Return to execute the step of obtaining the template power system operation data in the first template power system operation data sequence until the iteration rounds of each template power system operation data in the first template power system operation data sequence are greater than the first set rounds; wherein the iteration round of each template power system operation data is the round for updating parameters based on the template power system operation data.

[0124] In an alternative implementation manner, the first determining unit 220 is further configured to:

[0125] Acquire the template power system operation data in the second template power system operation data sequence; extract the operation state vector time sequence sequence of the template power system operation data according to the encoder;

[0126] Determining initial fault location data of the template power system operation data according to the operation state vector timing sequence and the second initialized fully connected output unit;

[0127] Determining a training error value according to the a priori system operation fault point carried by the template power system operation data and the initial fault location data;

[0128] According to the determined training error value, the second initialized fully connected output unit is updated; the step of obtaining the template power system operation data in the second template power system operation data sequence is returned to execute until the iteration rounds of each template power system operation data in the second template power system operation data sequence are greater than the second set rounds; wherein the iteration round of each template power system operation data is the round of parameter update based on the template power system operation data.

[0129] In an alternative implementation manner, the first determining unit 220 is further configured to:

[0130] The fully-connected output unit can output a classification index for each system operation fault point, wherein the classification index for each system operation fault point represents the possibility that the power system operation data output by the fully-connected output unit belongs to the system operation fault point; the system operation fault point represented by each system fault prediction data is: the system operation fault point with the largest classification index among the system operation fault points contained in the system fault prediction data.

[0131] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0132] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be considered exemplary and non-restrictive in all respects, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the present invention.

Claims

1. An operation optimization method applied to a power system, characterized in that: The method comprises: Extracting a time series sequence of operation state vectors of power system operation data for system operation fault prediction; According to the operation state vector time series, determining the first initial fault location data of the power system operation data according to the first fully connected output unit in the system operation fault prediction network; wherein the system operation fault prediction network also includes one or more second fully connected output units; If the first initial fault location data indicates that the power system operation data belongs to a set fault point queue, determining the second initial fault location data of the power system operation data according to the one or more second fully connected output units according to the operation state vector timing sequence, and determining the system operation fault point of the power system operation data according to the first initial fault location data and the second initial fault location data; If the first initial fault location data indicates that the power system operation data does not belong to the set fault point queue, the system operation fault point indicated by the first initial fault location data is determined as the system operation fault point of the power system operation data, and a corresponding operation optimization plan is generated based on the system operation fault point of the power system operation data; The determining, according to the first initial fault location data and the second initial fault location data, a system operation fault point of the power system operation data comprises: If the system operation fault point represented by the second initial fault location data belongs to the set fault point queue, determining the system operation fault point of the power system operation data as the set fault point queue; If the system operation fault point represented by the second initial fault location data does not belong to the set fault point queue, a system operation fault point is determined from each candidate system operation fault point, and is determined as the system operation fault point of the power system operation data; wherein the candidate system operation fault points include the system operation fault points among the system operation fault points that can be output by the first fully-connected output unit except for the set fault point queue.

2. The operation optimization method applied to the power system according to claim 1, characterized in that: A salient feature focusing unit corresponding to each fully connected output unit is also included before each fully connected output unit; Before the step of determining the initial fault location data of the power system operation data according to any fully connected output unit according to the operation state vector time sequence, the method further includes: According to the significant feature focusing unit corresponding to the fully connected output unit, significant feature weights are assigned to the operation state vector time series sequence to generate an operation state vector time series sequence after significant feature weight assignment; The determining of the initial fault location data of the power system operation data according to any fully connected output unit based on the operation state vector time sequence comprises: According to the operating state vector time series sequence after the significant feature weights are assigned, initial fault location data of the power system operating data is determined according to the fully connected output unit.

3. The operation optimization method applied to the power system according to claim 2, characterized in that: The operation state vector timing sequence comprises: An operation state vector diagram generated by one or more neurons; each salient feature focusing unit includes a self-salient feature focusing unit and a reconstruction salient feature focusing unit; The significant feature focusing unit corresponding to the fully connected output unit performs significant feature weight allocation on the operation state vector time series sequence to generate the operation state vector time series sequence after the significant feature weight allocation, including: According to the self-significant feature focusing unit corresponding to the fully connected output unit, for each neuron, based on the significant feature weight learned for the neuron in the self-significant feature focusing unit of the fully connected output unit, the operation state vector diagram of the neuron is fused to generate a fused operation state vector diagram of the neuron; According to the reconstructed significant feature focusing unit corresponding to the fully connected output unit, based on the significant feature weights learned by the reconstructed significant feature focusing unit of the fully connected output unit for each operating state vector node in the operating state vector diagram, the fused operating state vector diagram of the one or more neurons is fused to generate a processed operating state vector diagram of the one or more neurons, which is determined to be a time series sequence of the operating state vectors after the significant feature weights are assigned.

4. The operation optimization method applied to the power system according to claim 1, characterized in that: The system runs a training step of a fault prediction network, including: Obtaining a long short-term memory network with initialized weight parameters; wherein the long short-term memory network with initialized weight parameters includes an encoder, a first initialized fully connected output unit, and one or more second initialized fully connected output units; the first initialized fully connected output unit and each second initialized fully connected output unit are respectively connected to the encoder; According to the first template power system operation data sequence, updating the parameters of the first initialized fully-connected output unit, and using the updated first initialized fully-connected output unit as the first fully-connected output unit; After the first fully-connected output unit is updated and generated, for each of the one or more second initialized fully-connected output units, parameters of the second initialized fully-connected output unit are updated according to the second template power system operation data sequence, and the updated second initialized fully-connected output unit is used as a second fully-connected output unit; The long short-term memory network that is finally output is determined as the system operation fault prediction network.

5. The operation optimization method applied to the power system according to claim 4, characterized in that: The updating of parameters of the first initialized fully connected output unit according to the first template power system operation data sequence includes: Acquiring template power system operation data in a first template power system operation data sequence; Extracting the operation state vector time sequence sequence of the template power system operation data according to the encoder; According to the operation state vector timing sequence, and according to the first initialized fully connected output unit, initial fault location data of the template power system operation data is determined; Determining a training error value based on a priori system operation fault points carried by the template power system operation data and the determined initial fault location data; updating the first initialized fully connected output unit according to the determined training error value; Return to execute the step of obtaining the template power system operation data in the first template power system operation data sequence until the iteration rounds of each template power system operation data in the first template power system operation data sequence are greater than the first set rounds; wherein the iteration round of each template power system operation data is the round for updating parameters based on the template power system operation data.

6. The operation optimization method applied to the power system according to claim 5, characterized in that: The updating of parameters of the second initialized fully connected output unit according to the second template power system operation data sequence includes: Acquire the template power system operation data in the second template power system operation data sequence; Extract the operation state vector time sequence sequence of the template power system operation data according to the encoder; Determining initial fault location data of the template power system operation data according to the operation state vector timing sequence and the second initialized fully connected output unit; Determining a training error value according to the a priori system operation fault point carried by the template power system operation data and the initial fault location data; According to the determined training error value, the second initialized fully connected output unit is updated; the step of obtaining the template power system operation data in the second template power system operation data sequence is returned to execute until the iteration rounds of each template power system operation data in the second template power system operation data sequence are greater than the second set rounds; wherein the iteration round of each template power system operation data is the round for parameter update based on the template power system operation data.

7. The operation optimization method applied to the power system according to claim 1, characterized in that: The system fault prediction data determined by each fully connected output unit includes: The fully-connected output unit can output a classification index for each system operation fault point, wherein the classification index for each system operation fault point represents the possibility that the power system operation data output by the fully-connected output unit belongs to the system operation fault point; The system operation fault point represented by each system fault prediction data is: the system operation fault point with the largest classification index among the system operation fault points contained in the system fault prediction data.

8. A power system operation data classification device, used to implement the operation optimization method applied to the power system according to claim 1, characterized in that: The device comprises: An extraction unit, used for extracting a time series sequence of operation state vectors of power system operation data to be used for system operation fault prediction; A first determination unit is used to determine the first initial fault location data of the power system operation data according to the operation state vector time series sequence and the first fully connected output unit in the system operation fault prediction network, and determine it as the first initial fault location data; wherein the system operation fault prediction network also includes one or more second fully connected output units; a second determination unit, configured to determine, according to the operation state vector timing sequence and based on the one or more second fully-connected output units, second initial fault location data of the operation data of the power system, if the first initial fault location data indicates that the operation data of the power system belongs to a set fault point queue, and determine, according to the first initial fault location data and the second initial fault location data, a system operation fault point of the operation data of the power system; A third determination unit is used to determine the system operation fault point represented by the first initial fault location data as the system operation fault point of the power system operation data if the first initial fault location data represents that the power system operation data does not belong to the set fault point queue, and generate a corresponding operation optimization plan based on the system operation fault point of the power system operation data.

9. An electronic device, characterized in that: It includes a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other through the communication bus; the memory is used to store computer programs; the processor is used to implement the steps of the operation optimization method applied to the power system as described in any one of claims 1-7 when executing the program stored in the memory.

Citation Information

Patent Citations

  • Power failure prediction method and system based on graph neural network

    CN111461392A

  • Power system fault condition prediction method, device and system and storage medium

    CN111596157A