Through the pre-optimized target quality analysis network, the quality data of construction projects is automatically analyzed, which solves the problem of low reliability of engineering quality analysis in the existing technology, and achieves a more efficient and accurate project quality evaluation.
Patent Information
- Application Number
- CN202311415725.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-30
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2043-10-30
AI Technical Summary
In the prior art, the reliability of engineering quality analysis is not high, mainly due to the reliance on manual analysis, which limits the accuracy and efficiency of priority determination and quality evaluation.
Using a pre-optimized target quality analysis network, key information mining and data similarity calculations are carried out by analyzing the description data of the construction project, the priority of project quality detection is determined, and the correlation analysis and fusion characteristics are used to represent the output target quality results to achieve automated Engineering quality analysis.
It improves the reliability and efficiency of engineering quality analysis, and significantly improves the accuracy of priority determination and quality evaluation and data processing accuracy compared with manual analysis solutions.
Smart Images

Figure CN117314256B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data processing, and in particular to a method and system for detecting engineering quality. Background Art
[0002] Project quality inspection is an important means in the field of engineering applications. Therefore, in the prior art, construction project data is generally analyzed to determine the corresponding project quality. In addition, in the prior art, a large amount of concurrency may be encountered, that is, the quality of more construction projects needs to be analyzed. Therefore, it is necessary to determine the corresponding priority, such as first analyzing the quality of construction project 1, and then analyzing construction project 2, for example, arbitrarily determining the priority of the analysis. In this way, after determining the priority, the quality of each construction project can be analyzed in turn based on the corresponding priority. However, in the prior art, the construction project data is generally analyzed by staff, which makes its reliability low. Summary of the invention
[0003] In view of this, an object of the present invention is to provide a method and system for detecting engineering quality, so as to improve the reliability of engineering quality analysis.
[0004] To achieve the above objectives, the embodiments of the present invention adopt the following technical solutions:
[0005] A method for detecting engineering quality, comprising:
[0006] Analyzing the engineering quality inspection priority of each of the construction projects to be analyzed based on the construction project description data to be analyzed of each of the construction projects to be analyzed;
[0007] Among the multiple construction projects to be analyzed, according to the construction quality inspection priority of each of the construction projects to be analyzed, determining the target construction project to be analyzed that needs to be processed currently;
[0008] Using the pre-optimized target quality analysis network, an analysis operation is performed on the construction project description data of the target construction project to be analyzed to output a target quality result corresponding to the target construction project to be analyzed, and the target quality result is used to reflect the degree of quality.
[0009] In some preferred embodiments, in the above-mentioned method for detecting construction quality, the step of using the pre-optimized target quality analysis network to analyze the construction project description data to be analyzed of the target construction project to be analyzed to output the target quality result corresponding to the target construction project to be analyzed includes:
[0010] Determine, from among the plurality of construction projects to be analyzed, at least one construction project associated with the target construction project to be analyzed, wherein each of the associated construction projects to be analyzed and the target construction project to be analyzed do not belong to the same construction project to be analyzed;
[0011] Utilizing the pre-optimized target quality analysis network, analysis operations are performed on the construction project description data to be analyzed of the target construction project to be analyzed and the construction project description data to be analyzed of each of the at least one associated construction project to be analyzed, so as to output the target quality result corresponding to the target construction project to be analyzed.
[0012] In some preferred embodiments, in the above-mentioned method for detecting construction quality, the step of determining at least one associated construction project to be analyzed of the target construction project to be analyzed among the multiple construction projects to be analyzed comprises:
[0013] For each of the multiple building projects to be analyzed other than the target building project to be analyzed, calculating the data similarity between the building project description data to be analyzed corresponding to the building project to be analyzed and the building project description data to be analyzed of the target building project to be analyzed, and outputting the data similarity between the building project to be analyzed and the target building project to be analyzed;
[0014] Based on the data similarity between each building project to be analyzed other than the target building project to be analyzed in the multiple building projects to be analyzed and the target building project to be analyzed, at least one associated building project to be analyzed of the target building project to be analyzed is determined in each building project to be analyzed other than the target building project to be analyzed in the multiple building projects to be analyzed.
[0015] In some preferred embodiments, in the above-mentioned method for detecting project quality, the step of calculating data similarity between the construction project description data to be analyzed corresponding to each construction project to be analyzed other than the target construction project to be analyzed among the multiple construction projects to be analyzed and the construction project description data to be analyzed of the target construction project to be analyzed, and outputting the data similarity between the construction project to be analyzed and the target construction project to be analyzed comprises:
[0016] Performing a key information mining operation on the construction project description data to be analyzed of the target construction project to be analyzed to output a corresponding first data feature representation;
[0017] For each of the multiple building projects to be analyzed other than the target building project to be analyzed, performing a key information mining operation on the building project description data to be analyzed corresponding to the building project to be analyzed, so as to output a corresponding second data feature representation;
[0018] A similarity calculation operation is performed on the first data feature representation and the second data feature representation to output data similarity between the construction project to be analyzed and the target construction project to be analyzed.
[0019] In some preferred embodiments, in the above-mentioned method for detecting construction quality, the step of using the pre-optimized target quality analysis network to analyze the construction project description data to be analyzed of the target construction project to be analyzed and the construction project description data to be analyzed of each of the at least one associated construction project to be analyzed to output the target quality result corresponding to the target construction project to be analyzed includes:
[0020] Using the pre-optimized target quality analysis network, a key information mining operation is performed on the construction project description data to be analyzed of the target construction project to be analyzed to output a corresponding first data feature representation, and, for each construction project to be analyzed other than the target construction project to be analyzed among the multiple construction projects to be analyzed, a key information mining operation is performed on the construction project description data to be analyzed corresponding to the construction project to be analyzed to output a corresponding second data feature representation;
[0021] Using the target quality analysis network, based on each of the second data feature representations, respectively, performing association analysis on the first data feature representation to output each associated data feature representation;
[0022] Using the target quality analysis network, a fusion operation is performed on each of the associated data feature representations to output the corresponding fused associated data feature representation, and, based on the fused associated data feature representation, a quality analysis operation is performed on the target construction project to be analyzed to output the target quality result corresponding to the target construction project to be analyzed.
[0023] In some preferred embodiments, in the above-mentioned method for detecting engineering quality, the step of using the target quality analysis network to perform association analysis on the first data feature representation based on each of the second data feature representations to output each associated data feature representation includes: for each of the second data feature representations, using the target quality analysis network to perform:
[0024] performing a transposition process on the second data feature representation to form a transposed data feature representation corresponding to the second data feature representation;
[0025] multiplying the transposed data feature representation and the first data feature representation to output a corresponding correlation parameter distribution, and updating the correlation parameter distribution based on the number of dimensions of the first data feature representation to output a corresponding updated correlation parameter distribution;
[0026] The updated correlation parameter distribution is subjected to parameter adjustment processing to output a corresponding adjusted correlation parameter distribution, and, based on the adjusted correlation parameter distribution, the second data feature representation is subjected to weighted processing to output a corresponding associated data feature representation.
[0027] In some preferred embodiments, in the above-mentioned method for detecting construction quality, the step of analyzing the construction quality detection priority of each construction project to be analyzed based on the construction project description data to be analyzed of each construction project to be analyzed includes:
[0028] Determine the construction project description data to be analyzed of each construction project to be analyzed in the construction project cluster to be analyzed, wherein the construction project cluster to be analyzed includes a plurality of construction projects to be analyzed;
[0029] According to the description data of each of the construction projects to be analyzed, based on the form of performing the target operation in turn, the engineering quality inspection priority of each of the construction projects to be analyzed is analyzed, and performing the target operation once includes:
[0030] Based on the confirmed construction project cluster, a corresponding current detection priority is obtained, wherein the confirmed construction project cluster includes each confirmed construction project for which a construction quality detection priority has been determined, and the current detection priority is the highest detection priority other than the construction quality detection priority of each confirmed construction project that has been determined so far;
[0031] From the remaining to-be-analyzed construction project clusters, each remaining to-be-analyzed construction project for which the construction quality inspection priority has not yet been determined is obtained;
[0032] Analyzing the internal priority coefficient corresponding to each of the remaining building projects to be analyzed according to the building project description data to be analyzed of each of the building projects to be analyzed, the confirmed building project cluster and the remaining building project clusters to be analyzed;
[0033] Based on the internal priority coefficient, at least one remaining construction project to be analyzed is determined in the cluster of remaining construction projects to be analyzed, and the current detection priority is used as the project quality detection priority of the at least one remaining construction project to be analyzed.
[0034] The embodiment of the present invention further provides a system for detecting engineering quality, including:
[0035] A priority determination module, for analyzing the engineering quality inspection priority of each of the construction projects to be analyzed based on the construction project description data to be analyzed of each of the construction projects to be analyzed;
[0036] A construction project determination module is used to determine the target construction project to be analyzed that needs to be processed currently among multiple construction projects to be analyzed according to the construction quality inspection priority of each of the construction projects to be analyzed;
[0037] The building quality analysis module is used to use the pre-optimized target quality analysis network to analyze the description data of the target building project to be analyzed, so as to output the target quality result corresponding to the target building project to be analyzed, and the target quality result is used to reflect the degree of quality.
[0038] In some preferred embodiments, in the above-mentioned engineering quality detection system, the building quality analysis module is specifically used for:
[0039] Determine, from among the plurality of construction projects to be analyzed, at least one construction project associated with the target construction project to be analyzed, wherein each of the associated construction projects to be analyzed and the target construction project to be analyzed do not belong to the same construction project to be analyzed;
[0040] Utilizing the pre-optimized target quality analysis network, analysis operations are performed on the construction project description data to be analyzed of the target construction project to be analyzed and the construction project description data to be analyzed of each of the at least one associated construction project to be analyzed, so as to output the target quality result corresponding to the target construction project to be analyzed.
[0041] In some preferred embodiments, in the above-mentioned construction quality detection system, the target quality analysis network formed by pre-optimization is used to analyze the construction project description data to be analyzed of the target construction project to be analyzed and the construction project description data to be analyzed of each of the at least one associated construction project to be analyzed, so as to output the target quality result corresponding to the target construction project to be analyzed, including:
[0042] Using the pre-optimized target quality analysis network, a key information mining operation is performed on the construction project description data to be analyzed of the target construction project to be analyzed to output a corresponding first data feature representation, and, for each construction project to be analyzed other than the target construction project to be analyzed among the multiple construction projects to be analyzed, a key information mining operation is performed on the construction project description data to be analyzed corresponding to the construction project to be analyzed to output a corresponding second data feature representation;
[0043] Using the target quality analysis network, based on each of the second data feature representations, respectively, performing association analysis on the first data feature representation to output each associated data feature representation;
[0044] Using the target quality analysis network, a fusion operation is performed on each of the associated data feature representations to output the corresponding fused associated data feature representation, and, based on the fused associated data feature representation, a quality analysis operation is performed on the target construction project to be analyzed to output the target quality result corresponding to the target construction project to be analyzed.
[0045] A method and system for detecting project quality provided by an embodiment of the present invention can analyze the project quality detection priority of each construction project to be analyzed based on the construction project description data to be analyzed of each construction project to be analyzed; among multiple construction projects to be analyzed, determine the target construction project to be analyzed that currently needs to be processed based on the construction quality detection priority of each construction project to be analyzed; and use a pre-optimized target quality analysis network to analyze the construction project description data to be analyzed of the target construction project to be analyzed to output a target quality result corresponding to the target construction project to be analyzed, and the target quality result is used to reflect the degree of quality. Based on the above content, a target quality analysis network with high data processing accuracy can be used to perform quality analysis on construction projects, so that compared with conventional technical solutions based on manual analysis, the reliability of project quality analysis can be improved, thereby improving the problem of low reliability existing in the prior art.
[0046] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 A structural block diagram of the engineering quality detection platform provided in an embodiment of the present invention.
[0048] Figure 2 A flowchart of the steps of the method for detecting engineering quality provided in an embodiment of the present invention.
[0049] Figure 3 A schematic diagram of various modules included in the engineering quality detection system provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0050] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0051] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0052] like Figure 1 As shown, an embodiment of the present invention provides a project quality detection platform, wherein the project quality detection platform may include a memory and a processor.
[0053] In detail, the memory and the processor are electrically connected directly or indirectly to achieve data transmission or interaction. For example, they can be electrically connected to each other through one or more communication buses or signal lines. The memory can store at least one software function module (computer program) that can exist in the form of software or firmware. The processor can be used to execute the executable computer program stored in the memory, thereby realizing the engineering quality detection method provided by the embodiment of the present invention (as described later).
[0054] Optionally, in some embodiments, the memory may be, but is not limited to, a random access memory (RAM), a read only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable read-only memory (EEPROM), etc.
[0055] Optionally, in some embodiments, the processor may be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), a system on chip (SoC), etc.; it may also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components.
[0056] Optionally, in some implementations, the engineering quality detection platform may be a server with data processing capabilities.
[0057] Combination Figure 2 The embodiment of the present invention further provides a method for detecting engineering quality, which can be applied to the above-mentioned engineering quality detection platform. Among them, the method steps defined in the process related to the engineering quality detection method can be implemented by the engineering quality detection platform.
[0058] The following will Figure 2 The specific process shown is explained in detail.
[0059] Step S100, analyzing the engineering quality inspection priority of each of the construction projects to be analyzed based on the construction project description data to be analyzed.
[0060] In the embodiment of the present invention, the project quality detection platform can analyze the project quality detection priority of each construction project to be analyzed based on the construction project description data to be analyzed of each construction project to be analyzed.
[0061] Step S200: among a plurality of construction projects to be analyzed, according to the construction quality inspection priority of each of the construction projects to be analyzed, determining a target construction project to be analyzed that needs to be processed currently.
[0062] In an embodiment of the present invention, the project quality detection platform can determine the target building project to be analyzed that currently needs to be processed, such as the one with the highest priority, among multiple building projects to be analyzed based on the project quality detection priority of each of the building projects to be analyzed.
[0063] Step S300, using the pre-optimized target quality analysis network, analyze the construction project description data of the target construction project to be analyzed to output the target quality result corresponding to the target construction project to be analyzed.
[0064] In an embodiment of the present invention, the project quality detection platform can use a pre-optimized target quality analysis network to analyze the construction project description data of the target construction project to be analyzed, so as to output a target quality result corresponding to the target construction project to be analyzed. The target quality result is used to reflect the quality level.
[0065] Based on the above content, namely step S100, step S200 and step S300, a target quality analysis network with higher data processing accuracy can be used to perform quality analysis on the construction project, so that compared with the conventional technical solution based on manual analysis, the reliability of the project quality analysis can be improved, thereby improving the problem of low reliability existing in the prior art.
[0066] Optionally, in some embodiments, the step of analyzing the engineering quality inspection priority of each construction project to be analyzed based on the construction project description data of each construction project to be analyzed may further include the following contents, such as step S110 and step S120.
[0067] Step S110, determining the construction project description data to be analyzed of each construction project to be analyzed in the construction project cluster to be analyzed.
[0068] In an embodiment of the present invention, the project quality detection platform can determine the construction project description data to be analyzed of each construction project to be analyzed in the construction project cluster to be analyzed. The construction project cluster to be analyzed includes multiple construction projects to be analyzed. The construction project description data to be analyzed can be text data, image data, etc.
[0069] Step S120, analyzing the engineering quality inspection priority of each of the construction projects to be analyzed based on the form of executing the target operation in turn according to the construction project description data to be analyzed of each of the construction projects to be analyzed.
[0070] In an embodiment of the present invention, the engineering quality detection platform can analyze the engineering quality detection priority of each of the to-be-analyzed construction projects based on the to-be-analyzed construction project description data of each of the to-be-analyzed construction projects in the form of sequentially performing target operations. Executing the target operation once may include the following steps:
[0071] First, based on the confirmed construction project cluster, the corresponding current detection priority is obtained, the confirmed construction project cluster includes each confirmed construction project for which the engineering quality detection priority has been determined, and the current detection priority is the highest detection priority other than the engineering quality detection priority of each confirmed construction project that has been determined so far; secondly, from the remaining construction project clusters to be analyzed, each remaining construction project for which the engineering quality detection priority has not yet been determined is obtained; then, based on the construction project description data to be analyzed of each construction project to be analyzed, the confirmed construction project cluster and the remaining construction project clusters to be analyzed, the internal priority coefficient corresponding to each remaining construction project to be analyzed is analyzed; finally, based on the internal priority coefficient, in the remaining construction project clusters to be analyzed, at least one remaining construction project to be analyzed (such as one or more with the largest internal priority coefficient) is determined, and the current detection priority is used as the engineering quality detection priority of the at least one remaining construction project to be analyzed.
[0072] Based on the above content, namely the above steps S110 and S120, since the priority of project quality inspection is determined based on information such as the description data of the construction project to be analyzed, compared with the conventional technical solution of arbitrarily determining the inspection priority, the reliability of priority determination in project quality inspection can be improved, thereby improving the problem of low reliability existing in the prior art.
[0073] Optionally, in some implementations, the step of analyzing the internal priority coefficient corresponding to each of the remaining building projects to be analyzed based on the building project description data to be analyzed of each of the building projects to be analyzed, the confirmed building project clusters and the remaining building project clusters to be analyzed may further include the following contents:
[0074] Extracting a first feature representation of the engineering data analyzed based on the description data of the construction engineering to be analyzed of each of the construction engineering to be analyzed;
[0075] Performing a related information mining operation based on the first feature representation of the engineering data and the first feature representation of the analysis situation to output a first feature representation of the related information between each of the confirmed construction projects, wherein the first feature representation of the related information is used to reflect the content correlation information between each of the confirmed construction projects, the first feature representation of the analysis situation is obtained based on the analysis of each of the confirmed construction projects, and each feature representation parameter in the first feature representation of the analysis situation is used to reflect whether the corresponding construction project to be analyzed has analyzed the corresponding engineering quality detection priority;
[0076] An information mining operation is performed based on the first characteristic representation of the engineering data and the first characteristic representation of the analysis status, so as to output a first characteristic representation of the remaining information corresponding to each of the remaining construction projects to be analyzed, wherein the first characteristic representation of the remaining information is used to reflect the engineering data information of each of the remaining construction projects to be analyzed, and the first characteristic representation of the analysis status is obtained based on the analysis of each of the remaining construction projects to be analyzed, and each characteristic representation parameter in the first characteristic representation of the analysis status is used to reflect whether the corresponding construction project to be analyzed has not yet analyzed the engineering quality detection priority;
[0077] Based on the first characteristic representation of the relevant information and the first characteristic representation of the remaining information, the internal priority coefficient corresponding to each of the remaining construction projects to be analyzed is analyzed.
[0078] Optionally, in some embodiments, the step of extracting the first feature representation of the engineering data analyzed based on the description data of the to-be-analyzed building project of each to-be-analyzed building project may further include the following contents:
[0079] Loading the construction project description data to be analyzed of each of the construction projects to be analyzed to load into a construction data coding network formed by network optimization, wherein the construction data coding network is formed by network optimization based on a typical construction data cluster, wherein the typical construction data in the typical construction data cluster includes the construction project description data to be analyzed of the typical construction project to be analyzed and the actual construction quality detection priority and actual internal priority coefficient corresponding to the typical construction project to be analyzed;
[0080] By utilizing the engineering data mining sub-network in the engineering data encoding network, information mining operations are performed on the construction project description data to be analyzed of each of the construction projects to be analyzed to output the corresponding first feature representation of the engineering data. That is to say, the construction project description data to be analyzed can be mapped into the feature space to form the corresponding first feature representation of the engineering data.
[0081] Optionally, in some embodiments, the engineering data encoding network also includes an analysis output subnetwork and a linear processing subnetwork. Based on this, the step of performing relevant information mining operations based on the first feature representation of the engineering data and the first feature representation of the analysis situation to output the first feature representation of the relevant information between each of the confirmed construction projects may further include the following: loading the first feature representation of the engineering data to load it into the analysis output subnetwork included in the engineering data encoding network, using the analysis output subnetwork to perform multiplication operations on the first feature representation of the engineering data and the first feature representation of the analysis situation, and outputting the first feature representation of the relevant information between each of the confirmed construction projects.
[0082] Furthermore, based on the above content, the step of performing information mining operations based on the first characteristic representation of the engineering data and the first characteristic representation of the analysis status to output the first characteristic representation of the remaining information corresponding to each of the remaining construction projects to be analyzed may further include the following contents: based on the analysis output subnetwork, performing multiplication operations on the first characteristic representation of the engineering data and the first characteristic representation of the analysis status, and outputting the first characteristic representation of the remaining information corresponding to each of the remaining construction projects to be analyzed.
[0083] Furthermore, based on the above content, the step of analyzing the internal priority coefficient corresponding to each of the remaining construction projects to be analyzed based on the first characteristic representation of the relevant information and the first characteristic representation of the remaining information may further include the following contents:
[0084] The first feature representation of the cascade combination formed by cascading the first feature representation of the relevant information and the first feature representation of the remaining information is linearly processed by using a linear processing subnetwork, such as performing excitation mapping output through a softmax function, and outputting an internal priority coefficient corresponding to each of the remaining construction projects to be analyzed. Exceptionally, the cascade combination may refer to combining in dimension so that the number of dimensions of the first feature representation of the cascade combination is equal to the sum of the number of dimensions of the first feature representation of the relevant information and the number of dimensions of the first feature representation of the remaining information.
[0085] Optionally, in some embodiments, the network optimization of the engineering data encoding network may further include the following:
[0086] Based on the typical engineering data in the typical engineering data cluster, the engineering data encoding network is subjected to multi-stage network optimization, and after the network optimization process is completed, an optimized engineering data encoding network is obtained.
[0087] Among them, a stage of network optimization can further include the following contents:
[0088] Determining a typical engineering data combination in the typical engineering data cluster;
[0089] Loading the construction project description data to be analyzed of each typical construction project to be analyzed in the typical engineering data combination, the current confirmed typical construction project clusters and the remaining typical construction project clusters to be analyzed, as well as the confirmed typical construction project clusters and the remaining typical construction project clusters to be analyzed in the next stage, so as to load them into the engineering data encoding network, wherein the confirmed typical construction project clusters and the remaining typical construction project clusters to be analyzed are obtained according to the actual engineering quality detection priority analysis;
[0090] Using the engineering data mining sub-network in the engineering data encoding network, an information mining operation is performed on the construction engineering description data to be analyzed of each of the typical construction engineering to be analyzed, so as to output a second feature representation of the engineering data of the typical engineering data combination;
[0091] The second characteristic representation of the engineering data is loaded to the analysis output sub-network in the engineering data encoding network, so as to use the analysis output sub-network to analyze the first analysis value of the internal priority coefficient corresponding to each remaining typical building project to be analyzed in the current remaining typical building project cluster to be analyzed, and to analyze the second analysis value of the internal priority coefficient corresponding to each remaining typical building project to be analyzed in the remaining typical building project cluster to be analyzed in the next stage;
[0092] According to the first analysis value of the internal priority coefficient, the second analysis value of the internal priority coefficient and the corresponding actual internal priority coefficient (the difference between them), a target error parameter is calculated, and based on the target error parameter, the engineering data encoding network is optimized, such as optimizing the network in a direction of reducing the target error parameter.
[0093] Optionally, in some embodiments, the process of confirming the typical building project clusters and the process of determining the remaining typical building project clusters to be analyzed may further include the following:
[0094] Among the typical engineering data combinations, a randomly determined typical engineering data is marked to form typical engineering data to be processed;
[0095] Based on the actual engineering quality inspection priority and each typical construction project to be analyzed before the typical construction project to be analyzed in the typical engineering data to be processed, determine the current confirmed typical construction project cluster, and, based on the typical construction projects to be analyzed in other typical engineering data, determine the current remaining typical construction project clusters to be analyzed;
[0096] Based on the actual project quality inspection priority, the typical construction projects to be analyzed in the typical project data to be processed and each typical construction project to be analyzed before the typical construction project to be analyzed, the confirmed typical construction project clusters for the subsequent stage are determined, and, based on the typical construction projects to be analyzed in other typical project data, the remaining typical construction project clusters to be analyzed in the subsequent stage are determined.
[0097] Optionally, in some embodiments, the analysis output subnetwork includes a first analysis output unit and a second analysis output unit. Based on this, the step of loading the second feature representation of the engineering data to load it into the analysis output subnetwork in the engineering data encoding network, and using the analysis output subnetwork to analyze the first analysis value of the internal priority coefficient corresponding to each remaining typical building project to be analyzed in the current remaining typical building project cluster to be analyzed, and analyzing the second analysis value of the internal priority coefficient corresponding to each remaining typical building project to be analyzed in the remaining typical building project cluster to be analyzed in the next stage, can further include the following contents:
[0098] Utilizing the first analysis output unit, after multiplying the second feature representation of the engineering data and the second feature representation of the analysis situation, a focused feature analysis operation is performed to output the second feature representation of the related information between each confirmed typical construction project in the current confirmed typical construction project cluster, wherein the second feature representation of the related information is used to reflect the content correlation information between each currently confirmed typical construction project (i.e., the relationship between each confirmed typical construction project), and each feature representation parameter in the second feature representation of the analysis situation is used to reflect whether the construction project to be analyzed in the corresponding typical engineering data combination has been analyzed for the engineering quality inspection priority;
[0099] Using the first analysis output unit, determine the residual information second feature representation formed by multiplying the second feature representation of the engineering data and the second feature representation of the analysis status, the residual information second feature representation is used to display the engineering data information of each remaining typical construction project to be analyzed, and each feature representation parameter in the second feature representation of the analysis status is used to reflect whether the construction project to be analyzed in the corresponding typical engineering data combination has not yet analyzed the engineering quality detection priority;
[0100] Using the linear processing subnetwork in the first analysis output unit, a cascade combination second feature representation formed by cascading the second feature representation of the relevant information and the second feature representation of the remaining information is linearly processed to output a first analysis value of the internal priority coefficient corresponding to each remaining typical building project to be analyzed in the current remaining typical building project cluster;
[0101] Utilizing the second analysis output unit, after multiplying the second feature representation of the engineering data and the third feature representation of the analysis situation, a focused feature analysis operation is performed to output the third feature representation of the related information between each confirmed typical construction project in the confirmed typical construction project cluster at the next stage, wherein the third feature representation of the related information is used to reflect the content correlation information between each confirmed typical construction project at the next stage, and each feature representation parameter in the third feature representation of the analysis situation is used to reflect whether the construction project to be analyzed in the corresponding typical engineering data combination at the next stage has been analyzed for the engineering quality inspection priority;
[0102] Using the second analysis output unit, determine the residual information third feature representation formed by multiplying the second feature representation of the engineering data and the third feature representation of the analysis status, the residual information third feature representation is used to reflect the engineering data information of each remaining typical construction project to be analyzed in the next stage, and each feature representation parameter in the third feature representation of the analysis status is used to reflect whether the construction project to be analyzed in the typical engineering data combination corresponding to the next stage has not yet analyzed the engineering quality detection priority;
[0103] Utilizing the linear processing subnetwork in the second analysis output unit, the cascaded combined third feature representation formed by the cascade combination of the third feature representation of the relevant information and the third feature representation of the residual information is linearly processed to output the second analysis value of the internal priority coefficient corresponding to each remaining typical building project to be analyzed in the remaining typical building project cluster to be analyzed in the next stage.
[0104] Wherein, it can be selected that, in some implementations, the step of calculating the target error parameter according to the first analysis value of the internal priority coefficient, the second analysis value of the internal priority coefficient and the corresponding actual internal priority coefficient, and the step of optimizing the engineering data encoding network based on the target error parameter, can further include the following contents:
[0105] Based on the difference between the reference priority coefficient in the first analysis value of each internal priority coefficient and the maximum value in the second analysis value of each internal priority coefficient, and combined with the corresponding actual internal priority coefficient, the corresponding target error parameter is calculated, and the reference priority coefficient belongs to the first analysis value of the internal priority coefficient corresponding to the typical construction project to be analyzed in the typical engineering data to be processed.
[0106] Alternatively, in some embodiments, the step of using the pre-optimized target quality analysis network to analyze the construction project description data to be analyzed of the target construction project to be analyzed to output the target quality result corresponding to the target construction project to be analyzed may further include the following contents:
[0107] Determine, from among the plurality of construction projects to be analyzed, at least one construction project associated with the target construction project to be analyzed, wherein each of the associated construction projects to be analyzed and the target construction project to be analyzed do not belong to the same construction project to be analyzed;
[0108] Utilizing the pre-optimized target quality analysis network, analysis operations are performed on the construction project description data to be analyzed of the target construction project to be analyzed and the construction project description data to be analyzed of each of the at least one associated construction project to be analyzed, so as to output the target quality result corresponding to the target construction project to be analyzed.
[0109] Optionally, in some embodiments, the step of determining at least one associated building project to be analyzed of the target building project to be analyzed among the multiple building projects to be analyzed may further include the following:
[0110] For each of the multiple building projects to be analyzed other than the target building project to be analyzed, calculating the data similarity between the building project description data to be analyzed corresponding to the building project to be analyzed and the building project description data to be analyzed of the target building project to be analyzed, and outputting the data similarity between the building project to be analyzed and the target building project to be analyzed;
[0111] Based on the data similarity between each building project to be analyzed other than the target building project to be analyzed in the multiple building projects to be analyzed and the target building project to be analyzed, in each building project to be analyzed other than the target building project to be analyzed in the multiple building projects to be analyzed, at least one associated building project to be analyzed of the target building project to be analyzed (such as one or more with the largest corresponding data similarity) is determined.
[0112] Alternatively, in some embodiments, for each building project to be analyzed other than the target building project to be analyzed among the multiple building projects to be analyzed, the step of calculating the data similarity between the building project description data to be analyzed corresponding to the building project to be analyzed and the building project description data to be analyzed of the target building project to be analyzed, and outputting the data similarity between the building project to be analyzed and the target building project to be analyzed may further include the following contents:
[0113] Performing a key information mining operation on the construction project description data to be analyzed of the target construction project to be analyzed, and mapping it to a feature space to output a corresponding first data feature representation;
[0114] For each of the multiple building projects to be analyzed other than the target building project to be analyzed, performing a key information mining operation on the building project description data to be analyzed corresponding to the building project to be analyzed, so as to output a corresponding second data feature representation;
[0115] A similarity calculation operation is performed on the first data feature representation and the second data feature representation to output data similarity between the construction project to be analyzed and the target construction project to be analyzed.
[0116] Alternatively, in some embodiments, the step of using the pre-optimized target quality analysis network to analyze the construction project description data to be analyzed of the target construction project to be analyzed and the construction project description data to be analyzed of each of the at least one associated construction project to be analyzed to output the target quality result corresponding to the target construction project to be analyzed may further include the following contents:
[0117] Using the pre-optimized target quality analysis network, a key information mining operation is performed on the construction project description data to be analyzed of the target construction project to be analyzed to output a corresponding first data feature representation, and, for each construction project to be analyzed other than the target construction project to be analyzed among the multiple construction projects to be analyzed, a key information mining operation is performed on the construction project description data to be analyzed corresponding to the construction project to be analyzed to output a corresponding second data feature representation;
[0118] Using the target quality analysis network, based on each of the second data feature representations, respectively, performing association analysis on the first data feature representation to output each associated data feature representation;
[0119] Using the target quality analysis network, a fusion operation is performed on each of the associated data feature representations to output the corresponding fused associated data feature representation, and based on the fused associated data feature representation, a quality analysis operation is performed on the target construction project to be analyzed to output the target quality result corresponding to the target construction project to be analyzed (the target quality analysis network is formed by network optimization based on corresponding typical data and quality labels. In addition, the fusion operation may refer to cascading or superimposing each of the associated data feature representations).
[0120] Optionally, in some embodiments, the step of using the target quality analysis network to perform association analysis on the first data feature representation based on each of the second data feature representations to output each associated data feature representation further includes the following:
[0121] For each second data feature representation, using the target quality analysis network, perform:
[0122] performing a transposition process on the second data feature representation to form a transposed data feature representation corresponding to the second data feature representation;
[0123] multiplying the transposed data feature representation and the first data feature representation to output a corresponding correlation parameter distribution, and updating the correlation parameter distribution based on the number of dimensions of the first data feature representation to output a corresponding updated correlation parameter distribution, for example, dividing the correlation parameter distribution by the number of dimensions of the first data feature representation;
[0124] The updated correlation parameter distribution is subjected to parameter adjustment processing to output a corresponding adjusted correlation parameter distribution, such as parameter normalization processing on the updated correlation parameter distribution, and, based on the adjusted correlation parameter distribution, the second data feature representation is weighted, that is, the two are multiplied to output a corresponding associated data feature representation.
[0125] Combination Figure 3 The embodiment of the present invention further provides a system for detecting engineering quality, which can be applied to the above-mentioned engineering quality detection platform. The system for detecting engineering quality can include:
[0126] A priority determination module, for analyzing the engineering quality inspection priority of each of the construction projects to be analyzed based on the construction project description data to be analyzed of each of the construction projects to be analyzed;
[0127] A construction project determination module is used to determine the target construction project to be analyzed that needs to be processed currently among multiple construction projects to be analyzed according to the construction quality inspection priority of each of the construction projects to be analyzed;
[0128] The building quality analysis module is used to use the pre-optimized target quality analysis network to analyze the description data of the target building project to be analyzed, so as to output the target quality result corresponding to the target building project to be analyzed, and the target quality result is used to reflect the degree of quality.
[0129] Optionally, in some embodiments, the building quality analysis module is specifically used to:
[0130] Determine, from among the plurality of construction projects to be analyzed, at least one construction project associated with the target construction project to be analyzed, wherein each of the associated construction projects to be analyzed and the target construction project to be analyzed do not belong to the same construction project to be analyzed;
[0131] Utilizing the pre-optimized target quality analysis network, analysis operations are performed on the construction project description data to be analyzed of the target construction project to be analyzed and the construction project description data to be analyzed of each of the at least one associated construction project to be analyzed, so as to output the target quality result corresponding to the target construction project to be analyzed.
[0132] Alternatively, in some embodiments, the target quality analysis network formed by pre-optimization is used to analyze the construction project description data to be analyzed of the target construction project to be analyzed and the construction project description data to be analyzed of each of the at least one associated construction project to be analyzed, so as to output the target quality result corresponding to the target construction project to be analyzed, including:
[0133] Using the pre-optimized target quality analysis network, a key information mining operation is performed on the construction project description data to be analyzed of the target construction project to be analyzed to output a corresponding first data feature representation, and, for each construction project to be analyzed other than the target construction project to be analyzed among the multiple construction projects to be analyzed, a key information mining operation is performed on the construction project description data to be analyzed corresponding to the construction project to be analyzed to output a corresponding second data feature representation;
[0134] Using the target quality analysis network, based on each of the second data feature representations, respectively, performing association analysis on the first data feature representation to output each associated data feature representation;
[0135] Using the target quality analysis network, a fusion operation is performed on each of the associated data feature representations to output the corresponding fused associated data feature representation, and, based on the fused associated data feature representation, a quality analysis operation is performed on the target construction project to be analyzed to output the target quality result corresponding to the target construction project to be analyzed.
[0136] In summary, the present invention provides a method and system for detecting project quality, which can analyze the project quality detection priority of each construction project to be analyzed based on the construction project description data to be analyzed of each construction project to be analyzed; among multiple construction projects to be analyzed, determine the target construction project to be analyzed that currently needs to be processed based on the construction quality detection priority of each construction project to be analyzed; and use a pre-optimized target quality analysis network to analyze the construction project description data to be analyzed of the target construction project to be analyzed, so as to output a target quality result corresponding to the target construction project to be analyzed, and the target quality result is used to reflect the degree of quality. Based on the above content, a target quality analysis network with high data processing accuracy can be used to perform quality analysis on construction projects, so that compared with conventional technical solutions based on manual analysis, the reliability of project quality analysis can be improved, thereby improving the problem of low reliability existing in the prior art.
[0137] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for detecting engineering quality, It is characterized in that include: According to the construction project description data to be analyzed of each construction project to be analyzed, the engineering quality inspection priority of each construction project to be analyzed is analyzed; wherein, according to the construction project description data to be analyzed of each construction project to be analyzed, the step of analyzing the engineering quality inspection priority of each construction project to be analyzed comprises: determining the construction project description data to be analyzed of each construction project to be analyzed in the construction project cluster to be analyzed; according to the construction project description data to be analyzed of each construction project to be analyzed, based on the form of sequentially rotating execution of target operations, analyzing the engineering quality inspection priority of each construction project to be analyzed, wherein executing the target operation once comprises the following steps: based on confirming the construction project cluster, obtaining the corresponding current inspection priority, the confirmed construction project cluster includes For each confirmed construction project whose construction quality inspection priority has been determined, the current inspection priority is the highest inspection priority other than the construction quality inspection priority of each confirmed construction project that has been determined so far; from the remaining construction project clusters to be analyzed, each remaining construction project to be analyzed whose construction quality inspection priority has not yet been determined is obtained; based on the construction project description data to be analyzed of each construction project to be analyzed, the confirmed construction project cluster and the remaining construction project clusters to be analyzed, an internal priority coefficient corresponding to each remaining construction project to be analyzed is analyzed; based on the internal priority coefficient, at least one remaining construction project to be analyzed is determined in the remaining construction project clusters to be analyzed, and the current inspection priority is used as the construction quality inspection priority of the at least one remaining construction project to be analyzed; Among the multiple construction projects to be analyzed, according to the construction quality inspection priority of each of the construction projects to be analyzed, determining the target construction project to be analyzed that needs to be processed currently; Using the pre-optimized target quality analysis network, an analysis operation is performed on the construction project description data of the target construction project to be analyzed, so as to output a target quality result corresponding to the target construction project to be analyzed, wherein the target quality result is used to reflect the quality quality; The step of analyzing the internal priority coefficient corresponding to each of the remaining building projects to be analyzed based on the building project description data to be analyzed of each of the building projects to be analyzed, the confirmed building project clusters and the remaining building project clusters to be analyzed further includes the following contents: Extracting a first feature representation of the engineering data analyzed based on the description data of the construction engineering to be analyzed of each of the construction engineering to be analyzed; Performing a related information mining operation based on the first feature representation of the engineering data and the first feature representation of the analysis situation to output a first feature representation of the related information between each of the confirmed construction projects, wherein the first feature representation of the related information is used to reflect the content correlation information between each of the confirmed construction projects, the first feature representation of the analysis situation is obtained based on the analysis of each of the confirmed construction projects, and each feature representation parameter in the first feature representation of the analysis situation is used to reflect whether the corresponding construction project to be analyzed has analyzed the corresponding engineering quality detection priority; An information mining operation is performed based on the first characteristic representation of the engineering data and the first characteristic representation of the analysis status, so as to output a first characteristic representation of the remaining information corresponding to each of the remaining construction projects to be analyzed, wherein the first characteristic representation of the remaining information is used to reflect the engineering data information of each of the remaining construction projects to be analyzed, and the first characteristic representation of the analysis status is obtained based on the analysis of each of the remaining construction projects to be analyzed, and each characteristic representation parameter in the first characteristic representation of the analysis status is used to reflect whether the corresponding construction project to be analyzed has not yet analyzed the engineering quality detection priority; Based on the first characteristic representation of the relevant information and the first characteristic representation of the remaining information, the internal priority coefficient corresponding to each of the remaining construction projects to be analyzed is analyzed.
2. The method for detecting engineering quality according to claim 1, It is characterized in that The step of using the pre-optimized target quality analysis network to analyze the construction project description data of the target construction project to be analyzed to output the target quality result corresponding to the target construction project to be analyzed includes: Determine, from among the plurality of construction projects to be analyzed, at least one construction project associated with the target construction project to be analyzed, wherein each of the associated construction projects to be analyzed and the target construction project to be analyzed do not belong to the same construction project to be analyzed; Utilizing the pre-optimized target quality analysis network, analysis operations are performed on the construction project description data to be analyzed of the target construction project to be analyzed and the construction project description data to be analyzed of each of the at least one associated construction project to be analyzed, so as to output the target quality result corresponding to the target construction project to be analyzed.
3. The method for detecting engineering quality as claimed in claim 2, It is characterized in that The step of determining at least one associated building project to be analyzed of the target building project to be analyzed from among the multiple building projects to be analyzed comprises: For each of the multiple building projects to be analyzed other than the target building project to be analyzed, calculating the data similarity between the building project description data to be analyzed corresponding to the building project to be analyzed and the building project description data to be analyzed of the target building project to be analyzed, and outputting the data similarity between the building project to be analyzed and the target building project to be analyzed; Based on the data similarity between each building project to be analyzed other than the target building project to be analyzed in the multiple building projects to be analyzed and the target building project to be analyzed, at least one associated building project to be analyzed of the target building project to be analyzed is determined in each building project to be analyzed other than the target building project to be analyzed in the multiple building projects to be analyzed.
4. The method for detecting engineering quality as claimed in claim 3, It is characterized in that The step of calculating data similarity between the construction project description data to be analyzed corresponding to each construction project to be analyzed other than the target construction project to be analyzed among the multiple construction projects to be analyzed and the construction project description data to be analyzed of the target construction project to be analyzed, and outputting the data similarity between the construction project to be analyzed and the target construction project to be analyzed comprises: Performing a key information mining operation on the construction project description data to be analyzed of the target construction project to be analyzed to output a corresponding first data feature representation; For each of the multiple building projects to be analyzed other than the target building project to be analyzed, performing a key information mining operation on the building project description data to be analyzed corresponding to the building project to be analyzed, so as to output a corresponding second data feature representation; A similarity calculation operation is performed on the first data feature representation and the second data feature representation to output data similarity between the construction project to be analyzed and the target construction project to be analyzed.
5. The method for detecting engineering quality according to claim 2, It is characterized in that The step of using the pre-optimized target quality analysis network to analyze the construction project description data to be analyzed of the target construction project to be analyzed and the construction project description data to be analyzed of each of the at least one associated construction project to be analyzed to output a target quality result corresponding to the target construction project to be analyzed includes: Using the pre-optimized target quality analysis network, a key information mining operation is performed on the construction project description data to be analyzed of the target construction project to be analyzed to output a corresponding first data feature representation, and, for each construction project to be analyzed other than the target construction project to be analyzed among the multiple construction projects to be analyzed, a key information mining operation is performed on the construction project description data to be analyzed corresponding to the construction project to be analyzed to output a corresponding second data feature representation; Using the target quality analysis network, based on each of the second data feature representations, respectively, performing association analysis on the first data feature representation to output each associated data feature representation; Using the target quality analysis network, a fusion operation is performed on each of the associated data feature representations to output the corresponding fused associated data feature representation, and, based on the fused associated data feature representation, a quality analysis operation is performed on the target construction project to be analyzed to output the target quality result corresponding to the target construction project to be analyzed.
6. The method for detecting engineering quality as claimed in claim 5, It is characterized in that The step of using the target quality analysis network to perform association analysis on the first data feature representation based on each of the second data feature representations to output each associated data feature representation includes: for each of the second data feature representations, using the target quality analysis network to perform: performing a transposition process on the second data feature representation to form a transposed data feature representation corresponding to the second data feature representation; multiplying the transposed data feature representation and the first data feature representation to output a corresponding correlation parameter distribution, and updating the correlation parameter distribution based on the number of dimensions of the first data feature representation to output a corresponding updated correlation parameter distribution; The updated correlation parameter distribution is subjected to parameter adjustment processing to output a corresponding adjusted correlation parameter distribution, and, based on the adjusted correlation parameter distribution, the second data feature representation is subjected to weighted processing to output a corresponding associated data feature representation.
7. A system for detecting engineering quality, It is characterized in that include: A priority determination module is used to analyze the engineering quality inspection priority of each construction project to be analyzed based on the construction project description data to be analyzed of each construction project to be analyzed; wherein, the analysis of the engineering quality inspection priority of each construction project to be analyzed based on the construction project description data to be analyzed of each construction project to be analyzed includes: determining the construction project description data to be analyzed of each construction project to be analyzed in the construction project cluster to be analyzed; based on the construction project description data to be analyzed of each construction project to be analyzed, based on the form of sequentially rotating execution of target operations, analyzing the engineering quality inspection priority of each construction project to be analyzed, wherein executing the target operation once includes: based on confirming the construction project cluster, obtaining the corresponding current inspection priority, the confirmed construction project cluster includes For each confirmed construction project whose construction quality inspection priority has been determined, the current inspection priority is the highest inspection priority other than the construction quality inspection priority of each confirmed construction project that has been determined so far; from the remaining construction project clusters to be analyzed, each remaining construction project to be analyzed whose construction quality inspection priority has not yet been determined is obtained; based on the construction project description data to be analyzed of each construction project to be analyzed, the confirmed construction project cluster and the remaining construction project clusters to be analyzed, the internal priority coefficient corresponding to each remaining construction project to be analyzed is analyzed; based on the internal priority coefficient, at least one remaining construction project to be analyzed is determined in the remaining construction project clusters to be analyzed, and the current inspection priority is used as the construction quality inspection priority of the at least one remaining construction project to be analyzed; A construction project determination module is used to determine the target construction project to be analyzed that needs to be processed currently among multiple construction projects to be analyzed according to the construction quality inspection priority of each of the construction projects to be analyzed; A building quality analysis module, used to use a pre-optimized target quality analysis network to analyze the building project description data of the target building project to be analyzed, so as to output a target quality result corresponding to the target building project to be analyzed, wherein the target quality result is used to reflect the quality quality; The step of analyzing the internal priority coefficient corresponding to each of the remaining building projects to be analyzed based on the building project description data to be analyzed of each of the building projects to be analyzed, the confirmed building project clusters and the remaining building project clusters to be analyzed further includes: Extracting a first feature representation of the engineering data analyzed based on the description data of the construction engineering to be analyzed of each of the construction engineering to be analyzed; Performing a related information mining operation based on the first feature representation of the engineering data and the first feature representation of the analysis situation to output a first feature representation of the related information between each of the confirmed construction projects, wherein the first feature representation of the related information is used to reflect the content correlation information between each of the confirmed construction projects, the first feature representation of the analysis situation is obtained based on the analysis of each of the confirmed construction projects, and each feature representation parameter in the first feature representation of the analysis situation is used to reflect whether the corresponding construction project to be analyzed has analyzed the corresponding engineering quality detection priority; An information mining operation is performed based on the first characteristic representation of the engineering data and the first characteristic representation of the analysis status, so as to output a first characteristic representation of the remaining information corresponding to each of the remaining construction projects to be analyzed, wherein the first characteristic representation of the remaining information is used to reflect the engineering data information of each of the remaining construction projects to be analyzed, and the first characteristic representation of the analysis status is obtained based on the analysis of each of the remaining construction projects to be analyzed, and each characteristic representation parameter in the first characteristic representation of the analysis status is used to reflect whether the corresponding construction project to be analyzed has not yet analyzed the engineering quality detection priority; Based on the first characteristic representation of the relevant information and the first characteristic representation of the remaining information, the internal priority coefficient corresponding to each of the remaining construction projects to be analyzed is analyzed.
8. The engineering quality detection system according to claim 7, It is characterized in that The building quality analysis module is specifically used for: Determine, from among the plurality of construction projects to be analyzed, at least one construction project associated with the target construction project to be analyzed, wherein each of the associated construction projects to be analyzed and the target construction project to be analyzed do not belong to the same construction project to be analyzed; Utilizing the pre-optimized target quality analysis network, analysis operations are performed on the construction project description data to be analyzed of the target construction project to be analyzed and the construction project description data to be analyzed of each of the at least one associated construction project to be analyzed, so as to output the target quality result corresponding to the target construction project to be analyzed.
9. The engineering quality detection system according to claim 8, It is characterized in that The method of using the pre-optimized target quality analysis network to analyze the construction project description data to be analyzed of the target construction project to be analyzed and the construction project description data to be analyzed of each of the at least one associated construction project to be analyzed, so as to output a target quality result corresponding to the target construction project to be analyzed, includes: Using the pre-optimized target quality analysis network, a key information mining operation is performed on the construction project description data to be analyzed of the target construction project to be analyzed to output a corresponding first data feature representation, and, for each construction project to be analyzed other than the target construction project to be analyzed among the multiple construction projects to be analyzed, a key information mining operation is performed on the construction project description data to be analyzed corresponding to the construction project to be analyzed to output a corresponding second data feature representation; Using the target quality analysis network, based on each of the second data feature representations, respectively, performing association analysis on the first data feature representation to output each associated data feature representation; Using the target quality analysis network, a fusion operation is performed on each of the associated data feature representations to output the corresponding fused associated data feature representation, and, based on the fused associated data feature representation, a quality analysis operation is performed on the target construction project to be analyzed to output the target quality result corresponding to the target construction project to be analyzed.