Excavator bottom material removal method, device, material shaking control system and excavator

By modulating the pulse width of the pilot solenoid valve and controlling the opening of the main hydraulic valve of the remote-controlled excavator, combined with the material shaking mechanism, the signal delay problem of bottom material cleaning in the remote control system was solved, achieving a highly efficient and precise bottom material cleaning effect.

CN117627084BActive Publication Date: 2024-11-05EXWAY INTELLIGENT TECH (SUZHOU) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311686045.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-09
Publication Date
2024-11-05
Estimated Expiration
2043-12-09

AI Technical Summary

Technical Problem

The bottom material cleaning operation in the remote-controlled excavation system suffers from signal delay, resulting in insufficient flexibility and accuracy, making it difficult to achieve efficient and precise bottom material cleaning.

Method used

By using pulse width modulation control of the pilot solenoid valve to dynamically adjust the opening of the main hydraulic valve, combined with the material shaking motion mechanism, precise control of the bucket cylinder flow can be achieved. This includes gradually increasing and rapidly decreasing the opening of the main hydraulic valve in different strokes, and using PWM control and overflow pressure and oil temperature feedback mechanisms to ensure the vibration effect of the bucket.

Benefits of technology

It improves the efficiency and accuracy of bottom material cleaning by remote-controlled excavators, ensuring efficient bottom material cleaning in a remote-controlled environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117627084B_ABST
    Figure CN117627084B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and device for removing bottom material of an excavator, a material shaking control system and an excavator. In response to a bottom material removal signal from a remote control end (401), a pulse width modulation control is performed on a pilot solenoid valve (204) of an excavator (300) according to a material shaking movement mechanism to adjust the opening of a main hydraulic valve (202) that affects the flow rate of a bucket cylinder (203) so as to accurately control the movement of the bucket cylinder (203). The present invention realizes intelligent and accurate operation in the process of cleaning the bottom material of a remote-controlled excavator, thereby improving operation efficiency and accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of excavators, and in particular to an excavator bottom material removal method, device, material shaking control system and excavator. Background Art

[0002] When using an excavator, clearing the bottom material is a common and necessary operation. In traditional excavator operations, the bottom material is usually cleared by manually shaking the bucket or dipper arm to ensure that the broken materials in the bucket can be effectively unloaded. However, with the widespread application of remote excavation systems, the precision of manual operation faces some challenges.

[0003] In the remote excavation system, since the operation signal needs to be transmitted remotely, there may be a signal delay problem, which makes it difficult for the operator to accurately perceive the state and excavation action of the excavator during remote operation, because the delay of the operation signal may affect the real-time operation response. The operator usually needs to grasp the action of the excavator based on the feel, but the signal delay may cause the excavator's action to be inflexible and inaccurate, which is particularly significant in operations such as bottom material cleaning that require high precision and flexibility.

[0004] Therefore, the prior art has certain deficiencies in the bottom material cleaning operation in the remote control excavation system, and a more precise and responsive bottom material cleaning method is needed to improve the operation efficiency and accuracy. Summary of the invention

[0005] The present invention aims to solve the defects of the prior art in bottom material cleaning of a remote-controlled excavation system and to provide a bottom material cleaning means with more accuracy and faster response.

[0006] In the first aspect, a bottom material cleaning method is provided, comprising: in response to a bottom material cleaning signal from a remote control end, pulse width modulation control is performed on the pilot solenoid valve of the excavator according to a preset material shaking movement mechanism to adjust the opening of the main hydraulic valve that affects the flow rate entering the bucket cylinder; the opening adjustment of the main hydraulic valve is cyclically adjusted until the bottom material cleaning of the bucket is completed; the material shaking movement mechanism comprises: gradually increasing the opening of the main hydraulic valve in the first stroke of the bucket until the first preset condition is reached to trigger the second stroke; rapidly reducing the opening of the main hydraulic valve in the second stroke of the bucket until the second preset condition is reached to trigger the first stroke; wherein the first stroke and the second stroke are respectively any one of the excavation stroke and the unloading stroke, and the first stroke is greater than the second stroke. The method realizes precise control and efficient material shaking in the bottom material cleaning process of the excavator by introducing PWM control of the pilot solenoid valve, dynamic adjustment of the opening of the main hydraulic valve, and material shaking movement mechanisms for different strokes.

[0007] Preferably, the shaking material motion mechanism is expressed as:

[0008] ,

[0009] The first preset condition at least includes and The second preset condition at least includes and ,in, For at the moment The opening of the main hydraulic valve, is the speed gain, Speed ​​debuff, For the first trip, For the second trip, For at the moment The overflow pressure of the main hydraulic pump, is the influence function of overflow pressure on the opening of the main hydraulic valve, and are the set thresholds of the overflow pressure of the main hydraulic pump, for duration, To set the time threshold.

[0010] Preferably, in the material shaking motion mechanism, , ,in, For at the moment The oil temperature of the main hydraulic pump, It is the influence function of oil temperature on the opening of the main hydraulic valve.

[0011] Preferably, the method further comprises: calculating the deviation between the actual flow outputted by the main hydraulic pump and the expected flow, wherein the expected flow corresponds to the opening of the main hydraulic valve; calculating the amount of compensating oil according to the deviation and using it for the main hydraulic pump to adjust its output flow.

[0012] Preferably, before pulse width modulation control is performed on the pilot solenoid valve of the excavator, the method further comprises: pulse width modulation control is performed on the pilot solenoid valve of the excavator according to a preset material shaking movement mechanism to adjust the opening of the main hydraulic valve that affects the flow rate entering the boom cylinder.

[0013] In a second aspect, a bottom material clearing device for a remote-controlled excavator is provided, comprising: a signal receiving module for receiving a bottom material clearing signal from a remote control end; a control module for responding to the bottom material clearing signal and performing pulse width modulation control on a pilot solenoid valve of the excavator according to a preset material shaking movement mechanism to adjust the opening of a main hydraulic valve that affects the flow rate entering the bucket cylinder; the control module comprises: a first control submodule for gradually increasing the opening of the main hydraulic valve in a first stroke of the bucket until a first preset condition is reached to trigger a second stroke; a second control submodule for rapidly reducing the opening of the main hydraulic valve in a second stroke of the bucket until a second preset condition is reached to trigger the first stroke; wherein the first stroke and the second stroke are respectively any one of an excavation stroke and an unloading stroke, and the first stroke is greater than the second stroke.

[0014] According to a third aspect, a bottom material removal system for a remote-controlled excavator is provided, comprising: a main hydraulic pump for generating high-pressure liquid for providing power to the hydraulic system; a main hydraulic valve connected to the main hydraulic pump and used to control the flow direction and pressure of the high-pressure liquid; a bucket cylinder connected to the main hydraulic valve and used to control the movement of the bucket; a pilot solenoid valve connected to the main hydraulic valve and whose open and closed state affects the opening of the main hydraulic valve; the bottom material removal device disclosed above; wherein the bottom material removal device is respectively connected to the main hydraulic pump and the pilot solenoid valve.

[0015] In a fourth aspect, an excavator is provided, comprising the bottom material removal system disclosed above.

[0016] In a fifth aspect, a remote control excavation system is provided, comprising: a remote control terminal for sending a bottom material clearing signal; and the excavator disclosed above.

[0017] In a sixth aspect, a terminal device is provided, comprising a processor, a memory, and a computer program or instructions stored in the memory, wherein the processor executes the computer program or instructions to implement the method described above. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0019] Figure 1 An application scenario diagram of a remote control excavation system according to an embodiment of the present invention is shown;

[0020] Figure 2 A structural diagram of an excavator according to an embodiment of the present invention is shown;

[0021] Figure 3-4 A block diagram of a bottom material removal system according to an embodiment of the present invention is shown respectively;

[0022] Figure 5 A flowchart showing a method for removing a bottom material according to a first embodiment of the present invention is shown;

[0023] Figure 6 A motion control curve diagram of three stages according to an embodiment of the present invention is shown;

[0024] Figure 7 A flowchart showing a method for removing bottom material according to a second embodiment of the present invention is shown;

[0025] Figure 8 The pressure and flow curves of the second embodiment of the present invention are shown, wherein a) is a pilot pressure curve, and b) is a flow curve;

[0026] Fig. 9 A flowchart showing a method for removing bottom material according to a third embodiment of the present invention is shown;

[0027] Fig.10 A block diagram showing a bottom material removal device according to an embodiment of the present invention;

[0028] Fig.11 A block diagram showing the structure of a terminal device according to an embodiment of the present invention is shown. DETAILED DESCRIPTION

[0029] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0030] The embodiments of the present invention can be applied to various types of excavators, and in particular to remote-controlled excavators. A remote-controlled excavator is a type of engineering machinery that is controlled by a wireless remote control device and is widely used in the fields of mines, construction sites, infrastructure construction, etc. Unlike traditional excavators that are directly controlled by an operator, a remote-controlled excavator allows the operator to remotely control the machinery from a safe distance.

[0031] During the bottom material cleaning process of the remote-controlled excavator, since the operator is not in the cockpit, the operation signal needs to be controlled through remote transmission. This remote operation method provides greater flexibility and safety for engineering operations. However, due to a certain signal delay in remote transmission, it is difficult for the operator to perceive the status and real-time actions of the excavator when cleaning the bottom material, which brings some challenges to the operation.

[0032] Therefore, the following embodiments of the present invention are intended to improve the efficiency of bottom material cleaning and make the operation more accurate and efficient.

[0033] [Application of remote control excavation system]

[0034] Figure 1 FIG. 4 shows an application scenario diagram of the remote control excavation system 400 of the present invention. Figure 1 As shown, the application of the remote control excavation system 400 of the present invention relies on the communication cooperation between the remote control terminal 401 and the excavator 300. The remote control terminal 401 is arranged with devices such as a computer, a remote control handle, a manipulation button, and a display screen 4011. The real-time picture of the excavator 300 working is transmitted and displayed on the display screen 4011. The implementation method is, for example, to capture the real-time picture of the working area of ​​the excavator 300 by installing a camera or other visual perception device on the excavator 300. These pictures can be transmitted to the display screen 4011 of the remote control terminal 401 through wireless transmission technology to provide remote visual feedback for the operator. The operator can send instructions through control devices such as handles and manipulation buttons to adjust the movement, direction, bucket posture and other parameters of the excavator 300, so that the operator can realize accurate control of the excavator 300 through real-time images and remote control devices. Of course, the sent instructions also include a bottom material removal signal to control the excavator 300 to perform the bottom material cleaning operation, which will be described in detail below.

[0035] The communication between the excavator 300 and the remote control terminal 401 can be carried out through a base station (BS). In the remote excavation system 400, the BS acts as a relay station to assist in data transmission and communication between the excavator 300 and the remote control terminal 401. Specifically, the excavator 300 is equipped with a wireless communication module, which allows the excavator 300 to establish a connection with the surrounding BS and transmit the status, working data, real-time images and other information of the excavator 300 to the BS. The remote control terminal 401 is also equipped with a corresponding communication module and can be connected to the same BS. In this way, through the relay function of the BS, two-way communication can be carried out between the excavator 300 and the remote control terminal 401. The operator sends instructions through the operating device at the remote control terminal 401, and these instructions are transmitted to the excavator 300 via the BS to realize the remote control of the excavator 300.

[0036] In addition, the remote control terminal 401 and the excavator 300 can also be physically connected through a dedicated communication cable, or connected in a combination of wired and wireless modes. The specific connection mode used depends on actual application requirements, working environment and technical considerations.

[0037] [Structure of the excavator]

[0038] Figure 2FIG. 3 shows a structural diagram of an excavator 300 according to the present invention. Figure 2 In the example, the excavator 300 mainly includes the excavator body, bucket 207, bucket cylinder 203, arm 208, arm cylinder 205, boom 209, boom cylinder 206, crawler walking device 210, slewing system, hydraulic system and other key structures. The excavator 300 drives each cylinder through the hydraulic system to achieve flexible movement of the bucket, arm and boom, thereby completing various tasks such as earthwork, excavation, loading and transportation. The hydraulic system covers the main hydraulic pump 201 and the main hydraulic valve 202. The main hydraulic pump 201 is the power source of the hydraulic system of the excavator, which is used to increase the liquid pressure in the machine to provide sufficient hydraulic energy. It usually adopts a plunger pump or a gear pump. Its working principle is to suck and compress the liquid through a mechanical device, and then transport the high-pressure liquid to the hydraulic system through the output port to drive the hydraulic cylinder (each cylinder), motor and other actuators. The main hydraulic valve 202 is a component used to control the flow direction and pressure of the liquid in the hydraulic system. It adjusts the channels of the liquid flowing through the hydraulic cylinder and other actuators according to the operator's control signal, thereby realizing the control of the movement of the excavator 300. The main hydraulic valve 202 usually includes multiple valve ports, each of which performs a specific hydraulic function, such as lifting, rotating, telescoping, etc. By accurately controlling the opening of the main hydraulic valve 202, precise control of various functions of the excavator 300 can be achieved.

[0039] In addition, the present invention arranges a pilot solenoid valve 204 at the front end of the main hydraulic valve 202. In the hydraulic system, the pilot solenoid valve 204 is mainly used to control the operation of the main hydraulic valve 202. It receives signals from a remote control handle, a joystick, a computer or other control sources, and then operates or controls the opening of the main hydraulic valve 202 according to these signals, thereby adjusting the flow and pressure of the hydraulic system. In the opening control of the main hydraulic valve 202, the pilot solenoid valve 204 adopts pulse width modulation (PWM) (controlling the output by changing the on-off time ratio of the signal). PWM controls the opening and closing state of the main hydraulic valve 202 by changing the on-off frequency of the pilot solenoid valve 204 within a certain period of time, thereby indirectly adjusting the flow and pressure of the liquid in the hydraulic system. Specifically, PWM achieves precise control of the main hydraulic valve 202 by changing the on-off time ratio of the pilot solenoid valve 204 in each cycle. When it is necessary to increase the opening of the main hydraulic valve 202, PWM will increase the frequency of the on and off of the pilot solenoid valve 204, so that the pilot solenoid valve 204 is in the energized state more time, thereby increasing the opening of the main hydraulic valve 202; conversely, when it is necessary to reduce the opening, the frequency of pulse width modulation is reduced, so that the pilot solenoid valve 204 is in the de-energized state more time, thereby reducing the opening of the main hydraulic valve 202.

[0040] [Composition of the bottom material removal system]

[0041] Figure 3 FIG. 2 shows a block diagram of a bottom material removal system 200 of the present invention. Figure 3 In the example, the bottom material removal system 200 is composed of components such as a main hydraulic pump 201, a main hydraulic valve 202, a bucket cylinder 203, a pilot solenoid valve 204, and a bottom material removal device 100. The main hydraulic valve 202 is connected to the main hydraulic pump 201, the bucket cylinder 203 is connected to the main hydraulic valve 202, the pilot solenoid valve 204 is connected to the main hydraulic valve 202, and the bottom material removal device 100 is connected to the main hydraulic pump 201 and the pilot solenoid valve 204 respectively. The bottom material removal device 100 is a control device that realizes the bottom material removal action by controlling each hydraulic component. The bottom material removal device 100 works in coordination with components such as the main hydraulic pump 201, the main hydraulic valve 202, the bucket cylinder 203, and the pilot solenoid valve 204 to ensure the accurate and efficient operation of the remote control excavator during the bottom material removal process.

[0042] It should be understood that Figure 3 The components described are the most basic components for achieving the purpose of the present invention and do not represent any limitation on the composition of the bottom material removal system. Figure 4 In the example shown, the bottom material removal system 200 is further extended to include a boom cylinder 205 as part of the bottom material removal system 200, which works in conjunction with other key components to provide more execution and control options for bottom material removal. The boom cylinder 205 is connected to the main hydraulic valve 202, through which the system can control the movement of the boom.

[0043] [First embodiment of the bottom material removal method]

[0044] Figure 5 A flow chart of the bottom material removal method 10 of the present invention is shown. Figure 5 In the example, the bottom material removal method 10 mainly consists of step 11 and step 12.

[0045] 11. In response to the bottom material clearing signal from the remote control terminal 401, the pilot solenoid valve 204 of the excavator 300 is PWM controlled according to the preset material shaking movement mechanism to adjust the opening of the main hydraulic valve 202 that affects the flow entering the bucket cylinder 203.

[0046] 12. Adjust the opening of the circulating main hydraulic valve until the bottom material of the bucket is cleaned.

[0047] The bottom material removal signal is sent by the remote control terminal 401. The signal can be triggered by pressing a specific button on the remote control or by other remote control means, such as clicking a corresponding button for removing the bottom material in the remote control software. After the signal is sent, it is received and analyzed by the bottom material removal device 100 (hereinafter referred to as the device 100). The device 100 will determine whether it is a bottom material removal signal based on the received signal. If it is, it will start to perform bottom material removal. The reception and analysis of the bottom material removal signal is, for example, the signal processing unit in the device 100 is responsible, and the unit can effectively communicate with the remote control terminal 401 to ensure that the instruction can be accurately transmitted to the device 100.

[0048] The preset material shaking motion mechanism can be written into the device 100 in advance through a program or set parameters. It can be understood that the device 100 includes a program / model, in which the logic and steps of the material shaking motion mechanism are defined. The program may include specific control strategies for control elements such as the main hydraulic valve 202 and the pilot solenoid valve 204, and the specific characteristics of the material shaking motion may also be adjusted by setting parameters such as movement speed, opening threshold, etc.

[0049] The material shaking movement mechanism is intended to produce a vibration effect on the bucket cylinder 203, and its control strategy is specifically embodied in that, in the first stroke of the bucket 207, the opening of the main hydraulic valve 202 is gradually increased until the first preset condition is reached to trigger the second stroke; in the second stroke of the bucket 207, the opening of the main hydraulic valve 202 is rapidly reduced until the second preset condition is reached to trigger the first stroke, and the first stroke is greater than the second stroke.

[0050] It should be understood that the load F on the bucket cylinder 203 includes three types: effective working load, friction resistance and inertia force, expressed as: F r =F a +F m +F g , where F r is the actual load, F a For the set workload, F m is the friction resistance, F g Inertial load. Specifically, friction resistance is divided into static friction resistance and dynamic friction resistance. When the bucket cylinder 203 just starts to move, it is mainly affected by static friction resistance; when the bucket cylinder 203 has started to move, it is mainly affected by dynamic friction resistance.

[0051] The corresponding relationship between the motion state of the bucket cylinder 203 and the motion formula is shown in the following table:

[0052]

[0053] As can be seen from the above table, in theory, the entire bucket 207 shaking movement process can be divided into three stages, namely, starting movement (acceleration), uniform movement, and stopping movement (deceleration). Since a certain control flow needs to be maintained throughout the entire movement process, in order to better achieve the shaking effect, the three theoretical stages are simplified into two actual stages in actual control, namely, acceleration movement in the initial stage of the movement and deceleration movement in the second half of the stroke. In the initial stage of the movement, the device 100 gradually increases the flow of the bucket cylinder 203 by increasing the opening of the main hydraulic valve 202 to accelerate the shaking movement, so as to ensure that the bottom material is fully free from the bucket 207 and prepare to enter the next stage. In the second half of the stroke, the device 100 gradually reduces the flow of the bucket cylinder 203 by reducing the opening of the main hydraulic valve 202 to decelerate the shaking movement, so that the bottom material can more smoothly leave the bucket 207 and prepare to stop shaking.

[0054] In addition, the two-stage movement is divided into three situations: abc, such as Figure 6 As shown, a means that most of the stroke is deceleration motion, and the lesser half of the stroke is acceleration motion; b means that half of the stroke is acceleration motion, and the other half of the stroke is deceleration motion; c means that most of the stroke is acceleration motion, and the lesser half of the stroke is deceleration motion.

[0055] In order to generate a larger vibration force, the present invention preferably adopts a C-type motion process for the vibration process of the bucket 207, that is, during the movement of the bucket 207, most of the stroke is used to accelerate the movement process, and a sudden reverse braking is performed at the end of the stroke to generate a larger vibration force. Specifically, in the C-type motion, the bucket 207 undergoes accelerated motion within most of the vibration stroke, that is, in the early stage of the vibration, a stronger vibration effect is generated by rapidly increasing the movement speed of the bucket 207; in the second half of the vibration, the speed and direction of the bucket 207 are changed by sudden reverse braking, and this reverse braking can quickly slow down the movement of the bucket 207, generate a larger reaction force, and enhance the intensity of the vibration. By realizing accelerated motion in the early stage of vibration, the excavator 300 accumulates a certain amount of kinetic energy, and then reverse braking is performed at the end of the stroke, suddenly slowing down and changing the direction of motion, resulting in a rapid release of kinetic energy. This released kinetic energy is converted into vibration force, which is transmitted to the bucket 207 through vibration, helping the bottom material to separate from the bucket 207 during vibration. The control using the C-type motion takes into account the adhesion characteristics of the bottom material in the bucket 207, ensuring that the bottom material can be fully separated from the bucket 207 during the vibration process, thereby improving the effect of cleaning the bottom material.

[0056] In addition, as an optional embodiment, the present invention may also choose to adopt type A motion or type B motion. Type A motion performs deceleration motion in the major half of the bucket stroke to reduce the vibration force, and accelerates motion in the minor half of the stroke to generate vibration faster, which can provide relatively stable motion in the early stage of vibration, and then produce a stronger vibration effect in the second half. Type B motion achieves acceleration motion in the first half of the vibration, and deceleration motion in the second half, which can balance the intensity of the vibration, maintaining a certain stability and providing sufficient vibration force.

[0057] It should be understood that in the C-type movement, the terms such as "most of the stroke", "less of the stroke", and "end of the stroke" actually correspond to different stages of the first stroke and the second stroke described above. Specifically, the "most of the stroke" described is the "first stroke" disclosed above, and the descriptions such as "less of the stroke" and "end of the stroke" are the "second stroke" disclosed above.

[0058] In the material shaking motion mechanism, the motion stroke of the bucket 107 is further divided into an excavation stroke and an unloading stroke, which correspond to different stages of the first stroke and the second stroke, respectively. For example, when the excavation stroke corresponds to the first stroke, the unloading stroke corresponds to the second stroke; conversely, when the unloading stroke corresponds to the first stroke, the excavation stroke corresponds to the second stroke.

[0059] Specifically, the excavation stroke refers to the movement stage of the bucket 207 when the excavator 300 performs the excavation task. In this stage, the excavator 300 usually needs to gradually lower the bucket 207 to the excavation depth while performing the excavation task. For the shaking material movement mechanism, the excavation stroke is characterized by the movement direction of the bucket 207 is usually downward. The unloading stroke refers to the action stage when the excavator 300 performs unloading of materials. Compared with the excavation stroke, the unloading stroke is characterized by the movement direction of the bucket 207 is usually upward. For the shaking material movement mechanism, the excavation stroke and the unloading stroke are both included in the stroke category of the shaking material movement, that is, the shaking material movement mechanism may be triggered in both the excavation stroke and the unloading stroke, resulting in a shaking effect of the bucket 207. The shaking can be achieved by adjusting the opening of the main hydraulic valve 202 to achieve the operation of gradually increasing or decreasing the opening during the stroke.

[0060] When the excavator 300 performs a material clearing operation, the device 100 adjusts the pilot pressure (PWM control) by outputting a control signal to the pilot solenoid valve 204 . The adjustment process controls the opening of the main hydraulic valve 202 to adjust the hydraulic flow to the bucket cylinder 203 .

[0061] The entire motion control process follows the above-mentioned c-type curve. First, during the control of the entire bucket 207, the device 100 continuously increases the opening of the main hydraulic valve 202, and then rapidly reduces the opening of the main hydraulic valve 202 at the end of the stroke, forming a large inertia contrast. When it is detected that the excavation stroke of the bucket cylinder 203 reaches the limit, the system will immediately output an unloading control signal to the pilot solenoid valve 204, thereby adjusting the opening of the main hydraulic valve 202 and continuing the above-mentioned inertia contrast.

[0062] In short, the opening and closing control of the opening of the main hydraulic valve 202 itself forms a large inertia contrast. Subsequently, the inertia contrast is continuously increased by continuously adjusting the opening of the main hydraulic valve 202. Since the entire process is very short, the large inertia contrast causes great vibration, which effectively shakes off the residual material.

[0063] Similarly, after the unloading stroke of the bucket cylinder 203 reaches the limit, the device 100 will output an excavation control signal to the pilot solenoid valve 204, thereby adjusting the opening of the main hydraulic valve 202. The entire control process is performed in the opposite manner to the previously described process. The two control processes are performed alternately, resulting in a rapid shaking of the bucket 207, effectively clearing the residual material. This alternating control strategy enables the excavator 300 to efficiently complete the material clearing operation, thereby improving the operating efficiency.

[0064] In the material shaking motion mechanism, the motion process of the bucket 207 can be expressed as:

[0065] ,

[0066] in, For at the moment The opening of the main hydraulic valve (i.e. the target of control and adjustment), is the speed gain (indicating the sensitivity of speed change to opening change, used to adjust the influence of speed on the opening of the main hydraulic valve 202), is the speed decrement (indicating the sensitivity of the speed reduction to the opening change, similar to the speed gain, used to adjust the influence of the speed reduction on the opening of the main hydraulic valve 202), For the first trip, For the second trip, For at the moment The overflow pressure of the main hydraulic pump, It is the influence function of overflow pressure on the opening of the main hydraulic valve. It represents the opening of the main hydraulic valve 202 at time t-1, that is, the opening value at the previous moment, which is a previous state and has an impact on the current opening change.

[0067] It should be understood that the overflow pressure of the main hydraulic pump 201 is an important parameter indicating the load of the hydraulic system. When the excavator 300 is working, the overflow pressure reflects the load of the hydraulic system. By monitoring the overflow pressure of the main hydraulic pump 201, the device 100 can adjust the movement speed of the bucket 207 according to the load condition to maintain a proper working state.

[0068] The opening of the main hydraulic valve 202 needs to be adjusted according to different working conditions, and the overflow pressure has a direct impact on the opening of the main hydraulic valve 202. By introducing the influence function The purpose of the function is to establish the relationship between the overflow pressure and the opening of the main hydraulic valve 202. The function can be a mathematical model that describes the opening of the main hydraulic valve 202 at different overflow pressures to achieve the desired bucket movement. By adjusting the opening of the main hydraulic valve 202, stable and efficient movement of the digging bucket 207 can be achieved under different workloads and overflow pressures.

[0069] Based on the above expression, the first preset condition at least includes and , the second preset condition at least includes and . and are respectively the set thresholds of the overflow pressure of the main hydraulic pump 201, for duration, To set the time threshold.

[0070] In the first stroke of the bucket 207, the opening of the main hydraulic valve 202 is gradually increased. When the overflow pressure of the main hydraulic pump 201 reaches the set threshold (satisfying the condition ,For example is 350bar) and maintain the set time threshold (satisfying the condition ,For example 500ms), the stroke switching is executed, switching from the first stroke to the second stroke; and in the second stroke of the bucket 207, the opening of the main hydraulic valve 202 is quickly reduced, and when the overflow pressure of the main hydraulic pump 201 reaches the set threshold (satisfying the condition ) and maintain the set time threshold (satisfying the condition ), the stroke switching is executed, switching from the second stroke to the first stroke, and the cycle repeats.

[0071] As an optional implementation, in the material shaking motion mechanism, the movement process of the bucket 207 in the first stroke is:

[0072] , ,in, For at the moment The oil temperature of the main hydraulic pump, It is the influence function of oil temperature on the opening of the main hydraulic valve.

[0073] It describes the opening control process of the bucket 207 in the first stroke. The main influencing factors include overflow pressure and oil temperature. Through the influence of these two factors, the opening of the main hydraulic valve 202 can be adjusted to achieve the shaking movement of the bucket 207. In practical applications, by real-time monitoring of the overflow pressure and oil temperature, and according to the preset influence function, the device 100 can dynamically adjust the opening of the main hydraulic valve 202 so that the movement of the bucket 207 conforms to the designed shaking material movement mechanism. By introducing the monitoring and feedback mechanism of the overflow pressure and oil temperature, the device 100 can achieve precise control of the opening of the main hydraulic valve 202, so that the bucket 207 can better adapt to various excavation environments and conditions during the excavation process.

[0074] [Second embodiment of the bottom material removal method]

[0075] In actual applications, when the bucket cylinder 203 needs to move quickly, the main hydraulic pump 201 must output sufficient flow to ensure the movement speed of the bucket cylinder 203. If the output flow of the main hydraulic pump 201 is not enough to support the movement of the bucket cylinder 203, the bucket cylinder 203 will move too slowly or even stop. Therefore, on the basis of the first embodiment, the pump flow should also be reasonably controlled.

[0076] Figure 7 A flow chart of the bottom material removal method 20 of the present invention is shown. Figure 7 In the example, the bottom material removal method 20 is mainly composed of step 21 and step 22. It should be understood that the execution of the method 20 is based on the first embodiment.

[0077] 21. Calculate the deviation between the actual flow rate output by the main hydraulic pump and the expected flow rate, where the expected flow rate corresponds to the opening of the main hydraulic valve.

[0078] In this step, the device 100 first calculates the difference between the actual flow rate of the main hydraulic pump 202 and the expected flow rate, which is set according to the opening of the main hydraulic valve 202. There is a predetermined relationship between the opening of the main hydraulic valve 202 and the expected flow rate, for example, determined by an algorithm or control strategy preset by the device 100. The deviation represents the difference between the actual output flow rate and the expected output flow rate, providing a basis for subsequent adjustments.

[0079] 22. Calculate the amount of compensation oil based on the deviation and use it for the main hydraulic pump to adjust its output flow.

[0080] In this step, the device 100 uses the deviation calculated in the previous step to calculate the compensation oil volume through a specific algorithm or control logic. The purpose of calculating the compensation oil volume is to adjust the output flow of the main hydraulic pump 201 so that the actual flow can approach the expected flow, thereby achieving precise control of the hydraulic system of the excavator. Specifically, the calculation of the compensation oil volume can use control algorithms such as proportional control, integral control, and differential control (PID control). After the calculation is completed, the compensation oil volume is introduced into the main hydraulic pump 201, and the dynamic regulation of the hydraulic system of the excavator is achieved by adjusting the output flow.

[0081] like Figure 8 As shown, the unloading action and excavation action of the bucket 207 change with the change of the pilot pressure, and the flow rate of the main hydraulic pump 201 increases rapidly. When the pilot pressure decreases, the flow rate of the main hydraulic pump 201 should also decrease rapidly to match the rapid change of the valve core opening. The above-mentioned entire control cycle is completed, and the switching of the excavation and unloading of the bucket 207 is controlled periodically, and the material clearing action can be well completed.

[0082] Specifically, when the device 100 receives an excavation signal, the pilot solenoid valve 204 responds and adjusts the pilot pressure. The increase in the pilot pressure causes the flow of the main hydraulic pump 201 to increase rapidly to support the excavation action. As the flow of the main hydraulic pump 201 increases, the main hydraulic valve 202 gradually opens, allowing the bucket cylinder 203 to obtain sufficient flow, and the bucket begins to excavate. When it is detected that the bucket cylinder 203 reaches the excavation limit, the device 100 sends an unloading signal. At this time, the pilot solenoid valve 204 adjusts the pilot pressure. The reduction in the pilot pressure causes the flow of the main hydraulic pump 201 to decrease rapidly to cooperate with the rapid closure of the main hydraulic valve 202. As the flow of the main hydraulic pump decreases, the main hydraulic valve 202 closes, the flow of the bucket cylinder 203 decreases, and the bucket begins to unload.

[0083] The above-mentioned excavation and unloading process forms a control cycle, which involves the adjustment of the pilot solenoid valve 204, the flow change of the main hydraulic pump 201, the opening and closing of the main hydraulic valve 202, etc. The periodic switching of the control cycle enables the excavator 300 to flexibly and efficiently complete the excavation and unloading actions in the material clearing operation, ensuring that the excavator 300 can stably and quickly perform the material clearing task under various working conditions.

[0084] [Third Embodiment of the Bottom Material Removal Method]

[0085] Fig. 9 A flow chart of the bottom material removal method 30 of the present invention is shown. Fig. 9 In the example shown in FIG. 3 , the bottom material removal method 30 is mainly composed of steps 31 to 33.

[0086] 31. In response to the bottom material clearing signal from the remote control terminal 401, the pilot solenoid valve 204 of the excavator 300 is PWM controlled according to the preset material shaking movement mechanism to adjust the opening of the main hydraulic valve 202 that affects the flow entering the boom cylinder 205.

[0087] 32. According to the preset material shaking movement mechanism, the pilot solenoid valve 204 of the excavator 300 is PWM controlled to adjust the opening of the main hydraulic valve 202 that affects the flow rate entering the bucket cylinder 203.

[0088] 33. The opening of the circulating main hydraulic valve 202 is adjusted until the bottom material of the bucket 207 is cleaned.

[0089] In this embodiment, compared with the first embodiment, the motion control of the boom cylinder 205 is additionally introduced, that is, before the material cleaning operation begins, the device 100 first adjusts the boom cylinder 205, and adjusts the opening of the main hydraulic valve 202 through PWM control of the pilot solenoid valve 204 to affect the incoming flow of the boom cylinder 205. Through this control step, the device 100 can more finely adjust the action of the excavator 300, making it more flexible and efficient in the material cleaning process. This embodiment still adopts the material cleaning operation principle similar to that of the first embodiment, and realizes the process of excavator bottom material cleaning by dynamically adjusting the opening of the main hydraulic valve 202. In the entire material cleaning operation, the motion control of the boom cylinder 205 and the bucket cylinder 203 will work together to ensure the coordination and smoothness of the bottom material cleaning action.

[0090] [Composition of the bottom material removal device]

[0091] Fig.10 FIG. 1 shows a block diagram of a bottom material removal device 100 of the present invention. Fig.10 In the example, the bottom material removing device 100 is composed of a signal receiving module 101 and a control module 102 , and the control module 102 is composed of a first control submodule 1021 and a second control submodule 1022 .

[0092] Specific function configuration

[0093] The signal receiving module 101 is configured to receive a bottom material removal signal from a remote control terminal.

[0094] The control module 102 is configured to: respond to the bottom material clearing signal, and perform pulse width modulation control on the pilot solenoid valve of the excavator according to a preset material shaking movement mechanism to adjust the opening of the main hydraulic valve that affects the inflow of the bucket cylinder.

[0095] The first control submodule 1021 is configured to gradually increase the opening of the main hydraulic valve in the first stroke of the bucket until a first preset condition is reached to trigger the second stroke.

[0096] The second control submodule 1022 is configured to: rapidly reduce the opening of the main hydraulic valve in the second stroke of the bucket until the second preset condition is reached to trigger the first stroke.

[0097] The first stroke and the second stroke are respectively any one of an excavation stroke and an unloading stroke, and the first stroke is greater than the second stroke.

[0098] [Terminal equipment configuration]

[0099] Fig.11 FIG. 5 shows a block diagram of a terminal device 500 of the present invention. Fig.11 In the example, the terminal device 500 is composed of a processor 501, a memory 502, and a computer program or instruction 503 stored in the memory 502, and the processor 501 executes the computer program or instruction 503 to implement the first to third embodiments of the bottom material removal method.

[0100] Computer program or instruction 503 comprises a computer program for executing a computer process on a computing device. In some embodiments, computer program or instruction 503 is provided using a signal bearing medium. The signal bearing medium may include one or more program instructions, which when run by one or more processors 501 may provide the functions or partial functions described in the first to third embodiments of the above bottom material removal method. Therefore, for example, one or more features in the bottom material removal method may be undertaken by one or more instructions associated with the signal bearing medium.

[0101] In some examples, the signal bearing medium may include computer readable media such as, but not limited to, a hard drive, a compact disk (CD), a digital video disk (DVD), a digital tape, a memory, a read-only memory (ROM) or a random access memory (RAM), and the like.

[0102] In some embodiments, the signal bearing medium may include a computer recordable medium such as, but not limited to, a memory, a read / write (R / W) CD, a R / W DVD, or the like.

[0103] In some embodiments, the signal bearing medium may include communication media such as, but not limited to, digital and / or analog communication media (eg, fiber optic cables, wave guides, wired communication links, wireless communication links, etc.).

[0104] The signal bearing medium may be communicated by a wireless form of communication medium (eg, wireless communication medium complying with the IEEE 802.11 standard or other transmission protocols). The one or more program instructions may be, for example, computer executable instructions or logic implemented instructions.

[0105] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "exemplary" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.

[0106] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A method for removing bottom material of a remote-controlled excavator, It is characterized in that The method comprises: In response to a bottom material removal signal from a remote control terminal, a pulse width modulation control is performed on a pilot solenoid valve of the excavator according to a preset material shaking movement mechanism to adjust the opening of a main hydraulic valve that affects the inflow of a bucket cylinder; Circularly adjusting the opening of the main hydraulic valve until the bottom material of the bucket is cleaned; The jittering motion mechanism includes: gradually increasing the opening of the main hydraulic valve during the first stroke of the bucket until a first preset condition is reached to trigger a second stroke; Rapidly reducing the opening of the main hydraulic valve in the second stroke of the bucket until a second preset condition is reached to trigger the first stroke; Wherein, the first stroke and the second stroke are respectively any one of an excavation stroke and an unloading stroke, and the first stroke is greater than the second stroke; The jittering motion mechanism is expressed as: , The first preset condition at least includes and , The second preset condition at least includes and , in, For at the moment The opening of the main hydraulic valve, is the speed gain, Speed ​​debuff, For the first trip, For the second trip, For at the moment The overflow pressure of the main hydraulic pump, is the influence function of overflow pressure on the opening of the main hydraulic valve, and are the set thresholds of the overflow pressure of the main hydraulic pump, for duration, To set the time threshold.

2. The method for removing the bottom material according to claim 1, It is characterized in that In the material shaking motion mechanism, , , in, For at the moment The oil temperature of the main hydraulic pump, It is the influence function of oil temperature on the opening of the main hydraulic valve.

3. The bottom material removal method according to claim 1, It is characterized in that The method further comprises: Calculating a deviation between an actual flow rate output by the main hydraulic pump and an expected flow rate, wherein the expected flow rate corresponds to an opening degree of the main hydraulic valve; A compensation oil amount is calculated according to the deviation and used for the main hydraulic pump to adjust its output flow.

4. The bottom material removal method according to claim 1, It is characterized in that Before performing pulse width modulation control on the pilot solenoid valve of the excavator, the method further includes: According to the preset material shaking movement mechanism, the pilot solenoid valve of the excavator is pulse-width modulated to adjust the opening of the main hydraulic valve that affects the flow into the boom cylinder.

5. A bottom material removal device for remotely controlling an excavator to perform the method according to any one of claims 1 to 4, It is characterized in that The device comprises: A signal receiving module, used for receiving a bottom material removal signal from a remote control end; A control module, for responding to the bottom material removal signal, and performing pulse width modulation control on the pilot solenoid valve of the excavator according to a preset material shaking movement mechanism to adjust the opening of the main hydraulic valve affecting the inflow flow of the bucket cylinder; The control module comprises: A first control submodule, used for gradually increasing the opening of the main hydraulic valve in the first stroke of the bucket until a first preset condition is reached to trigger a second stroke; A second control submodule, used for rapidly reducing the opening of the main hydraulic valve in the second stroke of the bucket until a second preset condition is reached to trigger the first stroke; The first stroke and the second stroke are respectively any one of an excavation stroke and an unloading stroke, and the first stroke is greater than the second stroke.

6. A bottom material removal system for a remote-controlled excavator, It is characterized in that The system comprises: The main hydraulic pump, which produces the high-pressure fluid that powers the hydraulic system; A main hydraulic valve, connected to the main hydraulic pump, for controlling the flow direction and pressure of the high-pressure liquid; A bucket cylinder connected to the main hydraulic valve and used to control the movement of the bucket; A pilot solenoid valve connected to the main hydraulic valve and having an opening and closing state that affects the opening of the main hydraulic valve; The bottom material removing device according to claim 5; Wherein, the bottom material removing device is connected to the main hydraulic pump and the pilot solenoid valve respectively.

7. An excavator, It is characterized in that The excavator includes the bottom material removal system of claim 6.

8. A remote-controlled excavation system, It is characterized in that The remote control excavation system comprises: A remote control terminal for sending a bottom material removal signal; and The excavator as claimed in claim 7.

9. A terminal device comprising a processor, a memory and a computer program or instruction stored in the memory, It is characterized in that The processor executes the computer program or instructions to implement the method of any one of claims 1-4.