A method, apparatus, and equipment for refunding electricity charges due to inaccurate metering by a current transformer.
By measuring the calibration error and target secondary current of the faulty instrument transformer under different currents, and calculating the combined error in segments, the problem of inaccurate electricity fee refunds during the period of instrument transformer metering inaccuracy was solved, and the accuracy of electricity fee refunds was achieved.
Patent Information
- Application Number
- CN202311724151.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-14
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2043-12-14
AI Technical Summary
The existing electricity bill refund and reimbursement methods cannot accurately reflect the electricity consumption during the period when the instrument transformer metering is inaccurate, resulting in inaccurate electricity bill refunds and reimbursements.
The verification error of the faulty transformer under different preset primary currents is measured, the target secondary current is determined, and the load current and power curve are divided into multiple segments according to the wiring method and verification error. The combined error and the refund/compensation electricity fee are calculated.
The accuracy of electricity bill refund and subsidy calculation has been improved by performing segmented calculations based on actual metering data to ensure the accuracy of refund and subsidy payments.
Smart Images

Figure CN117825772B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to power systems, and more particularly to a method, apparatus, and equipment for refunding electricity charges when current transformer metering is inaccurate. Background Technology
[0002] Instrument transformer inaccuracies are one of the common faults in metering devices in power systems. When such metering faults occur, power supply companies find it difficult to determine the actual electricity consumption of users.
[0003] The current electricity fee refund and subsidy methods are based on the average electricity consumption of the same period in history, or on the error of the current transformer under the rated current.
[0004] However, users' electricity consumption is highly random and the error of faulty instrument transformers varies, so the existing electricity fee refund and compensation methods cannot accurately reflect users' electricity consumption during periods of instrument transformer metering inaccuracy. Summary of the Invention
[0005] This invention provides a method, apparatus, and equipment for refunding electricity charges due to metering inaccuracies in current transformers, thereby improving the accuracy of electricity charge refund calculations.
[0006] According to one aspect of the present invention, a method for refunding electricity charges due to metering inaccuracies in current transformers is provided, comprising:
[0007] Determine the verification error of the faulty current transformer in the metering device under test under different preset primary currents.
[0008] Based on the transformer ratio of the faulty transformer, the preset primary current, and the verification error under the preset primary current, the target secondary current of the faulty transformer under different preset primary currents is determined.
[0009] Using the target secondary current of the fault transformer under different preset primary currents as the dividing criteria, the load current curve and the corresponding power curve during the time period to be refunded and compensated are divided into multiple segments.
[0010] Based on the wiring method of the metering device under test and the verification error of the fault transformer in the metering device under test under different preset primary currents, calculate the combined error of the metering device under test in different sections.
[0011] Based on the combined error and energy metering value of the metering device under test in different sections, calculate the refund / refund electricity fee for the metering device under test during the time period to be refunded / refunded.
[0012] Optionally, before dividing the load current curve and corresponding power curve within the time period to be compensated into multiple segments by using the target secondary current of the fault transformer under different preset primary currents as the segmentation basis, the method further includes:
[0013] The time period for cancellation or replacement is determined based on the time of the previous successful calibration or rotation of the measuring device under test.
[0014] Optionally, determining the time period to be returned or supplemented based on the time of the previous calibration or rotation of the measuring device under test includes:
[0015] The halfway point between the previous successful verification or the rotation time and the electricity fee refund / refund period is determined as the start time of the refund / refund period.
[0016] Optionally, before dividing the load current curve and corresponding power curve within the time period to be compensated into multiple segments by using the target secondary current of the fault transformer under different preset primary currents as the segmentation basis, the method further includes:
[0017] The time period to be refunded or compensated is determined based on the changing trend of the load current curve of the metering device under test.
[0018] Optionally, determining the time period to be refunded or compensated based on the changing trend of the load current curve of the metering device under test includes:
[0019] The start time of the compensation / refund period is determined based on the abrupt change point of the load current curve.
[0020] Optionally, the wiring method includes three-phase four-wire;
[0021] The step of calculating the combined error of the metering device under test in different sections based on the wiring method of the metering device under test and the verification error of the faulty current transformer in the metering device under test under different preset primary currents includes:
[0022] When the wiring method is three-phase four-wire, the combined error of the metering device under test in different sections is calculated based on the verification error of the three current transformers in the metering device under test under different preset primary currents. Each preset primary current corresponds to one section, and the current transformer includes a faulty transformer.
[0023] Optionally, the wiring method includes three-phase three-wire;
[0024] The step of calculating the combined error of the metering device under test in different sections based on the wiring method of the metering device under test and the verification error of the faulty current transformer in the metering device under test under different preset primary currents includes:
[0025] When the wiring method is three-phase three-wire, the combined error of the metering device under test in different sections is calculated based on the verification error of the two current transformers in the metering device under test under different preset primary currents. Each preset primary current corresponds to one section, and the current transformer includes a faulty transformer.
[0026] Optionally, the step of calculating the refund / subsidy electricity fee for the metering device under test during the time period based on the combined error and electricity metering value of the metering device under test in different sections includes:
[0027] The energy metering value for each segment is determined based on the energy difference between the beginning and end of the unit curve in each segment of the energy curve.
[0028] The actual unit electricity consumption of the section is calculated based on the combined error of the metering device under test in the section and the electricity metering value.
[0029] The actual electricity consumption per unit in each segment within the time period to be refunded or compensated is summed to determine the total actual electricity consumption of the metering device to be measured within the time period to be refunded or compensated.
[0030] Based on the paid electricity bills, electricity prices, and the total actual electricity consumption, calculate the refund / refund electricity fee for the metering device under test during the period to be refunded / refunded.
[0031] According to another aspect of the present invention, a device for refunding electricity fees for current transformer metering inaccuracies is provided. The device includes an error measurement module, a target secondary current determination module, a section division module, a composite error calculation module, and a refund electricity fee calculation module.
[0032] The error measurement module is used to measure the verification error of the faulty current transformer in the metering device under test under different preset primary currents.
[0033] The target secondary current determination module is used to determine the target secondary current of the faulty transformer under different preset primary currents based on the transformer ratio of the faulty transformer, the preset primary current, and the verification error under the preset primary current.
[0034] The segmentation module is used to divide the load current curve and the corresponding power curve into multiple segments based on the target secondary current of the fault transformer under different preset primary currents.
[0035] The composite error calculation module is used to calculate the composite error of the metering device under test in different sections based on the wiring method of the metering device under test and the verification error of the fault transformer in the metering device under test under different preset primary currents.
[0036] The electricity fee refund / refund calculation module is used to calculate the electricity fee refund / refund for the metering device under test during the time period based on the combined error and electricity metering value of the metering device under test in different sections.
[0037] According to another aspect of the present invention, an electronic device is provided, the electronic device comprising:
[0038] At least one processor; and
[0039] A memory communicatively connected to the at least one processor; wherein,
[0040] The memory stores a computer program that can be executed by the at least one processor, which enables the at least one processor to perform the electricity fee refund method for current transformer metering inaccuracies as described in any embodiment of the present invention.
[0041] The present invention provides a method, apparatus, and equipment for refunding electricity charges for current transformer metering inaccuracies. The method involves measuring the calibration error of a faulty current transformer in the metering device under test under different preset primary currents, thereby determining the target secondary current of the faulty current transformer under different preset primary currents. Using the target secondary current of the faulty current transformer under different preset primary currents as a segmentation basis, the load current curve and the corresponding energy curve are divided into multiple segments. Based on the wiring method of the metering device under test and the calibration error of the faulty current transformer under test under different preset primary currents, the combined error of the metering device under test in different segments is calculated. Based on the combined error of the metering device under test in different segments and the energy metering value, the refundable electricity charges for the metering device under test during the refund period are calculated. This method achieves accurate calculation of refund charges based on the calibration error of the metering device under test and actual metering data. Furthermore, by segmenting the refund period according to the calibration error corresponding to different primary currents, the accuracy of electricity charge refund calculation is improved.
[0042] It should be understood that the description in this section is not intended to identify key or essential features of the embodiments of the present invention, nor is it intended to limit the scope of the invention. Other features of the invention will become readily apparent from the following description. Attached Figure Description
[0043] To more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0044] Figure 1 This is a flowchart illustrating a method for refunding electricity charges due to metering inaccuracies in current transformers, provided by an embodiment of the present invention.
[0045] Figure 2 A schematic flowchart illustrating another method for refunding electricity charges due to metering inaccuracies of current transformers provided in an embodiment of the present invention;
[0046] Figure 3 A flowchart illustrating another method for refunding electricity charges due to metering inaccuracy of current transformers provided in this embodiment of the invention;
[0047] Figure 4 A flowchart illustrating another method for refunding electricity charges due to metering inaccuracy of current transformers provided in this embodiment of the invention;
[0048] Figure 5 This is a schematic diagram of the composition of an electricity fee refund device for current transformer metering inaccuracy provided in an embodiment of the present invention;
[0049] Figure 6 A schematic diagram of an electronic device that can be used to implement embodiments of the present invention is shown. Detailed Implementation
[0050] To enable those skilled in the art to better understand the present invention, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of the present invention.
[0051] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this invention are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments of the invention described herein can be implemented in orders other than those illustrated or described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover a non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.
[0052] To address the problems mentioned in the background art, embodiments of the present invention provide a method for refunding electricity charges when current transformer metering is inaccurate. This method is applicable to situations where the faulty current transformer in the metering device under test has an error exceeding the standard and it is necessary to verify the actual electricity consumption of the user and refund the electricity charges. Figure 1 This is a flowchart illustrating a method for refunding electricity charges due to metering inaccuracies in current transformers, provided by an embodiment of the present invention. (Refer to...) Figure 1 The methods for refunding or supplementing electricity charges due to inaccurate current transformer metering include:
[0053] S101. Measure the verification error of the faulty current transformer in the metering device under different preset primary currents.
[0054] Specifically, the metering device under test refers to the electricity metering device installed on the user's inbound bus, including multiple faulty current transformers. The preset primary current refers to the set current value measured on the primary side of the faulty current transformer when determining the verification error of the faulty current transformer. It can be set as a preset percentage of the rated primary current. This preset percentage can be determined based on the user's historical electricity consumption data. For example, under normal circumstances, the preset primary current may include five test points: 1% rated current, 5% rated current, 20% rated current, 100% rated current, and 120% rated current. Based on the user's historical electricity consumption data under normal conditions, the primary current is consistently stable between 20% and 7% of the rated current over the years. If the current is between 0% and 100% of the rated current, then several test points can be added within the preset primary current range of 20% to 100% of the rated current. For example, five test points can be added at 30%, 40%, 50%, 60%, and 70% of the rated current, making the preset primary current include ten test points at 1%, 5%, 20%, 30%, 40%, 50%, 60%, 70%, 100%, and 120% of the rated current. Verification error refers to the verification error obtained from the verification of the faulty transformer. For example, verification error can include ratio error (also called ratio difference) and phase error (also called phase angle difference). For the faulty instrument transformers in the metering device under test that have malfunctioned, verification is carried out according to JJG 313-2010 "Verification Procedure for Faulty Instrument Transformers for Measurement" to measure the verification error of each faulty instrument transformer under different preset primary currents.
[0055] S102. Based on the transformer ratio of the faulty transformer, the preset primary current, and the verification error under the preset primary current, determine the target secondary current of the faulty transformer under different preset primary currents.
[0056] Specifically, the verification error includes ratio error and phase error. According to the definition formula for ratio error... The first formula for calculating the target secondary current can be determined. Where f is the ratio error of the faulty transformer, K is the transformation ratio of the faulty transformer, I1 is the preset primary current of the faulty transformer, and I2 is the secondary current of the faulty transformer. By substituting the transformation ratio of the faulty transformer, the preset primary current, and the verification error under the preset primary current into the first calculation formula, the target secondary current of the faulty transformer under different preset primary currents can be calculated.
[0057] S103. Using the target secondary current of the faulty transformer under different preset primary currents as the basis for segmentation, the load current curve and the corresponding power curve during the time period to be refunded and compensated are divided into multiple segments.
[0058] Specifically, the load current curve and corresponding energy curve of the metering device under test (TMD) are obtained during the pending refund / refund period. The pending refund / refund period refers to the time between the metering device's inaccurate readings and the electricity bill refund / refund. This period can be determined based on the trend of the load current curve or the time since the metering device passed its previous calibration. The load current curve refers to the curve showing the change in load current measured by the faulty instrument transformer, which is essentially the curve showing the change in the secondary current of the faulty instrument transformer. This curve can be determined based on the historical metering data of the metering device under test. The energy curve refers to the curve showing the change in the user's cumulative electricity consumption measured by the metering device under test.
[0059] Using the straight lines where the load current equals the secondary currents of each target point as the first curve dividing line, the load current curve is divided into multiple segments. The x-coordinate of the intersection point of the first dividing line and the load current curve is the segmentation time. Mapping the segmentation time to the load current curve allows us to divide the energy curve into the same number of segments. Each segment in the energy curve corresponds one-to-one with a segment in the load current curve. The preset primary current values also correspond one-to-one with each segment in the energy curve and the load current curve.
[0060] For example, the preset primary current includes five test points: 1% of rated current, 5% of rated current, 20% of rated current, 100% of rated current, and 120% of rated current. The corresponding target secondary currents are as follows: and So, the straight line and These five straight lines serve as dividing lines, which can divide the load current curve into... and These five sections, each of which can include multiple unit curves, refer to continuous curve segments within a section. Based on the start and end times of each unit curve in the load current curve, the load current curve can be divided into multiple unit curves. Each unit curve in the load current curve corresponds one-to-one with the others, and they belong to the same section. This divides the load current curve and its corresponding power curve into the same number of sections.
[0061] S104. Based on the wiring method of the metering device under test and the verification error of the faulty transformer in the metering device under test under different preset primary currents, calculate the combined error of the metering device under test in different sections.
[0062] Specifically, the wiring method refers to the connection method between the metering device under test and the incoming line. For example, wiring methods include three-phase four-wire and three-phase three-wire. The verification error of the faulty current transformer under the preset primary current is the verification error determined in step S101. The composite error refers to the total metering error of the metering device under test caused by the presence of the faulty current transformer, which is the energy metering error of the metering device under test. Different wiring methods have corresponding composite error calculation methods. Combining the verification errors of the faulty current transformer in the metering device under test under different preset primary currents, the composite error of the metering device under test in different sections can be calculated.
[0063] For example, if the wiring method is three-phase three-wire, the combined error of the metering device under test in different sections is calculated based on the verification errors of the two current transformers under test under different preset primary currents. If the wiring method is three-phase four-wire, the combined error of the metering device under test in different sections is calculated based on the verification errors of the three current transformers under test under different preset primary currents.
[0064] S105. Based on the combined error and energy metering value of the metering device under test in different sections, calculate the refund / refund electricity fee for the metering device under test during the period to be refunded / refunded.
[0065] Specifically, based on the combined error and energy metering value of the metering device under test in different sections, the actual energy consumption of the metering device under test in different sections can be determined. Then, by superimposing the actual energy consumption in each time period, the actual energy consumption of the metering device under test in the time period to be refunded can be calculated. Combining the electricity price and the energy metering value of the metering device under test in the time period to be refunded, the electricity fee to be refunded can be calculated.
[0066] In the electricity fee refund method for current transformer metering inaccuracies provided in this embodiment, the calibration error of the faulty current transformer in the metering device under test is measured under different preset primary currents, thereby determining the target secondary current of the faulty current transformer under different preset primary currents. Using the target secondary current of the faulty current transformer under different preset primary currents as a segmentation basis, the load current curve and the corresponding energy curve are divided into multiple segments. Based on the wiring method of the metering device under test and the calibration error of the faulty current transformer under test under different preset primary currents, the combined error of the metering device under test in different segments is calculated. Based on the combined error of the metering device under test in different segments and the energy metering value, the refund fee for the metering device under test during the refund period is calculated. Accurate calculation of the refund fee is achieved based on the calibration error of the metering device under test and the actual metering data. The calculation of the refund period is divided according to the calibration error corresponding to different primary currents, improving the accuracy of electricity fee refund calculation.
[0067] Figure 2 This is a flowchart illustrating another method for refunding electricity charges due to metering inaccuracies in current transformers, provided by an embodiment of the present invention. Based on the aforementioned embodiments, refer to... Figure 2 The methods for refunding or supplementing electricity charges due to inaccurate current transformer metering include:
[0068] S201. Measure the verification error of the faulty current transformer in the metering device under different preset primary currents.
[0069] S202. Based on the transformer ratio of the faulty transformer, the preset primary current, and the verification error under the preset primary current, determine the target secondary current of the faulty transformer under different preset primary currents.
[0070] Steps S201 and S202 correspond one-to-one with the aforementioned S101 and S102, and will not be repeated here.
[0071] S203. Determine the time period for cancellation or replacement based on the time of the previous qualified or rotated calibration of the measuring device to be tested.
[0072] Specifically, verification refers to the detection and verification of the accuracy of the metering device under test. Rotation refers to the operation of replacing the metering device under test. When the time difference between the previous rotation or verification completion time and the current electricity fee refund / refund is small (for example, a small time difference can mean less than one month), the refund / refund period can be determined based on the previous verification or rotation time of the metering device under test. If the previous verification completion time is closer to the current electricity fee refund / refund compared to the previous rotation completion time, the refund / refund period is determined based on the previous verification completion time. For example, setting the refund / refund period by taking the midpoint between the previous verification or rotation time and the current electricity fee refund / refund time as the start time of the refund / refund period, and the current electricity fee refund / refund time as the end time of the refund / refund period, can balance the customer's losses and the electricity user's losses, improving the accuracy of the refund / refund.
[0073] S204. Using the target secondary current of the faulty transformer under different preset primary currents as the basis for segmentation, the load current curve and the corresponding power curve during the time period to be refunded and compensated are divided into multiple segments.
[0074] S205. Based on the wiring method of the metering device under test and the verification error of the faulty current transformer in the metering device under test under different preset primary currents, calculate the combined error of the metering device under test in different sections.
[0075] S206. Based on the combined error and energy metering value of the metering device under test in different sections, calculate the refund / refund electricity fee for the metering device under test during the period to be refunded / refunded.
[0076] Steps S204, S205, and S206 correspond one-to-one with the aforementioned S103, S104, and S105, and will not be repeated here.
[0077] The electricity fee refund method for current transformer metering inaccuracies provided in this embodiment addresses the situation where the time difference between the previous successful replacement or calibration and the current electricity fee refund is small. For example, a small time difference can mean less than one month. The refund period can be determined based on the previous successful calibration or replacement time of the metering device under test. This method can determine the inaccuracy time more accurately and in a balanced way, thereby reducing losses for users and power supply companies and improving the accuracy of refunds.
[0078] Figure 3 This is a flowchart illustrating another method for refunding electricity charges due to metering inaccuracies in current transformers, provided by an embodiment of the present invention. Based on the aforementioned embodiments, referencing... Figure 3 The methods for refunding or supplementing electricity charges due to inaccurate current transformer metering include:
[0079] S301. Measure the verification error of the faulty current transformer in the metering device under test under different preset primary currents.
[0080] S302. Based on the transformer ratio of the faulty transformer, the preset primary current, and the verification error under the preset primary current, determine the target secondary current of the faulty transformer under different preset primary currents.
[0081] Steps S301 and S302 correspond one-to-one with the aforementioned S101 and S102, and will not be repeated here.
[0082] S303. Determine the time period for refund / refund based on the changing trend of the load current curve of the metering device under test.
[0083] Specifically, the load current curve refers to the curve showing the change in load current measured by the faulty instrument transformer, which is essentially the curve showing the change in the secondary current of the faulty instrument transformer. This curve can be determined based on historical metering data from the metering device under test. The trend of the load current curve can reflect the precise time of the instrument transformer failure. For example, the start time of the refund / refund period can be determined based on the time data corresponding to the abrupt change points of the load current curve. For instance, the point with the largest rate of change on the load current curve since the previous replacement or calibration can be determined as the start time of the refund / refund period, and the time of this electricity fee refund / refund can be taken as the end time of the refund / refund period. Another example is determining the point on the load current curve since the previous replacement or calibration that first shows the rate of change exceeding a preset value as the start time of the refund / refund period, and the time of this electricity fee refund / refund can be taken as the end time of the refund / refund period.
[0084] S304. Using the target secondary current of the faulty transformer under different preset primary currents as the basis for segmentation, the load current curve and the corresponding power curve during the time period to be refunded and compensated are divided into multiple segments.
[0085] S305. Based on the wiring method of the metering device under test and the verification error of the faulty transformer in the metering device under test under different preset primary currents, calculate the combined error of the metering device under test in different sections.
[0086] S306. Based on the combined error and energy metering value of the metering device under test in different sections, calculate the refund / refund electricity fee for the metering device under test during the period to be refunded / refunded.
[0087] Steps S304, S305, and S306 correspond one-to-one with the aforementioned S103, S104, and S105, and will not be repeated here.
[0088] The electricity fee refund method for current transformer metering inaccuracies provided in this embodiment determines the time period for refund based on the changing trend of the load current curve of the metering device under test, thus enabling a more evidence-based and accurate determination of the time period for refund, and further improving the accuracy of electricity fee refunds.
[0089] Figure 4 This is a flowchart illustrating another method for refunding electricity charges due to metering inaccuracies in current transformers, provided by an embodiment of the present invention. Based on the aforementioned embodiments, referencing... Figure 4 The methods for refunding or supplementing electricity charges due to inaccurate current transformer metering include:
[0090] S401. Measure the verification error of the faulty current transformer in the metering device under test under different preset primary currents.
[0091] S402. Based on the transformer ratio of the faulty transformer, the preset primary current, and the verification error under the preset primary current, determine the target secondary current of the faulty transformer under different preset primary currents.
[0092] S403. Using the target secondary current of the faulty transformer under different preset primary currents as the basis for segmentation, the load current curve and the corresponding power curve during the time period to be refunded and compensated are divided into multiple segments.
[0093] Steps S401, S402, and S403 correspond one-to-one with the aforementioned steps S101, S102, and S103, and will not be repeated here.
[0094] S404. When the wiring method is three-phase four-wire, calculate the combined error of the metering device under test in different sections based on the verification error of the three current transformers in the metering device under test under different preset primary currents.
[0095] Specifically, the wiring configuration includes three-phase four-wire; each preset primary current corresponds to one section, and the current transformers include fault transformers and normal transformers. In the case of a three-phase four-wire wiring configuration, the metering device under test is equipped with three current transformers. The combined error of the three-phase four-wire metering device under test can be calculated using the second formula. To calculate, where e 1n% It is the combined error of a three-phase four-wire metering device under test in the section corresponding to n% of the rated current, given a preset primary current of n%. It refers to the ratio error of the first current transformer A in a three-phase four-wire metering device under test, where the primary current is preset to be n% of the rated current. It refers to the ratio error of the second current transformer B in a three-phase four-wire metering device under test, where the primary current is preset to be n% of the rated current. It is the ratio error of the third current transformer C in a three-phase four-wire metering device under test, where the primary current is preset to be n% of the rated current. This refers to the phase error of the first current transformer A in a three-phase four-wire metering device under test, given a preset primary current of n% of the rated current. This refers to the phase error of the second current transformer B in a three-phase four-wire metering device under test, where the primary current is preset to be n% of the rated current. It is the phase error of the third current transformer C in a three-phase four-wire metering device under test, where the primary current is preset to be n% of the rated current. It is the power factor angle. The calibration error of the faulty transformer (including ratio error and angle error), the calibration error of the normal transformer, and the second calculation formula of the power factor angle calculated in step S401 can be used to synthesize the error of the three-phase four-wire metering device under test in different sections. Among them, the calibration error of the normal transformer can be set to 0.
[0096] S405. When the wiring method is three-phase three-wire, calculate the combined error of the metering device under test in different sections based on the verification error of the two current transformers in the metering device under test under different preset primary currents.
[0097] The wiring configuration includes three-phase three-wire; each preset primary current corresponds to one section, and the current transformers include fault transformers and normal transformers. In the case of a three-phase three-wire wiring configuration, the metering device under test is equipped with two current transformers. The combined error of the three-phase three-wire metering device under test can be calculated using the third formula. To calculate, where e 2n% It is the combined error of a three-phase three-wire metering device under test in the section corresponding to n% of the rated current, given a preset primary current of n%. It refers to the ratio error of the fourth current transformer X in a three-phase three-wire metering device under the condition that the primary current is n% of the rated current. It is the ratio error of the fifth current transformer Y in a three-phase three-wire metering device under test, where the primary current is preset to be n% of the rated current. This refers to the phase error of the fourth current transformer X in a three-phase, three-wire metering device under test, given a preset primary current of n% of the rated current. It is the phase error of the fifth current transformer Y in a three-phase three-wire metering device under test, where the primary current is preset to be n% of the rated current. It is the power factor angle. The calibration error of the faulty transformer (including ratio error and angle error), the calibration error of the normal transformer, and the third calculation formula of the power factor angle calculated in step S401 can be used to synthesize the error of the three-phase three-wire metering device under test in different sections. Among them, the calibration error of the normal transformer can be set to 0.
[0098] S406. Determine the energy metering value for each segment based on the energy difference between the beginning and end of the unit curve in each segment of the energy curve.
[0099] Specifically, by subtracting the energy corresponding to the start time from the energy corresponding to the end time within a unit segment, the energy consumption corresponding to each unit curve can be obtained. Then, by summing the energy consumption corresponding to all unit curves within a segment, the energy metering value for each segment is obtained. For example, if a segment includes three unit curves with the beginning and end energies of w1 and w2, w3 and w4, and w5 and w6 respectively, then the corresponding energy consumptions for the three unit curves are w2-w1, w4-w3, and w6-w5, respectively. Therefore, the energy metering value for this segment is (w2-w1)+(w4-w3)+(w6-w5).
[0100] S407. Calculate the unit actual electricity consumption of the section based on the combined error of the metering device under test and the electricity metering value within the section.
[0101] Specifically, the energy metering value can be calculated based on the energy metering value of the metering device under test in each section calculated in step S406, combined with the composite error determined in step S404 or S405, and substituted into the fourth calculation formula. Among them, W 实n% W represents the actual electricity consumption of the section corresponding to n% of the rated current. 计n% e is the energy metering value of the section corresponding to n% of the rated current. n% The combined error of the metering device under test in the section corresponding to n% of the rated current can be equal to e depending on the wiring method. 1n% or e 2n% .
[0102] S408. Accumulate the actual electricity consumption of each segment within the time period to be refunded or compensated, and determine the total actual electricity consumption of the metering device to be measured within the time period to be refunded or compensated.
[0103] For example, if the preset primary current includes five test points: 1% of rated current, 5% of rated current, 20% of rated current, 100% of rated current, and 120% of rated current, then the corresponding load current curve and power curve can both be divided into... and The actual electricity consumption for each of these five sections is as follows (in W). 实1% W 实5% W 实20% W 实100% and W 实120% Then the total actual electricity consumption of the metering device under test during the period of waiting for refund or compensation can be equal to W. 实1% +W 实5% +W 实20% +W 实100% +W 实120% .
[0104] S409. Based on the paid electricity fees, electricity prices, and total actual electricity consumption, calculate the refund or supplementary electricity fees for the metering device under test during the period to be refunded or supplemented.
[0105] Specifically, based on the electricity price and the actual total electricity consumption, the user's actual electricity bill payable during the pending refund / refund period can be calculated. Combined with the customer's already paid electricity bill during the pending refund / refund period, the refund / refund amount for the meter under test during the pending refund / refund period can be calculated. For example, subtracting the actual paid electricity bill from the already paid electricity bill during the pending refund / refund period determines the amount to be refunded. A positive refund amount indicates a refund is required, while a negative refund amount indicates additional payment is required. The refund or additional payment amount is equal to the absolute value of the refund amount.
[0106] In the electricity fee refund method for current transformer metering inaccuracies provided in this embodiment, the calibration error of the faulty current transformer in the metering device under test is measured under different preset primary currents, thereby determining the target secondary current of the faulty current transformer under different preset primary currents. Using the target secondary current of the faulty current transformer under different preset primary currents as a segmentation basis, the load current curve and the corresponding energy curve are divided into multiple segments. Based on the wiring method of the metering device under test and the calibration error of the faulty current transformer under test under different preset primary currents, the combined error of the metering device under test in different segments is calculated. Based on the combined error of the metering device under test in different segments and the energy metering value, the refund fee for the metering device under test during the refund period is calculated. Accurate calculation of the refund fee is achieved based on the calibration error of the metering device under test and the actual metering data. The calculation of the refund period is divided according to the calibration error corresponding to different primary currents, improving the accuracy of electricity fee refund calculation.
[0107] The present invention also provides a device for refunding electricity fees due to current transformer metering inaccuracies. This device can be integrated into a controller or a central control chip and can execute any of the aforementioned methods for refunding electricity fees due to current transformer metering inaccuracies. Figure 5 This is a schematic diagram of the composition of an electricity bill refund device for current transformer metering inaccuracies provided in an embodiment of the present invention. Based on the aforementioned embodiments, and combined with... Figure 5The current transformer metering misalignment refund device 500 includes an error measurement module 501, a target secondary current determination module 502, a section division module 503, a composite error calculation module 504, and a refund / refund electricity fee calculation module 505. The error measurement module 501 measures the calibration error of the faulty current transformer in the metering device under test under different preset primary currents. The target secondary current determination module 502 determines the target secondary current of the faulty current transformer under different preset primary currents based on the transformer ratio, preset primary current, and calibration error under the preset primary current. The section division module 503 uses the target secondary current of the faulty current transformer under different preset primary currents as the dividing criterion to divide the load current curve and the corresponding energy curve into multiple sections. The composite error calculation module 504 calculates the composite error of the metering device under test in different sections based on the wiring method of the metering device under test and the calibration error of the faulty current transformer in the metering device under test under different preset primary currents. The electricity fee refund / refund calculation module 505 is used to calculate the electricity fee refund / refund for the metering device under test during the time period based on the combined error and electricity metering value of the metering device under test in different sections.
[0108] In the electricity fee refund device for current transformer metering inaccuracies provided in this embodiment, the calibration error of the faulty current transformer in the metering device under test is measured under different preset primary currents, thereby determining the target secondary current of the faulty current transformer under different preset primary currents. Using the target secondary current of the faulty current transformer under different preset primary currents as a segmentation basis, the load current curve and the corresponding energy curve are divided into multiple segments. Based on the wiring method of the metering device under test and the calibration error of the faulty current transformer under test under different preset primary currents, the combined error of the metering device under test in different segments is calculated. Based on the combined error of the metering device under test in different segments and the energy metering value, the refund fee for the metering device under test during the refund period is calculated. Accurate calculation of the refund fee is achieved based on the calibration error of the metering device under test and the actual metering data. The calculation of the refund period is divided according to the calibration error corresponding to different primary currents, improving the accuracy of electricity fee refund calculation.
[0109] Figure 6A schematic diagram of an electronic device that can be used to implement embodiments of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processors, cellular phones, smartphones, wearable devices (e.g., helmets, glasses, watches, etc.), and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely illustrative and are not intended to limit the implementation of the invention described and / or claimed herein.
[0110] like Figure 6 As shown, the electronic device 600 includes at least one processor 601 and a memory, such as a read-only memory (ROM) 602 or a random access memory (RAM) 603, communicatively connected to the at least one processor 601. The memory stores computer programs executable by the at least one processor. The processor 601 can perform various appropriate actions and processes based on the computer program stored in the ROM 602 or loaded into the RAM 603 from storage unit 608. The RAM 603 may also store various programs and data required for the operation of the electronic device 600. The processor 601, ROM 602, and RAM 603 are interconnected via a bus 604. An input / output (I / O) interface 605 is also connected to the bus 604.
[0111] Multiple components in electronic device 600 are connected to I / O interface 605, including: input unit 606, such as keyboard, mouse, etc.; output unit 607, such as various types of displays, speakers, etc.; storage unit 608, such as disk, optical disk, etc.; and communication unit 609, such as network card, modem, wireless transceiver, etc. Communication unit 609 allows electronic device 600 to exchange information / data with other devices through computer networks such as the Internet and / or various telecommunications networks.
[0112] Processor 601 can be a variety of general-purpose and / or special-purpose processing components with processing and computing capabilities. Some examples of processor 601 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special-purpose artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any suitable processor, controller, microcontroller, etc. Processor 601 performs the various methods and processes described above, such as the electricity bill refund method for current transformer metering inaccuracies.
[0113] In some embodiments, the method for refunding electricity charges for current transformer metering inaccuracies can be implemented as a computer program tangibly contained in a computer-readable storage medium, such as storage unit 608. In some embodiments, part or all of the computer program can be loaded and / or installed on electronic device 600 via ROM 602 and / or communication unit 609. When the computer program is loaded into RAM 603 and executed by processor 601, one or more steps of the method for refunding electricity charges for current transformer metering inaccuracies described above can be performed. Alternatively, in other embodiments, processor 601 can be configured to perform the method for refunding electricity charges for current transformer metering inaccuracies by any other suitable means (e.g., by means of firmware).
[0114] Various embodiments of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field-programmable gate arrays (FPGAs), application-specific integrated circuits (ASICs), application-specific standard products (ASSPs), systems-on-a-chip (SoCs), payload-programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various embodiments may include implementations in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which may be a dedicated or general-purpose programmable processor, capable of receiving data and instructions from a storage system, at least one input device, and at least one output device, and transmitting data and instructions to the storage system, the at least one input device, and the at least one output device.
[0115] Computer programs used to implement the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, such that when executed by the processor, the computer programs cause the functions / operations specified in the flowcharts and / or block diagrams to be performed. The computer programs may be executed entirely on a machine, partially on a machine, or as a standalone software package, partially on a machine and partially on a remote machine, or entirely on a remote machine or server.
[0116] In the context of this invention, a computer-readable storage medium can be a tangible medium that may contain or store a computer program for use by or in conjunction with an instruction execution system, apparatus, or device. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, apparatus, or devices, or any suitable combination thereof. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. More specific examples of machine-readable storage media include electrical connections based on one or more wires, portable computer disks, hard disks, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), optical fibers, portable compact disk read-only memory (CD-ROM), optical storage devices, magnetic storage devices, or any suitable combination thereof.
[0117] To provide interaction with a user, the systems and techniques described herein can be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user provides input to the electronic device. Other types of devices can also be used to provide interaction with the user; for example, feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including sound input, voice input, or tactile input).
[0118] The systems and technologies described herein can be implemented in computing systems that include backend components (e.g., as data servers), or computing systems that include middleware components (e.g., application servers), or computing systems that include frontend components (e.g., user computers with graphical user interfaces or web browsers through which users can interact with implementations of the systems and technologies described herein), or any combination of such backend, middleware, or frontend components. The components of the system can be interconnected via digital data communication of any form or medium (e.g., communication networks). Examples of communication networks include local area networks (LANs), wide area networks (WANs), blockchain networks, and the Internet.
[0119] A computing system can include clients and servers. Clients and servers are generally located far apart and typically interact through communication networks. The client-server relationship is created by computer programs running on the respective computers and having a client-server relationship with each other. The server can be a cloud server, also known as a cloud computing server or cloud host, which is a hosting product within the cloud computing service system to address the shortcomings of traditional physical hosts and VPS services, such as high management difficulty and weak business scalability.
[0120] It should be understood that the various forms of processes shown above can be used, with steps reordered, added, or deleted. For example, the steps described in this invention can be executed in parallel, sequentially, or in different orders, as long as the desired result of the technical solution of this invention can be achieved, and this is not limited herein.
[0121] The specific embodiments described above do not constitute a limitation on the scope of protection of this invention. Those skilled in the art should understand that various modifications, combinations, sub-combinations, and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of this invention should be included within the scope of protection of this invention.
Claims
1. A method for refunding electricity charges due to inaccurate metering by a current transformer, characterized in that, include: Determine the verification error of the faulty current transformer in the metering device under test under different preset primary currents. Based on the transformer ratio of the faulty transformer, the preset primary current, and the verification error under the preset primary current, the target secondary current of the faulty transformer under different preset primary currents is determined. Using the target secondary current of the fault transformer under different preset primary currents as the dividing criteria, the load current curve and the corresponding power curve during the time period to be refunded and compensated are divided into multiple segments. Based on the wiring method of the metering device under test and the verification error of the fault transformer in the metering device under test under different preset primary currents, calculate the combined error of the metering device under test in different sections. Based on the combined error and energy metering value of the metering device under test in different sections, calculate the refund / refund electricity fee for the metering device under test during the time period to be refunded / refunded.
2. The method according to claim 1, characterized in that, Before dividing the load current curve and corresponding power curve within the time period to be compensated into multiple segments by using the target secondary current of the fault transformer under different preset primary currents as the segmentation basis, the method further includes: The time period for cancellation or replacement is determined based on the time of the previous successful calibration or rotation of the measuring device under test.
3. The method according to claim 2, characterized in that, The step of determining the time period to be returned or supplemented based on the time of the previous calibration or rotation of the measuring device under test includes: The halfway point between the previous successful verification or the rotation time and the electricity fee refund / refund period is determined as the start time of the refund / refund period.
4. The method according to claim 1, characterized in that, Before dividing the load current curve and corresponding power curve within the time period to be compensated into multiple segments by using the target secondary current of the fault transformer under different preset primary currents as the segmentation basis, the method further includes: The time period to be refunded or compensated is determined based on the changing trend of the load current curve of the metering device under test.
5. The method according to claim 4, characterized in that, The step of determining the time period to be refunded or compensated based on the changing trend of the load current curve of the metering device under test includes: The start time of the compensation / refund period is determined based on the abrupt change point of the load current curve.
6. The method according to claim 1, characterized in that, The wiring method includes three-phase four-wire; The step of calculating the combined error of the metering device under test in different sections based on the wiring method of the metering device under test and the verification error of the faulty current transformer in the metering device under test under different preset primary currents includes: When the wiring method is three-phase four-wire, the combined error of the metering device under test in different sections is calculated based on the verification error of the three current transformers in the metering device under test under different preset primary currents. Each preset primary current corresponds to one section, and the current transformer includes a faulty transformer.
7. The method according to claim 1, characterized in that, The wiring method includes three-phase three-wire; The step of calculating the combined error of the metering device under test in different sections based on the wiring method of the metering device under test and the verification error of the faulty current transformer in the metering device under test under different preset primary currents includes: When the wiring method is three-phase three-wire, the combined error of the metering device under test in different sections is calculated based on the verification error of the two current transformers in the metering device under test under different preset primary currents. Each preset primary current corresponds to one section, and the current transformer includes a faulty transformer.
8. The method according to claim 1, characterized in that, The step of calculating the refund / refund electricity fee for the metering device under test during the specified time period based on the combined error and electricity metering value of the metering device under test in different sections includes: The energy metering value for each segment is determined based on the energy difference between the beginning and end of the unit curve in each segment of the energy curve. The actual unit electricity consumption of the section is calculated based on the combined error of the metering device under test in the section and the electricity metering value. The actual electricity consumption per unit in each segment within the time period to be refunded or compensated is summed to determine the total actual electricity consumption of the metering device to be measured within the time period to be refunded or compensated. Based on the paid electricity bills, electricity prices, and the total actual electricity consumption, calculate the refund / refund electricity fee for the metering device under test during the period to be refunded / refunded.
9. A device for refunding electricity fees due to inaccurate metering by a current transformer, characterized in that, include: The error measurement module is used to measure the verification error of the faulty current transformer in the metering device under test under different preset primary currents. The target secondary current determination module is used to determine the target secondary current of the faulty transformer under different preset primary currents based on the transformer ratio of the faulty transformer, the preset primary current, and the verification error under the preset primary current. The segmentation module is used to divide the load current curve and the corresponding power curve in the time period to be returned and compensated into multiple segments based on the target secondary current of the fault transformer under different preset primary currents. The composite error calculation module is used to calculate the composite error of the metering device under test in different sections based on the wiring method of the metering device under test and the verification error of the fault transformer in the metering device under test under different preset primary currents. The electricity fee refund / refund calculation module is used to calculate the electricity fee refund / refund for the metering device under test during the time period based on the combined error and electricity metering value of the metering device under test in different sections.
10. An electronic device, characterized in that, The electronic device includes: At least one processor; and A memory communicatively connected to the at least one processor; wherein, The memory stores a computer program that can be executed by the at least one processor, the computer program being executed by the at least one processor to enable the at least one processor to perform the electricity fee refund method for current transformer metering inaccuracies as described in any one of claims 1-8.
Citation Information
Patent Citations
Electric energy metering device overall error detecting method, device and system
CN106338706A
Power device including current transformer and method for compensating of current transformer
EP2881955A1