Regional autonomy and demand response coordinated grid source load storage charging control system
Through regional autonomy and demand response coordination, the grid source, load, storage and charging control system solves the problem of the grid being unable to cope with large-scale electric vehicle charging, improves the balance of the grid and the convenience of charging, and ensures the safety, stability and resources of the grid. efficient utilization.
Patent Information
- Application Number
- CN202311323984.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-13
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2043-10-13
AI Technical Summary
The existing grid power supply facilities cannot effectively cope with the large-scale, large-scale, disorderly and uncontrollable installation of electric vehicle charging piles, resulting in an imbalance in the balance of the power grid, which may lead to accidents or resource waste, and it is difficult to meet the charging needs of electric vehicles.
Adopting regional autonomy and demand response collaborative network source load storage charging control system, through flexible orderly charging control terminals, distributed power supplies, energy storage control modules, charging load migration control terminals and other components, the charging power is monitored and adjusted to realize user Balanced distribution of electricity and charging power, cooperation with distributed energy sources and energy storage, independent adjustment of charging time and current to ensure the safety and stability of the power grid.
Achieve large-scale and large-scale installation of charging piles within the existing grid framework to meet the charging needs of electric vehicles, ensure the safety and stability of the grid, avoid grid accidents, reduce resource waste, and improve charging convenience and grid investment economy.
Smart Images

Figure CN117498307B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power system control technology, and in particular to a network source-load-storage-charge control system with regional autonomy and demand response coordination. Background Art
[0002] With the determination of the global goals of carbon peak and carbon neutrality, electric vehicles have become the trend of transportation today and in the future. How to meet the charging needs of more and more electric vehicles under the power supply capacity and wiring conditions of the existing power grid architecture, especially providing charging facilities in parking spaces in homes, communities, offices, enterprises, and various public places to facilitate the charging of electric vehicles, is the main bottleneck affecting the widespread use of electric vehicles. Charging is difficult, and installing charging piles is even more difficult. This is the main restrictive factor affecting the wider application of new energy electric vehicles. The electrification of vehicles is a national development strategy. China has already led the world in the electric vehicle industry. Charging is naturally an important part of this strategy and must be the primary strategic task of the power grid. It is necessary to serve the electric vehicle charging industry well, meet the social demand for electric vehicles, and ensure the safe, stable, efficient and economical operation of the power grid. These are the key points that power grid companies currently need to break through in technology and management.
[0003] The characteristic of the power grid is that the amount of electricity used, supplied, and generated must be balanced every second, otherwise accidents will occur, leading to power outages, or idling losses and waste of resources. The most basic requirement is to determine the power load and time. Without such certainty, it is difficult to ensure this balance. This characteristic is precisely because the existing power supply facilities and power supply capabilities of the power grid cannot adapt to the "burden" or demand for power supply capacity formed by large-scale, disorderly and uncontrollable charging pile registration, resulting in an imbalance in this balance point, which may cause large-scale power grid accidents or large-scale investment and construction leading to excessive consumption of resources. This is a global problem and challenge facing the power grid.
[0004] If every parking space can be equipped with charging capabilities without increasing or reducing the power supply capacity, and without expanding or reducing the charging lines, this capability can only be achieved by using a power supply and charging system that uses intelligent and flexible control methods. Therefore, it is urgently necessary to implement flexible and orderly demand response regulation and control of charging piles in a new load control and management system, and to implement a flexible and orderly charging control system with regional autonomy and demand response coordinated network source, load, storage and charging operations. Summary of the invention
[0005] In order to solve the deficiencies of the above-mentioned prior art, the present invention provides a regional autonomous and demand-response coordinated network source load storage charging control system, which can be widely used in various public or private parking garages, parking spaces, parking lot AC and DC charging piles, charging stations, this control system can not only meet the needs of large-scale installation of corresponding AC and DC charging piles in parking spaces and charging of electric vehicles, but also meet the requirements of power grids or power supply companies to ensure the safe, stable and economic operation of power supply lines, power supply areas, substation transformers, districts and counties, and urban power grids, involving the power distribution, power consumption, electric vehicle charging, new power systems and digital technology fields of power systems. The solution is to make each charging pile "informed and obedient" to the power grid, make each charging "flexible and controllable", and control "when" to charge and "how much" the current can be according to the conditions allowed by the power grid. Under the existing power grid framework, through appropriate matching and expansion, charging piles can be installed and used on a large scale.
[0006] The technical solution proposed by the present invention is:
[0007] Regional autonomy and demand response coordinated grid source load storage charging control system; including:
[0008] Flexible and orderly charging control terminal is used to monitor power load, energy storage device module, photovoltaic power module, grid power supply module and charging pile module. Based on the constraints of power supply capacity, power demand, line capacity and distribution capacity, the charging control terminal can independently identify, judge and control and adjust each charging pile within the autonomous area to achieve balanced distribution of power consumption and charging power in the area.
[0009] Distributed power supply, used to connect to the power grid and control the access to the power grid;
[0010] Energy storage DES control module, used to store and control the power supply of photovoltaic power generation and grid power supply module;
[0011] Charging load migration control terminal, used to provide power output and charging control for external devices;
[0012] The power load migration control terminal is used to monitor and control the power consumption of the power load;
[0013] The distribution station area control terminal is used to collect data and calculate the power balance of "grid source load storage and charging" in the area, and issue load migration instructions to the charging load migration control terminal and the power load migration control terminal according to the calculation results, so as to realize autonomous "grid source load storage and charging" power balance control in the area;
[0014] The new load management system is responsible for data collection and calculation of substation overload, district and county, and city power grid demand-side response, and the issuance of instructions for flexible charging station / pile power control and adjustment, realizing the control and management of grid-level charging load demand-side response;
[0015] Flexible and orderly charging operator management platform; used for operation control and management of charging piles, charging stations and power supply networks;
[0016] The distributed power supply and energy storage DES control module are connected to the flexible orderly charging control terminal, the flexible orderly charging control terminal is connected to the charging load migration control terminal, the charging load migration control terminal is connected to the distribution substation control terminal, the distribution substation control terminal is connected to the load migration control terminal, the distribution substation control terminal is connected to the load management system, and the flexible orderly charging control terminal is also connected to the flexible orderly charging operator management platform.
[0017] As a further technical solution of the present invention, the flexible orderly charging control terminal includes: AC FAC and DC FDC flexible orderly charging pile control terminals, according to the command values of power supply SAP, demand DAP, line LAP, area TAP, substation SUB, district and county ARE, and city CTY given by the new load management system, the corresponding data is collected and the corresponding charging pile adjustment control target value is calculated, and the adjustment control instructions are sent to the AC FAC and DC FDC flexible orderly charging pile control terminals to adjust the charging power up or down, and when distributed energy and energy storage are connected, the energy storage device module is controlled to operate in three different working modes of energy storage, discharge, and stop to maintain the power balance of "grid source load storage and charging" of charging.
[0018] As a further technical solution of the present invention, the AC FAC and DC FDC flexible orderly charging pile control terminals monitor the single-phase / three-phase current, voltage, and power parameters of the power supply incoming line, and adopt a mode of embedding a gateway between the pile guns to monitor and control the PWM / PLC handshake communication transmission signal between the pile guns, and give a target value control signal to the charging pile, and communicate with the flexible orderly charging control terminal through the PLC / CAN / 4G / LoRa communication interface to receive the adjustment control instruction constant, and perform power control and adjustment on each charging gun.
[0019] As a further technical solution of the present invention, the AC FAC and DC FDC flexible orderly charging pile control terminals, distributed power sources, energy storage DES control modules are connected to the flexible orderly charging control terminals via optical fiber / twisted pair / carrier communication, the charging load migration control terminal is connected to the distribution station area control terminal via optical fiber communication, the distribution station area control terminal is connected to the load migration control terminal via optical fiber communication, the distribution station area control terminal is connected to the load management system via wireless / private network communication, and the flexible orderly charging control terminal is connected to the flexible orderly charging operator management platform via 4G wireless communication.
[0020] As a further technical solution of the present invention, the load migration control strategy of the load migration control module is:
[0021] The load migration control strategy of the load migration control module is:
[0022] Real-time charging power calculation: CSAPi=ACSAPi+DCSAPi; Formula (1)
[0023] AC charging demand power calculation: DACSAPi = ∑DFACn; Formula (2)
[0024] DC charging real-time power calculation: DCSAPi = ∑FDCm; Formula (3)
[0025] DC charging demand power calculation: DDCSAPi = ∑DFDCm; Formula (4)
[0026] Distributed generation power calculation: DGN = ∑DGNy; Formula (5)
[0027] Distributed energy storage power calculation: DES = ∑DESz, energy storage charging and discharging bidirectional power; Formula (6)
[0028] Real-time power calculation of power supply: RSAPi = CSAPi, only charging load; Formula (7)
[0029] Real-time power calculation of power supply: RSAPi=CSAPi+DGNi, adding distributed generation; Formula (8)
[0030] Power supply real-time power calculation:
[0031] RSAPi=CSAPi+DGN+DES, bidirectional power, adding distributed generation and energy storage; Formula (9)
[0032] Power supply regulation power calculation: if (SAPi-RSAPi) < 0 Formula (10)
[0033] Reduce the charging power of the charging pile according to the power allocation adjustment control strategy of flexible and orderly charging;
[0034] Power supply regulation power calculation: if(SAPi-RSAPi)>0&if(DACSAPi+DDCSAPi-CSAPi)>0 Formula (11)
[0035] Increase the charging power of the charging pile according to the power allocation adjustment control strategy of flexible and orderly charging;
[0036] Demand regulation power calculation: if (DAPi-RSAPi)*KDAP<0; Formula (12) reduces the charging power of the charging pile according to the power allocation regulation control strategy of flexible orderly charging;
[0037] Demand regulation power calculation: if (DAPi-RSAPi)*KDAP>0&if (DACSAPi+DDCSAPi-CSAPi)>0 Formula (13) Increase the charging power of the charging pile according to the power allocation regulation control strategy of flexible orderly charging;
[0038] Line real-time power calculation: RLAP = RSAPi, single group charging load; Formula (14) Line real-time power calculation:
[0039] RLAP=∑RSAPi, when multiple groups of charging loads are on the same line, charging load migration is added; Formula (15) Line regulation power calculation: if (LAP-RLAP)<0 Formula (16) According to the power allocation regulation control strategy of flexible orderly charging, the charging power of the charging pile is reduced;
[0040] Line regulation power calculation: if (LAP-RLAP)>0&if (DACSAPi+DDCSAPi-CSAPi)>0 Formula (17) Increase the charging power of the charging pile according to the power allocation regulation control strategy of flexible orderly charging;
[0041] Real-time power calculation of the substation: RTAP = RLAP + LAD; Formula (18) Real-time power calculation of the substation: RTAP = RLAP + LAD + ∑TLADj, adding load migration; Formula (19) Substation adjustment power calculation: if (TAP-RTAP) < 0 Formula (20) Reduce the charging power of the charging pile according to the power allocation adjustment control strategy of flexible orderly charging;
[0042] Calculation of area regulation power: if (TAP-RTAP)>0&if (DACSAPi+DDCSAPi-CSAPi)>0 Formula (21) Increase the charging power of the charging pile according to the power allocation regulation control strategy of flexible and orderly charging;
[0043] Substation demand response regulation power calculation: if (SUB-RSAPi) < 0 Formula (22) Reduce the charging power of the charging pile according to the power allocation regulation control strategy of flexible orderly charging;
[0044] Substation demand response regulation power calculation:
[0045] if(SUB-RSAPi)>0&if(DACSAPi+DDCSAPi-CSAPi)>0 Formula (23)
[0046] Increase the charging power of the charging pile according to the power allocation adjustment control strategy of flexible and orderly charging;
[0047] Calculation of power regulation based on district and county demand response: if (ARE-RSAPi) < 0 Formula (24) Reduce the charging power of the charging pile according to the power allocation regulation control strategy of flexible and orderly charging;
[0048] Calculation of power for district and county demand response regulation:
[0049] if(ARE-RSAPi)>0&if(DACSAPi+DDCSAPi-CSAPi)>0 Formula (25)
[0050] Increase the charging power of the charging pile according to the power allocation adjustment control strategy of flexible and orderly charging;
[0051] Urban demand response adjustment power calculation: if (CTY-RSAPi) < 0 Formula (26) Reduce the charging power of the charging pile according to the power allocation adjustment control strategy of flexible orderly charging;
[0052] Urban demand response regulation power calculation:
[0053] if(CTY-RSAPi)>0&if(DACSAPi+DDCSAPi-CSAPi)>0 Formula (27)
[0054] Increase the charging power of the charging pile according to the power allocation adjustment control strategy of flexible and orderly charging;
[0055] Among them, the power supply balancing power SAPi, i=1,2..., represents multiple groups of different power supply powers; the real-time power supply power RSAPi, i=1,2..., represents multiple groups of different power supply powers; the real-time charging power CSAPi, i=1,2..., represents multiple groups of different charging powers; the real-time power of AC charging pile ACSAPi, i=1,2..., represents multiple groups of different AC charging powers; the real-time power of DC charging pile DCSAPi, i=1,2..., represents multiple groups of different DC charging powers; the demand balancing power DAP, i=1,2..., represents multiple groups of different power supply powers; the real-time demand power RDAP, i=1,2..., represents multiple groups of different power supply powers; the demand time factor KDAP; the line balancing power LAP; the line real-time power RLAP; the area balancing power TAP; the area real-time power RTAP; the substation demand Response power SUB; district and county demand response power ARE; city demand response power CTY; flexible AC charging demand power DFAC1, DFAC2, ... DFACn; flexible AC charging total demand power DACSAP; flexible AC charging load power FAC1, FAC2, ... FACn; flexible DC charging demand power DFDC1, DFDC2, ... DFDCm; flexible DC charging total demand power DDCSAP; flexible DC charging load power FDC1, FDC2, ... FDCm; rigid power load power LAD; rigid migration load power TLAD1, TLAD2, ..., TLADj; distributed power source power DGN1, DGN2, ... DGNy; distributed power source power DGN; distributed energy storage power DES1, DES2, ... DESz; distributed energy storage power DES.
[0056] As a further technical solution of the present invention, the power distribution adjustment control strategy of the flexible orderly charging is:
[0057] The power distribution and regulation control strategy for flexible orderly charging followed by a single power supply system consisting of multiple AC charging piles and multiple DC charging piles is: 1) Average distribution system - according to the percentage of the adjusted power value, it is evenly distributed to each charging pile for power increase or decrease adjustment; 2) DC pile weighted distribution system - according to the percentage of the adjusted power value, the DC charging piles are weighted and evenly distributed to each charging pile for power increase or decrease adjustment; 3) First-come weighted priority system - according to the first-come weighted allocation coefficient, the power adjustment value of each charging pile is allocated; 4) VIP service weighted priority system - the charging power adjustment value allocated to each charging pile is determined according to the charging price ratio.
[0058] As a further technical solution of the present invention, the flexible orderly charging control terminal includes a charging power reduction adjustment control strategy and a charging power addition adjustment control strategy; wherein the order of the charging power reduction adjustment control strategy is: 1) performing charging load migration, 2) performing power load migration, 3) using distributed energy storage, and 4) adjusting the charging load;
[0059] The order of the charging power regulation control strategy is: 1) regulating the charging load, 2) exiting the distributed energy storage, 3) migrating the power load, and 4) migrating the charging load.
[0060] The beneficial effects of the present invention are:
[0061] 1. The present invention promotes the application of charging piles based on a flexible and orderly charging control system, which not only takes into account the economic efficiency and scale requirements of urban power grid investment, but also better meets the needs of individual charging pile registration, and promotes the construction of more public charging piles in cities, making charging more convenient for ordinary people, making urban power supply safer and more stable, and no need for "capacity increase" of the power grid, so that every parking space can be charged.
[0062] 2. The present invention realizes the coordinated flexible and orderly charging control of "grid source, load, storage and charging": the charging edge computing control terminal autonomously identifies and judges the load distribution status and data in the area within the power supply area based on the power supply capacity, power supply demand, line capacity, and distribution transformer capacity constraints, and controls and adjusts the charging power and charging time of each charging pile according to the adaptive control strategy to achieve balanced distribution of electricity consumption and charging power in the area, and ensure that the power supply is not over-capacity and the lines and transformers are not overloaded in a mode that maximizes the charging demand.
[0063] 3. The present invention is based on the cloud-edge Internet of Things architecture, digital energy aggregation and virtual power plant control technology, enabling each charging pile to respond to the demand-side load control instructions of the substation, district and county, and city in the area where it is located. The charging control terminal controls and adjusts each charging pile according to the set strategy, thereby realizing demand-side response load control over a large area of the power grid and solving the operational difficulties of peak power shaving, power pulling, and inability to absorb power during valley hours.
[0064] 4. The present invention is a new type of digital low-voltage distribution network technology based on digital twin + AI cloud platform. According to the grid-side load of two or more distribution transformers, distributed rooftop photovoltaic power generation power, discrete charging pile power, and distributed energy storage capacity, it achieves the power supply and power consumption balance of "grid source load storage and charging" in the power supply area by migrating power consumption and charging loads in different power supply areas, investing and withdrawing energy storage devices, and adjusting charging power through coordinated control. BRIEF DESCRIPTION OF THE DRAWINGS
[0065] Figure 1This is a structural diagram of the regional autonomy and demand response coordinated grid source load storage charging control system proposed by the present invention;
[0066] Figure 2 This is a structural diagram of the mailbox orderly charging control power supply model proposed by the present invention;
[0067] Figure 3 This is the control structure diagram of the AC charging pile proposed by the present invention;
[0068] Figure 4 This is a control structure diagram of the DC charging pile proposed in the present invention. DETAILED DESCRIPTION
[0069] The following will be combined with the embodiments and drawings to clearly and completely describe the concept, specific structure and technical effects of the present invention, so as to fully understand the purpose, characteristics and effects of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, other embodiments obtained by those skilled in the art without creative work are all within the scope of protection of the present invention.
[0070] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the embodiments of the present invention should be understood by people with ordinary skills in the field to which the present disclosure belongs. The "first", "second" and similar words used in the present disclosure do not represent any order, quantity or importance, but are only used to distinguish different components. "Including" or "comprising" and similar words mean that the elements or objects appearing in front of the word cover the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0071] like Figure 1 to Figure 2 As shown, it shows a specific embodiment of the present invention:
[0072] See also Figure 1 to Figure 2 , regional autonomy and demand response coordinated grid source load storage charging control system; including:
[0073] Flexible and orderly charging control terminal is used to monitor power load, energy storage device module, photovoltaic power module, grid power supply module and charging pile module. Based on the constraints of power supply capacity, power demand, line capacity and distribution capacity, the charging control terminal can independently identify, judge and control and adjust each charging pile within the autonomous area to achieve balanced distribution of power consumption and charging power in the area.
[0074] Distributed power supply, used to connect to the power grid and control the access to the power grid;
[0075] Energy storage DES control module, used to store and control the power supply of photovoltaic power generation and grid power supply module;
[0076] Charging load migration control terminal, used to provide power output and charging control for external devices;
[0077] The power load migration control terminal is used to monitor and control the power consumption of the power load;
[0078] The distribution station area control terminal is used to collect data and calculate the power balance of "grid source load storage and charging" in the area, and issue load migration instructions to the charging load migration control terminal and the power load migration control terminal according to the calculation results, so as to realize autonomous "grid source load storage and charging" power balance control in the area;
[0079] The new load management system is responsible for data collection and calculation of substation overload, district and county, and city power grid demand-side response, and the issuance of instructions for flexible charging station / pile power control and adjustment, realizing the control and management of grid-level charging load demand-side response;
[0080] Flexible and orderly charging operator management platform; used for operation control and management of charging piles, charging stations and power supply networks;
[0081] The distributed power supply and energy storage DES control module are connected to the flexible orderly charging control terminal, the flexible orderly charging control terminal is connected to the charging load migration control terminal, the charging load migration control terminal is connected to the distribution substation control terminal, the distribution substation control terminal is connected to the load migration control terminal, the distribution substation control terminal is connected to the load management system, and the flexible orderly charging control terminal is also connected to the flexible orderly charging operator management platform.
[0082] The regional autonomy and demand response coordinated network source load storage charging control system provided by the present invention is a closed autonomous area consisting of a distributed photovoltaic power source, an energy storage device, a power load and a power supply and distribution network connected to the main power grid, and one or more electric vehicle charging systems, and a district, county, and city-level power grid connected to it. The flexible orderly charging system can be based on power supply capacity, power supply demand, line capacity, distribution transformer, etc. within the autonomous area when there is an imbalance between the power supply (network) access of one or more power grids, photovoltaic power sources (sources), energy storage (storage), power load (load) and the power of charging load (charging). Under the capacity constraint, the charging control terminal can autonomously identify and judge the control and adjustment of each charging pile to achieve balanced distribution of electricity consumption and charging power in the area; in response to the demand-side load control instructions of the substation, county, and city in the area, the charging control terminal controls and adjusts each charging pile according to the set strategy to achieve large-scale demand-side response control; according to the grid-side load of two or more distribution transformers, the connected photovoltaic power generation power, and the charging pile power, the charging power is adjusted and controlled by migrating rigid electricity loads and charging loads, and investing in and out of peak-shaving and valley-filling energy storage devices to achieve a power supply balance of "grid source load storage and charging" in the autonomous area.
[0083] See also Figure 3 and Figure 4 The flexible orderly charging control terminal includes: AC FAC and DC FDC flexible orderly charging pile control terminal. According to the command values of power supply SAP, demand DAP, line LAP, area TAP, substation SUB, district and county ARE, and city CTY given by the new load management system, the corresponding data is collected and the corresponding charging pile adjustment control target value is calculated. The adjustment control command is sent to the AC FAC and DC FDC flexible orderly charging pile control terminal to adjust the charging power up or down. When connected to distributed energy and energy storage, the energy storage device module is controlled to operate in three different working modes: energy storage, discharge, and stop, so as to maintain the power balance of "grid source load storage and charging" of charging.
[0084] In the embodiment of the present invention, the AC charging pile control terminal / DC charging pile control terminal monitors the single-phase / three-phase current, voltage, and power parameters of the power supply line, and adopts a mode of embedding a gateway between the pile guns to monitor and control the PWM / PLC handshake communication transmission signal between the pile guns, and gives a target value control signal to the charging pile, and communicates with the flexible orderly charging control terminal through the PLC / CAN / 4G / LoRa communication interface to receive the adjustment control instruction constant, and performs power control adjustment on each charging gun.
[0085] In the embodiment of the present invention, the charging pile control terminal can be installed inside or outside the AC charging pile, and the control interface connection standard can be selected according to the AC charging gun interface standard of the country where it is located, and has nothing to do with the manufacturer; the installed charging pile can be a single-phase or three-phase charging pile, a single-gun or double-gun AC charging pile.
[0086] Among them, the AC FAC and DC FDC flexible orderly charging pile control terminals, the distributed power supply DGN, the energy storage DES control module and the flexible orderly charging control terminal are connected through optical fiber / twisted pair / carrier communication, the charging load migration control terminal and the distribution station area control terminal are connected through optical fiber communication, the distribution station area control terminal and the load migration control terminal are connected through optical fiber communication, the distribution station area control terminal and the load management system are connected through wireless / private network communication, and the flexible orderly charging control terminal is connected to the flexible orderly charging operator management platform through 4G wireless communication.
[0087] In the embodiment of the present invention, the load migration control strategy of the load migration control module is:
[0088] Real-time charging power calculation: CSAPi=ACSAPi+DCSAPi; Formula (1)
[0089] AC charging demand power calculation: DACSAPi = ∑DFACn; Formula (2)
[0090] DC charging real-time power calculation: DCSAPi = ∑FDCm; Formula (3)
[0091] DC charging demand power calculation: DDCSAPi = ∑DFDCm; Formula (4) Distributed power generation power calculation: DGN = ∑DGNy; Formula (5) Distributed energy storage power calculation: DES = ∑DESz, energy storage charging and discharging bidirectional power; Formula (6) Power supply real-time power calculation: RSAPi = CSAPi, only charging load; Formula (7) Power supply real-time power calculation: RSAPi = CSAPi + DGNi, adding distributed generation; Formula (8) Power supply real-time power calculation:
[0092] RSAPi=CSAPi+DGN+DES, bidirectional power, adding distributed generation and energy storage; Formula (9) Power supply adjustment power calculation: if (SAPi-RSAPi)<0 Formula (10) Reduce the charging power of the charging pile according to the power allocation adjustment control strategy of flexible orderly charging;
[0093] Power supply adjustment power calculation: if (SAPi-RSAPi)>0&if (DACSAPi+DDCSAPi-CSAPi)>0 Formula (11) Increase the charging power of the charging pile according to the power allocation adjustment control strategy of flexible and orderly charging;
[0094] Demand regulation power calculation: if (DAPi-RSAPi)*KDAP<0; Formula (12) reduces the charging power of the charging pile according to the power allocation regulation control strategy of flexible orderly charging;
[0095] Demand regulation power calculation: if (DAPi-RSAPi)*KDAP>0&if (DACSAPi+DDCSAPi-CSAPi)>0 Formula (13) Increase the charging power of the charging pile according to the power allocation regulation control strategy of flexible orderly charging;
[0096] Line real-time power calculation: RLAP = RSAPi, single group charging load; Formula (14) Line real-time power calculation:
[0097] RLAP=∑RSAPi, when multiple groups of charging loads are on the same line, charging load migration is added; Formula (15) Line regulation power calculation: if (LAP-RLAP)<0 Formula (16) According to the power allocation regulation control strategy of flexible orderly charging, the charging power of the charging pile is reduced;
[0098] Line regulation power calculation: if (LAP-RLAP)>0&if (DACSAPi+DDCSAPi-CSAPi)>0 Formula (17) Increase the charging power of the charging pile according to the power allocation regulation control strategy of flexible orderly charging;
[0099] Real-time power calculation of the substation: RTAP = RLAP + LAD; Formula (18) Real-time power calculation of the substation: RTAP = RLAP + LAD + ∑TLADj, adding load migration; Formula (19) Substation adjustment power calculation: if (TAP-RTAP) < 0 Formula (20) Reduce the charging power of the charging pile according to the power allocation adjustment control strategy of flexible orderly charging;
[0100] Calculation of area regulation power: if (TAP-RTAP)>0&if (DACSAPi+DDCSAPi-CSAPi)>0 Formula (21) Increase the charging power of the charging pile according to the power allocation regulation control strategy of flexible and orderly charging;
[0101] Substation demand response regulation power calculation: if (SUB-RSAPi) < 0 Formula (22) Reduce the charging power of the charging pile according to the power allocation regulation control strategy of flexible orderly charging;
[0102] Substation demand response regulation power calculation:
[0103] if(SUB-RSAPi)>0&if(DACSAPi+DDCSAPi-CSAPi)>0 Formula (23)
[0104] Increase the charging power of the charging pile according to the power allocation adjustment control strategy of flexible and orderly charging;
[0105] Calculation of power regulation based on district and county demand response: if (ARE-RSAPi) < 0 Formula (24) Reduce the charging power of the charging pile according to the power allocation regulation control strategy of flexible and orderly charging;
[0106] Calculation of power for district and county demand response regulation:
[0107] if(ARE-RSAPi)>0&if(DACSAPi+DDCSAPi-CSAPi)>0 Formula (25)
[0108] Increase the charging power of the charging pile according to the power allocation adjustment control strategy of flexible and orderly charging;
[0109] Urban demand response adjustment power calculation: if (CTY-RSAPi) < 0 Formula (26) Reduce the charging power of the charging pile according to the power allocation adjustment control strategy of flexible orderly charging;
[0110] Urban demand response regulation power calculation:
[0111] if(CTY-RSAPi)>0&if(DACSAPi+DDCSAPi-CSAPi)>0 Formula (27)
[0112] Increase the charging power of the charging pile according to the power allocation adjustment control strategy of flexible and orderly charging;
[0113] Among them, the power supply balancing power SAPi, i=1,2..., represents multiple groups of different power supply powers;
[0114] Power supply real-time power RSAPi, i=1,2..., represents multiple groups of different power supply powers;
[0115] Charging real-time power CSAPi, i=1,2..., represents multiple groups of different charging powers;
[0116] AC charging pile real-time power ACSAPi, i = 1, 2..., represents multiple groups of different AC charging powers;
[0117] DC charging pile real-time power DCSAPi, i=1,2..., represents multiple groups of different DC charging powers;
[0118] Demand balance power DAP, i = 1, 2, ..., represents multiple groups of different power supply powers;
[0119] Demand real-time power RDAP, i = 1, 2, ..., represents multiple groups of different power supply powers;
[0120] Demand time factor KDAP; line balance power LAP; line real-time power RLAP;
[0121] Area balancing power TAP; Area real-time power RTAP; Substation demand response power SUB;
[0122] District and county demand response power ARE; city demand response power CTY;
[0123] Flexible AC charging demand power DFAC1, DFAC2, ... DFACn;
[0124] Flexible AC charging total demand power DACSAP; flexible AC charging load power FAC1, FAC2, ... FACn;
[0125] Flexible DC charging demand power DFDC1, DFDC2, ... DFDCm;
[0126] Flexible DC charging total demand power DDCSAP;
[0127] Flexible DC charging load power FDC1, FDC2, ... FDCm; rigid power load power LAD;
[0128] Rigid migration load power TLAD1, TLAD2, ..., TLADj;
[0129] Distributed generation power DGN1, DGN2, ... DGNy;
[0130] Distributed generation power DGN; distributed energy storage power DES1, DES2, ... DESz;
[0131] Distributed energy storage power DES.
[0132] The above formulas are run on a cycle basis, and the cycle duration can be set according to the preset performance indicators. Among them, formulas (7), (8), and (9) are used to distinguish the power calculations under the three modes of only charging load, charging load + distributed generation, and charging load + distributed generation + distributed energy storage. When using the calculation results, it is necessary to calculate according to the corresponding mode. Formulas (14) and (15) are used to distinguish the power calculations under the two modes of charging load and load migration type charging load. When using the calculation results, it is necessary to calculate according to the corresponding mode. Formulas (18) and (19) are used to distinguish the power calculations under the two modes of fixed power load and load migration type power load. When using the calculation results, it is necessary to calculate according to the corresponding mode.
[0133] In the embodiment of the present invention, the power distribution adjustment and control strategy of flexible and orderly charging is as follows: the power distribution adjustment and control strategy of flexible and orderly charging followed by a single power supply system composed of multiple AC charging piles and multiple DC charging piles is: 1) average distribution system - according to the percentage of the adjusted power value, it is evenly distributed to each charging pile for power increase or decrease adjustment; 2) DC pile weighted distribution system - according to the percentage of the adjusted power value, the DC charging piles are weighted and evenly distributed to each charging pile for power increase or decrease adjustment; 3) first-come weighted priority system - according to the first-come weighted allocation coefficient, the power adjustment value of each charging pile is allocated; 4) VIP service weighted priority system - the charging power adjustment value allocated to each charging pile is determined according to the charging price ratio.
[0134] Among them, the flexible orderly charging control terminal includes a charging power reduction control strategy and a charging power addition control strategy; among them, the order of the charging power reduction control strategy is: 1) charging load migration, 2) power load migration, 3) distributed energy storage, 4) charging load adjustment; the order of the charging power addition control strategy is: 1) charging load adjustment, 2) exiting distributed energy storage, 3) power load migration, 4) charging load migration.
[0135] The present invention makes each charging pile a "flexible load" of the power grid, and makes each charging a "helper" for the power grid to shave peaks and fill valleys. It is suitable for large-scale and wide-range construction and use of charging piles. The flexible and orderly smart charging station built by this technology, within its power supply area, through the migration and allocation of commercial and residential power loads and the power control of electric vehicle charging loads, integrates rooftop photovoltaics and distributed energy storage as adjustment supplements, which not only guarantees "rigid" commercial and residential electricity consumption, but also meets "flexible" charging needs, and helps the power grid to achieve efficient operation of "peak shaving and valley filling", and build a new digital power supply ecosystem with multi-terminal supply and demand balance of "source, grid, load, storage and charging"; especially in areas with dense space and power loads, the flexible and orderly charging technology can be used to carry out the construction of large-scale charging stations, but can ensure the safe and stable operation of the power grid without or with little capacity increase of the power supply network.
[0136] The present invention promotes the application of charging piles based on a flexible and orderly charging control system, which not only takes into account the economic efficiency and scale requirements of urban power grid investment, but also better meets the needs of individual charging pile registration, and promotes the construction of more public charging piles in cities, making charging more convenient for the people and making urban power supply safer and more stable. There is no need to "increase the capacity" of the power grid, so that every parking space can be charged.
[0137] The flexible and orderly charging control system technology disclosed in the present invention realizes regional autonomy and realizes adaptive regulation and control of rigid power consumption and flexible charging within the power supply area; realizes the interconnection and interaction of networks and charging piles, and responds to the grid demand-side response instructions in a hierarchical manner at substations, districts and counties, and cities, and makes the charging load of each charging pile flexible. Through the cloud platform, discrete charging flexible loads are aggregated according to regional attributes, and enabled to form regional virtual power plants that can be regulated by the grid; and realizes "grid-source-load-storage-charging" coordinated flexible and orderly charging control through a new low-voltage digital distribution network.
[0138] The flexible and orderly charging control system technology disclosed in the present invention realizes the coordinated flexible and orderly charging control of "grid source, load, storage and charging": the charging edge computing control terminal autonomously identifies and judges the load distribution status and data in the area within the power supply area based on the power supply capacity, power supply demand, line capacity, and distribution transformer capacity constraints, and controls and adjusts the charging power and charging time of each charging pile according to the adaptive control strategy, so as to realize the balanced distribution of electricity consumption and charging power in the area, and ensure that the power supply is not over-capacity and the line and transformer are not overloaded in a mode that maximizes the charging demand.
[0139] The present invention is based on the cloud-edge Internet of Things architecture, digital energy aggregation and virtual power plant control technology, enabling each charging pile to respond to the demand-side load control instructions of the substation, district and county, and city in the area where it is located. The charging control terminal controls and adjusts each charging pile according to the set strategy, realizing demand-side response load control over a large area of the power grid, and solving the operational difficulties of peak power shaving, power pulling, and inability to absorb power during valley hours.
[0140] The present invention is a new type of digital low-voltage distribution network technology based on digital twin + AI cloud platform. According to the grid-side load of two or more distribution transformers, distributed rooftop photovoltaic power generation power, discrete charging pile power, and distributed energy storage capacity, it achieves the power supply and power consumption balance of "grid source load storage and charging" in the power supply area by migrating power consumption and charging loads in different power supply areas, investing and withdrawing energy storage devices, and adjusting charging power through coordinated control.
[0141] Among them, the AC and DC charging pile control terminals can be selected and applied to electric vehicle charging applications in most parts of the world based on the interfaces and protocols of China, North America, Europe and other standards.
[0142] The flexible and orderly charging control system includes AC FAC and DC FDC flexible and orderly charging pile control terminals configured according to the number of charging piles, control modules configured according to the number of distributed power sources DGN and energy storage DES devices, flexible and orderly charging control terminals and charging load migration control terminals configured according to the number of charging stations, and includes power load migration control terminals and distribution station area control terminals within the power supply autonomous area, as well as a new load management system and flexible and orderly charging operator management platform accessed through the communication network.
[0143] The present invention is described in detail above, but the present invention is not limited to the above-mentioned embodiments. Various changes can be made within the knowledge of ordinary technicians in the field without departing from the purpose of the present invention. Many other changes and modifications can be made without departing from the concept and scope of the present invention. It should be understood that the present invention is not limited to specific embodiments, and the scope of the present invention is defined by the appended claims.
Claims
1. A grid-source-load-storage-charge control system with regional autonomy and demand response coordination, characterized by: include: Flexible and orderly charging control terminal is used to monitor power load, energy storage device module, photovoltaic power module, grid power supply module and charging pile module. Based on the constraints of power supply capacity, power demand, line capacity and distribution capacity, the charging control terminal can independently identify, judge and control and adjust each charging pile within the autonomous area to achieve balanced distribution of power consumption and charging power in the area. Distributed power sources, used to connect to the power grid and control access to the power grid; Energy storage DES control module, used to store and control the power supply of photovoltaic power generation and grid power supply module; Charging load migration control terminal, used to provide power output and charging control for external devices; The power load migration control terminal is used to monitor and control the power consumption of the power load; The distribution station area control terminal is used to collect data and calculate the power balance of "grid source load storage and charging" in the area, and issue load migration instructions to the charging load migration control terminal and the power load migration control terminal according to the calculation results, so as to realize autonomous "grid source load storage and charging" power balance control in the area; The new load management system is responsible for data collection and calculation of substation overload, district and county, and city power grid demand-side response, and the issuance of instructions for flexible charging station / pile power control and adjustment, realizing the control and management of grid-level charging load demand-side response; Flexible and orderly charging operator management platform; Used for operation control and management of charging piles, charging stations and power supply networks; The distributed power supply and energy storage DES control module are connected to the flexible orderly charging control terminal, the flexible orderly charging control terminal is connected to the charging load migration control terminal, the charging load migration control terminal is connected to the distribution substation control terminal, the distribution substation control terminal is connected to the load migration control terminal, the distribution substation control terminal is connected to the new load management system, and the flexible orderly charging control terminal is also connected to the flexible orderly charging operator management platform; The load migration control strategy of the load migration control terminal is: Real-time charging power calculation: CSAPi = ACSAPi + DCSAPi; Formula (1) AC charging demand power calculation: DACSAPi = ∑DFACn; Formula (2) DC charging real-time power calculation: DCSAPi = ∑FDCm; Formula (3) DC charging demand power calculation: DDCSAPi = ∑DFDCm; Formula (4) Distributed power generation power calculation: DGN = ∑DGNy; Formula (5) Distributed energy storage power calculation: DES = ∑DESz, energy storage charging and discharging bidirectional power; Formula (6) Power supply real-time power calculation: RSAPi = CSAPi, only charging load; Formula (7) Power supply real-time power calculation: RSAPi = CSAPi + DGNi, adding distributed generation; Formula (8) Power supply real-time power calculation: RSAPi = CSAPi + DGN + DES, bidirectional power, adding distributed generation and energy storage; Formula (9) Power supply adjustment power calculation: if (SAPi-RSAPi) < 0 Formula (10) Reduce the charging power of the charging pile according to the power allocation adjustment control strategy of flexible orderly charging; Power supply adjustment power calculation: if (SAPi-RSAPi)>0&if (DACSAPi+DDCSAPi-CSAPi)>0 Formula (11) Increase the charging power of the charging pile according to the power allocation adjustment control strategy of flexible and orderly charging; Demand regulation power calculation: if (DAPi-RSAPi)*KDAP<0; Formula (12) reduces the charging power of the charging pile according to the power allocation regulation control strategy of flexible orderly charging; Demand regulation power calculation: if (DAPi-RSAPi)*KDAP>0&if (DACSAPi+DDCSAPi-CSAPi)>0 Formula (13) Increase the charging power of the charging pile according to the power allocation regulation control strategy of flexible orderly charging; Line real-time power calculation: RLAP = RSAPi, single group charging load; Formula (14) Line real-time power calculation: RLAP=∑RSAPi, when multiple groups of charging loads are on the same line, charging load migration is added; Formula (15) Line regulation power calculation: if (LAP-RLAP)<0 Formula (16) According to the power allocation regulation control strategy of flexible orderly charging, the charging power of the charging pile is reduced; Line regulation power calculation: if (LAP-RLAP)>0&if (DACSAPi+DDCSAPi-CSAPi)>0 Formula (17) Increase the charging power of the charging pile according to the power allocation regulation control strategy of flexible orderly charging; Real-time power calculation of the substation: RTAP = RLAP + LAD; Formula (18) Real-time power calculation of the substation: RTAP = RLAP + LAD + ∑TLADj, adding load migration; Formula (19) Substation adjustment power calculation: if (TAP-RTAP) < 0 Formula (20) Reduce the charging power of the charging pile according to the power allocation adjustment control strategy of flexible orderly charging; Calculation of area regulation power: if (TAP-RTAP)>0&if (DACSAPi+DDCSAPi-CSAPi)>0 Formula (21) Increase the charging power of the charging pile according to the power allocation regulation control strategy of flexible and orderly charging; Substation demand response regulation power calculation: if (SUB-RSAPi) < 0 Formula (22) Reduce the charging power of the charging pile according to the power allocation regulation control strategy of flexible orderly charging; Substation demand response regulation power calculation: if(SUB-RSAPi)>0 & if (DACSAPi+DDCSAPi-CSAPi) > 0 Formula (23) Increase the charging power of the charging pile according to the power allocation adjustment control strategy of flexible and orderly charging; Calculation of power regulation based on demand response in districts and counties: if (ARE-RSAPi) < 0, formula (24) reduces the charging power of the charging pile according to the power allocation regulation control strategy of flexible and orderly charging; Calculation of power for district and county demand response regulation: if(ARE-RSAPi)>0&if(DACSAPi+DDCSAPi-CSAPi)>0 formula (25) Increase the charging power of the charging pile according to the power allocation adjustment control strategy of flexible and orderly charging; Urban demand response adjustment power calculation: if (CTY-RSAPi) < 0 Formula (26) Reduce the charging power of the charging pile according to the power allocation adjustment control strategy of flexible orderly charging; Urban demand response regulation power calculation: if(CTY-RSAPi)>0 & if (DACSAPi+DDCSAPi-CSAPi) > 0 Formula (27) Increase the charging power of the charging pile according to the power allocation adjustment control strategy of flexible and orderly charging; Among them, the power supply balancing power SAPi, i=1,2..., represents multiple groups of different power supply powers; Power supply real-time power RSAPi, i=1,2..., represents multiple groups of different power supply powers; Charging real-time power CSAPi, i=1,2..., represents multiple groups of different charging powers; AC charging pile real-time power ACSAPi, i = 1, 2..., represents multiple groups of different AC charging powers; DC charging pile real-time power DCSAPi, i=1,2..., represents multiple groups of different DC charging powers; Demand balance power DAP, i = 1, 2, ..., represents multiple groups of different power supply powers; Demand real-time power RDAP, i = 1, 2, ..., represents multiple groups of different power supply powers; Demand time factor KDAP; line balance power LAP; line real-time power RLAP; Area balancing power TAP; Area real-time power RTAP; Substation demand response power SUB; District and county demand response power ARE; city demand response power CTY; Flexible AC charging demand power DFAC1, DFAC2, ... DFACn; Flexible AC charging total demand power DACSAP; flexible AC charging load power FAC1, FAC2, ... FACn; Flexible DC charging demand power DFDC1, DFDC2, ... DFDCm; Flexible DC charging total demand power DDCSAP; Flexible DC charging load power FDC1, FDC2, ... FDCm; rigid power load power LAD; Rigid migration load power TLAD1, TLAD2, ..., TLADj; Distributed generation power DGN1, DGN2, ... DGNy; Distributed generation power DGN; distributed energy storage power DES1, DES2, ... DESz; Distributed energy storage power DES; Among them, formulas (7), (8) and (9) are used to distinguish the power calculation under the three modes of only charging load, charging load + distributed generation, and charging load + distributed generation + distributed energy storage. When using the calculation results, it is necessary to calculate according to the corresponding mode; formulas (14) and (15) are used to distinguish the power calculation under the two modes of charging load and load migration type charging load. When using the calculation results, it is necessary to calculate according to the corresponding mode; formulas (18) and (19) are used to distinguish the power calculation under the two modes of fixed power load and load migration type power load. When using the calculation results, it is necessary to calculate according to the corresponding mode.
2. The regional autonomy and demand response coordinated grid source load storage charging control system according to claim 1 is characterized by: The flexible orderly charging control terminal includes: AC FAC and DC FDC flexible orderly charging pile control terminals. According to the command values of power supply SAP, demand DAP, line LAP, area TAP, substation SUB, district and county ARE, and city CTY given by the new load management system, the corresponding data is collected and the corresponding charging pile adjustment control target value is calculated. The adjustment control command is sent to the AC FAC and DC FDC flexible orderly charging pile control terminals to adjust the charging power up or down. When the distributed energy and energy storage are connected, the energy storage device module is controlled to operate in three different working modes: energy storage, discharge, and stop, so as to maintain the power balance of the charging "grid source load storage charging".
3. The regional autonomy and demand response coordinated grid source load storage charging control system according to claim 2 is characterized by: The AC FAC and DC FDC flexible orderly charging pile control terminal monitors the single-phase / three-phase current, voltage, and power parameters of the power supply line, and adopts a mode of embedding a gateway between the pile guns to monitor and control the PWM / PLC handshake communication transmission signal between the pile guns, and gives a target value control signal to the charging pile, and communicates with the flexible orderly charging control terminal through the PLC / CAN / 4G / LoRa communication interface to receive the adjustment control instruction constant, and performs power control adjustment on each charging gun.
4. The regional autonomy and demand response coordinated grid source load storage charging control system according to claim 2 is characterized by: The AC FAC and DC FDC flexible orderly charging pile control terminals, distributed power sources, energy storage DES control modules are connected to the flexible orderly charging control terminals via optical fiber / twisted pair / carrier communication methods, the charging load migration control terminals are connected to the distribution station area control terminals via optical fiber communication methods, the distribution station area control terminals are connected to the load migration control terminals via optical fiber communication methods, the distribution station area control terminals are connected to the load management system via wireless / private network communication methods, and the flexible orderly charging control terminals are connected to the flexible orderly charging operator management platform via 4G wireless communication.
5. The regional autonomy and demand response coordinated grid source load storage charging control system according to claim 1 is characterized by: The power allocation regulation control strategy of the flexible orderly charging is: The power distribution regulation control strategy for flexible orderly charging followed by a single power supply system consisting of multiple AC charging piles and multiple DC charging piles is: Average distribution system - according to the percentage of the adjusted power value, it is evenly distributed to each charging pile to adjust the power up or down; Weighted DC charging pile distribution system - DC charging piles are weighted and evenly distributed to each charging pile according to the percentage of the adjusted power value to adjust the power up or down; First-come-first-come-first-priority system - the power adjustment value of each charging pile is allocated according to the weighted allocation coefficient of first-come-first-come; VIP service weight priority system - the charging power adjustment value of each charging pile is determined according to the charging price ratio.
6. The regional autonomy and demand response coordinated grid source load storage charging control system according to claim 1 is characterized by: The flexible orderly charging control terminal includes a charging power regulation control strategy and a charging power regulation control strategy; wherein the order of the charging power regulation control strategy is: 1) performing charging load migration, 2) performing power load migration, 3) using distributed energy storage, and 4) regulating charging load; The order of the charging power regulation control strategy is: 1) regulating the charging load, 2) exiting the distributed energy storage, 3) migrating the power load, and 4) migrating the charging load.
Citation Information
Cited By
Power distribution and energy storage management system, method and equipment for novel power system
CN120454142A