A method for reconstructing roof of soft rock open-pit mine

By digging coal mining tunnels and arranging 'n'-shaped troughs in open-pit mines, and alternately mining and filling high-strength materials between coal pillars, a double-layer roof is formed, which solves the problem of fragile coal seam roofs and improves the strength and stability of the roof. safety, ensuring the safety of underground mining and reducing tunnel roof collapse accidents.

CN117684975BActive Publication Date: 2024-10-01CHINA UNIV OF MINING & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311677035.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-08
Publication Date
2024-10-01
Estimated Expiration
2043-12-08

AI Technical Summary

Technical Problem

During the mining process of open-pit mines, the roof rock of the coal seam becomes fragile due to blasting or equipment rolling, which leads to frequent tunnel roof collapse accidents during underground mining, endangering the safety of construction personnel and bringing hidden dangers to mine production.

Method used

A soft rock open-pit mine roof reconstruction method is adopted, which involves digging a coal mining tunnel and arranging an 'n'-shaped trough in the coal area to be mined, and gradually pushing and filling high-strength materials to form a two-layer roof, odd-numbered coal pillars and even-numbered coal pillars. Coal pillars are mined and filled alternately to strengthen and support the roof.

Benefits of technology

Through the construction of a two-layer roof, the strength and stability of the roof are significantly improved, ensuring the safety of the underground mining process, reducing the occurrence of tunnel roof collapse accidents, and providing more reliable process support.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117684975B_ABST
    Figure CN117684975B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for reconstructing the roof of a soft rock open-pit mine, including the construction of a first-layer roof by an upper top pipe roof reconstruction method and the construction of a second-layer roof by a lower wedge-shaped alternating mining and filling method; the upper top pipe roof reconstruction method includes three steps of continuous coal adit mining, top pipe construction, and tunnel filling; the lower wedge-shaped alternating mining and filling method includes two steps of odd-numbered coal pillars ultra-high mining and filling, and even-numbered coal pillars ultra-wide mining and filling. The present invention constructs two layers of roof, which plays a role in strengthening the strength of the roof; the first layer of roof is constructed by the top pipe method, which can ensure the safety of the mining process and the convenience of operation; the second layer of roof is alternately mined and filled with odd and even coal pillars, which can ensure that during the mining process, the first layer of roof is supported, and the first layer of roof is further consolidated and strengthened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a roof reconstruction method, in particular to a roof reconstruction method for a soft rock open-pit mine. Background Art

[0002] ‌Open-pit mining and underground mining, that is, open-pit mining + underground mining, has been increasingly used in the mining of open-pit end-wall coal or deep coal resources in thick coal seam open-pit mines, forming a good process combination effect. However, since most of the coal mined in open-pit mines is located in shallow layers, the coal seam roof rock has a low degree of metamorphism, serious cracks, poor self-strength, and weak pressure bearing capacity. Even for deep open-pit mines, the coal seam roof rock will become fragile due to blasting or equipment crushing during open-pit mining. In this case, rash underground mining operations are very likely to cause tunnel roof collapse accidents, endangering the safety of construction workers and bringing hidden dangers to mine production. In recent years, domestic experts and scholars have developed a large number of high-quality high-strength materials based on the filling needs in the underground mining process, which are light and economical. Therefore, this scheme proposes a method for reconstructing the roof of an open-pit mine with a soft rock roof based on existing high-strength materials to solve the problem of the fragility of the existing roof and provide safety guarantees for underground mining projects in open-pit mines. Summary of the invention

[0003] In view of the problems existing in the above-mentioned prior art, the present invention provides a method for reconstructing the roof of a soft rock open-pit mine, which solves the problem of the fragility of the existing roof and provides safety protection for underground mining projects in open-pit mines.

[0004] To achieve the above object, the present invention provides the following technical solution: a method for reconstructing the roof of a soft rock open-pit mine, comprising the following steps;

[0005] In the open-pit mine, in the area of ​​the coal to be mined that needs to be mined underground, along the extension direction of the coal to be mined, close to the coal seam roof, the coal mining adit is excavated successively into the coal seam, and the coal mining adit is excavated until the bottom boundary of the coal to be mined;

[0006] During the excavation of the coal mining adit, "n"-shaped grooves are synchronously arranged inside the coal mining adit, and the length of a single "n"-shaped groove is 8-10m; the "n"-shaped grooves are pushed into the interior of the adit one by one from the entrance of the coal mining adit, and a section of "n"-shaped groove is pushed into the coal mining adit every 10m of excavation until the coal mining adit reaches the bottom boundary of the coal to be mined;

[0007] After the mining of the coal mining adit is completed, high-strength materials are filled backward from the inside of the coal mining adit to the entrance, and the filling fills the entire "n"-shaped groove; after all the coal mining adit is mined and the "n"-shaped grooves inside are filled, the construction of the first layer of roof is completed;

[0008] After the construction of the first roof is completed, the construction of the second roof begins below it; the corresponding coal to be mined below each "n"-shaped groove in the first roof is divided into 4, 6 or 8 coal pillars, and the coal pillars are divided into odd-numbered coal pillars and even-numbered coal pillars according to the direction of the construction of the first roof;

[0009] First, the odd-numbered coal pillars are mined at super-high level. The odd-numbered coal pillars are mined one by one in the direction of the first-layer roof construction. After the odd-numbered coal pillars are mined, odd-numbered mining shafts are formed. During the mining process of the odd-numbered coal pillars, 1-2m is excavated into the first-layer roof above. After the super-high mining of the odd-numbered coal pillars is completed, high-strength materials are filled backwards from the inside of the odd-numbered mining shaft to the shaft mouth, and the filling fills the entire odd-numbered mining shaft; and so on until the last odd-numbered mining shaft is filled with filling materials;

[0010] Then the even-numbered coal pillars are mined in an ultra-wide manner. The even-numbered coal pillars are mined one by one in the direction of the first-layer roof construction. After the even-numbered coal pillars are mined, even-numbered mining shafts are formed. During the mining of the even-numbered coal pillars, ultra-wide excavation is carried out inside the adjacent odd-numbered mining shafts on both sides. After the ultra-wide mining of the even-numbered coal pillars is completed, high-strength materials are filled backwards from the inside of the even-numbered mining shaft to the shaft entrance, and the filling fills the entire even-numbered mining shaft; and so on until the inside of the last even-numbered mining shaft is filled with filling materials; at this point, the construction of the second-layer roof is completed.

[0011] Furthermore, the coal mining horizontal shaft, odd-numbered mining shafts and even-numbered mining shafts are all inclined, with the mining shaft mouth at the highest position and the mining shaft bottom at the lowest position.

[0012] Furthermore, the inner and outer end faces of the "n"-shaped groove are respectively provided with corresponding steel bars and steel holes. When the front and rear end faces of two adjacent "n"-shaped grooves are in contact, the steel bar of the front "n"-shaped groove is just inserted into the steel hole of the rear "n"-shaped groove.

[0013] Furthermore, the steel bars and steel holes are evenly arranged on the side and top edges of the "n"-shaped groove.

[0014] Furthermore, the odd-numbered coal pillars are 20% wider than the even-numbered coal pillars.

[0015] Furthermore, the ultra-high mining of the odd-numbered coal pillars is intermittent ultra-high mining, and the ultra-wide mining of the even-numbered coal pillars is intermittent ultra-wide mining.

[0016] Compared with the prior art, the present invention constructs two layers of roof, which plays a role in strengthening the roof; the first layer of roof is constructed by the jacking method, which can ensure the safety of the mining process and the convenience of operation; the second layer of roof is filled with odd and even coal pillars alternately, which can ensure that during the mining process, it plays a supporting role for the upper first layer of roof, and ensures further consolidation and strengthening of the first layer of roof; ultra-high and ultra-wide mining allows the first layer of roof, odd-numbered mining shafts, and even-numbered mining shafts filled in different time periods to be staggered and constrained to achieve left and right, up and down connection as a whole, and realize the construction of a double-layer roof; the double-layer roof can be combined to strengthen the support of the soft rock roof of the open-pit mine, and the coal below it can be excavated according to the relevant underground mining process without being affected by the soft rock roof. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall cross section of the present invention;

[0018] Figure 2 This is a schematic diagram of the first layer roof coal mining adit mining of the present invention;

[0019] Figure 3 This is a schematic diagram of the "n"-shaped slot structure of the present invention;

[0020] In the figure: 1. First layer roof; 2. Second layer roof; 3. Coal to be mined; 4. Coal seam roof; 5. Coal mining adit; 6. Bottom boundary of coal to be mined; 7. Extension direction of coal to be mined; 8. End boundary of coal to be mined; 9. "n" shaped groove; 10. Steel bar hole; 11. Steel bar; 12. Odd-numbered coal pillars; 13. Even-numbered coal pillars; 14. Odd-numbered mining adit; 15. Even-numbered mining adit. DETAILED DESCRIPTION

[0021] The present invention will be further described below in conjunction with the accompanying drawings.

[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0023] The present invention provides a technical solution, which is applicable to thick and extremely thick coal seams with a thickness of more than 10m, and the greater the thickness, the better the economic benefits of the solution. The solution includes using the upper top pipe roof reconstruction method to build the first roof 1 and the lower wedge alternating mining and filling method to build the second roof 2.

[0024] The method of reconstructing the upper top pipe roof includes three steps: continuous adit mining of coal, top pipe construction, and tunnel filling.

[0025] Continuous adit mining of coal: Figure 1 and Figure 2 As shown, in the area of ​​the coal to be mined 3 in the open-pit mine that needs to be mined underground, along the extension direction 7 of the coal to be mined, close to the coal seam roof 4, coal mining horizontal shafts 5 are successively excavated into the coal seam. The coal mining horizontal shafts 5 are rectangular, with a height of 4-5m and a horizontal width of 30-40m. The coal mining horizontal shafts 5 are excavated until the position of the bottom boundary 6 of the coal to be mined; the horizontal shaft excavation process is the coal mining process. When the previous coal mining horizontal shaft 5 is excavated to 1 / 3 of the final excavation depth, the second coal mining horizontal shaft 5 is excavated next to the previous coal mining horizontal shaft 5, and so on until the last coal mining horizontal shaft 5 at the end boundary 8 of the coal to be mined; when the coal mining horizontal shaft 5 is excavated, a downward inclination angle of 1% is set, and the coal mining horizontal shaft 5 is inclined as a whole, with the highest cave entrance and the lowest cave bottom.

[0026] Pipe jacking construction: During the excavation of the coal mining adit 5, an "n"-shaped groove 9 is synchronously arranged inside the coal mining adit 5. The "n"-shaped groove 9 is a concrete prefabricated part with an "n"-shaped cross section and its front and rear ends are open rather than closed. The height and width of the "n"-shaped groove 9 are slightly smaller than the height and width of the coal mining adit 5. The length of a single section of the "n"-shaped groove 9 is 8-10m, and the thickness of the side wall and top wall of the "n"-shaped groove 9 are both about 1m; the "n"-shaped grooves 9 are pushed into the interior of the adit 5 one by one from the opening of the coal mining adit 5 using a thrust device arranged at the opening of the adit. Every 10m of the excavation of the coal mining adit 5, a section of the "n"-shaped groove 9 is pushed into the coal mining adit 5 until the coal mining adit 5 is mined to the position of the bottom boundary 6 of the coal to be mined; Figure 3 As shown, in order to improve the connection firmness of two adjacent "n" shaped grooves 9, the side edges, top edges of the inner end face and the side edges, top edges of the outer end face of the "n" shaped groove 9 are evenly provided with a plurality of corresponding steel bars 11 and steel bar holes 10. When the front and rear end faces of two adjacent "n" shaped grooves 9 are butt-contacted, the steel bar 11 of the front "n" shaped groove 9 is just inserted into the steel bar hole 10 of the rear "n" shaped groove 9, and the length of the steel bar 11 and the steel bar hole 10 is 1m.

[0027] Tunnel filling: After the mining of the coal mining adit 5 is completed, the mining equipment is withdrawn, and high-strength materials are filled backwards from the inside of the coal mining adit 5 to the tunnel entrance, and the filling fills the entire "n"-shaped groove 9; after all coal mining adit 5 are mined and the "n"-shaped grooves 9 inside are filled, the construction of the first layer of roof 1 is completed.

[0028] The "n"-shaped groove 9 mainly plays a supporting role. The filling material and the "n"-shaped groove 9 together constitute the first roof layer 1, realizing artificial roof reconstruction; the coal mining adit 5 is set to be inclined downward, which can facilitate the pushing of the "n"-shaped groove 9 to achieve the purpose of saving labor, and can also ensure the sufficient filling of the filling material and ensure the reliability of the roof.

[0029] Lower layer wedge-shaped alternating mining and filling: after the construction of the first layer of roof 1 is completed, or in the later stage of the construction of the first layer of roof 1, when the filling material in the early stage has solidified and has a certain supporting force, the construction of the second layer of roof 2 begins below the first layer of roof 1; the corresponding coal 3 to be mined below each "n"-shaped groove 9 in the first layer of roof 1 is divided into 4, 6 or 8 coal pillars with a height of 4-5m, and it is optimal to divide it into 4 coal pillars. According to the construction direction of the first layer of roof 1, the coal pillars are divided into odd-numbered coal pillars 12 and even-numbered coal pillars 13, and the odd-numbered coal pillars 12 are 20% wider than the even-numbered coal pillars 13.

[0030] First, the odd-numbered coal pillars 12 are mined at super-high altitude. The odd-numbered coal pillars 12 are mined one by one in the direction of the construction of the first layer of roof 1. After the mining of the odd-numbered coal pillars 12, odd-numbered mining shafts 14 are formed. The odd-numbered mining shafts 14 are set with a downward inclination angle of 1%, and are inclined as a whole, with the highest shaft opening and the lowest shaft bottom. During the mining of the odd-numbered coal pillars 12, 1-2m is excavated into the interior of the first layer of roof 1 above. After the super-high mining of the odd-numbered coal pillars 12 is completed, high-strength materials are filled from the interior of the odd-numbered mining shaft 14 to the shaft opening in a backward manner, and the filling fills the entire odd-numbered mining shaft 14; and so on until the last odd-numbered mining shaft 14 is filled with filling materials.

[0031] After the last odd-numbered mining shaft 14 is filled with filling materials, or when the filling materials of the previous odd-numbered mining shaft 14 solidify and can generate more than 80% of the supporting force, the even-numbered coal pillars 13 are then mined in an ultra-wide manner, and the even-numbered coal pillars 13 are mined one by one in the direction of the construction of the first layer of roof 1. After the mining of the even-numbered coal pillars 13, an even-numbered mining shaft 15 is formed. The even-numbered mining shaft 15 is set with a downward inclination angle of 1%, and the whole is inclined, with the highest shaft at the entrance. The bottom is the lowest; during the mining process of the even-numbered coal pillar 13, it is necessary to excavate the inside of the adjacent odd-numbered mining shafts 14 on both sides in an extra-wide manner, and the extra-wide excavation width is 10% of the width of the odd-numbered mining shaft 14. After the extra-wide mining of the even-numbered coal pillar 13 is completed, high-strength materials are filled backwards from the inside of the even-numbered mining shaft 15 to the shaft entrance, and the filling fills the entire even-numbered mining shaft 15; and so on until the inside of the last even-numbered mining shaft 15 is filled with filling materials; at this point, the construction of the second layer of roof 2 is completed.

[0032] The construction of the second roof 2 plays a role in strengthening the roof strength. The alternating mining of the odd-numbered coal pillars 12 and the even-numbered coal pillars 13 can ensure that the first roof 1 above is supported during the mining process, and ensure the further consolidation and strengthening of the first roof 1. The ultra-high and ultra-wide mining is to allow the first roof 1, odd-numbered mining shafts 14, and even-numbered mining shafts 15 filled in different time periods to be staggered but constrained from each other, so as to achieve left and right, upper and lower connection as a whole, and realize the construction of a double-layer artificial roof; the ultra-high mining of the odd-numbered coal pillars 12 is intermittent ultra-high mining, and the ultra-wide mining of the even-numbered coal pillars 13 is intermittent ultra-wide mining, that is, after ultra-high mining and ultra-wide mining, the bottom surface of the first roof 1 and the side of the even-numbered mining shafts 15 are both serrated, and after the filling solidifies, the connection between the first roof 1, odd-numbered mining shafts 14, and even-numbered mining shafts 15 is more firmly established.

[0033] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0034] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any slight modification, equivalent substitution and improvement made to the above embodiment based on the technical essence of the present invention should be included in the protection scope of the technical solution of the present invention.

Claims

1. A method for regenerating the roof of a soft rock open-pit mine, characterized in that: The steps include: In an open-pit mine, in an area of ​​the coal to be mined (3) where underground mining is required, mining adits (5) are sequentially excavated along an extension direction (7) of the coal to be mined, close to the coal seam roof (4) and into the coal seam, and the mining adits (5) are excavated until the bottom boundary (6) of the coal to be mined; During the excavation of the coal mining tunnel (5), an "n"-shaped groove (9) is synchronously arranged inside the coal mining tunnel (5), and the length of a single section of the "n"-shaped groove (9) is 8-10 meters; the "n"-shaped grooves (9) are pushed into the interior of the tunnel one by one from the entrance of the coal mining tunnel (5), and one section of the "n"-shaped groove (9) is pushed into the coal mining tunnel (5) every 10 meters of excavation until the coal mining tunnel (5) reaches the bottom boundary (6) of the coal to be mined; After the mining of the coal mining adit (5) is completed, high-strength materials are filled backwards from the inside of the coal mining adit (5) to the entrance of the adit, and the filling material fills the entire "n"-shaped groove (9); after all the coal mining adit (5) are mined and the "n"-shaped grooves (9) inside are filled, the construction of the first roof (1) is completed; After the construction of the first roof (1) is completed, the construction of the second roof (2) begins below the first roof; the coal (3) to be mined corresponding to each "n"-shaped groove (9) in the first roof (1) is divided into 4, 6 or 8 coal pillars, and the coal pillars are divided into odd-numbered coal pillars (12) and even-numbered coal pillars (13) according to the construction direction of the first roof (1); First, the odd-numbered coal pillars (12) are mined at super-high altitude. The odd-numbered coal pillars (12) are mined one by one in the direction of the construction of the first roof (1). After the odd-numbered coal pillars (12) are mined, odd-numbered mining shafts (14) are formed. During the mining of the odd-numbered coal pillars (12), 1-2 m is excavated inside the first roof (1) above. After the super-high mining of the odd-numbered coal pillars (12) is completed, high-strength materials are filled backwards from the inside of the odd-numbered mining shaft (14) toward the shaft opening, and the filling fills the entire odd-numbered mining shaft (14); and this process is repeated until the inside of the last odd-numbered mining shaft (14) is filled with the filling material. Then, the even-numbered coal pillars (13) are mined in an ultra-wide manner. The even-numbered coal pillars (13) are mined one by one in the direction of the construction of the first roof (1). After the mining of the even-numbered coal pillars (13), an even-numbered mining shaft (15) is formed. During the mining of the even-numbered coal pillars (13), the interior of the adjacent odd-numbered mining shafts (14) on both sides is ultra-widely excavated. After the ultra-wide mining of the even-numbered coal pillars (13) is completed, high-strength materials are filled backwards from the interior of the even-numbered mining shaft (15) toward the shaft opening, and the filling fills the entire even-numbered mining shaft (15); and so on until the interior of the last even-numbered mining shaft (15) is filled with filling materials; at this point, the construction of the second roof (2) is completed.

2. A method for reconstructing the roof of a soft rock open-pit mine according to claim 1, characterized in that: The coal mining horizontal tunnel (5), the odd-numbered mining tunnels (14) and the even-numbered mining tunnels (15) are all inclined, with the mining tunnel mouths being at the highest position and the mining tunnel bottoms being at the lowest position.

3. A method for reconstructing the roof of a soft rock open-pit mine according to claim 1, characterized in that: The inner end face and the outer end face of the "n"-shaped groove (9) are respectively provided with correspondingly positioned steel bars (11) and steel bar holes (10); when the front and rear end faces of two adjacent "n"-shaped grooves (9) are in contact, the steel bar (11) of the front "n"-shaped groove (9) is just inserted into the steel bar hole (10) of the rear "n"-shaped groove (9).

4. A method for reconstructing the roof of a soft rock open-pit mine according to claim 3, characterized in that: The steel bars (11) and steel bar holes (10) are evenly arranged on the side edges and top edges of the "n"-shaped groove (9).

5. The method for reconstructing the roof of a soft rock open-pit mine according to claim 1, characterized in that: The odd-numbered coal pillars (12) are 20% wider than the even-numbered coal pillars (13).

6. A method for reconstructing the roof of a soft rock open-pit mine according to claim 1, characterized in that: The ultra-high mining of the odd-numbered coal pillars (12) is intermittent ultra-high mining, and the ultra-wide mining of the even-numbered coal pillars (13) is intermittent ultra-wide mining.