A method for calculating the slope of the side wall surface of a straight-wall lined concrete tunnel

Through total station measurement and coordinate system construction, the slope of the side wall surface of the tunnel is calculated, which solves the problems of low computing efficiency and high cost in the existing technology, and realizes the precise positioning of the overall uneven side wall and improves the construction efficiency.

CN117216450BActive Publication Date: 2024-11-01CHINA THREE GORGES PROJECTS DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311263513.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-27
Publication Date
2024-11-01
Estimated Expiration
2043-09-27

AI Technical Summary

Technical Problem

The prior art consumes time, is low efficiency and high cost when calculating the slope of the side wall of the straight wall lining concrete tunnel, making it difficult to achieve accurate positioning of parts that do not meet the requirements of the slope.

Method used

The total station is used to measure the scattered points of the side wall surface, and build a rectangular coordinate system based on the overflow surface of the side wall. Through triangular meshing and plane intersection calculation, the slope of the side wall surface along the water direction and vertical water flow direction is accurately calculated to achieve unevenness. Overall accurate positioning.

Benefits of technology

It effectively reduces the construction period and cost, improves the efficiency and accuracy of side wall treatment, and realizes accurate positioning of parts that exceed the standard slope.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117216450B_ABST
    Figure CN117216450B_ABST
Patent Text Reader

Abstract

The present invention provides a method for calculating the surface slope of a side wall of a straight-wall lined concrete tunnel, comprising the following steps: step 1, the steel mold trolley moves to the next bin after completing the lining; step 2, completing the scattered point measurement of the side wall lining surface; step 3, constructing a rectangular coordinate system of the side wall surface; step 4, taking any target measuring point and any other two measuring points to form a triangle, and calculating the area of ​​the formed triangle; step 5, taking the target measuring point and the triangle formed by the two adjacent measuring points when the area is the smallest as the target triangle; step 6, constructing a plane parallel to the water flow direction and perpendicular to the water flow direction from the target measuring point, and calculating the coordinates of the intersection of the straight line formed by the other two measuring points of the triangle and the constructed plane; step 7, obtaining the surface slope of the side wall passing through the target measuring point through the target measuring point and the intersection coordinates. The method can calculate the slope of the tunnel side wall lining along the water flow direction and perpendicular to the water flow direction at any measuring point, and realize the precise positioning of the part whose slope does not meet the requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of lining of a straight-wall water conveyance tunnel of a hydropower project, and in particular to a method for calculating the surface slope of a side wall of a straight-wall lining concrete tunnel. Background Art

[0002] In order to avoid cavitation damage caused by high-speed water flow, water diversion tunnels in hydropower projects need to be treated with gentle slopes on the uneven flow surface according to relevant specifications. At present, steel mold trolleys are commonly used for pouring straight wall side walls of tunnels. Considering that steel mold trolleys generally do not have the function of overall treatment of uneven side walls, the subsequent construction platform is basically built on the outside of the side wall as a whole, and the overall slope measurement of the uneven side wall is completed by manual measurement with a ruler. The existing process is time-consuming, inefficient and costly. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a method for calculating the surface slope of the side wall of a straight-wall lined concrete tunnel, which can calculate the slope along the water flow direction and perpendicular to the water flow direction at any measuring point of the tunnel side wall lining, and realize accurate positioning of the part whose slope does not meet the requirements.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a method for calculating the surface slope of the side wall of a straight wall lined concrete tunnel, comprising the following steps:

[0005] Step 1: After the steel formwork trolley completes the lining, it moves to the next warehouse to provide conditions for measuring the surface of the side wall lining concrete;

[0006] Step 2: Use the total station to complete the scattered point measurement of the side wall lining surface;

[0007] Step 3: Construct a rectangular coordinate system on the side wall surface, with the lowest point on the upstream side of the designed casting shape of the side wall as the origin, the x-axis along the water flow and pointing to the downstream, the z-axis perpendicular to the water flow and pointing to the upper part, and the y-axis perpendicular to the x-axis and pointing to the hole, to construct a rectangular coordinate system on the side wall surface;

[0008] Step 4: Take any target measuring point A and any other two measuring points to form a triangle, and calculate the area of ​​the formed triangle;

[0009] Step 5: Complete the meshing of the lining surface by constructing triangles in step 4, and take ΔABC as the target triangle when the area of ​​the triangle formed by measuring point A and two adjacent measuring points B and C is the smallest;

[0010] Step 6. In the rectangular coordinate system of the side wall surface, construct planes parallel to the water flow direction and perpendicular to the water flow direction from any measuring point A, namely the x'O'y' plane and the z'O'y' plane. The x'O'y' plane is parallel to the xOy plane, and the z'O'y' is parallel to the zOy plane. Obtain the coordinates of the intersection points D and E of the BC side with the x'O'y' plane and the z'O'y' plane respectively.

[0011] Step 7. By measuring the coordinates of point A and the coordinates of D and E, calculate the slope of the side wall surface passing through point A.

[0012] In a preferred solution, in step 2, the scatter point spacing is controlled to be no greater than 30 cm.

[0013] In a preferred solution, in step three, the scattered point coordinates are transformed into corresponding coordinate values ​​of the rectangular coordinate system of the side wall surface.

[0014] In the preferred solution, in step 4, assuming that any measuring point is A, it forms a triangle with any other two measuring points B and C. The coordinates of the three points are A(x1, y1, z1), B(x2, y2, z2) and C(x3, y3, z3), respectively. Then the area calculation formula of ΔABC is:

[0015]

[0016] In a preferred solution, in step 6, the coordinates of the intersection points D and E are obtained based on the straight line equation of BC and the plane equations of the x′O′y′ plane and the z′O′y′ plane;

[0017] The simultaneous equations for point D calculation are:

[0018] The simultaneous equations for point E are:

[0019] Among them: the coordinates of point A are (x1, y1, z1), the coordinates of point B are (x2, y2, z2), and the coordinates of point C are (x3, y3, z3).

[0020] In the preferred solution, in step 7, assuming that the calculated coordinates of points D and E are (x4, y4, z1) and (x1, y5, z5) respectively, the slopes AD and AE can be obtained by coordinate calculation, where the slope AD is The AE slope is i1 and i2 are the slope values ​​of the side wall surface passing through point A.

[0021] The present invention provides a method for calculating the surface slope of a side wall of a straight-wall lined concrete tunnel. The method measures the scattered points on the side wall lining surface by a total station, combines the requirements of the specification for the slopes in the two directions of parallel water flow and perpendicular water flow on the flow surface, reconstructs the coordinate system based on the flow surface of the side wall, and converts the coordinate system of the measured scattered point data to realize the calculation of the overall slope of the uneven side wall surface, and accurately locates the part where the slope exceeds the standard. The construction period consumption caused by the overall layout of the side wall construction platform can be avoided, and the side wall treatment can be carried out instead of the local construction platform, effectively reducing the construction cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:

[0023] Figure 1 It is a calculation flow chart of the present invention;

[0024] Figure 2 It is the position diagram of each measuring point in the side wall surface coordinate system; DETAILED DESCRIPTION

[0025] like Figure 1 As shown, a method for calculating the surface slope of the side wall of a straight wall lined concrete tunnel comprises the following steps:

[0026] Step 1: After the steel formwork trolley completes the lining, it moves to the next warehouse to provide conditions for measuring the concrete surface of the side wall lining.

[0027] Step 2: Use the total station to complete the scattered point measurement of the side wall lining surface. Use any measurement coordinate system to perform scattered point measurement on the side wall lining concrete surface. Combined with the relevant specifications for the maximum allowable height of the uneven surface (≥3mm) and the grinding specification (≤1 / 10), to ensure that the measurement points can meet the above conditions, the scattered point spacing is controlled to be no more than 30cm. At the same time, considering that the flatness of the joints between the side wall warehouses is difficult to control, the measurement points on the lining surface at the joints can be appropriately increased during measurement.

[0028] Step 3: Construct the rectangular coordinate system of the side wall surface, with the lowest point on the upstream side of the designed casting body of the side wall as the origin, the x-axis along the water flow and pointing to the downstream, the z-axis perpendicular to the flow and pointing to the upper part, and the y-axis perpendicular to the x-axis and pointing to the hole. Transform the scattered coordinates into the corresponding coordinate values ​​of the rectangular coordinate system of the side wall surface to complete the coordinate conversion.

[0029] Step 4: Select any target measuring point A to form a triangle with any other two measuring points, and calculate the area of ​​the formed triangle.

[0030] Assume that any measuring point is A, which together with any other two measuring points B and C form a triangle. Let the coordinates of the three points be A(x1, y1, z1), B(x2, y2, z2) and C(x3, y3, z3). Then the area calculation formula of ΔABC is:

[0031]

[0032] Step 5: By constructing triangles in step 4, the lining surface is meshed, and when the area of ​​the triangle formed by measuring point A and two adjacent measuring points B and C is the smallest, ΔABC is taken as the target triangle to improve the fitting accuracy.

[0033] Step 6: Figure 2 As shown, in the rectangular coordinate system of the side wall surface, starting from any measuring point A, planes parallel to the water flow direction and perpendicular to the water flow direction are constructed, namely the x′O′y′ plane and the z′O′y′ plane. The x′O′y′ plane is parallel to the xOy plane, and the z′O′y′ is parallel to the zOy plane. The coordinates of the intersection points D and E of the BC side with the x′O′y′ plane and the z′O′y′ plane are obtained respectively.

[0034] Based on the equation of the line BC, and the plane equations of the x′O′y′ plane and the z′O′y′ plane, find the coordinates of the intersection points D and E;

[0035] The simultaneous equations for point D calculation are:

[0036] The simultaneous equations for point E are:

[0037] Among them: the coordinates of point A are (x1, y1, z1), the coordinates of point B are (x2, y2, z2), and the coordinates of point C are (x3, y3, z3).

[0038] Step 7. By measuring the coordinates of point A and the coordinates of D and E, calculate the slope of the side wall surface passing through point A.

[0039] Assuming that the calculated coordinates of points D and E are (x4, y4, z1) and (x1, y5, z5) respectively, the slopes AD and AE can be obtained by coordinate calculation, where the slope AD is The AE slope is i1 and i2 are the slopes of the downstream and perpendicular directions of the water flow through point A.

[0040] This method uses a total station to measure scattered points on the side wall lining surface, combines the specifications for the slope requirements of the flow surface in two directions parallel to the water flow and perpendicular to the water flow, reconstructs the coordinate system based on the flow surface of the side wall, and converts the coordinate system of the scattered point data obtained from the measurement to calculate the overall slope of the uneven side wall surface and accurately locate the parts where the slope exceeds the standard.

Claims

1. A method for calculating the surface slope of the side wall of a straight-wall lined concrete tunnel, characterized in that: The steps include: Step 1: After the steel formwork trolley completes the lining, it moves to the next warehouse to provide conditions for measuring the surface of the side wall lining concrete; Step 2: Use the total station to complete the scattered point measurement of the side wall lining surface; Step 3: Construct a rectangular coordinate system on the side wall surface, with the lowest point on the upstream side of the side wall design casting body as the origin and the point along the water flow and pointing downstream as the Axis, vertical flow direction and pointing upward Axis, perpendicular to Axis and pointing into the hole Axis, construct the rectangular coordinate system of the side wall surface; Step 4: Take any target measuring point A and any other two measuring points to form a triangle, and calculate the area of ​​the formed triangle; Step 5: Complete the meshing of the lining surface by constructing triangles in step 4, and take the triangle formed by measuring point A and two adjacent measuring points B and C as the smallest area. is the target triangle; Step 6: In the rectangular coordinate system on the side wall surface, from any measuring point Starting from constructing the planes parallel to the water flow direction and perpendicular to the water flow direction, they are Face to face noodle, Face parallel to noodle, Parallel to , seek Side Face to face The coordinates of the intersection points D and E of the surfaces are calculated according to The equation of the straight line is Face to face Solve the plane equations of the faces and find the coordinates of the intersection points D and E: in The point calculation simultaneous equations are: ; The point calculation simultaneous equations are: ; Among them: The coordinates of point A are , the coordinates of point B are , the coordinates of point C are ; Step 7: Obtain the slope of the side wall surface passing through point A by measuring the coordinates of point A and the coordinates of D and E. Assume that the calculated slope is , The coordinates of the points are and , can be obtained by coordinate calculation , Slope, where The slope is , The slope is , and That is through The slope value of the sidewall surface at the point.

2. The method for calculating the side wall surface slope of a straight wall lined concrete tunnel according to claim 1 is characterized in that: In the step 2, the scatter point spacing is controlled to be no greater than 30 cm.

3. The method for calculating the side wall surface slope of a straight wall lined concrete tunnel according to claim 1 is characterized in that: In the step three, the scattered point coordinates are transformed into corresponding coordinate values ​​of the rectangular coordinate system of the side wall surface.

4. The method for calculating the side wall surface slope of a straight wall lined concrete tunnel according to claim 1 is characterized in that: In step 4, it is assumed that any measuring point is , and any other two measuring points , Together they form a triangle, and the coordinates of the three points are A , B and C ,but The area calculation formula is: 。