A method for extended cyclic construction of composite lining process in tunnels

By designing a dust and water suction system in the shotcrete machine, floating dust and water are mixed and recycled into the mixing tank, solving the problems of dust pollution and resource waste in dry concrete shotcrete construction and realizing an environmentally friendly and efficient construction method.

CN117514253BActive Publication Date: 2026-11-17CHINA FIRST HIGHWAY ENGINEERING CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311716713.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-14
Publication Date
2026-11-17
Estimated Expiration
2043-12-14

AI Technical Summary

Technical Problem

During tunnel construction, the use of dry concrete spraying machines causes dust to float in the air when the material comes into contact with the air, polluting the environment and making it difficult to recycle, thus increasing production costs.

Method used

The design adopts a shotcrete machine, including a water tank, a mixing tank, a feed hopper, a dust suction pipe, a transmission component, and a power component. The dust and water are mixed and recycled into the mixing tank through the dust suction pipe and water suction pipe in the piston cylinder. The transmission component controls the piston to slide, thereby realizing the recycling of dust and water.

Benefits of technology

It effectively solved the dust pollution problem, reduced resource waste, improved the working environment, and increased construction efficiency and cost-effectiveness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117514253B_ABST
    Figure CN117514253B_ABST
Patent Text Reader

Abstract

This invention belongs to the field of tunnel construction technology, specifically a method for extended cyclic construction of composite lining processes in tunnels. The shotcrete machine includes a movable plate with a shotcrete assembly fixedly installed at its top. A nozzle for spraying concrete is provided on one side of the shotcrete assembly. It also includes a water tank, a mixing tank, a feed hopper, a dust extraction pipe, a transmission assembly, and a power assembly. The water tank is positioned above the movable plate, and the mixing tank is fixedly installed at its top. The shotcrete assembly communicates with the inner cavity of the mixing tank. The feed hopper is positioned above the mixing tank, with a receiving chamber on its inner wall and an air inlet on its side wall. The receiving chamber communicates with the air inlet. A piston cylinder is fixedly installed on the inner wall of the mixing tank, and a piston is slidably installed on the inner wall of the piston cylinder. The combined use of these structures effectively collects and utilizes airborne particles, thereby improving air quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of tunnel construction technology, specifically a method for extended cyclic construction of composite lining processes in tunnels. Background Technology

[0002] Extended cyclic construction of composite lining in tunnels is a tunnel construction method that applies monitoring and measurement technology, data processing, and information feedback technology to construction. It dynamically corrects construction methods and composite lining, and divides the entire composite lining project into blocks. Each construction area has a specific construction procedure, making construction quality easier to control. This helps ensure the safety and stability of the tunnel project, thereby reducing the occurrence of quality problems. It can improve construction efficiency while ensuring construction quality, and combines the advantages of different materials and procedures to adapt to various engineering conditions, effectively improving tunnel construction quality, saving costs, and shortening the construction period.

[0003] During the extended cyclic construction of the composite lining process in the tunnel, shotcrete is used to seal the rock surface, effectively preventing collapse and rockfall after the stress of the surrounding rock at the top of the arch is released, thus ensuring construction safety. In addition, the shotcrete and the surrounding rock form a concrete support structure, which actively makes the tunnel surrounding rock part of the ring-shaped load-bearing structure, and can withstand important loads within the tunnel's design life.

[0004] When the surrounding rock has poor stability or there is a lot of water seepage, dry concrete spraying machines are usually used to spray concrete. Dry concrete spraying machines have the advantage of high construction efficiency, so they are suitable for use when rapid construction is required.

[0005] However, when dry materials are added and mixed, the materials come into contact with the air, causing some material particles to float in the air. This not only pollutes the environment and affects air quality, but also makes it difficult to recycle and utilize the fine dust particles floating in the air, thus increasing production costs.

[0006] Therefore, the present invention provides a method for extended cyclic construction of composite lining process in tunnels. Summary of the Invention

[0007] In order to overcome the shortcomings of the prior art, at least one technical problem raised in the background art is solved.

[0008] The technical solution adopted by this invention to solve its technical problem is: a method for extended cyclic construction of composite lining in tunnels, comprising the following steps:

[0009] A1. Before extending the tunnel construction process, ensure that the working face is in a safe condition and has a suitable operating platform.

[0010] A2. Before the commencement of construction of composite lining tunnels, a monitoring and measurement plan for the entire construction process should be developed and incorporated into the on-site construction organization and management as a key procedure.

[0011] A3. Monitoring and measurement should be dynamically managed. Monitoring and measurement work should be combined with the progress of excavation and support operations, and points should be set up and monitored as required. Adjustments and supplements should be made in a timely manner according to the actual situation on site. Measurement data should be analyzed, processed and fed back in a timely manner, and a hierarchical management and information feedback and reporting system should be established.

[0012] A4. Carry out initial support construction, including shotcrete spraying, system anchor bolts, steel mesh and steel arch frame. Before shotcreting, pour the unmixed dry material into the shotcrete machine, add water and mix to form the required concrete, and finally spray out the concrete.

[0013] A5. Control the piston to slide on the inner wall of the piston cylinder. At this time, the dust suction pipe will suck the dust floating in the air into the inner cavity of the piston cylinder. By controlling the piston to slide downward, the dust in the piston cylinder will re-enter the inner cavity of the mixing box through the water outlet pipe.

[0014] A6. Before constructing the waterproofing membrane, a section of geotextile that has passed inspection and is no less than the length of the working section should be reserved. This ensures that the geotextile construction meets the requirements and provides a good foundation for the subsequent waterproofing membrane construction.

[0015] A7. Before constructing the geotextile, excavate the required height of the pit bottom and wall surface, and lay sand on the pit surface and slope for compaction.

[0016] A8. When installing waterproofing membrane, the base surface needs to be cleaned to ensure that the surface is flat, free of debris and dust. The specifications and laying requirements of the waterproofing membrane should be determined to ensure that the joints are well sealed and there is no leakage.

[0017] A9. Carry out the steel reinforcement binding construction. Bind the steel reinforcement on the bottom slab according to the design requirements, embed the steel reinforcement in the top slab, and bind the embedded steel reinforcement with the bottom slab steel reinforcement. Finally, carry out the secondary lining concrete construction.

[0018] A10. After the secondary lining concrete construction is completed, the results of the extended cyclic construction of the tunnel composite lining process shall be inspected and accepted. The inspection shall be carried out in accordance with relevant specifications and design requirements. Any unqualified parts shall be rectified and improved. At the same time, the monitoring and measurement data during the construction process shall be analyzed and summarized to provide experience and reference for subsequent construction.

[0019] A method for extended cyclic construction of composite tunnel lining process, wherein the shotcrete machine includes a movable plate, a shotcrete assembly is fixedly installed on the top of the movable plate, and a nozzle for spraying concrete is provided on one side of the shotcrete assembly.

[0020] It also includes a water tank, a mixing tank, a feeding hopper, a dust suction pipe, a transmission assembly, and a power assembly;

[0021] The water tank is placed above the movable plate, the mixing tank is fixedly installed on the top of the water tank, and the spraying assembly is connected to the inner cavity of the mixing tank.

[0022] The feed hopper is located above the mixing box. The inner wall of the feed hopper has a receiving chamber, and the upper side wall of the feed hopper has an air inlet. The receiving chamber is connected to the air inlet.

[0023] A piston cylinder is fixedly installed on the inner wall of the mixing box, and a piston is slidably installed on the inner wall of the piston cylinder. Dust entering the accommodating chamber enters the inner cavity of the piston cylinder through the dust suction pipe, and a first one-way valve is provided on the outer wall of the dust suction pipe.

[0024] The piston's sliding is controlled by a transmission assembly.

[0025] Preferably, the transmission assembly includes a transmission cylinder and a rotating rod. The transmission cylinder is fixedly installed on the top of the piston, and the outer wall of the rotating rod is provided with a reciprocating thread groove. The outer wall of the rotating rod is connected to the inner wall of the transmission cylinder by internal and external thread engagement.

[0026] The transmission assembly also includes a drive motor, a drive wheel, and a driven wheel. The drive motor is fixedly installed on the inner wall of the mixing box, the drive wheel is fixedly connected to the output shaft of the drive motor, and the driven wheel is fixedly installed on the outer wall of the rotating rod. The drive wheel and the driven wheel are connected by a belt.

[0027] Preferably, a limit rod is fixedly installed on the outer wall of the transmission cylinder, and a limit groove is opened on the inner wall of the piston cylinder, with one end of the limit rod extending to the inner wall of the limit groove.

[0028] Preferably, a water suction pipe is fixedly connected to the bottom end of the piston cylinder, and the other end of the water suction pipe extends into the inner cavity of the water tank. A solenoid valve is provided on the outer wall of the water suction pipe.

[0029] Preferably, a shielding opening is provided at the top of the inner wall of the mixing box, a water outlet pipe is fixedly connected to the outer wall of the piston cylinder, the other end of the water outlet pipe extends to the inner wall of the shielding opening, and a second one-way valve is fixedly installed on the outer wall of the water outlet pipe.

[0030] Preferably, inclined blocks are fixedly installed on the inner wall of the mixing tank.

[0031] Preferably, a vibrating motor is fixedly installed on the outer wall of the feed hopper.

[0032] The beneficial effects of this invention are as follows:

[0033] 1. The tunnel composite lining process extended cycle construction method of the present invention, through the transmission component driving the piston to slide upward on the inner wall of the piston cylinder, dust floating in the air can be sucked into the hopper through the dust suction pipe, and at the same time, water can be sucked into the inner cavity of the water tank through the water suction pipe. Finally, by controlling the piston to slide downward on the inner wall of the piston cylinder, the dust and water in the piston cylinder can be squeezed into the inner cavity of the water outlet pipe and sprayed out from the shielding port opened at the top of the inner wall of the mixing box, returning to the mixing box for stirring and mixing. This effectively solves the problem that dust floating in the air during material pouring affects the working environment and causes resource waste.

[0034] 2. The tunnel composite lining process extension cycle construction method of the present invention uses a vibrating motor to make the feed hopper vibrate, which shakes the dry material remaining on the inner wall of the feed hopper into the inner cavity of the feed hopper, thereby reducing the residue of dry material on the inner wall of the feed hopper. Attached Figure Description

[0035] The invention will now be further described with reference to the accompanying drawings.

[0036] Figure 1 This is a perspective view of the present invention;

[0037] Figure 2 This is a cross-sectional view of the mixing tank in this invention;

[0038] Figure 3 This is a cross-sectional view of the water tank in this invention;

[0039] Figure 4 This is a schematic diagram of the rotating rod in this invention;

[0040] Figure 5 In this invention Figure 4 Enlarged view of point A in the middle;

[0041] Figure 6 This is a schematic diagram of the structure of the vibration motor in this invention;

[0042] Figure 7 This is a flowchart of the construction method in this invention.

[0043] In the diagram: 1. Moving plate; 2. Water tank; 3. Mixing box; 4. Feed hopper; 5. Containing chamber; 6. Shotcrete assembly; 7. Nozzle; 8. Inclined block; 9. Rotating rod; 10. Drive motor; 11. Water outlet pipe; 12. Dust suction pipe; 13. Drive wheel; 14. Driven wheel; 15. Transmission cylinder; 16. Piston; 17. Limiting rod; 18. Piston cylinder; 19. Suction pipe; 20. First check valve; 21. Second check valve; 22. Solenoid valve; 23. Vibration motor. Detailed Implementation

[0044] To make the technical means, creative features, objectives and effects of this invention easier to understand, the invention will be further described below in conjunction with specific embodiments.

[0045] like Figure 7 As shown, a method for extended cyclic construction of composite lining in tunnels includes the following steps:

[0046] A1. Before extending the tunnel construction process, ensure that the working face is in a safe condition and has a suitable operating platform.

[0047] A2. Before the commencement of construction of composite lining tunnels, a monitoring and measurement plan for the entire construction process should be developed and incorporated into the on-site construction organization and management as a key procedure.

[0048] A3. Monitoring and measurement should be dynamically managed. Monitoring and measurement work should be combined with the progress of excavation and support operations, and points should be set up and monitored as required. Adjustments and supplements should be made in a timely manner according to the actual situation on site. Measurement data should be analyzed, processed and fed back in a timely manner, and a hierarchical management and information feedback and reporting system should be established.

[0049] A4. Carry out initial support construction, including shotcrete spraying, system anchor bolts, steel mesh and steel arch frame. Before shotcreting, pour the unmixed dry material into the shotcrete machine, add water and mix to form the required concrete, and finally spray out the concrete.

[0050] A5. Control the piston 16 to slide on the inner wall of the piston cylinder 18. At this time, the dust suction pipe 12 can suck the dust floating in the air into the inner cavity of the piston cylinder 18. By controlling the piston 16 to slide downward, the dust in the piston cylinder 18 can re-enter the inner cavity of the mixing box 3 through the water outlet pipe 11.

[0051] A6. Before constructing the waterproofing membrane, a section of geotextile that has passed inspection and is no less than the length of the working section should be reserved. This ensures that the geotextile construction meets the requirements and provides a good foundation for the subsequent waterproofing membrane construction.

[0052] A7. Before constructing the geotextile, excavate the required height of the pit bottom and wall surface, and lay sand on the pit surface and slope for compaction.

[0053] A8. When installing waterproofing membrane, the base surface needs to be cleaned to ensure that the surface is flat, free of debris and dust. The specifications and laying requirements of the waterproofing membrane should be determined to ensure that the joints are well sealed and there is no leakage.

[0054] A9. Carry out the steel reinforcement binding construction. Bind the steel reinforcement on the bottom slab according to the design requirements, embed the steel reinforcement in the top slab, and bind the embedded steel reinforcement with the bottom slab steel reinforcement. Finally, carry out the secondary lining concrete construction.

[0055] A10. After the secondary lining concrete construction is completed, the results of the extended cyclic construction of the tunnel composite lining process shall be inspected and accepted. The inspection shall be carried out in accordance with relevant specifications and design requirements. Any unqualified parts shall be rectified and improved. At the same time, the monitoring and measurement data during the construction process shall be analyzed and summarized to provide experience and reference for subsequent construction.

[0056] Example 1: As Figures 1 to 5 As shown, the shotcrete machine includes a movable plate 1, a shotcrete assembly 6 is fixedly installed on the top of the movable plate 1, a nozzle 7 for spraying concrete is provided on one side of the shotcrete assembly 6, and a movable wheel is provided at the bottom of the movable plate 1. By pushing the movable plate 1, the device placed on the movable plate 1 can be moved, which is convenient for moving around in various places.

[0057] It also includes a water tank 2, a mixing tank 3, a feeding hopper 4, a dust suction pipe 12, a transmission assembly, and a power assembly;

[0058] Water tank 2 is placed above the movable plate 1. The side wall of water tank 2 is provided with a water inlet and an air hole. Water can be injected into the inner cavity of water tank 2 through the water inlet. The air hole can discharge excess air from the inner cavity of water tank 2 or allow outside air to enter, so as to achieve air pressure balance.

[0059] The mixing tank 3 is fixedly installed on the top of the water tank 2. The spraying assembly 6 is connected to the inner cavity of the mixing tank 3. The side wall of the mixing tank 3 has a discharge port. The spraying assembly 6 is also provided with a feed port at the end closest to the mixing tank 3. After the raw materials in the inner cavity of the mixing tank 3 are mixed into concrete, they can enter the inner cavity of the spraying assembly 6 through the discharge port. Finally, the concrete is sprayed out from the nozzle 7 through the air pressure structure inside the spraying assembly 6.

[0060] The feed hopper 4 is located above the mixing box 3. The diameter of the end of the feed hopper 4 furthest from the mixing box 3 is larger, and the diameter of the end closer to the mixing box 3 is smaller. Therefore, the inner wall of the feed hopper 4 tends to slope downward. When the raw materials of concrete are poured into the inner cavity of the mixing box 3, the inclined inner wall of the feed hopper 4 can discharge as much raw material as possible into the inner cavity of the mixing box 3, reducing the residue on the inner wall of the feed hopper 4.

[0061] The inner wall of the feed hopper 4 is provided with a receiving chamber 5, and an air inlet is provided on the upper side wall of the feed hopper 4. The receiving chamber 5 is connected to the air inlet. An air inlet is provided on the upper side of the inner wall of the feed hopper 4. The air inlet is inclined upward. When the receiving chamber 5 inside the feed hopper 4 is in a negative pressure state, the dust generated by pouring in the raw material can be sucked into the inner cavity of the receiving chamber 5 through the air inlet.

[0062] A piston cylinder 18 is fixedly installed on the inner wall of the mixing tank 3. One end of the piston cylinder 18 is located on the inner wall of the mixing tank 3, and the other end extends to the inner wall of the water tank 2. A piston 16 is slidably installed on the inner wall of the piston cylinder 18. The piston 16 is made of rubber. The outer wall of the piston 16 is press-fitted with the inner wall of the piston cylinder 18. The sealing effect can be improved by setting the piston 16.

[0063] Dust entering the accommodating chamber 5 enters the inner cavity of the piston cylinder 18 through the suction pipe 12. A first one-way valve 20 is provided on the outer wall of the suction pipe 12. One end of the suction pipe 12 is connected to the inner cavity of the accommodating chamber 5, and the other end of the suction pipe 12 extends into the inner cavity of the piston cylinder 18. Sealing elements are required at both connections. By controlling the piston 16 to slide upward in the inner cavity of the piston cylinder 18, the inner cavity of the suction pipe 12 can be made into a negative pressure state, and at the same time, the inner cavity of the accommodating chamber 5 can be made into a negative pressure state. At this time, the dust floating in the air can be sucked into the inner cavity of the piston cylinder 18 through the provided air inlet. The first one-way valve 20 can limit the gas flow direction in the suction pipe 12, so that the gas in the accommodating chamber 5 can only enter the inner cavity of the piston cylinder 18, while the gas in the inner cavity of the piston cylinder 18 cannot enter the inner cavity of the accommodating chamber 5.

[0064] The sliding of piston 16 is controlled by a transmission assembly. By controlling piston 16 to slide through the transmission assembly, negative pressure can be created inside the accommodating chamber 5, which can collect dust from the air and effectively solve the side effects of using water mist dust suppression.

[0065] The transmission assembly includes a transmission cylinder 15 and a rotating rod 9. The transmission cylinder 15 is fixedly installed on the top of the piston 16. The outer wall of the rotating rod 9 is provided with a reciprocating thread groove. The outer wall of the rotating rod 9 is connected to the inner wall of the transmission cylinder 15 through internal and external thread engagement. Multiple stirring rods are fixedly installed on the outer wall of the end of the rotating rod 9 away from the piston cylinder 18. By controlling the rotation of the rotating rod 9, the raw materials in the inner cavity of the mixing box 3 can be mixed to produce concrete. The transmission cylinder 15 is located on the inner wall of the piston cylinder 18. The outer wall of the bottom end of the rotating rod 9 is provided with a reciprocating thread groove. When the rotating rod 9 rotates, it can drive the transmission cylinder 15 and the piston 16 to slide back and forth on the inner wall of the piston cylinder 18.

[0066] The transmission assembly also includes a drive motor 10, a drive wheel 13, and a driven wheel 14. The drive motor 10 is fixedly installed on the inner wall of the mixing box 3. The drive wheel 13 is fixedly connected to the output shaft of the drive motor 10. The driven wheel 14 is fixedly installed on the outer wall of the rotating rod 9. The drive wheel 13 and the driven wheel 14 are connected by a belt. When the drive motor 10 is started, the drive wheel 13 can be driven to rotate. Under the action of the belt, the drive wheel 13 synchronously drives the driven wheel 14 to rotate. The rotation of the driven wheel 14 can drive the rotating rod 9 to rotate. The reciprocating thread groove provided at the bottom of the rotating rod 9 allows the transmission cylinder 15 to drive the piston 16 to slide back and forth on the inner wall of the piston cylinder 18.

[0067] A limiting rod 17 is fixedly installed on the outer wall of the transmission cylinder 15, and a limiting groove is opened on the inner wall of the piston cylinder 18. One end of the limiting rod 17 extends to the inner wall of the limiting groove, and the limiting groove is set above the piston 16. Through the cooperation of the limiting rod 17 and the limiting groove, the sliding trajectory of the transmission cylinder 15 can be limited, so that it cannot rotate on the inner wall of the piston cylinder 18.

[0068] A suction pipe 19 is fixedly connected to the bottom end of the piston cylinder 18. The other end of the suction pipe 19 extends into the inner cavity of the water tank 2. A solenoid valve 22 is provided on the outer wall of the suction pipe 19. The direction of water flow in the inner cavity of the suction pipe 19 can be limited by the solenoid valve 22. The opening and closing of the solenoid valve 22 can also be remotely controlled to facilitate the control of the flow and closing of the suction pipe 19. When the solenoid valve 22 is open, the water in the inner cavity of the water tank 2 can enter the inner cavity of the piston cylinder 18 through the suction pipe 19. When the piston 16 slides upward on the inner wall of the piston cylinder 18, not only can the dust floating in the air be sucked into the inner cavity of the piston cylinder 18 through the suction pipe 12, but the water in the inner cavity of the water tank 2 can also be sucked into the inner cavity of the piston cylinder 18 under the action of the suction pipe 19. The end of the suction pipe 19 away from the piston cylinder 18 needs to be below the liquid surface in the water tank 2.

[0069] A shielding opening is provided at the top of the inner wall of the mixing tank 3. A water outlet pipe 11 is fixedly connected to the outer wall of the piston cylinder 18. The other end of the water outlet pipe 11 extends to the inner wall of the shielding opening. A second one-way valve 21 is fixedly installed on the outer wall of the water outlet pipe 11. The shielding opening is located at the top of the inner wall of the mixing tank 3, with the opening facing downwards. The end of the water outlet pipe 11 away from the piston cylinder 18 extends out from the shielding opening. Through the setting of the second one-way valve 21, the gas in the inner cavity of the piston cylinder 18 can be discharged into the water outlet pipe 11 and finally sprayed out from the shielding opening, returning to the inner cavity of the mixing tank 3.

[0070] When piston 16 slides upward on the inner wall of piston cylinder 18, the air inlet on the inner wall of feed hopper 4 can suck in dust floating in the air, and at the same time, water suction pipe 19 can suck water from the inner cavity of water tank 2 into piston cylinder 18. When piston 16 slides downward on the inner wall of piston cylinder 18, it can squeeze the inner cavity of piston cylinder 18. Under the action of the first one-way valve 20 and solenoid valve 22, water containing dust can only flow from water outlet pipe 11 to the shielding port and flow into the inner cavity of mixing box 3. At this time, water and dry materials inside mixing box 3 are stirred and mixed to form concrete, which finally flows into the inner cavity of spraying assembly 6.

[0071] When the inner cavity of the mixing tank 3 does not need to be filled with water for mixing, the solenoid valve 22 is closed by controlling it. At this time, when the piston 16 slides upward along the inner wall of the piston cylinder 18, dust in the air can only be sucked in through the dust suction pipe 12. When the piston 16 slides down, it re-enters the inner cavity of the mixing tank 3 through the water outlet pipe 11 for mixing.

[0072] An inclined baffle 8 is fixedly installed on the inner wall of the mixing box 3. The inclined baffle 8 is inclined toward the shotcrete assembly 6. The concrete after mixing can flow into the inner cavity of the shotcrete assembly 6 through the inclined baffle 8.

[0073] Example 2: Figure 6 As shown in Example 1, another embodiment of the present invention is as follows:

[0074] A vibration motor 23 is fixedly installed on the outer wall of the feed hopper 4. The drive motor 10 drives the drive wheel 13 and the driven wheel 14 to rotate. The rotating rod 9, through the setting of the reciprocating thread groove, can drive the transmission cylinder 15 and the piston 16 to slide back and forth on the inner wall of the piston cylinder 18. It can suck up and collect the dust generated during the feeding process and discharge it into the inner cavity of the mixing box 3 through the water outlet pipe 11, thereby improving air quality and reducing resource waste. At this time, the vibration motor 23 is started to make the feed hopper 4 vibrate, shaking the dry material remaining on the inner wall of the feed hopper 4 into the inner cavity of the feed hopper 4, thereby reducing the residue of dry material on the inner wall of the feed hopper 4.

[0075] Working principle: By starting the drive motor 10, the drive wheel 13 is driven to rotate, which in turn drives the driven wheel 14 to rotate under the action of the belt. At this time, the rotating rod 9 can drive multiple stirring rods to stir and mix the dry materials. At the same time, the reciprocating threaded groove on the bottom outer wall of the rotating rod 9 can drive the transmission cylinder 15 and the piston 16 to slide back and forth on the inner wall of the piston cylinder 18. When the piston 16 slides upward on the inner wall of the piston cylinder 18, the dust floating in the air can be sucked into the hopper 4 through the air inlet under the action of the dust suction pipe 12. At the same time, the water suction pipe 19 can suck the water in the inner cavity of the water tank 2 into the inner cavity of the piston cylinder 18. When the piston 16 slides downward on the inner wall of the piston cylinder 18, the dust and water can be squeezed into the inner cavity of the water outlet pipe 11 and sprayed out from the shielding port on the top of the inner wall of the mixing box 3, returning to the mixing box 3 for stirring and mixing. This effectively solves the problem of dust floating in the air during material pouring, which affects the working environment and causes resource waste.

[0076] The terms "front," "back," "left," "right," "top," and "bottom" all refer to the figures in the accompanying drawings. Figure 1 Based on the perspective of the observer, the side of the device facing the observer is defined as the front, the left side of the observer is defined as the left, and so on.

[0077] In the description of this invention, it should be understood that the terms "center", "longitudinal", "lateral", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limiting the scope of protection of this invention.

[0078] The foregoing has shown and described the basic principles, main features, and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of the invention. Various changes and modifications can be made to the invention without departing from its spirit and scope, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of protection of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for extended cyclic construction of composite lining processes in tunnels, characterized in that, Includes the following steps: A1. Before extending the tunnel construction process, ensure that the working face is in a safe condition and has a suitable operating platform. A2. Before the commencement of construction of composite lining tunnels, a monitoring and measurement plan for the entire construction process should be developed and incorporated into the on-site construction organization and management as a key procedure. A3. Monitoring and measurement should be dynamically managed. Monitoring and measurement work should be combined with the progress of excavation and support operations, and points should be set up and monitored as required. Adjustments and supplements should be made in a timely manner according to the actual situation on site. Measurement data should be analyzed, processed and fed back in a timely manner, and a hierarchical management and information feedback and reporting system should be established. A4. Carry out initial support construction, including shotcrete spraying, system anchor bolts, steel mesh and steel arch frame. Before shotcreting, pour the unmixed dry material into the shotcrete machine, add water and mix to form the required concrete, and finally spray out the concrete. A5. Control the piston (16) to slide on the inner wall of the piston cylinder (18). At this time, the dust suction pipe (12) sucks the dust floating in the air into the inner cavity of the piston cylinder (18). By controlling the piston (16) to slide downward, the dust in the piston cylinder (18) re-enters the inner cavity of the mixing box (3) through the water outlet pipe (11). A6. Before constructing the geotextile, excavate the required height of the pit bottom and wall surface, and lay sand on the pit surface and slope for compaction. A7. When installing waterproofing membrane, the base surface needs to be cleaned to ensure that the surface is flat, free of debris and dust. The specifications and laying requirements of the waterproofing membrane should be determined to ensure that the joints are well sealed and there is no leakage. A8. Carry out the steel reinforcement binding construction. Bind the steel reinforcement on the bottom slab according to the design requirements, embed the steel reinforcement in the top slab, and bind the embedded steel reinforcement with the bottom slab steel reinforcement. Finally, carry out the secondary lining concrete construction. The shotcrete machine includes a movable plate (1), a shotcrete assembly (6) is fixedly installed on the top of the movable plate (1), and a nozzle (7) for spraying concrete is provided on one side of the shotcrete assembly (6). It also includes a water tank (2), a mixing tank (3), a feeding hopper (4), a dust suction pipe (12), a transmission assembly, and a power assembly; The water tank (2) is placed above the movable plate (1), the mixing tank (3) is fixedly installed on the top of the water tank (2), and the spraying assembly (6) is connected to the inner cavity of the mixing tank (3); The feeding hopper (4) is located above the mixing box (3). The inner wall of the feeding hopper (4) is provided with a receiving chamber (5). An air inlet is provided on the upper side wall of the feeding hopper (4). The receiving chamber (5) is connected to the air inlet. A piston cylinder (18) is fixedly installed on the inner wall of the mixing box (3). A piston (16) is slidably installed on the inner wall of the piston cylinder (18). Dust entering the accommodating chamber (5) enters the inner cavity of the piston cylinder (18) through the dust suction pipe (12). A first one-way valve (20) is provided on the outer wall of the dust suction pipe (12). The sliding of the piston (16) is controlled by a transmission assembly; The bottom end of the piston cylinder (18) is fixedly connected to a water suction pipe (19), the other end of the water suction pipe (19) extends into the inner cavity of the water tank (2), and a solenoid valve (22) is provided on the outer wall of the water suction pipe (19). The mixing tank (3) has a shielding opening at the top of its inner wall. The piston cylinder (18) is fixedly connected to a water outlet pipe (11). The other end of the water outlet pipe (11) extends to the inner wall of the shielding opening. A second one-way valve (21) is fixedly installed on the outer wall of the water outlet pipe (11).

2. The tunnel composite lining process extension cycle construction method according to claim 1, characterized in that: The transmission assembly includes a transmission cylinder (15) and a rotating rod (9). The transmission cylinder (15) is fixedly installed on the top of the piston (16). The outer wall of the rotating rod (9) is provided with a reciprocating thread groove. The outer wall of the rotating rod (9) is connected to the inner wall of the transmission cylinder (15) by internal and external thread engagement. The transmission assembly also includes a drive motor (10), a drive wheel (13) and a driven wheel (14). The drive motor (10) is fixedly installed on the inner wall of the mixing box (3). The drive wheel (13) is fixedly connected to the output shaft of the drive motor (10). The driven wheel (14) is fixedly installed on the outer wall of the rotating rod (9). The drive wheel (13) and the driven wheel (14) are connected by a belt.

3. The tunnel composite lining process extension cycle construction method according to claim 2, characterized in that: A limiting rod (17) is fixedly installed on the outer wall of the transmission cylinder (15), and a limiting groove is opened on the inner wall of the piston cylinder (18). One end of the limiting rod (17) extends to the inner wall of the limiting groove.

4. The tunnel composite lining process extension cycle construction method according to claim 3, characterized in that: The inner wall of the mixing box (3) is fixedly installed with inclined blocks (8).

5. The tunnel composite lining process extension cycle construction method according to claim 4, characterized in that: A vibration motor (23) is fixedly installed on the outer wall of the feed hopper (4).

Citation Information

Patent Citations

  • Concrete mixer for building

    CN109676789A

  • Efficient and stable concrete mixer for building construction

    CN216152718U