A high-temperature, water-rich, broken rock mass grouting simulation test system and method

By designing a grouting simulation test system for high-temperature water-rich crushed rock mass, the problem of difficult to simulate the diffusion process of grouting slurry in high-temperature water-rich environment is solved, and dynamic visualization and analysis of the diffusion law of slurry in high-temperature water-rich environment is realized. Grouting construction guidance in high-temperature, water-rich crushed rock mass environment has been improved, and the project safety and efficiency have been improved.

CN117825232BActive Publication Date: 2024-11-01SHANDONG UNIV +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202311705190.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-11
Publication Date
2024-11-01
Estimated Expiration
2043-12-11

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively simulate the diffusion process of grouting slurry in high-temperature and water-rich environments, and cannot fully consider the combined effects of high-temperature and water-rich environments and other factors. Traditional grouting tests cannot accurately observe and record the diffusion of grouting slurry, and cannot effectively study the high-temperature and rich environments. Grouting effect in water-breaking rock mass environment.

Method used

A high-temperature water-rich crushed rock mass grouting simulation test system was designed, including crushed rock mass model, grouting system, high-temperature water-rich simulation system and data acquisition system. Through visual display of the dual media environment, different grouting methods and flow rates are simulated. , record temperature and pressure data in real time and analyze the diffusion rules of slurry.

Benefits of technology

The dynamic visualization of slurry diffusion in high-temperature and water-rich environment was realized, and the slurry diffusion laws under different grouting methods and flow rates were explored. It provides theoretical guidance on grouting construction in high-temperature and water-rich crushing rock environments, improving engineering safety Sex and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117825232B_ABST
    Figure CN117825232B_ABST
Patent Text Reader

Abstract

The present invention proposes a high-temperature, water-rich broken rock mass grouting simulation test system and method, which simulates a dual-medium broken rock mass environment through a broken rock mass model and displays it visually, thereby realizing dynamic visualization of the entire grouting process and the entire slurry diffusion process, and can simulate different broken rock mass conditions for testing through the prefabrication of different fracture spaces and the matching of transparent medium materials; the grouting system can perform grouting with controllable flow rate on the visualized broken rock mass model, and the grouting method can be selected to explore the slurry diffusion law under different grouting methods; the high-temperature, water-rich simulation system can truly simulate a high-temperature, water-rich environment, realize high-temperature dynamic water simulation, and supply a high-temperature dynamic water flow with controllable temperature and head pressure into the broken rock mass model in real time; the grouting slurry diffusion process, as well as the temperature and pressure during the grouting process are recorded through a data acquisition system, and the analysis system explores the slurry diffusion law under the high-temperature, water-rich broken rock mass environment based on the collected data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of grouting tests, and in particular relates to a high-temperature, water-rich, broken rock mass grouting simulation test system and method. Background Art

[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.

[0003] The water-rich broken zone is a common typical unfavorable geological condition. Due to its poor stability and low strength, it is easy to induce engineering disasters such as water gushing, mud bursting, and collapse. As an important method for repairing, reinforcing, and blocking water gushing, grouting has become the main technical means for managing broken zones. It can fill the pores and cracks in the rock mass in the broken zone, improve the impermeability and overall stability of the broken rock mass, and reduce the risk of geological disasters during engineering construction. However, in a high-temperature, water-rich environment, the coagulation and diffusion of the slurry are greatly affected. With the action of high-temperature water movement, the coagulation time of traditional grouting slurry increases, and the reinforcement and blocking effects on the rock mass are weakened. The grouting reinforcement effect and the diffusion law of the slurry in a high-temperature, water-rich, broken rock environment are receiving more and more attention.

[0004] The study of grouting slurry diffusion under high temperature and water-rich conditions requires comprehensive consideration of many factors. Model tests can be used to explore the influence of high temperature and water-rich environment, broken rock structure, different grouting methods and grouting flow rate on slurry diffusion, which is of great significance for the safe and efficient construction of underground projects crossing water-rich broken zones. At present, most simulation tests of grouting in high temperature and water-rich broken rock mass set single factor variables, without considering the comprehensive effects of high temperature and water-rich environment and other factors, and cannot reproduce the high temperature and water-rich environment in a targeted manner. There are few studies on the influence of different grouting methods and the slurry diffusion morphology. In addition, traditional grouting tests cannot well observe and record the grouting slurry diffusion process, and cannot well study the grouting effect in the high temperature and water-rich broken rock mass environment. Summary of the invention

[0005] In order to overcome the shortcomings of the above-mentioned prior art, the present invention provides a high-temperature, water-rich, and broken rock grouting simulation test system and method, which can simulate the high-temperature, water-rich environment and the grouting process under different grouting methods, grouting flow rates and other factors, and provide assistance for the subsequent slurry diffusion in the high-temperature, water-rich, and broken rock environment.

[0006] To achieve the above-mentioned purpose, the first aspect of the present invention provides a high-temperature, water-rich, broken rock mass grouting simulation test system, comprising: a broken rock mass model, a grouting system, a high-temperature, water-rich simulation system, a data acquisition system and an analysis system;

[0007] The broken rock model includes a fracture medium space and a porous medium space, which are used to simulate the broken rock environment of the dual medium and perform visual display;

[0008] The grouting system is connected to the broken rock model through a pipeline, and the grouting system provides different grouting methods for the broken rock model, and the grouting flow rate of the grouting system is controllable to analyze the slurry diffusion under different grouting methods and / or different grouting flow rates;

[0009] The high-temperature and rich-water simulation system is connected to the broken rock model through a pipeline to provide the broken rock model with high-temperature moving water with controllable temperature and pressure for simulating a high-temperature and rich-water environment;

[0010] The data acquisition system includes an image acquisition device, and a temperature sensor and a pressure sensor arranged in the broken rock model; the image acquisition device is used to record the diffusion process of the grouting slurry;

[0011] The analysis system is connected to the data acquisition system signal, and is used to analyze the temperature data and pressure data collected by the temperature sensor and the pressure sensor, as well as the recorded grouting slurry diffusion process, to explore the slurry diffusion in a high-temperature, water-rich, broken rock environment.

[0012] A second aspect of the present invention provides a high-temperature, water-rich, broken rock mass grouting simulation test method, comprising:

[0013] Inject high-temperature dynamic water of preset temperature and pressure into the broken rock model through a high-temperature water-rich simulation system;

[0014] After the temperature in the broken rock model becomes constant, the grouting system is started to inject a preset amount of slurry into the broken rock model at a preset grouting flow rate;

[0015] The grouting slurry diffusion process, temperature data and pressure data of the grouting process are collected through the data acquisition system;

[0016] Based on the collected temperature and pressure data, as well as the recorded grouting slurry diffusion process, the slurry diffusion in the high-temperature, water-rich, broken rock environment is explored.

[0017] One or more of the above technical solutions have the following beneficial effects:

[0018] In the present invention, a broken rock model is used to simulate a dual-medium broken rock environment and display it visually, thereby realizing dynamic visualization of the entire grouting process and the entire slurry diffusion process. Different broken rock conditions can be simulated for testing by prefabricating different fracture spaces and matching transparent medium materials. The grouting system can perform grouting with controllable flow rate on the visualized broken rock model, and the grouting method can be selected, thereby exploring the slurry diffusion law under different grouting methods. The high-temperature water-rich simulation system can truly simulate a high-temperature water-rich environment, realize high-temperature dynamic water simulation, and supply high-temperature dynamic water flow with controllable temperature and head pressure into the broken rock model in real time. The grouting slurry diffusion process, as well as the temperature and pressure during the grouting process are recorded by a data acquisition system, and the analysis system explores the slurry diffusion law under the high-temperature water-rich broken rock environment based on the collected data.

[0019] In the present invention, the grouting sealing time and pressure are affected by various factors through test data analysis, and the action function is fitted. At the same time, the test samples after complete grouting sealing are taken for strength test and analysis. The slurry diffusion and condensation and the grouting body strength factors are comprehensively considered, and the weight setting function is considered. Different weights are set according to actual needs to obtain the optimal grouting scheme, which provides theoretical guidance for subsequent grouting.

[0020] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0022] Figure 1 This is a schematic diagram of the principle of the high-temperature, water-rich, broken rock mass grouting simulation test system in the first embodiment of the present invention;

[0023] Figure 2 It is a structural diagram of a broken rock mass model in the first embodiment of the present invention;

[0024] Figure 3 This is a schematic diagram of the interior of a constant flow grouting pump in Embodiment 1 of the present invention;

[0025] Figure 4 This is a schematic diagram of the principle of the pressure-stabilizing water tank in the first embodiment of the present invention;

[0026] Figure 5 is a flow chart of the test method in Example 2 of the present invention;

[0027] In the figure, 1. broken rock model; 2. transparent box; 3. reducer; 4. control machine; 5. pressure piston; 6. slurry storage tank; 7. grouting pipe; 8. high-temperature water supply device; 9. pressure-stabilizing water tank; 10. lifting platform; 11. water pipeline; 12. control valve; 13. waste liquid collection barrel; 14. stable bracket; 15. high-speed camera; 16. sensor; 17. data connection line; 18. paperless recorder; 19. connector; 20. screw; 21. stirring disc; 22. heating coil; 23. test table; 24. heating plate; 25. water outlet; 26. porous medium space; 27. fracture medium space. DETAILED DESCRIPTION

[0028] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0029] It should be noted that the terms used herein are for describing specific embodiments only and are not intended to be limiting of exemplary embodiments according to the present invention.

[0030] In the absence of conflict, the embodiments of the present invention and the features of the embodiments may be combined with each other.

[0031] Embodiment 1

[0032] like Figure 1 As shown, this embodiment discloses a high-temperature, water-rich, broken rock mass grouting simulation test system, including: a broken rock mass model, a grouting system, a high-temperature, water-rich simulation system, a data acquisition system, and an analysis system;

[0033] The broken rock model includes a fracture medium space and a porous medium space, which are used to simulate the broken rock environment of the dual medium and perform visual display;

[0034] The grouting system is connected to the broken rock model through a pipeline, and the grouting system provides different grouting methods for the broken rock model, and the grouting flow rate of the grouting system is controllable to analyze the slurry diffusion under different grouting methods and / or different grouting flow rates;

[0035] The high-temperature and rich-water simulation system is connected to the broken rock model through a pipeline to provide the broken rock model with high-temperature moving water with controllable temperature and pressure for simulating a high-temperature and rich-water environment;

[0036] The data acquisition system includes an image acquisition device, and a temperature sensor and a pressure sensor arranged in the broken rock model; the image acquisition device is used to record the diffusion process of the grouting slurry;

[0037] The analysis system is connected to the data acquisition system signal, and is used to analyze the temperature data and pressure data collected by the temperature sensor and the pressure sensor, as well as the recorded grouting slurry diffusion process, to explore the slurry diffusion in a high-temperature, water-rich, broken rock environment.

[0038] In this embodiment, the broken rock mass model 1 adopts a transparent box 2, and the transparent box 2 contains a fracture medium space 27 and a porous medium space 26.

[0039] Specifically, Figure 2 As shown, the fracture medium space 27 is manufactured by a prefabricated fracture mold, wherein the fracture medium space 27 can be prefabricated into different types including single fracture, cross fracture, rough fracture and different fracture widths according to the test requirements, and the fracture medium space 27 can be set to different spatial positions, inclination angles and different types of fracture numbers to simulate complex fracture conditions.

[0040] First, an irregular crack mold is prefabricated and placed in a transparent box 2, and spherical transparent medium materials of different gradations are filled therein to simulate the porous medium space 26, wherein the simulated porous medium material can be set to different gradations. After the filling is completed, the crack mold is taken out, and large-grained materials are filled into the cracks to maintain the basic shape of the cracks. A certain amount of glue is applied to the porous medium material for fixing, and the connectivity between the crack medium space 27 and the porous medium space 26 is maintained to complete the visual broken rock model.

[0041] The transparent box 2 is made of high-strength organic glass material and is a flip-top structure. The size of the box can be prefabricated. After the internal broken rock model is completed, the flange at the box cover is closed and covered with a sealing strip.

[0042] In this embodiment, the grouting system realizes constant flow grouting of the model, and includes a grout storage tank 6, a reducer 3, a screw 20, a connector 19, a pressure piston 5, a stirring disc 21, a heating coil 22, a grouting pipe 7 and a control valve 12.

[0043] Specifically, two transparent slurry storage tanks 6 are used to store cement and water glass slurries to be injected, and single-liquid or double-liquid grouting can be realized. The slurry storage tanks 6 are configured as transparent cylinders for storing slurry materials. Slurry selection and double-liquid grouting can be configured according to test needs, so as to facilitate observation of the internal slurry remaining amount for pre-injection.

[0044] like Figure 3As shown, a pressure piston 5 that moves up and down is controlled by a reducer 3 connected to a screw 20 in a slurry storage tank 6, so as to control the inflow and outflow of slurry, wherein the pressure piston 5 is arranged at the lower end of the screw 20, and a stirring disc 21 is arranged at the lower end of the pressure piston 5, and the stirring disc 21 is connected to the screw 20; the reducer 3 is connected to a control machine 4, and the intelligent speed regulation of the reducer 3 is realized through the control machine 4, so as to realize the constant speed outflow of slurry material; the stirring disc 21 rotates continuously when the pressure piston 5 is driven down by the screw 20, so as to always keep the slurry fully mixed and avoid the slurry-water separation during the grouting process; the heating coil 22 can heat the liquid in the slurry storage tank 6 to realize slurry grouting with different initial temperatures.

[0045] The grouting pipe 7 is configured as a transparent pipe to facilitate observation of the slurry flow. A control valve 12 is provided on the grouting pipe 7 to control the flow of the slurry material. The experiment can set different slurry flow rates and grouting pipe positions to explore the effects of different grouting methods; one end of the grouting pipe 7 is connected to the broken rock model 1 under the test table 23, and the other end of the grouting pipe 7 is connected to two slurry storage tanks 6 through a tee pipe to realize grouting of different slurries in the broken rock model 1.

[0046] In this embodiment, the high-temperature, water-rich simulation system provides high-temperature dynamic water conditions and model heating conditions for the water-rich broken rock model, specifically including a high-temperature water supplier 8, a pressure-stabilizing water tank 9, a water supply pipeline 11, a water outlet pipeline, a heating plate 24 and a temperature controller. High-temperature dynamic water is provided by the high-temperature water supplier 8, and a stable head high-temperature dynamic water source is provided to the broken rock model through the pressure-stabilizing water tank 9. The heating plate 24 is placed under the broken rock model 1, and the heating temperature is controlled by the temperature controller to keep the temperature of the broken rock model and the high-temperature dynamic water constant. Grouting can be started when the test temperature is reached.

[0047] Specifically, the high-temperature water supply device 8 is a vertical structure, the back side is connected to the water source through a water pipe 11 hose, and the front side is connected to the pressure-stabilizing water tank 9 through a water pipe 11 hose to supply high-temperature water. Figure 4 As shown, the pressure-stabilizing water tank 9 is divided into a water storage space and a drainage space. The water storage space in the middle area maintains a constant water level, and the drainage spaces on both sides discharge excess high-temperature water through the outlet 25. The pressure-stabilizing water tank 9 is assembled with the lifting platform 10 and can be freely lifted and lowered to provide the model with high-temperature dynamic water with stable temperature and pressure. The high-temperature water overflowing from the broken rock model 1 and the injected slurry can flow into the waste collection barrel 13 through the hard pipe of the water pipe 11. A filter screen is set in the waste collection barrel 13 to filter the slurry solids, which is convenient for cleaning the test system.

[0048] The heating plate 24 is connected to a power source to continuously heat or keep the broken rock model 1 warm. Each test system is placed on a prefabricated test table 23 to facilitate observation and recording of the test process.

[0049] In this embodiment, the data acquisition system realizes real-time recording of the diffusion of grouting slurry, including a high-speed camera 15 above the broken rock model 1, a sensor 16 connected to the broken rock model 1, a data connection line 17, a paperless recorder 18 and a computer terminal.

[0050] Specifically, the stabilizing bracket 14 provides a stable support for the high-speed camera 15, ensuring that the high-speed camera 15 completely records the slurry diffusion morphology during the entire grouting process. The high-speed camera 15 records the slurry diffusion process in real time. The sensor 16 includes a temperature sensor and a pressure sensor. A set of temperature and pressure sensors are respectively set at the intersection of the crack space and the center of the porous medium area to monitor the temperature and pressure data of the entire grouting process in real time. The sensor 16 transmits the monitored temperature and pressure data to the paperless recorder 18 in real time through the data connection line 17 for recording and later output. After the test, the data information captured by the high-speed camera 15 is transmitted to the computer terminal, and the computer terminal records and processes the captured information.

[0051] This embodiment can prefabricate different fracture spaces and transparent porous medium material gradations to simulate different broken rock mass conditions for testing.

[0052] In this embodiment, different grouting pipe positions and different slurry selections can be set, such as single-liquid and double-liquid grouting, double-liquid grouting with different ratios, etc., to explore the slurry diffusion law under different grouting methods including penetration grouting, splitting grouting, and compaction grouting.

[0053] In this embodiment, different high-temperature dynamic water temperatures and model heating temperatures can be set to study the slurry diffusion morphology under different temperature environments.

[0054] The visualized broken rock model in this embodiment can well simulate the broken rock environment of dual media by prefabricating fracture space and transparent porous medium, and can realize dynamic visualization of the whole grouting process and the whole process of slurry diffusion. By prefabricating different transparent boxes, prefabricating different fracture spaces and matching transparent medium materials, different broken rock conditions can be simulated for testing; the grouting system can perform constant flow grouting on the visualized broken rock model, and realize constant flow of slurry by adjusting the intelligent speed regulation of the reducer by the control machine, solve the problem of slurry water segregation by setting a stirring disc, realize slurry stability during grouting, realize slurry grouting with different initial temperatures by setting a heating coil, and explore the slurry diffusion law under different grouting methods including infiltration grouting, splitting grouting, and compaction grouting by changing the slurry flow rate and grouting pipe position; the high-temperature and water-rich simulation system can truly simulate the high-temperature and water-rich environment. High-temperature dynamic water simulation is achieved through a high-temperature water supply device, and a high-temperature dynamic water flow with controllable temperature and head pressure is supplied to the broken rock model in real time. The broken rock model is heated by a heating plate to always maintain a high-temperature and water-rich environment with a constant temperature in the model. The data acquisition system can record the diffusion form of the grouting slurry in real time, and accurately record the diffusion process of the grouting slurry through a high-speed camera. The changes in temperature and pressure data during the grouting process are recorded in real time through temperature and pressure sensors and transmitted to a paperless recorder for real-time recording, and the computer terminal realizes the analysis and processing of images and monitoring data. The grouting sealing time and pressure are affected by various factors through test data analysis, and the action function is fitted. At the same time, the test samples after complete grouting sealing are taken for strength testing and analysis, and the factors of slurry diffusion and condensation and grouting body strength are comprehensively considered, and the weight setting function is considered, and different weight calculations are set according to actual needs.

[0055] Embodiment 2

[0056] The purpose of this embodiment is to provide a high-temperature, water-rich, broken rock mass grouting simulation test method, including:

[0057] Inject high-temperature dynamic water of preset temperature and pressure into the broken rock model through a high-temperature water-rich simulation system;

[0058] After the temperature in the broken rock model becomes constant, the grouting system is started to inject a preset amount of slurry into the broken rock model at a preset grouting flow rate;

[0059] The grouting slurry diffusion process, temperature data and pressure data of the grouting process are collected through the data acquisition system;

[0060] Based on the collected temperature and pressure data, as well as the recorded grouting slurry diffusion process, the slurry diffusion in the high-temperature, water-rich, broken rock environment is explored.

[0061] In this embodiment, a high-temperature, water-rich, broken rock mass grouting simulation test method is provided, comprising the following steps:

[0062] Construct a broken rock medium model including fracture medium space and porous medium space, and complete the structural assembly of the high-temperature water-rich broken rock grouting simulation test system;

[0063] Data monitoring equipment including temperature and pressure sensors are installed, which are connected to paperless recorders via data cables to monitor and record data in real time. A high-speed camera is set above the model to record the flow of high-temperature dynamic water and the diffusion pattern of slurry during the entire grouting process.

[0064] Start the heating plate under the model to heat up the broken rock model. Start the high-temperature water supply to deliver high-temperature water to the pressure-stabilizing water tank. Set the constant head of the pressure-stabilizing water tank to inject constant temperature and pressure high-temperature moving water into the visualized broken rock model to simulate the effect of high-temperature moving water in the actual environment. Place a wastewater collection box on the right side of the model to collect the waste fluid flowing out of the device.

[0065] After the temperature inside the model monitored by the temperature sensor reaches the requirement, the grouting system is started, and the amount of slurry required for the test configuration is injected into the two slurry storage tanks respectively. The control machine adjusts the reducer intelligent speed regulation to set different slurry discharge speeds of the two tanks to simulate different slurry selection ratios. The grouting pipe is connected to transport it to the model at a constant flow rate, and the flow and stop of the slurry are controlled by the control valve.

[0066] The diffusion process of slurry in the broken rock model is recorded in real time by a high-speed camera above the model. The data monitored by the temperature and pressure sensors are transmitted to the paperless recorder through the data connection line. The image data and sensor monitoring data are exported for analysis and processing. The test system is organized to complete the high-temperature and water-rich broken rock grouting simulation test.

[0067] Through the test data analysis, the grouting sealing time and pressure are affected by various factors, and the action function is fitted. At the same time, the test samples after complete grouting are taken for strength test and analysis. The slurry diffusion and condensation and the strength of the grouting body are comprehensively considered, and the weight setting function is considered. Different weights are set according to actual needs.

[0068] In this embodiment, the time required for slurry plugging during the grouting process is analyzed by the influence of dynamic water flow rate, grouting speed, ambient temperature, slurry water-cement ratio, and double liquid ratio, and the fitting function is set to the corresponding influencing factor letters, which are Q A , Q G , C, D, E, etc., then the grouting plugging time can be set as:

[0069]

[0070] Take multiple sets of test data and take the logarithms of both sides of the equation to solve the coefficients K1, a1, b1, c1, d1, and e1.

[0071] The pressure conditions at each position monitored during the grouting process are taken, and the spatial pressure distribution diagram of the grouting process is constructed in combination with the model coordinates to better observe the diffusion form of the grouting slurry. Through the comparison of different groups of tests, the changes of the grouting port pressure with various factors during grouting plugging are analyzed, and the grouting pressure can be set as:

[0072]

[0073] Take multiple sets of test data and take the logarithms of both sides of the equation to solve the coefficients K2, a2, b2, c2, d2, and e2.

[0074] After the grouting is completed, the broken rock model is taken out for curing and strength test is carried out. By comparing different groups of tests, the strength of the structure after grouting is analyzed with various factors. The strength can be set as:

[0075]

[0076] Take multiple sets of test data and take the logarithms of both sides of the equation to solve the coefficients K3, a3, b3, c3, d3, and e3.

[0077] A comprehensive analysis is conducted on the grouting plugging time, the required grouting pressure and the strength of the solid structure after grouting. Under the same influencing factors, according to formulas (1), (2) and (3) after the coefficient values ​​are obtained, the values ​​of grouting temperature, grouting pressure and the strength of the solid structure after grouting corresponding to a group of schemes are obtained. Then, the values ​​of grouting temperature, grouting pressure and the strength of the solid structure after grouting are quantified to the same order of magnitude to obtain R x 、T x , U x , where x = 1, 2, 3, ..., for R x 、T x , U x The weight distribution is performed, and the sum of the weight coefficients α, β and γ is 1. According to actual needs, the weight of slurry diffusion and condensation is increased in terms of grouting water blocking, and the weight of strength is increased in terms of grouting reinforcement. The weight of the actual grouting pressure is set to be relatively small, which can be achieved within the existing technical standards. At the same time, if any value of the grouting plugging time, grouting pressure and the strength of the structure after grouting reaches the grouting threshold, the plan is changed. The weight function can be set as:

[0078] Y=R x α -T x β -U x γ (4)

[0079] On the basis of known factors, the unknown factors are changed to achieve the maximum value of Y under grouting conditions, which is the optimal grouting scheme configuration.

[0080] It is understandable that the R x 、T x , U x When allocating weights, the specific values ​​of α, β, and γ can be determined based on the actual situation of construction site A; similarly, for R x 、T x , U x When allocating weights, the specific values ​​of α, β and γ can be determined based on the actual situation of construction site B.

[0081] The analysis method of this embodiment focuses on the influence of dynamic water velocity, grouting speed, ambient temperature, slurry water-cement ratio and double liquid ratio on grouting sealing time, grouting pressure and solid strength after grouting, fits the action function, comprehensively considers the factors of slurry diffusion and condensation and grouting body strength, considers the weight setting function, and according to actual needs, increases the weight of slurry diffusion and condensation in terms of grouting water plugging, increases the weight of strength in terms of grouting reinforcement, and sets a smaller weight for the actual grouting pressure.

[0082] Those skilled in the art should understand that the modules or steps of the present invention described above can be implemented by a general-purpose computer device, or alternatively, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. The present invention is not limited to any specific combination of hardware and software.

[0083] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.

Claims

1. A high temperature, water-rich, broken rock mass grouting simulation test system, It is characterized in that include: Broken rock model, grouting system, high temperature and rich water simulation system, data acquisition system and analysis system; The broken rock model includes a fracture medium space and a porous medium space, which are used to simulate a dual-medium broken rock environment and display it visually; in the broken rock model, different placement positions and inclination angles of the fracture medium space are set, and multiple different types of fractures are set and placed in different spatial positions to simulate complex fracture conditions; the porous medium space is simulated by filling the broken rock model with spherical transparent medium materials of different gradations; the fracture medium space and the porous medium space maintain connectivity; The grouting system is connected to the broken rock model through a pipeline, and the grouting system provides different grouting methods for the broken rock model, and the grouting flow rate of the grouting system is controllable to analyze the slurry diffusion under different grouting methods and / or different grouting flow rates; the grouting system includes a slurry storage tank, a screw is arranged in the slurry storage tank, a pressure piston is arranged at the lower end of the screw, a stirring disc is arranged below the pressure piston, and the stirring disc is connected to the screw, and the speed of the screw is controlled by a reducer to realize constant speed injection of slurry; the grouting system also includes a heating plate and a heating coil, and the heating plate is arranged below the broken rock model to maintain a high-temperature and water-rich environment with a constant temperature in the broken rock model; the heating coil is used to heat the liquid in the slurry storage tank to realize grouting of slurries with different initial temperatures; The high-temperature and rich-water simulation system is connected to the broken rock model through a pipeline to provide the broken rock model with high-temperature moving water with controllable temperature and pressure for simulating a high-temperature and rich-water environment; The data acquisition system includes an image acquisition device, and a temperature sensor and a pressure sensor arranged in the broken rock model; the image acquisition device is used to record the diffusion process of the grouting slurry; The analysis system is connected to the data acquisition system signal, and is used to analyze the temperature data and pressure data collected by the temperature sensor and the pressure sensor, as well as the recorded grouting slurry diffusion process, to explore the slurry diffusion in a high-temperature, water-rich, broken rock environment.

2. A high temperature, water-rich, broken rock mass grouting simulation test system as claimed in claim 1, It is characterized in that The high-temperature rich water simulation system includes a high-temperature water supplier and a pressure-stabilizing water tank. The high-temperature water supplier is connected to a water source and the pressure-stabilizing water tank pipeline respectively. The pressure-stabilizing water tank provides high-temperature moving water with controllable temperature and pressure for the broken rock model.

3. A high temperature, water-rich, broken rock mass grouting simulation test system as claimed in claim 2, It is characterized in that The pressure-stabilizing water tank comprises a water storage space and a drain space. The water storage space maintains a constant water level. The drain spaces arranged on both sides of the water storage space discharge excess high-temperature water through water outlets.

4. A high temperature, water-rich, broken rock mass grouting simulation test system as claimed in claim 1, It is characterized in that The grouting method is one of penetration grouting, splitting grouting and compaction grouting, and the slurry diffusion law is explored through different grouting methods.

5. A high-temperature, water-rich, broken rock mass grouting simulation test method, implemented by a high-temperature, water-rich, broken rock mass grouting simulation test system as claimed in any one of claims 1 to 4, It is characterized in that include: Inject high-temperature dynamic water of preset temperature and pressure into the broken rock model through a high-temperature water-rich simulation system; After the temperature in the broken rock model becomes constant, the grouting system is started to inject a preset amount of slurry into the broken rock model at a preset grouting flow rate; The grouting slurry diffusion process, temperature data and pressure data of the grouting process are collected through the data acquisition system; Based on the collected temperature and pressure data, as well as the recorded grouting slurry diffusion process, the grouting slurry diffusion in the high-temperature, water-rich, and broken rock environment is analyzed; According to the influence of various influencing factors on grouting plugging time, pressure and solid strength of grouting joint, a fitting function is set. The values ​​of grouting plugging time, pressure and solid strength of grouting joint under the same influencing factors are obtained through the fitting function. The obtained values ​​of grouting plugging time, pressure and solid strength of grouting joint are quantified to the same order of magnitude, and a weight function is set. According to the set weight function, the optimal grouting scheme configuration is obtained.

6. A high-temperature, water-rich, broken rock mass grouting simulation test method as claimed in claim 5, It is characterized in that Various influencing factors include: the time required for slurry sealing during the grouting process is affected by the dynamic water flow rate, grouting speed, ambient temperature, slurry water-cement ratio and double liquid ratio.

Citation Information

Cited By

  • Grouting test device and method for high-temperature and high-pressure water-rich fractured rock mass

    CN122329925A