A prefabricated integrated pipe gallery

By assembling arc-shaped segments and linear beams and columns, arched stress-bearing members are formed, which solves the problems of low construction efficiency, high cost and poor bending stress-resisting structure in the existing technology, and realizes an efficient and economical underground comprehensive Pipe gallery construction.

CN117738238BActive Publication Date: 2024-10-01CHINA RUILIN ENG TECH CO LTD DONGGUAN BRANCH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410008407.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-04
Publication Date
2024-10-01
Estimated Expiration
2044-01-04

AI Technical Summary

Technical Problem

The existing construction methods of integrated pipe corridors have problems such as low construction efficiency, long cycle, high cost, heavy component weight, and difficult assembly. In particular, the double-cabin and three-cabin pipeline corridors have poor bending resistance structures, resulting in increased project costs. .

Method used

The prefabricated assembly method is used to assemble arc-shaped reinforced concrete segments and linear steel beams and columns to form arched stress-bearing components. The compressive strength of concrete and the tensile strength of the steel structure are used to improve the load-bearing capacity and pass On-site assembly forms an overall frame structure, reducing segment thickness and component weight, and reducing project costs.

Benefits of technology

It improves the load-bearing capacity and construction efficiency of the pipe gallery, reduces the project cost, simplifies the assembly process, facilitates on-site construction, and forms an efficient and economical underground comprehensive pipe gallery structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117738238B_ABST
    Figure CN117738238B_ABST
Patent Text Reader

Abstract

The present invention discloses a prefabricated integrated pipe gallery, which is assembled from pipe segments and beams and columns. The pipe segments are arc-shaped and prefabricated with reinforced concrete, and the beams and columns are straight and made of steel. The construction is assembled on site, and the space formed by the assembly of components is used as different functional partitions. The middle rectangular space is used as a pipeline cabin, and the surrounding crescent-shaped spaces are respectively used as a drainage cavity, a strong current cavity, a weak current cavity, and a facility cavity. The main body of the pipe gallery is laid in an underground corridor shape, and the main body of the pipe gallery is connected in series with the functional rooms set at intervals to form an underground integrated pipe gallery that accommodates municipal pipelines. The defect of the poor stress structure of the flat plate components in the prior art is overcome, and the arc-shaped pipe segments and beams and columns are combined into an arched stress-bearing component, which changes the bending structure into a compression and tension structure, fully utilizing the high compressive strength of concrete and the high tensile strength of steel structure, greatly improving the bearing capacity of the component, effectively reducing the thickness of the pipe segment, reducing the project cost, and the weight of the component is small, which is convenient for assembly and construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a prefabricated assembled comprehensive pipe gallery, belongs to underground structural engineering, and particularly relates to a prefabricated steel-concrete assembled underground comprehensive pipe gallery. Background Art

[0002] Underground utility corridors, also known as "common trenches", are public tunnels built underground in cities for the centralized laying of municipal pipelines such as electricity, communications, radio and television, water supply, drainage, heat, and gas. Underground utility corridors can effectively prevent the "road zipper" phenomenon. There is no need to repeatedly excavate the road surface. Various pipelines can be repaired, maintained, expanded, and renovated in the corridors, and the time for pipeline repairs can be greatly reduced. Suitable conditions for utility corridors: urban trunk roads with busy transportation or many underground pipelines, as well as construction sites such as rail transit, underground roads, and urban underground complexes; urban core areas, central business districts, high-intensity concentrated development zones in underground spaces, important squares, intersections of major roads, intersections of roads with railways or rivers, and cross-river tunnels; sections where the width of the road is difficult to meet the requirements for direct burial of multiple pipelines; important public spaces; sections where it is not suitable to excavate the road surface. The integrated pipe gallery is composed of pipeline cabins and functional rooms. The pipeline cabin is connected by several functional rooms and laid underground along the road corridor. The pipeline cabin is used to set professional pipelines. The functional rooms include inlets and outlets, ventilation ports, feeding ports, power distribution rooms, drainage stations, emergency escape ports, etc. The cross-section of the pipeline cabins of the integrated pipe gallery in the prior art is mostly rectangular. The pipeline cabins are divided into single cabins, double cabins, and triple cabins according to the plastics of the pipelines. Gas pipelines should be set up in independent cabins.

[0003] The main construction method of the existing technology integrated pipe corridor is open excavation and cast-in-place reinforced concrete structure. The foundation pit of the pipe corridor adopts open excavation, and the steel bars are tied on site and the concrete is cast with formwork. Although the pipe corridor structure formed by this method has fewer joints, good structural integrity and waterproofness, the construction efficiency is low and the construction period is long. The existing technology integrated pipe corridor non-excavation construction includes shallow buried dark excavation method, jacking method, shield method and other non-excavation construction methods, which are mainly used in special areas without excavation conditions, but the construction is difficult and the cost is high, and it is rarely used in actual projects. There is also an integrated pipe corridor constructed by open excavation assembly method in the existing technology. The foundation pit of the pipe corridor adopts open excavation and is assembled on site using prefabricated components. It is one of the development trends of the integrated pipe corridor, which greatly reduces construction costs, improves construction quality, and saves construction time. Prefabricated components include full-section integral prefabrication and piece-by-piece prefabrication. The former has a heavier component weight and requires larger lifting machinery, especially for double-compartment and triple-compartment corridors, which make construction difficult. The latter divides the corridor section into different parts and prefabricates them into flat plates, generally divided into bottom plate, side wall and top plate. This method is widely used in practice, but it also has some problems. The assembly connection of the flat plate is simply supported, which is different from the full-section integrated structure, which has a consolidated overall frame with good stress resistance, especially the top plate and bottom plate, which are subjected to bending stress. The piece-by-piece prefabricated components require a larger wall plate thickness to improve the bending resistance, which will increase the project cost. Summary of the invention

[0004] The purpose of the present invention is to provide a prefabricated integrated pipe gallery, which is assembled from pipe segments and beams and columns. The pipe segments are arc-shaped and prefabricated with reinforced concrete. The beams and columns are straight and made of steel. The construction is assembled on site. The space formed by the assembly of components is used as different functional partitions. The middle rectangular space is used as a pipeline cabin, and the surrounding crescent-shaped spaces are respectively a drainage cavity, a strong current cavity, a weak current cavity, and a facility cavity. The main body of the pipe gallery is laid in an underground corridor shape, and the main body of the pipe gallery is connected in series with the functional rooms set at intervals to form an underground integrated pipe gallery that accommodates municipal pipelines. The beneficial effects are: it overcomes the defects of the poor stress structure of the flat plate components in the prior art, and uses arc-shaped pipe segments and beams and columns to form an arched stress-bearing component, which changes the bending structure into a compression and tension structure, fully utilizing the high compressive strength of concrete and the high tensile strength of steel structure, greatly improving the bearing capacity of the component, effectively reducing the thickness of the pipe segment, reducing the project cost, and the component weight is small, which is convenient for assembly and construction.

[0005] The present invention is realized by the following technologies: prefabricated and assembled integrated pipe gallery, which is divided into single-cabin pipe gallery, double-cabin pipe gallery and triple-cabin pipe gallery. The pipe gallery is assembled by pipe segments and beams and columns. The cross-sectional outer contour of the single-cabin pipe gallery is a circular ring. A bottom plate 100 is located at the lower part of the pipe gallery, two side plates 200 are located on both sides of the pipe gallery, and a top plate 300 is located at the upper part of the pipe gallery. The lower part of the side plate 200 is connected to the bottom plate 100, and the upper part of the side plate 200 is connected to the top plate 300. The pipe segments are fixed at the connection point with an arc anchor 1, and a channel for installing the arc anchor 1 is reserved on the pipe segment. The pipe segment is provided with an embedded steel plate 2. The ends of a bottom cross beam 101, two side columns 201 and a top cross beam 301 are connected to each other and fixed with bolts to the embedded steel plate 2. Four beams and columns are assembled with four pipe segments to form five spaces. The central rectangular space is the pipeline cabin 400, the lower crescent-shaped space is the drainage cavity 500, the crescent-shaped spaces on both sides are the high-voltage cavity 600 and the low-voltage cavity 700 respectively, and the upper crescent-shaped space is the facility cavity 800.

[0006] The outer contour of the cross section of the double-cabin corridor is two intersecting circular rings, the two side bottom pieces 102 are butt-jointed in the middle and located at the lower part of the corridor, the two side pieces 200 are located on both sides of the corridor, the two side top pieces 302 are butt-jointed in the middle and located at the upper part of the corridor, the lower part of the side piece 200 is connected to the side bottom piece 102, the upper part of the side piece 200 is connected to the side top piece 302, the connecting parts of the pipe pieces are fixed with arc anchors 1, and holes for installing the arc anchors 1 are reserved on the pipe pieces. The pipe segment is provided with embedded steel plates 2, a bottom cross beam 101 runs through two side bottom plates 102, a top cross beam 301 runs through two side top plates 302, two side columns 201 are respectively arranged at the ends of the bottom cross beam 101 and the top cross beam 301, a middle column 202 is arranged in the middle of the bottom cross beam 101 and the top cross beam 301, and the beam-column connection is fixed with bolts and the embedded steel plates 2. Five beams and columns are assembled with six pipe segments to form eight spaces. The two in the middle are interconnected pipeline cabins 400, the two crescent-shaped spaces in the lower part are drainage chambers 500, the crescent-shaped spaces on both sides are strong current chambers 600 and weak current chambers 700, and the two crescent-shaped spaces in the upper part are facility chambers 800.

[0007] The cross-sectional outer contour of the three-cabin pipe gallery is three intersecting circular rings, two side bottom pieces 102 are arranged on both sides and docked with a middle bottom piece 103 at the lower part of the pipe gallery, two side pieces 200 are located on both sides of the pipe gallery, two side top pieces 302 are arranged on both sides and docked with a middle top piece 303 at the upper part of the pipe gallery, the lower part of the side piece 200 is connected to the side bottom piece 102, and the upper part of the side piece 200 is connected to the side top piece 302. The pipe segments are fixed at the connection point with arc anchors 1, and the pipe segments are reserved for installing the arc anchors 1. The pipe segments are provided with embedded steel plates 2, and a partition wall 203 is provided between the side bottom piece 102 and the side top piece 302 on one side, dividing the pipe gallery into a single cabin and a double cabin. The ends of a bottom beam 101, a side column 201, and a top beam 301 in the single cabin are connected to each other, and the other ends of the bottom beam 101 and the top beam 301 are connected to the partition wall 203. In the double cabin, a bottom cross beam 101 runs through the side bottom plate 102 and the middle bottom plate 103, a top cross beam 301 runs through the side top plate 302 and the middle top plate 303, a side column 201 is connected to one end of the bottom cross beam 101 and the top cross beam 301, and the other ends of the bottom cross beam 101 and the top cross beam 301 are connected to the partition wall 203, and the beam-column connection is fixed with bolts and embedded steel plates 2. Six beams, eight pipe segments, and a partition wall are assembled to form eleven spaces. The single cabin is an independent gas warehouse 401, the lower crescent-shaped space is a drainage cavity 500, and the upper crescent-shaped space is a facility cavity 800. The double cabin is two interconnected pipeline cabins 400, the lower two crescent-shaped spaces are drainage cavities 500, one side of the crescent-shaped space is a weak current cavity 700, and the upper two crescent-shaped spaces are facility cavities 800.

[0008] The pipe segments are prefabricated with reinforced concrete, the beams and columns are made of steel, and the construction is carried out by on-site assembly. The arc-shaped pipe segments and beams and columns are combined into arched load-bearing components. Multiple arched load-bearing components constitute a steel-concrete integral frame load-bearing structure, which is laid in the shape of an underground corridor to form the main body of the corridor, and is connected in series with the functional rooms 900 arranged at intervals. The functional rooms 900 include entrances and exits, ventilation ports, feeding ports, emergency escape ports, power distribution rooms, drainage pump rooms, and fan rooms, forming an underground comprehensive corridor that accommodates municipal pipelines.

[0009] A foundation 3 is provided at the lower part of the pipe gallery, and grouting holes 4 are provided on the bottom film 100, the side bottom film 102, and the middle bottom film 103. Grouting grooves 5 communicating with the grouting holes 4 are provided at the bottom of the bottom film 100, the side bottom film 102, and the middle bottom film 103 in the longitudinal and transverse directions. The bottom of the bottom film 100, the side bottom film 102, and the middle bottom film 103 are flat, which are placed on the foundation and grouting is injected through the grouting holes 4. The slurry fills the grouting grooves 5, so that the space between the bottom film 100, the side bottom film 102, the middle bottom film 103 and the foundation 3 is densely filled, which plays a role in overall stability.

[0010] The side bottom plate 102 of the double-cabin pipe gallery is provided with a connecting hole 6 to connect the two drainage chambers 500; the side bottom plate 102 and the middle bottom plate 103 of the double-cabin part of the three-cabin pipe gallery are provided with a connecting hole 6 to connect the two drainage chambers 500.

[0011] A supporting tenon 7 is provided between the two side top sheets 302 of the double-cabin pipe gallery, and a supporting tenon 7 is provided between the side top sheets 302 and the middle top sheet 303 on both sides of the three-cabin pipe gallery. The function of the supporting tenon 7 is to improve the bending resistance of the upper structure.

[0012] The bottom plate 100, side bottom plate 102, middle bottom plate 103, side plate 200, top plate 300, side top plate 302 and middle top plate 303 are prefabricated reinforced concrete components in segments, with a length of L=1000~3000mm. The circumferential joints 8 of adjacent segments are assembled with staggered joints, and the longitudinal joints 9 are assembled with through joints. Sealing gaskets 10 are arranged in the joints. A deformation joint 11 is arranged every 10~20m in the corridor, and the deformation joint 11 is fully circumferentially connected. A waterstop 12 is arranged in the joint. An assembly unit is formed between two deformation joints 11, and the two ends of the assembly unit are assembled alternately with a whole segment with a length of L and a half segment with a length of L / 2 to adjust the staggered joints of the circumferential joints 8.

[0013] The bottom cross beam 101, the side columns 201, and the top cross beam 301 are arranged at a spacing of L / 2.

[0014] The central column 202 is arranged at intervals of 1 to 3 side columns 201 according to the spacing of the side columns 201 .

[0015] The distance between the center of the support tenon 7 and the edge of the pipe segment is L / 4, and the distance between the support tenons 7 is L / 2.

[0016] The construction method of prefabricated integrated pipe gallery is to prefabricate the pipe segments and beams in the factory, and then transport them to the site for assembly. The assembly steps are as follows.

[0017] a. After the tunnel trench excavation is completed, one assembly unit is regarded as one construction section. The length of the construction section is an integer multiple of the segment length L including the width of the annular joint 8. The concrete of the foundation 3 is cast according to the center position and elevation of the design drawing, and the foundation 3 is disconnected at the deformation joint 11.

[0018] b. Install the bottom segment:

[0019] 1) Assembling the bottom pipe segments of the single-cabin pipe gallery: Place the first row of bottom plates 100 with a length of L on one end of the foundation 3 of the assembly unit. When assembling the second row of bottom plates 100, use the tenons and grooves of the pipe segment tongue and groove to quickly position them. Insert the arc anchor 1 into the reserved hole of the bottom plate 100, tighten the nut of the arc anchor 1, squeeze the sealing gasket 10 of the annular joint 8, and stop tightening the nut when the inner and outer walls of the annular joint 8 reserve gaps. Assemble the bottom plates 100 row by row to the other end of the assembly unit;

[0020] 2) Assembling the bottom pipe segments of the double-cabin pipe gallery: on one side of one end of the foundation 3 of the assembly unit, place the first row of side bottom pieces 102 with a length of L, and on the other side of the first row, use a half side bottom piece 102 with a length of L / 2 to assemble with the whole side bottom piece 102, tighten the nut of the arc anchor 1 of the longitudinal seam 9 between the two side bottom pieces 102, butt the whole side bottom piece 102 on one side of the half side bottom piece 102, and use side bottom pieces 102 with a length of L in turn row by row, and assemble the circumferential seam 8 of the two side bottom pieces 102 to the other end of the assembly unit with staggered seams, and tighten the nuts of the arc anchor 1 of the circumferential seam 8 and the longitudinal seam 9 simultaneously, and use a side bottom piece 102 with a length of L / 2 to fill the side corresponding to the starting point of the last row;

[0021] 3) Assemble the bottom pipe segments of the three-compartment pipe gallery. Place the first row of middle bottom pieces 103 with a length of L in the middle of one end of the foundation 3 of the assembly unit. Use half-pieces of side bottom pieces 102 with a length of L / 2 on both sides of the first row and assemble with the whole middle bottom piece 103. Tighten the nuts of the arc-shaped anchors 1 of the longitudinal joints 9 between the side bottom pieces 102 and the middle bottom pieces 103. Connect the middle bottom pieces 103 in the first row to the middle bottom pieces 103 in the second row. During the assembly, always keep the middle bottom piece 103 half the length of the side bottom piece 102. Use whole side bottom pieces 102 on both sides of the middle bottom piece 103 for splicing. Use side bottom pieces 102 and middle bottom pieces 103 with a length of L in sequence row by row. Stagger the circumferential joints 8 to the other end of the assembly unit. Tighten the nuts of the arc-shaped anchors 1 of the circumferential joints 8 and the longitudinal joints 9 simultaneously. Use side bottom pieces 102 with a length of L / 2 to fill the gaps on both sides of the last row.

[0022] c. After the bottom segment of an assembly unit is assembled, a grouting machine is used to inject grout into the grouting holes 4 of the bottom segment 100, the side bottom segment 102, and the middle bottom segment 103. The grout diffuses to the surroundings through the grouting groove 5 to fill the gap between the bottom segment 100 and the foundation 3.

[0023] d. Install the bottom cross beam 101 on the bottom plate 100 or the side bottom plate 102 or the middle bottom plate 103 and fix it to the embedded steel plate 2.

[0024] .e. Install the pipe segments on both sides:

[0025] 1) For the assembly of pipe segments on both sides of the single-cabin pipe gallery, the first row is assembled with a half-piece side piece 200 with a length of L / 2 and assembled on the bottom piece 100, and fixed with the bottom piece 100 using an arc anchor 1. The whole side piece 200 with a length of L is sequentially assembled row by row with the circumferential joint 8 of the bottom piece 100 staggered to the other end of the assembly unit, and the nuts of the arc anchor 1 of the circumferential joint 8 and the longitudinal joint 9 are tightened synchronously. After each side piece 200 is assembled, the side column 201 and the top crossbeam 301 are promptly installed and fixed with the embedded steel plate 2. The last row is completed with a side piece 200 with a length of L / 2;

[0026] 2) The pipe segments on both sides of the double-cabin pipe gallery are assembled. The bottom pipe segment of the first row is one side of the whole side bottom piece 102, and a half side piece 200 with a length of L / 2 is used to assemble it. The bottom pipe segment is one side of the half side bottom piece 102, and a whole side piece 200 with a length of L is used to assemble it with it. The whole side pieces 200 with a length of L are used row by row in sequence, and are staggered with the circumferential joint 8 of the bottom piece 100 to the other end of the assembly unit. The nuts of the arc anchors 1 of the circumferential joint 8 and the longitudinal joint 9 are tightened synchronously. After each side piece 200 is assembled, the side columns 201, the middle columns 202 and the top crossbeam 301 are installed in time to fix them with the embedded steel plate 2. The side piece 200 with a length of L / 2 is used to fill the half starting point of the last row;

[0027] 3) The pipe segments on both sides of the three-cabin pipe gallery are assembled. Both sides are assembled with a whole side piece 200 of length L, and are staggered with the circumferential joint 8 of the side bottom piece 102 to the other end of the assembly unit. The nuts of the arc anchors 1 of the circumferential joint 8 and the longitudinal joint 9 are tightened synchronously. After each side piece 200 is assembled, the side columns 201, the middle column 202, the partition wall 203 and the top crossbeam 301 are installed in time and fixed to the embedded steel plate 2.

[0028] f. Install the top segment:

[0029] 1) For the assembly of the top pipe segments of the single-cabin pipe gallery, all the top sheets 300 with a length of L are assembled, and the circumferential seams 8 of the side sheets 200 are staggered and assembled to the other end of the assembly unit, and the nuts of the arc-shaped anchors 1 of the circumferential seams 8 and the longitudinal seams 9 are tightened synchronously. After each top sheet 300 is assembled, the embedded steel plate 2 is fixed to the top crossbeam 301 in time;

[0030] 2) Assembling the top pipe segments of the double-cabin pipe gallery: the first row is assembled on one side of the lower half-piece side piece 200 with a length of L / 2, and the half-piece side top piece 302 with a length of L / 2 is assembled on one side of the lower full-piece side piece 200 with a length of L / 2. The support tenons 7 between the two side top pieces 302 are tightly pressed, and staggered with the circumferential seams 8 of the side pieces 200 to the other end of the assembly unit, and the nuts of the arc-shaped anchors 1 of the circumferential seams 8 and the longitudinal seams 9 are tightened synchronously. After each side top piece 302 is assembled, the embedded steel plate 2 is fixed to the top crossbeam 301 in time, and the side of the last row corresponding to the starting point of the half piece is filled with a side top piece 302 with a length of L / 2;

[0031] 3) Assembling the top pipe segments of the three-cabin pipe gallery, the first row is assembled in the middle with a whole middle top piece 303 of length L, and half side top pieces 302 of length L / 2 are assembled on both sides of the middle top piece 303, the side top pieces 302 are pressed against the supporting tenons 7 of the middle top piece 303, and the middle top pieces 303 are all made of a whole piece of length L. During the assembly, the middle top piece 303 is always kept half the length of the side top piece 302, and whole side top pieces 302 are used for splicing on both sides of the middle top piece 303, and side top pieces 302 and middle top pieces 303 of length L are used row by row in sequence, and staggered with the circumferential seam 8 of the side piece 200 to the other end of the assembly unit, and the nuts of the arc anchors 1 of the circumferential seam 8 and the longitudinal seam 9 are tightened synchronously. When assembled to the other end of the assembly unit, the side top pieces 302 of length L / 2 are used to fill the gap on both sides of the last row.

[0032] g. Drill a caulking hole 13 with a diameter of 20-25 mm and a depth of 50-100 mm at the gap between the two supporting tenons 7 of the second-compartment pipe gallery and the third-compartment pipe gallery, remove the concrete slag in the hole, insert the grouting pipe connected to the grouting pump into the hole, and inject grout into the gap between the two supporting tenons 7.

[0033] h. Install the channel plate 14 on the bottom cross beam 101, and install the ventilation pipe 15, the fire extinguisher 16, and the lighting lamp 17 in the facility cavity 800.

[0034] i. The hole 18 where the arc anchor 1 is installed in the segment is sealed with epoxy resin mortar, and the circumferential joints 8 and longitudinal joints 9 on the inner and outer walls of the segment are filled with polyurethane sealant.

[0035] .After the pipe gallery is assembled, reinforced concrete is used to cast the functional room 900. After the concrete reaches the designed strength, the earth is backfilled to the ground. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 This is a cross-sectional view of a single-cabin corridor;

[0037] Figure 2 This is the exploded view of the pipe segments, beams and columns of a single-cabin pipe gallery;

[0038] Figure 3 This is a cross-sectional view of a double-cabin pipe gallery;

[0039] Figure 4 This is the cross-section of the three-cabin pipe gallery;

[0040] Figure 5 This is a top view of the double-cabin pipe gallery;

[0041] Figure 6 This is a three-dimensional diagram of the double-cabin pipe gallery;

[0042] Figure 7 This is the longitudinal section of the pipe gallery;

[0043] Figure 8 This is the longitudinal seam drawing ( Figure 1 A node sample diagram);

[0044] Fig. 9 This is the large drawing of the circumferential joint ( Figure 6 Node B sample diagram);

[0045] Fig.10 This is a plan diagram of a single-cabin integrated pipeline corridor.

[0046] In the figure: 100-bottom film, 101-bottom cross beam, 102-side bottom film, 103-middle bottom film, 200-side film, 201-side column, 202-middle column, 203-partition wall, 300-top film, 301-top cross beam, 302-side top film, 303-middle top film, 400-pipeline cabin, 401-gas bunker, 500-drainage chamber, 600-strong current chamber, 700-weak current chamber, 800-facility cavity, 900-functional room, 1-arc anchor, 2-embedded steel plate, 3-foundation, 4-grouting hole, 5-grouting groove, 6-connecting hole, 7-support tenon, 8-circumferential joint, 9-longitudinal joint, 10-sealing pad, 11-deformation joint, 12-waterstop, 13-caulking hole, 14-channel plate, 15-ventilation pipe, 16-fire extinguisher, 17-lighting lamp, 18-hole opening. Implementation

[0047] In order for those skilled in the art to better understand the present invention, Figure 1 to Figure 10 The present invention is further described, and the contents mentioned in the implementation modes are not intended to limit the present invention.

[0048] In the present description, the terms "up", "down", "left", "right", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or directions or positional relationships commonly understood by those skilled in the art. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0049] The present invention is an open-cut prefabricated integrated pipe gallery, which is divided into a single-compartment pipe gallery, a double-compartment pipe gallery, and a three-compartment pipe gallery. The pipe gallery is assembled from pipe segments and beams and columns. The pipe segments are prefabricated with reinforced concrete, the beams and columns are made of steel, and the construction is assembled on site. The arc-shaped pipe segments and beams and columns are combined into arched load-bearing components. Multiple arched load-bearing components form a steel-concrete integral frame load-bearing structure, which is laid in an underground corridor to form a pipe gallery section. The pipe gallery section is the main part of the integrated pipe gallery. The pipe gallery section is connected in series with the functional room 900 set at intervals to form an underground integrated pipe gallery accommodating municipal pipelines.

[0050] The cross-sectional outer contour of a single-compartment pipe gallery is a circular ring, which is composed of 4 arc-shaped pipe segments and 4 beams and columns. The cross-sectional view of a single-compartment pipe gallery is shown in Figure 1 The specific structure is that a bottom sheet 100 is located at the lower part of the pipe gallery, two side sheets 200 are located on both sides of the pipe gallery, and a top sheet 300 is located at the upper part of the pipe gallery. The lower part of the side sheet 200 is connected to the bottom sheet 100, and the upper part of the side sheet 200 is connected to the top sheet 300. The pipe segments are fixed at the connection point with an arc anchor 1, and a hole for installing the arc anchor 1 is reserved on the pipe segment. The pipe segment is provided with an embedded steel plate 2, and the ends of a bottom cross beam 101, two side columns 201, and a top cross beam 301 are connected to each other and fixed with bolts and the embedded steel plate 2. Four beams and columns are assembled with four pipe segments to form five spaces. The central rectangular space is the pipeline cabin 400, the lower crescent-shaped space is the drainage cavity 500, the crescent-shaped spaces on both sides are the strong current cavity 600 and the weak current cavity 700, and the upper crescent-shaped space is the facility cavity 800. Segments and beams are the basic components of the assembled pipe gallery. The exploded diagram of the segments and beams is shown in Figure 2 ,This figure is an exploded view of the pipe segments and beams and columns of a single-cabin pipe gallery, showing the structure when the pipe segments and beams and columns are not assembled.

[0051] The cross section of the double-compartment corridor is evolved from the single-compartment corridor, and its outer contour is two intersecting circles. Figure 3The specific structure is that two edge bottom pieces 102 are butt-jointed in the middle and located at the lower part of the pipe gallery, two side pieces 200 are located at both sides of the pipe gallery, and two edge top pieces 302 are butt-jointed in the middle and located at the upper part of the pipe gallery. The lower part of the side piece 200 is connected to the edge bottom piece 102, and the upper part of the side piece 200 is connected to the edge top piece 302. The connecting part of the pipe pieces is fixed with an arc anchor 1, and a hole for installing the arc anchor 1 is reserved on the pipe piece. The pipe segment is provided with embedded steel plates 2, a bottom cross beam 101 runs through two side bottom plates 102, a top cross beam 301 runs through two side top plates 302, two side columns 201 are respectively arranged at the ends of the bottom cross beam 101 and the top cross beam 301, a middle column 202 is arranged in the middle of the bottom cross beam 101 and the top cross beam 301, and the beam-column connection is fixed with bolts and the embedded steel plates 2. Five beams and columns are assembled with six pipe segments to form eight spaces. The two in the middle are interconnected pipeline cabins 400, the two crescent-shaped spaces in the lower part are drainage chambers 500, the crescent-shaped spaces on both sides are strong current chambers 600 and weak current chambers 700, and the two crescent-shaped spaces in the upper part are facility chambers 800.

[0052] The cross section of the three-compartment corridor is further evolved from the two-compartment corridor, and the outer contour is three intersecting circles. The cross section of the three-compartment corridor is shown in Figure 4 . The specific structure is that two side bottom plates 102 are arranged on both sides and connected with a middle bottom plate 103 at the lower part of the pipe gallery, two side plates 200 are located on both sides of the pipe gallery, and two side top plates 302 are arranged on both sides and connected with a middle top plate 303 at the upper part of the pipe gallery. The lower part of the side plate 200 is connected with the side bottom plate 102, and the upper part of the side plate 200 is connected with the side top plate 302. The pipe segments are fixed at the connected part with an arc anchor 1, and a hole for installing the arc anchor 1 is reserved on the pipe segment; the pipe segment is provided with an embedded steel plate 2, and a partition wall 203 is provided between the side bottom plate 102 and the side top plate 302 on one side, which divides the pipe gallery into a single cabin and a double cabin. The three-cabin pipe gallery is provided for gas pipelines that need independent compartments. The gas pipeline is arranged in the single cabin, and the remaining pipelines and cables are arranged in the double cabin. The partition wall 203 is prefabricated with reinforced concrete, and sealing gaskets are arranged above and below the partition wall 203 to ensure isolation from the double cabin. Figure 4In a single cabin, the ends of a bottom crossbeam 101, a side column 201, and a top crossbeam 301 are connected to each other, and the other ends of the bottom crossbeam 101 and the top crossbeam 301 are connected to the partition wall 203; in a double cabin, a bottom crossbeam 101 passes through the side bottom sheet 102 and the middle bottom sheet 103, a top crossbeam 301 passes through the side top sheet 302 and the middle top sheet 303, a side column 201 is connected to one end of the bottom crossbeam 101 and the top crossbeam 301, and the other ends of the bottom crossbeam 101 and the top crossbeam 301 are connected to the partition wall 203. The partition wall 203 is connected, and the beam-column connection is fixed with bolts and embedded steel plates 2. Six beams and columns, eight pipe segments, and one partition wall are assembled to form eleven spaces. The single cabin is an independent gas warehouse 401, the lower crescent-shaped space is a drainage cavity 500, and the upper crescent-shaped space is a facility cavity 800. The double cabin is two interconnected pipeline cabins 400, the lower two crescent-shaped spaces are drainage cavities 500, one side of the crescent-shaped space is a weak current cavity 700, and the upper two crescent-shaped spaces are facility cavities 800.

[0053] The bottom plate 100, side bottom plate 102, middle bottom plate 103, side plate 200, top plate 300, side top plate 302 and middle top plate 303 of the present application are prefabricated reinforced concrete components in pieces, and the length of one piece is L=1000~3000mm. The comprehensive pipeline corridor construction of the present application adopts open-cut trench. After the tunnel trench is excavated according to the design elevation, the lower structure construction is carried out first. The lower part of the pipeline corridor is provided with a foundation 3, and the foundation 3 is cast-in-place with C25~C30 concrete. The bottom plate 100, the side bottom plate 102, and the middle bottom plate 103 are provided with grouting holes 4. The grouting holes 4 are pre-buried in the concrete with DN20~25 steel pipes, and the exposed parts are threaded, see Figure 2 The bottom of the bottom plate 100, the side bottom plate 102, and the middle bottom plate 103 are provided with grouting grooves 5 in the vertical and horizontal directions, which are connected with the grouting holes 4. Figure 1~Figure 4 The bottom of the bottom plate 100, the side bottom plate 102, and the middle bottom plate 103 are flat, placed on the foundation and grouting is performed through the grouting hole 4. The slurry adopts cement mortar with a ratio of cement: medium sand = 1:1. The slurry fills the grouting groove 5, so that the bottom plate 100, the side bottom plate 102, the middle bottom plate 103 and the foundation 3 are densely filled, which plays a role in overall stability. The side bottom plate 102 of the double-cabin corridor is provided with a connecting hole 6 to connect the two drainage cavities 500; the side bottom plate 102 and the middle bottom plate 103 of the double-cabin part of the three-cabin corridor are provided with a connecting hole 6 to connect the two drainage cavities 500. A supporting tenon 7 is provided between the two side top plates 302 of the double-cabin corridor, and a supporting tenon 7 is provided between the side top plates 302 and the middle top plates 303 on both sides of the three-cabin corridor. The center of the supporting tenon 7 is L / 4 away from the edge of the pipe segment, and the spacing between the supporting tenons 7 is L / 2. Figure 3~Figure 6The function of the support tenon 7 is to support the upper structure when it is bent and deformed downward under the action of load, thereby improving the bending resistance of the upper structure. Since the two support tenons 7 that are pressed against each other are not in absolute plane contact, there is a certain gap. After the pipe segment is assembled, an electric drill is used to drill a caulking hole 13 with a diameter of 20~25mm and a depth of 50~100mm at the gap between the two support tenons 7 that are pressed against each other, and the concrete slag in the hole is removed. The grouting pipe connected to the grouting pump is inserted into the hole, and grouting is injected into the gap between the two support tenons 7. The slurry uses cement slurry (without sand).

[0054] The segments are assembled piece by piece on the foundation 3. The circumferential joints 8 of adjacent segments are assembled with staggered joints, and the longitudinal joints 9 are assembled with continuous joints. The circumferential joints 8 and the longitudinal joints 9 are tongue-and-groove joints. When the segments are prefabricated, one side of the edge is a tongue-and-groove groove and the other side is a convex tenon. When two adjacent segments are assembled, the convex tenon is embedded in the groove to form a tongue-and-groove joint. See the sample of the longitudinal joint 9 for details. Figure 8 , see the circumferential joint pattern Fig. 9 . A sealing gasket 10 is arranged in the seam. The sealing gasket 10 is a water-swelling rubber with a thickness of 10 to 20 mm. The sealing gasket 10 is glued in the groove of the tongue-and-groove seam. When the pipe segment is assembled, the sealing gasket 10 in the seam is compressed under the fastening of the arc-shaped anchor 1 to seal the seam. The remaining seam width at the joint between the inner and outer edges of the pipe segment is 5 to 10 mm to avoid rigid extrusion and breakage of the pipe segment concrete. After the assembly of the pipe gallery is completed, polyurethane sealant is used to fill the seam. Therefore, when making the pipe segment, the length should be reserved for assembly clearance. A deformation joint 11 is arranged at intervals of 10 to 20 m in the pipe gallery. The deformation joint 11 is circumferentially connected to the entire section. A waterstop 12 is arranged in the seam. The waterstop 12 is a rubber waterstop specially made according to the cross-sectional shape of the pipe gallery. The foundation 3 is disconnected at the deformation joint 11 with an asphalt-soaked wooden board. The width of the deformation joint 11 is about 20 mm. Figure 7 The right side of the pipe segment. Between the two deformation joints 11 is an assembly unit. The pipe segment assembly is a construction section with one assembly unit. The length of the construction section is an integer multiple of the pipe segment length L including the width of the annular joint 8. At the two ends of the assembly unit, whole pipe segments with a length of L and half pipe segments with a length of L / 2 are alternately assembled to adjust the staggered seams of the annular joint 8. Therefore, a small number of half pipe segments with a length of L / 2 need to be prefabricated when making the pipe segments. Taking a single-cabin pipe gallery as an example, the end bottom piece 100 of the assembly unit is assembled to the other end with a whole pipe segment with a length of L, which is exactly flush with the deformation joint 11; the first piece of the two side pieces 200 is a half pipe segment with a length of L / 2, and the middle part is all a whole pipe segment with a length of L. When assembled to the end of the other end, the side piece 200 is supplemented with a half pipe segment with a length of L / 2; the top piece 300 is assembled to the other end with a whole pipe segment with a length of L, which is exactly flush with the deformation joint 11. The number of cross-sectional segments in the single-cabin, double-cabin and triple-cabin corridors are all even numbers, and the two ends of the assembly unit are assembled alternately by full-length and half-length segments, which can achieve 8-staggered assembly of circumferential joints.

[0055] In order to further illustrate the staggered assembly of the circumferential joint 8, taking the double-cabin pipe gallery as an example, Figure 5 Double-cabin pipe gallery top view, Figure 6 After the foundation 3 is completed, a side bottom sheet 102 with a length of L is placed on the right side of the first row, and a side bottom sheet 102 with a length of L / 2 is placed on the left side. Figure 5 The top view does not show the side bottom film 102. Figure 6 The stereogram cannot be shown due to the viewing angle. In the counterclockwise direction, it is the side piece 200 with a length of L / 2, the side top piece 302 with a length of L, the side top piece 302 with a length of L / 2, the side piece 200 with a length of L, and the side piece 200 with a length of L on the left is staggered and spliced ​​with the side bottom piece 102 with a length of L / 2 on the left. From the second piece on, the entire section is a pipe piece with a length of L. At the other end of the assembly unit, the position of the half pipe piece with a length of L / 2 corresponding to the starting section is filled with a half pipe piece of L / 2.

[0056] In this application, the arc-shaped pipe segment and the straight beam column form an arched force-bearing unit. The pipe segment and the beam column bear force together. In order to adapt to the L / 2 length staggered assembly, the bottom cross beam 101, the side column 201, and the top cross beam 301 are set at a spacing of L / 2. Figure 7 The bottom cross beam 101 and the top cross beam 301 are under tension in the force combination, and the side column 201 is under compression in the force combination. Therefore, according to the spacing of the beams and columns and the force combination calculation, it is appropriate to use channel steel, or I-beams. In addition to being fixed by the arc anchors 1 of the longitudinal joints 9, the circumferentially adjacent segments are also fixed together by the embedded steel plates 2 on the two segments through the beams and columns. Figure 8 In addition to being fixed by the arc-shaped anchors 1 of the annular joints 8, the longitudinally adjacent segments are also fixed together by screws by sandwiching the beams and columns between the embedded steel plates 2 on the adjacent segments. Fig. 9 The position of the embedded steel plate 2 should be set accurately, which can not only play a fixing role, but also make the sealing gasket 10 squeezed appropriately. The spacing of the embedded steel plates 2 in the middle of the whole pipe segment is set to a degree that it can be embedded in the beams and columns without being loose. The middle column 202 of the double-cabin corridor and the triple-cabin corridor is set at every 1 to 3 side columns 201 according to the spacing of the side columns 201. On the premise of meeting the force requirements, the spacing is large enough to leave space for the two cabins to communicate with each other.

[0057] After the pipe gallery components are assembled, the cable hanger is installed. The cable hanger is made of angle steel and fixed on the side column 201 with screws. The pipe bracket is made according to the professional requirements of the pipeline and fixed on the bottom beam 101 and the side column 201. The channel plate 14 is installed on the bottom beam 101. The thickness of the channel plate 14 is 60~100mm. The ventilation pipe 15, fire extinguisher 16, and lighting lamp 17 are installed in the facility cavity 800. The ventilation pipe 15 is connected to the fan room of the functional room 900; the fire extinguisher 16 adopts a temperature-controlled suspended heptafluoropropane automatic fire extinguishing device, and the installation spacing is determined according to the spray coverage range; the lighting lamp 17 adopts an explosion-proof explosion-proof lamp, and the control method can be controlled by human infrared induction; the drainage cavity 500 at the bottom of the pipe gallery is mainly used to collect pipeline condensation water and pipe gallery seepage water. According to the slope of the pipe gallery, the water collection tank of the functional room 900 at the lower end is sloped to the lower end, and the accumulated water is discharged through the drainage pump room.

[0058] All metal components such as beams and columns, arc anchors 1, embedded steel plates 2, beam and column fixing bolts, cable hangers, etc. must be hot-dip galvanized.

[0059] Embodiment, taking a single-cabin pipe gallery as an example, the inner diameter of the pipe gallery ring is 4m, the outer top of the pipe gallery is covered with soil for 5m, the ground vehicle load is City-A, a deformation joint 11 is set every 20m, the length L of the pipe segment is 2000mm (minus the reserved gap of 10mm during prefabrication), the beam-column spacing is 1000mm, and after calculation, the bottom cross beam 101, the side column 201, and the top cross beam 301 are made of 20 channel steel, the wall thickness of the pipe segment is 300mm, the arc anchor 1 uses M20 bolts, the embedded steel plate 2 is 16mm thick, the foundation 3 is 300mm thick, and the channel plate 14 is 80mm thick.

[0060] The prefabricated assembly in this application is only the main part of the corridor, and it can only form a comprehensive corridor when combined with the functional room 900. The functional room 900 is generally set at an interval of 200~500m. It is set into different types according to the function. It is connected with the assembled corridor by cast-in-place reinforced concrete. The plan diagram of the single-cabin comprehensive corridor is shown in Fig.10 , double-cabin corridor and triple-cabin corridor can be used for reference.

[0061] To implement the prefabricated and assembled integrated pipe gallery construction method of this application, the pipe segments and beams are first prefabricated in the factory and transported to the site for assembly. The assembly steps are as follows.

[0062] a. The tunnel trench needs to be excavated and necessary measures should be taken according to the geological conditions and construction site conditions. After the trench excavation is completed, one assembly unit is used as a construction section. The length of the construction section is an integer multiple of the segment length L including the width of the annular joint 8. The concrete of the foundation 3 is poured according to the center position and elevation of the design drawing, and the foundation 3 is disconnected at the deformation joint 11.

[0063] b. Install the bottom segment:

[0064] 1) Assemble the bottom pipe segments of the single-cabin pipe gallery. Place the first row of bottom plates 100 with a length of L on one end of the foundation 3 of the assembly unit. When assembling the second row of bottom plates 100, use the tenons and grooves of the pipe segment tongue and groove to quickly locate them. Insert the arc anchor 1 into the reserved hole of the bottom plate 100 and tighten the nut of the arc anchor 1. Tighten the nut alternately at both ends of the arc anchor 1 to ensure uniform force. Under the tightening of the arc anchor 1, the sealing gasket 10 of the annular joint 8 is squeezed, and a gap of 5 to 10 mm is reserved on the inner and outer walls of the annular joint 8 to stop tightening the nut. Assemble the bottom plates 100 row by row to the other end of the assembly unit.

[0065] 2) Assemble the bottom segments of the double-compartment pipe gallery. On one side of the upper end of the foundation 3 of the assembly unit (such as Figure 6 ), place the first row of edge bottom sheets 102 with a length of L, and on the other side of the first row (such as Figure 6 The left side of the assembly unit) uses a half-piece side bottom plate 102 with a length of L / 2 to assemble with the whole side bottom plate 102, tightens the arc-shaped anchor 1 nut of the longitudinal seam 9 between the two side bottom plates 102, butts the whole side bottom plate 102 on one side of the half-piece side bottom plate 102, and sequentially uses side bottom plates 102 with a length of L in sequence, and the two side bottom plates 102 are assembled to the other end of the assembly unit with staggered circumferential seams 8. Because the circumferential seam 8 and the longitudinal seam 9 are perpendicular to each other, the arc-shaped anchor 1 nuts of the circumferential seam 8 and the longitudinal seam 9 are tightened synchronously, and a certain arc-shaped anchor 1 nut shall not be tightened on one side. The side of the last row corresponding to the starting point of the half-piece is filled with a side bottom plate 102 with a length of L / 2;

[0066] 3) Assemble the bottom pipe segments of the three-compartment pipe gallery. Place the first row of middle bottom pieces 103 with a length of L in the middle of one end of the foundation 3 of the assembly unit. Use half-pieces of side bottom pieces 102 with a length of L / 2 on both sides of the first row and assemble with the whole middle bottom piece 103. Tighten the nuts of the arc-shaped anchors 1 of the longitudinal joints 9 between the side bottom pieces 102 and the middle bottom pieces 103. Connect the middle bottom pieces 103 in the first row to the middle bottom pieces 103 in the second row. During the assembly, always keep the middle bottom piece 103 half the length of the side bottom piece 102. Use whole side bottom pieces 102 on both sides of the middle bottom piece 103 for splicing. Use side bottom pieces 102 and middle bottom pieces 103 with a length of L in sequence row by row. Stagger the circumferential joints 8 to the other end of the assembly unit. Tighten the nuts of the arc-shaped anchors 1 of the circumferential joints 8 and the longitudinal joints 9 simultaneously. Use side bottom pieces 102 with a length of L / 2 to fill the gaps on both sides of the last row.

[0067] c. After the bottom segment of an assembly unit is assembled, a grouting machine is used to inject grout into the grouting holes 4 of the bottom segment 100, the side bottom segment 102, and the middle bottom segment 103. The grout diffuses to the surroundings through the grouting groove 5 to fill the gap between the bottom segment 100 and the foundation 3.

[0068] d. Install the bottom cross beam 101 on the bottom plate 100 or the side bottom plate 102 or the middle bottom plate 103 and fix it to the embedded steel plate 2.

[0069] e. Install the pipe segments on both sides:

[0070] 1) For the assembly of pipe segments on both sides of the single-cabin pipe gallery, the first row is assembled with a half-piece side piece 200 with a length of L / 2 and assembled on the bottom piece 100, and fixed with the bottom piece 100 using an arc anchor 1. The whole side piece 200 with a length of L is sequentially assembled row by row with the circumferential joint 8 of the bottom piece 100 staggered to the other end of the assembly unit, and the nuts of the arc anchor 1 of the circumferential joint 8 and the longitudinal joint 9 are tightened synchronously. After each side piece 200 is assembled, the side column 201 and the top crossbeam 301 are promptly installed and fixed with the embedded steel plate 2. The last row is completed with a side piece 200 with a length of L / 2;

[0071] 2) The pipe segments on both sides of the double-cabin pipe gallery are assembled. The bottom pipe segment of the first row is one side of the whole side bottom piece 102, and a half side piece 200 with a length of L / 2 is used to assemble it. The bottom pipe segment is one side of the half side bottom piece 102, and a whole side piece 200 with a length of L is used to assemble it with it. The whole side pieces 200 with a length of L are used row by row in sequence, and are staggered with the circumferential joint 8 of the bottom piece 100 to the other end of the assembly unit. The nuts of the arc anchors 1 of the circumferential joint 8 and the longitudinal joint 9 are tightened synchronously. After each side piece 200 is assembled, the side columns 201, the middle columns 202 and the top crossbeam 301 are installed in time to fix them with the embedded steel plate 2. The side piece 200 with a length of L / 2 is used to fill the half starting point of the last row;

[0072] 3) The pipe segments on both sides of the three-cabin pipe gallery are assembled. Both sides are assembled with a whole side piece 200 of length L, and are staggered with the circumferential joint 8 of the side bottom piece 102 to the other end of the assembly unit. The nuts of the arc anchors 1 of the circumferential joint 8 and the longitudinal joint 9 are tightened synchronously. After each side piece 200 is assembled, the side columns 201, the middle column 202, the partition wall 203 and the top crossbeam 301 are installed in time and fixed to the embedded steel plate 2.

[0073] f. Install the top segment:

[0074] 1) For the assembly of the top pipe segments of the single-cabin pipe gallery, all the top sheets 300 with a length of L are assembled, and the circumferential seams 8 of the side sheets 200 are staggered and assembled to the other end of the assembly unit, and the nuts of the arc-shaped anchors 1 of the circumferential seams 8 and the longitudinal seams 9 are tightened synchronously. After each top sheet 300 is assembled, the embedded steel plate 2 is fixed to the top crossbeam 301 in time;

[0075] 2) Assembling the top pipe segments of the double-cabin pipe gallery: the first row is assembled on one side of the lower half-piece side piece 200 with a length of L / 2, and the half-piece side top piece 302 with a length of L / 2 is assembled on one side of the lower full-piece side piece 200 with a length of L / 2. The support tenons 7 between the two side top pieces 302 are tightly pressed, and staggered with the circumferential seams 8 of the side pieces 200 to the other end of the assembly unit, and the nuts of the arc-shaped anchors 1 of the circumferential seams 8 and the longitudinal seams 9 are tightened synchronously. After each side top piece 302 is assembled, the embedded steel plate 2 is fixed to the top crossbeam 301 in time, and the side of the last row corresponding to the starting point of the half piece is filled with a side top piece 302 with a length of L / 2;

[0076] 3) Assembling the top pipe segments of the three-cabin pipe gallery, the first row is assembled in the middle with a whole middle top piece 303 of length L, and half side top pieces 302 of length L / 2 are assembled on both sides of the middle top piece 303, the side top pieces 302 are pressed against the supporting tenons 7 of the middle top piece 303, and the middle top pieces 303 are all made of a whole piece of length L. During the assembly, the middle top piece 303 is always kept half the length of the side top piece 302, and whole side top pieces 302 are used for splicing on both sides of the middle top piece 303, and side top pieces 302 and middle top pieces 303 of length L are used row by row in sequence, and staggered with the circumferential seam 8 of the side piece 200 to the other end of the assembly unit, and the nuts of the arc anchors 1 of the circumferential seam 8 and the longitudinal seam 9 are tightened synchronously. When assembled to the other end of the assembly unit, the side top pieces 302 of length L / 2 are used to fill the gap on both sides of the last row.

[0077] g. Drill a caulking hole 13 with a diameter of 20-25 mm and a depth of 50-100 mm at the gap between the two supporting tenons 7 of the second-compartment pipe gallery and the third-compartment pipe gallery, remove the concrete slag in the hole, insert the grouting pipe connected to the grouting pump into the hole, and inject grout into the gap between the two supporting tenons 7.

[0078] .h. Install the channel plate 14 on the bottom cross beam 101, and install the ventilation pipe 15, the fire extinguisher 16, and the lighting lamp 17 in the facility cavity 800.

[0079] i. The hole 18 where the arc anchor 1 is installed in the segment is sealed with epoxy resin mortar, and the circumferential joints 8 and longitudinal joints 9 on the inner and outer walls of the segment are filled with polyurethane sealant.

[0080] After the pipe gallery is assembled, reinforced concrete is used to cast the functional room 900. After the concrete reaches the designed strength, the earth is backfilled to the ground.

[0081] The structure described in the application document and drawings of the present invention is only an embodiment. The arched stress-bearing pipe gallery structure formed by combining arc-shaped pipe segments and beams and columns is within the protection scope of the present application.

Claims

1. A prefabricated integrated pipe gallery, which is divided into a single-compartment pipe gallery, a double-compartment pipe gallery, and a triple-compartment pipe gallery, and is characterized by: The pipe gallery is assembled from pipe segments and beams and columns. The cross-sectional outer contour of the single-cabin pipe gallery is a circular ring. A bottom plate (100) is located at the bottom of the pipe gallery. Two side plates (200) are located at both sides of the pipe gallery. A top plate (300) is located at the top of the pipe gallery. The bottom of the side plate (200) is connected to the bottom plate (100), and the top of the side plate (200) is connected to the top plate (300). The pipe segments are fixed at the connection points with arc-shaped anchors (1). A hole for installing the arc-shaped anchors (1) is reserved on the pipe segments. An embedded steel plate (2) is provided, the ends of a bottom crossbeam (101), two side columns (201), and a top crossbeam (301) are connected to each other and fixed to the embedded steel plate (2) by bolts, and four beams and columns are assembled with four pipe segments to form five spaces, wherein the central rectangular space is a pipeline cabin (400), the lower crescent-shaped space is a drainage cavity (500), the crescent-shaped spaces on both sides are respectively a strong current cavity (600) and a weak current cavity (700), and the upper crescent-shaped space is a facility cavity (800); The cross-sectional outer contour of the double-cabin pipe gallery is two intersecting circular rings, two side bottom plates (102) are butt-jointed in the middle and are located at the lower part of the pipe gallery, two side plates (200) are located at both sides of the pipe gallery, two side top plates (302) are butt-jointed in the middle and are located at the upper part of the pipe gallery, the lower part of the side plate (200) is connected to the side bottom plate (102), and the upper part of the side plate (200) is connected to the side top plate (302), the pipe segments are fixed at the connection point with arc-shaped anchors (1), and a hole for installing the arc-shaped anchors (1) is reserved on the pipe segments; the pipe segments are provided with embedded steel plates (2), a bottom cross beam (101) passes through the two side bottom plates (102), and a top cross beam (301) passes through Two side top plates (302), two side columns (201) are respectively arranged at the ends of the bottom cross beam (101) and the top cross beam (301), a middle column (202) is arranged between the bottom cross beam (101) and the top cross beam (301), the beam-column connection is fixed with bolts and pre-buried steel plates (2), five beam columns and six pipe segments are assembled to form eight spaces, the two in the middle are interconnected pipeline cabins (400), the two crescent-shaped spaces in the lower part are drainage chambers (500), the crescent-shaped spaces on both sides are respectively strong current chambers (600) and weak current chambers (700), and the two crescent-shaped spaces in the upper part are facility chambers (800); The cross-sectional outer contour of the three-cabin pipe gallery is three intersecting circular rings, two side bottom pieces (102) are arranged on both sides and connected with a middle bottom piece (103) and are located at the lower part of the pipe gallery, two side pieces (200) are located on both sides of the pipe gallery, two side top pieces (302) are arranged on both sides and connected with a middle top piece (303) and are located at the upper part of the pipe gallery, the lower part of the side piece (200) is connected with the side bottom piece (102), the upper part of the side piece (200) is connected with the side top piece (302), and the pipe pieces are connected The pipe gallery is fixed with arc-shaped anchors (1) at the locations, and a hole for installing the arc-shaped anchors (1) is reserved on the pipe segment; the pipe segment is provided with a pre-buried steel plate (2), and a partition wall (203) is provided between the side bottom piece (102) and the side top piece (302) on one side, so as to divide the pipe gallery into a single compartment and a double compartment; the ends of a bottom cross beam (101), a side column (201), and a top cross beam (301) in the single compartment are connected to each other, and the other ends of the bottom cross beam (101) and the top cross beam (301) are connected to each other. One end is connected to the partition wall (203); in the double cabin, a bottom crossbeam (101) penetrates the side bottom plate (102) and the middle bottom plate (103), a top crossbeam (301) penetrates the side top plate (302) and the middle top plate (303), a side column (201) is connected to one end of the bottom crossbeam (101) and the top crossbeam (301), and the other end of the bottom crossbeam (101) and the top crossbeam (301) is connected to the partition wall (203), and the beam-column connection is bolted to the embedded steel The plate (2) is fixed, six beams, eight pipe segments and a partition wall are assembled to form eleven spaces, the single cabin is an independent gas storage tank (401), the lower crescent-shaped space is a drainage cavity (500), and the upper crescent-shaped space is a facility cavity (800); the double cabin is two interconnected pipeline cabins (400), the lower two crescent-shaped spaces are drainage cavities (500), one side of the crescent-shaped space is a weak current cavity (700), and the upper two crescent-shaped spaces are facility cavities (800); A supporting tenon (7) is provided between the two side top sheets (302) of the double-cabin pipe gallery, and a supporting tenon (7) is provided between the side top sheets (302) and the middle top sheet (303) on both sides of the three-cabin pipe gallery. The function of the supporting tenon (7) is to improve the bending resistance of the upper structure. The bottom plate (100), the side bottom plate (102), the middle bottom plate (103), the side plate (200), the top plate (300), the side top plate (302) and the middle top plate (303) are prefabricated reinforced concrete components in segments, each having a length of L=1000-3000 mm, the circumferential joints (8) of adjacent segments are assembled in staggered manner, the longitudinal joints (9) are assembled in through-joint manner, sealing pads (10) are arranged in the joints, a deformation joint (11) is arranged every 10-20 m in the corridor, the deformation joint (11) is fully circumferentially connected, a water stop strip (12) is arranged in the joint, an assembly unit is formed between two deformation joints (11), and two ends of the assembly unit are assembled alternately using a whole segment with a length of L and a half segment with a length of L / 2, so as to adjust the staggered circumferential joints (8); The pipe segments are prefabricated with reinforced concrete, the beams and columns are made of steel, and the construction is carried out by on-site assembly. The arc-shaped pipe segments and beams and columns are combined into arched load-bearing components. Multiple arched load-bearing components form a steel-concrete integral frame load-bearing structure, which is laid in an underground corridor shape to form the main body of the corridor, and is connected in series with the functional rooms (900) arranged at intervals. The functional rooms (900) include entrances and exits, ventilation ports, feeding ports, emergency escape ports, power distribution rooms, drainage pump rooms, and fan rooms, forming an underground comprehensive corridor that accommodates municipal pipelines.

2. The prefabricated integrated pipe gallery according to claim 1 is characterized in that: The lower part of the pipe gallery is provided with a foundation (3); the bottom plate (100), the side bottom plate (102), and the middle bottom plate (103) are provided with grouting holes (4); the bottoms of the bottom plate (100), the side bottom plate (102), and the middle bottom plate (103) are provided with grouting grooves (5) in longitudinal and transverse directions and communicated with the grouting holes (4); the bottoms of the bottom plate (100), the side bottom plate (102), and the middle bottom plate (103) are flat and are placed on the foundation to be grouted through the grouting holes (4); the grout fills the grouting grooves (5), so that the space between the bottom plate (100), the side bottom plate (102), the middle bottom plate (103) and the foundation (3) is densely filled, thereby playing a role in stabilizing the whole.

3. The prefabricated integrated pipe gallery according to claim 1 is characterized in that: The side bottom plate (102) of the double-cabin pipe gallery is provided with a communication hole (6) to connect the two drainage chambers (500); the side bottom plate (102) and the middle bottom plate (103) of the double-cabin part of the triple-cabin pipe gallery are provided with a communication hole (6) to connect the two drainage chambers (500).

4. The prefabricated integrated pipe gallery according to claim 1 is characterized in that: The bottom cross beam (101), the side columns (201), and the top cross beam (301) are arranged at a spacing of L / 2.

5. The prefabricated integrated pipe gallery according to claim 1 is characterized in that: The central column (202) is arranged at intervals of 1 to 3 side columns (201) according to the spacing of the side columns (201).

6. The prefabricated integrated pipe gallery according to claim 1 is characterized in that: The distance between the center of the support tenon (7) and the edge of the pipe segment is L / 4, and the distance between the support tenons (7) is L / 2.

7. A method for constructing a prefabricated integrated pipe gallery according to claim 1, characterized in that: The construction method described above is to prefabricate the pipe segments and beams in the factory and transport them to the site for assembly. The assembly method steps are as follows: a. After the tunnel trench is excavated, one assembly unit is regarded as one construction section. The length of the construction section is an integral multiple of the segment length L including the width of the circumferential joint (8). The concrete of the foundation (3) is cast in the formwork according to the center position and elevation of the design drawing. The foundation (3) is disconnected at the deformation joint (11); b. Install the bottom segment: 1) Assembling the bottom pipe segments of the single-cabin pipe gallery: on one end of the foundation (3) of the assembly unit, place the first row of bottom plates (100) of length L; when assembling the second row of bottom plates (100), use the convex and concave grooves of the pipe segment tongue and groove to quickly position them; insert the arc-shaped anchor (1) into the reserved hole of the bottom plate (100); tighten the nut of the arc-shaped anchor (1); the sealing gasket (10) of the annular joint (8) is squeezed; the inner and outer walls of the annular joint (8) reserve gaps and stop tightening the nuts; assemble the bottom plates (100) row by row to the other end of the assembly unit; 2) Assembling the bottom pipe segments of the double-cabin pipe gallery: on one side of the upper end of the foundation (3) of the assembly unit, place the first row of side bottom pieces (102) with a length of L, assemble the half side bottom piece (102) with the whole side bottom piece (102) on the other side of the first row, tighten the nuts of the arc-shaped anchor pieces (1) of the longitudinal joint (9) between the two side bottom pieces (102), butt the whole side bottom piece (102) on one side of the half side bottom piece (102), sequentially use side bottom pieces (102) with a length of L in turn, assemble the circumferential joints (8) of the two side bottom pieces (102) to the other end of the assembly unit with staggered seams, and simultaneously tighten the nuts of the arc-shaped anchor pieces (1) of the circumferential joints (8) and the longitudinal joints (9), and fill the last row with a side bottom piece (102) with a length of L / 2 on the side corresponding to the starting point of the half piece; 3) Assemble the bottom pipe segments of the three-compartment pipe gallery. Place the first row of middle bottom pieces (103) with a length of L in the middle of the upper end of the foundation (3) of the assembly unit. Use half-pieces of side bottom pieces (102) with a length of L / 2 and the middle whole bottom piece (103) to assemble on both sides of the first row. Tighten the nuts of the arc-shaped anchors (1) at the longitudinal joints (9) between the side bottom pieces (102) and the middle bottom piece (103). Connect the first row of middle bottom pieces (103) to the second row of middle bottom pieces (103). The middle bottom piece (103) is always kept longer than half the length of the side bottom piece (102), and the side bottom pieces (102) are used for splicing on both sides of the middle bottom piece (103). The side bottom pieces (102) and the middle bottom pieces (103) with a length of L are used row by row in sequence, and the circumferential seams (8) are staggered and assembled to the other end of the assembly unit, and the nuts of the arc-shaped anchoring pieces (1) of the circumferential seams (8) and the longitudinal seams (9) are tightened synchronously, and the side bottom pieces (102) with a length of L / 2 are used to fill the gap on both sides of the last row; c. After the bottom segment of an assembly unit is assembled, a grouting machine is used to inject grout into the grouting holes (4) of the bottom segment (100), the side segment (102), and the middle segment (103), and the grout is spread to the surroundings through the grouting groove (5) to fill the gap between the segment and the foundation (3); d. Install the bottom cross beam (101) on the bottom plate (100) or the side bottom plate (102) or the middle bottom plate (103) and fix it to the embedded steel plate (2); e. Install the pipe segments on both sides: 1) Assembling the pipe segments on both sides of the single-cabin pipe gallery. The first row is assembled with a half-piece side piece (200) with a length of L / 2 and assembled on the bottom piece (100). The arc-shaped anchor (1) is used to fix the bottom piece (100). The whole side piece (200) with a length of L is sequentially assembled row by row with the circumferential joint (8) of the bottom piece (100) staggered to the other end of the assembly unit. The nuts of the arc-shaped anchor (1) of the circumferential joint (8) and the longitudinal joint (9) are tightened synchronously. After each side piece (200) is assembled, the side column (201) and the top crossbeam (301) are promptly installed and fixed with the embedded steel plate (2). The last row is completed with a side piece (200) with a length of L / 2; 2) Assembling the pipe segments on both sides of the double-cabin pipe gallery. The first row of bottom pipe segments is one side of the whole side bottom piece (102). A half side piece (200) with a length of L / 2 is used to assemble it. The bottom pipe segment is one side of the half side bottom piece (102). A whole side piece (200) with a length of L is used to assemble it. The whole side pieces (200) with a length of L are used row by row in sequence. They are staggered and assembled with the circumferential joint (8) of the bottom piece (100) to the other end of the assembly unit. The nuts of the arc anchors (1) of the circumferential joint (8) and the longitudinal joint (9) are tightened synchronously. After each side piece (200) is assembled, the side columns (201), the middle columns (202) and the top cross beam (301) are promptly installed and fixed to the embedded steel plate (2). The side of the last row corresponding to the starting point of the half piece is filled with a side piece (200) with a length of L / 2. 3) Assemble the pipe segments on both sides of the three-compartment pipe gallery. Both sides are assembled with a whole side piece (200) of length L, and are assembled to the other end of the assembly unit with the circumferential joint (8) of the side bottom piece (102) in a staggered manner. The nuts of the arc-shaped anchors (1) of the circumferential joint (8) and the longitudinal joint (9) are tightened synchronously. After each side piece (200) is assembled, the side columns (201), the center columns (202), the partition walls (203) and the top cross beams (301) are promptly installed and fixed to the embedded steel plates (2); f. Install the top segment: 1) Assembling the top pipe segments of the single-cabin pipe gallery, all of which are assembled using a whole top sheet (300) of length L, and staggeredly assembled with the circumferential joint (8) of the side sheet (200) to the other end of the assembly unit, and simultaneously tightening the nuts of the arc-shaped anchors (1) of the circumferential joint (8) and the longitudinal joint (9). After each top sheet (300) is assembled, the embedded steel plate (2) is promptly fixed to the top crossbeam (301); 2) Assembling the top pipe segments of the double-cabin pipe gallery: the first row is assembled on one side of the lower half-piece side piece (200) with a length of L / 2, using a full-piece side top piece (302) with a length of L; the first row is assembled on one side of the lower full-piece side piece (200) with a length of L / 2, using a half-piece side top piece (302) with a length of L / 2; the support tenons (7) between the two side top pieces (302) are tightly pressed together, and the side pieces (200) are assembled to the other end of the assembly unit in a staggered manner with the circumferential joint (8) of the side piece (200); the nuts of the arc-shaped anchors (1) of the circumferential joint (8) and the longitudinal joint (9) are tightened synchronously; after each side top piece (302) is assembled, the embedded steel plate (2) is promptly fixed to the top crossbeam (301); the side of the last row corresponding to the starting point of the half piece is filled with a side top piece (302) with a length of L / 2; 3) Assembling the top pipe segments of the three-cabin pipe gallery, the first row is assembled in the middle using a whole middle top piece (303) with a length of L, and then a half-piece side top piece (302) with a length of L / 2 is assembled on both sides of the middle top piece (303), the side top pieces (302) and the middle top piece (303) are tightly pressed against the supporting tenons (7), and the middle top pieces (303) are all made of a whole piece with a length of L. During the assembly, the middle top piece (303) is always kept longer than the half-piece length of the side top piece (302). The two sides of the top sheet (303) are spliced ​​with a whole side top sheet (302), and the side top sheets (302) and the middle top sheets (303) with a length of L are sequentially used in a row, and are staggered with the circumferential seams (8) of the side sheets (200) to be assembled to the other end of the assembly unit, and the nuts of the arc-shaped anchoring pieces (1) of the circumferential seams (8) and the longitudinal seams (9) are simultaneously tightened. When assembled to the other end of the assembly unit, the side top sheets (302) with a length of L / 2 are used to fill the gap on both sides of the last row; g. Drill a caulking hole (13) with a diameter of 20-25 mm and a depth of 50-100 mm at the gap between the two supporting tenons (7) of the second and third compartment pipe corridors, remove the concrete slag in the hole, insert a grouting pipe connected to a grouting pump into the hole, and inject grout into the gap between the two supporting tenons (7); h. Install a channel plate (14) on the bottom cross beam (101), and install a ventilation pipe (15), a fire extinguisher (16), and a lighting lamp (17) in the facility cavity (800); i. The hole opening (18) of the arc anchor (1) is sealed with epoxy resin mortar, and the circumferential joints (8) and longitudinal joints (9) of the inner and outer walls of the segment are filled with polyurethane sealant.

8. The prefabricated integrated pipe gallery construction method according to claim 7 is characterized in that: After the pipe gallery is assembled, reinforced concrete cast-in-place functional rooms (900) are used. After the concrete reaches the designed strength, the earth is backfilled to the ground.