A hierarchical coordinated control method, device, equipment and medium for power system
Through the layered coordination control method, the operation data of the power system and the preset interaction mechanism are used to coordinate the area control main station and the station domain control sub-station, which solves the problem of recovery control of multi-station power outage areas in the existing technology and realizes the power system Flexible and efficient automatic recovery.
Patent Information
- Application Number
- CN202311388800.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-24
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2043-10-24
AI Technical Summary
The existing high-voltage power automatic recovery control technology cannot achieve recovery control in multi-station power outage areas, especially when the distributed power supply is connected, it lacks coordination and selectivity, and cannot adapt to changes in the system operation mode.
The hierarchical coordination control method is adopted to obtain the operating data of the power system, and the charging status of the area control main station and the station domain control substation is determined. When a tripping power outage occurs, the area control main station is controlled based on the preset interaction mechanism and control strategy. The station coordinates with multiple station domain control substations to realize automatic recovery and layered coordination control.
It realizes the flexible operation mode of the power system, provides coordination of distributed control functions, ensures automatic recovery control of multi-station power outage areas, and improves the rapid flexibility and data synchronization of the system.
Smart Images

Figure CN117526277B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power automation, and in particular to a hierarchical coordinated control method, device, equipment and medium for an electric power system. Background Art
[0002] With the continuous deepening of the construction of new power systems, high-voltage power automation restoration and control technology faces new challenges and development space. The traditional single and independent backup power restoration control can no longer meet the relevant requirements of large-scale utilization of new energy and coordinated operation of sources, networks, loads and storage. At present, high-voltage power automatic restoration and control generally adopts decentralized and independent backup power automatic input devices. Based on local information and related operations, it realizes the automatic input of local or remote hot standby switches when the busbar of the station loses pressure, thereby restoring power supply to the station. This technology has relatively simple functions, limited control measures, lacks systematic information, has inherent delays in power outage detection, lacks adaptability to changes in system operation modes, lacks coordination and selectivity when there are multiple power sources, especially distributed power sources, and cannot achieve regional restoration control of multi-station power outages. Summary of the Invention
[0003] In view of this, the present invention provides a hierarchical coordinated control method, device, equipment and medium for an electric power system to solve the problem that existing high-voltage power automatic restoration control technology cannot achieve regional restoration control of multi-station power outages.
[0004] In a first aspect, the present invention provides a hierarchical coordinated control method for a power system, wherein the power system includes a regional control master station and a plurality of station control substations; the method includes:
[0005] Obtain an operating data set of the power system; based on the operating data set, determine whether the regional control master station and multiple station area control substations are in a charging completion state through a preset first charging logic and a preset second charging logic; when the regional control master station and multiple station area control substations are all in a charging completion state, obtain a regional control strategy corresponding to the regional control master station and a local control strategy corresponding to each station area control substation; determine whether a tripping and power outage event occurs in the power system; when a tripping and power outage event occurs in the power system, coordinate the regional control master station and multiple station area control substations based on a preset interaction mechanism, the regional control strategy and each local control strategy to obtain a hierarchical coordinated control result of the power system.
[0006] The hierarchical coordinated control method for power systems provided by this invention determines the charging status of a regional control master station and multiple substations based on different charging logics, adapting to more flexible power system operation modes and providing a basis for coordinating distributed control functions. Furthermore, in the event of a power outage in the power system, the method utilizes the regional control strategy corresponding to the regional control master station and the local control strategy corresponding to each substation, combined with a preset interaction mechanism, to coordinate control of the regional control master station and multiple substations, thus achieving automatic recovery and hierarchical coordinated control of the power system.
[0007] In an optional embodiment, based on the operating data set, determining whether the regional control master station and the plurality of station control substations are in a charging completion state respectively through a preset first charging logic and a preset second charging logic includes:
[0008] Based on the operating data set, a preset first charging logic is used to determine whether the regional control master station is in a charging completion state; based on the operating data set, a preset second charging logic is used to determine whether multiple station area control substations are in a charging completion state.
[0009] The present invention determines the charging status of a regional control master station and multiple station area control substations according to different charging logics, can adapt to a more flexible operation mode of the power system, and provides a basis for achieving coordination of distributed control functions.
[0010] In an optional embodiment, based on the operating data set, determining whether the regional control master station is in a charging completion state through a preset first charging logic includes:
[0011] Obtain a charging judgment condition set corresponding to a preset first charging logic; based on an operating data set, determine whether the regional control master station satisfies each charging judgment condition in the charging judgment condition set; when the regional control master station satisfies each charging judgment condition, determine that the regional control master station is in a charging delay state; obtain a first charging delay time corresponding to the charging delay state; when the regional control master station satisfies each charging judgment condition within the first charging delay time, determine that the regional control master station is in a charging completion state after the first charging delay time ends.
[0012] In an optional embodiment, based on the operating data set, determining whether the plurality of station domain control substations are in a charging completion state through a preset second charging logic includes:
[0013] Obtain the line charging conditions and bus-tie charging conditions corresponding to the preset second charging logic; based on the operation data set, determine whether multiple site control substations meet the line charging conditions and bus-tie charging conditions respectively; when multiple site control substations meet the line charging conditions or when multiple site control substations meet the bus-tie charging conditions, obtain the second charging delay time corresponding to the multiple site control substations; when multiple site control substations meet the line charging conditions and the second charging delay time / when multiple site control substations meet the bus-tie charging conditions, determine that the multiple site control substations are in a charging completion state.
[0014] In an optional embodiment, when a power outage occurs in the power system, the regional control master station and multiple station control substations are coordinated based on a preset interaction mechanism, a regional control strategy, and each local control strategy to obtain a hierarchical coordinated control result of the power system, including:
[0015] When a power outage occurs in the power system, it is determined whether the regional control strategy meets the preset first execution condition; it is determined whether each local control strategy meets the preset second execution condition; when the regional control strategy meets the preset first execution condition and each local control strategy meets the preset second execution condition, based on the preset interaction mechanism, the regional control strategy and each local control strategy, the regional control master station and multiple station control substations are coordinated to obtain the hierarchical coordinated control result of the power system.
[0016] In the event of a power outage in the power system, the present invention utilizes the regional control strategy corresponding to the regional control master station and the local control strategy corresponding to each station control substation, and combines a preset interaction mechanism to coordinate control of the regional control master station and multiple station control substations, thereby realizing automatic recovery and hierarchical coordinated control of the power system.
[0017] In an optional embodiment, when a power outage event occurs in the power system, determining whether the regional control strategy meets a preset first execution condition includes:
[0018] When a power outage occurs in the power system, the mutation quantity starting condition set and the first electrical mutation quantity corresponding to the regional control master station are obtained; based on the first electrical mutation quantity, it is determined whether the regional control master station meets the mutation quantity starting condition set; when the regional control master station meets any mutation quantity starting condition in the mutation quantity starting condition set, it is determined that the regional control strategy corresponding to the regional control master station meets the preset first execution condition.
[0019] The present invention determines whether the regional control master station can execute the corresponding regional control strategy based on the electrical mutation quantity. It is not restricted by conventional electrical quantity judgment criteria and the delay setting values of each device, and can solve problems such as the inability to coordinate quickly and flexibly and poor data synchronization.
[0020] In an optional embodiment, when a power outage event occurs in the power system, determining whether the regional control strategy meets a preset first execution condition further includes:
[0021] When a power outage occurs in the power system, the switch quantity change starting condition set and the switch quantity change status corresponding to the regional control master station are obtained; based on the switch quantity change status, it is determined whether the regional control master station meets the switch quantity change starting condition set; when the regional control master station meets each switch quantity change starting condition in the switch quantity change starting condition set, it is determined that the regional control strategy corresponding to the regional control master station meets the preset first execution condition.
[0022] The present invention determines whether the regional control master station can execute the corresponding regional control strategy based on the switching state of the switch quantity. It is not restricted by conventional electrical quantity judgment criteria and the delay settings of each device, and can solve problems such as the inability to coordinate quickly and flexibly and poor data synchronization.
[0023] In an optional implementation, determining whether each local control strategy satisfies a preset second execution condition includes:
[0024] Obtain a preset condition set and a second electrical mutation corresponding to each station area control substation; based on each second electrical mutation, determine whether each station area control substation meets the preset condition set; when each station area control substation meets each preset condition in the preset condition set, determine that the local control strategy corresponding to each station area control substation meets the preset second execution condition.
[0025] In an optional embodiment, when the regional control strategy satisfies a preset first execution condition and each local control strategy satisfies a preset second execution condition, the regional control master station and the multiple site control substations are coordinated based on the preset interaction mechanism, the regional control strategy, and each local control strategy to obtain a hierarchical coordinated control result of the power system, including:
[0026] When the regional control strategy meets the preset first execution condition and each local control strategy meets the preset second execution condition, the regional control strategy is used to process the tripping and power outage event to obtain the regional recovery control strategy of the power system; based on the preset interaction mechanism, the regional recovery control strategy and each local control strategy, the regional control master station and multiple station control substations are coordinated to obtain the hierarchical coordinated control result of the power system.
[0027] In an optional embodiment, when the regional control strategy satisfies a preset first execution condition and each local control strategy satisfies a preset second execution condition, the regional control strategy is used to process the tripping and power outage event to obtain a regional restoration control strategy for the power system, including:
[0028] When the regional control strategy meets the preset first execution condition and each local control strategy meets the preset second execution condition, the regional control strategy is used to process the tripping and power outage event to obtain multiple voltage loss control objects; multiple preset recovery control measures corresponding to the multiple voltage loss control objects are obtained; based on the multiple preset recovery control measures, a regional recovery control strategy is obtained through a preset analysis and calculation method.
[0029] In an optional embodiment, based on a preset interaction mechanism, a regional recovery control strategy, and each local control strategy, the regional control master station and multiple station control substations are coordinated to obtain a hierarchical coordinated control result of the power system, including:
[0030] Based on the preset interaction mechanism and multiple voltage loss control objects, it is judged whether multiple station control substations meet the preset control conditions; based on the judgment results, the regional control master station and multiple station control substations are coordinated using the regional recovery control strategy and each local control strategy to obtain the hierarchical coordinated control results of the power system.
[0031] In an optional embodiment, based on a preset interaction mechanism and multiple voltage loss control objects, determining whether multiple site control substations meet preset control conditions includes:
[0032] Obtain the hierarchical anti-misjudgment logic; based on the hierarchical anti-misjudgment logic, the preset interaction mechanism and multiple pressure loss control objects, determine whether multiple station area control substations meet the preset control conditions.
[0033] The present invention combines hierarchical anti-misjudgment logic on the basis of a preset interaction mechanism, which can improve the judgment accuracy and provide support for improving the hierarchical coordinated control accuracy of the power system.
[0034] In a second aspect, the present invention provides a hierarchical coordinated control device for a power system, the power system comprising a regional control master station and a plurality of substations; the device comprising:
[0035] The first acquisition module is used to obtain the operating data set of the power system; the first judgment module is used to judge whether the regional control master station and multiple station control substations are in a charging completion state based on the operating data set and the preset first charging logic and the preset second charging logic; the second judgment module is used to obtain the regional control strategy corresponding to the regional control master station and the local control strategy corresponding to each station control substation when the regional control master station and the multiple station control substations are all in a charging completion state; the second acquisition module is used to judge whether a tripping and power outage event occurs in the power system; the coordination module is used to coordinate the regional control master station and multiple station control substations based on the preset interaction mechanism, the regional control strategy and each local control strategy when a tripping and power outage event occurs in the power system, so as to obtain a hierarchical coordinated control result of the power system.
[0036] In a third aspect, the present invention provides a computer device comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the computer instructions to thereby execute the hierarchical coordinated control method for the power system of the first aspect or any corresponding embodiment thereof.
[0037] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the hierarchical coordinated control method for an electric power system according to the first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the specific embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0039] Figure 1 is a flow chart of a hierarchical coordinated control method for a power system according to an embodiment of the present invention;
[0040] Figure 2 is a flow chart of another hierarchical coordinated control method for a power system according to an embodiment of the present invention;
[0041] Figure 3 is a schematic diagram of the opening conditions of the regional control function according to an embodiment of the present invention;
[0042] Figure 4 is a schematic diagram of the opening conditions of the local control function according to an embodiment of the present invention;
[0043] Figure 5 is another schematic diagram of opening conditions of a local control function according to an embodiment of the present invention;
[0044] Figure 6 is a flow chart of another hierarchical coordinated control method for a power system according to an embodiment of the present invention;
[0045] Figure 7 is a schematic diagram of activation conditions of a regional control function according to an embodiment of the present invention;
[0046] Figure 8 is a schematic diagram of a coordinated control flow according to an embodiment of the present invention;
[0047] Figure 9is a schematic diagram of a functional interaction flow in a hierarchical coordinated control process according to an embodiment of the present invention;
[0048] Figure 10 is a schematic diagram of a grid configuration of a receiving-end power system according to an embodiment of the present invention;
[0049] Figure 11 is a structural block diagram of a hierarchical coordinated control device for a power system according to an embodiment of the present invention;
[0050] Figure 12 Schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0051] To make the purpose, technical solutions, and advantages of the embodiments of the present invention more clear, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative efforts shall fall within the scope of protection of the present invention.
[0052] According to an embodiment of the present invention, an embodiment of a hierarchical coordinated control method for an electric power system is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0053] In this embodiment, a hierarchical coordinated control method for an electric power system is provided, wherein the electric power system includes a regional control master station and multiple station control substations, which are dispersedly deployed at all hub nodes of the electric power system, and the regional control master station and each station control substation communicate in real time synchronously through an optical fiber transmission network.
[0054] Figure 1 FIG. 1 is a flow chart of a hierarchical coordinated control method for a power system according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:
[0055] Step S101: Acquire an operating data set of the power system.
[0056] The operation data set may include different operation data of the regional control master station and each station area control substation in the power system.
[0057] Step S102 : Based on the operating data set, the preset first charging logic and the preset second charging logic are used to determine whether the regional control master station and the plurality of station area control substations are in a charging completion state.
[0058] Among them, the preset first charging logic is the charging logic adopted by the regional control master station; the preset second charging logic is the charging logic adopted by the station area control substation. Different charging logics can provide a basis for achieving the coordination of distributed control functions.
[0059] Specifically, the charging status of the regional control master station and multiple station area control substations can be determined respectively through different charging logics.
[0060] Step S103: When the regional control master station and multiple station area control substations are in the charging completion state, the regional control strategy corresponding to the regional control master station and the local control strategy corresponding to each station area control substation are obtained.
[0061] Specifically, when the regional control master station and multiple station area control substations are in the charging completion state, the regional control master station has the regional control function, and each station area control substation has the on-site control function. At this time, the regional control strategy corresponding to the regional control master station and the on-site control strategy corresponding to each station area control substation can be obtained.
[0062] Step S104: determine whether a power outage event occurs in the power system.
[0063] Specifically, after the regional control master station and the plurality of station area control substations have completed charging, it is further determined whether a tripping and power outage event has occurred in the power system.
[0064] Step S105: When a power outage occurs in the power system, the regional control master station and multiple station control substations are coordinated based on the preset interaction mechanism, regional control strategy and each local control strategy to obtain a hierarchical coordinated control result of the power system.
[0065] Specifically, when a power outage occurs in the power system, the regional control strategy corresponding to the regional control master station and the local control strategy corresponding to each station control substation are utilized, and the preset interaction mechanism is combined to coordinate and control the regional control master station and multiple station control substations, thereby realizing automatic recovery and hierarchical coordinated control of the power system.
[0066] The hierarchical coordinated control method for a power system provided in this embodiment determines the charging status of a regional control master station and multiple substations based on different charging logics. This method can adapt to more flexible power system operation modes and provides a basis for coordinating distributed control functions. Furthermore, in the event of a power outage in the power system, the regional control strategy corresponding to the regional control master station and the local control strategy corresponding to each substation are utilized, combined with a preset interaction mechanism, to coordinate control of the regional control master station and multiple substations, thus achieving automatic recovery and hierarchical coordinated control of the power system.
[0067] In this embodiment, a hierarchical coordinated control method for a power system is provided. Figure 2 FIG. 1 is a flow chart of a hierarchical coordinated control method for a power system according to an embodiment of the present invention. Figure 2 As shown, the process includes the following steps:
[0068] Step S201: Obtain the operating data set of the power system. Figure 1 Step S101 of the illustrated embodiment will not be described in detail here.
[0069] Step S202 : Based on the operating data set, the preset first charging logic and the preset second charging logic are used to determine whether the regional control master station and the plurality of station area control substations are in a charging completion state.
[0070] Specifically, the above step S202 includes:
[0071] Step S2021 : Based on the operating data set, a preset first charging logic is used to determine whether the regional control master station is in a charging completion state.
[0072] Specifically, as described in step S102 , the charging status of the regional control master station can be determined by the preset first charging logic.
[0073] Step S2022: Based on the operating data set, a preset second charging logic is used to determine whether the plurality of domain control substations are in a charging completion state.
[0074] Specifically, as described in step S102, the charging status of multiple area control substations can be determined by presetting the second charging logic.
[0075] In some optional implementations, the above step S2021 includes:
[0076] Step a1: obtaining a charging determination condition set corresponding to a preset first charging logic.
[0077] Step a2: Based on the operating data set, determine whether the regional control master station satisfies each charging judgment condition in the charging judgment condition set.
[0078] Step a3: When the regional control master station meets each charging judgment condition, it is determined that the regional control master station is in a charging delay state.
[0079] Step a4: obtaining a first charging delay time corresponding to the charging delay state.
[0080] Step a5: When the regional control master station satisfies each charging judgment condition within the first charging delay time, it is determined that the regional control master station is in a charging completion state after the first charging delay time ends.
[0081] The charging judgment condition set may include:
[0082] ① The regional coordination control function pressure plate is in the activation state;
[0083] ② The operating busbar within the area has no low voltage. An operating busbar within the area represents a busbar not under maintenance, which can be automatically identified by the maintenance pressure plate or busbar switch position. The specific logic is that if at least one of the circuit breaker switches connected to the busbar is in the closed position, the busbar is considered to be in operation; otherwise, it is under maintenance.
[0084] ③ No tripping events occurred in the area;
[0085] ④ There are switches in hot standby state in the area;
[0086] ⑤ There are no abnormal switch positions in the area;
[0087] ⑥ There is no busbar PT full-phase disconnection in the area;
[0088] ⑦ If the system action requires manual reset, it is also necessary to add signal reset conditions.
[0089] Specifically, when the regional control master station meets each of the above charging judgment conditions, the regional control master station enters the charging delay state.
[0090] Furthermore, when the regional control master station continuously satisfies each of the above-mentioned charging judgment conditions during the charging delay process, the regional control master station is in the charging completion state after the delay ends.
[0091] Furthermore, when the regional control master station is in the charging completion state, it means that the regional control master station in the charging completion state has the regional control function.
[0092] In one example, Figure 3 As shown, when Figure 3 Medium condition and through T cc After the delay, the regional master station is in the charging completion state and the regional coordination control function is open. cc You can consider taking 10s.
[0093] In some optional implementations, the above step S2022 includes:
[0094] Step b1: Obtain the line charging condition and bus-coupler charging condition corresponding to the preset second charging logic.
[0095] Step b2: Based on the operation data set, determine whether multiple site control substations meet the line charging conditions and the busbar charging conditions.
[0096] Step b3: when multiple site control substations meet the line charging condition or when multiple site control substations meet the bus-coupled charging condition, obtain the second charging delay times corresponding to the multiple site control substations.
[0097] Step b4: when the plurality of site control substations meet the line charging condition and the second charging delay time / when the plurality of site control substations meet the bus-tie charging condition, determine that the plurality of site control substations are in the charging completion state.
[0098] Specifically, the corresponding charging conditions are divided into line charging conditions and bus-coupler charging conditions according to the different electrical connection modes of the switch station or substation where the station control substation is located.
[0099] Among them, line charging conditions may include:
[0100] ①The local control function pressure plate is in the engaged state;
[0101] ② When the busbar is in operation, both sections of the busbar are pressurized, or when the busbar is under maintenance, only one section of the busbar is pressurized;
[0102] ③The bus tie breaker is in the closed position, or the bus tie is under maintenance;
[0103] ④ There are lines in hot standby status.
[0104] Specifically, when the station area control substation meets each of the above conditions, it can be determined that the corresponding station area control substation enters the line local control charging state.
[0105] Furthermore, after the second charging delay time has passed, the corresponding station area control substation is in a charging completion state.
[0106] Furthermore, when the station area control substation is in the charging completion state, it means that the station area control substation in the charging completion state has the line local control function.
[0107] In one example, Figure 4 As shown, when Figure 4 Medium condition and through T ci After the delay, the station area control substation is in the charging completion state and has the line local control function.
[0108] Furthermore, the busbar charging conditions may include:
[0109] ①The local control function pressure plate is in the engaged state;
[0110] ②The main coupling switch is in hot standby state.
[0111] Specifically, when the station area control substation meets each of the above conditions, it can be determined that the corresponding station area control substation enters the bus-coupled local control charging state.
[0112] Furthermore, after the second charging delay time has passed, the corresponding station area control substation is in a charging completion state.
[0113] Furthermore, when the station area control substation is in the charging completion state, it means that the station area control substation in the charging completion state has the bus tie local control function.
[0114] In one example, Figure 5 As shown, when Figure 5 Medium condition and through T ci After the delay, the substation in the station area is in the charging completion state and has the main coupling local control function.
[0115] Step S203: When the regional control master station and multiple sub-stations are in the charging completion state, obtain the regional control strategy corresponding to the regional control master station and the local control strategy corresponding to each sub-station. Figure 1 Step S103 of the illustrated embodiment will not be described in detail here.
[0116] Step S204: Determine whether a power outage has occurred in the power system. Figure 1 Step S104 of the illustrated embodiment will not be described in detail here.
[0117] Step S205: When a power outage occurs in the power system, the regional control master station and multiple sub-stations are coordinated based on the preset interaction mechanism, regional control strategy and each local control strategy to obtain the hierarchical coordinated control result of the power system. Figure 1 Step S105 of the illustrated embodiment will not be described in detail here.
[0118] The hierarchical coordinated control method for a power system provided in this embodiment determines the charging status of a regional control master station and multiple substations based on different charging logics. This method can adapt to more flexible power system operation modes and provides a basis for coordinating distributed control functions. Furthermore, in the event of a power outage in the power system, the regional control strategy corresponding to the regional control master station and the local control strategy corresponding to each substation are utilized, combined with a preset interaction mechanism, to coordinate control of the regional control master station and multiple substations, thus achieving automatic recovery and hierarchical coordinated control of the power system.
[0119] In this embodiment, a hierarchical coordinated control method for a power system is provided. Figure 6 FIG. 1 is a flow chart of a hierarchical coordinated control method for a power system according to an embodiment of the present invention. Figure 6 As shown, the process includes the following steps:
[0120] Step S601: Obtain the operating data set of the power system. Figure 1 Step S101 of the illustrated embodiment will not be described in detail here.
[0121] Step S602: Based on the operating data set, the preset first charging logic and the preset second charging logic are used to determine whether the regional control master station and the multiple station control substations are in the charging completion state. Figure 2 Step S202 of the illustrated embodiment will not be described in detail here.
[0122] Step S603: When the regional control master station and multiple substations are in the charging completion state, obtain the regional control strategy corresponding to the regional control master station and the local control strategy corresponding to each substation. Figure 1 Step S103 of the illustrated embodiment will not be described in detail here.
[0123] Step S604: Determine whether a power outage has occurred in the power system. Figure 1 Step S104 of the illustrated embodiment will not be described in detail here.
[0124] Step S605: When a power outage occurs in the power system, the regional control master station and multiple station control substations are coordinated based on the preset interaction mechanism, regional control strategy and each local control strategy to obtain a hierarchical coordinated control result of the power system.
[0125] Specifically, the above step S605 includes:
[0126] Step S6051: When a power outage event occurs in the power system, it is determined whether the regional control strategy meets a preset first execution condition.
[0127] Specifically, according to the description in step S103, when the regional control master station has the regional control function, the corresponding regional control strategy can be obtained.
[0128] Furthermore, when a power outage occurs in the power system, it is also necessary to determine whether the regional control master station can execute the regional control strategy, that is, to determine whether the regional control strategy meets the preset first execution condition.
[0129] Step S6052: Determine whether each local control strategy meets the preset second execution condition.
[0130] Specifically, according to the description in step S103, when the site control substation has a local control function, the corresponding local control strategy can be obtained.
[0131] Furthermore, when a power outage occurs in the power system, it is also necessary to determine whether the station control substation can execute the corresponding local control strategy, that is, to determine whether the local control strategy meets the preset second execution condition.
[0132] Step S6053: When the regional control strategy satisfies the preset first execution condition and each local control strategy satisfies the preset second execution condition, the regional control master station and multiple station control substations are coordinated based on the preset interaction mechanism, the regional control strategy and each local control strategy to obtain the hierarchical coordinated control result of the power system.
[0133] Specifically, when the regional control strategy meets the preset first execution condition, the corresponding regional control master station starts to execute the regional control strategy. Further, when the local control strategy meets the preset second execution condition, each corresponding station control substation starts to execute the corresponding local control strategy.
[0134] Furthermore, when multiple site control substations begin to execute corresponding local control strategies, the decentralized local control strategies may operate in a disorderly manner, resulting in failure of regional power supply restoration, regional grid disconnection, and even component overload, leading to the expansion of the power outage scope.
[0135] Therefore, the control system executes the corresponding regional control strategy based on the preset interaction mechanism to coordinate the decentralized local control strategy, thereby completing the hierarchical coordinated control of the regional control master station and multiple station control substations in the power system.
[0136] In some optional implementations, step S6051 includes:
[0137] Step c1: When a power outage occurs in the power system, a sudden change starting condition set and a first electrical sudden change corresponding to the regional control master station are obtained.
[0138] Step c2: Based on the first electrical sudden change value, determine whether the regional control master station meets the sudden change value starting condition set.
[0139] Step c3: when the regional control master station satisfies any sudden change starting condition in the sudden change starting condition set, it is determined that the regional control strategy corresponding to the regional control master station satisfies a preset first execution condition.
[0140] The first electrical mutation may include: current mutation, power mutation, voltage mutation, etc.; the mutation startup condition set may include:
[0141] ① Current sudden change start: the difference between the current value of any phase of the component and the current value before Δt (such as Figure 7 Δi a , Δi b , Δi c) is greater than or equal to the current change constant i s , Δt is 20ms~40ms;
[0142] ②Power sudden change start: The absolute value of the difference ΔP between the current power of the component and the power 200ms ago is greater than or equal to the power change constant P s ;
[0143] ③ Voltage sudden change start: The sudden drop between the voltage value of any phase of the busbar and the voltage value before Δt (such as Figure 7 Δu a0 -Δu a , Δu b0 -Δu b , Δu c0 -Δu c ) is greater than or equal to the voltage dip value u s , Δt is 20ms~40ms.
[0144] Specifically, when the first electrical mutation corresponding to the regional control master station meets the above ① or ② or ③, it can be determined that the regional control function of the regional control master station is in the starting state, that is, the regional control master station can execute the corresponding regional control strategy and meet the preset first execution condition.
[0145] In some optional implementations, the above step S6051 further includes:
[0146] Step c4: when a power outage occurs in the power system, a switch value change starting condition set and a switch value change state corresponding to the regional control master station are obtained.
[0147] Step c5: Based on the switch value change state, determine whether the regional control master station meets the switch value change start condition set.
[0148] Step c6: when the regional control master station satisfies each switch value change starting condition in the switch value change starting condition set, it is determined that the regional control strategy corresponding to the regional control master station satisfies a preset first execution condition.
[0149] The switch value position change starting condition set may include:
[0150] ① The position of the switch or boundary branch is determined by the resultant variation;
[0151] ② The current value of any phase of the switch or boundary branch is less than the current setting value after tripping.
[0152] Specifically, when the switch position change state corresponding to the regional control master station satisfies both ① and ② above, it can be determined that the regional control function of the regional control master station is in the starting state, that is, the regional control master station can execute the corresponding regional control strategy, that is, satisfy the preset first execution condition.
[0153] In summary, the local control strategy adopts no-pressure and no-current logic start. The electrical sudden change combined with the switch position change logic can be used to start the regional control function, that is, to execute the corresponding regional control strategy.
[0154] Whether the regional control master station can execute the corresponding regional control strategy is judged based on the electrical mutation quantity and the switch quantity change status. It is not restricted by conventional electrical quantity judgment criteria and the delay setting values of each device. It can solve problems such as the inability to coordinate quickly and flexibly and poor data synchronization.
[0155] In one example, Figure 7 As shown, when the regional control master station has the regional control function, that is, the regional coordinated control is open, and the preset first execution condition is met, the regional coordinated control is started, that is, the regional control strategy corresponding to the regional control master station meets the preset first execution condition and can be executed and used by the regional control master station.
[0156] Furthermore, after regional coordinated control is initiated, if a new electrical sudden change is detected that meets the preset first execution condition, the start cycle is extended by one full cycle, and detection of sudden change starts continues. However, new switch position change starts are not extended, and the start is not repeated. Switch position change starts are suitable for situations where the power system is lightly loaded and the switch is not faulty, and sudden electrical changes prevent starting. Furthermore, when regional coordinated control is manually disabled, the power system control start determination is no longer performed.
[0157] In some optional implementations, the above step S6052 includes:
[0158] Step d1: obtaining a preset condition set and a second electrical mutation value corresponding to each substation.
[0159] Step d2: Based on each second electrical mutation amount, determine whether each site control substation meets a preset condition set.
[0160] Step d3: When each area control substation satisfies each preset condition in the preset condition set, determining that the local control strategy corresponding to each area control substation satisfies a preset second execution condition.
[0161] The second electrical mutation variable may include a power branch current, a bus voltage, etc. on the station domain control substation side; and the preset condition set may include:
[0162] ①The switch position on the power branch side is in the open state;
[0163] ② Three-phase current of power supply branch (such as Figure 8 Middle I a , I b , I c ) are all less than the current constant value I w ;
[0164] ③ Load bus three-phase voltage (such as Figure 8 Middle U a 、U b 、U c ) are all less than the pressure set value U w ;
[0165] ④ Judgment delay (such as Figure 8 Middle T s2 )confirm.
[0166] Specifically, the substation adopts a local control strategy corresponding to the no-voltage and no-current logic startup, i.e., it uses electrical quantities such as the local power branch current and bus voltage for startup. Furthermore, when the second electrical mutation quantity corresponding to the substation satisfies the aforementioned conditions ①, ②, ③, and ④ simultaneously, the substation's local control function can be determined to be in the startup state, meaning that the substation can execute the corresponding local control strategy, thus satisfying the preset second execution condition.
[0167] In one example, when the site control substation has the local control function, that is, the local control is open, and the preset second execution condition is met, the local control is started, that is, the local control strategy corresponding to the site control substation meets the preset second execution condition and can be executed and used by the site control substation.
[0168] In some optional implementations, step S6053 includes:
[0169] Step e1: When the regional control strategy meets the preset first execution condition and each local control strategy meets the preset second execution condition, the regional control strategy is used to process the power outage event to obtain the regional restoration control strategy of the power system.
[0170] In step e2, based on the preset interaction mechanism, the regional recovery control strategy and each local control strategy, the regional control master station and multiple station control substations are coordinated to obtain a hierarchical coordinated control result of the power system.
[0171] Specifically, according to the description of step S6053, when the regional control strategy meets the preset first execution condition and each local control strategy meets the preset second execution condition, the decentralized local control strategies may operate in a disorderly manner, resulting in failure of regional power supply restoration, regional grid decoupling, and even causing component overload, leading to the expansion of the power outage scope.
[0172] Therefore, when the regional control strategy meets the preset first execution condition and each local control strategy meets the preset second execution condition, the regional control strategy is first used to process the tripping and power outage event, and the regional recovery control strategy of the power system is obtained.
[0173] Furthermore, on the basis of the regional recovery control strategy, combined with the preset interaction mechanism and each local control strategy, sequential control is performed according to the regional recovery control strategy, and the decentralized control behaviors of each station area control substation are coordinated.
[0174] In some optional implementations, the above step e1 includes:
[0175] Step e11: When the regional control strategy satisfies the preset first execution condition and each local control strategy satisfies the preset second execution condition, the regional control strategy is used to process the power outage event to obtain multiple voltage loss control objects.
[0176] Step e12: Acquire multiple preset recovery control measures corresponding to multiple pressure loss control objects.
[0177] In step e13, based on a plurality of preset recovery control measures and through a preset analysis and calculation method, a regional recovery control strategy is obtained.
[0178] Specifically, after the regional control master station starts the regional control strategy, it processes the tripping and power outage events in chronological order, and searches during the processing to lock the corresponding voltage loss control object.
[0179] Furthermore, by performing online analysis and calculation on the relevant recovery control measures corresponding to the pressure loss control object, the corresponding regional recovery control strategy can be obtained.
[0180] In some optional implementations, the above step e2 includes:
[0181] Step e21 : Based on a preset interaction mechanism and multiple voltage loss control objects, it is determined whether multiple site control substations meet preset control conditions.
[0182] In step e22, based on the judgment result, the regional recovery control strategy and each local control strategy are used to coordinate the regional control master station and multiple station control substations to obtain a hierarchical coordinated control result of the power system.
[0183] Specifically, the regional control master coordinates the decentralized local control through a "request-response" interaction mechanism. Because regional coordinated control uses sudden start-up, while local control uses no-pressure, no-flow start-up, regional coordinated control precedes local decentralized control in terms of inherent timing. This "request-response" coordination interaction mechanism can be established based on this inherent timing relationship.
[0184] Furthermore, when the regional control master station and multiple station area control substations are coordinated and controlled, different station area control substations need to be controlled differently according to preset control conditions.
[0185] Specific coordinated control mainly includes:
[0186] (1) During the sequential control process, the local control of each station area control substation that meets the start-up conditions of the pressure loss state will start one after another. First, a cooperative control request will be sent to the regional control master station. The regional control master station will feedback the control requirements to the station area control substation according to the regional recovery control strategy.
[0187] (2) In the station domain control substation that sends the request message, if the switch closing control point is controlled by the regional control master station, the regional control master station will feedback a "control allowed" message to it; if the switch closing control point is controlled by a non-regional control master station, the regional control master station will feedback a "control not allowed" message to it.
[0188] (3) The station area control substation that receives the "allow control" message enters the cooperative control mode, waiting to receive and execute the control command issued by the regional control master station, and no longer waits for the local recovery control delay.
[0189] (4) The substation that receives the "control not allowed" message will increase the local control delay by one segment time and continue to execute the local recovery control waiting. When the segment delay ends, it can send a cooperative control request to the regional control master station again, and the regional control master station responds according to the refresh strategy. When the pressure loss condition is not met, the local control automatically returns.
[0190] (5) When the station area control substation's transmission channel is abnormal, the station area control substation executes according to the local control strategy, but uses a manually preset output waiting delay value that reflects the action priority. If the pressure loss condition is not met during the delay, the control automatically returns. Otherwise, the local control command is executed after the delay expires.
[0191] (6) When abnormal conditions such as channel interruption or switch position verification error occur at the regional control master station, the regional coordinated control strategy automatically exits operation, and only the local control function of the power system is valid.
[0192] In one example, the coordination control process is as follows Figure 8 shown.
[0193] In some optional implementations, the above step e21 includes:
[0194] Step e211, obtaining layered anti-misjudgment logic.
[0195] Step e212: Based on the hierarchical anti-misjudgment logic, the preset interaction mechanism and the multiple voltage loss control objects, it is determined whether the multiple site control substations meet the preset control conditions.
[0196] Among them, the hierarchical error prevention judgment logic represents a two-level error prevention mechanism, including regional control master station error prevention and station control substation local error prevention.
[0197] Specifically, before the sequential control command is exported, the regional control master station performs the first-level anti-error judgment on the important and high-risk local control strategy in combination with the global information. After receiving the action command from the regional control master station, the station control substation performs the second-level anti-error judgment in combination with the local information. Only after passing the second-level anti-error judgment can the action command be finally exported:
[0198] (1) Regional control master station anti-error
[0199] The busbars in the identified islanded area are checked for low voltage. Only after the check passes will the islanded area be considered a valid island. The voltage comparison setting value is selected as the voltage setting value, rather than the strict no-voltage setting value. During the recovery control process, after the waiting delay expires, the busbars in the islanded area are checked for no voltage, and the voltage comparison setting value is selected as the strict no-voltage setting value.
[0200] For the judgment of the switch position status, in addition to using the normally open and normally closed contact switch quantity as the main judgment criterion, the no-current or low-power judgment criterion should also be used to prevent false verification. When the verification is abnormal, an alarm signal is given and the regional coordinated control is discharged to reduce the risk of false operation caused by false islanding caused by false position judgment;
[0201] For the judgment of switch tripping, in addition to using the switch quantity as the main judgment criterion, the no-current or low-power judgment criterion is also used as an anti-false judgment criterion to reduce the risk of false tripping.
[0202] (2) Local error prevention of station area control substation
[0203] After receiving the re-tripping command, the substation in the area where the re-tripping switch belongs will make an anti-misjudgment judgment based on the local information. The re-tripping command can be issued only when the busbar meets the no-pressure condition and the switch meets the no-current condition.
[0204] After receiving the shutdown command, the substation in the area where the small power source is disconnected will make an error-proof judgment based on the bus voltage connected to the small power source. Only when the bus meets the low-voltage error-proof condition can the small power source be disconnected.
[0205] After receiving the load shedding and local verification commands, the substation in the area where the load-shedding point belongs will make an anti-misjudgment judgment based on the local information. Only when the busbar in the substation meets the no-voltage condition can the load be shelved.
[0206] After the station control substation to which the backup power supply belongs receives the command to close the backup switch, it will make a judgment based on the local information. Only when the switch meets the conditions for standby switching can it issue the switch closing command.
[0207] The hierarchical coordinated control method for the power system provided in this embodiment determines the charging status of the regional control master station and multiple station area control substations according to different charging logics, can adapt to a more flexible operation mode of the power system, and provides a basis for realizing the coordination of distributed control functions. In the event of a power outage in the power system, the regional control strategy corresponding to the regional control master station and the local control strategy corresponding to each station area control substation are utilized, and the regional control master station and multiple station area control substations are coordinated and controlled in combination with a preset interaction mechanism, thereby realizing automatic recovery and hierarchical coordinated control of the power system. Furthermore, based on the preset interaction mechanism, combined with hierarchical anti-misjudgment logic, the judgment accuracy can be improved, providing support for improving the hierarchical coordinated control accuracy of the power system.
[0208] Optionally, in one example, Figure 9 As shown, a functional interaction flow chart of the hierarchical coordinated control process of the hierarchical coordinated control method of the power system based on the above embodiment is provided.
[0209] Optionally, in another example, a 110 kV receiving-end power system is taken as an example to illustrate the hierarchical coordinated control method of the power system provided by the above embodiment of the present invention:
[0210] like Figure 10 As shown, the receiving-end power system consists of one 220kV substation and five 110kV substations. The system's power supply comes from three primary sources: the 220kV main transformer at Station Y, the 110kV JW line, and the 110kV TY line. Each 110kV substation's power supply area is connected to distributed power generation (DGs), but their generation capacity is insufficient to support the maximum load. To mitigate common accident risks and maintain high- and low-voltage electromagnetic ring network operation, the network operates in three sections under normal operation: the 110kV JW line supplies the 110kV W and G stations; the 220kV main transformer supplies the 110kV Z and M station #2 transformers; and the 110kV TY line supplies the 110kV M station #1 transformer and H station.
[0211] The busbar load level is M and Z stations > G stations > W and H stations. Y1 and Y2 represent two busbar sections at Y station, W1 and W2 represent two busbar sections at W station, G1 and G2 represent two busbar sections at G station, Z1 and Z2 represent two busbar sections at Z station, M1 and M2 represent two busbar sections at M station, and H represents the busbar section at H station.
[0212] This power system employs the hierarchical coordinated control method for power systems proposed in the aforementioned embodiments of the present invention. This system employs a hierarchical distributed architecture, comprising one regional control master station and five substation control stations, distributed across hub nodes such as 220kV Y stations, 110kV W stations, G stations, Z stations, M stations, and H stations. The master station and substations communicate synchronously in real time via an optical fiber transmission network. The system functions at two levels: on-site station control and regional coordination. The regional master station provides both on-site and regional coordination functions, while the control substations only provide on-site station control functions.
[0213] The local control function mainly includes data acquisition module, local control charge and discharge module, local judgment module of cooperative control command, local recovery control module, etc. The regional control function mainly includes system status identification module, coordinated control charge and discharge module, sudden change detection module, fault identification and processing module, power supply recovery strategy execution module, etc. (1) The data acquisition module collects the position signals, current signals, voltage signals and control signals of the circuit breaker and disconnector of each station in real time. (2) The local control charge and discharge module executes the line charging or bus charging logic according to the electrical wiring method of the switch station or substation where the substation is located. (3) The local judgment module of cooperative control command determines whether the command sent by the regional coordinated control layer can be executed. (4) The local recovery control module adopts the conventional local standby automatic switching function, which can be manually selected. (5) The system status identification module establishes a network analysis model based on the regional power grid structure and electrical wiring, and updates the relevant parameter information of the network model based on the real-time collected calculation data. (6) The coordinated control charge and discharge module determines the status information of the busbar low voltage, tripping events, hot standby switches, etc. in the region, and completes the initialization of the regional coordinated control function. (7) The sudden change detection module uses the three-phase voltage of the measuring point bus and the three-phase current of the circuit breaker to form a sudden change detection element. (8) The fault identification and processing module generates tripping event queue data, identifies all power outage areas caused by tripping, establishes relevant information such as the power network, power supply, and load of the power outage area, and generates a power outage area recovery control strategy online. (9) The power supply recovery strategy execution module selects the optimal recovery strategy from multiple valid recovery strategies, coordinates the decentralized control behavior of each substation based on the control strategy, and issues relevant control commands in the order of operation.
[0214] The automatic power restoration control system features a master station, substation control circuits, a master station regional coordination control module, and a sudden load detection module. This system allows for control delays, enabling and disabling fault lockout functions, and enabling and disabling manual trip lockout functions. Inputs to the control system include current, voltage, manual trip signals, switch position, and disconnector position, collected and connected to the master station controller at each station. Outputs from the master station regional coordination control module include switch re-trip signals, open-loop point closing signals, load shedding busbar number, and load shedding amount, which are then opened and closed via the control circuits at each station.
[0215] A short circuit occurred in the main transformer at station Y at 1 second, and the transformer protection tripped at 1.1 seconds, causing a power outage on the Y1 busbar, the entire Z station, and the M2 busbar. At this point, there were three available restoration control points in the regional power supply system: the GZ line switch, the bridge switch at station M, and the bus tie switch at station Y.
[0216] If the regional coordination layer controls the GZ line switch BKgz to close, the 110kV JW line will supply power to W station, G station, Z station, and M2 bus load (140MW). Due to the thermal stability limit of 110kV JW (90MW), 50MW of load needs to be cut off; the local layer in the station area does not have the conditions for restoration control, and the power supply to Z station cannot be restored by controlling the switch BKgz to close.
[0217] If the regional coordination layer controls the M station bridge switch BKmtm to close, the 110kV TY line will supply the loads (155MW) of Z station, M station, and H station. Due to the thermal stability limit of the 110kV TY line (90MW), 65MW of load needs to be cut off; if the station area local layer controls the switch BKmtm to close, only the M2 bus power supply can be restored through the 110kV TY line, and the power supply of Z station cannot be restored.
[0218] If the regional coordination layer controls the BKycm busbar switch of Station Y to be closed, the load (155MW) of Station Z, Station M, and Station H will be supplied by the 110kV TY line. However, due to the thermal stability limit of the 110kV TY line (90MW), 65MW of load will need to be cut off. If the local layer of the station area controls the switch BKycm to be closed, the load of Station Z, Station M, and Station H will also be supplied by the 110kV TY line. However, because the load control cannot be achieved, the 110kV TY line will be overloaded and tripped, resulting in the complete shutdown of Station Z, Station M, and Station H, and the scope of the power outage will be further expanded.
[0219] The regional coordination control layer is activated by a tripping event. After the main transformer at station Y trips, the tripping event is immediately processed. After obtaining the regional recovery control plan, the control delay wait begins. During the control delay process, stations Y, Z, and M meet the no-pressure and no-flow conditions. The local recovery control layers of their substations are activated one after another, sending control requests to the regional coordination control layer. The coordination control layer sends a "control allowed" message to the station Y control substation according to the regional recovery control plan, and sends "control not allowed" messages to the station Z and station M control substations. After receiving the "control allowed" message, the station Y control substation enters cooperative control mode, waiting to receive and execute control commands issued by the master station, and no longer waits for local recovery control delays. After receiving the "control not allowed" message, the station Z and station M control substations increase the local recovery control delay by one segment time, continue executing the local recovery control delay wait and related processes, and automatically return when the regional control restores the bus voltage.
[0220] The power restoration strategy execution module optimizes the restoration control schemes described above. In the case of load shedding, the one with the least amount of core load shedding is prioritized, specifically the one that closes switch BKgz on line GZ. Regional coordinated control first re-trips switch BKyzb and closes switch BKgz. Because the load transferred to the outage area under this scheme exceeds the backup power margin, switching on the backup line would overload the 110kV JW line. The power restoration capability identification module selects stations W, G, and Z as load shedding points based on the importance of each station's load and the principle of minimizing over-shedding.
[0221] Furthermore, according to the regional coordinated control action results obtained from the above processing process and the maximum phase voltage curves of each 110kV bus, it can be seen that when both local and regional recovery control conditions are valid, regional and local recovery control may operate in a disorderly manner, resulting in the inability to restore power to multiple stations, or causing component overload and expanding the scope of the power outage. This example adopts a coordinated charging mechanism, a coordinated starting mechanism, a "request-response" interaction mechanism, and a layered error prevention mechanism. The regional recovery control uses electrical mutation quantity combined with switch position logic to start, and the local recovery control uses no-voltage and no-current logic to start. In terms of starting sequence, the regional recovery control precedes the local recovery control. The coordinated interaction of regional recovery control and local recovery control is achieved with a simple and reliable principle, better supporting the comprehensive, coordinated, selective, and adaptive automatic recovery control of the regional power supply system in various operating modes.
[0222] In this embodiment, a hierarchical coordinated control device for a power system is also provided. The device is used to implement the above-mentioned embodiments and preferred implementation methods. The details that have been described will not be repeated here. As used below, the term "module" can be a combination of software and / or hardware that implements a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, implementation in hardware, or a combination of software and hardware, is also possible and contemplated.
[0223] This embodiment provides a hierarchical coordinated control device for an electric power system, wherein the electric power system includes a regional control master station and a plurality of station control substations. Figure 11 As shown, the device includes:
[0224] The first acquisition module 701 is configured to acquire an operation data set of the power system.
[0225] The first judgment module 702 is used to judge whether the regional control master station and the multiple station area control substations are in a charging completion state based on the operation data set and the preset first charging logic and the preset second charging logic.
[0226] The second acquisition module 703 is used to acquire the regional control strategy corresponding to the regional control master station and the local control strategy corresponding to each station control substation when the regional control master station and multiple station control substations are in the charging completion state.
[0227] The second judgment module 704 is used to judge whether a power outage event occurs in the power system.
[0228] The coordination module 705 is used to coordinate the regional control master station and multiple station control substations based on the preset interaction mechanism, regional control strategy and each local control strategy when a power outage occurs in the power system to obtain a hierarchical coordinated control result of the power system.
[0229] In some optional implementations, the first determination module 702 includes:
[0230] The first judgment submodule is configured to judge whether the regional control master station is in a charging completion state based on the operating data set and through a preset first charging logic.
[0231] The second judgment submodule is used to judge whether the plurality of station area control substations are in a charging completion state based on the operation data set and through a preset second charging logic.
[0232] In some optional implementations, the first judgment submodule includes:
[0233] The first acquisition unit is configured to acquire a charging determination condition set corresponding to a preset first charging logic.
[0234] The first judgment unit is configured to judge, based on the operation data set, whether the regional control master station satisfies each charging judgment condition in the charging judgment condition set.
[0235] The first determining unit is configured to determine that the regional control master station is in a charging delay state when the regional control master station meets each charging determination condition.
[0236] The second acquiring unit is configured to acquire a first charging delay time corresponding to the charging delay state.
[0237] The second determining unit is configured to determine that the regional control master station is in a charging completion state after the first charging delay time ends when the regional control master station satisfies each charging determination condition within the first charging delay time.
[0238] In some optional implementations, the second judgment submodule includes:
[0239] The third acquisition unit is configured to acquire a line charging condition and a bus-coupler charging condition corresponding to a preset second charging logic.
[0240] The second judgment unit is used to judge whether the multiple station area control substations meet the line charging conditions and the busbar charging conditions based on the operation data set.
[0241] The fourth acquisition unit is used to acquire the second charging delay time corresponding to the multiple station area control substations when the multiple station area control substations meet the line charging condition or when the multiple station area control substations meet the bus-couple charging condition.
[0242] The third determining unit is used to determine that the multiple site control substations are in a charging completion state when the multiple site control substations meet the line charging condition and the second charging delay time / when the multiple site control substations meet the bus-connection charging condition.
[0243] In some optional implementations, the coordination module 705 includes:
[0244] The third judgment submodule is used to judge whether the regional control strategy meets the preset first execution condition when a power outage event occurs in the power system.
[0245] The fourth judgment submodule is used to judge whether each local control strategy meets the preset second execution condition.
[0246] The coordination submodule is used to coordinate the regional control master station and multiple station control substations based on the preset interaction mechanism, the regional control strategy and each local control strategy when the regional control strategy meets the preset first execution condition and each local control strategy meets the preset second execution condition, so as to obtain the hierarchical coordinated control result of the power system.
[0247] In some optional implementations, the third judgment submodule includes:
[0248] The fifth acquisition unit is used to acquire the sudden change starting condition set and the first electrical sudden change corresponding to the regional control master station when a tripping and power outage event occurs in the power system.
[0249] The third judgment unit is used to judge whether the regional control master station meets the sudden change starting condition set based on the first electrical sudden change value.
[0250] The fourth determining unit is configured to determine that the regional control strategy corresponding to the regional control master station satisfies a preset first execution condition when the regional control master station satisfies any sudden change starting condition in the sudden change starting condition set.
[0251] In some optional implementations, the third judgment submodule further includes:
[0252] The sixth acquisition unit is used to acquire the switch value change starting condition set and the switch value change state corresponding to the regional control master station when a tripping and power outage event occurs in the power system.
[0253] The fourth judgment unit is used to judge whether the regional control master station meets the switch value change starting condition set based on the switch value change state.
[0254] The fifth determining unit is configured to determine whether the regional control strategy corresponding to the regional control master station satisfies a preset first execution condition when the regional control master station satisfies each switch value change starting condition in the switch value change starting condition set.
[0255] In some optional implementations, the fourth judgment submodule includes:
[0256] The seventh acquisition unit is used to acquire the preset condition set and the second electrical mutation value corresponding to each station area control substation.
[0257] The fifth judgment unit is used to judge whether each site control substation meets the preset condition set based on each second electrical mutation amount.
[0258] The sixth determining unit is configured to determine that the local control strategy corresponding to each station area control substation satisfies a preset second execution condition when each station area control substation satisfies each preset condition in the preset condition set.
[0259] In some optional implementations, the coordination submodule includes:
[0260] The processing unit is used to process the tripping and power outage event using the regional control strategy when the regional control strategy meets the preset first execution condition and each local control strategy meets the preset second execution condition to obtain the regional recovery control strategy of the power system.
[0261] The coordination unit is used to coordinate the regional control master station and multiple station control substations based on the preset interaction mechanism, regional recovery control strategy and each local control strategy to obtain the hierarchical coordinated control results of the power system.
[0262] In some optional embodiments, the processing unit includes:
[0263] The processing subunit is used to process the tripping and power outage event using the regional control strategy when the regional control strategy meets the preset first execution condition and each local control strategy meets the preset second execution condition to obtain multiple voltage loss control objects.
[0264] The first acquisition subunit is configured to acquire a plurality of preset recovery control measures corresponding to a plurality of pressure loss control objects.
[0265] The analysis and calculation subunit is used to obtain a regional recovery control strategy based on multiple preset recovery control measures through a preset analysis and calculation method.
[0266] In some optional implementations, the coordination unit includes:
[0267] The first judgment subunit is configured to judge whether a plurality of site control substations meet a preset control condition based on a preset interaction mechanism and a plurality of voltage loss control objects.
[0268] The coordination subunit is used to coordinate the regional control master station and multiple station control substations based on the judgment results, using the regional recovery control strategy and each local control strategy, to obtain the hierarchical coordinated control results of the power system.
[0269] In some optional implementations, the first judgment subunit includes:
[0270] The second acquisition subunit is used to acquire the layered anti-misjudgment logic.
[0271] The second judgment subunit is used to judge whether multiple station area control substations meet preset control conditions based on the hierarchical anti-misjudgment logic, the preset interaction mechanism and the multiple pressure loss control objects.
[0272] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.
[0273] The hierarchical coordinated control device of the power system in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.
[0274] The embodiment of the present invention also provides a computer device having the above Figure 11 The hierarchical coordinated control device of the power system shown.
[0275] See also Figure 12 , Figure 12 is a structural diagram of a computer device provided by an optional embodiment of the present invention, such as Figure 12As shown, the computer device includes: one or more processors 10, memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components utilize different buses to communicate with each other and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in the memory or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Equally, multiple computer devices can be connected, and each device provides part of the necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 12 A processor 10 is taken as an example.
[0276] The processor 10 may be a central processing unit, a network processor, or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be an application-specific integrated circuit, a programmable logic device, or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic, or any combination thereof.
[0277] The memory 20 stores instructions that can be executed by at least one processor 10, so as to enable at least one processor 10 to execute the method shown in the above embodiment.
[0278] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system and application programs required for at least one function; the data storage area may store data created based on the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely located relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0279] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid-state drive; the memory 20 may also include a combination of the above types of memory.
[0280] The computer device further includes a communication interface 30 for the computer device to communicate with other devices or a communication network.
[0281] The embodiment of the present invention also provides a computer-readable storage medium. The above-mentioned method according to the embodiment of the present invention can be implemented in hardware, firmware, or implemented as a computer code that can be recorded in a storage medium, or implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and downloaded through a network and will be stored in a local storage medium, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state drive, etc.; further, the storage medium can also include a combination of the above-mentioned types of memory. It can be understood that a computer, a processor, a microprocessor controller or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor or hardware, the method shown in the above embodiment is implemented.
[0282] Although the embodiments of the present invention have been described with reference to the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention. Such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A hierarchical coordinated control method for power systems, It is characterized in that The power system includes a regional control master station and a plurality of station control substations; the method includes: Acquiring an operating data set of the power system; Based on the operation data set, the preset first charging logic and the preset second charging logic are used to respectively determine whether the regional control master station and the multiple station area control substations are in a charging completion state, wherein the preset first charging logic is the charging logic adopted by the regional control master station, and is used to determine the charging state of the regional control master station; the preset second charging logic is the charging logic adopted by the station area control substation, and is used to determine the charging state of the station area control substation; When the regional control master station and the plurality of station control substations are all in the charging completion state, obtaining a regional control strategy corresponding to the regional control master station and a local control strategy corresponding to each station control substation; Determining whether a power outage event occurs in the power system; When a power outage event occurs in the power system, the regional control master station and the multiple station control substations are coordinated based on a preset interaction mechanism, the regional control strategy and each of the local control strategies to obtain a hierarchical coordinated control result of the power system, wherein the preset interaction mechanism is a "request-response" coordinated interaction mechanism established through an inherent timing relationship, and the inherent timing relationship is that regional coordinated control precedes local decentralized control; Wherein, when a power outage event occurs in the power system, the regional control master station and the multiple station control substations are coordinated based on a preset interaction mechanism, the regional control strategy and each of the local control strategies to obtain a hierarchical coordinated control result of the power system, including: When a power outage event occurs in the power system, it is determined whether the regional control strategy meets a preset first execution condition, wherein the first execution condition is used to indicate whether the regional control master station can execute the regional control strategy when a power outage event occurs in the power system; Determine whether each of the local control strategies meets a preset second execution condition, where the second execution condition is used to indicate whether the station area control substation can execute the local control strategy when a power outage event occurs in the power system; When the regional control strategy satisfies the preset first execution condition and each of the local control strategies satisfies the preset second execution condition, the tripping and power outage event is processed using the regional control strategy to obtain a regional restoration control strategy for the power system; Based on the preset interaction mechanism, the regional recovery control strategy and each of the local control strategies, the regional control master station and the multiple station control substations are coordinated to obtain the hierarchical coordinated control result of the power system.
2. The method according to claim 1, It is characterized in that Based on the operation data set, judging whether the regional control master station and the plurality of station area control substations are in a charging completion state respectively through a preset first charging logic and a preset second charging logic, including: Based on the operation data set, judging whether the regional control master station is in a charging completion state through the preset first charging logic; Based on the operation data set, it is determined whether the plurality of station area control substations are in a charging completion state through the preset second charging logic.
3. The method according to claim 2, It is characterized in that Based on the operation data set, judging whether the regional control master station is in a charging completion state through the preset first charging logic includes: Obtaining a charging discrimination condition set corresponding to the preset first charging logic, wherein the charging discrimination condition set includes a signal reset condition when the regional coordination control function pressure plate is in the input state, there is no low voltage on the operating bus in the area, no tripping event occurs in the area, there is a switch in the hot standby state in the area, there is no abnormal switch position in the area, there is no bus PT full-phase disconnection in the area, and the system action requires manual reset; Based on the operation data set, determining whether the regional control master station satisfies each charging discrimination condition in the charging discrimination condition set; When the regional control master station satisfies each of the charging determination conditions, determining that the regional control master station is in a charging delay state; Obtaining a first charging delay time corresponding to the charging delay state; When the regional control master station satisfies each of the charging determination conditions within the first charging delay time, it is determined that the regional control master station is in a charging completion state after the first charging delay time ends.
4. The method according to claim 2, It is characterized in that Based on the operation data set, judging whether the plurality of station area control substations are in a charging completion state through the preset second charging logic includes: Obtaining the line charging condition and bus coupling charging condition corresponding to the preset second charging logic, wherein the line charging condition includes that the local control function pressure plate is in the on-state, both bus sections are pressurized during bus coupling operation or only one bus section is pressurized during bus coupling maintenance, the bus coupling switch is in the closed position or the bus coupling is in the maintenance state, and there is a line in the hot standby state, and the bus coupling charging condition includes that the local control function pressure plate is in the on-state and the coupling switch is in the hot standby state; Based on the operation data set, respectively determining whether the multiple station area control substations meet the line charging condition and the bus-tie charging condition; When the multiple station area control substations meet the line charging condition or when the multiple station area control substations meet the bus-connection charging condition, obtaining second charging delay times corresponding to the multiple station area control substations; When the multiple station area control substations meet the line charging condition and the second charging delay time / when the multiple station area control substations meet the bus-connection charging condition, it is determined that the multiple station area control substations are in a charging completion state.
5. The method according to claim 1, It is characterized in that When a power outage event occurs in the power system, determining whether the regional control strategy meets a preset first execution condition includes: When a tripping and power outage event occurs in the power system, a mutation quantity starting condition set and a first electrical mutation quantity corresponding to the regional control master station are obtained; Based on the first electrical mutation amount, judging whether the regional control master station satisfies the mutation amount starting condition set, wherein the mutation amount starting condition set includes a current mutation amount starting condition, a power mutation amount starting condition and a voltage mutation amount starting condition; When the regional control master station satisfies any sudden change quantity starting condition in the sudden change quantity starting condition set, it is determined that the regional control strategy corresponding to the regional control master station satisfies the preset first execution condition.
6. The method according to claim 5, It is characterized in that When a power outage event occurs in the power system, determining whether the regional control strategy meets a preset first execution condition further includes: When a power outage occurs in the power system, a switch quantity change starting condition set and a switch quantity change state corresponding to the regional control master station are obtained; Based on the switch quantity change state, judging whether the regional control master station meets the switch quantity change start condition set, the switch quantity change start condition set including that the switch or boundary branch position changes from closed to open, and any phase current value of the switch or boundary branch is less than the current set value after tripping; When the regional control master station satisfies each switch quantity change starting condition in the switch quantity change starting condition set, it is determined that the regional control strategy corresponding to the regional control master station satisfies the preset first execution condition.
7. The method according to claim 1, It is characterized in that Determining whether each of the local control strategies meets a preset second execution condition includes: Obtaining a preset condition set and a second electrical mutation corresponding to each of the station area control substations, wherein the preset condition set includes that the switch position of the power branch local side is in a split state, the three-phase current of the power branch is less than the current set value, the three-phase voltage of the load bus is less than the voltage set value, and the judgment criterion is delayed and confirmed; Based on each of the second electrical mutation quantities, determining whether each of the station area control substations meets the preset condition set; When each of the station area control substations satisfies each preset condition in the preset condition set, it is determined that the local control strategy corresponding to each of the station area control substations satisfies the preset second execution condition.
8. The method according to claim 1, It is characterized in that When the regional control strategy satisfies the preset first execution condition and each of the local control strategies satisfies the preset second execution condition, the tripping and power outage event is processed using the regional control strategy to obtain the regional restoration control strategy of the power system, including: When the regional control strategy satisfies the preset first execution condition and each of the local control strategies satisfies the preset second execution condition, the tripping and power outage event is processed using the regional control strategy to obtain multiple voltage loss control objects; Acquire a plurality of preset recovery control measures corresponding to the plurality of pressure loss control objects; Based on the multiple preset recovery control measures, the regional recovery control strategy is obtained through a preset analysis and calculation method.
9. The method according to claim 8, It is characterized in that Based on the preset interaction mechanism, the regional recovery control strategy and each of the local control strategies, the regional control master station and the multiple station control substations are coordinated to obtain the hierarchical coordinated control result of the power system, including: Based on the preset interaction mechanism and the multiple voltage loss control objects, determining whether the multiple station area control substations meet preset control conditions; Based on the judgment result, the regional recovery control strategy and each of the local control strategies are used to coordinate the regional control master station and the multiple station area control substations to obtain the hierarchical coordinated control result of the power system.
10. The method according to claim 9, It is characterized in that Based on the preset interaction mechanism and the multiple voltage loss control objects, judging whether the multiple site area control substations meet preset control conditions includes: Acquire a hierarchical error prevention judgment logic, wherein the hierarchical error prevention judgment logic represents a two-level error prevention mechanism, including regional control master station error prevention and station domain control substation local error prevention; Based on the hierarchical anti-misjudgment logic, the preset interaction mechanism and the multiple voltage loss control objects, it is determined whether the multiple station area control substations meet the preset control conditions.
11. A hierarchical coordination control device for a power system, It is characterized in that Used to execute the hierarchical coordinated control method of the power system according to any one of claims 1 to 10, the power system includes a regional control master station and a plurality of station area control substations; the device includes: A first acquisition module, used to acquire an operation data set of the power system; A first judgment module is used to judge whether the regional control master station and the plurality of station area control substations are in a charging completion state respectively based on the operation data set and through a preset first charging logic and a preset second charging logic; A second acquisition module is used to acquire a regional control strategy corresponding to the regional control master station and a local control strategy corresponding to each station control substation when the regional control master station and the multiple station control substations are in the charging completion state; A second judgment module is used to judge whether a tripping and power outage event occurs in the power system; A coordination module is used to coordinate the regional control master station and the multiple station control substations based on a preset interaction mechanism, the regional control strategy and each of the local control strategies when a power outage occurs in the power system, so as to obtain a hierarchical coordinated control result of the power system.
12. A computer device, It is characterized in that include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the hierarchical coordinated control method of the power system according to any one of claims 1 to 10 by executing the computer instructions.
13. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the hierarchical coordinated control method for a power system according to any one of claims 1 to 10.