A method for the layout of sprinkler fire extinguishers in traditional villages based on the FRAME method

By collecting fire risk data in traditional villages and applying FRAME method to optimize the layout of sprinkler fire extinguishers, the problem of inaccurate fire prevention layout in traditional villages has been solved, and efficient and precise fire prevention and control in traditional villages has been achieved.

CN117436145BActive Publication Date: 2024-12-06SOUTH CHINA UNIV OF TECH +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311257357.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-27
Publication Date
2024-12-06
Estimated Expiration
2043-09-27

AI Technical Summary

Technical Problem

There is a lack of overall layout methods for traditional villages in terms of fire prevention, the FRAME method is not optimized and applicable to modern buildings, and no fire risk data set is established, resulting in inaccurate layout of sprinkler fire extinguishers, which is difficult to meet the complex pattern and high fire risks of traditional villages.

Method used

By collecting fire risk data from traditional villages, calculating the fire risk level chart based on the FRAME method, correcting the fire zoning, and layout in combination with the characteristics of the sprinkler fire extinguisher, including the layout of full-coverage and targeted sprinkler fire extinguishers to ensure coverage area and accuracy.

Benefits of technology

It has achieved rapid and accurate layout of sprinkler fire extinguishers in traditional villages, improved the efficiency and pertinence of fire prevention and control, and improved the scientificity and economicality of fire extinguishing facilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117436145B_ABST
    Figure CN117436145B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for the layout of sprinkler fire extinguishers in traditional villages based on the FRAME method, and the steps are as follows: prepare a traditional village building fire risk data set and assign building fire risk attributes; delineate the original fire zoning for the target traditional village; delineate the fire risk level for the target traditional village; couple and correct the original fire zoning using the fire risk level map to obtain the target fire zoning; judge the distribution of buildings in the target fire zoning, layout the full-coverage sprinkler fire extinguisher, and arrange large high-pressure sprinkler water guns and separation water curtains in areas that meet the corresponding conditions; judge the building fire risk value and protection properties of the target fire zoning, layout the targeted sprinkler fire extinguisher, and arrange small high-pressure sprinkler water guns in areas that meet the corresponding conditions. This method can be used for efficient analysis of fire risk zoning in traditional villages in a large area, and further for the rapid and accurate layout of sprinkler fire extinguishers.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of traditional village protection based on geographic information data, and in particular to a method for arranging sprinkler fire extinguishers in traditional villages based on a FRAME method. Background Art

[0002] Traditional villages contain rich historical information and cultural landscapes, and are typical representatives of China's architectural cultural heritage. Most of the traditional villages were established before 1949, preserving the traditional village pattern, with certain historical environmental elements, traditional building scale, traditional craft construction and intangible cultural heritage. At present, the fire prevention measures in traditional villages mainly rely on residents' manual firefighting, and large-scale fire-fighting equipment mainly relies on the transportation of fire stations. However, on the one hand, the limited manpower of residents, insufficient fire-fighting equipment in villages, narrow and complicated streets and lanes in villages, and long transportation time of fire stations can easily lead to missing the best fire-fighting time in traditional villages, increasing the difficulty of fire-fighting. On the other hand, the traditional village pattern is complex, the fire resistance level of traditional buildings is low, and the fire-fighting equipment is insufficient, making it difficult to equip fire-fighting facilities that meet the fire safety standards of modern buildings. At the same time, the use of fire and electricity in traditional villages is complex, which increases the risk of fire and further increases the difficulty of fire prevention in traditional villages. At present, there is no unified fire prevention standard for traditional villages to guide the layout method of sprinkler fire extinguishers.

[0003] The main problems of fire prevention in traditional villages at present:

[0004] (1) No method for the layout of sprinkler fire extinguishers in the whole village at the level of traditional villages has been proposed. The research is limited to the local layout of the device in the building unit, so it is impossible to carry out fire protection at the overall level.

[0005] (2) The FRAME method has not been optimized according to the characteristics of traditional villages. The FRAME method is generally applicable to modern building units. The index system is complex and requires a large amount of data collection and calculation. In addition, some index factors do not conform to the fire protection characteristics of traditional villages. When using the FRAME method to build a logical framework for fire zoning, the index system needs to be optimized and simplified for traditional villages to meet the needs of fast and accurate division.

[0006] (3) A fire risk data set has not been established to serve the delineation of fire zones. Since the risk factors that cause fires in traditional buildings are relatively complex, scientific delineation of fire zones in traditional villages based on fire risk data analysis is an important prerequisite for the layout of sprinkler fire extinguishers in traditional villages. When delineating fire zones, it is necessary to classify fire risk levels based on the fire risk data of traditional villages and revise the original fire zone division to meet the needs of scientific and economic delineation.

[0007] (4) It is limited to demarcating fire zones in traditional villages, or only limited to proposing the layout method of sprinkler fire extinguishers for traditional building units. There is no systematic idea of ​​using fire zone demarcation to guide the layout of sprinkler fire extinguishers. Therefore, it is impossible to accurately layout sprinkler fire extinguishers at the overall level of traditional villages. Summary of the invention

[0008] The purpose of the present invention is to solve the above-mentioned defects in the prior art and provide a method for the layout of sprinkler fire extinguishers in traditional villages based on the FRAME method. The method collects and calculates the fire risk data of traditional villages, calculates the fire risk level map based on the FRAME method, performs coupling correction on the original fire partitions, obtains the target fire partitions, and arranges three types of sprinkler fire extinguishers according to the characteristics of the target fire partitions. The method can be used for the rapid and accurate layout of sprinkler fire extinguishers in various traditional villages, and improves the efficiency and pertinence of the overall fire prevention and control of traditional villages.

[0009] The purpose of the present invention can be achieved by adopting the following technical solutions:

[0010] A method for locating sprinkler fire extinguishers in traditional villages based on the FRAME method, the positioning method comprising the following steps:

[0011] S1. Establishment of fire risk database: Import the surveyed CAD building block plan of the target traditional village into the geographic information processing software GIS platform, assign relevant fire risk data attributes, and calculate the fire risk value R;

[0012] S2. Original fire zone delineation: Delineate the original fire zones for the target traditional villages;

[0013] S3. Determination of fire risk levels: Determine the fire risk level based on the FRAME method, and generate a fire risk level map with graded color blocks on the geographic information processing software GIS platform according to the fire risk value R of each building in the target traditional village;

[0014] S4, target fire zone delineation: superimpose and couple the fire risk level map with the original fire zone, trim the boundaries, and obtain the final target fire zone;

[0015] S5. Layout of full-coverage sprinkler fire extinguishers: Full-coverage sprinkler fire extinguishers are deployed in the target traditional villages. According to the building distribution characteristics of the target fire compartments, large high-pressure sprinkler water guns are deployed in the target fire compartments with an area of ​​≥16㎡ of unobstructed public space, and separation water curtains are deployed in the areas not covered by the range of the sprinkler water guns; separation water curtains are deployed in the target fire compartments with an area of ​​<16㎡ of unobstructed public space;

[0016] S6. Targeted sprinkler fire extinguisher layout: small high-pressure sprinkler water guns are arranged around buildings with high fire risk values ​​R ≥ 4.5 and immovable cultural relics;

[0017] S7. Data visualization: The sprinkler fire extinguisher layout calculation result dataset and its coverage radius are imported into the geographic information processing software GIS platform for visualization to obtain the sprinkler fire extinguisher layout map of the target traditional village.

[0018] Furthermore, the selection of fire risk factors for traditional village buildings in step S1 is based on the basic indicator factors in the FRAME method as the logical basis, combined with the "Traditional Village Evaluation and Recognition System (Trial)", referring to the relevant fire risk factor system, and a large number of fire causes in traditional villages where fires have occurred, and finally adjusted and formed. The full name of the FRAME method is the Fire Risk Analysis Method for Engineering. It is a comprehensive method for calculating building fire risks. It is currently the most comprehensive, scientific and mature building fire analysis method in the field of international risk assessment. The FRAME method is a semi-quantitative analysis method, which takes into account the protection of the building itself, indoor objects and indoor activities at the same time. It can be used to evaluate the current fire risk situation and the effectiveness of alternative design solutions. The building fire risk value R finally calculated in the basic FRAME method is graded according to a certain logic, which can guide the assessment and evaluation of building fire risks and the hierarchical planning and implementation of fire protection design solutions.

[0019] The traditional village fire risk value R constructed by the present invention is determined by the following three types of target layer factors and a total of 9 indicator layer factors, where the target layer factors include potential risk value P, resistible risk value A and structural factor F. 0 The potential risk value P includes five index layer factors: fire load factor q, fire spread factor i, area factor g, ventilation factor v, and floor factor e; the risk value A includes three index layer factors: activity factor a, value factor c, and environmental factor r; the structural factor F 0 It contains one index layer factor: fire resistance factor f, where the relevant index definitions and calculation methods are as follows:

[0020] (1) Fire risk value R = P / (A×F 0 );

[0021] In the optimized FRAME method, the fire risk R is composed of the potential risk value P, the resistance risk value A and the structural factor F. 0Joint decision. In a fully protected building there is a balance between risk and protection. If both are expressed numerically, the numerical value is equivalent to "risk divided by protection", that is, the quotient of the potential risk value P divided by the withstanding risk value A is equal to or less than 1. A quotient greater than 1 indicates that the protection is still insufficient relative to the risk and the layout of the fire extinguishers needs to be further strengthened.

[0022] In the basic FRAME method, for buildings that already have certain fire protection facilities, the fire risk value R is determined by the potential risk value P, the resistible risk value A, and the fire protection level D. In the FRAME method, the calculation of the initial risk value R is determined by the potential risk value P, the resistible risk value A, and the structural factor F. 0 The FRAME method is used in the present invention to provide guidelines for selecting fire protection systems for traditional villages that have not yet scientifically arranged fire protection facilities. Therefore, the influencing factors related to the initial risk value of traditional villages, that is, the parameters related to the initial structural design, include the potential risk value P, the risk value A and the structural factor F. 0 Three first-level impact factors.

[0023] In the basic FRAME method, the fire risk value R of the building's property, residents and indoor activities is calculated separately. In the present invention, the focus is on traditional villages with historical characteristics as the outstanding value of the buildings. Most of them are idle and lack residents and indoor activities. Therefore, the influencing factors of the optimized fire risk value R mainly focus on the building property characteristics. In the present invention, the influencing factors of the potential risk value P and the resistible risk value A and their calculation methods are simplified. In order to ensure that the logic that the quotient of the potential risk value P and the resistible risk value A is 1, it means that the risk and protection are balanced, the maximum value of the potential risk value P and the resistible risk value A is defined as 1, and then subsequent calculations are performed.

[0024] In the basic FRAME method, when calculating the fire risk value R for multi-story buildings, it is necessary to consider each floor of each target building separately. In the present invention, the focus is on historical buildings with mainly single floors. Although there are open spaces including patios in the buildings, the volume of building units divided by courtyards is much smaller than the scale of a fire zone, and the building construction density is relatively large. The possibility of fire spreading between courtyards is extremely high. Therefore, the present invention calculates the fire risk value R for each building courtyard unit.

[0025] (2) Potential risk value P = q + i + g + v + e;

[0026] The influence weights of the five index layer factors of the potential risk value P are calculated by combining expert scoring with the AHP hierarchical analysis method. The reference weights define the value ranges of the secondary indicators as follows: the reference value range of the fire load factor q is 0-0.38; the reference value range of the fire spread factor i is 0-0.32; the reference value range of the area factor g is 0-0.06; the reference value range of the ventilation factor v is 0-0.18; the reference value range of the floor factor e is 0-0.06;

[0027] ① The fire load factor q is defined as: the mass of combustible material per unit area m2, where the reference type values ​​are: the estimated value for all-wood structure is 1500MJ / m2, and the formula value is 0.38; the estimated value for brick-wood structure is 1000MJ / m2, and the formula value is 0.26; the estimated value for rammed earth structure is 300MJ / m2, and the formula value is 0.09; the estimated value for masonry structure is 200MJ / m2, and the formula value is 0.05; the estimated value for reinforced concrete is 100MJ / m2, and the formula value is 0.02;

[0028] ② The fire spread factor i is defined as: the degree of difficulty of fire spreading in a building, which is related to the combustion characteristics of indoor furniture and facilities. The reference type values ​​are: 0 for non-combustible materials; 0.08 for flame-retardant materials; 0.24 for combustible materials; and 0.32 for flammable materials.

[0029] ③ Area factor g is defined as: the horizontal effect of fire and the building area S 占地 Regarding the building area S 占地 The unit is m2. The value formula is g = -0.0001S 占地 +0.06.

[0030] ④ The ventilation factor v is defined as: the total area of ​​doors and windows in the building that can exhaust smoke S 门窗 With building area S 占地 Ratio, the units of both variables are square meters, and the formula for the value is v = -0.207 (S 门窗 / S 占地 )+0.18;

[0031] ⑤ Floor factor e is defined as: the vertical effect of fire, the value is based on the total number of floors of the building, where the reference type value is: 1st floor value: 0.06; 2-3rd floor value: 0.03; 4th floor and above value: 0.01;

[0032] (3) The risk value that can be resisted is A = 1-(a+c+r);

[0033] The influence weights of the three indicator layer factors of the risk value A that can be resisted are calculated by combining expert scoring with the AHP hierarchical analysis method. The reference weights define the value ranges of the secondary indicators as follows: the reference value range of activity factor a is 0 to 0.35; the reference value range of value factor c is 0 to 0.24; the reference value range of environmental factor r is 0 to 0.41;

[0034] ① The activity factor a is defined as: the main activities carried out in the building, where the reference activity values ​​are: idle value: 0.05; exhibition activity value: 0.1; residential activity value: 0.15; commercial activity value: 0.2; modern public activity value: 0.25; sacrificial activity value: 0.3; production activity value: 0.35;

[0035] ②The value factor c is defined as: the construction age and protection strength of the building, where the reference type values ​​are: historical buildings in the Ming Dynasty and before: 0.24; Qing Dynasty and cultural relics protection units: 0.21; general historical buildings in the Qing Dynasty: 0.18; 1912 to 1949 and before cultural relics protection units: 0.15; general historical buildings in 1912 to 1949: 0.12; 1949 to 1980 and before cultural relics protection units: 0.09; general historical buildings in 1949 to 1980: 0.06; general buildings built after 1980: 0.03;

[0036] ③ The environmental factor r is defined as: the distance d between the centroid of the building and the centroid of the nearest adjacent building, in meters, where the value formula is r = -0.041d + 0.41. When the distance is greater than 10 meters, the environmental factor is 0;

[0037] (4) Structure factor F 0 =f, where the fire resistance factor f is defined as: building construction fire resistance factor f 构建 、External wall fire resistance factor f 外墙 , Fire resistance factor of roofing materials f 顶板或屋顶材料 The average value of the reference value range is 0 to 1, and the value formula is f = (f 构建 +f 外墙 +f 顶板或屋顶材料 ) / 3, where the reference type values ​​are: non-combustible material value: 1; flame retardant material value: 0.75; combustible material value: 0.5; flammable material value: 0.25.

[0038] Furthermore, due to the different structural materials of the buildings, the original fire protection characteristics of the buildings are different, and the fire spread characteristics between buildings of different structural materials are different. Therefore, the present invention comprehensively considers scientificity and economy, and stipulates the division size of two original fire partitions according to the proportion of buildings of different structural materials. In the step S2, for traditional villages where the total land area of ​​combustible and flame-retardant structures including wooden structures or brick-wood structures is greater than 60% of the total land area of ​​buildings within the core protection range, it is stipulated that the original fire partitions are delineated with a width of 60m, which can be adjusted according to actual conditions; for traditional villages where the total land area of ​​non-combustible structures including masonry structures and reinforced concrete is greater than 60% of the total land area of ​​buildings within the core protection range, it is stipulated that the original fire partitions are delineated with a width of 160m, which can be adjusted according to actual conditions; for the fire isolation belts that divide the original fire partitions, the existing conditions including the original roads, open spaces, and water systems should be utilized, and the width should be greater than 2m.

[0039] Furthermore, in the application of the basic FRAME method, the general measurement targets modern buildings, and the fire risk levels are determined as: low [0, 1.0], medium (1.0, 1.6], high (1.6, 2.7], and extremely high > 2.7. However, in the present invention, the measurement targets traditional village buildings, which have lower fire resistance than modern buildings and are equipped with fewer fire-fighting facilities than modern buildings, resulting in a fire risk value R that is generally higher than that of modern buildings. Therefore, the calculation results of the fire risk value R of a large number of existing buildings in traditional villages are After statistical analysis and expert opinions, the fire risk level is adjusted in a targeted manner. In step S3, the reference value of the fire risk level is determined on the geographic information processing software GIS platform according to the fire risk value R of traditional village buildings and based on the principle of the FRAME method and the experience of fire risk assessment of traditional village buildings, specifically: low [0, 1.0], medium (1.0, 1.6], high (1.6, 4.5], extremely high> 4.5, and visualized to form a fire risk level map of graded color blocks.

[0040] Furthermore, since the original fire partition only considers the commonality of building structural materials in a large area and whether there is material space suitable for carrying fire isolation zones at the regional boundaries, it has not yet considered whether the fire risk levels of buildings in the area are greatly different, which can easily lead to unscientific and inaccurate layout of sprinkler fire extinguishers. Therefore, the fire risk level map will be further used in the present invention to correct the original fire partition. Step S4 process is as follows:

[0041] S41. Calculate the proportion of buildings of various fire risk levels in the original fire protection zones;

[0042] S42, adjacent original fire partition T i With T i+1Compare the two buildings in pairs and analyze the physical space characteristics of the buildings b and the adjacent streets on both sides of the shared fire isolation zone. i Regional Buildings i The fire risk value R belongs to a level closer to the adjacent fire zone T i+1 A higher proportion of fire risk level, and building b i Close to fire compartment T i If the width of the street on the side of the building differs from the width of the street where the original fire isolation zone is located by ≤1m, the building b i Reclassified to Fire Zone T i+1 ; According to the above principles, analyze and reclassify the buildings on the fire isolation belt in turn to complete the original fire partition T i With T i+1 Correction of the location of the fire isolation zone between them.

[0043] Furthermore, due to the characteristics of traditional villages, large fire stations are far away, village roads are narrow and tortuous, buildings have low fire resistance, and there is a lack of technical personnel and equipment to monitor fires. When a fire occurs, it is easy to cause slow fire extinguishing response and large fire extinguishing equipment is difficult to accurately arrive at the scene. Therefore, the present invention arranges full-coverage sprinkler fire extinguishers in the traditional village as a whole, increases the coverage area of ​​the spray water mist, and allows all buildings to be covered by water mist. When a fire breaks out, multiple sprinkler fire extinguishers that detect the source of the fire can be opened at the same time, acting on the corresponding area to quickly control the fire. When laying out the full-coverage sprinkler fire extinguisher in step S5, the layout process is as follows:

[0044] When there is an unobstructed public space with an area of ​​≥16㎡ in the target fire compartment, a large high-pressure sprinkler water gun is arranged in the public space. This type of large high-pressure sprinkler water gun adopts a quick response sprinkler nozzle. Among them, ① the water mist coverage radius of the large high-pressure water gun is 30-60m, which is adjusted according to the size of the target fire compartment. The coverage angle is 0-360°, which is adjusted according to the target coverage object to achieve precise coverage. ② The height of the water gun is adjusted according to the building height of the target fire compartment. The principle of its height adjustment is to take the nearest building height value, and the value range is 3-5m. The device covers an area of ​​about 4 square meters in a rectangular area. ③ At the same time, the spacing of large high-pressure sprinkler water guns needs to meet the distance value coverage radius of 0.9-1.1 times. ④ For areas not covered by the range area of ​​the sprinkler water gun, a fire separation water curtain is arranged on the fire isolation belt of two adjacent fire partitions. The height of the fire separation water curtain spraying point is ≤12m, and it is set as a fast response sprinkler nozzle. The width of a single fire separation water curtain should not exceed 15m. Fire separation water curtains are arranged at building spacings of ≤6m. Separation water curtains should be arranged at street intersections near buildings with a fire risk value of R>1.6;

[0045] When the area of ​​unobstructed public space in the target fire compartment is less than 16 m2, a fire separation water curtain shall be arranged on the fire isolation belt between two adjacent target fire compartments. The height of the fire separation water curtain spraying point shall be ≤12m and it shall be set as a fast response sprinkler. The width of a single fire separation water curtain shall not exceed 15m. Fire separation water curtains shall be arranged at building spacings ≤6m. Separation water curtains shall be arranged at street intersections near buildings with a fire risk value R>1.6.

[0046] Furthermore, in order to further improve the fireproof characteristics of key protected buildings, while the whole village is equipped with full-coverage sprinkler fire extinguishers, targeted sprinkler fire extinguishers are arranged for buildings with high fire risk values ​​and immovable cultural relics, forming a second water mist area coverage, increasing the water mist surface density at the same time, improving the fire extinguishing speed, quickly cutting off the fire spread path, and achieving efficient and accurate fire extinguishing. In the step S6, when the targeted sprinkler fire extinguisher is arranged, small high-pressure spray water guns are arranged around high fire risk buildings and immovable cultural relics with a fire risk value R≥4.5. Such small high-pressure spray water guns use fast-response sprinkler nozzles. The water gun generates a water mist coverage radius of 5-30m, which is adjusted according to the target building size. The coverage angle is 0-360°, which is adjusted according to the target coverage object to achieve accurate coverage. The height of the water gun is adjusted according to the size of the target building's exterior wall, taking the height value of the exposed flammable eaves, and the water gun arrangement interval needs to meet the distance value of 0.9-1.1 times the coverage radius, so as to achieve comprehensive fire extinguishing range coverage of the entire building.

[0047] Compared with the prior art, the present invention has the following advantages and effects:

[0048] (1) The method of the present invention proposes a layout method for the overall layout of sprinkler fire extinguishers in traditional villages, taking into account the pattern, components and fire risk of traditional villages. Through the mutual coordination of the three types of sprinkler fire extinguishers, on the one hand, the overall village protection and precise protection of fire extinguishing facilities can be strengthened, and on the other hand, the economic benefits of configuring fire extinguishing facilities can be improved.

[0049] (2) The method of the present invention optimizes and simplifies the application of the FRAME method in the calculation of fire risk values ​​in traditional villages, including combining the selection of indicators with the characteristics of traditional villages, simplifying the method and application logic of indicator calculation, and improving the calculation efficiency of fire risk values ​​and data validity.

[0050] (3) The method of the present invention constructs a fire risk dataset that serves the delineation of fire zones, which can be used for long-term fire risk value calculation and fire zone delineation of target traditional villages, ensuring the accurate coverage of the fire extinguishing range of sprinkler fire extinguishers and the sustainable development of fire protection in traditional villages.

[0051] (4) The method of the present invention combines the planning of fire zones with the layout of sprinkler fire extinguishers, so that the location of fire extinguishing facilities has theoretical support, thereby improving the scientificity and effectiveness of the facility layout. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0053] Figure 1 It is a flow chart of the steps of the traditional village sprinkler fire extinguisher layout method based on the FRAME method disclosed in the present invention;

[0054] Figure 2 This is a schematic diagram of the original fire protection zone division in Example 1 of the present invention;

[0055] Figure 3 This is a schematic diagram of the target fire protection zone division in Example 1 of the present invention;

[0056] Figure 4 It is a schematic diagram of the layout of a large-scale high-pressure spray water gun and its coverage area and separated water curtain in Example 1 of the present invention;

[0057] Figure 5 This is a schematic diagram of the layout and coverage area of ​​small and medium-sized high-pressure spray water guns in Example 1 of the present invention;

[0058] Figure 6 It is a schematic diagram of the plan layout of the sprinkler fire extinguisher in Example 1 of the present invention.

[0059] Figure 7 This is a schematic diagram of the original fire protection zone division in Example 2 of the present invention;

[0060] Figure 8 This is a schematic diagram of the target fire protection zone division in Example 2 of the present invention;

[0061] Fig. 9 It is a schematic diagram of the layout of a large-scale high-pressure spray water gun and its coverage area and a separated water curtain in Embodiment 2 of the present invention;

[0062] Fig.10 This is a schematic diagram of the layout and coverage area of ​​small and medium-sized high-pressure spray water guns in Example 2 of the present invention;

[0063] Fig.11 It is a schematic diagram of the plan layout of the sprinkler fire extinguisher in Example 2 of the present invention. DETAILED DESCRIPTION

[0064] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0065] Example 1

[0066] Figure 1 This is a flow chart of the steps of a method for arranging sprinkler fire extinguishers in a traditional village based on the FRAME method disclosed in the present invention. Figure 1 As shown, a method for arranging sprinkler fire extinguishers in a traditional village based on the FRAME method includes the following steps:

[0067] S1. Establishment of fire risk database: Import the surveyed CAD building block plan of the target traditional village into the geographic information processing software GIS platform, assign relevant fire risk data attributes, and calculate the fire risk value R;

[0068] In the above step S1, the building blocks and surrounding water boundaries of the target traditional village Longtou Ancient Village are first mapped and imported into the geographic information processing software GIS platform, and fire risk data including: fire load factor q, fire spread factor i, area factor g, ventilation factor v, floor factor e, activity factor a, value factor c, environmental factor r and structural factor f are collected, and the relevant attributes are entered into the corresponding shepfile attribute table of the GIS building. Part of the fire risk database is shown in Table 1;

[0069] Table 1. Fire risk data table in some examples 1

[0070]

[0071]

[0072] S2. Original fire zone delineation: Delineate the original fire zones for the target traditional villages;

[0073] In the above step S2, for traditional villages where the total land area of ​​buildings with combustible and flame-retardant structures, including wooden structures or brick-wood structures, is greater than 60% of the total land area of ​​buildings within the core protection area, it is stipulated that the original fire partitions shall be delineated with a width of 60m, which can be adjusted according to actual conditions; for traditional villages where the total land area of ​​buildings with non-combustible structures, including masonry structures and reinforced concrete, is greater than 60% of the total land area of ​​buildings within the core protection area, it is stipulated that the original fire partitions shall be delineated with a width of 160m, which can be adjusted according to actual conditions; the fire isolation belts used to divide the original fire partitions shall utilize the existing conditions including the original roads, open spaces, and water systems, and the width shall be stipulated to be greater than 2m. In this embodiment, 30 original fire partitions are obtained, of which 21 original fire partitions have a width of nearly 60m and 9 original fire partitions have a width of nearly 160m. Figure 2 shown.

[0074] S3. Determination of fire risk levels: Determine the fire risk level based on the FRAME method, and generate a fire risk level map with graded color blocks on the geographic information processing software GIS platform according to the fire risk value R of each building in the target traditional village;

[0075] In the above step S3, the reference value of the fire risk level is determined on the geographic information processing software GIS platform according to the fire risk value R of the traditional village buildings and based on the principle of the FRAME method and the experience and opinions on the fire risk assessment of traditional village buildings. Specifically, it is: low [0, 1.0], medium (1.0, 1.6], high (1.6, 4.5], extremely high> 4.5, and is visualized to form a fire risk level map of graded color blocks;

[0076] S4, target fire partition delineation: superimpose and couple the fire risk level map with the original fire partition, trim the boundaries, and obtain the final target fire partition. In the above step S4:

[0077] 1. Calculate the proportion of buildings of various fire risk levels in the original fire protection zones.

[0078] 2. For adjacent original fire partitions T i With T i+1 Compare the two buildings in pairs and analyze the physical space characteristics of the buildings b and the adjacent streets on both sides of the shared fire isolation zone. i Regional Buildings i The fire risk value R belongs to a level closer to the adjacent fire zone T i+1 A higher proportion of fire risk level, and building b i Close to fire compartment T i If the width of the street on the side of the building differs from the width of the street where the original fire isolation zone is located by ≤1m, the building b iReclassified to Fire Zone T i+1 ; According to the above principles, analyze and reclassify the buildings on the fire isolation belt in turn to complete the original fire partition T i With T i+1之 In this embodiment, three fire isolation zones are modified, such as Figure 3 shown.

[0079] S5. Layout of full-coverage sprinkler fire extinguishers: Full-coverage sprinkler fire extinguishers are arranged in the target traditional villages. According to the building distribution characteristics of the target fire compartments, large-scale high-pressure sprinkler water guns are arranged in the target fire compartments with an area of ​​≥16㎡ of unobstructed public space, and separation water curtains are arranged in the areas not covered by the range of the sprinkler water guns; separation water curtains are arranged in the target fire compartments with an area of ​​<16㎡ of unobstructed public space; In the above step S5:

[0080] 1. When there is an unobstructed public space with an area of ​​≥16㎡ in the target fire compartment, a large high-pressure sprinkler water gun is arranged in the public space. This type of large high-pressure sprinkler water gun adopts a quick response sprinkler nozzle. Among them, ① the water mist coverage radius of the large high-pressure water gun is 30-60m, which is adjusted according to the size of the target fire compartment. The coverage angle is 0-360°, which is adjusted according to the target coverage object to achieve precise coverage. ② The height of the water gun is adjusted according to the building height of the target fire compartment. The principle of height adjustment is to take the nearest building height value, with a value range of 3-5m. The device occupies a rectangular area of ​​about 4㎡. ③ At the same time, the arrangement interval of large-scale high-pressure sprinkler water guns needs to meet the coverage radius of 0.9-1.1 times of the distance value. ④ In the area not covered by the range area of ​​the sprinkler water gun, a fire separation water curtain is arranged on the fire isolation belt of two adjacent fire partitions. The height of the fire separation water curtain spraying point is ≤12m, and it is set as a fast response sprinkler nozzle. The width of a single fire separation water curtain should not exceed 15m. The fire separation water curtain is arranged at a building spacing of ≤6m. The separation water curtain should be arranged at the intersection of streets and lanes near the building with a fire risk value R>1.6; In this embodiment, 62 large-scale high-pressure sprinkler water guns are set, and 23 separation water curtains are set. Figure 4 shown.

[0081] 2. When there is no unobstructed public space with an area ≥16 m2 in the target fire compartment, a fire separation water curtain shall be arranged on the fire isolation belt between two adjacent target fire compartments. The height of the fire separation water curtain spraying point is ≤12m, and it is set as a fast response sprinkler. The width of a single fire separation water curtain should not exceed 15m. The fire separation water curtain shall be arranged at a building spacing of ≤6m. The separation water curtain should be arranged at the intersection of streets and lanes near buildings with a fire risk value R>1.6. In this embodiment, there is no situation where there is no unobstructed public space with an area ≥16 m2 in the target fire compartment.

[0082] S6. Targeted sprinkler fire extinguisher layout: small high-pressure sprinkler water guns are arranged around buildings with high fire risk values ​​R ≥ 4.5 and immovable cultural relics;

[0083] In the above step S6, this type of small high-pressure spray water gun adopts a fast-response sprinkler nozzle. The water gun generates a water mist coverage radius of 5-30m, which is adjusted according to the size of the target building. The coverage angle is 0-360°, which is adjusted according to the target coverage object to achieve precise coverage. The height of the water gun is adjusted according to the size of the target building's exterior wall, taking the height value of the exposed flammable eaves. The water gun arrangement interval needs to meet the distance value of 0.9-1.1 times the coverage radius to achieve comprehensive fire extinguishing range coverage of the entire building. In this embodiment, 18 small high-pressure spray water guns are set, such as Figure 5 shown.

[0084] S7. Data visualization: The sprinkler fire extinguisher layout calculation result dataset and its coverage radius are imported into the geographic information processing software GIS platform for visualization, and the sprinkler fire extinguisher layout map of the target traditional village is obtained, such as Figure 6 shown.

[0085] The experimental results show that the layout of sprinkler fire extinguishers in traditional villages based on the FRAME method can comprehensively consider the pattern, components and fire risk of traditional villages, and can scientifically and accurately layout the three types of sprinkler fire extinguishers to form a multi-type, hierarchical and focused whole-village sprinkler fire extinguishing system.

[0086] Example 2

[0087] The steps of the traditional village sprinkler fire extinguisher layout method based on the FRAME method disclosed in this embodiment are basically the same as those in the first embodiment, and the main change is: for a traditional village with dispersed buildings with different spatial characteristics from that in the first embodiment, the technical effect is verified.

[0088] The target object of this embodiment is the traditional village of Chadong Ancient Village. Compared with the first embodiment, the building density of the village is relatively low, and there are more unobstructed public spaces of ≥16㎡ between buildings, which makes the conditions for the layout of large-scale high-pressure sprinkler water guns more sufficient.

[0089] The steps in this embodiment are the same as those in the first embodiment, wherein a fire risk database is established in step S1, and a portion of the fire risk database is shown in Table 2;

[0090] Table 2. Fire risk data table in some examples 2

[0091]

[0092] In step S2, 27 original fire partitions are delineated, of which 23 are close to 60m in width and 4 are close to 160m in width. Figure 7 As shown; in step S4, the target fire partition is defined, such as Figure 8 As shown; in step S5, a full coverage sprinkler fire extinguisher is arranged, including a large high-pressure sprinkler water gun 47, a water curtain 3 is separated, as shown Fig. 9 In step S6, a targeted sprinkler fire extinguisher is arranged, including a small high-pressure sprinkler water gun 20, as shown in FIG. Fig.10 As shown; in step S7, the plan layout of the target traditional village sprinkler fire extinguisher is visualized, as shown Fig.11 shown.

[0093] The comparison of the sprinkler fire extinguisher layout results of the two embodiments is shown in Table 3. It can be seen that the traditional village sprinkler fire extinguisher layout method is technically flexible and can be adapted to traditional villages with different architectural space patterns. The architectural characteristics and fire risk conditions of the target traditional village can be taken into consideration during the calculation and implementation process, and the three types of sprinkler fire extinguishers can be scientifically laid out in a targeted manner, thereby improving the economic benefits of configuring fire extinguishing facilities in traditional villages.

[0094] Table 3. Data comparison table of different embodiments

[0095]

[0096] The above two embodiments are preferred implementation modes of the present invention, but the implementation modes of the present invention are not limited to the above embodiments. Any other changes, modifications, substitutions, combinations, and simplifications that do not deviate from the spirit and principles of the present invention should be equivalent replacement methods and are included in the protection scope of the present invention.

Claims

1. A traditional village sprinkler fire extinguisher layout method based on FRAME method, It is characterized in that The layout method comprises the following steps: S1. Establishment of fire risk database: import the surveyed target traditional village CAD building block plan into the geographic information processing software GIS platform, assign relevant fire risk data attributes, and calculate the fire risk value R; the fire risk value R in step S1 is determined by the following three types of target layer factors, a total of 9 indicator layer factors, where the target layer factors include potential risk value P, resistible risk value A and structural factor F 0 The potential risk value P includes five index layer factors: fire load factor q, fire spread factor i, area factor g, ventilation factor v, and floor factor e; the risk value A includes three index layer factors: activity factor a, value factor c, and environmental factor r; the structural factor F 0 It contains one index layer factor: fire resistance factor f, where the relevant index definitions and calculation methods are as follows: (1) Fire risk value R = P / (A×F 0 ); (2) Potential risk value P = q + i + g + v + e; The maximum value of the potential risk value P is stipulated to be 1, and the influence weights of each indicator layer factor of the potential risk value are calculated by combining expert scoring with the AHP hierarchical analysis method. The reference weight defines the value range of the secondary index as follows: the reference value range of the fire load factor q is 0 to 0.38; The reference value range of fire spread factor i is 0~0.32; the reference value range of area factor g is 0~0.06; the reference value range of ventilation factor v is 0~0.18; the reference value range of floor factor e is 0~0.06; ① The fire load factor q is defined as: the mass of combustible material per unit area m2, where the reference type values ​​are: the estimated value for all-wood structure is 1500MJ / m2, and the formula value is 0.38; the estimated value for brick-wood structure is 1000MJ / m2, and the formula value is 0.26; the estimated value for rammed earth structure is 300MJ / m2, and the formula value is 0.09; the estimated value for masonry structure is 200MJ / m2, and the formula value is 0.05; the estimated value for reinforced concrete is 100MJ / m2, and the formula value is 0.02; ② The fire spread factor i is defined as: the degree of difficulty of fire spreading in a building, which is related to the combustion characteristics of indoor furniture and facilities. The reference type values ​​are: 0 for non-combustible materials; 0.08 for flame-retardant materials; 0.24 for combustible materials; and 0.32 for flammable materials. ③ Area factor g is defined as: the horizontal effect of fire and the building area S 占地 Regarding the building area S 占地 The unit is m2, and the value formula is g = -0.0001S 占地 +0.06; ④ The ventilation factor v is defined as: the total area of ​​doors and windows in the building that can exhaust smoke S 门窗 With building area S 占地 Ratio, the units of both variables are in square meters, and the formula for the value is v = -0.207 (S 门窗 / S 占地 )+0.18; ⑤ Floor factor e is defined as: the vertical effect of fire, the value is based on the total number of floors of the building, where the reference type value is: 1st floor value: 0.06; 2-3rd floor value: 0.03; 4th floor and above value: 0.01; (3) The risk value that can be resisted is A = 1-(a+c+r); The maximum value of the risk value A that can be resisted is 1, and the influence weights of the factors at each level of the risk value that can be resisted are calculated by combining expert scoring with the AHP analytic hierarchy process. The reference weights define the value ranges of the secondary indicators as follows: the reference value range of the activity factor a is 0 to 0.35; the reference value range of the value factor c is 0 to 0.24; the reference value range of the environmental factor r is 0 to 0.41; ① The activity factor a is defined as: the main activities carried out in the building, where the reference activity values ​​are: idle value: 0.05; exhibition activity value: 0.1; residential activity value: 0.15; Business activity value: 0.2; The value of modern public activities is 0.25; the value of sacrificial activities is 0.3; Production activity value: 0.35; ②The value factor c is defined as: the construction age and protection strength of the building, where the reference type values ​​are: historical buildings in the Ming Dynasty and before: 0.24; Qing Dynasty and cultural relics protection units: 0.21; general historical buildings in the Qing Dynasty: 0.18; 1912 to 1949 and cultural relics protection units: 0.15; general historical buildings in 1912 to 1949: 0.12; 1949 to 1980 and cultural relics protection units: 0.09; The value of general historical buildings built between 1949 and 1980 is 0.06; the value of general buildings built after 1980 is 0.03; ③ The environmental factor r is defined as: the distance d between the centroid of the building and the centroid of the nearest adjacent building, in meters, where the value formula is r = -0.041d + 0.

41. When the distance is greater than 10 meters, the environmental factor is 0; (4) Structure factor F 0 =f, where the fire resistance factor f is defined as: building construction fire resistance factor f 构建 、External wall fire resistance factor f 外墙 , Fire resistance factor of roofing materials f 顶板或屋顶材料 The average value of the reference value range is 0 to 1, and the value formula is f = (f 构建 +f 外墙 +f 顶板或屋顶材料 ) / 3, where the reference type values ​​are: non-combustible material value: 1; flame retardant material value: 0.75; combustible material value: 0.5; flammable material value: 0.25; S2. Original fire zone delineation: Delineate the original fire zones for the target traditional villages; S3. Determination of fire risk levels: Determine the fire risk level based on the FRAME method, and generate a fire risk level map with graded color blocks on the geographic information processing software GIS platform according to the fire risk value R of each building in the target traditional village; S4, target fire zone delineation: superimpose and couple the fire risk level map with the original fire zone, trim the boundaries, and obtain the final target fire zone; S5. Layout of full-coverage sprinkler fire extinguishers: Full-coverage sprinkler fire extinguishers are deployed in the target traditional villages. According to the building distribution characteristics of the target fire compartments, large high-pressure sprinkler water guns are deployed in the target fire compartments with an area of ​​≥16㎡ of unobstructed public space, and separation water curtains are deployed in the areas not covered by the range of the sprinkler water guns; separation water curtains are deployed in the target fire compartments with an area of ​​<16㎡ of unobstructed public space; S6. Targeted sprinkler fire extinguisher layout: small high-pressure sprinkler water guns are arranged around buildings with high fire risk values ​​R ≥ 4.5 and immovable cultural relics; S7. Data visualization: The sprinkler fire extinguisher layout calculation result dataset and its coverage radius are imported into the geographic information processing software GIS platform for visualization to obtain the sprinkler fire extinguisher layout map of the target traditional village.

2. According to the traditional village sprinkler fire extinguisher layout method based on the FRAME method as described in claim 1, It is characterized in that In step S2, for traditional villages where the total land area of ​​combustible and flame-retardant structures including wooden structures or brick-wood structures is greater than 60% of the total building land area within the core protection area, it is stipulated that the original fire partitions are delineated with a width of 60m, which can be adjusted according to actual conditions; for traditional villages where the total land area of ​​non-combustible structures including masonry structures and reinforced concrete is greater than 60% of the total building land area within the core protection area, it is stipulated that the original fire partitions are delineated with a width of 160m, which can be adjusted according to actual conditions; the fire isolation belts for dividing the original fire partitions should utilize the existing conditions including the original roads, open spaces, and water systems, and the width is stipulated to be greater than 2m.

3. According to the traditional village sprinkler fire extinguisher layout method based on the FRAME method as described in claim 1, It is characterized in that In step S3, the reference value of the fire risk level is determined on the geographic information processing software GIS platform according to the fire risk value R of the traditional village buildings and based on the principle of the FRAME method and the experience and opinions on the fire risk assessment of traditional village buildings. Specifically, the reference value of the fire risk level is: low [0, 1.0], medium (1.0, 1.6], high (1.6, 4.5], and very high > 4.5, and a visual expression is performed to form a fire risk level map of graded color blocks.

4. According to the traditional village sprinkler fire extinguisher layout method based on the FRAME method as described in claim 1, It is characterized in that The process of step S4 is as follows: S41. Calculate the proportion of buildings of various fire risk levels in the original fire protection zones; S42, adjacent original fire partition T i With T i+1 Compare the two buildings in pairs and analyze the physical space characteristics of the buildings b and the adjacent streets on both sides of the shared fire isolation zone. i Regional Buildings i The fire risk value R belongs to a level closer to the adjacent fire zone T i+1 A higher proportion of fire risk level, and building b i Close to fire compartment T i If the width of the street on the side of the building differs from the width of the street where the original fire isolation zone is located by ≤1m, the building b i Reclassified to Fire Zone T i+1 ; According to the above principles, analyze and reclassify the buildings on the fire isolation belt in turn to complete the original fire partition T i With T i+1 Correction of the location of the fire isolation zone between buildings.

5. According to the traditional village sprinkler fire extinguisher layout method based on the FRAME method as described in claim 1, It is characterized in that When the full coverage sprinkler fire extinguisher is arranged in step S5, the arrangement process is as follows: When there is an unobstructed public space with an area of ​​≥16㎡ in the target fire compartment, a large high-pressure sprinkler water gun is arranged in the public space. This type of large high-pressure sprinkler water gun adopts a quick response sprinkler nozzle. Among them, ① the water mist coverage radius of the large high-pressure water gun is 30-60m, which is adjusted according to the size of the target fire compartment. The coverage angle is 0-360°, which is adjusted according to the target coverage object to achieve precise coverage. ② The height of the water gun is adjusted according to the building height of the target fire compartment. The principle of its height adjustment is to take the nearest building height value, and the value range is 3-5m. The device covers an area of ​​about 4 square meters in a rectangular area. ③ At the same time, the spacing of large high-pressure sprinkler water guns needs to meet the distance value coverage radius of 0.9-1.1 times. ④ For areas not covered by the range area of ​​the sprinkler water gun, a fire separation water curtain is arranged on the fire isolation belt of two adjacent fire partitions. The height of the fire separation water curtain spraying point is ≤12m, and it is set as a fast response sprinkler nozzle. The width of a single fire separation water curtain should not exceed 15m. Fire separation water curtains are arranged at building spacings of ≤6m. Separation water curtains should be arranged at street intersections near buildings with a fire risk value of R>1.6; When the area of ​​unobstructed public space in the target fire compartment is less than 16 m2, a fire separation water curtain shall be arranged on the fire isolation belt between two adjacent target fire compartments. The height of the fire separation water curtain spraying point shall be ≤12m and it shall be set as a fast response sprinkler. The width of a single fire separation water curtain shall not exceed 15m. Fire separation water curtains shall be arranged at building spacings ≤6m. Separation water curtains shall be arranged at street intersections near buildings with a fire risk value R>1.

6.

6. According to the traditional village sprinkler fire extinguisher layout method based on the FRAME method as described in claim 1, It is characterized in that When laying out targeted sprinkler fire extinguishers in step S6, small high-pressure sprinkler water guns are arranged around high fire risk buildings with a fire risk value R≥4.5 and immovable cultural relics. Such small high-pressure sprinkler water guns use fast-response sprinkler nozzles. The water mist coverage radius generated by the water gun is 5-30m, which is adjusted according to the size of the target building. The coverage angle is 0-360°, which is adjusted according to the target coverage object to achieve precise coverage. The height of the water gun is adjusted according to the size of the outer wall of the target building, taking the height value of the exposed flammable eaves. The water gun arrangement interval needs to meet 0.9-1.1 times of the distance value coverage radius to achieve comprehensive fire extinguishing range coverage of the entire building.