A monitoring device and monitoring method for anchor net surface stress

By designing an anchor net surface stress monitoring device including an installation base, lifting components and detection parts, the problems of complex installation, low precision and high cost in the existing technology are solved, and simple and accurate anchor net surface stress monitoring is achieved, which is suitable for in tunnel excavation environment.

CN117782399BActive Publication Date: 2024-10-18CCTEG COAL MINING RES INST +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202311861779.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-10-18
Estimated Expiration
2043-12-29

AI Technical Summary

Technical Problem

The existing anchor mesh surface stress monitoring device is complex to install, has low accuracy and high cost, cannot accurately reflect the anchor mesh surface stress, and can only monitor the stress condition at a single point, affecting the tunnel excavation and monitoring effects.

Method used

An anchor net surface stress monitoring device including an installation base, a lifting component, an anchor component and a detection component is designed. By simulating the deformation state of the anchor net, the detection component is used to detect the surface stress on the top of the lifting component, thereby realizing the surface stress of the anchor network. Accurate monitoring.

Benefits of technology

The surface stress monitoring of the anchor net is realized with simple operation, accurate monitoring results and low cost. It can simulate the deformation state of the anchor net at the construction site, clearly reflect the surface stress on the anchor net, and improve the accuracy and efficiency of monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117782399B_ABST
    Figure CN117782399B_ABST
Patent Text Reader

Abstract

The present invention proposes a monitoring device and a monitoring method for anchor net surface stress, the monitoring device comprises: a mounting base, a lifting assembly, an anchor rod assembly and a detection member, the lifting assembly is mounted on the mounting base, the lifting assembly comprises a control member and a lifting member, the control member is connected to the lifting member to control at least part of the lifting member to move along the height direction of the mounting base, the lifting assembly also comprises a lifting group, the lifting group comprises a plurality of lifting members, the plurality of lifting members are arranged at intervals along the length direction of the mounting base, there are a plurality of lifting groups, the plurality of lifting groups are arranged at intervals along the width direction of the mounting base, the top of the lifting member is used to place the anchor net to be tested, the anchor rod assembly is connected to the mounting base, the anchor rod assembly is used to fix the anchor net to be tested arranged on the top of the lifting member, the detection member is connected to the lifting member, there are a plurality of detection members, and the plurality of detection members correspond one to one with the plurality of lifting members. The monitoring device for anchor net surface stress of the present invention has the advantages of simple operation, accurate monitoring results and low cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of anchor net surface stress monitoring, and in particular to a monitoring device and a monitoring method for anchor net surface stress. Background Art

[0002] Under the dual effects of high stress and weathering of water vapor in the tunnel, the surrounding rock cracks of deep well soft rock tunnels develop from shallow to deep, leading to further deterioration of the surrounding rock. Existing research results show that it is difficult to effectively control the deformation of tunnel surrounding rocks by relying solely on one form of support. Practice has shown that the coordinated use of anchor mesh spraying and backfilling can effectively control the deformation of deep well high-stress soft rock tunnel surrounding rocks.

[0003] In the design of backfill support, the thickness of the backfill has a great influence on the size and diffusion range of the anchor net prestress. Conventional monitoring is to place a water bag dynamometer or earth pressure box in the anchor net and the backfill bag or between the backfill bag and the surrounding rock. The flexible mold bag has a certain water exudation. During the filling process, the free water in the bag will be exuded when the flexible mold bag is pumped under pressure. When the filling stops, the elastic energy accumulated in the water bag dynamometer or earth pressure box is gradually released, squeezing the flexible mold bag, causing the water in the flexible mold bag to be exuded faster, resulting in the monitored anchor net surface stress being less than the actual anchor net surface stress.

[0004] The installation process of water bag dynamometers or earth pressure boxes in the underground backfill support is complicated, which affects the excavation of the tunnel. The installation accuracy of the water bag dynamometers or earth pressure boxes also affects the accuracy of the monitoring effect. In addition, the dynamometers or earth pressure boxes can only monitor the stress condition at a certain point. The dynamometers or earth pressure boxes are disposable and the monitoring cost is high. Summary of the invention

[0005] The present invention aims to solve one of the technical problems in the related art to at least a certain extent. To this end, an embodiment of the present invention provides a monitoring device for anchor net surface stress, which has the advantages of simple operation, accurate monitoring results and low cost.

[0006] The embodiment of the present invention provides a method for monitoring the stress of the anchor mesh surface, which has the advantages of simple operation, accurate results and low cost.

[0007] The monitoring device for anchor mesh surface stress of an embodiment of the present invention comprises:

[0008] Install the base;

[0009] A lifting component, the lifting component is installed on the mounting base, the lifting component includes a control component and a lifting component, the control component is connected to the lifting component to control at least part of the lifting component to move along the height direction of the mounting base, the lifting component also includes a lifting group, the lifting group includes a plurality of the lifting components, the plurality of the lifting components are arranged at intervals along the length direction of the mounting base, the lifting groups are multiple, the plurality of the lifting groups are arranged at intervals along the width direction of the mounting base, and the top of the lifting component is used to place the anchor net to be tested;

[0010] An anchor rod assembly, the anchor rod assembly is connected to the mounting base, and the anchor rod assembly is used to fix the anchor net to be measured arranged on the top of the lifting member;

[0011] A detection member is connected to the lifting member, there are multiple detection members, and the multiple detection members correspond one-to-one to the multiple lifting members. The detection member is used to detect the size of the surface stress borne by the top of the lifting member.

[0012] The monitoring device for the surface stress of the anchor net according to the embodiment of the present invention can perform a surface stress monitoring test according to the deformation of the anchor net at the construction site by using an anchor net with the same specifications as the anchor net at the construction site, and convert the deformation of the anchor net into the expansion and contraction amount of each lifting member by using a control member, so that the monitoring device for the surface stress of the anchor net according to the embodiment of the present invention can simulate the deformation state of the anchor net at the construction site, and then use the detection member to detect the magnitude of the surface stress on the top of the lifting member, thereby clearly reflecting the magnitude of the surface stress to which the anchor net at the construction site is subjected.

[0013] Therefore, the monitoring device for anchor mesh surface stress according to the embodiment of the present invention has the advantages of simple operation, accurate monitoring results and low cost.

[0014] In some embodiments, the lifting member includes a hydraulic cylinder and a stress panel, wherein the stress panel is connected to the push rod of the hydraulic cylinder and is located at one end of the push rod away from the cylinder body of the hydraulic cylinder, and the stress panel is rotatable relative to the push rod of the hydraulic cylinder.

[0015] In some embodiments, the stress panel is rotatable along a first axial direction, and the first axial direction is orthogonal to the axial direction of the push rod.

[0016] In some embodiments, the stress panel is hinged to a push rod ball of the hydraulic cylinder.

[0017] In some embodiments, a plurality of anchor holes are provided on the top wall of the mounting base, the anchor assembly includes an anchor rod and an anchor head, the anchor rod cooperates with the anchor rod hole, the anchor head is used to cooperate with the anchor rod, the anchor head is located above the anchor net to be measured in the height direction of the mounting base, and the anchor head abuts against the anchor net to be measured.

[0018] In some embodiments, the multiple anchor holes are divided into fixed holes, transverse hole groups, longitudinal hole groups and matching hole groups. The transverse hole groups, the longitudinal hole groups and the matching hole groups all include multiple anchor holes. The multiple anchor holes in the transverse hole groups are arranged at intervals along the length direction of the mounting base, the multiple anchor holes in the longitudinal hole groups are arranged at intervals along the width direction of the mounting base, and the multiple anchor holes in the matching hole groups are distributed at equal intervals.

[0019] In some embodiments, the minimum distance between the transverse hole group and the fixing hole is equal to the minimum distance between the longitudinal hole group and the fixing hole.

[0020] The minimum distance between the matching hole group and the transverse hole group is equal to the minimum distance between the matching hole group and the longitudinal hole group, and the minimum distance between the matching hole group and the transverse hole group is equal to the minimum distance between the transverse hole group and the fixing hole.

[0021] In some embodiments, the ratio of the distance between two adjacent anchor holes in the matching hole group to the minimum distance between the matching hole group and the transverse hole group is less than or equal to 1:3.

[0022] The method for monitoring the stress of the anchor mesh surface according to the embodiment of the present invention is implemented by using the monitoring device according to any one of the above embodiments, and comprises the following steps:

[0023] Record the deformation of the anchor net in the mining site;

[0024] Lay an anchor net with the same specifications as that used at the mining site on the lifting parts and fasten it with an anchor rod assembly;

[0025] Providing the recorded deformation amount to the control member and controlling the lifting member to move to a preset height;

[0026] The detection parts are used to monitor the surface stress on the stress panel.

[0027] In some embodiments, the preload force applied to the anchor head in the anchor assembly is the same as the preload force actually applied to the anchor head in the mining site. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic cross-sectional structure diagram of a device for monitoring anchor mesh surface stress according to an embodiment of the present invention.

[0029] Figure 2 1 is a schematic diagram of the top view of the structure of the device for monitoring the anchor mesh surface stress according to an embodiment of the present invention.

[0030] Figure 3 It is a schematic structural diagram of a mounting base of a device for monitoring anchor mesh surface stress according to an embodiment of the present invention.

[0031] Reference numerals:

[0032] 100. Anchor net,

[0033] 1. Installation base, 11. Anchor hole, 111. Fixing hole, 112. Horizontal hole group, 113. Longitudinal hole group, 114. Matching hole group,

[0034] 2. Lifting assembly, 21. Lifting parts, 211. Hydraulic cylinder, 212. Stress panel,

[0035] 3. Anchor rod assembly, 31. Anchor rod, 32. Anchor head,

[0036] 4 test pieces. DETAILED DESCRIPTION

[0037] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.

[0038] The following describes a device for monitoring anchor mesh surface stress according to an embodiment of the present invention with reference to the accompanying drawings.

[0039] like Figure 1-Figure 3 As shown, the monitoring device for anchor mesh surface stress according to the embodiment of the present invention comprises: a mounting base 1 , a lifting assembly 2 , an anchor rod assembly 3 and a detection member 4 .

[0040] The lifting assembly 2 is installed on the mounting base 1. The lifting assembly 2 includes a control member (not shown in the figure) and a lifting member 21. The control member is connected to the lifting member 21 to control at least part of the lifting member 21 to move along the height direction of the mounting base 1. The lifting assembly 2 also includes a lifting group. The lifting group includes a plurality of lifting members 21. The plurality of lifting members 21 are arranged at intervals along the length direction of the mounting base 1. There are a plurality of lifting groups. The plurality of lifting groups are arranged at intervals along the width direction of the mounting base 1. The top of the lifting member 21 is used to place the anchor net 100 to be tested. The anchor rod assembly 3 is connected to the mounting base 1, and the anchor rod assembly 3 is used to fix the anchor net 100 to be tested arranged on the top of the lifting member 21. The detection member 4 is connected to the lifting member 21. There are a plurality of detection members 4. The plurality of detection members 4 correspond to the plurality of lifting members 21 one by one. The detection member 4 is used to detect the magnitude of the surface stress borne by the top of the lifting member 21.

[0041] Specifically, Figure 1-Figure 3As shown, a plurality of lifting members 21 are evenly spaced on the upper wall of the mounting base 1, and in a top view, the projections of the plurality of lifting members 21 on the mounting base 1 are generally rectangular. The anchor net 100 to be tested is laid on the top surface of the lifting member 21, and the anchor net assembly 3 can fix the anchor net 100 to be tested, so that at least part of the lifting member 21 moves upward, causing the anchor net 100 to be tested to deform, so that the detection member 4 is used to detect the magnitude of the surface stress borne by the top of the lifting member 21, and the surface stress is the surface stress borne by the anchor net 100 to be tested in the state of the deformation.

[0042] It can be understood that the control component can be a remote control, a computer or other device with the function of receiving and sending commands, so that the measurement results of the anchor net deformation in the actual construction scene can be input into the control component, and then the control component can be used to transmit the measurement result information to the lifting component 21, so that the lifting component 21 can lift and deform the anchor net 100 to be measured until the lifting component 21 stops moving, thereby ensuring the control accuracy and further improving the accuracy of surface stress monitoring.

[0043] In other words, the monitoring device for the surface stress of the anchor net in the embodiment of the present invention can perform a surface stress monitoring test according to the deformation of the anchor net at the construction site by using an anchor net with the same specifications as the anchor net at the construction site, and convert the deformation of the anchor net 100 into the expansion and contraction amount of each lifting member 21 by using a control member, so that the monitoring device for the surface stress of the anchor net in the embodiment of the present invention can simulate the deformation state of the anchor net at the construction site, and then use the detection member 4 to detect the magnitude of the surface stress at the top of the lifting member 21, thereby clearly reflecting the magnitude of the surface stress to which the anchor net at the construction site is subjected.

[0044] Therefore, the monitoring device for anchor mesh surface stress according to the embodiment of the present invention has the advantages of simple operation, accurate monitoring results and low cost.

[0045] In some embodiments, the lifting member 21 includes a hydraulic cylinder 211 and a stress panel 212. The stress panel 212 is connected to the push rod of the hydraulic cylinder 211 and is located at one end of the push rod away from the cylinder body of the hydraulic cylinder 211. The stress panel 212 is rotatable relative to the push rod of the hydraulic cylinder 211.

[0046] Specifically, as shown in the figure, the lower end of the hydraulic cylinder 211 is connected to the mounting base 1 , the push rod of the hydraulic cylinder 211 is movable in the up and down directions, and the stress panel 212 is located at the top of the hydraulic cylinder 211 .

[0047] It is understandable that due to the different deformation amounts of the anchor net, the height fluctuations of the anchor net at different positions are different. Therefore, the height to which the push rod of each lifting member 21 rises is also different, and the stress panel 212 is rotatable relative to the push rod of the hydraulic cylinder 211, so that each lifting member 21 is easier to adapt to the deformed anchor net 100 to be tested, thereby avoiding the occurrence of problems such as the breakage of the anchor net 100 to be tested or the deformation of the stress panel 212 due to the mismatch of the angle between the stress panel 212 and the anchor net 100 to be tested.

[0048] Optionally, the stress panel 212 may be made of a steel plate with a thickness of not less than 5 mm to ensure that under a stress of 1.0 MPa, the deformation of the steel plate does not exceed 10% of the thickness.

[0049] In some embodiments, the stress panel 212 is rotatable along a first axis, which is orthogonal to the axis of the push rod. Figure 1 As shown, the bottom of the stress panel 212 is connected to the push rod of the hydraulic cylinder 211 through a rotating shaft, that is, the bottom of the pressure panel is provided with a rotating shaft extending in the front-to-back direction, and the top of the push rod of the hydraulic cylinder 211 is provided with an axle seat adapted to the rotating shaft, and the rotating shaft is fitted in the axle seat, so that the stress panel 212 can rotate to the left and right directions along the axis of the rotating shaft.

[0050] In other embodiments, the stress panel 212 is hinged to the push rod ball of the hydraulic cylinder 211 .

[0051] In some embodiments, a plurality of anchor rod 31 holes 11 are opened on the top wall of the mounting base 1, and the anchor rod assembly 3 includes an anchor rod 31 and an anchor head 32, the anchor rod 31 cooperates with the anchor rod 31 hole 11, the anchor head 32 is used to cooperate with the anchor rod 31, and the anchor head 32 is located above the anchor net 100 to be tested in the height direction of the mounting base 1, and the anchor head 32 abuts against the anchor net 100 to be tested.

[0052] Specifically, as shown in the figure, the anchor net 100 to be tested requires multiple anchor rod assemblies 3 to be fixed, that is, four anchor rod assemblies 3 are arranged at the four corners of the anchor net 100 to be tested, and after the anchor rods 31 are installed in cooperation with the corresponding anchor rod 31 holes 11 on the mounting base 1, the anchor net 100 to be tested is put on the anchor rods 31, and then the anchor head 32 is used to cooperate with the anchor rod 31 to fix the anchor net 100 to be tested.

[0053] It should be noted that the preload force applied by the anchor head 32 on the anchor rod 31 needs to be the same as the preload force of the anchor head 32 on the anchor net for measuring deformation at the construction site, so as to ensure that the detection data of the detection member 4 is more accurate.

[0054] In some embodiments, the multiple anchor rod 31 holes 11 are divided into a fixing hole 111, a transverse hole group 112, a longitudinal hole group 113 and a matching hole group 114. The transverse hole group 112, the longitudinal hole group 113 and the matching hole group 114 each include multiple anchor rod 31 holes 11. The multiple anchor rod 31 holes 11 in the transverse hole group 112 are arranged at intervals along the length direction of the mounting base 1, the multiple anchor rod 31 holes 11 in the longitudinal hole group 113 are arranged at intervals along the width direction of the mounting base 1, and the multiple anchor rod 31 holes 11 in the matching hole group 114 are evenly spaced.

[0055] Specifically, as shown in the figure, the fixing hole 111 is located at the left rear of the plurality of anchor rod holes 31 , the transverse hole group 112 is located at the right side of the fixing hole 111 , the longitudinal hole group 113 is located at the front side of the fixing hole 111 , and the matching hole group 114 is located at the right front side of the fixing hole 111 .

[0056] It can be understood that, according to the size of the anchor net 100 to be tested, the anchor rod 31 hole 11 that is adapted to the size of the anchor net 100 to be tested is selected in the fixing hole 111, the transverse hole group 112, the longitudinal hole group 113 and the matching hole group 114, so that the monitoring device for the surface stress of the anchor net of the embodiment of the present invention can monitor the surface stress of the anchor nets 100 to be tested of different sizes.

[0057] That is to say, as shown in the figure, the area formed by the fixing hole 111, the anchor rod 31 hole 11 of the transverse hole group 112 located at the leftmost side, the anchor rod 31 hole 11 of the longitudinal hole group 113 located at the rearmost side, and the anchor rod 31 hole 11 of the matching hole group 114 located at the leftmost rear side is selected as the minimum monitoring area. Correspondingly, if the area formed by the fixing hole 111, the anchor rod 31 hole 11 of the transverse hole group 112 located at the leftmost side, the anchor rod 31 hole 11 of the longitudinal hole group 113 located at the rearmost side, and the anchor rod 31 hole 11 of the matching hole group located at the rightmost front side is selected, it is the maximum monitoring area.

[0058] In some embodiments, the minimum distance between the transverse hole group 112 and the fixing hole 111 is equal to the minimum distance between the longitudinal hole group 113 and the fixing hole 111, the minimum distance between the matching hole group 114 and the transverse hole group 112 is equal to the minimum distance between the matching hole group 114 and the longitudinal hole group 113, and the minimum distance between the matching hole group 114 and the transverse hole group 112 is equal to the minimum distance between the transverse hole group 112 and the fixing hole 111.

[0059] Specifically, as shown in the figure, the minimum distance between the transverse hole group 112 and the fixing hole 111 is b, and the minimum distance between the longitudinal hole group 113 and the fixing hole 111 is a, then a=b; the minimum distance between the matching hole group 114 and the transverse hole group 112 is d, and the minimum distance between the matching hole group 114 and the longitudinal hole group 113 is c, then c=d, and c=a. In other words, the distances between the fixing hole 111, the anchor rod 31 hole 11 at the leftmost side of the transverse hole group 112, the anchor rod 31 hole 11 at the rearmost side of the longitudinal hole group 113, and the anchor rod 31 hole 11 at the leftmost rear side of the matching hole group 114 are all equal.

[0060] In some embodiments, the ratio of the distance between two adjacent anchor rod 31 holes 11 in the matching hole group 114 to the minimum distance between the matching hole group 114 and the transverse hole group 112 is less than or equal to 1:3.

[0061] Specifically, as shown in the figure, the distance between two adjacent anchor rod 31 holes 11 in the matching hole group 114 is h, and h / c≤1 / 3. In other words, the smaller the distance between two adjacent anchor rod 31 holes 11 in the matching hole group 114, the smaller the change in the anchor rod 31 hole 11 selected in the matching hole group 114, so when the outer contour of the anchor net 100 to be tested is irregular, it is easier to select the anchor rod 31 hole 11 that overlaps with the outer contour of the anchor net 100 to be tested, thereby ensuring the installation of the anchor rod assembly 3.

[0062] The following describes a method for monitoring anchor mesh surface stress according to an embodiment of the present invention.

[0063] The method for monitoring the anchor mesh surface stress of an embodiment of the present invention is implemented by using a monitoring device according to any one of the above embodiments, and comprises the following steps:

[0064] Record the deformation of the anchor net in the mining site.

[0065] An anchor net with the same specifications as those used at the mining site is laid on the lifting parts and fastened with anchor rod assemblies.

[0066] The control member provides the recorded deformation amount and controls the lifting member to move to a preset height. It is understandable that the control member sends an upward movement instruction to the lifting member according to the recorded deformation amount, so that the corresponding lifting member gradually moves to the height preset by the control member.

[0067] The detection part is used to monitor the surface stress on the stress panel, wherein the surface stress on the stress panel is the surface stress corresponding to the anchor net under the deformation amount.

[0068] In some embodiments, the preload force applied to the anchor head in the anchor assembly is the same as the preload force actually applied to the anchor head in the mining site. It can be understood that the monitoring method of the anchor net surface stress of the embodiment of the present invention simulates the state of the deformed anchor net in a more actual construction environment.

[0069] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0070] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0071] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0072] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0073] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0074] Although the above embodiments have been shown and described, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations on the present invention. Changes, modifications, substitutions and variations of the above embodiments by those of ordinary skill in the art are all within the scope of protection of the present invention.

Claims

1. A monitoring device for anchor net surface stress, characterized in that: include: Install the base; A lifting component, the lifting component is installed on the mounting base, the lifting component includes a control member and a lifting member, the control member is connected to the lifting member to control at least part of the lifting member to move along the height direction of the mounting base, the lifting component also includes a lifting group, the lifting group includes a plurality of the lifting members, the plurality of the lifting members are arranged at intervals along the length direction of the mounting base, the lifting groups are multiple, and the plurality of the lifting groups are arranged at intervals along the width direction of the mounting base, and the top of the lifting member is used to place the anchor net to be tested; the lifting member includes a hydraulic cylinder and a stress panel, the stress panel is connected to the push rod of the hydraulic cylinder, and is located at one end of the push rod away from the cylinder body of the hydraulic cylinder, and the stress panel is rotatable relative to the push rod of the hydraulic cylinder; An anchor rod assembly, the anchor rod assembly is connected to the mounting base, and the anchor rod assembly is used to fix the anchor net to be measured arranged on the top of the lifting member; a plurality of anchor rod holes are provided on the top wall of the mounting base, the anchor rod assembly comprises the anchor rod and an anchor head, the anchor rod cooperates with the anchor rod holes, the anchor head is used to cooperate with the anchor rod, the anchor head is located above the anchor net to be measured in the height direction of the mounting base, and the anchor head abuts against the anchor net to be measured; A detection member is connected to the lifting member, there are multiple detection members, and the multiple detection members correspond one-to-one to the multiple lifting members. The detection member is used to detect the size of the surface stress borne by the top of the lifting member.

2. The monitoring device for anchor mesh surface stress according to claim 1, characterized in that: The stress panel is rotatable along a first axial direction, and the first axial direction is orthogonal to the axial direction of the push rod.

3. The monitoring device for anchor mesh surface stress according to claim 1, characterized in that: The stress panel is hinged to the push rod ball of the hydraulic cylinder.

4. The device for monitoring anchor mesh surface stress according to claim 1, characterized in that: The multiple anchor holes are divided into fixed holes, transverse hole groups, longitudinal hole groups and matching hole groups. The transverse hole group, the longitudinal hole group and the matching hole group all include multiple anchor holes. The multiple anchor holes in the transverse hole group are arranged at intervals along the length direction of the mounting base, the multiple anchor holes in the longitudinal hole group are arranged at intervals along the width direction of the mounting base, and the multiple anchor holes in the matching hole group are distributed at equal intervals.

5. The device for monitoring anchor mesh surface stress according to claim 4, characterized in that: The minimum distance between the transverse hole group and the fixing hole is equal to the minimum distance between the longitudinal hole group and the fixing hole. The minimum distance between the matching hole group and the transverse hole group is equal to the minimum distance between the matching hole group and the longitudinal hole group, and the minimum distance between the matching hole group and the transverse hole group is equal to the minimum distance between the transverse hole group and the fixing hole.

6. The device for monitoring anchor surface stress according to claim 5, characterized in that: The ratio of the distance between two adjacent anchor holes in the matching hole group to the minimum distance between the matching hole group and the transverse hole group is less than or equal to 1:

3.

7. A method for monitoring anchor surface stress, characterized in that: The monitoring method is performed using a monitoring device according to any one of claims 1 to 6, comprising the following steps: Record the deformation of the anchor net in the mining site; Lay an anchor net with the same specifications as that used at the mining site on the lifting parts and fasten it with an anchor rod assembly; Providing the recorded deformation amount to the control member and controlling the lifting member to move to a preset height; The detection parts are used to monitor the surface stress on the stress panel.

8. The method for monitoring anchor mesh surface stress according to claim 7, characterized in that: The preload force applied to the anchor head in the anchor rod assembly is the same as the preload force actually applied to the anchor head in the mining site.

Citation Information

Patent Citations

  • Intelligent monitoring system for flexible passive protective net

    CN103985225A

  • Node monitoring device and method for active protective net

    CN113340502A

  • Anchor net mechanical property testing device and method

    CN115288761A

  • Slope protection net and protection net drilling lofting and construction method

    CN116537228A

  • A node monitoring device for an active protection network

    CN215296526U