Ecological-rock-soil slope consolidation structure and slope consolidation method
By designing a combination of disconnected and reversely inclined geotechnical structures and plant planting, the problems of high construction difficulty and poor anti-rainwater erosion effect in the existing technology have been solved, and an ecological slope stabilization technology with simple construction and excellent anti-erosion effect has been realized. .
Patent Information
- Application Number
- CN202311525774.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-16
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2043-11-16
AI Technical Summary
The existing ecological slope stabilization technology cannot balance the difficulty of construction and the effect of preventing rain erosion, resulting in high construction costs and poor results. Especially under extreme conditions such as heavy rainfall or mudslides, it cannot effectively prevent slope instability.
An ecological geotechnical slope-retaining structure composed of several groups of geotechnical components is used. Each group of geotechnical components is composed of two geotechnical structures that are not connected to each other and are inclined in opposite directions. The structural design conforms to a specific formula and is prepared by pouring. And rivet anchoring methods are suitable for various slope surfaces, and plants are planted on the geotechnical structure to enhance stability.
It has achieved ecological slope stabilization with low construction difficulty, small amount of work, and excellent rain erosion resistance. It has significantly reduced the number of artificial structure projects. It is suitable for various slope surfaces and effectively prevents water and soil erosion and slope collapse.
Smart Images

Figure CN117513368B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of slope consolidation engineering, and in particular relates to a slope consolidation structure utilizing ecological vegetation and rock and soil to consolidate the slope, and a corresponding slope consolidation method. Background Art
[0002] Slope instability can easily lead to serious natural disasters such as landslides and collapses. Among all geological disasters, the degree of damage is second only to earthquakes. The causes of slope instability are relatively complex, and the main factors include geological tectonic movement, rain erosion, vibration (such as blasting, earthquakes), weathering and vegetation growth. Among them, shallow instability of ecological slopes under rainfall conditions is one of the important geological disasters that are common in slope engineering and cause property losses.
[0003] In dealing with landslides, traditional reinforcement methods are mainly divided into three categories according to different principles: reducing the sliding force (slope cutting and load reduction), increasing the strength of the slope rock mass (grouting method, blasting sliding surface method) and artificial reinforcement (anti-slide pile reinforcement, anchor reinforcement). Although these methods have been proven to be relatively effective, the amount of work is usually large and is not conducive to maintaining or restoring the ecology of the slope.
[0004] At present, with the improvement of environmental awareness, the call for using ecological slope consolidation technology to solve slope problems is growing, and this technology has been continuously developed and promoted. Traditional ecological slope consolidation methods usually adopt sowing grass seeds, hole sowing and furrow sowing, laying turf, planting grass on stone skeletons, and planting grass on hollow hexagonal prisms. With the development of technology, people have also developed corresponding frame projects (building square, circular, diamond-shaped frames on the slope, and filling soil and planting plants in the frame) and net laying projects (such as three-dimensional vegetation nets, geogrids, geonets, geocells, metal nets, etc.) on this basis. However, due to the difficulty of frame construction, large engineering volume and high requirements for slope, it is difficult to promote and apply; and the net laying project is difficult to block heavy rainfall, or impact debris flow, rolling stones on the slope, debris, etc., and even under the action of these external forces, the self-weight of vegetation causes further damage to the slope.
[0005] Therefore, in recent years, people have continuously developed new ecological slope consolidation technologies in an attempt to overcome the above-mentioned defects. For example, Wang Cong compared various protective structures in "Experimental Study on Rainwater Infiltration of Soil Slopes with Different Protection Forms" (Wang Cong. Experimental Study on Rainwater Infiltration of Soil Slopes with Different Protection Forms [D]. Changsha University of Science and Technology, 2014.) and found that the anti-scouring ability of the short-tube protection structure is stronger than that of geotextiles and straw ropes. However, the engineering volume of the short-tube protection structure is also large, and the subsequent in-depth study of the cement mortar protection scheme has not been able to solve the anti-scouring problem well.
[0006] Wu Tao et al. investigated the fixing method of vegetation bags in "Fixing Method and Application of Vegetation Bags in Rock Slope Protection" (Wu Tao, Peng Chengyu. Fixing Method and Application of Vegetation Bags in Rock Slope Protection [J]. Traffic World, 2023(09):46-48.), and believed that although the use of vegetation bags combined with frame beam structure is more effective in slope consolidation, the amount of engineering is large, and the effect of using anchor rods as the skeleton carrier structure and stacking vegetation bags is better. In fact, in order to obtain natural landscape effects, this method sacrifices the ability to consolidate slopes, is not easy to resist heavy rainfall erosion, and fails to overcome the defects of traditional mesh engineering. Similarly, CN 106545021B also constructs an integrated support bag covering soil and root irrigation ecological slope protection method by combining anchor rods with flexible bag cloth or bag net. This method is also difficult to make significant improvements in improving resistance to rainwater erosion.
[0007] CN 112538839 B combines a stepped structure with a U-shaped canal to provide a construction method for a composite ecological slope protection. This construction method has many artificial structures and a large amount of work, and almost the entire slope surface needs to be covered, which is not suitable for promotion and application, especially on steep slopes with greater construction difficulty or slopes with more rocks.
[0008] CN 112796278 A provides an ecological slope protection structure by combining grass grid planting technology, gabion stone cage technology and ecological blanket technology. However, the ecological slope protection structure is technically complex, requires many projects and is not suitable for popularization and application.
[0009] In summary, this field is in urgent need of a method that can overcome the contradiction of the existing technology in constructing ecological slope consolidation structures, that is, the inability to take into account both the construction difficulty and the rainwater scouring prevention effect, so as to provide an ecological slope consolidation structure with low construction difficulty and construction workload and excellent rainwater scouring resistance. Summary of the invention
[0010] In view of the defects of the prior art, the purpose of the present invention is to provide an ecological slope consolidation structure with low construction difficulty and construction workload and excellent resistance to rainwater erosion, so as to overcome the contradiction between the difficulty of construction and the anti-rainwater erosion effect in the prior art.
[0011] In order to achieve the above object, the present invention provides the following technical solutions:
[0012] An ecological-rock-soil slope consolidation structure, the structure comprising a plurality of groups of rock-soil components, each group of rock-soil components consisting of two rock-soil structures; the two rock-soil structures are not connected to each other and are inclined in opposite directions to each other, and the two rock-soil structures are in a V-shaped shape without an interface;
[0013] Among them, the length of the geotechnical structure α, the width of the geotechnical structure β, the angle formed by the two geotechnical structures γ, the distance from the tail end of the geotechnical structure above the horizontal to the plane of the other geotechnical structure δ, the height difference between the tail end of the geotechnical structure above the horizontal and the top of the other geotechnical structure The relationship with the slope angle Ω conforms to formula (1):
[0014]
[0015] The angle between the rock and soil structure below the horizontal plane is 45°.
[0016] As shown in comparative examples 1-4 of the present invention, when the traditional frame engineering (square structure, inverted U-shaped structure, diamond structure) and the traditional mesh engineering (geotextile) are used, the rolling stone interception effect is not good. More importantly, these frame engineering constructions are difficult, the engineering volume is large, and the requirements for slope conditions are relatively high; while the geotextile engineering has the disadvantages of poor durability and high foundation requirements.
[0017] As shown in the experimental examples of the present invention, the slope-fixing structure of the present invention has a good rolling stone interception effect and also has a very good rainwater scouring prevention effect. The slope-fixing structure of the present invention has a simple structure, low cost and is easy to construct, has the advantages of low construction difficulty and being suitable for various slope conditions, and well solves the contradiction between the difficulty of construction and the rainwater scouring prevention effect in the existing slope-fixing technology.
[0018] Preferably, the plants are planted on a horizontal surface of the geotechnical structure, the diameter of the plants not exceeding 1 / 3 of the width of the geotechnical structure.
[0019] Preferably, the geotechnical component is prepared by casting.
[0020] Preferably, the length α of the geotechnical structure is 5 m, the width β of the geotechnical structure is 0.5 m, the angle γ formed by the two geotechnical structures is 60°, the distance δ from the tail end of the geotechnical structure above the horizontal to the plane of the other geotechnical structure is 2.5 m, the height difference between the tail end of the geotechnical structure above the horizontal and the top of the other geotechnical structure is is 1.8m, and the slope angle Ω is 20°. It is worth noting that formula (1) in the present invention is an empirical formula, R 2 =0.9977. When using formula (1), the integer can be obtained by rounding off. For example, in this preferred embodiment, the calculated value of Ω is 19.978°, and the actual value is 20°.
[0021] The length of the geotechnical structure α is 5m, the width of the geotechnical structure β is 0.5m, the angle γ formed by the two geotechnical structures is 90°, the distance δ from the tail end of the geotechnical structure above the horizontal to the plane of the other geotechnical structure is 3m, and the height difference between the tail end of the geotechnical structure above the horizontal and the top of the other geotechnical structure is The height of the slope is 2.2m and the slope angle Ω is 30°.
[0022] Preferably, a protrusion and groove structure is provided on the horizontal plane of the geotechnical structure, the protrusions are arranged on both radial sides of the horizontal plane of the geotechnical structure in a staggered manner; the grooves are arranged in the radial center of the horizontal plane of the geotechnical structure.
[0023] Preferably, 3 to 4 protrusions are arranged at equal distances radially along the horizontal plane of the geotechnical structure.
[0024] Preferably, the upper surface of the geotechnical structure below the horizontal is concavely curved with a curvature coefficient of 1.3.
[0025] Preferably, rivets for inserting into the slope are provided on both sides of the geotechnical structure.
[0026] The present invention also provides an ecological-rock-soil slope consolidation method, which comprises building the aforementioned ecological-rock-soil slope consolidation structure on the slope surface.
[0027] When the ecological-rock-soil slope-fixing structure is built on the slope, the method used is:
[0028] The geotechnical structure is reinforced at both ends by means of rivet anchoring, and the precast concrete components are fixed on the slope as the geotechnical structure.
[0029] As a construction principle, first of all, according to the design requirements and site conditions, the components are made to ensure that the size and quality of the components meet the requirements. Then, at the construction site, clean and level the slope surface to ensure that the foundation is stable, dig trenches for placing the structure in advance, and tamp the soil to increase the strength and stability of the slope. Next, determine the layout of the components according to the design drawings, reinforce the precast concrete components on the slope by rivet anchoring at both ends of the structure, with an anchoring length of about 0.5m. After fixing, check the components to ensure horizontal and verticality. When the slope is less than or equal to 30 degrees, plant trees in the vicinity of the horizontal plane of the geotechnical structure, and plant shrubs when the slope is greater than 30 degrees. The pit specifications of the trees are 0.5×0.5×0.5m; the pit specifications of the shrubs are 0.3×0.3×0.3m, and the spacing of the vegetation is equidistantly planted in the vicinity of the horizontal plane of the geotechnical structure according to the length of the geotechnical structure. Finally, carry out necessary maintenance and maintenance as needed to ensure the stability and protective effect of the precast concrete components. The entire construction process needs to be carried out strictly in accordance with the construction drawings and technical specifications to ensure construction quality and project safety.
[0030] Optionally, the slope of the slope is less than or equal to 30 degrees.
[0031] Beneficial effects of the present invention:
[0032] The present invention can achieve excellent slope consolidation effect with significantly less artificial structure engineering, has excellent rainwater scouring resistance, and effectively prevents soil erosion. Compared with existing structures, the present invention has lower construction difficulty, less engineering volume, and is easy to promote and apply. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a schematic diagram of the rock and soil structure of the present invention;
[0034] Figure 2 It is a schematic diagram of the construction process of the slope-fixing structure of the present invention;
[0035] Figure 3 This is a schematic diagram of the ecological-rock-soil slope consolidation structure of the present invention;
[0036] Figure 4 A schematic diagram of a specific geotechnical structure of the present invention;
[0037] Figure 5 It is a schematic diagram of one of the existing technologies, "geotextile";
[0038] Figure 6 This is a photo of the construction site of "geotextile", one of the existing technologies;
[0039] Figure 7 This is a schematic diagram of a "square slope protection structure" of one of the existing technologies;
[0040] Figure 8 This is a photo of the engineering site of "square slope protection structure", one of the existing technologies;
[0041] Fig. 9 This is a schematic diagram of an "inverted U-shaped slope protection structure" of one of the existing technologies;
[0042] Fig.10 This is a photo of the engineering site of the "inverted U-shaped slope protection structure", one of the existing technologies;
[0043] Fig.11 This is a schematic diagram of a "diamond-shaped slope protection structure" of one of the prior arts;
[0044] Fig.12 This is a photo of the construction site of the "diamond-shaped slope protection structure", one of the existing technologies. DETAILED DESCRIPTION
[0045] The present invention is described in detail below through examples. It is necessary to point out that the following examples are only used to further illustrate the present invention and cannot be understood as limiting the scope of protection of the present invention. Some non-essential improvements and adjustments made by technical personnel in this field based on the above invention content still fall within the scope of protection of the present invention.
[0046] Example 1
[0047] like Figure 1 and Figure 2 As shown, multiple geotechnical structures are prepared by pouring concrete, and the length α of the geotechnical structure is 5 meters, the width β is 0.3 meters, and the height h is 0.5 meters. Every two geotechnical structures form a group of geotechnical components, and the geotechnical components are fixed on a slope with a slope Ω of 20°. In each group of geotechnical components, the angle γ between the two geotechnical structures is 60°, the distance δ from the tail end of the geotechnical structure above the horizontal to the plane of the other geotechnical structure is 2.5 meters, and the height difference between the tail end of the geotechnical structure above the horizontal and the top of the other geotechnical structure is The height is 1.8m, and the angle between the rock and soil structure below the horizontal plane and the horizontal plane is 45°. The above parameters satisfy the following formula:
[0048] Example 2
[0049] like Figure 1 and Figure 2 As shown in FIG. 1 , multiple geotechnical structures are prepared by pouring concrete, and the length α of the geotechnical structure is 5 meters, the width β is 0.3 meters, and the height h is 0.5 meters. A group of geotechnical components is formed by every two geotechnical structures, and the geotechnical components are fixed on a slope with a slope of 30°. In each group of geotechnical components, the angle γ between the two geotechnical structures is 90°, the distance δ from the tail end of the geotechnical structure above the horizontal to the plane of the other geotechnical structure is 3 meters, and the height difference between the tail end of the geotechnical structure above the horizontal and the top of the other geotechnical structure is 1. The height is 2.2m, and the angle between the geotechnical structure below the horizontal plane and the horizontal plane is 45°. The above parameters satisfy the following formula:
[0050] Example 3
[0051] like Figure 3 As shown, on the basis of Example 1, a plant model is fixed on the horizontal plane of the rock and soil structure, the shrub model is 4.5 cm high, and three shrub models are set at equal distances on each rock and soil structure.
[0052] Example 4
[0053] like Figure 1As shown, on the basis of Example 3, a protrusion and groove structure is provided on the horizontal plane of the geotechnical structure, and the protrusions are arranged on both sides of the radial direction of the horizontal plane of the geotechnical structure in a staggered manner. Each protrusion has a length of 0.03m and a width of 0.01m, and three protrusions are arranged at equal distances on each side; the groove is arranged in the radial center of the horizontal plane of the geotechnical structure, with a width of 0.01m and a depth of 0.01m.
[0054] Example 5
[0055] like Figure 4 As shown, on the basis of Example 3, the upper surface of the geotechnical structure located below the horizontal plane is concavely curved, and the curvature coefficient is 1.3.
[0056] Comparative Example 1
[0057] Geotextile slope protection is a common slope protection measure. For specific structure and on-site pictures, see Figure 5 and Figure 6 This comparative example was prepared according to the following structural parameters: the thickness of the geotextile was 0.5 mm, and the mesh size was 1 cm×1 cm.
[0058] Geotextile slope protection technology has the following disadvantages:
[0059] 1. Limited durability: Although geotextiles have a certain degree of durability, their service life is generally short, especially under strong ultraviolet radiation and extreme weather conditions, they are prone to aging and damage.
[0060] 2. High requirements for foundation: Geotextile slope protection needs to be supported by a solid foundation. If the foundation is not solid, it may affect the stability of the geotextile and the working effect of the entire slope protection structure.
[0061] 3. Not suitable for large-scale projects: Geotextile slope protection may not be suitable for large-scale slope projects because a larger area of geotextile material is required and additional reinforcement measures are required.
[0062] 4. Not suitable for high loads: For slopes that need to withstand large loads, geotextile slope protection may not be strong enough and is not suitable for long-term high load applications.
[0063] Comparative Example 2
[0064] like Figure 7 and Figure 8 As shown, the square slope protection is constructed by using square prefabricated concrete blocks to reinforce and protect the soil slope. This comparative example is prepared according to the following structural parameters: the length×width×height dimensions of the square structure are 2m×2m×0.4m.
[0065] This slope protection structure is designed to prevent erosion and collapse of the slope surface, maintain the stability of the slope surface and the overall beauty of the slope surface, but it also has corresponding disadvantages, such as: High cost: Compared with other slope protection forms, the construction cost of square stone slope protection is higher. This is because it needs to be prefabricated and precisely laid on site, which requires a lot of labor and material investment. Not suitable for steep slopes: Square stone slope protection is usually suitable for gentler slopes and may not be suitable for steep slopes. Steep slopes require stronger anti-slip and anti-scouring capabilities, and other more stable slope protection forms may need to be adopted. High maintenance cost: Although square stone slope protection has good durability, it requires regular maintenance during long-term use. The gaps between the blocks may be eroded or damaged, requiring timely repair and maintenance.
[0066] Comparative Example 3
[0067] like Fig. 9 and Fig.10 As shown, the inverted "U"-shaped slope protection is a common slope protection measure, which is to build a similar inverted "U"-shaped structure on the surface or bottom of the slope to increase the stability and anti-slip ability of the slope. The advantage of this slope protection form is that it provides better slope protection stability and anti-slip performance, and is suitable for medium or gentle slopes. This comparative example is prepared according to the following structural parameters: the width of the inverted "U"-shaped concrete slope protection is 2m, the height is 0.3m, and the depth is 0.2m.
[0068] However, since the inverted “U”-shaped slope protection requires a large space, it may not be suitable for slopes with space constraints, and the construction cost is high.
[0069] Comparative Example 4
[0070] like Fig.11 and Fig.12 As shown, diamond slope protection is a common slope protection measure, also known as "diamond slope protection" or "diamond grid slope protection". This comparative example is prepared according to the following structural parameters: the square width of the diamond grid skeleton is: 3m×3m, the skeleton is embedded in the slope by 0.4m, and the width is 0.4m.
[0071] It is achieved by laying diamond grids or similar diamond structures on the surface or inside the slope to increase the stability and anti-slip ability of the slope. The advantage of this type of slope protection is that it provides better slope stability and anti-slip performance, and is suitable for different types of slopes, including steep slopes and gentle slopes, and is suitable for various soil types and geological conditions. However, the construction and material costs of diamond slope protection are high, and the foundation requirements are also high.
[0072] Experimental Example 1
[0073] Slope rock rolling interception test plan:
[0074] In order to explore the effect of "V"-shaped geotechnical structure protection measures on the gradual reduction of the kinetic energy of rolling stones on slopes, this experiment used a "V"-shaped geotechnical structure and set different initial heights of rolling stones to push the stones to roll down, and then recorded the speed and kinetic energy of the rolling stones after passing through the "V"-shaped geotechnical structure protection. The speed and kinetic energy data of the rolling stones during the rolling process were recorded by a speedometer and a dynamometer.
[0075] Embodiment 1-5:
[0076] 1. Let the stone roll down the hillside at initial heights of 2, 3, and 4 meters respectively;
[0077] 2. Record the rolling time, rolling distance and speed changes of the rolling stone;
[0078] 3. Repeat the above steps to obtain the data.
[0079] Comparative Examples 1-4:
[0080] Comparative Example 1: Geotextile slope protection. Structural parameters: The thickness of the geotextile is 0.5 mm, and the mesh size is 1 cm*1 cm. The geotextile is laid on the slope, and then the test is carried out according to the steps of Examples 1-5.
[0081] Comparative Example 2: Square concrete slope protection. Structural parameters: The length×width×height dimensions of the square structure are 2m×2m×0.4m. Then, the test is carried out according to the steps of Examples 1-5.
[0082] Comparative Example 3: Inverted "U"-shaped concrete slope protection. Structural parameters: The width of the inverted "U"-shaped concrete slope protection is 2m, the height is 0.3m, and the depth is 0.2m. Then, the test is carried out according to the steps of Examples 1-5.
[0083] Comparative Example 4: Diamond-shaped concrete slope protection. Structural parameters: The square width of the diamond-shaped grid skeleton is 3m×3m, the skeleton is embedded 0.4m into the slope, and the width is 0.4m. Then, the test is carried out according to the steps of Examples 1-5.
[0084] The following is a table of initial velocity (when the rock falls to the center of the slope), final velocity (when the rock falls to the bottom of the slope), and related momentum calculation results for Examples 1-5, on a 30-degree slope, using a "V"-shaped geotechnical structure for protection, and a rock with a mass of 1 kg on an initial height of 2, 3, and 4 meters:
[0085] Table 1 Rolling stone test at different heights
[0086]
[0087]
[0088] Results and discussion about Table 1:
[0089] In terms of speed reduction, the speed reduction rates of Examples 1-5 at a height of 2 meters are: 29.03%, 32.76%, 35.71%, 37.74%, 40.00%. The speed reduction rates at a height of 3 meters are: 18.82%, 22.22%, 24.05%, 25.00%, 26.03%. The speed reduction rates at a height of 4 meters are: 14.71%, 23.47%, 25.00%, 25.81%, 26.67%. The speed reduction rates of Comparative Examples 1-4 at a height of 2 meters are: 27.78%, 28.57%, 29.41%, 30.30%. The speed reduction rates of Comparative Examples 1-4 at a height of 3 meters are: 23.40%, 23.91%, 24.44%, 25.00%. The speed reduction rates of comparative examples 1-4 at a height of 4 meters are: 18.92%, 19.27%, 20.56%, and 20.95%.
[0090] From the above data, it can be seen that the speed reduction of the rolling stones in Examples 1 and 2 at the height of 2, 3, and 4 meters is greater than that in Comparative Examples 1-4, and the speed reduction of the rolling stones in Examples 3-5 is much greater than that in Comparative Examples 1-4. While the construction difficulty and cost of the present invention are significantly superior to those of Comparative Examples 1-4, the interception effect of the present invention on rolling stones is still better than that of the traditional technical solutions represented by Comparative Examples 1-4. It is not difficult to know that the present invention has better application prospects in terms of rolling stone interception than the prior art.
[0091] Through Examples 1-5 and Comparative Examples 1-4, it is found that the "V"-shaped structural protection is superior to the traditional slope protection form, and through the comparison of Examples 1-5 themselves, it is found that the optimized "V"-shaped structural protection has a more obvious energy dissipation effect on rolling stones.
[0092] Experimental Example 2
[0093] Rainwater scour prevention test (impact test of debris flow fluid on slope surface)
[0094] This experimental example aims to explore the interception effect of slope protection devices under different debris flow scale erosion. The test materials are viscous debris flows with a volume of 150L (small), 200L (medium), and 250L (large) and a bulk density of 1.95g / cm3. The actual size of the slope is length × width × height = 40m × 40m × 20m, with a slope of 30°. The simulated slope is reduced in size at a ratio of 1:10, with a size of length × width × height = 4m × 4m × 2m, and a slope of 30°. Erosion tests were conducted on debris flows of different sizes on exposed slopes, slopes protected by concrete rectangular piles, slopes protected by the "V"-shaped geotechnical structure of Example 2, slopes protected by the "V"-shaped geotechnical structure + ecological protection of Example 3, protection 1 of the "V"-shaped geotechnical structure that does not meet the design formula, protection 2 of the "V"-shaped geotechnical structure that does not meet the design formula, comparative examples 1-4, and combined examples 1-4 using the "V"-shaped geotechnical structure + ecological protection of Example 3 combined with comparative examples 1-4. The test process is to artificially simulate the debris flow rushing from the upper end of the slope to the lower end, and collect the volume of material remaining at the lower end, so as to obtain the volume of material intercepted by each slope test, and finally, by comparing the amount of debris flow intercepted, the optimal interception scheme can be obtained.
[0095] Experimental setup:
[0096] (1) Material pool. Length × width × height = 0.6 × 0.6 × 1m, maximum capacity of 350L, built with bricks and cement, with a rectangular funnel-shaped bottom to facilitate the outflow of slurry and scouring of the entire slope. This part is used to contain the reshaped debris fluid set according to the actual bulk density of the Jiangjiagou debris flow.
[0097] (2) Concrete rectangular pile model. Model dimensions: length × width × height = 5 × 0.5 × 0.3 m, burial depth 0.3 m, pile spacing 0.02 m, row spacing 0.03 m.
[0098] (3) "V" type structural model. Refer to Example 2.
[0099] (4) "V" type geotechnical structure + ecological protection. Refer to Example 3 and reduce the size. Model parameters: length α is 5 meters, width β is 0.3 meters, height h is 0.5 meters, the angle γ between the two geotechnical structures is 60 degrees, the distance δ from the tail end of the geotechnical structure above the horizontal to the plane of the other geotechnical structure is 2.5 meters, and the height difference between the tail end of the geotechnical structure above the horizontal and the top of the other geotechnical structure is The height of the plant model used in the experiment is 1.8m. The height of the tree model is 18cm, and the height of the shrub model is 4.5cm.
[0100] (5) Does not comply with the design formula: The "V" type geotechnical structure 1. The model parameters are length α of 4.5 meters, width β of 0.5 meters, height h of 0.6 meters, the angle γ between the two geotechnical structures is 50 degrees, the distance δ from the tail end of the geotechnical structure above the horizontal to the plane of the other geotechnical structure is 2.8 meters, and the height difference between the tail end of the geotechnical structure above the horizontal and the top of the other geotechnical structure is is 2m.
[0101] (6) Does not comply with the design formula: V-type geotechnical structure 2. Model parameters: α = 4m, β = 0.8m, γ = 80°, δ = 3.2m, The length α is 4 meters, the width β is 0.8 meters, the height h is 0.5 meters, the angle γ between the two geotechnical structures is 80°, the distance δ from the tail end of the geotechnical structure above the horizontal to the plane of the other geotechnical structure is 3.2 meters, and the height difference between the tail end of the geotechnical structure above the horizontal and the top of the other geotechnical structure is is 2.5m.
[0102] (7) Tailings bucket. According to the preset total amount of debris flow, three tailings buckets with a capacity of 300L are placed under the slope to facilitate the measurement of the volume of the remaining material.
[0103] Table 2 Slope tests under three scale debris flows
[0104]
[0105]
[0106] Combined with the above data analysis:
[0107] Exposed slope: average slurry flow rate = (3.4 + 3.7 + 4.6) / 3 = 3.9 m / s Average intercepted slurry volume = (15 + 25 + 30) / 3 = 23.33 L. From the data, we can see that no matter the scale of the debris flow is 150 L, 200 L or 250 L, the slurry flow rate of the exposed slope is the highest, while the intercepted slurry volume is the lowest. This shows that the exposed slope is the worst in preventing debris flow.
[0108] Concrete rectangular pile protection: average slurry flow rate = (3.1 + 3.5 + 4.2) / 3 = 3.6 m / s average intercepted slurry volume = (30 + 40 + 45) / 3 = 38.33 L. Compared with the exposed slope, the concrete rectangular pile protection can effectively reduce the slurry flow rate and increase the intercepted slurry volume. However, its effect is still not as good as other more advanced protection schemes.
[0109] Protection of "V" type geotechnical structure: average slurry flow rate = (2.9 + 3.3 + 4.0) / 3 = 3.4 m / s average intercepted slurry volume = (50 + 60 + 65) / 3 = 58.33 L. This protection scheme further reduces the slurry flow rate and increases the intercepted slurry volume. This shows that the protection effect of "V" type geotechnical structure is better than that of exposed slope and concrete rectangular pile protection.
[0110] Type "V" geotechnical structure + ecological protection: average slurry flow rate = (2.7 + 3.1 + 3.9) / 3 = 3.23 m / s average intercepted slurry volume = (60 + 70 + 75) / 3 = 68.33 L. This is the most effective protection scheme, which not only reduces the slurry flow rate, but also greatly increases the intercepted slurry volume.
[0111] Type "V" geotechnical structure protection 1 (not in accordance with the design formula): average slurry flow rate = (3 + 3.4 + 4.1) / 3 = 3.5 m / s average interception slurry volume = (40 + 50 + 55) / 3 = 48.33 L. This shows that the type "V" geotechnical structure protection that does not meet the design parameters has a significantly lower control effect on debris flow than the type "V" geotechnical structure that meets the design parameters.
[0112] Type "V" geotechnical structure protection 2 (not in accordance with the design formula): average slurry flow rate = (3.2 + 3.5 + 4.3) / 3 = 3.67m / s Average intercepted slurry volume = (38 + 46 + 51) / 3 = 45L. This shows that the type "V" geotechnical structure protection that does not meet the design parameters has a significantly lower control effect on debris flow than the type "V" geotechnical structure that meets the design parameters.
[0113] Comparative Example 1: Average slurry flow rate = (3.3 + 3.6 + 4.4) / 3 = 3.77 m / s Average intercepted slurry volume = (15 + 25 + 30) / 3 = 23.33 L. The effect of this example is similar to that of the exposed slope, and the slurry flow rate and intercepted slurry volume are the same as those of the exposed slope.
[0114] Comparative Example 2: Average slurry flow rate = (2.8 + 3.2 + 4.2) / 3 = 3.4 m / s Average intercepted slurry volume = (43 + 51 + 56) / 3 = 50 L. The effect of this embodiment is obviously better than that of the exposed slope and Comparative Example 1, but still inferior to the "V" type geotechnical structure protection and the "V" type geotechnical structure + ecological protection.
[0115] Comparative Example 3: Average slurry flow rate = (3.0 + 3.4 + 4.2) / 3 = 3.53 m / s Average intercepted slurry volume = (41 + 50 + 55) / 3 = 48.67 L. The effect of this embodiment is similar to that of Comparative Example 2, but the slurry flow rate is slightly higher and the intercepted slurry volume is slightly lower.
[0116] Comparative Example 4: Average slurry flow rate = (2.9 + 3.3 + 4.1) / 3 = 3.43 m / s Average intercepted slurry volume = (42 + 52 + 58) / 3 = 50.67 L. The effect of this embodiment is between Comparative Example 2 and Comparative Example 3, and the slurry flow rate and intercepted slurry volume are between these two embodiments.
[0117] In summary: in all test cases, the "V" type geotechnical structure + ecological protection scheme has the best effect, which has the lowest average slurry flow rate and the highest average intercepted slurry volume. In the comparative examples, the effects of comparative examples 2 and 4 are relatively good, but they are not as good as the best effect of the "V" type geotechnical structure + ecological protection scheme. Therefore, when designing a slope protection scheme, we should give priority to the use of the "V" type geotechnical structure + ecological protection scheme.
Claims
1. An ecological-rock-soil slope consolidation structure, characterized in that: The structure includes a plurality of groups of geotechnical components, each group of geotechnical components is composed of two geotechnical structures; the two geotechnical structures are not connected to each other and are inclined in opposite directions to each other, and the two geotechnical structures are in a V-shaped shape without an interface; Among them, the relationship between the length of the geotechnical structure α, the width of the geotechnical structure β, the angle formed by the two geotechnical structures γ, the distance δ from the tail end of the geotechnical structure above the horizontal to the plane of the other geotechnical structure, the height difference φ between the tail end of the geotechnical structure above the horizontal and the top of the other geotechnical structure and the slope angle Ω conforms to formula (1): Ω=9.92-5.6α+0.872β+0.09γ-8.74δ+30.04φ The angle between the rock and soil structure located below the horizontal plane and the horizontal plane is 45°; In the formula (1), the units of α, β, δ and φ are meters; the units of γ and Ω are degrees.
2. The ecological-rock-soil slope consolidation structure according to claim 1, characterized in that: Plants are planted adjacent to and above the horizontal plane of the geotechnical structure, the diameter of the plants not exceeding 1 / 3 of the width of the geotechnical structure.
3. The ecological-rock-soil slope consolidation structure according to claim 1, characterized in that: The geotechnical components are prepared by casting.
4. The ecological-rock-soil slope consolidation structure according to claim 1, characterized in that: The length α of the geotechnical structure is 5m, the width β of the geotechnical structure is 0.5m, the angle γ formed by the two geotechnical structures is 60°, the distance δ from the tail end of the geotechnical structure above the horizontal to the plane of the other geotechnical structure is 2.5m, the height difference φ between the tail end of the geotechnical structure above the horizontal and the top of the other geotechnical structure is 1.8m, and the slope angle Ω is 20°; Or, the length α of the geotechnical structure is 5m, the width β of the geotechnical structure is 0.5m, the angle γ formed by the two geotechnical structures is 90°, the distance δ from the tail end of the geotechnical structure above the horizontal plane to the plane of the other geotechnical structure is 3m, the height difference φ between the tail end of the geotechnical structure above the horizontal plane and the top of the other geotechnical structure is 2.2m, and the slope angle Ω is 30°.
5. The ecological-rock-soil slope consolidation structure according to claim 1, characterized in that: A protrusion and groove structure is provided on the horizontal plane of the geotechnical structure. The protrusions are arranged on both radial sides of the horizontal plane of the geotechnical structure in a staggered manner; the grooves are arranged at the radial center of the horizontal plane of the geotechnical structure, and holes for rivet anchoring are reserved at the central positions at both ends of the structure.
6. The ecological-rock-soil slope consolidation structure according to claim 5, characterized in that: The protrusions are arranged 3 to 4 times at equal distances radially along the horizontal plane of the rock and soil structure.
7. The ecological-rock-soil slope consolidation structure according to claim 5, characterized in that: The upper surface of the geotechnical structure below the horizontal plane is concavely curved with a curvature coefficient of 1.
3.
8. An ecological-rock-soil slope consolidation structure according to any one of claims 1 to 7, characterized in that: Rivets for inserting into the slope surface are arranged on both sides of the geotechnical structure.
9. A method for constructing an ecological-rock-soil slope consolidation, characterized in that: The ecological-rock-soil slope consolidation structure according to any one of claims 1 to 6 is constructed on the slope surface.
10. The construction method according to claim 9, characterized in that: When the ecological-rock-soil slope-fixing structure is built on the slope, the method used is: The geotechnical structure is reinforced at both ends by means of rivet anchoring, and the precast concrete components are fixed on the slope as the geotechnical structure.
11. The construction method according to claim 9, characterized in that: The slope is less than or equal to 30 degrees.
Citation Information
Patent Citations
Ecological slope protection method of integrated support bag covering soil and root irrigation
CN106545021B
A construction method for composite ecological slope protection
CN112538839B
Ecological slope protection structure suitable for steep slope and slope protection manufacturing method
CN112796278A
Rock soil slope protection structure and construction method thereof
CN106149734A
Slope protection structure and construction method thereof
CN116220075A