A method for determining and locating the breakdown cause of multi-section laying of 10kV power cables

Through the phase split test and withstand voltage experiment combined with the two-end measurement method, the problem of 10kV cable fault location is solved, the precise determination and location of cable faults is achieved, and the efficiency and accuracy of cable fault handling are improved.

CN117554763BActive Publication Date: 2024-10-01CHONGQING KEBAO POWER CONSTR IND CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202311541746.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-17
Publication Date
2024-10-01
Estimated Expiration
2043-11-17

AI Technical Summary

Technical Problem

The existing technology lacks a method for accurately locating fault points of 10kV power cables, resulting in low cable fault handling efficiency and affecting the stability of power transmission.

Method used

The phase split test and voltage withstand test are used to determine the cause of breakdown based on the appearance of the cable. The breakdown location is located through the two-end measurement method. The high-voltage constant current source and bridge balance method are used for accurate measurement to determine the cause and location of breakdown.

Benefits of technology

It achieves accurate determination and location of 10kV cable faults and rapid repair, ensuring the stability and safety of cable power supply.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117554763B_ABST
    Figure CN117554763B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for determining and locating the breakdown cause of a 10kV power cable multi-section laying, which belongs to the field of cable fault determination, and comprises the following steps: performing a phase test on a test cable, performing a withstand voltage test on the 10kV power cable of the test phase, collecting experimental data and cable appearance of the 10kV power cable that has been broken down; determining the breakdown cause based on the experimental data and cable appearance; and determining the breakdown position by a two-end measurement method based on the breakdown cause. The present invention can accurately determine the cause of cable breakdown and locate the breakdown position.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of cable fault judgment, and in particular to a method for judging and locating the breakdown cause of a 10kV power cable laid in multiple sections. Background Art

[0002] Electric energy is already one of the most important energy sources in this era, and it is also the most important energy source for future development. With the improvement of people's living standards, the requirements for cables are getting higher and higher. In addition to their own structural performance and power-carrying performance, they are also given important performance indicators such as flame retardancy, fire resistance, environmental protection, safety, and long life. However, as the blood vessels of the national economy, the most important task of cables is to ensure the transmission of electric energy. However, for 10kV conventional power cables, the general laying environment is mostly cable trenches, underground pipes, and underground direct burials. The environment they pass through is mostly hard objects such as sand, soil, and concrete. Therefore, cable installation often causes scratches, crushing, and other situations that affect cable failures; therefore, in order to ensure the normal operation of the cable, it is necessary to follow the installation and construction specifications during installation and laying to ensure that it is not mechanically damaged. At the same time, when the cable encounters a fault, it is also necessary to accurately locate the cable fault point in time and troubleshoot the fault, repair it, and ensure the normal power supply of the cable to ensure the needs of industrial electricity and people's daily electricity.

[0003] However, there is still a lack of a method for accurately locating cable fault points. Summary of the invention

[0004] In order to solve the problems existing in the above-mentioned prior art, the present invention provides the following technical solutions:

[0005] A method for determining and locating the breakdown cause of a 10kV power cable installed in multiple sections, comprising the following steps:

[0006] Conduct phase tests on the test cables, conduct withstand voltage tests on the 10kV power cables of the test phases, and collect the test data and cable appearance of the 10kV power cables that have been broken down;

[0007] Determine the cause of the breakdown based on the experimental data and the cable appearance;

[0008] Based on the breakdown cause, the breakdown position is determined by two-end measurement method.

[0009] Optionally, the withstand voltage test is performed using a high voltage constant current source, the no-load voltage of the high voltage constant current source is 15 kV, and the short-circuit current is 30 mA.

[0010] Optionally, the experimental data include breakdown voltage, breakdown current and DC withstand voltage complete breakdown time.

[0011] Optionally, the breakdown causes include damage to the cable construction machinery, breakdown of the cable intermediate joint and insulation failure of the cable itself.

[0012] Optionally, the method for determining whether the cable construction machinery is damaged includes: when performing a withstand voltage test, if the voltage is 0V, the current is above 10mA, and there are obvious scratches on the surface, it is determined that the cause of the breakdown is damage to the cable construction machinery.

[0013] Optionally, the method for judging whether the intermediate joint of the cable is punctured includes: during a withstand voltage test, when the set voltage is 10kV, the cable voltage is between 7kV-9kV, the insulation resistance does not decrease and there is always voltage present in the cable when the voltage is increased, there is a faint crisp power sound at the joint position, and there is a heat sensation on the joint surface, then it is judged that the cause of the breakdown is the breakdown of the intermediate joint of the cable.

[0014] Optionally, the method for determining the insulation failure of the cable itself includes: during a withstand voltage test, when the set voltage is 10kV and the cable voltage is between 6kV-8kV, the set voltage is increased to 15kV. If the cable is completely broken down and there is no abnormality in appearance and there is a clear pulse signal, it is determined that the cause of the breakdown is an insulation failure of the cable itself.

[0015] Optionally, the process of determining the breakdown position by the two-end measurement method includes: selecting the positioning current and the sensitivity of the withstand voltage test equipment according to the breakdown cause;

[0016] Connect the withstand voltage test equipment to both ends of the cable to perform measurement and calculation to obtain the breakdown position;

[0017] When measuring on one side of the cable, connect the conductor of the cable core to be measured with the conductor of any of the other two cores, and connect the copper shielding layer at the same time, measure and calculate the two connected cores to obtain the breakdown position.

[0018] The present invention has the following technical effects:

[0019] The present invention provides a method for analyzing and locating the breakdown fault of cross-linked insulation at the site of 10kV cable laying. Through the display and data analysis of the equipment, the cause of the breakdown can be accurately determined. After the cause of the breakdown is determined, even if the equipment cannot meet the on-site positioning requirements, the breakdown positioning selection can be made through the determination. The cable construction fault can be solved, quickly repaired and powered on smoothly. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0021] Figure 1 Schematic diagram of cable core connection according to an embodiment of the present invention. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0023] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0024] Embodiment 1

[0025] This embodiment provides a method for determining and locating the breakdown cause of a 10kV power cable installed in multiple sections, and a breakdown cause data analysis and determination method (see Table 1):

[0026] Table 1

[0027]

[0028] The specific determination and positioning methods are as follows:

[0029] Determination of cable breakdown caused by improper cable installation and construction:

[0030] Generally speaking, it is easy to judge the breakdown of cable cross-linked insulation caused by external pressure. In general, the cable fault point is very obvious and damaged. When performing pulse voltage test, the voltage is almost 0V and the current is above 10mA. This positioning is very accurate, and the positioning sensitivity can be turned to the maximum. Generally, the fault point calculated is easy to find.

[0031] Determination of breakdown failure of the cable middle cold shrink joint:

[0032] This kind of judgment is difficult, which has something in common with the insulation defects of the cable itself. When we use a DC power supply for withstand voltage testing, if the voltage is set to 10kV, during the DC withstand voltage process, the voltage will be between 7kV-9kV for a long time. At the same time, through the 5000V megohmmeter test, the insulation resistance is almost not reduced, and then with the increase of withstand voltage time, the breakdown voltage gradually drops to between 5kV-8kV. The cable will always have voltage when the voltage is increased. When positioning, the positioning sensitivity is poor, which increases the difficulty of calibration. When we are locating the intermediate joint, the first thing to do is to judge by the content of Table 1, once it is determined that the intermediate joint is broken. The DC current of the equipment positioning can be increased, and according to experience, it can be opened to 20mA-30mA for positioning. If the positioning interval is large, the position of the intermediate joint can be determined according to the construction drawings and confirmed on site. When the on-site personnel arrive at the designated position of the breakdown intermediate joint, the pulse power supply can be heard that the joint has a weak and crisp power sound, and the joint has a heat sensation that is obviously different from other parts of the cable. This is to determine that the joint is broken.

[0033] Insulation defect fault determination of the cable itself:

[0034] In general, the insulation defects of the cable itself cause breakdown, which means that the insulation performance of the fault point exists at the beginning even if it is not found in the factory test. If this happens to the cable with a rated voltage of 26 / 35kV, there will even be what we call "high resistance breakdown" in our terminology, that is, the cable itself has been broken down, but because the insulation still has sufficient thickness and strength, the insulation resistance is still in a good state, and the voltage remains within a certain range. When the voltage rises again, the leakage current increases and breakdown occurs. If we see that the voltage is maintained at 6kV-8kV, we increase the DC voltage to 15kV. It is expected that the cable will be completely broken down after a period of stability, and the positioning will be more accurate. However, when searching on site, there is no abnormality in the appearance, and a pulse power supply must be used to completely locate it. In this kind of positioning search after the insulation breakdown of the cable, the sound of the breakdown pulse point is very obvious, the positioning is accurate, and it is easy to find.

[0035] 10kV power cable multi-section laying breakdown location method:

[0036] In summary, after determining the cause of cable breakdown, breakdown positioning must be performed. For cables with multiple connections, the cable length is relatively long, and the presence of joints in the middle will affect the resistance of the cable, thereby affecting the accuracy of positioning. Generally speaking, it is difficult to accurately measure long cables (the long cables mentioned in this article refer to cables of 1500m to 2000m after installation). The requirements for equipment, power supply, and the experience of testers are very important when measuring. The range of most measurement locators is even controlled within 1000m. If faced with on-site cable laying, the range is only 500m. The following is a description of how to use limited positioning equipment to meet the breakdown positioning of long-length cables. Our company uses the earliest two-end measurement method.

[0037] The principle of device positioning is:

[0038] The equipment uses a switching power supply to form a high-voltage constant current source, with a no-load voltage of 15kV and a short-circuit current of 30mA. It is small in size and light in weight. A high-sensitivity amplifier and a galvanometer are used to indicate balance, and a balanced bridge is formed with a proportional potentiometer, and the whole is placed at a high potential. The cable is reliably grounded through the braided shielding layer, the operating button on the panel is at ground potential, and the bridge is operated through the insulating rod. The operating button on the panel is at ground potential, and the bridge is operated through the insulating rod. The specially designed double-core high-voltage rubber measurement cable has a copper mesh braided shielding layer that is reliably grounded and safe to use. The four-terminal resistance measurement method avoids the error introduced by the lead resistance. The high-voltage constant current source and the bridge are integrated in a portable aluminum alloy box. The equipment has high voltage, light weight, and is easy to operate. Compared with the wave reflection method, the bridge balance method has no blind spots, and is particularly suitable for judging the breakdown point of short cables and near the end, the fault point with poor wave characteristics, etc., and is easy to operate.

[0039] The device has a red clip end and a black clip end, and each end is equipped with two clips of different sizes; the large clip is used for the wire core, and the small clip is used for shielding and grounding. Through the bridge principle, a data will appear with the red clip end as the calculation direction, and when the red and black clips are swapped, another test data will appear;

[0040] Application example: take the red core of a 2500m finished cable laid on site as an example, divided into 5 sections (500+500+500+500+500), with 4 shrink joints in the middle, and measure at one end of the cable:

[0041] First, tie the red core and yellow core conductors at the other end of the cable tightly together. Do not use small copper wires to connect them. The two-phase conductors must be connected, and the copper shields must be connected.

[0042] A. The equipment has the highest sensitivity level;

[0043] The data of the red wire core held by the red clip is: 522;

[0044] The data of the black clip clamping the yellow wire core is: 478;

[0045] Calculation of breakdown point: 522÷1000×2500×2=2610 meters from the red clip, 478÷1000×2500×2=2390 meters from the black clip; it can be seen that the breakdown point is 2390 meters away from the measurement position, 110 meters from the other end, without an intermediate joint. If the breakdown current is stable, it can be determined that the cable should be externally damaged or have insulation defects.

[0046] B. The equipment has a high sensitivity and a voltage of 1kV;

[0047] The data of the red wire core held by the red clip is: 101;

[0048] The data of the black clip clamping the yellow wire core is: 898;

[0049] Calculation of breakdown point: 101÷1000×2500×2=505 meters from the red clip, 898÷1000×2500×2=4490 meters from the black clip; 4490+505=4995 meters is less than 5000, but from the perspective of sensitivity and incomplete breakdown, it is impossible to accurately locate, but it can be analyzed that the breakdown is caused by the breakdown of the middle joint. It can be seen that the breakdown point is probably at the first middle joint position (500 meters of the finished product).

[0050] C. For positioning bridges with length requirements (assuming the maximum positioning cable length is 1000 meters)

[0051] For this type of positioning bridge with a positioning length limit, the maximum positioning cable length allowed is 1000 meters, which means there is no way to meet the positioning of 2500 meters of finished products (a total of 5000 meters of wire core). Through experience, we can first calculate the breakdown point calculation ratio, and then obtain the location of the breakdown point by converting the actual cable length.

[0052] For example:

[0053] The data of the red clip holding the red wire core is: 201;

[0054] The data of the black clip clamping the yellow wire core is: 799;

[0055] The maximum segment length of the equipment input is 1000 meters;

[0056] The length calculated by the equipment is: 202÷1000×(1000×2)=404 meters from the red clip, 799÷1000×(1000×2)=1598 meters from the black clip, which is equivalent to 598 meters from the black clip end of the finished cable; (first calculate the breakdown ratio of the rated segment length)

[0057] Converted to: Enter D from the red clip 1

[0058] 404 / 1000=D 1 / 2500, where D 1 =1010

[0059] Enter from the black clip D 2

[0060] 598 / 1000=D 2 / 2500, where D 2 =1495

[0061] 1010+1495=2505 is greater than 2500, but from the perspective of sensitivity and incomplete breakdown, it is impossible to accurately locate the location, but it can be analyzed that the breakdown is caused by the breakdown of the middle joint. From this, it can be seen that the breakdown point is probably at the second middle joint (the second middle joint at 1000 meters of the finished product).

[0062] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have several changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A method for determining and locating the breakdown cause of a 10kV power cable installed in multiple sections, characterized in that: The following steps are involved: Conduct phase tests on the test cables, conduct withstand voltage tests on the 10kV power cables of the test phases, and collect the test data and cable appearance of the 10kV power cables that have been broken down; Determine the breakdown cause based on the experimental data and the cable appearance, the breakdown cause includes damage to the cable construction machinery, breakdown of the cable intermediate joint and insulation failure of the cable itself; The method for judging the damage of the cable construction machinery includes: when the voltage is 0V, the current is above 10mA, and there are obvious scratches on the surface during the withstand voltage test, it is judged that the cause of the breakdown is the damage of the cable construction machinery; The method for judging whether the intermediate joint of the cable is broken includes: when the voltage is set to 10kV during the withstand voltage test, the cable voltage is between 7kV and 9kV, the insulation resistance does not decrease, and the cable always has voltage when the voltage is increased, there is a faint crisp power sound at the joint position, and there is a heat sensation on the joint surface, then it is judged that the cause of the breakdown is the breakdown of the intermediate joint of the cable; The method for judging the insulation fault of the cable itself includes: when performing a withstand voltage test, when the set voltage is 10kV and the cable voltage is between 6kV and 8kV, the set voltage is increased to 15kV. If the cable is completely broken down and there is no abnormality in appearance and there is a crisp pulse signal, it is determined that the cause of the breakdown is the insulation fault of the cable itself; Based on the breakdown cause, the breakdown position is determined by two-end measurement method.

2. The method for determining and locating the breakdown cause of a 10kV power cable installed in multiple sections according to claim 1 is characterized in that: The withstand voltage test is carried out using a high voltage constant current source, the no-load voltage of the high voltage constant current source is 15 kV, and the short-circuit current is 30 mA.

3. The method for determining and locating the breakdown cause of a 10kV power cable installed in multiple sections according to claim 1 is characterized in that: The experimental data include breakdown voltage, breakdown current and DC withstand voltage complete breakdown time.

4. The method for determining and locating the breakdown cause of a 10kV power cable installed in multiple sections according to claim 1 is characterized in that: The process of determining the breakdown position by the two-end measurement method includes: selecting the positioning current and the sensitivity of the withstand voltage test equipment according to the breakdown cause; Connect the withstand voltage test equipment to both ends of the cable to perform measurement and calculation to obtain the breakdown position; When measuring on one side of the cable, connect the conductor of the cable core to be measured with the conductor of any of the other two cores, and connect the copper shielding layer at the same time, measure and calculate the two connected cores to obtain the breakdown position.

Citation Information

Patent Citations

  • Test device for simulation combustion of environment-friendly electric wire

    CN101846665A

  • Method for detecting alternating current short circuit non-discharge type insulators

    CN101968512A

  • Cable for petroleum exploration and manufacturing method thereof

    CN102368399A

  • Power cable fault traveling wave synchronization range finding method

    CN102435915A

  • Temperature rise strain monitoring and alarming and fault analysis method for composite submarine cable

    CN102636730A