A method for developing a gas field with coexisting carbon and hydrocarbon resources

By extracting and injecting CO2 nearby in the gas field, the problem of high development costs caused by long-distance transportation of CO2 is solved, the recovery rate of hydrocarbon gas is increased and carbon emissions are reduced, and the purpose of collaborative green development of hydrocarbon resources is achieved.

CN117868758BActive Publication Date: 2024-10-18CHINA NAT OFFSHORE OIL CORP +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311787635.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-22
Publication Date
2024-10-18
Estimated Expiration
2043-12-22

AI Technical Summary

Technical Problem

In the existing technology, CO2 needs to be transported to natural gas reservoirs over long distances, resulting in high costs for hydrocarbon gas development and difficulty in supporting economic operations.

Method used

By extracting CO2 nearby in the gas field and injecting it into the natural gas reservoir for independent carbon neutralization, the cost of carbon capture is reduced, the cost of long-distance transportation of CO2 is eliminated, and hydrocarbon gas recovery is maximized and carbon emissions are minimized.

Benefits of technology

It effectively improves hydrocarbon gas recovery, avoids an increase in carbon emissions, and achieves collaborative green development of hydrocarbon resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117868758B_ABST
    Figure CN117868758B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of gas field development, and more specifically, to a method for developing a gas field with coexisting carbon and hydrocarbon resources, which comprises the following steps: Step 1: determining a developed area of ​​a carbon-rich gas reservoir, an undeveloped area of ​​a carbon-rich gas reservoir, and a gas injection target area of ​​a hydrocarbon-rich gas reservoir. Step 2: using a drilled well in the developed area of ​​a carbon-rich gas reservoir as a first gas production well; deploying or not deploying a second gas production well in the undeveloped area of ​​the carbon-rich gas reservoir; using a drilled well in the gas injection target area of ​​a hydrocarbon-rich gas reservoir as a third gas production well, and deploying a gas injection well. Step 3: setting a decarbonization device; extracting the gas in the first gas production well and / or the second gas production well to the decarbonization device for decarbonization treatment. Step 4: injecting the high-concentration CO2 gas obtained by the decarbonization treatment into a gas injection well. The present invention can improve the hydrocarbon gas recovery rate, reduce the carbon capture cost and the long-distance transmission cost, and achieve the purpose of coordinated green development of carbon and hydrocarbon resources by extracting CO2 from the carbon-rich gas reservoir in the gas field and injecting it back into the hydrocarbon-rich gas reservoir for on-site autonomous carbon neutralization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of gas field development, and more specifically, to a method for developing a gas field with coexisting carbon and hydrocarbon resources. Background Art

[0002] Natural gas refers to a mixture of hydrocarbons and non-hydrocarbon gases naturally stored in the strata. Natural gas reservoirs refer to strata or rock structures that store abundant natural gas underground, which are important sources of hydrocarbon gas. A gas field is an area containing multiple natural gas reservoirs. As the gas reservoirs are continuously mined, the formation pressure decreases, and the gas reservoir production capacity will gradually decrease. When the formation pressure decays to the abandoned pressure of the gas reservoir, the hydrocarbon gas recovery rate is about 20% to 90%, and 10% to 80% of the hydrocarbon gas will remain underground and not be extracted.

[0003] One of the methods to improve the recovery rate of hydrocarbon gas is the CO2 flooding method, which increases the recovery rate of hydrocarbon gas by injecting CO2 into natural gas reservoirs. On the one hand, injecting CO2 gas into natural gas reservoirs can increase the energy of the formation, drive out the remaining hydrocarbon gas in the formation, inhibit water invasion of gas reservoirs, reduce wellbore liquid accumulation, and ultimately improve the recovery rate of hydrocarbon gas; on the other hand, natural gas reservoirs have good structural integrity and closure, and the injection of CO2 for storage is highly safe, and there is a great potential for injection and storage in depleted developed gas reservoirs, which can achieve effective carbon storage, thereby reducing CO2 emissions in the atmosphere.

[0004] In the prior art, the CO2 injected into the natural gas reservoir is mainly the product obtained by treating the waste gas from coal-fired power plants or chemical plants, which needs to be transported to the natural gas reservoir over a long distance. Therefore, the equipment cost, transportation cost and labor cost generated by this method are relatively high, which is difficult to support the economic operation of the development technology. Summary of the invention

[0005] In response to the problem in the above-mentioned prior art that CO2 needs to be transported to natural gas reservoirs over long distances, resulting in high costs for hydrocarbon gas development, the present invention provides a development method for gas fields where carbon and hydrocarbon resources coexist. This method does not require long-distance transportation of CO2 gas. By extracting CO2 nearby and injecting it into natural gas reservoirs nearby for autonomous carbon neutralization, it can not only reduce carbon capture costs and save the cost of transporting CO2 over long distances, but also maximize hydrocarbon gas recovery and minimize carbon emissions, thereby achieving the goal of coordinated green development of carbon and hydrocarbon resources.

[0006] In order to solve the above technical problems, the technical solution provided by the present invention is:

[0007] A method for developing a gas field with coexisting carbon and hydrocarbon resources comprises the following steps:

[0008] Step 1: Determine the developed area of ​​carbon-rich gas reservoirs, the undeveloped area of ​​carbon-rich gas reservoirs and the target area for gas injection of hydrocarbon-rich gas reservoirs in the gas field. The carbon-rich gas reservoir refers to a formation with a CO2 molar content greater than 50%. The developed area refers to an area that has been used to extract hydrocarbon gas. These areas have deployed multiple gas wells, but some gas is restricted from being extracted due to carbon emission restrictions. The undeveloped area refers to an area that has not been mined and can be used to deploy new gas wells. The hydrocarbon-rich gas reservoir refers to a formation with a relatively high molar content of hydrocarbon gas, and the gas reservoir has been developed to the middle and late stages, the formation pressure coefficient has dropped below 0.6, and has entered a stage of declining production.

[0009] Step 2: Use the drilled wells in the developed area of ​​the carbon-rich gas reservoir as the first gas production well; deploy or not deploy the second gas production well in the undeveloped area of ​​the carbon-rich gas reservoir according to actual needs; use the drilled wells in the gas injection target area of ​​the hydrocarbon-rich gas reservoir as the third gas production well, and deploy gas injection wells in the gas injection target area of ​​the hydrocarbon-rich gas reservoir. Among them, it is necessary to combine the production capacity of the first gas production well in the developed area of ​​the carbon-rich gas reservoir, the carbon resource content and production capacity of the undeveloped area of ​​the carbon-rich gas reservoir, and the high-concentration CO2 demand during the gas injection process in the gas injection target area of ​​the hydrocarbon-rich gas reservoir to determine the production allocation of the first gas production well in the developed area of ​​the carbon-rich gas reservoir, whether to drill a new second gas production well, how many second gas production wells to drill, and how to allocate production, so as to achieve a balance between injection and production of carbon resources and the rational use and exploitation of carbon-rich gas reservoirs.

[0010] Step three: Decarbonization equipment is installed on the gas field; the gas in the first gas production well and / or the second gas production well is produced to the decarbonization equipment for decarbonization treatment to obtain high hydrocarbon gas and high concentration CO2 gas. In this step, it is selected according to actual needs to produce only the gas from the first gas production well, only the gas from the second gas production well, or the gas from the first gas production well and the second gas production well at the same time. It can be understood that, affected by the molar content of CO2 in the produced gas and the decarbonization capacity of the decarbonization equipment, the high concentration CO2 gas obtained after decarbonization treatment is a gas mixed with a small amount of hydrocarbon gas and a large amount of CO2.

[0011] Step 4: pressurize the high-concentration CO2 gas, and inject the pressurized high-concentration CO2 gas into each of the gas injection wells and into the hydrocarbon-rich gas reservoir using a gas injection pipeline, displacing the gas in the high-hydrocarbon gas reservoir to the third gas production well and being produced.

[0012] In the above technical solution, the gas in the first gas production well and / or the second gas production well is produced to the decarbonization equipment for decarbonization treatment, thereby separating high-concentration CO2 gas and high-hydrocarbon gas, and then injecting the separated high-concentration CO2 gas into the hydrocarbon-rich gas reservoir. Not only can the gas in the carbon-rich gas reservoir that is limited by carbon emissions be released, but the CO2 in these gases can also be injected into the nearby hydrocarbon-rich gas reservoir for autonomous carbon neutralization, without the need to transport CO2 gas from a distance to the hydrocarbon-rich gas reservoir, thereby greatly reducing the cost of hydrocarbon gas production.

[0013] Preferably, in step 1, an area where the hydrocarbon gas molar content in the reservoir natural gas is above 50% and there is no serious water seepage is selected as the target area for gas injection in the hydrocarbon-rich gas reservoir. Deploying gas injection wells in areas where the hydrocarbon gas molar content in the reservoir natural gas is above 50% can enable the injected gas to displace more hydrocarbon gas, thereby obtaining higher returns. Deploying gas injection wells in areas where there is no water seepage or the water seepage is not serious can avoid the adverse effect of large amounts of water produced by gas production wells on the gas injection effect.

[0014] Preferably, in step 2, the gas injection wells are deployed in areas where the residual gas abundance is greater than 200 million cubic meters per square kilometer. The gas in these areas is relatively rich and can be collected more, so the recovery efficiency is higher.

[0015] Preferably, in step 2, when the number of the hydrocarbon-rich gas reservoir gas injection target areas is greater than 1 and the gas-bearing areas of at least two of the hydrocarbon-rich gas reservoir gas injection target areas overlap, at least one combined injection gas well is deployed in the gas-bearing surface overlap area of ​​the hydrocarbon-rich gas reservoir gas injection target areas according to the actual gas injection volume demand. The gas-bearing area overlap area refers to the area where the gas-bearing range of the formation where two or more hydrocarbon-rich gas reservoir gas injection target areas are located overlaps up and down. The combined injection gas well can simultaneously pass through the formation where two or more hydrocarbon-rich gas reservoir gas injection target areas are located and simultaneously inject high-concentration CO2 into these hydrocarbon-rich gas reservoir gas injection target areas. The number of combined injection gas wells can be determined according to the actual gas injection demand.

[0016] Preferably, in step 3, when the amount of high-concentration CO2 gas obtained by decarbonization of the decarbonization equipment is less than the amount of high-concentration CO2 gas required by the target area for gas injection of the hydrocarbon-rich gas reservoir, the gas production rate of the first gas production well is increased until the injection amount and production amount of high-concentration CO2 are balanced. This can not only significantly release the hydrocarbon gas in the developed area of ​​the carbon-rich gas reservoir, but also ensure that there is enough CO2 injected into the target area for gas injection of the hydrocarbon-rich gas reservoir.

[0017] Preferably, in step four, the gas produced from the third gas well is transported to the decarbonization equipment for decarbonization treatment to obtain the high-hydrocarbon gas and the high-concentration CO2 gas; the high-hydrocarbon gas is then transported to a land terminal, and the obtained high-concentration CO2 gas is injected into the gas injection well as a gas injection source, thereby ensuring low emissions of the produced CO2.

[0018] In order to reduce the decarbonization burden of the decarbonization equipment and improve the recovery efficiency of high-hydrocarbon gas, preferably, in step four, when the CO2 molar content of the gas produced from the third gas well is less than 30%, these gases with CO2 molar content less than 30% are directly transported to the land terminal for processing and sales via an external transmission pipeline; when the CO2 molar content of the mixed gas produced from the third gas well is greater than or equal to 30%, these gases with CO2 molar content greater than or equal to 30% are transported to the decarbonization equipment for decarbonization treatment, and the obtained high-concentration CO2 gas is used for injection into the gas injection well.

[0019] Among them, the decarbonization treatment method can select membrane separation method or amine absorption method according to the decarbonization scale, CO2 concentration requirements and economy. Due to the large scale of gas injection, it is preferred that in step three, the decarbonization method of the mixed gas is membrane separation method. The membrane separation method can achieve a higher separation efficiency, and the amount of waste generated during the separation process is less, and the impact on the environment is less. In addition, the equipment structure required for the membrane separation method is relatively simple, and the footprint is small, which is conducive to reducing investment costs.

[0020] Preferably, in step 4, the process of injecting the high-concentration CO2 gas into the gas injection well includes an energy replenishment stage, a pressure stabilization stage, and an injection reduction stage. The injection-production ratio in the energy replenishment stage is greater than 2, so as to quickly replenish energy for the hydrocarbon-rich gas reservoir with a low pressure coefficient; when the formation pressure coefficient of the hydrocarbon-rich gas reservoir increases to a certain level, the pressure stabilization stage is entered; the injection-production ratio in the pressure stabilization stage is between 0.9 and 1.1, at which time the injection and production are basically balanced; when the CO2 molar content of the produced gas from the third gas production well increases to 80%, reducing the injection amount can reduce the cost caused by the ineffective injection of CO2 that produces high-concentration CO2 gas. It can be understood that the injection-production ratio refers to the ratio of the volume of high-concentration CO2 gas injected into the hydrocarbon-rich gas reservoir in the gas injection well under ground conditions to the volume of gas collected from the hydrocarbon-rich gas reservoir.

[0021] Preferably, in step 4, the energy replenishment stage, the pressure stabilization stage and the injection reduction stage are firstly numerically simulated to determine the injection value of the gas injection well and the production allocation coefficient of the third gas production well in the energy replenishment stage, the pressure stabilization stage and the injection reduction stage, and then the high-concentration CO2 gas is injected into the gas injection well according to the determined injection value, and the third gas production well is allocated production according to the determined production allocation coefficient multiplied by the value of the unobstructed flow rate. Numerical simulation of oil and gas reservoirs is to model and simulate the geological, physical and fluid dynamic processes of oil and gas reservoirs through mathematical methods and computer technology to predict the development effect of oil and gas reservoirs and optimize the development plan. After the numerical simulation of oil and gas reservoirs, the reasonable injection value and production allocation coefficient of the energy replenishment stage, the pressure stabilization stage and the injection reduction stage are determined, which can effectively improve the recovery rate, reduce resource waste and extend the production life of the gas field.

[0022] Preferably, in step 4, the molar content of CO2 in the high-concentration CO2 gas is greater than 90%. It is understandable that the lower the CO2 content in the high-concentration CO2 gas, the higher the hydrocarbon gas content in the high-concentration CO2 gas, and the more hydrocarbon gas injected into the injection well together with CO2. When the hydrocarbon gas injected into the injection well increases, the net production obtained by subtracting the amount of hydrocarbon gas injected into the injection well from the amount of hydrocarbon gas produced by the third gas production well will decrease. Therefore, the molar content of CO2 in the high-concentration CO2 gas needs to be greater than 90% to ensure a higher net production of hydrocarbon gas.

[0023] The beneficial effects of the present invention are as follows: by exploiting the CO2 from the carbon-rich gas reservoirs inside the gas field and injecting the CO2 back into the hydrocarbon-rich gas reservoirs for on-site autonomous carbon neutralization, not only can the hydrocarbon gas recovery rate of the hydrocarbon-rich gas reservoirs be effectively improved, but the hydrocarbon gas in the carbon-rich gas reservoirs can also be released while avoiding increasing carbon emissions. It can also save the cost of transporting CO2 over long distances, thereby maximizing hydrocarbon gas recovery and minimizing carbon emissions, and achieving the goal of coordinated green development of carbon and hydrocarbon resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a flow chart of a method for developing a gas field with coexisting carbon and hydrocarbon resources;

[0025] Figure 2 is a graph showing the relationship between formation pressure and time during the three gas injection stages. DETAILED DESCRIPTION

[0026] The technical solution of the present invention is further described in detail below through specific embodiments and in conjunction with the accompanying drawings:

[0027] Example 1

[0028] Take a gas field in the South my country Sea as an example. This gas field is a gas field with coexisting carbon and hydrocarbon resources, that is, a gas field with both carbon-rich gas reservoirs and hydrocarbon-rich gas reservoirs. This gas field belongs to gravity flow submarine fan deposits, which is a lithological and structural lithological gas reservoir. It is mainly elastic drive, and there is weak edge bottom water drive in some well areas. The physical properties are mainly medium porosity and medium permeability, and some well areas are medium porosity and low permeability. The formation temperature is about 81°C, the formation pressure is about 14MPa, and the pressure coefficient is between 1.01 and 1.08; the distribution of carbon and hydrocarbon components is complex, and the overall trend is high carbon in the north and high hydrocarbon in the south. The hydrocarbon content is 25% to 84%, with the characteristics of large reservoir area, low reserve abundance, medium production capacity, connectivity and complex component distribution. Since production, the average gas production rate of the gas field is about 3%, and the current production degree of each well area is only 26% to 68%. The predicted exhaustion development recovery rate is 34% to 80%, and there is still a large amount of residual hydrocarbon gas that has not been produced.

[0029] During the production process, due to the requirements of downstream components and the limitation of decarbonization capacity, carbon-rich gas reservoirs have been in a state of limited production, with high wellhead pressure, reservoir pressure coefficient of 0.51-0.91 and strong production capacity. However, the wellhead pressure of hydrocarbon-rich gas reservoirs is close to the manifold pressure, the reservoir pressure coefficient is 0.29-0.58, and the production capacity has dropped significantly. It is urgent to inject CO2 gas to increase the hydrocarbon gas recovery rate.

[0030] like Figure 1 As shown, this embodiment takes the above-mentioned gas field as the development object and introduces a development method for a gas field with coexisting carbon and hydrocarbon resources, which includes the following steps:

[0031] Step 1: Determine 2 developed areas of carbon-rich gas reservoirs, 2 undeveloped areas of carbon-rich gas reservoirs and 4 gas injection target areas of hydrocarbon-rich gas reservoirs in the above-mentioned gas fields; carbon-rich gas reservoirs refer to formations with a CO2 molar content greater than 50%; developed areas refer to areas that have been used to extract hydrocarbon gas, and these areas have deployed multiple gas wells, but some gases have not been extracted due to carbon emission restrictions; undeveloped areas refer to areas that have not been mined and can be used to deploy new gas wells; hydrocarbon-rich gas reservoirs refer to formations with a relatively high hydrocarbon gas molar content, and the gas reservoirs have been developed to the middle and late stages, with the formation pressure coefficient dropping below 0.6 and entering a stage of declining production.

[0032] Step 2: Use the drilled wells in the developed area of ​​the carbon-rich gas reservoir as the first gas production well; choose to deploy or not deploy the second gas production well in the undeveloped area of ​​the carbon-rich gas reservoir according to actual needs; use the drilled wells in the gas injection target area of ​​the hydrocarbon-rich gas reservoir as the third gas production well, and deploy gas injection wells in the gas injection target area of ​​the hydrocarbon-rich gas reservoir. Among them, combined with the production capacity of the first gas production well in the developed area of ​​the carbon-rich gas reservoir, the carbon resource content and production capacity of the undeveloped area of ​​the carbon-rich gas reservoir, and the CO2 demand during the gas injection process in the gas injection target area of ​​the hydrocarbon-rich gas reservoir, determine the production allocation of the first gas production well in the developed area of ​​the carbon-rich gas reservoir, whether to drill a new second gas production well, how many second gas production wells to drill, and how to allocate production, so as to achieve the injection and production balance of carbon resources and the reasonable use and exploitation of carbon-rich gas reservoirs. In this step, it is selected to deploy the second gas production well in each undeveloped area of ​​the carbon-rich gas reservoir to fully release hydrocarbon gas and meet the CO2 injection demand.

[0033] Step 3: Decarbonization equipment is installed on the gas field; the gas in the first gas production well and the second gas production well is produced together by the gas pipeline to the decarbonization equipment for decarbonization treatment, thereby obtaining high-hydrocarbon gas and high-concentration CO2 gas. It can be understood that, affected by the molar content of CO2 in the produced gas and the decarbonization capacity of the decarbonization equipment, the high-concentration CO2 gas obtained after decarbonization treatment is a gas mixed with a small amount of hydrocarbon gas and a large amount of CO2.

[0034] Step 4: Use the boosting equipment to pressurize the high-concentration CO2 gas to 8MPa, and then inject the pressurized high-concentration CO2 gas into each gas injection well through the gas injection pipeline and the wellbore of the gas injection well, so that the gas in the hydrocarbon-rich gas reservoir is driven to the third gas production well and produced; at the same time, use the boosting equipment to pressurize the high-hydrocarbon gas, and then transport the high-hydrocarbon gas to the land terminal for processing and sales.

[0035] Specifically, in step 4, when the CO2 molar content of the gas produced by the third gas production well is less than 30%, the gas with a CO2 molar content of less than 30% is directly transported to the land terminal by using an external transmission pipeline; when the CO2 molar content of the mixed gas produced by the third gas production well is greater than or equal to 30%, the gas with a CO2 molar content greater than or equal to 30% is transported to the decarbonization equipment for decarbonization treatment and used for injection into the gas injection well. This realizes the recycling of CO2 and ensures low emissions of the produced CO2.

[0036] The beneficial effects of this embodiment are as follows: by exploiting the CO2 in the carbon-rich gas reservoir inside the gas field and injecting the CO2 back into the hydrocarbon-rich gas reservoir for on-site utilization, not only can the hydrocarbon gas recovery rate in the hydrocarbon-rich gas reservoir be effectively improved, but the hydrocarbon gas in the carbon-rich gas reservoir can also be released, while avoiding increasing carbon emissions and saving the cost of transporting CO2 over long distances, thereby maximizing hydrocarbon gas recovery and minimizing carbon emissions, and achieving the goal of coordinated green development of carbon and hydrocarbon resources.

[0037] Example 2

[0038] This embodiment further illustrates step 1 to step 3 based on embodiment 1.

[0039] Furthermore, in step 1, the area with a hydrocarbon gas molar content of more than 50% in the reservoir natural gas and no serious water breakthrough is selected as the target area for gas injection in the hydrocarbon-rich gas reservoir. Deploying gas injection wells in the area with a hydrocarbon gas molar content of more than 50% in the reservoir natural gas can enable the injected gas to displace more hydrocarbon gas, thereby obtaining higher returns. Deploying gas injection wells in areas where no water breakthrough or water breakthrough is not serious can avoid the adverse effects of large amounts of water produced by gas production wells on the gas injection effect.

[0040] In addition, the gas injection wells in the target area of ​​gas injection in hydrocarbon-rich gas reservoirs are selected and deployed in relatively low-lying areas of the structure with good connectivity between the injection and production wells and weak reservoir heterogeneity. On the one hand, good connectivity between the injection and production wells can enable the gas injected by the injection well to effectively displace the hydrocarbon gas to the corresponding production well and be produced, ensuring a good effective relationship between the injection and production; on the other hand, weak reservoir heterogeneity can reduce the gas channeling caused by the injection gas flowing along the high permeability channel and improve the utilization rate of the injected gas; in addition, since the injected high-concentration CO2 gas has a higher density than the high hydrocarbon gas in the reservoir, the high-concentration CO2 gas injected in the relatively low-lying area of ​​the structure can be enriched in the relatively low-lying area of ​​the structure, displacing the high hydrocarbon gas in the reservoir more evenly, which is conducive to improving the hydrocarbon gas recovery rate.

[0041] Furthermore, in step 2, the gas injection wells are deployed in areas where the residual gas abundance is greater than 200 million cubic meters per square kilometer. The gas in these areas is relatively rich and can be collected more, so the recovery efficiency is higher.

[0042] Furthermore, in step 2, if the gas-bearing areas of the two hydrocarbon-rich gas reservoir injection target areas overlap, two combined injection wells are selected to be deployed in the overlapping area of ​​the gas-bearing areas of the hydrocarbon-rich gas reservoir injection target areas. The overlapping area of ​​the gas-bearing area refers to the area where the gas-bearing range of the formation where the two hydrocarbon-rich gas reservoir injection target areas are located overlaps up and down. Although the combined injection well can pass through the formation where the two hydrocarbon-rich gas reservoir injection target areas are located at the same time and inject high-concentration CO2 into the two hydrocarbon-rich gas reservoir injection target areas at the same time, the number of combined injection wells needs to be determined based on the injection-production effect relationship and the gas injection demand.

[0043] Furthermore, in step 3, the gas production rates of the developed areas of the two carbon-rich gas reservoirs are 2.0% and 1.8% respectively. According to the high-concentration CO2 required to be injected into the hydrocarbon-rich gas injection target area and the gas production capacity of the undeveloped area of ​​the carbon-rich gas reservoir, when the amount of high-concentration CO2 gas obtained by the decarbonization equipment is less than the amount of high-concentration CO2 gas required by the hydrocarbon-rich gas injection target area, the gas production rates of the developed areas of the two carbon-rich gas reservoirs are increased to 3.5% and 4.2% respectively. This can not only significantly release the hydrocarbon gas in the developed areas of the carbon-rich gas reservoirs, but also ensure that there is enough high-concentration CO2 gas injected into the hydrocarbon-rich gas injection target area. It is estimated that the hydrocarbon gas production can be increased by 590 million cubic meters in the first five years.

[0044] Furthermore, due to the large scale of gas injection, in step 3, the decarbonization method of the decarbonization equipment is membrane separation. The membrane separation method can achieve a higher separation efficiency, and the amount of waste generated during the separation process is less, and the impact on the environment is less. In addition, the equipment structure required by the membrane separation method is relatively simple, and the floor space is small, which is conducive to reducing investment costs.

[0045] The other features, working principles and beneficial effects of this embodiment are consistent with those of Embodiment 1.

[0046] Example 3

[0047] This embodiment further illustrates step 4 based on embodiment 2.

[0048] like Figure 2 As shown, in step 4, the process of injecting high-concentration CO2 gas into the gas injection well includes an energy replenishment stage, a pressure stabilization stage, and an injection reduction stage. The injection-production ratio in the energy replenishment stage is greater than 2, so that the hydrocarbon-rich gas reservoir with a low pressure coefficient can be quickly replenished; when the formation pressure coefficient of the hydrocarbon-rich gas reservoir increases to a certain level, it enters the pressure stabilization stage; the injection-production ratio in the pressure stabilization stage is between 0.9 and 1.1, at which time the injection and production are basically balanced; when the CO2 molar content of high-concentration CO2 is reduced to 80%, reducing the injection volume can reduce the cost caused by the ineffective injection of CO2 of high-concentration CO2 gas. It can be understood that the injection-production ratio refers to the ratio of the volume of high-concentration CO2 gas injected into the hydrocarbon-rich gas reservoir in the gas injection well under ground conditions to the volume of gas produced from the hydrocarbon-rich gas reservoir.

[0049] Furthermore, in step 4, the numerical simulation of the oil and gas reservoir is first performed on the energy replenishment stage, the pressure stabilization stage and the injection reduction stage, so as to determine the injection value of the gas injection well and the production allocation coefficient of the third gas production well in the energy replenishment stage, the pressure stabilization stage and the injection reduction stage, and then the high-concentration CO2 gas is injected into the gas injection well according to the determined injection value, and the third gas production well is allocated according to the determined production allocation coefficient multiplied by the value of the open flow rate. Numerical simulation of oil and gas reservoirs is to model and simulate the geological, physical and fluid dynamic processes of oil and gas reservoirs through mathematical methods and computer technology to predict the development effect of oil and gas reservoirs and optimize the development plan. After the numerical simulation of oil and gas reservoirs, the reasonable injection value and production allocation coefficient of the energy replenishment stage, the pressure stabilization stage and the injection reduction stage are determined, which can effectively improve the recovery rate, reduce resource waste, and extend the production life of the gas field.

[0050] Specifically, the numerical simulation of oil and gas reservoirs was used to simulate the hydrocarbon gas production increase effect under different injection and production coefficients in the above three stages. The injection volume in the energy replenishment stage was optimized to be 2.5 million cubic meters / day, the production coefficient was 0.4, and the injection time was calculated based on 3 years; the injection volume in the pressure stabilization stage (13 years) was 2 million cubic meters / day, the production coefficient was 0.4, and the injection time was calculated based on 13 years; the injection volume in the reduction stage was 1 million cubic meters / day, the production coefficient was 0.4, and the injection time was calculated based on 7 years. According to the results of the numerical simulation of oil and gas reservoirs, the cumulative increase in hydrocarbon gas production is 1.974 billion cubic meters.

[0051] Further, in step 4, the molar content of CO2 in the high-concentration CO2 gas is greater than 90%. It is understandable that the lower the CO2 content in the high-concentration CO2 gas, the higher the hydrocarbon gas content in the high-concentration CO2 gas, and the more hydrocarbon gas injected into the gas reservoir through the gas injection well together with CO2. When the hydrocarbon gas injected into the gas reservoir increases, the net production of hydrocarbon gas obtained by subtracting the amount of hydrocarbon gas injected into the injection well from the amount of hydrocarbon gas produced by the third gas production well will decrease. Therefore, the molar content of CO2 in the high-concentration CO2 gas needs to be greater than 90% to ensure a higher net production of hydrocarbon gas in the gas injection well.

[0052] The other features, working principles and beneficial effects of this embodiment are consistent with those of Embodiment 2.

[0053] Obviously, the above embodiments of the present invention are merely examples for clearly explaining the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description, and it is not necessary and impossible to list all the implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.

Claims

1. A method for developing a gas field with coexisting hydrocarbon resources. It is characterized in that The following steps are involved: Step 1: Determine the developed area of ​​carbon-rich gas reservoirs, the undeveloped area of ​​carbon-rich gas reservoirs and the gas injection target area of ​​hydrocarbon-rich gas reservoirs in the gas field; Step 2: using the drilled wells in the developed area of ​​the carbon-rich gas reservoir as the first gas production well; deploying or not deploying the second gas production well in the undeveloped area of ​​the carbon-rich gas reservoir according to actual needs; using the drilled wells in the gas injection target area of ​​the hydrocarbon-rich gas reservoir as the third gas production well, and deploying gas injection wells in the gas injection target area of ​​the hydrocarbon-rich gas reservoir; Step 3: Install decarbonization equipment on the gas field; extract the gas in the first gas production well and / or the second gas production well to the decarbonization equipment for decarbonization treatment to obtain high hydrocarbon gas and high concentration CO 2 gas; Step 4: The high concentration CO 2 The gas is pressurized, and the pressurized high-concentration CO is injected into the gas pipeline. 2 The gas is injected into each of the gas injection wells and enters the hydrocarbon-rich gas reservoir, displacing the gas in the hydrocarbon-rich gas reservoir to the third gas production well and being produced; In step 4, the high concentration CO 2 The process of injecting gas into the target area of ​​the hydrocarbon-rich gas reservoir includes an energy replenishment stage, a pressure stabilization stage and an injection reduction stage, wherein the injection-production ratio in the energy replenishment stage is greater than 2, the injection-production ratio in the pressure stabilization stage is between 0.9 and 1.1, and the injection-production ratio in the injection reduction stage is between 0.4 and 0.6; In the step 4, the oil and gas reservoir numerical simulation is first performed on the energy replenishment stage, the pressure stabilization stage and the injection reduction stage, so as to determine the injection value of the gas injection well and the production allocation coefficient of the third gas production well in the energy replenishment stage, the pressure stabilization stage and the injection reduction stage, and then the high concentration CO is injected into the gas production well according to the determined injection value. 2 The gas is injected into the gas injection well, and the production of the third gas production well is allocated according to the value of the determined production allocation coefficient multiplied by the open flow rate.

2. The method for developing a gas field containing coexisting hydrocarbon resources according to claim 1, It is characterized in that In the step 1, an area where the hydrocarbon gas molar content in the reservoir natural gas is above 50% and there is no serious water breakthrough is selected as the gas injection target area of ​​the hydrocarbon-rich gas reservoir.

3. The method for developing a gas field containing coexisting hydrocarbon resources according to claim 1, It is characterized in that In the step 2, the gas injection well is deployed in an area where the residual gas abundance is greater than 200 million cubic meters per square kilometer.

4. The method for developing a gas field containing coexisting hydrocarbon resources according to claim 1, It is characterized in that In the step 2, when the number of the hydrocarbon-rich gas reservoir gas injection target areas is greater than 1 and the gas-bearing surfaces of at least two of the hydrocarbon-rich gas reservoir gas injection target areas overlap, at least one combined gas injection well is deployed in the overlapping area of ​​the gas-bearing surfaces of the hydrocarbon-rich gas reservoir gas injection target areas according to the actual gas injection volume demand.

5. The method for developing a gas field with coexisting hydrocarbon resources according to claim 1, It is characterized in that In step 3, when the decarbonization equipment decarbonizes the high concentration CO 2 The amount of gas is less than the high concentration CO required for the injection target area of ​​the hydrocarbon-rich gas reservoir. 2 When the gas volume is high, the gas production rate of the first gas production well is increased to a high concentration of CO 2 The injection volume and production volume are balanced.

6. The method for developing a gas field with coexisting carbon and hydrocarbon resources according to claim 1, It is characterized in that In the fourth step, the gas produced from the third gas production well is transported to the decarbonization equipment for decarbonization treatment to obtain the high hydrocarbon gas and the high concentration CO 2 gas; and then transporting the high hydrocarbon gas to a land terminal, and at the same time 2 Gas is injected into the gas injection well as a gas injection source.

7. The method for developing a gas field containing coexisting hydrocarbon resources according to claim 6, It is characterized in that In step 4, when the CO 2 When the molar content is less than 30%, the CO 2 The gas with a molar content of less than 30% is directly transported to the land terminal; when the CO 2 When the molar content is greater than or equal to 30%, these CO 2 The gas with a molar content greater than or equal to 30% is transported to the decarbonization equipment for decarbonization treatment and is used for injection into the gas injection well.

8. A method for developing a gas field containing coexisting hydrocarbon resources according to any one of claims 1 to 7, It is characterized in that In step 4, the high concentration CO 2 CO 2 The molar content is greater than 90%.

Citation Information

Patent Citations

  • Method for building sleeve perforating manmade natural gas migration channels between gas pools

    CN102900401A

  • Method for integrating natural gas recovery efficiency increasing through CO2 waste gas reinjection with CO2 geological storage

    CN103590795A