A dust control and air distribution regulation system and method for underground tunneling construction

By controlling the airflow direction through a dust control and air distribution system, an air curtain is formed to absorb dust, solving the problem of gas vortex in the ventilation system of underground coal mines, and achieving efficient dust removal and safety improvement.

CN117307230BActive Publication Date: 2026-11-10SHANDONG ENERGY GRP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311498809.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-10
Publication Date
2026-11-10
Estimated Expiration
2043-11-10

AI Technical Summary

Technical Problem

The existing underground ventilation system in coal mines has design flaws, which makes it easy for gas vortices to be generated in the roadways, resulting in low dust removal and dust suppression efficiency and significant safety hazards.

Method used

A dust control and air distribution system is adopted, including an air distribution device and a telescopic air duct. The air distribution device controls the airflow direction to form an air curtain facing the working face, and the return air duct absorbs the dust airflow and treats it in conjunction with the dust removal fan.

Benefits of technology

It effectively avoids gas eddies, improves dust removal efficiency, reduces dust concentration, enhances construction visibility and safety, reduces system space occupation, and saves costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117307230B_ABST
    Figure CN117307230B_ABST
Patent Text Reader

Abstract

This invention relates to a dust control and air distribution system and method for underground tunneling construction, specifically in the field of coal mine ventilation technology. It includes an intake duct connected to an air distribution device via a telescopic duct chamber. The air distribution device is connected to an outlet duct and a return duct via connecting ports. A roadheader is installed at the bottom of the inlet end of the return duct. A first and second conveyor belts are installed at the tail of the roadheader. A dust removal fan is installed on the upper part of the second conveyor belt, and the dust removal fan is connected to the return duct via the air distribution device. This invention can divide the airflow passing through the air distribution device into bidirectional airflows of distribution and return, simultaneously achieving air distribution and return. It generates an air curtain facing the working face in the roadway, preventing the formation of gas vortices that affect dust removal efficiency, further reducing dust concentration in the roadway, improving visibility in the roadway and at the working face, ensuring construction efficiency, minimizing safety hazards, and guaranteeing the personal safety of workers.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of underground ventilation technology in coal mines, and specifically discloses a dust control and ventilation adjustment system and method for underground tunneling construction. Background Technology

[0002] Coal mines are a vital mineral resource. During coal mining, roadheaders are widely used for tunneling in mine roadways. This process generates dust, primarily coal (rock) dust, which directly impacts mining efficiency and effectiveness. Furthermore, dust severely affects underground operations. For instance, coal dust poses an explosion hazard due to its spontaneous combustion properties. Even with extreme caution, seemingly insignificant factors can trigger spontaneous combustion, leading to a powerful explosion. In addition, the prolonged presence of coal dust reduces visibility, impacting worker efficiency and seriously affecting their health. Therefore, coal mines commonly employ dust suppression fans to achieve dust control and reduction.

[0003] The invention patent with application publication number CN114718625A discloses a ventilation and dust control system for mining tunnel construction, including an air supply system and a secondary lining trolley-following dust removal system. The air supply system includes an axial flow fan, an air supply duct, and a branch tee. The air supply duct is located above the tunnel, with its connecting end connected to the axial flow fan and its outlet end connected to the branch tee. The main branch of the branch tee is positioned corresponding to the tunnel face, and its side branch is inclined downwards towards the tunnel face, forming an angle with the main branch. The secondary lining trolley-following dust removal system includes a dust collector and a suction pipe. The suction pipe is located below the tunnel, with its connecting end connected to the dust collector and its inlet end corresponding to the tunnel face. The inlet end of the suction pipe is closer to the tunnel face than the main branch of the branch tee.

[0004] In the disclosed patented technology, the air supply pipe is arranged above the roadway and the suction pipe is arranged below the roadway. By using the combination of the diversion tee pipe and the suction pipe, a negative pressure zone is formed in front of the working face. The axial flow fan delivers clean airflow into the roadway. The airflow is sent into the area close to the working face (working face) through the side branch pipe and the main branch pipe respectively. Under the action of the dust removal fan, the airflow mixed with dust is treated by dust suppression and then discharged. In actual production, the ventilation and dust control system in the aforementioned patented technology is prone to forming gas vortices near the working face. Part of the airflow mixed with dust is drawn in through the suction pipe, while most of the airflow mixed with dust forms a gas vortex between the supply pipe and the suction pipe. This gas vortex contains a large amount of dust, and as the roadheader advances, the gas vortex will gradually spread backward, filling the tunnel with dust. This can lead to reduced visibility and affect the efficiency of workers; in severe cases, it can cause spontaneous combustion and a violent explosion, seriously threatening the personal safety of workers. Summary of the Invention

[0005] In view of the problem that the design defects of the ventilation system in current coal mines make it easy for gas vortices to be generated in the roadway, resulting in low dust removal efficiency and major safety hazards, this invention provides a dust control and ventilation adjustment system and method for underground tunneling construction.

[0006] To achieve the above objectives, in a first aspect, the present invention provides the following technical solution: A dust control and ventilation system for underground tunneling includes an air intake duct installed in a roadway. The air intake duct is connected to a telescopic air chamber. An air distribution device is installed at the end of the telescopic air chamber. The air distribution device has multiple connecting ports, which are connected to an outlet air duct and a return air duct, respectively. The outlet air duct generates an air curtain facing the working face within the roadway, covering and filling the entire roadway. The return air duct is connected to a dust removal fan via the air distribution device. The return air duct absorbs dust-laden airflow and delivers it to the dust removal fan for dust removal. The air distribution device includes a housing with a flow channel inside to facilitate airflow. The housing has an air inlet, an air outlet, a return air inlet, and a return air outlet. The air inlet is connected to... The telescopic duct is connected, the air outlet is connected to the air outlet duct, the return air inlet is connected to the return air duct, and the return air outlet is connected to the dust removal fan; a first hydraulic cylinder and a second hydraulic cylinder are installed inside the housing, the first hydraulic cylinder is provided with a first piston rod, and the second hydraulic cylinder is provided with a second piston rod; the first piston rod is connected to a first valve plate, which can connect the air inlet and the air outlet into an integrated flow channel and isolate the return air inlet and the return air outlet, the second piston rod is connected to a second valve plate, which can connect the return air inlet and the return air outlet into an integrated flow channel and isolate the air inlet and the air outlet, the dimensions of the first valve plate and the second valve plate are the same as the dimensions of the flow channel inside the housing, and the first valve plate and the second valve plate are rotatably connected to the housing through a rotating shaft.

[0007] Preferably, a slide rail is suspended from the top of the roadway. The slide rail has a multi-section installation structure. The telescopic ventilation duct and the air distribution device are slidably engaged with the slide rail. A roadheader is installed on one side of the return air duct. The roadheader is located in the roadway near the working face. The roadheader's tunneling direction faces the working face. A first conveyor belt for transporting crushed stone is installed at the tail of the roadheader. The first conveyor belt is connected to a second conveyor belt, which is located below the dust removal fan.

[0008] Preferably, the telescopic ventilation duct includes a duct shell that is slidably mounted on a slide rail, and a telescopic ventilation duct is provided inside the duct shell. The telescopic ventilation duct is connected to an air inlet duct and an air distribution device, respectively.

[0009] Preferably, the air outlet duct is horizontally arranged, and the side of the air outlet duct facing the working face has a flat surface, on which air outlet holes are evenly distributed.

[0010] Preferably, the dust removal fan is connected to a dust discharge duct, which is located above the second conveyor belt.

[0011] Preferably, an air volume sensor is installed in both the air inlet and the return air inlet, and the sensor probe of the air volume sensor is located in the middle of the air inlet and the return air inlet.

[0012] Preferably, the air distribution device is 30-40 meters away from the working face, and the return air duct is 5-10 meters away from the working face.

[0013] On the other hand, the present invention also provides a dust control and ventilation adjustment method for underground tunneling construction, comprising the following steps: S1: Install multiple slide rails at a distance of 30-40 meters from the working face, slide the silo shell and air distribution device on the slide rails, connect the air inlet duct to the telescopic duct, connect the telescopic duct to the air inlet, connect the air outlet duct to the air outlet, connect the return air duct to the return air inlet, and connect the return air outlet to the air inlet of the dust removal fan. S2: Install the body of the roadheader 5-10 meters away from the working face, so that the cutting part of the roadheader is located at the front end of the return air duct close to the working face. S3: Before tunneling, the first valve plate is controlled by the first piston rod to connect the air inlet and the air outlet and isolate the return air inlet and the return air outlet. The second valve plate is controlled by the second piston rod to connect the return air inlet and the return air outlet and isolate the air inlet and the air outlet, thereby forming two independent flow channels in the air distribution device. S4: Start the roadheader and make the cutting section of the roadheader excavate towards the working face. The ventilation fan inputs clean airflow through the air inlet duct and the airflow flows out from the air outlet duct, forming an air curtain facing the working face in the roadway. The air curtain combines with the dust near the working face and enters the dust removal fan through the return air duct. The dust removal fan processes the dust and discharges it onto the second conveyor belt, which then transports the dust out.

[0014] Compared with the prior art, the present invention has the following beneficial effects: This invention, by setting up an air distribution device in the overall system, can divide the airflow flowing through the air distribution device into bidirectional airflows of distribution and return air, which can simultaneously realize air distribution and return air operation. At the same time, it generates an air curtain facing the working face in the roadway, avoiding the formation of gas vortices near the working face, reducing the dust concentration at the working face and in the roadway, improving visibility in the roadway, improving the construction vision and efficiency of workers, minimizing safety hazards, and ensuring the personal safety of workers. The air distribution device and telescopic ventilation duct in this invention can move forward towards the front along the working direction of the roadheader by following the slide rail. Furthermore, the slide rail is set as a multi-segment installation structure, which can not only save production costs, but also reduce the installation area occupied by the slide rail in the roadway, and further reduce the space occupied by the overall system installation. By setting a matching structure between the piston rod and the valve plate, this invention can control the flow path of the airflow when it passes through the air distribution device at any time, so that the airflow can flow from each connection port to the corresponding pipeline according to the predetermined design. On the one hand, it can increase the adjustability of the overall system and make it easier to control the flow path of the airflow. On the other hand, it can also reduce the space occupied by the overall system, making it more practical. The invention has a simple and flexible overall structure, can adjust the airflow direction in real time, and has strong compatibility. It can be quickly installed in tunnels, thus having a very wide range of application prospects. Attached Figure Description

[0015] To more clearly illustrate the technical solution of the present invention, the drawings used in the description will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort. Figure 1 This is a cross-sectional view of the overall system structure of the present invention; Figure 2 This is a schematic diagram of the telescopic ventilation silo structure of the present invention; Figure 3 This is a schematic diagram of the air outlet duct structure of the present invention; Figure 4 This is a schematic diagram of the external structure of the air distribution device of the present invention; Figure 5 This is a cross-sectional view of the internal structure of the air distribution device of the present invention; In the diagram: 1. Roadway, 2. Air inlet duct, 3. Telescopic ventilation duct chamber, 301. Chamber shell, 302. Telescopic ventilation duct, 4. Air distribution device, 401. Shell, 402. Air inlet, 403. Air outlet, 404. Return air inlet, 405. Return air outlet, 5. Air outlet duct, 501. Air outlet hole, 502. Baffle, 6. Return air duct, 7. Roadheader, 8. Working face, 9. First conveyor belt, 10. Second conveyor belt, 11. Dust removal fan, 12. Slide rail, 13. First hydraulic cylinder, 14. First piston rod, 15. Second piston rod, 16. First valve plate, 17. Second valve plate, 18. Dust removal duct, 19. Air volume sensor, 20. Second hydraulic cylinder, 21. Rotary shaft. Detailed Implementation

[0016] To make the objectives, features, and advantages of this invention more apparent and understandable, the technical solutions of this invention will be clearly and completely described below with reference to the accompanying drawings of the specific embodiments. Obviously, the embodiments described below are only some embodiments of this invention, and not all embodiments. Based on the embodiments of this invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this patent.

[0017] This specific embodiment provides a dust control and ventilation system for underground tunneling operations, such as... Figure 1-5 As shown, the front end of roadway 1 is the working face 8, which is the coal mining face. A slide rail 12 is suspended from the top of roadway 1. The slide rail 12 has a multi-segment installation structure, and a telescopic ventilation duct 3 and a ventilation distribution device 4 are slidably installed on the slide rail 12. The telescopic ventilation duct 3 includes a shell 301 slidably installed on the slide rail 12. A telescopic ventilation duct 302 is installed inside the shell 301. The shell 301 protects the internal telescopic ventilation duct 302 from being scratched by the rocks at the top of roadway 1, preventing air leakage. Simultaneously, the telescopic structure allows for the temporary extension of the telescopic ventilation duct 302 during the traction movement of the roadheader 7. One end of the telescopic ventilation duct 302 is connected to the air inlet duct 2, and the other end is connected to the ventilation distribution device 4. A ventilator can be installed at the port of the air inlet duct 2. Under the operation of the ventilator, clean airflow is sent from the air inlet duct 2 into the telescopic ventilation duct 302.

[0018] The air distribution device 4 includes a housing 401, the top of which is slidably fitted with a slide rail 12, allowing the housing 401 to slide on the slide rail 12. The housing 401 has a rectangular cylindrical structure, and its interior is a flow channel to facilitate airflow. The air distribution device 4 has multiple connecting ports, all located on the housing 401. The housing 401 has an air inlet 402, an air outlet 403, a return air inlet 404, and a return air outlet 405. The air inlet 402 is connected to a telescopic duct 302, the air outlet 403 is connected to an outlet duct 5, the return air inlet 404 is connected to a return air duct 6, and the return air outlet 405 is connected to a dust collector fan 11 via a pipe.

[0019] The air outlet duct 5 is horizontally arranged, with its inlet end connected to the outlet 403. Clean airflow passing through the inlet duct 2 can enter the air outlet duct 5 through the outlet 403. The side of the air outlet duct 5 facing the working face 8 has a flat surface with evenly distributed air outlet holes 501. After entering the air outlet duct 5, the clean airflow flows out through the air outlet holes 501, thus forming an air curtain in the roadway 1. During the air curtain's circulation, it can protect the area near the working face 8. The generated dust is drawn into it and, after reaching the working face 8, enters the return air duct 6 through the air inlet end. This avoids the generation of gas vortices in the roadway 1, improves the overall dust removal efficiency of the system, and avoids safety hazards. Furthermore, a baffle 502 for blocking the air outlet 501 can be installed on the plane. When the baffle 502 is installed on the plane, it can block the air outlet 501, preventing the airflow from flowing out of the air outlet duct 5 and causing it to flow out through the return air duct 6.

[0020] A first hydraulic cylinder 13 and a second hydraulic cylinder 20 are fixedly installed inside the housing 401 via support rods. The first hydraulic cylinder 13 is equipped with a first piston rod 14, and the second hydraulic cylinder 20 is equipped with a second piston rod 15. The head of the first piston rod 14 is hinged to a first valve plate 16 via a hinge structure, and the head of the second piston rod 15 is hinged to a second valve plate 17 via a hinge structure. Rotating shafts 21 are fixedly installed on the sides of both the first valve plate 16 and the second valve plate 17. The rotating shafts 21 are rotatably connected to the housing 401. The housing 401 is provided with cylindrical through slots, and the upper and lower ends of the rotating shafts 21 can rotate within the cylindrical through slots, thereby ensuring the smooth opening and closing of the first valve plate 16 and the second valve plate 17. Under the action of the first hydraulic cylinder 13 and the second hydraulic cylinder 20, the extension and retraction of the first piston rod 14 and the second piston rod 15 can be achieved simultaneously. The end of the first piston rod 14 is rotatably engaged with the first valve plate 16, and the end of the second piston rod 15 is rotatably engaged with the first valve plate 16. Rod 15 rotatably engages with second valve plate 17. First valve plate 16 connects air inlet 402 and air outlet 403 into an integrated flow channel and isolates return air inlet 404 and return air outlet 405. Second valve plate 17 connects return air inlet 404 and return air outlet 405 into an integrated flow channel and isolates air inlet 402 and air outlet 403. When first valve plate 16 and second valve plate 17 are open, first valve plate 16 blocks air outlet 403, and second valve plate 17 blocks return air. The outlet 405 allows clean airflow from the air inlet 402 to enter the air inlet 2 and exit through the return air inlet 404, thereby supplying clean and sustainable airflow into the tunnel. When the first valve plate 16 and the second valve plate 17 are closed, the interior of the housing 401 will be divided into two flow channels. One of them is the first flow channel composed of the air inlet 402 and the air outlet 403, and the other is the second flow channel composed of the return air inlet 404 and the return air outlet 405. The first flow channel is the air inlet flow channel, and the second flow channel is the return air flow channel.

[0021] By setting a cooperative structure between the piston rod and the valve plate, the flow path of the airflow through the air distribution device 4 can be controlled at any time, so that the airflow can flow from each connection port to the corresponding pipeline according to the predetermined design. On the one hand, the design of the air distribution device 4 increases the adjustability of the overall system and makes it easier to control the flow path of the airflow. On the other hand, it also reduces the space occupied by the overall system, making it more practical.

[0022] The dimensions of the first valve plate 16 and the second valve plate 17 are the same as the dimensions of the flow channels inside the housing 401, and their structures are compatible; thereby enhancing the ability of the first valve plate 16 and the second valve plate 17 to isolate airflow, ensuring that when the first valve plate 16 and the second valve plate 17 are closed, the two flow channels inside the housing 401 can not interfere with each other, thus ensuring the smooth operation of the overall system.

[0023] In addition, air volume sensors 19 are installed in both the air inlet 402 and the return air inlet 404. The sensor probes of the air volume sensors 19 are located in the middle of the air inlet 402 and the return air inlet 404. The air volume sensors 19 can sense the airflow velocity through the first valve plate 16 and the second valve plate 17, providing data feedback to the on-site operators. If a large amount of dust is generated due to the operation, the air supply velocity of the ventilator can be increased, thereby increasing the airflow velocity in the tunnel 1, ensuring that the dust concentration in the tunnel 1 remains within a reasonable range, thus improving the overall system coordination.

[0024] A roadheader 7 is installed on one side of the air inlet end of the return air duct 6. The body of the roadheader 7 and the air inlet end of the return air duct 6 are on the same vertical plane. The cutting section of the roadheader 7 faces the working face 8. A first conveyor belt 9 for transporting crushed stone is installed at the tail of the roadheader 7. When the cutting section of the roadheader 7 is tunneling at the working face 8, the working face 8 will generate flying fine debris under the action of the cutting section of the roadheader 7. In order to avoid the debris interfering with the operation of the roadheader 7, the first conveyor belt 9 is installed at the tail of the roadheader 7. This allows some of the debris that flies a long distance to fall onto the first conveyor belt 9 and be transported out of the working area of ​​the roadheader 7 by the first conveyor belt 9. Since the debris has a strong impact force, a high-elasticity rubber conveyor belt can be used as the first conveyor belt 9 to ensure that the first conveyor belt 9 can operate normally for a long time.

[0025] The first conveyor belt 9 is connected to the second conveyor belt 10. A bridge can be used to connect the first conveyor belt 9 and the second conveyor belt 10 to ensure stable transmission. A dust removal fan 11 is installed on the upper part of the second conveyor belt 10. The dust removal fan 11 is connected to the return air outlet 405 via a pipeline, and the dust removal fan 11 is connected to the return air duct 6 via an air distribution device 4. The airflow passing through the return air duct 6 can be filtered out by the dust removal fan 11, thereby reducing the high dust concentration in the roadway 1, further improving the overall dust removal efficiency of the system and reducing safety hazards.

[0026] The dust removal fan 11 is connected to a dust discharge duct 18, which is located above the second conveyor belt 10. After the dust-laden airflow passes through the dust removal fan 11, the dust removal fan 11 filters out the dust in the airflow. The clean airflow flows out from the air outlet of the dust removal fan 11, while the dust is discharged in the form of dry dust or wet mud through the dust discharge duct 18 connected to the dust removal fan 11. The dust is discharged onto the second conveyor belt 10 and then transported out by the second conveyor belt 10, thereby preventing the regeneration of dust-laden airflow in the roadway 1 and further reducing the dust concentration in the roadway 1.

[0027] In addition, the air distribution device 4 is 30-40 meters away from the working face 8, and the return air duct 6 is 5-10 meters away from the working face 8.

[0028] The foregoing has described in detail an embodiment of a dust control and ventilation system for underground tunneling construction. Based on the dust control and ventilation system for underground tunneling construction described in the above embodiment, this invention also provides a corresponding method for dust control and ventilation system for underground tunneling construction, comprising the following steps: S1: Install fixed anchor bolts on the top of the roadway 1. The slide rail 12 can be installed on the top of the roadway 1 through the fixed anchor bolts. The slide rail 12 is a multi-section installation structure. Each slide rail 12 can be connected to each other through connectors, so as to form a continuous slide rail on the top of the roadway 1. The silo shell 301 and the air distribution device 4 are slidably installed on the slide rail 12 at a distance of 30-40 meters from the working face 8. The air inlet duct 2 is connected to the telescopic air duct 302, the telescopic air duct 302 is connected to the air inlet 402, the air outlet duct 5 is connected to the air outlet 403, the return air duct 6 is connected to the return air inlet 404, and the dust removal fan 11 is connected to the return air outlet 405. S2: Install the body of the roadheader 7 at a distance of 5-10 meters from the working face 8, so that the cutting part of the roadheader 7 is located at the front end of the return air duct 6; S3: Before tunneling, the first valve plate 16 is controlled by the first piston rod 14 to connect the air inlet 402 and the air outlet 403 and isolate the return air inlet 404 and the return air outlet 405. The second valve plate 17 is controlled by the second piston rod 15 to connect the return air inlet 404 and the return air outlet 405 and isolate the air inlet 402 and the air outlet 403. Thus, two independent flow channels are formed in the air distribution device 4. The air inlet 402 and the air outlet 403 form the first flow channel, and the return air inlet 404 and the return air outlet 405 form the second flow channel. S4: Start the roadheader 7, so that the cutting part of the roadheader 7 can carry out tunneling operations on the working face 8. The ventilation fan inputs clean airflow through the air inlet duct 2. The clean airflow flows in the first flow channel and flows out through the air outlet duct 5. Since the air outlet duct 5 is provided with evenly distributed air outlet holes 501, an air curtain facing the working face 8 can be generated in the roadway 1. The air curtain combines with the dust near the working face 8 and enters the dust removal fan 11 through the return air duct 6. The dust removal fan 11 discharges the dust onto the second conveyor belt 10, and the second conveyor belt 10 transports the dust out.

[0029] In addition, when the roadheader 7 is not in operation, the first valve plate 16 and the second valve plate 17 are returned to their initial positions, respectively closing the air outlet 403 and the return air outlet 405 of the air distribution device 4. An integrated airflow channel is formed inside the air distribution device 4. The clean airflow delivered by the ventilation fan passes through the air inlet duct 2 and the telescopic air duct 302, enters the air distribution device 4 through the air inlet 402, and flows out into the roadway 1 through the return air inlet 404. After reaching the working face 8, the airflow returns along the roadway 1, thereby forming a circulating airflow. This controls the airflow direction and enhances the ventilation in the roadway 1.

[0030] Compared with existing technologies, this invention incorporates a wind distribution device 4 in the overall system, which divides the airflow passing through the device into bidirectional airflows of distribution and return air. This allows for simultaneous wind distribution and return air operation, while simultaneously generating an air curtain facing the working face in the roadway 1. This prevents the formation of gas vortices, reduces dust concentration in the roadway 1, improves visibility, ensures worker efficiency, minimizes safety hazards, and guarantees the personal safety of workers. Furthermore, the wind distribution device 4 and the telescopic ventilation duct 302 in this invention can move towards the working face along the sliding rail with the working direction of the roadheader 7. The sliding rail 12 is designed with a multi-segment installation structure, which not only saves production costs but also reduces the installation area occupied by the sliding rail 12 in the roadway 1, further reducing the space occupied by the overall system installation. At the same time, the overall structure of this invention is simple and flexible, can adjust the airflow direction in real time, and has strong compatibility. It can be quickly installed in the roadway, thus having a very broad application prospect.

[0031] The above description of the disclosed embodiments enables those skilled in the art to make or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A dust control and ventilation system for underground tunneling construction, comprising an air intake duct (2) installed in a roadway (1), characterized in that, The air inlet duct (2) is connected to the telescopic air duct chamber (3). The telescopic air duct chamber (3) is equipped with an air distribution device (4) at its end. The air distribution device (4) has multiple connecting ports. The air distribution device (4) is connected to the air outlet duct (5) and the air return duct (6) through the connecting ports. The air outlet duct (5) is used to generate an air curtain facing the working face (8) in the roadway (1). The air curtain can cover and fill the entire roadway (1). The air return duct (6) is connected to the dust removal fan (11) through the air distribution device (4). The air return duct (6) can absorb the airflow that carries dust and transport it to the dust removal fan (11) through the air distribution device (4) for dust removal. The air distribution device (4) includes a housing (401), inside which is a flow channel to facilitate airflow. The housing (401) is provided with an air inlet (402), an air outlet (403), a return air inlet (404), and a return air outlet (405). The air inlet (402) is connected to a telescopic air duct (302), the air outlet (403) is connected to an air outlet duct (5), the return air inlet (404) is connected to a return air duct (6), and the return air outlet (405) is connected to a dust removal fan (11). The housing (401) houses a first hydraulic cylinder (13) and a second hydraulic cylinder (20). The first hydraulic cylinder (13) is equipped with a first piston rod (14), and the second hydraulic cylinder (20) is equipped with a second piston rod (15). The first piston rod (14) is connected to a first valve plate (16). The first valve plate (16) can connect the air inlet (402) and the air outlet (403) into an integrated flow channel and isolate the return air inlet (404) and the return air outlet (405). The second piston rod (15) is connected to the second valve plate (17). The second valve plate (17) can connect the return air inlet (404) and the return air outlet (405) into an integrated flow channel and isolate the air inlet (402) and the air outlet (403). The dimensions of the first valve plate (16) and the second valve plate (17) are the same as the dimensions of the flow channel inside the housing (401). The first valve plate (16) and the second valve plate (17) are rotatably connected to the housing (401) through the rotating shaft (21).

2. The dust control and ventilation system for underground tunneling construction according to claim 1, characterized in that, The top of the roadway (1) is equipped with a slide rail (12), which is a multi-section installation structure. The telescopic ventilation duct (3) and the air distribution device (4) are both slidably engaged with the slide rail (12). A roadheader (7) is installed on one side of the return air duct (6). The roadheader (7) is located in the roadway (1) near the working face (8). The roadheader (7) is excavating towards the working face (8). The tail of the roadheader (7) is equipped with a first conveyor belt (9) for transporting crushed stone. The first conveyor belt (9) is connected to a second conveyor belt (10). The second conveyor belt (10) is located below the dust removal fan (11).

3. The dust control and ventilation system for underground tunneling construction according to claim 2, characterized in that, The telescopic ventilation duct (3) includes a duct shell (301) that is slidably mounted on a slide rail (12). The duct shell (301) is provided with a telescopic ventilation duct (302), which is connected to the air inlet duct (2) and the air distribution device (4) respectively.

4. The dust control and ventilation system for underground tunneling construction according to claim 1, characterized in that, The air outlet duct (5) is horizontally set, and the side of the air outlet duct (5) facing the working face (8) has a plane, on which air outlet holes (501) are evenly distributed.

5. A dust control and ventilation system for underground tunneling construction according to claim 2, characterized in that, The dust removal fan (11) is connected to a dust discharge duct (18), which is located on the upper part of the second conveyor belt (10).

6. The dust control and ventilation system for underground tunneling construction according to claim 1, characterized in that, An air volume sensor (19) is installed in both the air inlet (402) and the return air inlet (404). The sensor probe of the air volume sensor (19) is located in the middle of the air inlet (402) and the return air inlet (404).

7. A dust control and ventilation system for underground tunneling construction according to claim 1, characterized in that, The air distribution device (4) is 30-40 meters away from the working face (8), and the return air duct (6) is 5-10 meters away from the working face (8).

8. A method for adjusting dust control and ventilation in underground tunneling construction, as described in claim 3, characterized in that, The specific steps are as follows: S1: Install multiple slide rails (12) at a distance of 30-40 meters from the working face (8), slide the silo shell (301) and the air distribution device (4) on the slide rails (12), connect the air inlet duct (2) to the telescopic air duct (302), connect the telescopic air duct (302) to the air inlet (402), connect the air outlet duct (5) to the air outlet (403), connect the return air duct (6) to the return air inlet (404), and connect the return air outlet (405) to the air inlet of the dust removal fan (11); S2: Install the body of the roadheader (7) at a distance of 5-10 meters from the working face (8), so that the cutting part of the roadheader (7) is located at the front end of the return air duct (6) close to the working face (8). S3: Before the tunneling operation, the first valve plate (16) is controlled by the first piston rod (14) to connect the air inlet (402) and the air outlet (403) and isolate the return air inlet (404) and the return air outlet (405). The second valve plate (17) is controlled by the second piston rod (15) to connect the return air inlet (404) and the return air outlet (405) and isolate the air inlet (402) and the air outlet (403), thereby forming two independent flow channels in the air distribution device (4). S4: Start the roadheader (7) and make the cutting part of the roadheader (7) excavate the working face (8). The ventilation fan inputs clean airflow through the air inlet duct (2) and the airflow flows out from the air outlet duct (5), forming an air curtain facing the working face (8) in the roadway. The air curtain combines with the dust near the working face (8) and enters the dust removal fan (11) through the return air duct (6). The dust removal fan (11) processes the dust and discharges it onto the second conveyor belt (10), which then transports the dust out.

Citation Information

Patent Citations

  • Ventilation dust control and removal system for mining method tunnel construction

    CN114718625A

  • Ventilation device for laneway grubbing with roadheader

    CN1869402A